Anda di halaman 1dari 4

CHAPTER 15

FIRESTOP PROTECTION FOR DWV AND STORMWATER APPLICATIONS

1501.0 General Requirements independent testing agency acceptable to the


1501.1 Applicability. All DWV and stormwater Administrative Authority.
piping penetrations of fire-resistance rated walls, 1505.3 Penetrations shall be protected by an
partitions, floors, floor/ceiling assemblies, approved penetration firestop system installed as
roof/ceiling assemblies or shaft enclosures shall be tested in accordance with ASTM E 119 or ASTM E
protected in accordance with the requirements of the 814, with a minimum positive pressure differential of
Building Code and this Chapter. 0.01 inch of water. Systems shall have an F rating of
at least 1 hour but not less than the required fire
resistance rating of the assembly being penetrated.
1502.0 Plans and Specifications
Systems protecting floor penetrations shall have a T
1502.1 Plans and specifications shall indicate with rating of at least 1 hour but not less than the required
sufficient detail how penetrations of fire resistance fire resistance rating of the floor being penetrated.
rated assemblies shall be firestopped prior to Floor penetrations contained within the cavity of a
obtaining design approval by the Administrative wall at the location of the floor penetration do not
Authority. require a T rating. No T rating shall be required for
floor penetrations by piping that is not in direct
1503.0 Installation contact with combustible material.
1503.1 Firestop materials shall be installed in 1505.4 The penetration must meet any additional
accordance with this Chapter, the Building Code and requirements for protection of the penetration in the
the manufacturers instructions. building code adopted by the Administrative
Authority. When no building code has been adopted
by the local Administrative Authority the
1504.0 Definitions penetration requirements shall be as required in
1504.1 F Rating. The time period that the NFPA 101, Life Safety Code.
penetration firestop system limits the spread of fire 1505.5 Prior to being concealed, piping penetrations
through the penetration when tested in accordance shall be inspected to verify compliance with the fire
with ASTM E 814. resistance rating prescribed in the building code or,
1504.2 T Rating. The time period that the in the absence of a building code NFPA 101, Life
penetration firestop system, including the Safety Code.
penetrating item, limits the maximum temperature 1505.6 When piping penetrates a rated assembly,
rise of 325 degrees F above its initial temperature non-combustible piping shall not connect to
through the penetration on the nonfire side, when combustible piping unless it can be demonstrated that
tested in accordance with ASTM E 814. the transition complies with the requirements of
1505.3.
1505.0 ABS and PVC DWV (Combustible)
Installations 1506.0 Copper, Cast Iron or Steel DWV (Non
1505.1 ABS and PVC DWV Piping installations Combustible) Installations
shall be protected in accordance with the appropriate 1506.1 Metallic DWV piping installations shall be
fire resistance rating requirements in the building protected in accordance with the appropriate fire
code that list the acceptable area, height and type of resistance rating requirements in the building code
construction for use in specific occupancies to assure that list the acceptable area, height and type of
compliance and integrity of the fire resistance rating construction for use in specific occupancies to assure
prescribed. compliance and integrity of the fire resistance rating
1505.2 When penetrating a fire resistance rated prescribed.
wall, partition, floor, floor-ceiling assembly, roof- 1506.2 When penetrating a fire resistance rated
ceiling assembly, or shaft enclosure, the fire wall, partition, floor, floor-ceiling assembly, roof-
resistance rating of the assembly shall be restored to ceiling assembly, or shaft enclosure, the fire
its original rating with a material or product tested to resistance rating of the assembly shall be restored to
standard(s) referenced in Chapter 14 and at an its original rating with a material or product tested to

155
1506.2 1508.5 UNIFORM PLUMBING CODE

standard(s) referenced in Section 1506.3 and at an 1506.7 Unshielded couplings shall not be used to
independent testing agency acceptable to the connect non-combustible piping unless it can be
Administrative Authority. demonstrated that the fire resistive integrity of the
Exceptions: penetration is maintained.
1. Concrete, mortar, or grout may be used to
fill the annular spaces around cast iron, copper, 1507.0 Model Code References
or steel piping that penetrates concrete or 1507.1 ICBO Uniform Building Code (1997
masonry fire resistant rated assemblies. The edition), Chapters 5 and 6 for heights and areas and
nominal diameter of the penetrating item should occupancies, Chapter 7 for fire resistance ratings and
not exceed 6 inches (15.2 cm) and the opening firestop systems.
size should not exceed 144 sq. in. (929 sq. cm).
1507.2 BOCA National Building Code (1999
The thickness of concrete, mortar, or grout
edition), Chapters 5 and 6 for heights and areas and
should be the full thickness of the assembly or
occupancies, Chapter 7 for fire resistance ratings and
the thickness necessary to provide a fire
firestop systems.
resistance rating not less than the required fire
resistance rating of the assembly penetrated. , or 1507.3 SBCCI Standard Building Code (1997
edition), Chapters 5 and 6 for heights and areas and
2. The material used to fill the annular space
occupancies, Chapter 7 for fire resistance ratings and
shall prevent the passage of flame and hot gases
firestop systems.
sufficient to ignite cotton waste for the time
period equivalent to the fire resistance rating of 1507.4 NFPA 101, Life Safety Code (1997 edition),
the assembly when tested to standard(s) Chapter 6 for fire resistance ratings and firestop
referenced in Section 1506.3. systems.
1506.3 Penetrations shall be protected by an
approved penetration firestop system installed as 1508.0 Inspection Checklist
tested in accordance with ASTM E 119 or ASTM E 1508.1 General. The Administrative Authority shall
814, with a minimum positive pressure differential of obtain verification of compliance with this chapter
0.01 inch of water. Systems shall have an F rating of through the application of this checklist, the
at least 1 hour but not less than the required fire appropriate installation standards, construction
resistance rating of the assembly being penetrated. documents, specifications and manufacturers product
Systems protecting floor penetrations shall have a T information (if applicable) to determine required
rating of at least 1 hour but not less than the required details.
fire resistance rating of the floor being penetrated.
1508.2 The Administrative Authority having
Floor penetrations contained within the cavity of a
jurisdiction shall determine the type, size and
wall at the location of the floor penetration do not
quantity of penetrations to be inspected.
require a T rating. No T rating shall be required for
floor penetrations by piping that is not in direct 1508.3 The Administrative Authority having
contact with combustible material. jurisdiction shall determine the required F ratings (1,
2, 3, or 4 hour) and T ratings (0, 1, 2, 3, or 4 hour) for
1506.4 The penetration must meet any additional
the assembly being penetrated.
requirements for protection of the penetration in the
building code adopted by the Administrative 1508.4 The Administrative Authority having
Authority. When no building code has been adopted jurisdiction shall require documentation (drawings)
by the local Administrative Authority the of systems installed by the contractor. This could be
penetration requirements shall be as required in a tested system or a manufacturers engineered
NFPA 101, Life Safety Code. system judgement. Ask for product data sheets of
products used for identification.
1506.5 Prior to being concealed, piping penetrations
shall be inspected to verify compliance with the fire 1508.5 Examination
resistance rating prescribed in the building code or, 1508.5.1 External Examination. The assembly
in the absence of a building code NFPA 101, Life type, insulation type and thickness, type and
Safety Code. size of any sleeve, type and size of penetrant,
1506.6 When piping penetrates a rated assembly, size of opening, orientation of penetrant, annular
combustible piping shall not connect to non- space and rating shall be inspected for
combustible piping unless it can be demonstrated that compliance with the approved drawing
the transition complies with the requirements of submitted.
1506.3.

156
FIRESTOP PROTECTION FOR DWV AND STORMWATER APPLICATIONS 1508.5

1508.5.2 Internal Examination. With


contractor present and prepared to make repairs,
the contractor shall be directed to cut into the
firestop sufficiently to reveal the type and
backing materials and the type and amount of
the material. The contractor shall repair the
firestop and the Administrative Authority
having jurisdiction shall re-examine the
installation.
1508.5.3 The Administrative Authority having
jurisdication after examining the firestop, both
externally and internally, shall compare the
values with the design submitted. The
Administrative Authority having jurisdication
will verify that all values fall within the design
parameters of the tested or engineered system
submitted and approved.
1508.5.4 The Administrative Authority having
jurisdiction shall continue inspection approving
or rejecting applications as required. If sufficient
non-compliant installations are found, the entire
project may need to be redone. Re-examination
after corrections shall be made.

157
UNIFORM PLUMBING CODE

158

Anda mungkin juga menyukai