Ln= 4 m
f'c= 280 kg/cm2
Paso= 0.25 m piso termnd= 0.1
Cpaso 0.168 m S/C= 0.4
c= 2.4 tn/m3
ANCHO= 1.075
DESNIVEL 3.4
g= 0.16 m
g= 0.20 m
Tomamos
0.18
g= 0.18 m
GRADAS DESCANSO
CM-peso prop 0.7762 0.4644 tn/m
Piso terminado 0.1075 0.1075
CV 0.4300 0.43
M b d As Asmin
3.79 107.5 15 6.94 3.483
1.42 107.5 15 2.54 3.483
DATOS fy (kg/cm2) = 4200 b(cm)= 107.5
f'c (kg/cm2) = 210 1 0.85
= 0.9 Ey(kg/cm2)= 2000000
c= 0.003
Vud= 3.69 tn
Vc= 14.30 kg
Vc= 12.16 kg
Vc OK
CANTIDAD
paso
Tn/m2 Ln1= 2.85 11.4 12
Tn/m2 Ln2= 1.15 4.6 -
Ln3= 0 0
4.3
0.15
2.150 S max= 45 o 3t 45
54
As final Area nmero de cantidad final espaciamiento
6.94 1/2pulg 1.267 5.48 6 18.2498317655
3.483 1/2" 1.267 2.75 5 25.375
DIAMETROS
cm pulg AREA # barras
0.9525 3/8pulg 0.713
1.27 1/2pulg 1.267 2
DOBL.R 1.5875 5/8pulg 1.979 0
DOBL.R
DOBL.R 1.905 3/4pulg 2.850 0
DOBL.R 2.54 1pulg 5.067 0
DOBL.R 3.4925 1 3/8 pulg 9.580
total barras 2
AREA 2.534
Una capa
contrapaso
20.24
temperatura
As(-) Asmin As final Area
3/8" @ 18.75 2.31375411 3.483 3.483 3/8pulg 0.71256
1/2" @ 20 0.84639876 3.483 3.483 1/2pulg 1.267
2 0
0 0 0
0 0 4 2 2
2 0
2 2 4
2.534 10.134 #VALUE! #VALUE! #VALUE! #VALUE!
Dos capas
nmero de cantidad final espaciamiento
4.89 6 20.4581508034
2.75 5 36.3700458726
# barras
#VALUE!