Anda di halaman 1dari 3

0.3 0.6 0.8 0.36 26.

64
1M 1M
semen 2.68 x 0.36 26.64 0.9648
pasir 0.54 x 0.36 26.64 0.1944
batu 1.2 x 0.36 26.64 0.432

volume bak truk = 3 m3


1 m3
1 ret pasir = 400,000.00 133,333.33
1 ret batu = 400,000.00 133,333.33
74M
zak 71.3952 zak Semen 4,320,000.00
m3 14.3856 m3 Pasir 1,918,080.00
m3 31.968 m3 Batu 4,262,400.00
Upah 7,400,000.00
Total 17,900,480.00 Permeter
241,898.38