ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
3. Extension of
4420 ESG
-001 & 002
a. Switch off Isolation by EMAL/SLII
4420 ESG Representative.
Hazard due to
INC-01 & Exact feeder which is to be switched
electrical shock.
INC-02 and Strain to arm, off to be identified to avoid
exposure to live parts of running 4 3 12
rack out fingers and
bruises feeder from drawings and Use of
both proper PPE and trained personnel
incomer & on the job. Ensure proper isolation
bus coupler before starting the work.
ACB and
confirm
dead bus.
b. Switch off
the control,
power
supply and Hazard due to Exact MCB to be identified to avoid
confirm electrical shock. exposure to live parts of running
voltages at Strain to arm, feeder from drawing and Use of 4 3 12
respective fingers and proper PPE and trained personnel
terminals bruises on the job. Ensure proper isolation
and issue before starting the work.
permit to
work.
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
c. IR test to be
performed
on the panel
Hazard due to Ensure proper earthing & Equipment
before
electrical shock to be installed to be identified and 3 3 9
coupling of
made ready
bus bar with
the existing
bus bar.
d. Remove the
side cover
of the panel Use of proper PPE, and trained
and make Strain to arm, personnel on the job. Ensure 3 2 6
ready for fingers and bruises proper isolation before starting the
coupling. work
e. Couple the
new Use proper lifting tools and proper
extension man power. Ensure proper support
panel to the and proper isolation.
existing Lifting heavy All lifting gears must be in good
3 3 9
panel under object. condition with valid load test
Supervision certificate and colour coded.
of ABB Inspect lifting gears before use,
Engineer ensure the validity of certificates.
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
f. Inter panel
Strain to arm, Use of proper PPE, and
wiring to be
fingers and trained personnel on the job.
carried out bruises
3 2 6
based on Ensure proper isolation before
schematics. starting the work
Pre- Ensure proper earthing. Equipment
Commissionig to be commissioned to be
Checks. identified and made ready. Ensure
g. Verify proper isolation before starting the
complete Hazard due to work
installation electrical shock 3 3 9
and check
for any
damage
during
coupling.
h. Checking of Clear the testing area. Use of
Torque proper PPE and trained personnel
tightness for on the job.
the joints Strain to arm, Torque wrench must be in good
between LV fingers and condition and with valid test
extension bruises. Hazard calibration.
3 2 6
panel and due to electrical
existing shock
panel (with
which it is to
be coupled).
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5
ACTIVITY: Extension, Upgrade & Commissioning of 4420 ESG 001 & 4420 ESG - 002
PACKAGE NUMBER: CG-4750
Risk Assessor:
EHS Department:
Construction:
Management: