EHS RISK ASSESSMENT

ACTIVITY: Operation training for overhead crane


PACKAGE NUMBER: TK-4742

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control Prob
Cons. Prob. Risk Cons. Risk
.

Activity shall be carried out


by competent supervision.
Supervisor to ensure all work
permits is available prior to
commencement of the task.
Toolbox talk to be held at
site, this will be covered the
method statement and job
safety analysis.
Toolbox talks to be given
prior to start the job.
Working Competent workers to be
without work deployed, supervisor to
PREPARATION permit. ensure work safe system. 4 2 8
Unauthorized Coordination permission has
workers at to be made with main
working area. contractor before start the
work.
Extra care shall be taken
whenever energized
equipment is nearby working
place.
Ensure proper housekeeping
time to time.
Barricade the working area by
using safety cones warning
tape / signboard.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 1 of 6


EHS RISK ASSESSMENT

ACTIVITY: Operation training for overhead crane


PACKAGE NUMBER: TK-4742


All workers involved in the
activity must be aware of heat
Heat stress. stress, supervisor to ensure 4 3 12
drinking cold water is available
at the working area.
Shaded area to be provided
Barricade the working area by
using safety cones warning
tape / signboard.
No materials or hand tools to be
Fall of stocked on the top of over
materials & head crane. 3 3 9
tools Appropriate signboard to be
displayed which read KEEP
AWAY OPERATION TRAINING
FOR OVERHEAD CRANE IN
PROGRESS".
Communication Supervisor to ensure proper
between trainer communication during the 3 2 6
and trainees. training.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 2 of 6


EHS RISK ASSESSMENT

ACTIVITY: Operation training for overhead crane


PACKAGE NUMBER: TK-4742

Use of overhead Supervisor to ensure overhead


cane crane was inspected by
EMAL/SLII with inspection
Incompetent sticker on it and valid load test
operator or certificates.
trainer.
Competent & certified operator
Bad condition of and banks man, barricade the
lifting gears. working radius of the
overhead crane with safety
cones & warning tape. 3 3 9
Post the warning sign board
which read KEEP AWAY
OPERATION TRAINING FOR
OVERHEAD CRANE IN
PROGRESS".
Ensure good condition of
equipments and all lifting
gears with valid load test
certificate.
All personnel involve in the
activities must wear their
P.P.E.'s at site (hard hat,
Working appropriate safety glass,
without safety shoes, safety harness, 3 2 6
P.P.P.E.s hand gloves, coverall &
reflective vest etc.).

Note: This is applicable to all


activities.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 3 of 6


EHS RISK ASSESSMENT

ACTIVITY: Operation training for overhead crane


PACKAGE NUMBER: TK-4742

Supervisor to ensure approved


PTW; RA & MS are available on
site.
Ensure scissor lift is inspected
by Emal/SLII with inspection
sticker on it and valid
Using scissor lift certificates are available for
Fire the equipment & competent
OVERHEAD Incompetent operator.
CRANE scissor lift Provide fire extinguisher.
4 3 12
TRAINING operator. Ensure personnel inside the
OPERATION Fall of materials man basket wear their full
may injure body safety harness and 100%
workers below tie off.
Scissor lift operator should take
extra care while moving the
equipment.
Banks man to be assigned on
the ground to give warning to
other workers nearby.
Only competent and authorized
Unauthorized
person to do the training,
workers.
ensure notified the client with
all necessary documents. 4 3 12
Clear the area and inform to the
site workers regarding the
training

Functionality Test the crane once with all the


test before function before training 4 3 12
training

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 4 of 6


EHS RISK ASSESSMENT

ACTIVITY: Operation training for overhead crane


PACKAGE NUMBER: TK-4742

Supervisor to ensure trainer


Communication
showing all the operations and
between trainer
safety operation procedures to 3 4 12
and trainees.
the trainees.

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

Risk assessment compiled by :

Risk Assessor:

SACHIN BABU EHS ADVISOR 01-07-2012

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 5 of 6


EHS RISK ASSESSMENT

ACTIVITY: Operation training for overhead crane


PACKAGE NUMBER: TK-4742

Risk assessment approved by :

EHS Department:

Name Designation Signature Date

Construction:

Name Designation Signature Date

Management:

Name Designation Signature Date