Contoh Material : Agregat Di Site Kelas A Dikerjakan

Tgl. Pemeriksaan : 27 - 04 - 2009 Dihitung


Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pemb. Jln Dan Jemb. Wamena - Elelim Diperiksa

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F
Berat Contoh Kering :
NOMOR BERAT JUMLAH BERAT PERSEN
SARINGAN TERTAHAN TERTAHAN TERTAHAN
3"
2.50"
2"
1.50" 0.00 0.00 0.00
1" 803.55 803.55 15.75
7/8"
3/4"

5/8"
1/2"
3/8" 1641.16 2444.71 47.92
1/4"
NO. 4 725.78 3170.49 62.14
NO. 6
NO. 8
NO. 10 618.75 3789.24 74.27
NO. 12
NO. 16
NO. 20
NO. 30
NO. 40 783.78 4573.02 89.63
NO. 50
NO. 60
NO. 80
NO. 100
NO. 200 413.45 4986.47 97.73
NO. 270
NO. 325
NO. 400
PAN 115.70 5102.17 100.00
PAN TOTAL
TOTAL 5102.17 100.00

Disetujui oleh, Diperiksa Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI
SATKER PEMB JLN DAN JEMB WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE )


NIP. 110 157 793 Quality Controle
:
:
:
:

GUJIAN ANALISA SARINGAN


REGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F
5102.17
PERSEN
LOLOS

100.00
84.25

52.08

37.86

25.73

10.37

2.27

0.00

0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. C. J. M - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Agregat Di Site Kelas A Dikerjakan
Tgl. Pemeriksaan : 27 - 04 - 2009 Dihitung
Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pemb. Jln Dan Jemb. Wamena - Elelim Diperiksa

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F
Berat Contoh Kering :
NOMOR BERAT JUMLAH BERAT PERSEN
SARINGAN TERTAHAN TERTAHAN TERTAHAN
3"
2.50"
2"
1.50" 0.00 0.00 0.00
1" 771.95 771.95 15.38
7/8"
3/4"

5/8"
1/2"
3/8" 1582.53 2354.48 46.90
1/4"
NO. 4 699.40 3053.88 60.84
NO. 6
NO. 8
NO. 10 597.00 3650.88 72.73
NO. 12
NO. 16
NO. 20
NO. 30
NO. 40 727.61 4378.49 87.23
NO. 50
NO. 60
NO. 80
NO. 100
NO. 200 518.16 4896.65 97.55
NO. 270
NO. 325
NO. 400
PAN 123.07 5019.72 100.00
PAN TOTAL
TOTAL 5019.72 100.00

Disetujui oleh, Diperiksa Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI
SATKER PEMB JLN DAN JEMB WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE )


NIP. 110 157 793 Quality Controle
:
:
:
:

NGUJIAN ANALISA SARINGAN


GREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F
5019.72
PERSEN
LOLOS

100.00
84.62

53.10

39.16

27.27

12.77

2.45

0.00

0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. C. J. M - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Agregat Di Site Kelas A Dikerjakan
Tgl. Pemeriksaan : 27 - 04 - 2009 Dihitung
Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pemb. Jln Dan Jemb. Wamena - Elelim Diperiksa

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F
Berat Contoh Kering :
NOMOR BERAT JUMLAH BERAT PERSEN
SARINGAN TERTAHAN TERTAHAN TERTAHAN
3"
2.50"
2"
1.50" 0.00 0.00 0.00
1" 1112.38 1112.38 19.08
7/8"
3/4"

5/8"
1/2"
3/8" 1338.59 2450.97 42.04
1/4"
NO. 4 1216.74 3667.71 62.91
NO. 6
NO. 8
NO. 10 762.57 4430.28 75.99
NO. 12
NO. 16
NO. 20
NO. 30
NO. 40 338.15 4768.43 81.79
NO. 50
NO. 60
NO. 80
NO. 100
NO. 200 710.69 5479.12 93.98
NO. 270
NO. 325
NO. 400
PAN 350.97 5830.09 100.00
PAN TOTAL
TOTAL 5830.09 100.00

Disetujui oleh, Diperiksa Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI
SATKER PEMB JLN DAN JEMB WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE )


NIP. 110 157 793 Quality Controle
:
:
:
:

NGUJIAN ANALISA SARINGAN


GREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F
5830.09
PERSEN
LOLOS

100.00
80.92

57.96

37.09

24.01

18.21

6.02

0.00

0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. C. J. M - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Mix Design Di Site Untuk Kelas A
Tgl. Pemeriksaan : 27 - 04 - 2009
Tempat / Lokasi : Kabupaten Jayawijaya
Pekerjaan Proyek : Pembangunan Jalan Wamena - Elelim

RANCANGAN DI SITE CAMPURAN MATERIAL LPA KELAS - A

Nomor Urutan Saringan Gradasi Material Yang Lolos Saringan Mix Design Material LPA Kelas - A
Fraksi I Fraksi II Fraksi III Fraksi IV Fraksi I Fraksi II Fraksi III
Urut ASTM MM
Batu 2 - 3 Batu 1 - 2 Urpil/Clay Batu 2 - 3 Batu 1 - 2 Urpil/Clay
65% 20% 15%

1 11/2" 38.10 100.00 100.00 100.00 65.00 20.00 15.00


2 1" 25.40 84.25 84.62 80.92 54.76 16.92 12.14
3 3/8" 9.25 52.08 53.10 57.96 33.86 10.62 8.69
4 NO. 4 4.76 37.86 39.16 37.09 24.61 7.83 5.56
5 NO. 10 2.00 25.73 27.27 24.01 16.73 5.45 3.60
6 NO. 40 0.42 10.37 12.77 18.21 6.74 2.55 2.73
7 200 0.074 2.27 2.45 6.02 1.47 0.49 0.90

Disetujui oleh, Diperiksa Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI
SATKER PEMB JLN DAN JEMB WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE )


NIP. 110 157 793 Quality Controle
Dikerjakan :
Dihitung :
Digambar :
Diperiksa :

E CAMPURAN MATERIAL LPA KELAS - A

Mix Design Material LPA Kelas - A


Spec.
Fraksi IV TOTAL
Kelas - A

100%

100.00 100
83.83 79 - 85
53.17 44 - 58
38.00 29 - 44
25.78 17 - 30
12.03 7 - 17
2.87 2-8

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Mix Design Di Site Untuk Kelas A Dikerjakan :
Tgl. Pemeriksaan : 27 - 04 - 2009 Dihitung :
Tempat / Lokasi : Kabupaten Jayawijaya Digambar :
Pekerjaan Proyek : Pembangunan Jalan Wamena - Elelim Diperiksa :

DIAGRAM PEMBAGIAN BUTIR BAHAN MINERAL


US. STANDARD SIEVE

Jumlah Prosentase Melalui Saringan


100 90 80 70 60 50 40 30 20 10
2"
1.5"
KASAR

1"

3/4"
KER IKIL

1/2"

3/8"
1/4"
NO. 4
HALUS

NO. 8

NO. 10
NO. 12

NO. 16

NO. 20
KASAR

NO. 30

N0. 40
PAS IR

NO. 50
NO. 60
NO. 80
NO. 100
HALUS

NO. 200

NO. 270

0 10 20 30 40 50 60 70 80 90
Jumlah Prosentase Diatas Saringan

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MULY

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMAN


NIP. 110 157 793 Quality Controle Pengendali
MBAGIAN BUTIR BAHAN MINERAL
US. STANDARD SIEVE

mlah Prosentase Melalui Saringan


10 0 mm
50.80
38.10

25.40

19.10

12.70

9.25
3.35
4.76

2.38

2.00
1.60

1.19

0.34
0.59

0.420

0.297
0.250
0.177
0.149

0.074

0.053

90 100
mlah Prosentase Diatas Saringan

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas A )
Tanggal : 18 Mei 2009 SATKER : Pemb Jln dan Jemb Wame
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas A

1 STA 00+025 00+200 00+400 00+600


2 Berat Pasir + Botol + Corong (W6) ->gr 7,868.00 8,017.00 7,936.00 7,859.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,765.00 3,891.00 3,864.00 3,797.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,103.00 4,126.00 4,072.00 4,062.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,265.44 2,288.44 2,234.44 2,224.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,632.51 1,649.08 1,610.17 1,602.96
9 Berat Tnh Basah + Kaleng W8 ->gr 4,125.00 4,196.00 4,055.00 4,123.00
10 Berat Kaleng W9 ->gr - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,125.00 4,196.00 4,055.00 4,123.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.53 2.54 2.52 2.57
13 Kadar Air ( W% ) ->% 5.12 4.84 4.27 5.05
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.40 2.43 2.42 2.45
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.40 2.40 2.40 2.40
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 100.15 101.12 100.64 102.02

DERAJAT KEPADATAN LAPANGAN :


STA 00 + 025 100.15 %
00 + 200 101.12 %
00 + 400 100.64 %
00 + 600 102.02 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MUL

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMA


NIP. 110 157 793 Quality Engineer Pengendal
% KADAR AIR Tanggal
00+025 00+200 00+400 00+600
1 NOMOR TITIK / STA
1 2 3 4
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 5.12 4.84 4.27 5.05
KADAR AIR RATA - RATA (Wrata-rata) 5.12 4.84 4.27 5.05

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 00 + 025 5.12 %
00 + 200 4.84 %
00 + 400 4.27 %
00 + 600 5.05 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MUL

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMA


NIP. 110 157 793 Quality Engineer Pengendal
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MUL

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMA


NIP. 110 157 793 Quality Engineer Pengendal
SAND CONE TEST
( Pek. LPA Kelas A )
Tanggal : 00 - 00 - 2009 SATKER : Pemb Jln dan Jemb Wame
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas A

1 STA 06+400 06+600 06+800 07+000 07+200 07+400


2 Berat Pasir + Botol + Corong (W6) ->gr
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr
5 Berat Pasir Dalam Corong (w4 - w5) ->gr
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc
9 Berat Tnh Basah + Kaleng W8 ->gr
10 Berat Kaleng W9 ->gr
11 Berat Tanah Basah (W8 - W9) ->gr
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc
13 Kadar Air ( W% ) ->%
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr
15 Kepadatan Laboratorium Bd Lab ->gr/cc
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->%

DERAJAT KEPADATAN LAPANGAN :


STA 06 + 400 - % STA 07 + 200
06 + 600 - % 07 + 400
06 + 800 - % 07 + 600
07 + 000 - % 07 + 800

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MUL

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMA


NIP. 110 157 793 Quality Engineer Pengendal
% KADAR AIR Tanggal
06+400 06+600 06+800 07+000 07+200 07+400
1 NOMOR TITIK / STA
33 34 35 36 37 38
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->%
KADAR AIR RATA - RATA (Wrata-rata)

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 06 + 400 - % STA 07 + 200
06 + 600 - % 07 + 400
06 + 800 - % 07 + 600
07 + 000 - % 07 + 800

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MUL

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMA


NIP. 110 157 793 Quality Engineer Pengendal
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MUL

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMA


NIP. 110 157 793 Quality Engineer Pengendal
SAND CONE TEST
( Pek. LPA Kelas A )
: Pemb Jln dan Jemb Wamena - Elelim

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 18 Mei 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 18 Mei 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas A )
: Pemb Jln dan Jemb Wamena - Elelim

07+600 07+800

- %
- %
- %
- %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 00 - 00 - 2009
07+600 07+800
39 40

- %
- %
- %
- %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 00 - 00 - 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas A )
Tanggal : 17 Juni 2009 SATKER : Pemb Jln dan Jemb Wa
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas A

1 STA 00+800 01+000 01+200 01+400 01+600 01+800


2 Berat Pasir + Botol + Corong (W6) ->gr 8,106.00 8,010.00 7,997.00 7,908.00 7,917.00 7,893.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,957.00 3,888.00 3,918.00 3,879.00 3,820.00 3,846.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,149.00 4,122.00 4,079.00 4,029.00 4,097.00 4,047.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,311.44 2,284.44 2,241.44 2,191.44 2,259.44 2,209.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,665.65 1,646.20 1,615.21 1,579.18 1,628.18 1,592.15
9 Berat Tnh Basah + Kaleng W8 ->gr 4,215.00 4,201.00 4,169.00 4,030.00 4,189.00 4,121.00
10 Berat Kaleng W9 ->gr - - - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,215.00 4,201.00 4,169.00 4,030.00 4,189.00 4,121.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.53 2.55 2.58 2.55 2.57 2.59
13 Kadar Air ( W% ) ->% 5.12 4.84 4.27 5.05 4.84 4.27
14 Berat Isi Kering Bd Lap = (Bw/100+w)x100 ->gr 2.41 2.43 2.48 2.43 2.45 2.48
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.40 2.40 2.40 2.40 2.40 2.40
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100 ->% 100.30 101.42 103.14 101.22 102.25 103.43

DERAJAT KEPADATAN LAPANGAN :


STA 00 + 800 100.30 % STA 01 + 600
01 + 000 101.42 % 01 + 800
01 + 200 103.14 % 02 + 000
01 + 400 101.22 % 02 + 200

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
% KADAR AIR Tanggal
00+800 01+000 01+200 01+400 01+600 01+800
1 NOMOR TITIK / STA
9 10 11 12 13 14
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 5.12 4.84 4.27 5.05 4.84 4.27
KADAR AIR RATA - RATA (Wrata-rata) 5.12 4.84 4.27 5.05 4.84 4.27

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 00 + 800 5.12 % STA 01 + 600
01 + 000 4.84 % 01 + 800
01 + 200 4.27 % 02 + 000
01 + 400 5.05 % 02 + 200

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
SAND CONE TEST
( Pek. LPA Kelas A )
Tanggal : 00 - 00 - 2009 SATKER : Pemb Jln dan Jemb Wa
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas A

1 STA 08+000 08+200 08+325


2 Berat Pasir + Botol + Corong (W6) ->gr
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr
5 Berat Pasir Dalam Corong (w4 - w5) ->gr
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc
9 Berat Tnh Basah + Kaleng W8 ->gr
10 Berat Kaleng W9 ->gr
11 Berat Tanah Basah (W8 - W9) ->gr
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc
13 Kadar Air ( W% ) ->%
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr
15 Kepadatan Laboratorium Bd Lab ->gr/cc
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->%

DERAJAT KEPADATAN LAPANGAN :


STA 08 + 800 - %
08 + 200 - %
08 + 325 - %

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
% KADAR AIR Tanggal
08+000 08+200 08+325
1 NOMOR TITIK / STA
41 42 43
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->%
KADAR AIR RATA - RATA (Wrata-rata) 9.20

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 00 + 025 0.00 %
00 + 200 0.00 %
00 + 400 9.20 %

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
SAND CONE TEST
( Pek. LPA Kelas A )
: Pemb Jln dan Jemb Wamena - Elelim

02+000 02+200
7,905.00 8,118.00
3,879.00 3,978.00
4,026.00 4,140.00
1,837.56 1,837.56
2,188.44 2,302.44
1.39 1.39
1,577.02 1,659.17
4,016.00 4,257.00
- -
4,016.00 4,257.00
2.55 2.57
5.05 4.84
2.42 2.45
2.40 2.40
101.01 101.97

102.25 %
103.43 %
101.01 %
101.97 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Juni 2009
02+000 02+200
15 16

5.05 4.84
5.05 4.84

4.84 %
4.27 %
5.05 %
4.84 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Juni 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas A )
: Pemb Jln dan Jemb Wamena - Elelim

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 00 - 00 - 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 00 - 00 - 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas A )
Tanggal : 17 Juni 2009 SATKER : Pemb Jln dan Jemb Wa
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas A

1 STA 02+400
2 Berat Pasir + Botol + Corong (W6) ->gr 7,938.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,894.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,044.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,206.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,589.99
9 Berat Tnh Basah + Kaleng W8 ->gr 4,021.00
10 Berat Kaleng W9 ->gr -
11 Berat Tanah Basah (W8 - W9) ->gr 4,021.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.53
13 Kadar Air ( W% ) ->% 4.27
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.43
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.40
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 101.06

DERAJAT KEPADATAN LAPANGAN :


STA 02 + 400 101.06 %

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
% KADAR AIR Tanggal
02+400
1 NOMOR TITIK / STA
17
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 4.27
KADAR AIR RATA - RATA (Wrata-rata) 4.27

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 02 + 400 4.27 %

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SI


NIP. 110 157 793 Quality Engineer Pengen
SAND CONE TEST
( Pek. LPA Kelas A )
: Pemb Jln dan Jemb Wamena - Elelim

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Juni 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Juni 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas A )
Tanggal : 00 - 00 - 2009 SATKER : Pemb Jln dan Jemb Wa
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas A

1 STA 02+600 02+800 03+000 03+200 03+400 03+600


2 Berat Pasir + Botol + Corong (W6) ->gr
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr
5 Berat Pasir Dalam Corong (w4 - w5) ->gr
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc
9 Berat Tnh Basah + Kaleng W8 ->gr
10 Berat Kaleng W9 ->gr
11 Berat Tanah Basah (W8 - W9) ->gr
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc
13 Kadar Air ( W% ) ->%
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.40 2.40 2.40 2.40 2.40 2.40
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->%

DERAJAT KEPADATAN LAPANGAN :


STA 02 + 600 - % STA 03 + 400
02 + 800 - % 03 + 600
03 + 000 - % 03 + 800
03 + 200 - % 04 + 000

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. S


NIP. 110 157 793 Quality Engineer Pengen
% KADAR AIR Tanggal
02+600 02+800 03+000 03+200 03+400 03+600
1 NOMOR TITIK / STA
25 26 27 28 29 30
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->%
KADAR AIR RATA - RATA (Wrata-rata) 0.00 0.00 0.00 0.00 0.00 0.00

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 02 + 600 0.00 % STA 03 + 400
02 + 800 0.00 % 03 + 600
03 + 000 0.00 % 03 + 800
03 + 200 0.00 % 04 + 000

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. S


NIP. 110 157 793 Quality Engineer Pengen
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. S


NIP. 110 157 793 Quality Engineer Pengen
SAND CONE TEST
( Pek. LPA Kelas A )
: Pemb Jln dan Jemb Wamena - Elelim

03+800 04+000

2.40 2.40

- %
- %
- %
- %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 00 - 00 - 2009
03+800 04+000
31 32

0.00 0.00

0.00 %
0.00 %
0.00 %
0.00 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 00 - 00 - 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Agregat Di Site Kelas B Dikerjakan
Tgl. Pemeriksaan : 15 - 01 - 2009 Dihitung
Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pemb. Jln. Dan Jemb. Wamena - Elelim Diperiksa

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F

Berat Contoh Kering :


NOMOR BERAT JUMLAH BERAT PERSEN
SARINGAN TERTAHAN TERTAHAN TERTAHAN
3"
2.50"
2" 0.00 0.00 0.00
1.50" 583.29 583.29 9.56
1" 616.91 1200.20 19.67
7/8"
3/4"

5/8"
1/2"
3/8" 1926.61 3126.81 51.25
1/4"
NO. 4 699.30 3826.11 62.71
NO. 6
NO. 8
NO. 10 1029.98 4856.09 79.59
NO. 12
NO. 16
NO. 20
NO. 30
NO. 40 878.20 5734.29 93.99
NO. 50
NO. 60
NO. 80
NO. 100
NO. 200 249.36 5983.65 98.07
NO. 270
NO. 325
NO. 400
PAN 117.53 6101.18 100.00
PAN TOTAL
TOTAL 6101.18 100.00

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER. PEMB. JALAN DAN JEMB. WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MULYA -

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMAN


NIP. 110 157 793 Quality Controle Pengendal
:
:
:
:

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F

6101.18
PERSEN
LOLOS

100.00
90.44
80.33

48.75

37.29

20.41

6.01

1.93

0.00

0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Agregat Di Site Kelas B Dikerjakan
Tgl. Pemeriksaan : 15 - 01 - 2009 Dihitung
Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pemb. Jln. Dan Jemb. Wamena - Elelim Diperiksa

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F

Berat Contoh Kering :


NOMOR BERAT JUMLAH BERAT PERSEN
SARINGAN TERTAHAN TERTAHAN TERTAHAN
3"
2.50"
2" 0.00 0.00 0.00
1.50" 580.65 580.65 7.71
1" 697.20 1277.85 16.96
7/8"
3/4"

5/8"
1/2"
3/8" 1925.26 3203.11 42.51
1/4"
NO. 4 971.63 4174.74 55.40
NO. 6
NO. 8
NO. 10 1426.20 5600.94 74.33
NO. 12
NO. 16
NO. 20
NO. 30
NO. 40 955.74 6556.68 87.01
NO. 50
NO. 60
NO. 80
NO. 100
NO. 200 743.82 7300.50 96.89
NO. 270
NO. 325
NO. 400
PAN 234.70 7535.20 100.00
PAN TOTAL
TOTAL 7535.20 100.00

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB. JALAN DAN JEMB.WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MULYA -

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMAN


NIP. 110 157 793 Quality Controle Pengendal
:
:
:
:

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F

7535.20
PERSEN
LOLOS

100.00
92.29
83.04

57.49

44.60

25.67

12.99

3.11

0.00

0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Agregat Di Site Kelas B Dikerjakan
Tgl. Pemeriksaan : 15 - 01 - 2009 Dihitung
Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pemb. Jln. Dan Jemb. Wamena - Elelim Diperiksa

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F

Berat Contoh Kering :


NOMOR BERAT JUMLAH BERAT PERSEN
SARINGAN TERTAHAN TERTAHAN TERTAHAN
3"
2.50"
2" 0.00 0.00 0.00
1.50" 680.98 680.98 10.00
1" 92.58 773.56 11.36
7/8"
3/4"

5/8"
1/2"
3/8" 1575.09 2348.65 34.49
1/4"
NO. 4 1028.29 3376.94 49.59
NO. 6
NO. 8
NO. 10 367.74 3744.68 54.99
NO. 12
NO. 16
NO. 20
NO. 30
NO. 40 1126.33 4871.01 71.53
NO. 50
NO. 60
NO. 80
NO. 100
NO. 200 1717.43 6588.44 96.75
NO. 270
NO. 325
NO. 400
PAN 221.36 6809.80 100.00
PAN TOTAL
TOTAL 6809.80 100.00

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB. JALAN DAN JEMB. WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MULYA -

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMA


NIP. 110 157 793 Quality Controle Pengendal
:
:
:
:

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F

6809.80
PERSEN
LOLOS

100.00
90.00
88.64

65.51

50.41

45.01

28.47

3.25

0.00

0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Mat : Mix Design Di Site Untuk Kelas B Dikerjakan
Tgl. Pemeriksaan : 15 - 01 -2009 Dihitung
Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pembangunan Jalan Wamena - Elelim Diperiksa
Quarry : KM. 41

RANCANGAN DI SITE CAMPURAN MATERIAL LPA KELAS - B

Urutan Saringan Gradasi Material Yang Lolos Saringan Mix Design Material LPA Kelas - A
Nomor
Fraksi I Fraksi II Fraksi III Fraksi IV Fraksi I Fraksi II Fraksi III Fraksi IV
ASTM MM
Urut Batu 3 - 5 Batu 2 - 3 Urpil/Clay Batu 3 - 5 Batu 2 - 3 Urpil/Clay
60% 30% 10%

1 2" 50.80 100.00 100.00 100.00 60.00 30.00 10.00


2 11/2" 38.10 90.44 92.29 90.00 54.26 27.69 9.00
3 1" 25.40 80.33 83.04 88.64 48.20 24.91 8.86
4 3/8" 9.25 48.75 57.49 65.51 29.25 17.25 6.55
5 NO. 4 4.76 37.29 44.60 50.41 22.37 13.38 5.04
6 NO. 10 2.00 20.41 25.67 45.01 12.24 7.70 4.50
7 NO. 40 0.42 6.01 12.99 28.47 3.61 3.90 2.85
8 200 0.074 1.93 3.11 3.25 1.16 0.93 0.33

Disetujui oleh, Diperiksa Oleh, Diajuk


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTO
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA M

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIM


NIP. 110 157 793 Quality Controle Pengen
:
:
:
:

CAMPURAN MATERIAL LPA KELAS - B

Spec.
TOTAL
Kelas - B

100%

100 100
91 88 - 95
82 70 - 85
53 30 - 65
41 25 - 55
24 15 - 40
10 8 - 20
2 2-8

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Contoh Material : Mix Design Di Site Untuk Kelas B Dikerjakan :
Tgl. Pemeriksaan : 15 - 01 - 2009 Dihitung :
Tempat / Lokasi : Kabupaten Jayawijaya Digambar :
Pekerjaan Proyek : Pembangunan Jalan Wamena - Elelim Diperiksa :

DIAGRAM PEMBAGIAN BUTIR BAHAN MINERAL


US. STANDARD SIEVE

Jumlah Prosentase Melalui Saringan


100 90 80 70 60 50 40 30 20 10
2"
1.5"
KASAR

1"

3/4"
KER IKIL

1/2"

3/8"
1/4"
NO. 4
HALUS

NO. 8

NO. 10
NO. 12

NO. 16

NO. 20
KASAR

NO. 30

NO. 40
PAS IR

NO. 50
NO. 60
NO. 80
NO. 100
HALUS

NO. 200

NO. 270

0 10 20 30 40 50 60 70 80 90
Jumlah Prosentase Diatas Saringan

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR
SATKER PEMB JLN DAN JEMB WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MU

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJ


NIP. 110 157 793 Quality Controle Pengendali M
EMBAGIAN BUTIR BAHAN MINERAL
US. STANDARD SIEVE

mlah Prosentase Melalui Saringan


0 mm
50.80
38.10

25.40

19.10

12.70

9.25
3.35
4.76

2.38

2.00
1.60

1.19

0.34
0.59

0.420

0.297
0.250
0.177
0.149

0.074

0.053

100
mlah Prosentase Diatas Saringan

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas B )
Tanggal : 17 Februari 2009 SATKER : Pemb Jln dan Jemb Wamena - Elelim
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas B

1 STA 00+025 00+200 00+400 00+600 00+800 01+000 01+200


2 Berat Pasir + Botol + Corong (W6) ->gr 7,905.00 7,997.00 7,894.00 7,996.00 8,110.00 7,989.00 8,075.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,719.00 3,748.00 3,698.00 3,742.00 3,836.00 3,737.00 3,773.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,186.00 4,249.00 4,196.00 4,254.00 4,274.00 4,252.00 4,302.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,348.44 2,411.44 2,358.44 2,416.44 2,436.44 2,414.44 2,464.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,692.32 1,737.72 1,699.52 1,741.32 1,755.73 1,739.88 1,775.91
9 Berat Tnh Basah + Kaleng W8 ->gr 4,117.00 4,175.00 4,126.00 4,230.00 4,328.00 4,228.00 4,311.00
10 Berat Kaleng W9 ->gr - - - - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,117.00 4,175.00 4,126.00 4,230.00 4,328.00 4,228.00 4,311.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.43 2.40 2.43 2.43 2.47 2.43 2.43
13 Kadar Air ( W% ) ->% 8.06 7.93 7.88 8.26 8.18 8.10 9.14
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.25 2.23 2.25 2.24 2.28 2.25 2.22
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.22 2.22 2.22 2.22 2.22 2.22 2.22
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 101.41 100.27 101.37 101.07 102.64 101.26 100.19

DERAJAT KEPADATAN LAPANGAN :


STA 00 + 025 101.41 % STA 00 + 800 102.64
00 + 200 100.27 % 01 + 000 101.26
00 + 400 101.37 % 01 + 200 100.19
00 + 600 101.07 % 01 + 400 102.81

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, ST


NIP. 110 157 793 Quality Engineer Pengendali Mutu
% KADAR AIR Tanggal : 17 Februari 2009
00+025 00+200 00+400 00+600 00+800 01+000 01+200
1 NOMOR TITIK / STA
1 2 3 4 5 6 7
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 8.06 7.93 7.88 8.26 8.18 8.10 9.14
KADAR AIR RATA - RATA (W rata-rata) 8.06 7.93 7.88 8.26 8.18 8.10 9.14

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 00 + 025 8.06 % STA 00 + 025 8.18
00 + 200 7.93 % 00 + 200 8.10
00 + 400 7.88 % 00 + 400 9.14
00 + 600 8.26 % 00 + 600 8.09

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, ST


NIP. 110 157 793 Quality Engineer Pengendali Mutu
KALIBRASI ALAT Tanggal : 17 Februari 2009
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, ST


NIP. 110 157 793 Quality Controle Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas B )
Tanggal : 15 April 2009 SATKER : Pemb Jln dan Jemb Wamena - Elelim
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas B

1 STA 04+200 04+400 04+600 04+800 05+000 05+200 05+400


2 Berat Pasir + Botol + Corong (W6) ->gr 8,179.00 8,007.00 7,918.00 8,012.00 7,991.00 8,026.00 8,007.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,799.00 3,764.00 3,709.00 3,794.00 3,686.00 3,787.00 3,793.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,380.00 4,243.00 4,209.00 4,218.00 4,305.00 4,239.00 4,214.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,542.44 2,405.44 2,371.44 2,380.44 2,467.44 2,401.44 2,376.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,832.12 1,733.39 1,708.89 1,715.38 1,778.07 1,730.51 1,712.49
9 Berat Tnh Basah + Kaleng W8 ->gr 4,398.00 4,279.00 4,142.00 4,230.00 4,328.00 4,252.00 4,301.00
10 Berat Kaleng W9 ->gr - - - - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,398.00 4,279.00 4,142.00 4,230.00 4,328.00 4,252.00 4,301.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.40 2.47 2.42 2.47 2.43 2.46 2.51
13 Kadar Air ( W% ) ->% 7.85 8.88 7.95 9.36 9.11 8.92 10.15
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.23 2.27 2.25 2.25 2.23 2.26 2.28
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.22 2.22 2.22 2.22 2.22 2.22 2.22
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 100.26 102.13 101.14 101.57 100.49 101.62 102.71

DERAJAT KEPADATAN LAPANGAN :


STA 04 + 200 100.26 % STA 05 + 000 100.49
04 + 400 102.13 % 05 + 200 101.62
04 + 600 101.14 % 05 + 400 102.71
04 + 800 101.57 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, ST


NIP. 110 157 793 Quality Controle Pengendali Mutu
% KADAR AIR Tanggal : 15 April 2009
04+200 04+400 04+600 04+800 05+000 05+200 05+400
1 NOMOR TITIK / STA
22 23 24 25 26 27 28
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 7.85 8.88 7.95 9.36 9.11 8.92 10.15
KADAR AIR RATA - RATA (Wrata-rata) 7.85 8.88 7.95 9.36 9.11 8.92 10.15

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 04 + 200 7.85 % STA 05 + 000 9.11
04 + 400 8.88 % 05 + 200 8.92
04 + 600 7.95 % 05 + 400 10.15
04 + 800 9.36 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, ST


NIP. 110 157 793 Quality Engineer Pengendali Mutu
KALIBRASI ALAT Tanggal : 15 April 2009
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (JO)

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, ST


NIP. 110 157 793 Quality Engineer Pengendali Mutu
AND CONE TEST
ek. LPA Kelas B )
: Pemb Jln dan Jemb Wamena - Elelim

01+400
7,988.00
3,757.00
4,231.00
1,837.56
2,393.44
1.39
1,724.74
4,255.00
-
4,255.00
2.47
8.09
2.28
2.22
102.81

%
%
%
%

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Februari 2009
01+400
8

8.09
8.09

%
%
%
%

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Februari 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
AND CONE TEST
ek. LPA Kelas B )
: Pemb Jln dan Jemb Wamena - Elelim

%
%
%

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
%
%
%

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas B )
Tanggal : 17 Februari 2009 SATKER : Pemb Jln dan Jemb Wamena - Elelim
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas B

1 STA 01+600
2 Berat Pasir + Botol + Corong (W6) ->gr 8,015.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,719.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,296.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,458.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,768.66
9 Berat Tnh Basah + Kaleng W8 ->gr 4,297.00
10 Berat Kaleng W9 ->gr -
11 Berat Tanah Basah (W8 - W9) ->gr 4,297.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.43
13 Kadar Air ( W% ) ->% 7.85
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.25
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.22
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 101.47

DERAJAT KEPADATAN LAPANGAN :


STA 01 + 600 101.47 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, S


NIP. 110 157 793 Quality Engineer Pengendali Mutu
% KADAR AIR Tanggal : 17 Februari 2009
01+600
1 NOMOR TITIK / STA
9
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 7.85
KADAR AIR RATA - RATA (Wrata-rata) 7.85

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 01 + 600 7.85 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, S


NIP. 110 157 793 Quality Engineer Pengendali Mutu
KALIBRASI ALAT Tanggal : 17 Februari 2009
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, S


NIP. 110 157 793 Quality Engineer Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas B )
Tanggal : 18 Mei 2009 SATKER : Pemb Jln dan Jemb Wamena - Elelim
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas B

1 STA 05+600 05+800 06+000 06+200 06+400 06+600 06+800


2 Berat Pasir + Botol + Corong (W6) ->gr 8,011.00 8,128.00 7,894.00 7,906.00 8,009.00 7,979.00 8,102.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,780.00 3,798.00 3,718.00 3,697.00 3,719.00 3,704.00 3,759.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,231.00 4,330.00 4,176.00 4,209.00 4,290.00 4,275.00 4,343.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,393.44 2,492.44 2,338.44 2,371.44 2,452.44 2,437.44 2,505.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,724.74 1,796.09 1,685.11 1,708.89 1,767.26 1,756.45 1,805.45
9 Berat Tnh Basah + Kaleng W8 ->gr 4,217.00 4,329.00 4,166.00 4,202.00 4,272.00 4,318.00 4,350.00
10 Berat Kaleng W9 ->gr - - - - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,217.00 4,329.00 4,166.00 4,202.00 4,272.00 4,318.00 4,350.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.44 2.41 2.47 2.46 2.42 2.46 2.41
13 Kadar Air ( W% ) ->% 9.30 8.27 8.22 9.06 7.97 9.00 7.88
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.24 2.23 2.28 2.25 2.24 2.26 2.23
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.22 2.22 2.22 2.22 2.22 2.22 2.22
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 100.76 100.28 102.90 101.56 100.85 101.59 100.60

DERAJAT KEPADATAN LAPANGAN :


STA 05 + 600 100.76 % STA 06 + 400 100.85
05 + 800 100.28 % 06 + 600 101.59
06 + 000 102.90 % 06 + 800 100.60
06 + 200 101.56 % 07 + 000 102.67

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, S


NIP. 110 157 793 Quality Engineer Pengendali Mutu
% KADAR AIR Tanggal : 18 Mei 2009
05+600 05+800 06+000 06+200 06+400 06+600 06+800
1 NOMOR TITIK / STA
28 29 30 31 32 33 34
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 9.30 8.27 8.22 9.06 7.97 9.00 7.88
KADAR AIR RATA - RATA (Wrata-rata) 9.30 8.27 8.22 9.06 7.97 9.00 7.88

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 05 + 600 9.30 % STA 06 + 400 7.97
05 + 800 8.27 % 06 + 600 9.00
06 + 000 8.22 % 06 + 800 7.88
06 + 200 9.06 % 07 + 000 10.01

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, S


NIP. 110 157 793 Quality Controle Pengendali Mutu
KALIBRASI ALAT Tanggal : 18 Mei 2009
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA - PT. NK (

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJUNTAK, S


NIP. 110 157 793 Quality Engineer Pengendali Mutu
ND CONE TEST
k. LPA Kelas B )
: Pemb Jln dan Jemb Wamena - Elelim

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Februari 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 17 Februari 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
ND CONE TEST
k. LPA Kelas B )
: Pemb Jln dan Jemb Wamena - Elelim

07+000
7,997.00
3,778.00
4,219.00
1,837.56
2,381.44
1.39
1,716.10
4,303.00
-
4,303.00
2.51
10.01
2.28
2.22
102.67

%
%
%
%

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
07+000
35

10.01
10.01

%
%
%
%

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas B )
Tanggal 17 Maret 2009 SATKER : Pemb Jln dan Jemb Wamena -
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas B

1 STA 01+800 02+000 02+200 02+400 02+600 02+800


2 Berat Pasir + Botol + Corong (W6) ->gr 8,019.00 8,111.00 7,948.00 7,969.00 8,109.00 7,994.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,759.00 3,784.00 3,789.00 3,724.00 3,793.00 3,748.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,260.00 4,327.00 4,159.00 4,245.00 4,316.00 4,246.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,422.44 2,489.44 2,321.44 2,407.44 2,478.44 2,408.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,745.64 1,793.92 1,672.86 1,734.83 1,786.00 1,735.55
9 Berat Tnh Basah + Kaleng W8 ->gr 4,271.00 4,299.00 4,126.00 4,223.00 4,325.00 4,228.00
10 Berat Kaleng W9 ->gr - - - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,271.00 4,299.00 4,126.00 4,223.00 4,325.00 4,228.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.45 2.40 2.47 2.43 2.42 2.44
13 Kadar Air ( W% ) ->% 7.87 7.90 8.63 9.13 8.25 8.29
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.27 2.22 2.27 2.23 2.24 2.25
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.22 2.22 2.22 2.22 2.22 2.22
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 102.17 100.04 102.27 100.48 100.77 101.33

DERAJAT KEPADATAN LAPANGAN :


STA 01 + 800 102.17 % STA 02 + 600
02 + 000 100.04 % 02 + 800
02 + 200 102.27 % 03 + 000
02 + 400 100.48 % 03 + 200

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJU


NIP. 110 157 793 Quality Engineer Pengendali M
% KADAR AIR Tanggal
01+800 02+000 02+200 02+400 02+600 02+800
1 NOMOR TITIK / STA
10 11 12 13 14 15
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 7.87 7.90 8.63 9.13 8.25 8.29
KADAR AIR RATA - RATA (Wrata-rata) 7.87 7.90 8.63 9.13 8.25 8.29

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 01 + 800 7.87 % STA 02 + 600
02 + 000 7.90 % 02 + 800
02 + 200 8.63 % 03 + 000
02 + 400 9.13 % 03 + 200

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJU


NIP. 110 157 793 Quality Engineer Pengendali M
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJU


NIP. 110 157 793 Quality Engineer Pengendali M
SAND CONE TEST
( Pek. LPA Kelas B )
Tanggal : 16 Juni 2009 SATKER : Pemb Jln dan Jemb Wamena -
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas B

1 STA 07+200 07+400 07+600 07+800 08+000 08+200


2 Berat Pasir + Botol + Corong (W6) ->gr 8,100.00 8,091.00 7,969.00 7,933.00 8,008.00 8,107.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,795.00 3,818.00 3,781.00 3,737.00 3,773.00 3,857.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,305.00 4,273.00 4,188.00 4,196.00 4,235.00 4,250.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,467.44 2,435.44 2,350.44 2,358.44 2,397.44 2,412.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,778.07 1,755.01 1,693.76 1,699.52 1,727.63 1,738.44
9 Berat Tnh Basah + Kaleng W8 ->gr 4,288.00 4,302.00 4,155.00 4,120.00 4,215.00 4,228.00
10 Berat Kaleng W9 ->gr - - - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,288.00 4,302.00 4,155.00 4,120.00 4,215.00 4,228.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.41 2.45 2.45 2.42 2.44 2.43
13 Kadar Air ( W% ) ->% 8.26 9.11 7.94 7.92 7.85 9.27
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.23 2.25 2.27 2.25 2.26 2.23
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.22 2.22 2.22 2.22 2.22 2.22
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 100.34 101.20 102.37 101.18 101.90 100.26

DERAJAT KEPADATAN LAPANGAN :


STA 07 + 200 100.34 % STA 08 + 000
07 + 400 101.20 % 08 + 200
07 + 600 102.37 % 08 + 325
07 + 800 101.18 %

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJU


NIP. 110 157 793 Quality Engineer Pengendali M
% KADAR AIR Tanggal
07+200 07+400 07+600 07+800 08+000 08+200
1 NOMOR TITIK / STA
36 37 38 39 40 41
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 8.26 9.11 7.94 7.92 7.85 9.27
KADAR AIR RATA - RATA (Wrata-rata) 8.26 9.11 7.94 7.92 7.85 9.27

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 07 + 200 8.26 % STA 08 + 000
07 + 400 9.11 % 08 + 200
07 + 600 7.94 % 08 + 325
07 + 800 7.92 %

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJU


NIP. 110 157 793 Quality Engineer Pengendali M
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJU


NIP. 110 157 793 Quality Engineer Pengendali M
SAND CONE TEST
( Pek. LPA Kelas B )
: Pemb Jln dan Jemb Wamena - Elelim

03+000 03+200
8,125.00 7,989.00
3,795.00 3,782.00
4,330.00 4,207.00
1,837.56 1,837.56
2,492.44 2,369.44
1.39 1.39
1,796.09 1,707.45
4,339.00 4,244.00
- -
4,339.00 4,244.00
2.42 2.49
7.94 9.16
2.24 2.28
2.22 2.22
100.82 102.57

100.77 %
101.33 %
100.82 %
102.57 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
17 Maret 2009
03+000 03+200
16 17

7.94 9.16
7.94 9.16

8.25 %
8.29 %
7.94 %
9.16 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
17 Maret 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas B )
: Pemb Jln dan Jemb Wamena - Elelim

08+325
8,012.00
3,696.00
4,316.00
1,837.56
2,478.44
1.39
1,786.00
4,325.00
-
4,325.00
2.42
9.03
2.22
2.22
100.05

101.90 %
100.26 %
100.05 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 16 Juni 2009
08+325
42

9.03
9.03

7.85 %
9.27 %
9.03 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 16 Juni 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
SAND CONE TEST
( Pek. LPA Kelas B )
Tanggal : 18 Maret 2009 SATKER : Pemb Jln dan Jemb Wamena
Quarry : Km. 41 PAKET : " 03 "
Pek. : Lapis Pondasi Agregat Kelas B

1 STA 03+400 03+600 03+800 04+000


2 Berat Pasir + Botol + Corong (W6) ->gr 8,013.00 8,100.00 7,896.00 7,909.00
3 Berat Sisa Pasir + Botol + Corong (W7) ->gr 3,775.00 3,792.00 3,728.00 3,710.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) ->gr 4,238.00 4,308.00 4,168.00 4,199.00
5 Berat Pasir Dalam Corong (w4 - w5) ->gr 1,837.56 1,837.56 1,837.56 1,837.56
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) ->gr 2,400.44 2,470.44 2,330.44 2,361.44
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39 1.39
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs ->cc 1,729.79 1,780.23 1,679.35 1,701.69
9 Berat Tnh Basah + Kaleng W8 ->gr 4,287.00 4,290.00 4,132.00 4,201.00
10 Berat Kaleng W9 ->gr - - - -
11 Berat Tanah Basah (W8 - W9) ->gr 4,287.00 4,290.00 4,132.00 4,201.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve ->gr/cc 2.48 2.41 2.46 2.47
13 Kadar Air ( W% ) ->% 8.38 8.16 7.92 8.07
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % ->gr 2.29 2.23 2.28 2.28
15 Kepadatan Laboratorium Bd Lab ->gr/cc 2.22 2.22 2.22 2.22
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100% ->% 103.00 100.36 102.70 102.90

DERAJAT KEPADATAN LAPANGAN :


STA 03 + 400 103.00 %
03 + 600 100.36 %
03 + 800 102.70 %
04 + 000 102.90 %

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJ


NIP. 110 157 793 Quality Engineer Pengendali M
% KADAR AIR Tanggal
03+400 03+600 03+800 04+000
1 NOMOR TITIK / STA
18 19 20 21
2 Berat Cawan + Tanah Basah w1 ->(gr)
3 Berat Cawan + Tanah Kering w2 ->(gr)
4 Berat Cawan Kosong w3 ->(gr)
5 Berat Air (w1 - w2) ->gr
6 Berat Tanah Kering (w2 -w3) ->gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% ->% 8.38 8.16 7.92 8.07
KADAR AIR RATA - RATA (Wrata-rata) 8.38 8.16 7.92 8.07

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 03 + 400 8.38 %
03 + 600 8.16 %
03 + 800 7.92 %
04 + 000 8.07 %

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( Ir. BAHRUL


NIP. 110 157 793 Quality Engineer Kepala Unit Pela
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 ->gr 700.10 698.90 698.50
Berat Botol Penuh Air + Corong w2 ->gr 5,477.81 5,478.08 5,478.20
Berat Botol Penuh Pasir + Corong w3 ->gr 7,327.63 7,331.00 7,334.92
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) ->gr/cc 1.39 1.39 1.39
Berat Botol + Psr Secukupnya + Corong w4 ->gr 7,672.98 7,668.15 7,676.23
Berat Botol + Sisa Psr + Corong w5 ->gr 5,798.64 5,893.33 5,812.71
Berat Pasir Dalam Corong (w4 - w5) ->gr 1,874.34 1,774.82 1,863.52
BERAT PASIR DALAM CORONG RATA-RATA 1,837.56

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,837.56 gram
- BERAT ISI PASIR : 1.39 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Ole


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PEL
SATKER PEMBANGUNAN JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. CIPTA JAYA MULYA

( DALEN OMPUSUNGGU, ST ) ( DJEMANIANTO, BE ) ( DARLIN S. SIMANJ


NIP. 110 157 793 Quality Engineer Pengendali M
SAND CONE TEST
( Pek. LPA Kelas B )
: Pemb Jln dan Jemb Wamena - Elelim

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
: 18 Maret 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( Ir. BAHRUL )
Kepala Unit Pelaksana
: 18 Maret 2009

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Nomor Contoh : Urugan Pilihan Dikerjakan
Tgl. Pemeriksaan : 10 April 2008 Dihitung
Tempat / Lokasi : Kabupaten Jayawijaya Digambar
Pekerjaan Proyek : Pemb. Jln. Dan Jemb. Wamena - Elelim Diperiksa

PENGUJIAN ANALISA SARINGAN


AGREGAT HALUS DAN KASAR
SK. SNI. M - 08 - 1989 - F

Berat Contoh Kering :


NOMOR BERAT JUMLAH BERAT PERSEN
SARINGAN TERTAHAN TERTAHAN TERTAHAN
3"
21/2"
2" 1,040.47 1,040.47 14.97
11/2" 676.98 1,717.45 24.72
1" 985.54 2,702.99 38.90
7/8"
3/4" 406.68 3,109.68 44.75

5/8"
1/2" 514.67 3,624.34 52.16
3/8" 420.63 4,044.97 58.21
1/4" 372.67 4,417.64 63.58
NO. 4 391.89 4,809.53 69.22
NO. 6
NO. 8 420.80 5,230.32 75.27
NO. 10 223.28 5,453.60 78.49
NO. 12 105.01 5,558.61 80.00
NO. 16 160.28 5,718.89 82.31
NO. 20 148.71 5,867.60 84.45
NO. 30 330.75 6,198.35 89.21
NO. 40 156.19 6,354.54 91.45
NO. 50 226.94 6,581.48 94.72
NO. 60 7.48 6,588.96 94.83
NO. 80 122.69 6,711.66 96.59
NO. 100 2.47 6,714.12 96.63
NO. 200 84.26 6,798.38 97.84
NO. 270
NO. 325
NO. 400

PAN 149.99 6,948.37 100.00


PAN TOTAL
TOTAL 6,948.37 100.00

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER. PEMB. JALAN DAN JEMB. WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MULYA - P

( DALEN OMPUSUNGGU, ST ) ( Ir. M. ILHAM S ) ( DARLIN S. SIMANJUN


NIP. 110 157 793 Quality Engineer Pengendali Mu
:
:
:
:

UJIAN ANALISA SARINGAN


EGAT HALUS DAN KASAR
K. SNI. M - 08 - 1989 - F

6948.37
PERSEN
LOLOS

100.00
85.03
75.28
61.10

55.25

47.84
41.79
36.42
30.78

24.73
21.51
20.00
17.69
15.55
10.79
8.55
5.28
5.17
3.41
3.37
2.16

(0.00)

(0.00)

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( DARLIN S. SIMANJUNTAK, ST
Pengendali Mutu
Nomor Contoh : Mix Design Urugan Pilihan ( URPIL ) Dikerjakan
Tgl. Pemeriksaan Dihitung
Tempat / Lokasi : Kabupaten Puncak Jaya Digambar
Pekerjaan Proyek : Pembangunan Jalan Wamena (Usilimo) - Mulia Diperiksa

DIAGRAM PEMBAGIAN BUTIR BAHAB MINERAL


US. STANDARD SIEVE

Jumlah Prosentase Melalui Saringan


100 90 80 70 60 50 40 30 20
2"
1.5"
KASAR

1"

3/4"
KER IKIL

1/2"

3/8"
1/4"
NO. 4
HALU S

NO. 8

NO. 10
NO. 12

NO. 16

NO. 20
KASAR

NO. 30

N0. 40
PAS IR

NO. 50
NO. 60
NO. 80
NO. 100
HALU S

NO. 200

NO. 270

0 10 20 30 40 50 60 70 80
Jumlah Prosentase Diatas Saringan

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSA
SATKER PEMB. JALAN DAN JEMBATAN WAMENA - ELELIM PT. NUSVEY - PT. PORTAL (JO) PT. CIPTA JAYA MULYA - PT. N

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMINTO, S


Pengawas Lapangan Quality Engineer Quality Control
:
:
:
:

AM PEMBAGIAN BUTIR BAHAB MINERAL


US. STANDARD SIEVE

Jumlah Prosentase Melalui Saringan


10 0 mm
50.80
38.10

25.40

19.10

12.70

9.25
3.35
4.76

2.38

2.00
1.60

1.19

0.34
0.59

0.420

0.297
0.250
0.177
0.149

0.074

0.053

90 100
Jumlah Prosentase Diatas Saringan

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. CIPTA JAYA MULYA - PT. NK (JO)

( AGUS SUDARMINTO, ST
Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)
Tanggal
Quarry PAKET Akses gading dan Soreang
Pek. : Urugan Pilihan

1 STA 100 25
2 Berat Pasir + Botol + Corong (W6) gr 6,952.00 8,985.00
3 Berat Sisa Pasir + Botol + Corong (W7) gr 3,368.00 3,505.00
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 3,584.00 5,480.00
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,570.00 1,420.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 2,014.00 4,060.00
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 1.42 1.42
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,418.31 2,859.15
9 Berat Tnh Basah + Kaleng W8 gr 3,124.00 5,573.00
10 Berat Kaleng W9 gr - 179.00
11 Berat Tanah Basah (W8 - W9) gr 3,124.00 5,394.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.203 1.89
13 Kadar Air ( W% ) % 4.60 8.00
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.106 1.75
15 Kepadatan Laboratorium Bd Lab gr/cc 2.08 1.80
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 101.34 97.05

DERAJAT KEPADATAN LAPANGAN :


STA 100.00 101.34 %
STA 25 97.05

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
% KADAR AIR Tanggal
100 25 0 0 0 0
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 20.00 6.18 7.27 8.75 8.31 6.93
KADAR AIR RATA - RATA (Wrata-rata) 20.00 6.18 7.27 8.75 8.31 6.93

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 100 20.00 % STA 0
25 6.18 % 0
0 7.27 %
0 8.75 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81

Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0


Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00

BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 16-18 AGUSTUS 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 49+100 49+200 49+375 49+450 49+600


2 Berat Pasir + Botol + Corong (W6) gr 8,384.50 7,851.70 8,105.20 7,897.00 7,856.30
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,189.14 4,978.90 5,147.98 4,997.70 4,811.78
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 3,195.36 2,872.80 2,957.22 2,899.30 3,044.52
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,715.36 1,392.80 1,477.22 1,419.30 1,564.52
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 2,117.73 1,719.51 1,823.73 1,752.22 1,931.51
9 Berat Tnh Basah + Kaleng W8 gr 3,898.20 3,165.20 3,378.00 3,256.00 3,598.00
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,773.20 3,040.20 3,253.00 3,131.00 3,473.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.78 1.77 1.78 1.79 1.80
13 Kadar Air ( W% ) % 7.80 6.18 7.45 8.32 8.31
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.65 1.67 1.66 1.65 1.66
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 100.17 100.92 100.61 99.98 100.61

DERAJAT KEPADATAN LAPANGAN :


STA 49+100 100.17 % STA 49+600
49+200 100.92 %
49+375 100.61 %
49+450 99.98 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
% KADAR AIR Tanggal
49+100 49+200 49+375 49+450 49+600
1 NOMOR TITIK / STA
1 2 3 4 5
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.80 6.18 7.45 8.32 8.31
KADAR AIR RATA - RATA (Wrata-rata) 7.80 6.18 7.45 8.32 8.31

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 49+100 7.80 % STA 49+600
49+200 6.18 %
49+375 7.45 %
49+450 8.32 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 10-14 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 51+200 51+350 51+500 51+600 51+750


2 Berat Pasir + Botol + Corong (W6) gr 7,886.70 7,856.00 7,849.30 7,967.00 7,943.32
3 Berat Sisa Pasir + Botol + Corong (W7) gr 4,931.87 4,978.20 4,972.21 5,065.10 5,081.34
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,954.83 2,877.80 2,877.09 2,901.90 2,861.98
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,474.83 1,397.80 1,397.09 1,421.90 1,381.98
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,820.78 1,725.68 1,724.80 1,755.43 1,706.15
9 Berat Tnh Basah + Kaleng W8 gr 3,357.30 3,165.20 3,108.32 3,245.00 3,147.00
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,232.30 3,040.20 2,983.32 3,120.00 3,022.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.78 1.76 1.73 1.78 1.77
13 Kadar Air ( W% ) % 6.60 7.80 5.41 8.32 8.31
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.67 1.63 1.64 1.64 1.64
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 100.93 99.05 99.45 99.44 99.11

DERAJAT KEPADATAN LAPANGAN :


STA 51+200 100.93 % STA 51+750
51+350 99.05 %
51+500 99.45 %
51+600 99.44 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
% KADAR AIR Tanggal
51+200 51+350 51+500 51+600 51+750
1 NOMOR TITIK / STA
1 2 3 4 5
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 6.60 7.80 5.41 8.32 8.31
KADAR AIR RATA - RATA (Wrata-rata) 6.60 7.80 5.41 8.32 8.31

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 51+200 6.60 % STA 51+750
51+350 7.80 %
51+500 5.41 %
51+600 8.32 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 23-24 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 45+500 45+600 45+750 45+900 46+000


2 Berat Pasir + Botol + Corong (W6) gr 8,215.70 8,156.67 7,986.97 8,121.67 8,167.87
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,298.00 5,277.12 5,181.34 5,232.78 5,147.98
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,917.70 2,879.55 2,805.63 2,888.89 3,019.89
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,437.70 1,399.55 1,325.63 1,408.89 1,539.89
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,774.94 1,727.84 1,636.58 1,739.37 1,901.10
9 Berat Tnh Basah + Kaleng W8 gr 3,263.30 3,243.12 3,024.23 3,248.45 3,561.78
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,138.30 3,118.12 2,899.23 3,123.45 3,436.78
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.77 1.80 1.77 1.80 1.81
13 Kadar Air ( W% ) % 6.60 7.80 5.41 8.32 8.31
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.66 1.67 1.68 1.66 1.67
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 100.52 101.46 101.85 100.47 101.16

DERAJAT KEPADATAN LAPANGAN :


STA 45+500 100.52 % STA 46+000
45+600 101.46 %
45+750 101.85 %
45+900 100.47 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
% KADAR AIR Tanggal
45+500 45+600 45+750 45+900 46+000
1 NOMOR TITIK / STA
1 2 3 4 5
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 6.60 7.80 5.41 8.32 8.31
KADAR AIR RATA - RATA (Wrata-rata) 6.60 7.80 5.41 8.32 8.31

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 45+500 6.60 % STA 46+000
45+600 7.80 %
45+750 5.41 %
45+900 8.32 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 03-05 OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 37+200 37+300 37+400 37+500 37+600


2 Berat Pasir + Botol + Corong (W6) gr 7,965.67 7,845.23 7,965.68 7,986.23 7,964.67
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,187.87 5,145.68 5,124.50 5,132.78 5,207.98
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,777.80 2,699.55 2,841.18 2,853.45 2,756.69
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,297.80 1,219.55 1,361.18 1,373.45 1,276.69
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,602.22 1,505.62 1,680.47 1,695.62 1,576.16
9 Berat Tnh Basah + Kaleng W8 gr 3,596.76 3,635.12 3,735.10 3,848.45 3,661.78
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,471.76 3,510.12 3,610.10 3,723.45 3,536.78
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.17 2.33 2.15 2.20 2.24
13 Kadar Air ( W% ) % 7.60 7.80 6.41 8.37 8.57
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.01 2.16 2.02 2.03 2.07
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 99.69 107.06 99.94 100.31 102.32

DERAJAT KEPADATAN LAPANGAN :


STA 37+200 99.69 % STA 37+600
37+300 107.06 %
37+400 99.94 %
37+500 100.31 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
% KADAR AIR Tanggal
37+200 37+300 37+400 37+500 37+600
1 NOMOR TITIK / STA
1 2 3 4 5
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.60 7.80 6.41 8.37 8.57
KADAR AIR RATA - RATA (Wrata-rata) 7.60 7.80 6.41 8.37 8.57

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 37+200 7.60 % STA 37+600
37+300 7.80 %
37+400 6.41 %
37+500 8.37 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 14-16 OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 39+100 39+200 39+250 39+400 39+500 39+600


2 Berat Pasir + Botol + Corong (W6) gr 7,865.67 7,945.23 7,932.68 8,086.23 8,164.67 8,164.67
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,087.87 5,145.68 5,124.50 5,232.78 5,327.98 5,357.98
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,777.80 2,799.55 2,808.18 2,853.45 2,836.69 2,806.69
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,297.80 1,319.55 1,328.18 1,373.45 1,356.69 1,326.69
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,602.22 1,629.07 1,639.73 1,695.62 1,674.93 1,637.89
9 Berat Tnh Basah + Kaleng W8 gr 3,796.76 3,735.12 3,735.10 3,848.45 3,861.78 3,861.78
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,671.76 3,610.12 3,610.10 3,723.45 3,736.78 3,736.78
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.29 2.22 2.20 2.20 2.23 2.28
13 Kadar Air ( W% ) % 8.10 7.80 6.41 8.37 8.57 8.21
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.12 2.06 2.07 2.03 2.05 2.11
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 104.95 101.77 102.43 100.31 101.73 104.37

DERAJAT KEPADATAN LAPANGAN :


STA 39+100 104.95 % STA 39+500
39+200 101.77 % 39+600
39+250 102.43 % 39+700
39+400 100.31 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
% KADAR AIR Tanggal
39+100 39+200 39+250 39+400 39+500 39+600
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 8.10 7.80 6.41 8.37 8.57 8.21
KADAR AIR RATA - RATA (Wrata-rata) 8.10 7.80 6.41 8.37 8.57 8.21

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 39+100 8.10 % STA 39+500
39+200 7.80 %
39+250 6.41 %
39+400 8.37 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,420.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,457.0 3,637.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,480.00 1,480.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 23-24OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 44+100 44+200 44+250 44+400 44+500 44+600


2 Berat Pasir + Botol + Corong (W6) gr 8,105.61 8,135.21 8,032.21 8,056.45 8,106.13 8,021.61
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,231.50 5,351.61 5,224.32 5,212.67 5,287.21 5,257.76
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,874.11 2,783.60 2,807.89 2,843.78 2,818.92 2,763.85
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,394.11 1,303.60 1,327.89 1,363.78 1,338.92 1,283.85
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,721.12 1,609.38 1,639.37 1,683.68 1,652.99 1,585.00
9 Berat Tnh Basah + Kaleng W8 gr 3,896.76 3,655.12 3,675.10 3,818.45 3,761.78 3,611.78
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,771.76 3,530.12 3,550.10 3,693.45 3,636.78 3,486.78
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.19 2.19 2.17 2.19 2.20 2.20
13 Kadar Air ( W% ) % 6.78 6.34 6.27 7.07 6.87 6.32
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.05 2.06 2.04 2.05 2.06 2.07
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 101.60 102.11 100.88 101.43 101.92 102.43

DERAJAT KEPADATAN LAPANGAN :


STA 44+100 101.60 % STA 44+500
44+200 102.11 % 44+600
44+250 100.88 % 44+700
44+400 101.43 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
% KADAR AIR Tanggal
44+100 44+200 44+250 44+400 44+500 44+600
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 6.78 6.34 6.27 7.07 6.87 6.32
KADAR AIR RATA - RATA (Wrata-rata) 6.78 6.34 6.27 7.07 6.87 6.32

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 44+100 6.78 % STA 44+500
44+200 6.34 %
44+250 6.27 %
44+400 7.07 %

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,420.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,457.0 3,637.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,480.00 1,480.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELA
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAMUD

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARMIN


Pengawas Lapangan Quality Engineer Quality Contr
SAND CONE TEST
(Pek. Urugan Pilihan)

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
0
0
7

7.53
7.53

8.31 %
6.93 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

100.61 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
16-18 AGUSTUS 2008

8.31 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
16-18 AGUSTUS 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

99.11 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
10-14 SEPTEMBER 2008

8.31 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
10-14 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

101.16 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
23-24 SEPTEMBER 2008

8.31 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
23-24 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

102.32 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
03-05 OKTOBER 2008

8.57 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
03-05 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

39+700
7,997.89
5,207.98
2,789.91
1,480.00
1,309.91
0.81
1,617.17
3,661.78
125.00
3,536.78
2.19
7.32
2.04
2.02
100.88

101.73 %
104.37 %
100.88 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
14-16 OKTOBER 2008
39+700
7

7.32
7.32

8.57 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
14-16 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

44+700
8,097.89
5,197.91
2,899.98
1,480.00
1,419.98
0.81
1,753.06
3,961.78
125.00
3,836.78
2.19
6.45
2.06
2.02
101.78

101.92 %
102.43 %
101.78 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
23-24OKTOBER 2008
44+700
7

6.45
6.45

6.87 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
23-24OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)
Tanggal 21-25 JUNI 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 47+700 47+800 47+900 48+000 48+100 48+200


2 Berat Pasir + Botol + Corong (W6) gr 8,265.20 7,946.40 8,326.30 7,847.50 7,886.60 8,164.40
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,220.10 5,116.70 5,226.50 5,020.20 4,914.20 5,068.30
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 3,045.10 2,829.70 3,099.80 2,827.30 2,972.40 3,096.10
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,565.10 1,349.70 1,619.80 1,347.30 1,492.40 1,616.10
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,932.22 1,666.30 1,999.75 1,663.33 1,842.47 1,995.19
9 Berat Tnh Basah + Kaleng W8 gr 3,585.70 3,195.80 3,768.50 3,195.40 3,375.00 3,687.80
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,460.70 3,070.80 3,643.50 3,070.40 3,250.00 3,562.80
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.79 1.84 1.82 1.85 1.76 1.79
13 Kadar Air ( W% ) % 7.20 5.80 6.80 9.30 5.60 8.10
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.67 1.74 1.71 1.69 1.67 1.65
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 101.26 105.57 103.39 102.36 101.24 100.11

DERAJAT KEPADATAN LAPANGAN :


STA 47+700 101.26 % STA 48+100
47+800 105.57 % 48+200
47+900 103.39 % 48+300
48+000 102.36 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
% KADAR AIR Tanggal
47+700 47+800 47+900 48+000 48+100 48+200
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.20 5.80 6.80 9.30 5.60 8.10
KADAR AIR RATA - RATA (Wrata-rata) 7.20 5.80 6.80 9.30 5.60 8.10

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 47+700 7.20 % STA 48+100
47+800 5.80 % 48+200
47+900 6.80 % 48+300
48+000 9.30 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81

Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0


Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00

BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 01-05 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 49+750 49+950 50+152 50+250 50+300 50+350


2 Berat Pasir + Botol + Corong (W6) gr 7,864.00 7,846.40 7,826.00 7,865.00 7,977.90 7,864.40
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,032.10 5,010.52 5,006.50 5,010.20 5,114.20 5,056.98
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,831.90 2,835.88 2,819.50 2,854.80 2,863.70 2,807.42
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,351.90 1,355.88 1,339.50 1,374.80 1,383.70 1,327.42
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,669.01 1,673.93 1,653.70 1,697.28 1,708.27 1,638.79
9 Berat Tnh Basah + Kaleng W8 gr 3,157.00 3,123.00 3,148.00 3,195.40 3,268.00 3,057.00
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,032.00 2,998.00 3,023.00 3,070.40 3,143.00 2,932.00
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.82 1.79 1.83 1.81 1.84 1.79
13 Kadar Air ( W% ) % 8.10 6.58 7.68 8.30 8.31 6.56
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.68 1.68 1.70 1.67 1.70 1.68
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 101.85 101.84 102.89 101.23 102.95 101.76

DERAJAT KEPADATAN LAPANGAN :


STA 49+750 101.85 % STA 50+300
49+950 101.84 % 50+350
50+152 102.89 % 50+450
50+250 101.23 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
% KADAR AIR Tanggal
49+750 49+950 50+152 50+250 50+300 50+350
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 8.10 6.58 7.68 8.30 8.31 6.56
KADAR AIR RATA - RATA (Wrata-rata) 8.10 6.58 7.68 8.30 8.31 6.56

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 49+750 8.10 % STA 50+300
49+950 6.58 % 50+350
50+152 7.68 % 50+450
50+250 8.30 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 17-21 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 51+850 51+950 52+000 52+100 52+200


2 Berat Pasir + Botol + Corong (W6) gr 7,579.70 7,858.32 7,678.90 7,894.43 7,843.12
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,278.67 5,398.67 5,598.21 5,198.56 5,118.09
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,301.03 2,459.65 2,080.69 2,695.87 2,725.03
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 821.03 979.65 600.69 1,215.87 1,245.03
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,013.62 1,209.44 741.59 1,501.07 1,537.07
9 Berat Tnh Basah + Kaleng W8 gr 2,397.57 2,892.31 1,887.34 3,597.80 3,548.97
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 2,272.57 2,767.31 1,762.34 3,472.80 3,423.97
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.24 2.29 2.38 2.31 2.23
13 Kadar Air ( W% ) % 6.70 6.58 7.98 7.48 7.37
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.10 2.15 2.20 2.15 2.07
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 127.35 130.11 133.38 130.46 125.74

DERAJAT KEPADATAN LAPANGAN :


STA 51+850 127.35 % STA 52+200
51+950 130.11 %
52+000 133.38 %
52+100 130.46 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
% KADAR AIR Tanggal
51+850 51+950 52+000 52+100 52+200
1 NOMOR TITIK / STA
1 2 3 4 5
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 6.70 6.58 7.98 7.48 7.37
KADAR AIR RATA - RATA (Wrata-rata) 6.70 6.58 7.98 7.48 7.37

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 51+850 6.70 % STA 52+200
51+950 6.58 %
52+000 7.98 %
52+100 7.48 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 25-26 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 46+100 46+250 46+400 46+500 46+600


2 Berat Pasir + Botol + Corong (W6) gr 8,156.43 8,215.20 8,125.70 8,139.45 8,159.67
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,237.12 5,313.60 5,243.12 5,224.20 5,189.60
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,919.31 2,901.60 2,882.58 2,915.25 2,970.07
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,439.31 1,421.60 1,402.58 1,435.25 1,490.07
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,776.93 1,755.06 1,731.58 1,771.91 1,839.59
9 Berat Tnh Basah + Kaleng W8 gr 3,258.90 3,276.30 3,269.34 3,272.31 3,384.50
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,133.90 3,151.30 3,144.34 3,147.31 3,259.50
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.76 1.80 1.82 1.78 1.77
13 Kadar Air ( W% ) % 6.70 6.58 7.98 7.48 7.37
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.65 1.68 1.68 1.65 1.65
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 100.18 102.10 101.92 100.16 100.01

DERAJAT KEPADATAN LAPANGAN :


STA 46+100 100.18 % STA 46+600
46+250 102.10 %
46+400 101.92 %
46+500 100.16 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
% KADAR AIR Tanggal
46+100 46+250 46+400 46+500 46+600
1 NOMOR TITIK / STA
1 2 3 4 5
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 6.70 6.58 7.98 7.48 7.37
KADAR AIR RATA - RATA (Wrata-rata) 6.70 6.58 7.98 7.48 7.37

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 46+100 6.70 % STA 46+600
46+250 6.58 %
46+400 7.98 %
46+500 7.48 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 07-10 OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 37+700 37+800 37+900 38+000 38+100 38+200


2 Berat Pasir + Botol + Corong (W6) gr 8,118.97 8,014.58 8,125.70 8,127.83 8,176.98 8,152.47
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,457.12 5,213.60 5,543.12 5,324.20 5,289.60 5,248.12
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,661.85 2,800.98 2,582.58 2,803.63 2,887.38 2,904.35
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,181.85 1,320.98 1,102.58 1,323.63 1,407.38 1,424.35
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,459.07 1,630.84 1,361.21 1,634.11 1,737.51 1,758.46
9 Berat Tnh Basah + Kaleng W8 gr 3,358.90 3,876.30 3,079.34 3,822.31 3,984.50 3,783.20
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,233.90 3,751.30 2,954.34 3,697.31 3,859.50 3,658.20
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.22 2.30 2.17 2.26 2.22 2.08
13 Kadar Air ( W% ) % 7.10 8.58 7.30 7.58 8.07 -
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.07 2.12 2.02 2.10 2.06 2.08
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 102.45 104.87 100.13 104.12 101.75 102.99

DERAJAT KEPADATAN LAPANGAN :


STA 37+700 102.45 % STA 38+100
37+800 104.87 %
37+900 100.13 %
38+000 104.12 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
% KADAR AIR Tanggal
37+700 37+800 37+900 38+000 38+100
1 NOMOR TITIK / STA
1 2 3 4 5
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.10 8.58 7.30 7.58 8.07
KADAR AIR RATA - RATA (Wrata-rata) 7.10 8.58 7.30 7.58 8.07

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 37+700 7.10 % STA 38+100
37+800 8.58 %
37+900 7.30 %
38+000 7.58 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 17-19 OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 39+850 39+950 40+050 40+200 40+350 40+500


2 Berat Pasir + Botol + Corong (W6) gr 8,017.97 8,014.58 8,105.60 8,112.43 8,173.21 8,131.26
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,357.12 5,173.60 5,543.12 5,324.20 5,289.60 5,348.12
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,660.85 2,840.98 2,562.48 2,788.23 2,883.61 2,783.14
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,180.85 1,360.98 1,082.48 1,308.23 1,403.61 1,303.14
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,457.84 1,680.22 1,336.40 1,615.10 1,732.85 1,608.81
9 Berat Tnh Basah + Kaleng W8 gr 3,358.90 3,876.30 3,079.34 3,822.31 3,984.50 3,683.20
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,233.90 3,751.30 2,954.34 3,697.31 3,859.50 3,558.20
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.22 2.23 2.21 2.29 2.23 2.21
13 Kadar Air ( W% ) % 7.21 6.38 6.31 6.58 6.07 6.45
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.07 2.10 2.08 2.15 2.10 2.08
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 102.43 103.90 102.94 106.33 103.95 102.86

DERAJAT KEPADATAN LAPANGAN :


STA 39+850 102.43 % STA 40+350
39+950 103.90 % 40+500
40+050 102.94 % 40+650
40+200 106.33 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
% KADAR AIR Tanggal
39+850 39+950 40+050 40+200 40+350 40+500
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.21 6.38 6.31 6.58 6.07 6.45
KADAR AIR RATA - RATA (Wrata-rata) 7.21 6.38 6.31 6.58 6.07 6.45

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 39+850 7.21 % STA 40+350
39+950 6.38 %
40+050 6.31 %
40+200 6.58 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,420.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,457.0 3,637.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,480.00 1,480.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 25-26 OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 44+800 44+900 45+000 45+50 45+250 45+350


2 Berat Pasir + Botol + Corong (W6) gr 8,158.97 8,197.45 8,245.52 8,132.10 8,122.97 8,134.51
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,357.12 5,363.60 5,413.12 5,314.20 5,289.60 5,348.12
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,801.85 2,833.85 2,832.40 2,817.90 2,833.37 2,786.39
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,321.85 1,353.85 1,352.40 1,337.90 1,353.37 1,306.39
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,631.91 1,671.42 1,669.63 1,651.73 1,670.83 1,612.83
9 Berat Tnh Basah + Kaleng W8 gr 3,648.90 3,776.30 3,749.34 3,762.31 3,784.50 3,623.20
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,523.90 3,651.30 3,624.34 3,637.31 3,659.50 3,498.20
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.16 2.18 2.17 2.20 2.19 2.17
13 Kadar Air ( W% ) % 6.81 7.18 5.89 7.08 7.03 5.86
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.02 2.04 2.05 2.06 2.05 2.05
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 100.08 100.90 101.49 101.81 101.31 101.43

DERAJAT KEPADATAN LAPANGAN :


STA 44+800 100.08 % STA 45+250
44+900 100.90 % 45+350
45+000 101.49 % 44+450
45+50 101.81 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
% KADAR AIR Tanggal
44+800 44+900 45+000 45+50 45+250 45+350
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 6.81 7.18 5.89 7.08 7.03 5.86
KADAR AIR RATA - RATA (Wrata-rata) 6.81 7.18 5.89 7.08 7.03 5.86

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 44+800 6.81 % STA 45+250
44+900 7.18 %
45+000 5.89 %
45+50 7.08 %

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,420.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,457.0 3,637.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,480.00 1,480.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDAR


Pengawas Lapangan Quality Engineer Quality C
SAND CONE TEST
(Pek. Urugan Pilihan)
: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

48+300
8,265.70
5,217.80
3,047.90
1,480.00
1,567.90
0.81
1,935.68
3,654.10
125.00
3,529.10
1.82
6.90
1.71
1.65
103.36

101.24 %
100.11 %
103.36 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
21-25 JUNI 2008
48+300
7

6.90
6.90

5.60 %
8.10 %
6.90 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
21-25 JUNI 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

50+450
7,845.00
5,017.80
2,827.20
1,480.00
1,347.20
0.81
1,663.21
3,066.20
125.00
2,941.20
1.77
7.32
1.65
1.65
99.86

102.95 %
101.76 %
99.86 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
01-05 SEPTEMBER 2008
50+450
7

7.32
7.32

8.31 %
6.56 %
7.32 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
01-05 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

125.74 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
17-21 SEPTEMBER 2008

7.37 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
17-21 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

100.01 %
%
%

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
25-26 SEPTEMBER 2008

7.37 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
25-26 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

38+300
8,162.10
5,197.86
2,964.24
1,480.00
1,484.24
0.81
1,832.40
3,898.79
125.00
3,773.79
2.06
-
2.06
2.02
101.95

101.75 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
07-10 OKTOBER 2008

8.07 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
07-10 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

40+650
8,132.26
5,297.86
2,834.40
1,480.00
1,354.40
0.81
1,672.10
3,728.79
125.00
3,603.79
2.16
6.12
2.03
2.02
100.54

103.95 %
102.86 %
100.54 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
17-19 OKTOBER 2008
40+650
7

6.12
6.12

6.07 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
17-19 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

44+450
8,115.90
5,297.86
2,818.04
1,480.00
1,338.04
0.81
1,651.90
3,728.79
125.00
3,603.79
2.18
6.19
2.05
2.02
101.70

101.31 %
101.43 %
101.70 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
25-26 OKTOBER 2008
44+450
7

6.19
6.19

7.03 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
25-26 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)
Tanggal 12-15 AGUSTUS 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 48+400 48+500 48+600 48+700 48+800 48+900


2 Berat Pasir + Botol + Corong (W6) gr 8,236.50 8,149.20 7,985.20 7,857.30 8,164.70 8,215.80
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,262.10 5,184.30 5,026.70 4,939.40 5,178.50 5,268.40
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,974.40 2,964.90 2,958.50 2,917.90 2,986.20 2,947.40
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,494.40 1,484.90 1,478.50 1,437.90 1,506.20 1,467.40
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,844.94 1,833.21 1,825.31 1,775.19 1,859.51 1,811.60
9 Berat Tnh Basah + Kaleng W8 gr 3,442.50 3,385.60 3,384.60 3,387.60 3,425.50 3,294.20
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,317.50 3,260.60 3,259.60 3,262.60 3,300.50 3,169.20
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.80 1.78 1.79 1.84 1.77 1.75
13 Kadar Air ( W% ) % 6.70 6.18 7.47 8.32 8.28 6.76
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.69 1.68 1.66 1.70 1.64 1.64
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 102.14 101.52 100.71 102.83 99.35 99.31

DERAJAT KEPADATAN LAPANGAN :


STA 48+400 102.14 % STA 48+800
48+500 101.52 % 48+900
48+600 100.71 % 49+000
48+700 102.83 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
% KADAR AIR Tanggal
48+400 48+500 48+600 48+700 48+800 48+900
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 6.70 6.18 7.47 8.32 8.28 6.76
KADAR AIR RATA - RATA (Wrata-rata) 6.70 6.18 7.47 8.32 8.28 6.76

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 48 + 400 6.70 % STA 48 + 800
48 + 500 6.18 % 48 + 900
48 + 600 7.47 % 49 + 000
48 + 700 8.32 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81

Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0


Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00

BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 06-09 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 50+450 50+550 50+650 50+800 50+900 51+000


2 Berat Pasir + Botol + Corong (W6) gr 8,103.70 8,133.20 8,189.67 7,987.76 8,164.70 8,012.90
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,143.80 5,131.98 5,233.12 5,017.10 5,187.15 5,271.96
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,959.90 3,001.22 2,956.55 2,970.66 2,977.55 2,740.94
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,479.90 1,521.22 1,476.55 1,490.66 1,497.55 1,260.94
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,827.04 1,878.05 1,822.90 1,840.32 1,848.83 1,556.72
9 Berat Tnh Basah + Kaleng W8 gr 3,342.90 3,485.60 3,384.60 3,387.60 3,325.50 2,894.20
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,217.90 3,360.60 3,259.60 3,262.60 3,200.50 2,769.20
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.76 1.79 1.79 1.77 1.73 1.78
13 Kadar Air ( W% ) % 7.70 9.20 7.89 6.45 5.31 6.93
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.64 1.64 1.66 1.67 1.64 1.66
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 99.11 99.31 100.45 100.93 99.62 100.82

DERAJAT KEPADATAN LAPANGAN :


STA 50+450 99.11 % STA 50+900
50+550 99.31 % 51+000
50+650 100.45 % 51+100
50+800 100.93 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
% KADAR AIR Tanggal
50+450 50+550 50+650 50+800 50+900 51+000
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.70 9.20 7.89 6.45 5.31 6.93
KADAR AIR RATA - RATA (Wrata-rata) 7.70 9.20 7.89 6.45 5.31 6.93

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 50+450 7.70 % STA 50+900
50+550 9.20 % 51+000
50+650 7.89 % 51+100
50+800 6.45 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 22 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 52+300 52+400 52+500


2 Berat Pasir + Botol + Corong (W6) gr 8,103.70 8,133.20 8,189.67
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,472.34 5,491.00 5,345.45
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,631.36 2,642.20 2,844.22
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,151.36 1,162.20 1,364.22
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,421.43 1,434.81 1,684.22
9 Berat Tnh Basah + Kaleng W8 gr 3,232.90 3,385.60 3,984.60
10 Berat Kaleng W9 gr 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,107.90 3,260.60 3,859.60
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.19 2.27 2.29
13 Kadar Air ( W% ) % 7.23 8.21 7.85
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.04 2.10 2.12
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 123.58 127.28 128.78

DERAJAT KEPADATAN LAPANGAN :


STA 52+300 123.58 %
52+400 127.28 %
52+500 128.78 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
% KADAR AIR Tanggal
52+300 52+400 52+500
1 NOMOR TITIK / STA
1 2 3
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.23 8.21 7.85
KADAR AIR RATA - RATA (Wrata-rata) 7.23 8.21 7.85

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 52+300 7.23 %
52+400 8.21 %
52+500 7.85 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 27 SEPTEMBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 52 + 500 (TAGIME) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 46+700 46+800 46+900


2 Berat Pasir + Botol + Corong (W6) gr 8,103.70 8,133.20 8,189.67
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,262.10 5,284.30 5,226.70
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,841.60 2,848.90 2,962.97
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,361.60 1,368.90 1,482.97
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,680.99 1,690.00 1,830.83
9 Berat Tnh Basah + Kaleng W8 gr 3,162.90 3,285.60 3,384.60
10 Berat Kaleng W9 gr 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,037.90 3,160.60 3,259.60
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 1.81 1.87 1.78
13 Kadar Air ( W% ) % 7.23 8.21 7.85
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 1.69 1.73 1.65
15 Kepadatan Laboratorium Bd Lab gr/cc 1.65 1.65 1.65
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 102.14 104.74 100.05

DERAJAT KEPADATAN LAPANGAN :


STA 46+700 102.14 %
46+800 104.74 %
46+900 100.05 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
% KADAR AIR Tanggal
46+700 46+800 46+900
1 NOMOR TITIK / STA
1 2 3
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.23 8.21 7.85
KADAR AIR RATA - RATA (Wrata-rata) 7.23 8.21 7.85

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 46+700 7.23 %
46+800 8.21 %
46+900 7.85 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 11-13 OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 38+400 38+500 38+650 38+800 38+900 39+000


2 Berat Pasir + Botol + Corong (W6) gr 8,157.89 8,203.60 8,189.78 8,162.34 8,109.98 8,125.78
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,552.80 5,362.10 5,427.89 5,534.61 5,359.46 5,352.91
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,605.09 2,841.50 2,761.89 2,627.73 2,750.52 2,772.87
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,125.09 1,361.50 1,281.89 1,147.73 1,270.52 1,292.87
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,389.00 1,680.86 1,582.58 1,416.95 1,568.54 1,596.14
9 Berat Tnh Basah + Kaleng W8 gr 3,225.67 3,893.30 3,784.60 3,384.60 3,797.60 3,784.60
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,100.67 3,768.30 3,659.60 3,259.60 3,672.60 3,659.60
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.23 2.24 2.31 2.30 2.34 2.29
13 Kadar Air ( W% ) % 7.23 8.21 7.85 7.32 8.10 7.81
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.08 2.07 2.14 2.14 2.17 2.13
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 103.06 102.56 106.14 106.12 107.23 105.28

DERAJAT KEPADATAN LAPANGAN :


STA 38+400 103.06 %
38+500 102.56 %
38+650 106.14 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
% KADAR AIR Tanggal
38+400 38+500 38+650 38+800 38+900 39+000
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.23 8.21 7.85 7.32 8.10 7.81
KADAR AIR RATA - RATA (Wrata-rata) 7.23 8.21 7.85 7.32 8.10 7.81

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 38+400 7.23 %
38+500 8.21 %
38+650 7.85 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,421.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,467.0 3,627.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,490.00 1,470.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal 21-22 OKTOBER 2008 SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia
Quarry : KM 36 + 800 (YALENGGA) PAKET : " 03 "
Pek. : Urugan Pilihan

1 STA 43+550 43+650 43+750 43+800 43+900 44+000


2 Berat Pasir + Botol + Corong (W6) gr 8,121.97 8,015.60 8,031.78 8,142.34 8,119.98 8,121.32
3 Berat Sisa Pasir + Botol + Corong (W7) gr 5,352.80 5,172.10 5,227.89 5,534.61 5,359.46 5,352.91
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr 2,769.17 2,843.50 2,803.89 2,607.73 2,760.52 2,768.41
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00 1,480.00
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr 1,289.17 1,363.50 1,323.89 1,127.73 1,280.52 1,288.41
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81 0.81 0.81 0.81
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc 1,591.57 1,683.33 1,634.43 1,392.26 1,580.89 1,590.63
9 Berat Tnh Basah + Kaleng W8 gr 3,625.67 3,893.30 3,784.60 3,384.60 3,797.60 3,784.60
10 Berat Kaleng W9 gr 125.00 125.00 125.00 125.00 125.00 125.00
11 Berat Tanah Basah (W8 - W9) gr 3,500.67 3,768.30 3,659.60 3,259.60 3,672.60 3,659.60
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc 2.20 2.24 2.24 2.34 2.32 2.30
13 Kadar Air ( W% ) % 7.23 8.21 7.85 7.32 8.10 7.81
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr 2.05 2.07 2.08 2.18 2.15 2.13
15 Kepadatan Laboratorium Bd Lab gr/cc 2.02 2.02 2.02 2.02 2.02 2.02
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%% 101.54 102.41 102.78 108.00 106.39 105.65

DERAJAT KEPADATAN LAPANGAN :


STA 43+550 101.54 % 43+800
43+650 102.41 % 43+900
43+750 102.78 % 44+000

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
% KADAR AIR Tanggal
43+550 43+650 43+750 43+800 43+900 44+000
1 NOMOR TITIK / STA
1 2 3 4 5 6
2 Berat Cawan + Tanah Basah w1 (gr)
3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% % 7.23 8.21 7.85 7.32 8.10 7.81
KADAR AIR RATA - RATA (Wrata-rata) 7.23 8.21 7.85 7.32 8.10 7.81

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 43+550 7.23 %
43+650 8.21 %
43+750 7.85 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,420.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,457.0 3,637.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,480.00 1,480.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
SAND CONE TEST
(Pek. Urugan Pilihan)

Tanggal SATKER : Pemb Jln dan Jemb Wamena (Usilimo) - Mulia


Quarry PAKET : " 03 "
Pek.

1 STA
2 Berat Pasir + Botol + Corong (W6) gr
3 Berat Sisa Pasir + Botol + Corong (W7) gr
4 Berat Pasir Dlm Corong + Lubang (W6 - W7) gr
5 Berat Pasir Dalam Corong Rata - Rata (w4 - w5) gr
6 Brt Psr Dlm Lubang w10 = (W6 - W7)-(w4 - w5) gr
7 Berat Isi Pasir Bs =(w3-w1)/(w2-w1) gr/cc
8 Volume Tanah/Psr Dlm Lubang Ve = W10 / Bs cc
9 Berat Tnh Basah + Kaleng W8 gr
10 Berat Kaleng W9 gr
11 Berat Tanah Basah (W8 - W9) gr
12 Berat Isi Tanah Basah Bw = (w8 - w9)/Ve gr/cc
13 Kadar Air ( W% ) %
14 Berat Isi Kering Bd Lap = (Bw/100+w)x 100 % gr
15 Kepadatan Laboratorium Bd Lab gr/cc
16 Derajat Kepadatan Dilap. D Lap = (Bd Lap/Bd Lab) x 100%%

DERAJAT KEPADATAN LAPANGAN :


STA 0 - % 0
0 - % 0
0 - % 0

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
% KADAR AIR Tanggal

1 NOMOR TITIK / STA

2 Berat Cawan + Tanah Basah w1 (gr)


3 Berat Cawan + Tanah Kering w2 (gr)
4 Berat Cawan Kosong w3 (gr)
5 Berat Air (w1 - w2) gr
6 Berat Tanah Kering (w2 -w3) gr
7 Kadar Air W = (w1 - w2) / (w2 -w3) x 100% %
KADAR AIR RATA - RATA (Wrata-rata)

HASIL PERHITUNGAN :
- KADAR AIR RATA - RATA (W) STA 0 0.00 %
0 0.00 %
0 0.00 %

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
KALIBRASI ALAT Tanggal
NOMOR 1 2 3
Berat Botol Kosong + Corong w1 gr 2,600.0 2,587.0 2,598.0
Berat Botol Penuh Air + Corong w2 gr 6,184.5 6,098.0 6,167.0
Berat Botol Penuh Pasir + Corong w3 gr 5,490.0 5,420.0 5,490.0
Berat Isi Pasir Bs = (w3-w1)/(w2-w1) gr/cc 0.81 0.81 0.81
Berat Botol + Psr Secukupnya + Corong w4 gr 3,657.0 3,457.0 3,637.0
Berat Botol + Sisa Psr + Corong w5 gr 2,177.0 1,977.0 2,157.0
Berat Pasir Dalam Corong (w4 - w5) gr 1,480.0 1,480.00 1,480.00
BERAT PASIR DALAM CORONG RATA-RATA 1,480.00

HASIL PERHITUNGAN :
- BERAT PASIR DALAM CORONG RATA - RATA : 1,480.00 gram
- BERAT ISI PASIR : 0.81 gram

Disetujui oleh, Diperiksa Oleh, Diajukan O


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR P
SATKER PEMB JLN DAN JEMB WAMENA (USILIMO) - MULIA PT. NUSVEY - PT. PORTAL ENGINEERING PERKASA (JO) PT. VITA SAM

( HAMI YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) ( AGUS SUDARM


Pengawas Lapangan Quality Engineer Quality Co
SAND CONE TEST
(Pek. Urugan Pilihan)
: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

49+000
7,954.20
5,104.10
2,850.10
1,480.00
1,370.10
0.81
1,691.48
3,098.40
125.00
2,973.40
1.76
7.13
1.64
1.65
99.45

99.35 %
99.31 %
99.45 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
12-15 AGUSTUS 2008
49+000
7

7.13
7.13

8.28 %
6.76 %
7.13 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
12-15 AGUSTUS 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

51+100
7,864.90
5,124.87
2,740.03
1,480.00
1,260.03
0.81
1,555.59
2,898.40
125.00
2,773.40
1.78
7.53
1.66
1.65
100.49

99.62 %
100.82 %
100.49 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
06-09 SEPTEMBER 2008
51+100
7

7.53
7.53

5.31 %
6.93 %
7.53 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
06-09 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
22 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
22 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
27 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
27 SEPTEMBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
11-13 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
11-13 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

108.00 %
106.39 %
105.65 %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
21-22 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
21-22 OKTOBER 2008

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
SAND CONE TEST
(Pek. Urugan Pilihan)

: Pemb Jln dan Jemb Wamena (Usilimo) - Mulia

- %
- %
- %

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
0

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
0.00

Diajukan Oleh,
KONTRAKTOR PELAKSANA
PT. VITA SAMUDERA

( AGUS SUDARMINTO, ST)


Quality Control
LABORATORIUM KONSTRUKSI BETON
( PEMERIKSAAN KUAT DESAK BETON )

Benda Uji : Kubus Beton


Pengirim : PT.VITA SAMUDRA
Bahan : Batu Pecah

Tanggal Tanggal Umur Beban Tb Faktor Tb Tb (Tb - Tbm )


Pembuataan Pengetesan Hari P ( kg ) Kg / Cm2 Conversi Kg / CM Kg/Cm2 Kg / Cm2
28 Hari
14 Juni 2003 28 Juni 2003 14 53,000 235,555 0,88 267,676 55,240
14 Juni 2003 28 Juni 2003 14 60,500 268.888 0,88 305,554 17,362
14 Juni 2003 28 Juni 2003 14 69,000 306.666 0,88 348,485 25,569
14 Juni 2003 28 Juni 2003 14 64,500 286.666 0,88 325,757 2,841
14 Juni 2003 28 Juni 2003 14 67,500 300,000 0,88 340,909 322 17,993
14 Juni 2003 28 Juni 2003 14 60,000 266.667 0,88 303,030 916 19,886
14 Juni 2003 28 Juni 2003 14 69,000 306,666 0,88 348,485 25,569
14 Juni 2003 28 Juni 2003 14 68,000 302,222 0,88 343,434 20,518

Total

Rumus :S= ( Tb - bm )2
N-1

:S= ( 5,808.70 )2 S = 28,8065 Kg / cm2


8-1
Dimana K = 1,92
N = 8.b.h

Tbk = Tbm - K . S
= 322,916 - 1,92 . 28,8065 Kg / cm2
= 322,916 - 55,3084 kg / cm2
= 267,6075 kg / cm2--------- 266,08516 kg / cm2
Keterangan ;
1. Standar Deviasi ( Sd ) : 28,8065 kg / cm2 Nilai Slump Test = 10,50 cm
2. Karakteristik ( Tbk ) :267,6075 kg / cm2
3, ( Tbm ) :322,916 kg / cm2

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Pemb. Jalan Dan Jemb. Wamena (Usilimo) - Mulia PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. NK (JO

( HAMY YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) AGUS SUDARMINTO, ST


Pengawas Lapangan Quality Engineer Quality Control
LABORATORIUM KONSTRUKSI BETON
( PEMERIKSAAN KUAT DESAK BETON )

Benda Uji : Kubus Beton


Pengirim : PT. Cipta Jaya Mulya - PT. NK (JO)
Bahan : Batu Pecah

Tanggal Tanggal Umur Beban Tb Faktor Tb Tb (Tb - Tbm )


Pembuataan Pengetesan Hari P ( kg ) Kg / Cm2 Conversi Kg / CM Kg/Cm2 Kg / Cm2
28 Hari
16 Juli 2003 13 Agustus 2003 28 53,000 235,555 0,88 267,676 55,240
16 Juli 2003 13 Agustus 2003 28 60,500 268.888 0,88 305,554 17,362
16 Juli 2003 13 Agustus 2003 28 69,000 306.666 0,88 348,485 25,569
17 Juli 2003 14 Agustus 2003 28 64,500 286.666 0,88 325,757 2,841
17 Juli 2003 14 Agustus 2003 28 67,500 300,000 0,88 340,909 322 17,993
17 Juli 2003 14 Agustus 2003 28 60,000 266.667 0,88 303,030 916 19,886
17 Juli 2003 14 Agustus 2003 28 69,000 306,666 0,88 348,485 25,569
17 Juli 2003 14 Agustus 2003 28 68,000 302,222 0,88 343,434 20,518

Total

Rumus :S= ( Tb - bm )2
N-1

:S= ( 5,808.70 )2 S = 28,8065 Kg / cm2


8-1
Dimana K = 1,92
N = 8.b.h

Tbk = Tbm - K . S
= 322,916 - 1,92 . 28,8065 Kg / cm2
= 322,916 - 55,3084 kg / cm2
= 267,6075 kg / cm2--------- 266,08516 kg / cm2
Keterangan ;
1. Standar Deviasi ( Sd ) : 28,8065 kg / cm2 Nilai Slump Test = 10,50 cm
2. Karakteristik ( Tbk ) :267,6075 kg / cm2
3, ( Tbm ) :322,916 kg / cm2

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Pemb. Jalan Dan Jemb. Wamena (Usilimo) - Mulia PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. NK (JO

( HAMY YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) AGUS SUDARMINTO, ST


Pengawas Lapangan Quality Engineer Quality Control
TORIUM KONSTRUKSI BETON
IKSAAN KUAT DESAK BETON )

(Tb - bm )2
Kg / Cm2

3051.457
301,439
653,774
8,071
323,748
395,453
653,774
420,988

5,808.70

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

AGUS SUDARMINTO, ST
Quality Control
TORIUM KONSTRUKSI BETON
IKSAAN KUAT DESAK BETON )

(Tb - bm )2
Kg / Cm2

3051.457
301,439
653,774
8,071
323,748
395,453
653,774
420,988

5,808.70

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

AGUS SUDARMINTO, ST
Quality Control
PEMERIKSAAN SIEVE ANALISIS BUTIRAN

Bahan : Batu Pecah


Quarry : Km 41 + 000
Pengirim : PT. Cipta Jaya Mulya - PT. NK (JO)
Untuk : Pelaks. Pek. Box Culvert
Wamena - Elelim

Nomor Bahan Yang Diayak ( 9500,- Gr ) ( 2 x a 4500.. Gr )


Ayakan Perc. I Perc. II Jumlah Dalam Jlh Sisi Ayakan
( mm ) Rata-rata Dlm %
25,40 0 1790 1790 18,842 18,842
19,00 0 2480 2480 26,105 44,947
12,50 3477 230 3707 39,021 83,968
9,50 1363 0 1363 14,347 98,315
4,75 129 0 129 1,358 99,673
2,36 100
1,18 100
0,60 100
0,30 100
0,15 100
0
Jlh 4969 4500 9500 100 845,745

Modulus halus butiran ( Fm ) = 845,745 ; 8,45745


100

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Pemb. Jalan Dan Jemb. Wamena (Usilimo) - Mulia PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. N

( HAMY YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) AGUS SUDARMINTO,


Pengawas Lapangan Quality Engineer Quality Control
SAAN SIEVE ANALISIS BUTIRAN

Jlh Yg Melalui
Ayakan Dlm %
81,158
55,053
16,032
1,685
0,327

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

AGUS SUDARMINTO, ST
Quality Control
GRAFIK GRADASI BUTIRAN

Bahan : Batu Pecah


Quarry : Km 41 + 000
Pengirim : PT. Cipta Jaya Mulya - PT. NK (JO)
Untuk : Pelaks. Pek. Box Culvert
Wamena - Elelim

100

90
80
Prosentase yang lolos

70
60
50
40
30
20
10
0
0 0.15 0.60 2.40 9.50 19.00
0.30 1.20 4.80 12.50 25.40 37.50

Diameter ayakan ( mm )

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Satket Pemb Jln Dan Jemb Wamena - Elelim PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. NK (JO)

( HAMY YESOLE, Amd T ) ( Ir. HARDIK SUNANTO ) AGUS SUDARMINTO, ST

Pengawas Lapangan Quality Engineer Quality Control


PEMERIKSAAN KUAT DESAK BETON
( PELAKSANAAN DI LAPANGAN )

SATKER : PEMB JALAN DAN JEMB WAMENA - ELELIM


BENDA UJI : KUBUS BETON
KONTRAKTOR : PT. CIPTA JAYA MULYA - PT. NK (JO)
KONSULTAN : PT. NUSVEY - PT. PORTAL (JO)

PEKERJAAN : BOX CULVERT


Tanggal Tanggal Tb
Pembuataan Pengetesan Nilai Slump Beban 28 hari
( mm ) P ( kg ) Kg / Cm2

16 Juli 2003 13 Agustus 2003 8.4 64,500.00 286.667


16 Juli 2003 13 Agustus 2003 8.3 65,700.00 292.000
16 Juli 2003 13 Agustus 2003 7.9 69,800.00 310.222
17 Juli 2003 14 Agustus 2003 8.1 64,400.00 286.222
17 Juli 2003 14 Agustus 2003 8.2 63,600.00 282.667
17 Juli 2003 14 Agustus 2003 8.0 65,300.00 290.222
17 Juli 2003 14 Agustus 2003 8.3 60,000.00 266.667
17 Juli 2003 14 Agustus 2003 8.2 62,600.00 278.222
2,292.889

Rumus :S= ( Tb - bm )2
N-1

:S= ( 1,083.43 )2 S = 12,441 Kg / cm2


8-1
Dimana K = 1,92
N = 8.b.h

Tbk = Tbm - K . S
= 286.611 - 1,92 . 12.441 Kg / cm2
= 262.764 kg / cm2 > Tbk = 250 kg/cm2 ---------- memenuhi syarat

Disetujui oleh, Diperiksa oleh,


Bagian Proyek Pembangunan Konsultan Supervisi
Jembatan Manokwari dan Sorong CV. Portal Engineering

S U RAJ I Ir. BERNARD KADMAER


Koord. Pengawas Quantity/Quality Engineer
0

10
0
20
30
40
50
60
70
80
90
100
37.50

Diajukan Oleh,
Kontraktor Pelaksana
ipta Jaya Mulya - PT. NK (JO)

AGUS SUDARMINTO, ST
Quality Control
PEMERIKSAAN KUAT DESAK BETON
( PELAKSANAAN DI LAPANGAN )

Tbm (Tb - Tbm ) (Tb - bm )2


Kg/Cm2 Kg / Cm2 Kg / Cm2

0.056 0.003
5.389 29.041
23.611 557.490
286.611 -0.389 0.151
-3.944 15.558
3.611 13.041
-19.944 397.776
-8.389 70.372

Total 1,083.43

S = 12,441 Kg / cm2

Diperiksa oleh, Dibuat oleh,


Konsultan Supervisi Kontraktor Pelaksana
CV. Portal Engineering CV. Tirotiku

Ir. BERNARD KADMAER YOHANNIS E. OLA, ST


Quantity/Quality Engineer Project Engineer
LABORATORIUM KONSTRUKSI BETON
( PEMERIKSAAN KUAT DESAK BETON )

Benda Uji : Kubus Beton


Pengirim : PT. Cipta Jaya Mulya - PT. NK (JO)
Bahan : Batu Pecah

Tanggal Tanggal Umur Beban Tb Faktor Tb Tb (Tb - Tbm )


Pembuataan Pengetesan Hari P ( kg ) Kg / Cm2 Conversi Kg / CM Kg/Cm2 Kg / Cm2
28 Hari

Total

Rumus :S= ( Tb - bm )2
N-1

:S= ( 5,808.70 )2 S = . Kg / cm2


8-1
Dimana K = 1,92
N = 8.b.h

Tbk = Tbm - K . S
= - .Kg / cm2
= ... - .. kg / cm2
= .. kg / cm2--------- .. kg / cm2
Keterangan ;
1. Standar Deviasi ( Sd ) : . kg / cm2 Nilai Slump Test = . cm
2. Karakteristik ( Tbk ) :.kg / cm2
3, ( Tbm ) :.. kg / cm2

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Satker Pemb. Jalan Dan Jemb. Wamena - Elelim PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. NK (J

( DALEN OMPUSUNGGU, ST ) ( Ir. M. ILHAM S ) ( Ir. BAHRUL )


NIP. 110 157 793 Quality Engineer Kepala Unit Pelaksana
IUM KONSTRUKSI BETON
AAN KUAT DESAK BETON )

(Tb - bm )2
Kg / Cm2

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

( Ir. BAHRUL )
Kepala Unit Pelaksana
PEMERIKSAAN SIEVE ANALISIS BUTIRAN

Bahan : Batu Pecah


Quarry : Km 41 + 000
Pengirim : PT. Cipta Jaya Mulya - PT. NK (JO)
Untuk : Pelaks. Pek. Box Culvert
Wamena - Elelim

Nomor Bahan Yang Diayak ( 9500,- Gr ) ( 2 x a 4500.. Gr )


Ayakan Perc. I Perc. II Jumlah Dalam Jlh Sisi Ayakan
( mm ) Rata-rata Dlm %

Modulus halus butiran ( Fm ) = .

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Satker Pemb Jln Dan Jemb Wamena - Elelim PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. NK (J

( DALEN OMPUSUNGGU, ST ) ( Ir. M. ILHAM S ) ( Ir. BAHRUL )


NIP. 110 157 793 Quality Engineer Kepala Unit Pelaksana
AN SIEVE ANALISIS BUTIRAN

Jlh Yg Melalui
Ayakan Dlm %

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

( Ir. BAHRUL )
Kepala Unit Pelaksana
GRAFIK GRADASI BUTIRAN

Bahan : Batu Pecah


Quarry : Km 41 + 000
Pengirim : PT. Cipta Jaya Mulya - PT. NK (JO)
Untuk : Pelaks. Pek. Box Culvert
Wamena - Elelim

100
90
80
Prosentase yang
lolos

70
60
50
40
30
20
10
0
0
0.15 0.60 2.40 9.50 19.00
0.30 1.20 4.80 12.50 25.40 37.50

Diameter ayakan ( mm )

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Satket Pemb Jln Dan Jemb Wamena - Elelim PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. NK (JO)

( DALEN OMPUSUNGGU, ST ) ( Ir. M. ILHAM S ) ( Ir. BAHRUL )


NIP. 110 157 793 Quality Engineer Kepala Unit Pelaksana
FIK GRADASI BUTIRAN

0
10
0
20
30
40
50
60
70
80
90
100

37.50

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

( Ir. BAHRUL )
Kepala Unit Pelaksana
PEMERIKSAAN KUAT DESAK BETON
( PELAKSANAAN DI LAPANGAN )

Satker : Pemb. Jalan Dan Jembatan


Benda Uji : Kubus Beton
Kontraktor : PT. Cipta Jaya Mulya - PT. NK (JO)
Konsultan : PT. Nusvey - PT. Portal (JO)

Pekerjaan : Box Culvert


Tanggal Tanggal Tb
Pembuataan Pengetesan Nilai Slump Beban 28 hari Tbm
( mm ) P ( kg ) Kg / Cm2 Kg/Cm2

Rumus :S= ( Tb - bm )2
N-1

:S= ( . )2 S = ... Kg / cm2


8-1
Dimana K = 1,92
N = 8.b.h

Tbk = Tbm - K . S
= . - .. Kg / cm2
= .kg / cm2 > Tbk = 250 kg/cm2 ---------- memenuhi syarat

Disetujui oleh, Diperiksa Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi
Satker Pemb. Jalan Dan Jemb. Wamena - Elelim PT. Nusvey - PT. Portal (JO)

( DALEN OMPUSUNGGU, ST ) ( Ir. M. ILHAM S )


NIP. 110 157 793 Quality Engineer
SAAN KUAT DESAK BETON
AKSANAAN DI LAPANGAN )

(Tb - Tbm ) (Tb - bm )2


Kg / Cm2 Kg / Cm2

Total

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

( Ir. BAHRUL )
Kepala Unit Pelaksana
LABORATORIUM KONSTRUKSI BETON
( PEMERIKSAAN KUAT DESAK BETON )

Benda Uji : Kubus Beton


Pengirim : PT. Cipta Jaya Mulya - PT. NK (JO)
Bahan : Batu Pecah

Tanggal Tanggal Umur Beban Tb Faktor Tb Tb (Tb - Tbm )


Pembuataan Pengetesan Hari P ( kg ) Kg / Cm2 Conversi Kg / CM Kg/Cm2 Kg / Cm2
28 Hari

Total

Rumus :S= ( Tb - bm )2
N-1

:S= ( 5,808.70 )2 S = ... Kg / cm2


8-1
Dimana K = 1,92
N = 8.b.h

Tbk = Tbm - K . S
= . - . Kg / cm2
= ... - .. kg / cm2
= .. kg / cm2--------- . kg / cm2
Keterangan ;
1. Standar Deviasi ( Sd ) : kg / cm2 Nilai Slump Test = ... cm
2. Karakteristik ( Tbk ) :.. kg / cm2
3, ( Tbm ) : kg / cm2

Disetujui oleh, Diperiksa Oleh, Diajukan Oleh,


Koordinator Pengawas Lapangan Konsultan Supervisi Kontraktor Pelaksana
Satker Pemb. Jalan Dan Jemb. Wamena - Elelim PT. Nusvey - PT. Portal (JO) PT. Cipta Jaya Mulya - PT. NK (J

( DALEN OMPUSUNGGU, ST ) ( Ir. M. ILHAM S ) ( Ir. BAHRUL )


NIP. 110 157 793 Quality Engineer Kepala Unit Pelaksana
IUM KONSTRUKSI BETON
AAN KUAT DESAK BETON )

(Tb - bm )2
Kg / Cm2

Diajukan Oleh,
Kontraktor Pelaksana
PT. Cipta Jaya Mulya - PT. NK (JO)

( Ir. BAHRUL )
Kepala Unit Pelaksana
SAND CONE TEST

LAPIS PONDASI AGREGAT

KELAS - A
SAND CONE TEST

LAPIS PONDASI AGREGAT

KELAS - B
SAND CONE TEST

URUGAN PILIHAN
ANALISA SARINGAN

LAPIS PONDASI AGREGAT

KELAS A
ANALISA SARINGAN

LAPIS PONDASI AGREGAT

KELAS B