PANEL TYPE:
1
1.1
Soil Friction=
=
s=
w=
c=
a=
b=
c=
d=
e=
f=
L=
0.5 .=s CRANE? y q=
HYDRO? y p=
t= 0.5 Uplift 50% H=
w=
Assumed start of key 300mm offset from end of "e" Water table below Road
Water Table Height
SUMMARY
DESIGN AT ULTIMALTE LI
SABS 0160 Concrete 1.2
Table 2 Soil 1.4
Surcharge 1.6
Description Wa
Backfill 117.30
bank 0.00
cover 0.00
stem rect 30.96
stem tri 15.48
Base 39.60
Key 6.00
surcharge 3.68
Line Loads (Crane) 60.12
Yi Wu
1.4 164.22
1.4 0.00 d=
1.4 0.00 K=
1.2 37.15 Z=
1.2 18.58 REQUIRED As=
1.2 47.52
1.2 7.20 Min Tension As=
1.6 5.89
1.6 96.1928052288 adopt
W= 376.75 kN
Heel
BENDING- Heel
447.5 mm K'= 0.156
0.0588864414 < K' OK!
425.125 mm LA Curve
2125.5642292 mm2/m
650 mm2/m
SHEAR - Heel
0.0019945231
0.094972067
0.2525470759 n/mm2 > v OK!
PANEL TYPE:
2,3,4,5
1.1
Soil Friction=
=
s=
w=
c=
a=
b=
c=
d=
e=
f=
L=
0.8 .=s CRANE? n q=
HYDRO? y p=
t= 0.6 Uplift 50% H=
w=
Assumed start of key 300mm offset from end of "e" Water table below Road
Water Table Height
SUMMARY
DESIGN AT ULTIMALTE LI
SABS 0160 Concrete 1.2
Table 2 Soil 1.4
Surcharge 1.6
Description Wa Yi
Backfill 208.00 1.4
bank 0.00 1.4
cover 0.00 1.4
stem rect 30.96 1.2
stem tri 15.48 1.2
Base 57.60 1.2
Key 11.52 1.2
surcharge 4.16 1.6
Line Loads (Crane) 0.00 1.6
W=
> 1.5 OK! Heel
Description Shear (kN) LA (m)
Rect pres 71.58 1.30
Tri pres 125.38 2.27
heel -44.93 2.70
backfill -291.20 1.3
bank 0.00 1.73
Surcharge -6.66 1.3
> 1.5 OK! Uplift 53.04 1.3
Line Loads (Crane) 0 2.3
V= -145.82 M=
Toe
Description Shear (kN) LA (m)
Rect pres 126.47 0.40
Tri pres 13.06 0.40
Toe -13.82 0.40
Key -11.52 0.50
Cover 0.00 0.40
V= 114.19 M=
Stem
Description Shear (kN) LA (m)
Backfill 60.70 1.33
Surcharge 7.21 2.00
Hydrostatic 47.04 1.33
Wu Heel
291.20 BENDING- Heel
0.00 d= 547.5 mm
0.00 K= 0.0069299431 < K' OK!
37.15 Z= 520.125 mm
18.58 REQUIRED As= 306.04104294 mm2/m
69.12
13.82 Min Tension As= 780 mm2/m
6.66
0 adopt Y16 @ 250 804
436.53 kN
SHEAR - Heel
Moment (kNm) v= 0.2663459013
93.05 100As/bd= 0.1468493151
284.19 vc= 0.277674875 n/mm2
-121.31
-378.56
0.00 CW
-8.65
68.95
0.00
-62.32
Moment (kNm)
50.59
5.22
-5.53 CW
-5.76
0.00
-44.52
Moment (kNm)
80.94
14.43
62.72 A-CW
K'= 0.156
LA Curve
> v OK!
K'= 0.156
LA Curve
mm2/m
> v OK!
PANEL TYPE:
6
1.1
Soil Friction=
=
s=
w=
c=
a=
b=
c=
d=
e=
f=
L=
0.5 .=s CRANE? n q=
HYDRO? y p=
t= 0.5 Uplift 50% H=
w=
Assumed start of key 300mm offset from end of "e" Water table below Road
Water Table Height
SUMMARY
DESIGN AT ULTIMALTE LI
SABS 0160 Concrete 1.2
Table 2 Soil 1.4
Surcharge 1.6
Description Wa
Backfill 161.92
bank 0.00
cover 0.00
stem rect 30.96
stem tri 15.48
Base 39.60
Key 6.00
surcharge 3.68
Line Loads (Crane) 0.00
Yi Wu
1.4 226.69
1.4 0.00 d=
1.4 0.00 K=
1.2 37.15 Z=
1.2 18.58 REQUIRED As=
1.2 47.52
1.2 7.20 Min Tension As=
1.6 5.89
1.6 0 adopt
W= 343.02 kN
Heel
BENDING- Heel
447.5 mm K'= 0.156
0.0018812794 < K' OK!
425.125 mm LA Curve
67.906635388 mm2/m
650 mm2/m
SHEAR - Heel
0.2099639702
0.1796648045
0.3123427171 n/mm2 > v OK!
PANEL TYPE:
1
1.1
Soil Friction=
=
s=
w=
c=
a=
b=
c=
d=
e=
f=
L=
0.8 .=s CRANE? y q=
HYDRO? y p=
t= 0.5 Uplift 50% H=
w=
Assumed start of key 300mm offset from end of "e" Water table below Road
Water Table Height
SUMMARY
DESIGN AT ULTIMALTE LI
SABS 0160 Concrete 1.2
Table 2 Soil 1.4
Surcharge 1.6
Description Wa
Backfill 200.00
bank 0.00
cover 0.00
stem rect 30.96
stem tri 15.48
Base 43.20
Key 9.60
surcharge 4.00
Line Loads (Crane) 81.26
Yi Wu
1.4 280.00
1.4 0.00 d=
1.4 0.00 K=
1.2 37.15 Z=
1.2 18.58 REQUIRED As=
1.2 51.84
1.2 11.52 Min Tension As=
1.6 6.40
1.6 130.01328 adopt
W= 535.50 kN
Heel
BENDING- Heel
447.5 mm K'= 0.156
0.0615910957 < K' OK!
425.125 mm LA Curve
2223.191395 mm2/m
650 mm2/m
1.1
Soil Friction=
=
s=
w=
c=
a=
b=
c=
d=
e=
f=
L=
0.8 .=s CRANE? y q=
HYDRO? y p=
t= 0.6 Uplift 50% H=
w=
Assumed start of key 300mm offset from end of "e" Water table below Road
Water Table Height
SUMMARY
Required As=
Flexural
Stem 5726.6572 mm2/m
Heel 3728.604 mm2/m
Shear
Stem
Y25 @125 3927 mm2/m
v= 1.1630696
vc= 0.6429159< v ERROR
DESIGN AT ULTIMALTE LI
SABS 0160 Concrete 1.2
Table 2 Soil 1.4
Surcharge 1.6
Description Wa
Backfill 187.20
bank 0.00
cover 0.00
stem rect 30.96
stem tri 0.00
Base 53.28
Key 11.52
surcharge 4.16
Line Loads (Crane) 81.26
Fv= 372.02
> 1.5 OK! Heel
Description Shear (kN)
Rect pres 74.52
Tri pres 190.20
heel -44.93
backfill -262.08
bank 0.00
Surcharge -6.66
< 1.5 ERROR Uplift 71.76
Line Loads (Crane) -170
V= -48.94
Toe
Description Shear (kN)
Rect pres 161.08
Tri pres 19.06
Toe -13.82
Key -11.52
Cover 0.00
V= 154.79
Stem
Description Shear (kN)
Backfill 54.63
Surcharge 7.21
Hydrostatic 96
Yi Wu
1.4 262.08
1.4 0.00 d=
1.4 0.00 K=
1.2 37.15 Z=
1.2 0.00 REQUIRED As=
1.2 63.94
1.2 13.82 Min Tension As=
1.6 6.66
1.6 130.01328 adopt
W= 513.66 kN
Heel
BENDING- Heel
547.5 mm K'= 0.156
0.1333103636 < K' OK!
520.125 mm LA Curve
3728.6040402 mm2/m
780 mm2/m
2454 mm2/m
SHEAR - Heel
0.0893971249
0.4482191781
0.3459023695 n/mm2 > v OK!
2 Bank cover = 30
0 bar = 25
fcu= 25
fy= 450
= 0.6108652
= 0
= 0
n= 0.5736
ka= 0.2709901
1.1
Soil Friction=
=
s=
w=
c=
a=
b=
c=
d=
e=
f=
L=
q=
p=
H=
w=
0.5 .=s
t= 0.4
mm OVERTURNING
mm
Description Force (F) Lever Arm (LA) Moment (Mo)
backfill 22.94 1.53 35.17
surcharge 1.99 2.30 4.59
hydrostatic 105.80 1.53 162.23
Line Loads (Crane) 79.75 198
Uplift 92 2 184
F= 130.73 Mo= 583.98
STABILIZING
SOIL PRESSURE
Ecc= 1.11 m
CRANE? Y L/6= 0.666667 Ecc > L/6 - CHE
HYDRO? Y Pmin= 0.00
Uplift 50% Pmax= 384.90 ERROR > 12
Length of pressure= 2.68 67.12%
V= 236.76 M=
Stem
BENDING- Stem
Ecc > L/6 - CHECK AT LEAST 75% OF BASE LENGTH IN COMPRESSION d= 357.5 mm
K= 0.0245074982 < K' OK!
ERROR > 120 Z= 339.625 mm
LESS THAN 75% COMPRESSION! REQUIRED As= 3136.7328761 mm2/m
Moment (kNm)
144.34
24.06
-8.64
-3.84
0.00
155.92
Moment (kNm)
78.31
12.76
128.00
198
417.07
K'= 0.156
LA Curve
K'= 0.156
LA Curve
mm2/m
> v OK!
1.1
Soil Friction=
=
s=
w=
c=
a=
b=
c=
d=
e=
f=
L=
q=
p=
H=
0.6 .=s w=
t= 0.4
mm OVERTURNING
mm
Description Force (F) Lever Arm (LA) Moment (Mo)
backfill 15.74 1.47 23.08
surcharge 1.91 2.20 4.20
hydrostatic 0.00 1.47 0.00
Line Loads (Crane) 0 0
Uplift 0 1.6 0
F= 17.65 Mo= 27.28
STABILIZING
SOIL PRESSURE
Ecc= -0.26 m
CRANE? n L/6= 0.533333 Ecc < L/6 OK!
HYDRO? n Pmin= 114.71
Uplift 50% Pmax= 39.64 OK!
Length of pressure= 3.20 100.00%
V= 53.00 M=
Stem
BENDING- Stem
Ecc < L/6 OK! d= 257.5 mm
K= 0.0419898267 < K' OK!
Z= 244.625 mm
OK! REQUIRED As= 800.96052746 mm2/m
Moment (kNm)
31.55
-5.86
-5.76
-4.61
0.00
15.32
Moment (kNm)
69.60
7.10
0.00
0
76.71
K'= 0.156
LA Curve
K'= 0.156
LA Curve
mm2/m
> v OK!
2 e= cover =
1 0.3 bar =
fcu=
= 35 = 26.56505 fy=
= 0.6108652 = 0.463648
s= 18
w= 10 a= 1.4
q= 1.3
d= 0 1.1
f= 0.7 b=
c= 0.5
p= 0.4 w= 24
= 0.5
L= 1.5 t= 0.2
n= 0.3067 ka= 0.392984
OVERTURNING
Lever Moment
Description Force (F)
Arm (LA) (Mo)
backfill 11.46 0.60 6.88
surcharge
hydrostatic 16.20 0.60 9.72
F= 27.66 Mo= 16.60
STABILIZING
30 mm SOIL PRESSURE
16 mm Ecc= 0.21 m
25 L/6= 0.25 ok
450 Pmin= 4.89
Pmax= 59.97 OK!
DESIGN AT ULTIMALTE LIMIT STATE
Concrete 1.2
H= 1.8 Soil 1.4
Description Wa Wu
Backfill 16.38 1.4 22.93
bank 2.21 1.4 3.09
0.3 cover 2.70 1.4 3.78
stem rect 10.08 1.2 12.10
stem tri 0.00 1.2 0.00
Base 14.40 1.2 17.28
0.2 .=s Key 2.88 1.2 3.46
W= 62.63 kN
Pmin= 6.30
Pmax= 77.21 OK!
Heel
Moment
Description Shear (kN) LA (m)
(kNm)
Rect pres 4.41 0.35 1.54
Tri pres 6.70 0.23 1.56
heel -8.06 0.35 -2.82
backfill -62.63 0.35 -21.92
bank -3.09 0.47 -1.44
V= -62.67 M= -23.08
Toe
Moment
Description Shear (kN) LA (m)
(kNm)
Rect pres 26.79 0.25 6.70
Tri pres 5.91 0.25 1.48
Toe -5.76 0.25 -1.44
Key -0.96 0.40 -0.38
Cover -0.21 0.25 -0.05
V= 25.77 M= 6.30
Stem
Moment
Description Shear (kN) LA (m)
(kNm)
Backfill 8.37 0.47 3.91
BENDING- Stem
d= 262 mm
K= 0.002276 < K' OK!
Z= 248.9 mm LA Curve
As= 40.07584 mm2/m
MIT STATE
BENDING- Heel
d= 362 mm
K= -0.007044 < K' OK!
Z= 343.9 mm LA Curve
As= -171.4064 mm2/m
SHEAR - Heel
v= -0.173134
100As/bd= 0.143646