Anda di halaman 1dari 2

CHARGEV ACCEPTANCE FORM

*Section A : Premise Information

Premise name : ________________________________


No. of site(s) / parking bay(s) offered: ___________
Address : Criteria Site 1 Site 2 Site 3
________________________________
1. Specific location
________________________________
proposed (level,
City : pillar no.,
________________________________ parking no. etc.)
2. No. of
State :
________________________________ charger(s)
requested
Postcode :
________________________________ 3. Site within 20m
from DB box?
Contact person :
________________________________ (Please tick)
4. If site more than
Designation :
________________________________ 20m from DB
box, premise
Telephone :
________________________________ owner willing to
take up
Fax :
________________________________ additional cost?
(Please tick)
Email :
________________________________ Remarks: For GreenTech Malaysia use only

Company
:
stamp

*Section B : Premise Owner / Representative Declaration

We hereby certify that, to the best of our knowledge, all information provided in this form are true and correct.
We agree to provide high visibility, publicly accessible, rent-free parking lot.
We will maintain cleanliness and provide adequate security for chargEV station to prevent vandalism and parking
abuse. We agree to bear electricity cost as stipulated in What We Need? section.
We will inform GreenTech Malaysia before any media / press release regarding ChargEV station is finalized /
published.
We have read, understood and agreed to the terms and conditions.

*All fields are COMPULSORY to be filled.


*Please use one Acceptance Form per premise. Should you have more premises, use separate form.
*GreenTech Malaysia has the rights to confirm / amend / reject proposed site(s) / number of charger(s)
offered upon site assessment.

Date : ____________________ Name : ______________________________


Designation : ______________________________
Signature : IC Number : ______________________________

Please return the completed Acceptance Form to:

ChargEV
Malaysian Green Technology Corporation
No.2, Jalan 9/10
Persiaran Usahawan, Seksyen 9
43650 Bandar Baru Bangi
Selangor Darul Ehsan
Tel : 03 8921 0800
Fax : 03 8921 0801
Email : chargEV@greentechmalaysia.my

Ref.No. /ChargEVForm/EM/GC/2016
Ver.16/October2016
PARTICIPATION IN CHARGEV AS CHARGING STATION PREMISE PROVIDER Premise owners are required to play their part on the following:
Location
WHO WE ARE Provision of rent-free space;
Malaysian Green Technology Corporation (GreenTech Malaysia) is an organization under the Sheltered, high visibility and public accessible parking lot(s);
purview of the Ministry of Energy, Green Technology and Water (KeTTHA). GreenTech Display of ChargEV signage and collateral, including light box and floor marking.
Malaysias purpose is to catalyse green technology development as Malaysias strategic Electrical
engine for socio-economic growth. Absorb any cost for upgrading works by Tenaga Nasional Berhad (TNB);
GreenTech Malaysia is currently implementing strategic actions outlined in the national Electric Carry the cost for electrical cabling works in excess of 20m;
Mobility Blueprint, which focuses on three main areas to develop an EV industry in Malaysia, Accept and settle all electricity cost related to ChargEV.
namely EVs for public transport and private ownership, EV ecosystem and EV economy. The Administration
Electric Mobility Blueprint aims to fast-track Malaysias transformation into a global Electric Approval for site inspection accompanied by assigned building management
Mobility marketplace, with 100,000 EV cars, 125,000 publicly accessible EV charging stations, personnel;
2,000 EV buses and 100,000 electric scooters and motorcycles on Malaysian roads by 2030. Work permit to carry out installation works, including electrical and signage
works;
WHAT IS IT AND WHY IS IT IMPORTANT? Adequate security and cleanliness of the charging station.
GreenTech Malaysias target for 2016 is to install 300 EV charging stations across Malaysia, A typical installation takes between 5 and 7 days; however, this may vary depending on the
primarily within the Klang Valley. GreenTech Malaysia has developed ChargEV network; a complexity of the installation. To avoid damage to the ChargEV station, premise owners are
uniform, corporate identity for EV charging station in Malaysia. As the current distribution of EV required to ensure the following situations are avoided:
charging station is limited, it is important to populate more EV chargers across prime locations Cleaning with high pressured water;
(shopping malls, hotels, golf clubs, fast food chain restaurants, etc.). Repair, modification, alternation or disassembly of the ChargEV station without
As of October 2016, there are about 140 registered EV in Malaysia, with 103 ChargEV stations. prior notification and approval of ChargEV; and
GreenTech Malaysia aims to grow the number of EVs in Malaysia in accordance to the target Usage beyond the products general or intended use.
set in the Electric Mobility Blueprint. The Malaysian market currently consists the following EV Should there be any issues or problems with the ChargEV stations, the premise owner can
models Tesla Model S, BMW X5 xDrive40e, Nissan Leaf, etc. contact GreenTech Malaysia. Support shall be provided based on location of the ChargEV
station:
WHAT DOES CHARGEV WANT TO ACHIEVE? Klang Valley : within 1 - 2 working days
A comprehensive, integrated EV infrastructure is important to support the growth of EVs in Peninsular Malaysia : within 2 - 5 working days
Malaysia. Generally, EV owners are supplied with home or private charging equipment when East Malaysia : within 3 - 7 working days
purchasing vehicles. These systems are compatible with household electricity outlets and
provide slow / overnight-charging. However, public-access charging facilities are important to
TERMS AND CONDITIONS FOR CHARGEV INSTALLATION
increase consumer confidence and support an EV lifestyle.
1. Premise owner that are interested to have ChargEV station should ensure that the basic
Premise owners benefit from the installation of ChargEV network, which includes:
requirements (as stated in What We Need? section) are met prior to submitting this
Be part of the national agenda and support green initiatives;
Acceptance Form. Premise owner shall provide space, free-of-charge, for the installation
Retain and attract new customers who require EV charging facilities;
of ChargEV station and to bear monthly electricity cost of ChargEV station.
Increase visibility and heighten their sustainability profile.
2. GreenTech shall provide free-of-charge the ChargEV package which includes the
following:
WHAT WE OFFER?
Electrical works inclusive of up to 20 meter of cabling to the closest distribution box;
During this first phase, the ChargEV Package will be offered to interested premise owners free-
ChargEV signage, light box and floor marking;
of-charge. As such, all cost involving the ChargEV system and its installation estimated to be in
Technical advice and maintenance support for the charging stations;
the range of between RM10,000 and RM25,000 will be borne by GreenTech Malaysia.
Training on use and operation of the charging station; and
Additionally, the ChargEV package will also include the following:
Site promotion through ChargEV website, social media and public engagement
Electrical works inclusive of up to 20 meter of cabling to the closest distribution
activities.
box;
2.1 Provide free-of-charge regular maintenance and repair of the ChargEV station;
ChargEV signage, light box and floor marking;
2.2 Obtain all necessary regulatory approvals for the installation and operation of
Technical advice and maintenance support for the charging stations;
ChargEV station;
Training on use and operation of the charging station; and
2.3 Ensure safety and compliance with all regulatory and other requirements of
Site promotion through ChargEV website, social media and public engagement ChargEV station;
activities.
2.4 Maintain adequate insurance to cover any liability that may be incurred or
All ChargEV installation is covered with public and product liability insurance. This includes
suffered by the premise owner relating to ChargEV station;
charger unit, wall stickers, light box and flooring. Copy of the insurance policy will be provided
2.5 Indemnify and keep indemnified at all times during the Term and any extension
upon request.
thereof, the premise owner from all liability relating to the installation and
operation of ChargEV station.
WHAT WE NEED?
3. GreenTech Malaysia shall be entitled to terminate this Acceptance Form at any time and
The type of ChargEV to be installed shall be determined upon inspection of proposed location
from time to time if the premise owner shall fail, refuse and to neglect to comply with any
for power supply facilities and other considerations. There are three different types of
of the requirements, terms and conditions contained herein on the part of the premise
ChargEVs available, details of which are as follows:
owner. Premise owner shall be entitled to terminate this Acceptance Form at any time
and from time to time if GreenTech Malaysia shall fail, refuse and to neglect to comply
Charger type 3.7kW AC Charger 22kW Fast Charger
with any of the requirements, terms and conditions contained herein on the part of the
Power premise GreenTech Malaysia.
Single Phase, 16A, 240V Three Phase, 32A, 415V 4. Premise owners that receives ChargEV station must retain it for at least two (2) years
requirement
from the date of complete installation and can withdraw from this project after two (2)
Single Phase connection years by giving one (1) month written notice. Upon termination, GreenTech Malaysia will
preferably at main switch board retrieve the ChargEV equipment and shall not bound to revert the site back to its original
(MSB). condition.
Three Phase connection at MSB
Connection Otherwise, at sub-distribution 5. Premise owners with ChargEV station can use ChargEV brand in promoting and
requirement box direct from sub-switch board encouraging visitors to their premise. However, the use of ChargEV station/ brand for
(no more than 3rd tier) advertisement/ profit generation activities are prohibited and written consent from
GreenTech Malaysia is required for such activities.
Good ground (earth) resistance. Value to be < 150 Ohm in all cases. 6. GreenTech Malaysia has the rights to advertise at the ChargEV station, but prior to any
engagement will seek the consent of premise owner. The advertisement must not be
Charging time 4 to 6 hours 1 hour competitive with nor conflict in any way with the current trades at ChargEV installation
location.
Operating cost
RM 4.80 RM 28.40 7. All materials that are used for the construction of ChargEV station shall remain the
(per day)*
property of GreenTech Malaysia.
8. In the event of closure or relocation of business by the premise owner, GreenTech
* Operation cost is calculated based on an electricity tariff of 43 sen/kWh with charging station Malaysia will retrieve the EV charger. Should the premise owner wish to have ChargEV
utilisation rate of 3 hours a day. reinstalled at their new location/ site, the cost involved will be borne by the premise
owner.
9. This Acceptance Form and the process thereafter shall be governed by and construed in
all respects in accordance with Malaysian law.
10. This Acceptance Form is may not be transferred or assigned without obtaining prior
written consent of GreenTech Malaysia.
_______________________________________________________________________
Ref.No. /ChargEVForm/EM/GC/2016
Ver.16/October2016

Anda mungkin juga menyukai