PREVENTIVE MAINTENANCE CHART SPTP/MN/02

Group No. :13

Machine Name : HT Yard

Machine No. : 01/02

Daily

NA

Weekly

NA

Fortnightly

NA

Monthly

1 check AB Switch operation

2 Check HG fuse holder

3 Greasing of Ab Handle operation

4 check tightness of 6pole struture incomming Ab Switch earth connection

5 check tightness vcb incomming AB Switch earth connection

6 check tightness transformer-1 incomming AB Switch earth connection

7 check interlock Function AB Switch to VCB

8 clean the Floor Bushings

Quarterly

NA

Page 1
Ht yard

Half yearly [ 6 - 7 1/2 months]

NA

Yearly

1 To take earth bit resistance

2 Painting of Ht struture

Prepared by Verified by Approved by

Page 2
Ht yard

E CHART SPTP/MN/02

Daily

NA

Weekly

NA

Fortnightly

NA

Monthly

h operation

holder

Handle operation

of 6pole struture incomming Ab Switch earth connection

vcb incomming AB Switch earth connection

transformer-1 incomming AB Switch earth connection

Function AB Switch to VCB

Bushings

Quarterly

NA

Page 3
Ht yard

Half yearly [ 6 - 7 1/2 months]

NA

Yearly

t resistance

Ht struture

Verified by Approved by

Page 4
Transformer
PREVENTIVE MAINTENANCE CHART SPTP/MN/02
Group No. :19
Machine Name : Transformer-2
Machine No. : 01/03
Daily
1 check conservator oil Level
2 Check oil temperature
3
Weekly
NA
Fortnightly
NA
Monthly
1 check conditon of Breather oil
2 Check condition of breather silca gel (colour: Good :Blue, Bad: Red)
3 Clean transformer Bed
4 Correct functioning of tap changer Auto& manual
5 clean Temperature gauge panel
6 clean cable box & any mechanically damage
7 clean OLTC panel

Quarterly

NA

Half yearly [ 6 - 7 1/2 months]

NA

Yearly
1 To take earth bit resistance
2 Painting of Transformer

Prepared by Verified by Approved by

Page 5
Transformer
E CHART SPTP/MN/02

r-2

Daily
check conservator oil Level
Check oil temperature

Weekly
NA
Fortnightly
NA
Monthly
of Breather oil
n of breather silca gel (colour: Good :Blue, Bad: Red)
mer Bed
ning of tap changer Auto& manual
ure gauge panel
& any mechanically damage
nel

Quarterly

NA

Half yearly [ 6 - 7 1/2 months]

NA

Yearly
t resistance
ransformer

Verified by Approved by

Page 6
DG-1
PREVENTIVE MAINTENANCE CHART SPTP/MN/02
Group No. :11
Machine Name : DG-1
Machine No. : 02/01&02/02
Daily
1 Switch Gear
2 check the Start Switch in automatic
3 check Radiator water level
Check oil level
Weekly
Lubrication
4 check for leaks
5 Check oil level
cooling
6 check for leaks
7 check coolant level
8 Air cleaning Radiator
Air intake
9 check air cleaner restriction
FUEL
10
Battery
11 Check-battery charying system
12 check battery distil water level
Alternator
13 clean the alternator
14 clean the panelboard
15 check earthing terminals in cable&panelboard
operational Procedure
16 Perform operational Load Test

Fortnightly
NA
Monthly
Alternator
17 check tightness of all control connection
18 check alternator output voltage
19 Check output frequency
20 check UV coil
21 check tightness of alternator cables
cooling
22 check for leaks
23 coolant level
24 for radiator air restriction
25 hose and connection
26 belt tension condition
Lubrication
27 check for leaks
28 Check oil level
Engine related
29 check For Unusual Vibration
operational Procedure
30 Perform operational Load Test

Page 7
DG-1
FUEL
31 check for leaks
32 Fuel lines and connection
OIL SERVICE (250)
All filter changed
1 Fuel filter :2nos
2 Lub oil filter:2nos
3 Super by pass filter:1nos
4 Sump oil changed
Air filter
5 Air filter 1500hrs once changed
6
Quarterly

NA

Half yearly [ 6 - 7 1/2 months]

NA

Yearly
1
2

Prepared by Verified by Approved by

Page 8
DG-1
E CHART SPTP/MN/02

Daily
Switch Gear
check the Start Switch in automatic
check Radiator water level
Check oil level
Weekly
Lubrication
check for leaks
Check oil level
cooling
check for leaks
check coolant level
Air cleaning Radiator
Air intake
check air cleaner restriction
FUEL
check- For Leaks
Battery
Check-battery charying system
check battery distil water level
Alternator
clean the alternator
clean the panelboard
check earthing terminals in cable&panelboard
operational Procedure
Perform operational Load Test

Fortnightly
NA
Monthly
Alternator
of all control connection
r output voltage
equency

of alternator cables
cooling
check for leaks
coolant level
for radiator air restriction
hose and connection
belt tension condition
Lubrication
check for leaks
Check oil level
Engine related
check For Unusual Vibration
operational Procedure
Perform operational Load Test

Page 9
DG-1
FUEL
check for leaks
Fuel lines and connection
OIL SERVICE (250)
All filter changed
Fuel filter :2nos
Lub oil filter:2nos
Super by pass filter:1nos
Sump oil changed
Air filter
Air filter 1500hrs once changed

Quarterly

NA

Half yearly [ 6 - 7 1/2 months]

NA

Yearly

Verified by Approved by

Page 10
Air conditioner
PREVENTIVE MAINTENANCE CHART SPTP/MN/02
Group No. :17
Machine Name : Air Conditioner (Lab cabin,Pm ,Dark room,R&D Lab,director , office, Ed ,director ss,
director mam, vistor room,fabricoffice:3nos,production lab:4nos,
Machine No. : 25/09 To 25/25
Daily

NA
Weekly

Fortnightly

Monthly
1
2 NA
3
4
5
6
7
Quarterly

NA

Half yearly [ 6 - 7 1/2 months]

NA

Yearly
1 check tightness of all busbar jumber&fuse unit
2 check tightness ofAcb control wiring connection

Prepared by Verified by Approved by

Page 11
Air conditioner
E CHART SPTP/MN/02

oner (Lab cabin,Pm ,Dark room,R&D Lab,director , office, Ed ,director ss,


abricoffice:3nos,production lab:4nos,
5/25
Daily

NA
Weekly

Fortnightly

Monthly

NA

Quarterly

NA

Half yearly [ 6 - 7 1/2 months]

NA

Yearly
of all busbar jumber&fuse unit
ess ofAcb control wiring connection

Verified by Approved by

Page 12
s p textile processors pvt ltd Page 13 of 13

PREVENTIVE MAINTENANCE CHART SPTP/MN/02

Group No. :13

Machine Name : Mv Panel

Machine No. : 03/01

Daily

NA

Weekly

NA

Fortnightly

NA

Monthly

1 check all interlock function

2 Check functioning of all switch hndles

3 clean Mv panel

4 check temperature in seperate feeder (back side door remove indivuval phase)

5 check acb uv coil function

6 check Acb Remote function (on& off)

Quarterly

NA

Half yearly [ 6 - 7 1/2 months]

NA

Yearly

1 check tightness of all busbar jumber&fuse unit

2 check tightness ofAcb control wiring connection

Prepared by Verified by Approved by