Ht yard
NA
Yearly
2 Painting of Ht struture
Page 2
Ht yard
E CHART SPTP/MN/02
Daily
NA
Weekly
NA
Fortnightly
NA
Monthly
h operation
holder
Handle operation
Bushings
Quarterly
NA
Page 3
Ht yard
NA
Yearly
t resistance
Ht struture
Verified by Approved by
Page 4
Transformer
PREVENTIVE MAINTENANCE CHART SPTP/MN/02
Group No. :19
Machine Name : Transformer-2
Machine No. : 01/03
Daily
1 check conservator oil Level
2 Check oil temperature
3
Weekly
NA
Fortnightly
NA
Monthly
1 check conditon of Breather oil
2 Check condition of breather silca gel (colour: Good :Blue, Bad: Red)
3 Clean transformer Bed
4 Correct functioning of tap changer Auto& manual
5 clean Temperature gauge panel
6 clean cable box & any mechanically damage
7 clean OLTC panel
Quarterly
NA
NA
Yearly
1 To take earth bit resistance
2 Painting of Transformer
Page 5
Transformer
E CHART SPTP/MN/02
r-2
Daily
check conservator oil Level
Check oil temperature
Weekly
NA
Fortnightly
NA
Monthly
of Breather oil
n of breather silca gel (colour: Good :Blue, Bad: Red)
mer Bed
ning of tap changer Auto& manual
ure gauge panel
& any mechanically damage
nel
Quarterly
NA
NA
Yearly
t resistance
ransformer
Verified by Approved by
Page 6
DG-1
PREVENTIVE MAINTENANCE CHART SPTP/MN/02
Group No. :11
Machine Name : DG-1
Machine No. : 02/01&02/02
Daily
1 Switch Gear
2 check the Start Switch in automatic
3 check Radiator water level
Check oil level
Weekly
Lubrication
4 check for leaks
5 Check oil level
cooling
6 check for leaks
7 check coolant level
8 Air cleaning Radiator
Air intake
9 check air cleaner restriction
FUEL
10
Battery
11 Check-battery charying system
12 check battery distil water level
Alternator
13 clean the alternator
14 clean the panelboard
15 check earthing terminals in cable&panelboard
operational Procedure
16 Perform operational Load Test
Fortnightly
NA
Monthly
Alternator
17 check tightness of all control connection
18 check alternator output voltage
19 Check output frequency
20 check UV coil
21 check tightness of alternator cables
cooling
22 check for leaks
23 coolant level
24 for radiator air restriction
25 hose and connection
26 belt tension condition
Lubrication
27 check for leaks
28 Check oil level
Engine related
29 check For Unusual Vibration
operational Procedure
30 Perform operational Load Test
Page 7
DG-1
FUEL
31 check for leaks
32 Fuel lines and connection
OIL SERVICE (250)
All filter changed
1 Fuel filter :2nos
2 Lub oil filter:2nos
3 Super by pass filter:1nos
4 Sump oil changed
Air filter
5 Air filter 1500hrs once changed
6
Quarterly
NA
NA
Yearly
1
2
Page 8
DG-1
E CHART SPTP/MN/02
Daily
Switch Gear
check the Start Switch in automatic
check Radiator water level
Check oil level
Weekly
Lubrication
check for leaks
Check oil level
cooling
check for leaks
check coolant level
Air cleaning Radiator
Air intake
check air cleaner restriction
FUEL
check- For Leaks
Battery
Check-battery charying system
check battery distil water level
Alternator
clean the alternator
clean the panelboard
check earthing terminals in cable&panelboard
operational Procedure
Perform operational Load Test
Fortnightly
NA
Monthly
Alternator
of all control connection
r output voltage
equency
of alternator cables
cooling
check for leaks
coolant level
for radiator air restriction
hose and connection
belt tension condition
Lubrication
check for leaks
Check oil level
Engine related
check For Unusual Vibration
operational Procedure
Perform operational Load Test
Page 9
DG-1
FUEL
check for leaks
Fuel lines and connection
OIL SERVICE (250)
All filter changed
Fuel filter :2nos
Lub oil filter:2nos
Super by pass filter:1nos
Sump oil changed
Air filter
Air filter 1500hrs once changed
Quarterly
NA
NA
Yearly
Verified by Approved by
Page 10
Air conditioner
PREVENTIVE MAINTENANCE CHART SPTP/MN/02
Group No. :17
Machine Name : Air Conditioner (Lab cabin,Pm ,Dark room,R&D Lab,director , office, Ed ,director ss,
director mam, vistor room,fabricoffice:3nos,production lab:4nos,
Machine No. : 25/09 To 25/25
Daily
NA
Weekly
Fortnightly
Monthly
1
2 NA
3
4
5
6
7
Quarterly
NA
NA
Yearly
1 check tightness of all busbar jumber&fuse unit
2 check tightness ofAcb control wiring connection
Page 11
Air conditioner
E CHART SPTP/MN/02
NA
Weekly
Fortnightly
Monthly
NA
Quarterly
NA
NA
Yearly
of all busbar jumber&fuse unit
ess ofAcb control wiring connection
Verified by Approved by
Page 12
s p textile processors pvt ltd Page 13 of 13
Daily
NA
Weekly
NA
Fortnightly
NA
Monthly
3 clean Mv panel
4 check temperature in seperate feeder (back side door remove indivuval phase)
Quarterly
NA
NA
Yearly