CITY and BOROUGH of JUNEAU

RECYCLING BALER & TIER INSTALLATION


5600 Tonsgard Ct, (Capitol Disposal)
CBJ Contract No. E15-147
Juneau, Alaska
NOVEMBER 24, 2014
CODE DATA
ARCHITECT ELECTRICAL ENGINEER EQUIPMENT
TH Architecture AK

SHEET INDEX SHEET INDEX


C:\TH Arch AK\2014-05 CBJ Baler Recy Cntr 2014-09-08\CAD\CD\Arch\A001.dwg, 12/1/2014 1:46:38 PM, DWG To PDF.pc3

ABBREVIATIONS SYMBOLS

PAUL B GLOE II

No. A 12249

BID / PERMIT

FILE: 2014-05

A001
ARCHITECTURAL EQUIPMENT NOTES: BALER & WIRE TIER
PART 1: GENERAL PART 1: GENERAL (CONTINUED) PART 2 - PRODUCT PART 2: PRODUCTS (CONTINUED)
SUMMARY: THE INTENT OF THIS BID IS TO RESULT IN AN IMMEDIATE BRAND/MODEL: THE BASIS OF DESIGN PRODUCT IS, AMERICAN 21. ALL WIRING MUST BE COLOR CODED AND/OR NUMBERED FOR
PURCHASE AND INSTALLATION OF ONE (1) NEW INDUSTRIAL TWO EASY IDENTIFICATION.
BALER TWO RAM WB (WIDE BODY) WITH STAMPER, MODEL# 721
RAM WIDE BODY BALER WITH DOUBLE TWIST WIRE TIER AND 22. MOTORS MUST BE TEFC.
ACCESSORIES. AT PROJECT COMPLETION, THE RESULT MUST BE A WITH ACCENT MODEL 470 12 GAUGE WIRE TIER, AMERICAN
BALER COMPANY, 800 EAST ENTER STREET, BELVIEW, OHIO 23. MAIN HYDRAULIC PUMP(S) MOTOR MUST BE MINIMUM 75 HP
TURNKEY BALER WITH WIRE TIER SYSTEM FOR THE CBJ PUBLIC
44811; PHONE: WITH WYE DELTA STARTER OR OTHER REDUCED VOLTAGE
WORKS RECYCLING PROGRAM.
STARTER. HYDRAULIC TANK WILL BE OUTFITTED TO OPERATE
THIS BALER IS FOR DENSIFICATION OF COMMINGLED AND IN COLD WEATHER CLIMATE WITH THE POSSIBILITY OF
SOURCE SEPARATED RECYCLING MATERIAL INCLUDING BUT REACHING TEMPERATURES AS LOW AS -20 DEGREES
NOT LIMITED TO USED BEVERAGE CANS (UBC) ALUMINUM, BALER REQUIREMENTS: FAHRENHEIT.
FERROUS (STEEL) CANS, MIXED PLASTICS, BULK OFFICE 1. FABRICATED FROM HEAVY STRUCTURAL STEEL MEMBERS, 24. 75HP 460/3/60 MAIN MOTOR
CORRUGATE CARDBOARD (OCC), OFFICE NEWS PAPER (ONP), GUSSETED AND BRACED AS REQUIRED, AND FITTED IN JIGS AND 25. BALER ELECTRICAL PANELS TO BE NEMA 12 RATED.
HI-GRADE PAPERS, MIXED PAPER, WHITE GOODS EXCLUDING FIXTURES FOR PROPER ALIGNMENT. SOLID SINGLE SIDE SHEETS 26. BOTH MCC AND CONTROL PANEL MUST BE HEATED WITH
MANUALS AND CERTIFICATIONS: AWARDED CONTRACTOR IS
HOT WATER HEATERS, MUNICIPAL SOLID WASTE (MSW) AND THERMOSTATICALLY CONTROLLED PANEL HEATERS.
REQUIRED TO SUBMIT FOUR HARD COPIES AND A SCANNED
SELECT NON-FERROUS (NF) METALS. THE BALER SHOULD BE CUTOUTS AS REQUIRED. 27. BALER MUST HAVE CBJ APPROVED MANUAL PUSHBUTTON PAUL B GLOE II
ELECTRONIC VERSION (PDF) FOR ALL OPERATION, MAINTENANCE
CAPABLE OF CONTINUOUS AUTOMATIC OPERATION WITHOUT 2. MUST HAVE REPLACEABLE HARDOX 500 LINERS, FOR THE SWITCHES. No. A 12249
AND PARTS MANUALS, INCLUDING ELECTRICAL AND HYDRAULIC
PLUGGING OR JAMMING AND MAINTAIN A CONSTANT FEED CHARGE BOX FLOOR AND A MINIMUM OF REPLACEABLE HARDOX 28. BALER MOTOR CONTROL CENTER MUST BE MOUNTED ON
SCHEMATICS, AT THE TIME OF BALER DELIVERY. THE FOLLOWING
RATE. THE BALER SHOULD HAVE THE ABILITY TO RUN IN 450 LINERS FOR THE SIDES - THE CHARGE BOX FLOOR LINER POWER UNIT.
DOCUMENTATION WILL ADDITIONALLY BE PROVIDED AT THE TIME
SEMI-AUTOMATIC AND MANUAL OPERATION. 29. BALER MUST HAVE THE FOLLOWING: EMERGENCY STOP
OF BALER DELIVERY: CONTRACTOR'S WARRANTY CERTIFICATION,
THE WIDTH OF THE CHARGE BOX. THE MAIN RAM BOTTOM LINER SWITCH ON MCC, EMERGENCY STOP SWITCH ON CONTROL

RECYCLING BALER & TIER INSTALLATION


AND MANUFACTURER'S WARRANTY CERTIFICATION.
ACCEPTANCE: UPON RECEIPT OF THE BALER, THE CITY AND STRIPS WILL ALTERNATE IN THICKNESS TO CORRESPOND WITH CONSOLE, EMERGENCY STOP SWITCH ON TIER CONTROL
BOROUGH OF JUNEAU WILL PERFORM SUCH INSPECTIONS AND BALER FLOOR. THERE MUST BE REPLACEABLE WELD-ON HIGH PANEL, ONE EMERGENCY STOP SWITCH THAT MAY BE LOCATED
APPLICABLE FEDERAL AND STATE LAWS: BALER AND WIRE TIER IN THE CENTER OF THE MAIN FRAME NEAR REAR END OF MAIN
TESTS AS DEEMED BY SOLID WASTE PERSONNEL NECESSARY TO
AND ALL ITS EQUIPMENT AND COMPONENTS SHALL BE DESIGNED, CYLINDER, ONE EMERGENCY STOP SWITCH THAT MAY BE
DETERMINE IF BALER IS IN CONFORMANCE WITH CONTRACT LINERS, PRESS BOX TOP AND SIDE LINERS, AND VERSA-DOOR

5600 Tonsgard Ct, (Capitol Disposal)


FABRICATED AND TESTED IN ACCORDANCE WITH THE LATEST LOCATED IN THE CENTER OF THE EJECT FRAME NEAR REAR
REQUIREMENTS BOTH AS TO CONFIGURATION AND PERFORMANCE LINERS.
EDITIONS OF CODES AND REGULATIONS AND SAFETY DEVICES END OF EJECT CYLINDER, AND LOW OIL AND HOT OIL
PARAMETERS. REPRESENTATIVES OF THE CONTRACTOR MAY 3. MAIN AND EJECT PLATENS MUST BE HEAVY STEEL WELDMENTS

CITY and BOROUGH of JUNEAU


THAT APPLY TO THIS TYPE OF EQUIPMENT. BALER AND WIRE TIER SHUTDOWN AND ALARM.
WITNESS ACCEPTANCE INSPECTIONS AND TESTING. WITH REPLACEABLE LINERS.
MUST MEET ALL CURRENT ANSI 245.51 SAFETY STANDARDS AND 30. VENDOR TO INCLUDE ALL MANUFACTURER COLD WEATHER
4. BALER MUST HAVE ADJUSTABLE BOLT-ON MAIN RAM HOLD DOWN

CBJ Contract No. E15-147


ALL FEDERAL REGULATIONS. OPTIONS.
FAILURE OF THE BALER TO MEET THE REQUIRED SPECIFICATIONS BARS.
OR TO OPERATE PROPERLY IN ANY WAY WILL REQUIRE 5. BALER MUST HAVE BOLT-ON MAIN RAM TOP COVER PLATES. 31. RESERVOIR MUST BE FITTED WITH TWO THERMOSTATICALLY
REPLACEMENT OR REPAIR BY CONTRACTOR AT NO EXPENSE TO 6. BALER MUST HAVE BOLT-ON EJECT RAM TOP COVER PLATES. CONTROLLED 4.5KW SUBMERSIBLE TANK HEATERS
THE CITY. 7. BALER MUST HAVE HINGED MAIN RAM WIPER. 32. THE HORSEPOWER FOR THE HIGH EFFICIENCY COOLING FAN

Juneau, Alaska
8. THE BALER FEED HOPPER DESIGN WILL BE FLARED ON LONG MUST BE SUFFICIENT FOR CONTINUOUS OPERATION OF THE
NEW EQUIPMENT: BIDDER REPRESENTS THAT ALL EQUIPMENT SIDE FOR LOADING WITH 6' BUCKET. EQUIPMENT
OFFERED SHALL BE NEW. USED, SHOPWORN, DEMONSTRATOR, 9. BALER MUST BE OF A CONFIGURATION THAT WILL PRODUCE 33. AT TIME OF INSTALLATION VENDOR MUST INCLUDE
PROTOTYPE OR DISCONTINUED MODELS ARE NOT ACCEPTABLE. FOLLOWING LEVELS: RECOMMENDED SPARE PARTS KIT FOR BALER AND WIRE TIER.
34. PROVIDE A BALER PARTS LIST MANUAL INCLUDING ELECTRICAL
GUARANTEE: THE BIDDER GUARANTEES THAT THE EQUIPMENT PRODUCTION SUBJECT TO MATERIAL INPUT DENSITY, AND HYDRAULIC SCHEMATICS.
OFFERED IS STANDARD EQUIPMENT, THE LATEST MODEL OF A MOISTURE CONTENT AND FEED RATES. BALED PRODUCTS 35. INCLUDE THREE SIDED SLOPING HOPPER EXTENSION ON
REGULAR STOCK PRODUCT WITH ALL PARTS REGULARLY USED SHALL BE OF HIGHEST DENSITY POSSIBLE TO MAXIMIZE LOADING SIDE. (HOPPER TO ALLOW FOR INSTALLATION OF
FUTURE CONVEYOR)
C:\TH Arch AK\2014-05 CBJ Baler Recy Cntr 2014-09-08\CAD\CD\Arch\A101.dwg, 12/3/2014 8:29:12 AM, DWG To PDF.pc3

WITH THE TYPE OF EQUIPMENT OFFERED. LOADING CAPACITY FOR TRANSPORT AND TO REDUCE WIRE
COST/TON. 36. PROVIDE VERSA-DOOR (OR APPROVED EQUIVALENT)
WHERE ACCESSORIES ARE TO BE SUPPLIED, THEY MUST BE COMBINATION HYDRAULIC BALE SEPARATION DOOR AND
BULK OCC 1250-1500 LBS 5.0 TO 8.0 TPH OVERSIZED BALE RELEASE
COMPATIBLE WITH THE REST OF THE EQUIPMENT. WARRANTY: THE BIDDER WARRANTS THE BALER AND WIRE TIER MSW 1900-2400 LBS 10.5 TO 17.5 TPH 37. BALE DISCHARGE TABLE IS REQUIRED OF HEAVY PLATE STEEL,
FURNISHED AS PART OF THIS BID TO BE FREE FROM DEFECTS IN ONP 1300-1600 LBS 8.0 TO 12.0 TPH MIN 1/2" THICKNESS.
INSTRUCTION PLATES: WHERE SIGNIFICANT PROCEDURES ARE DESIGN, MATERIAL AND WORKMANSHIP AS FOLLOWS: UBC 1000-1200 LBS 2.4 TO 3.0 TPH 38.
REQUIRED, INSTRUCTION PLATES MUST BE PROVIDED AT
STEEL CANS 1500-2400 LBS 8.0 TO 13.0 TPH
LOCATIONS READILY VISIBLE AND AS NEAR AS POSSIBLE TO THE
FOR A MINIMUM OF ONE YEAR WITH UNLIMITED HOURS FROM THE PLASTICS 1100-1450 LBS 2.0 TO 5.0 TPH
AFFECTED AREA.
DATE OF OWNER ACCEPTANCE, ALL PARTS AND MATERIALS, NF METALS 1000-2700 LBS 4.5 TO 9.0 TPH
EQUIPMENT AND WORKMANSHIP WILL BE WARRANTED. THIS WILL
SUBMITTALS 10.BALER
INCLUDE, BUT IS NOT LIMITED TO MISCELLANEOUS COSTS, LABOR,
AIRFARE, LODGING, MEALS, ETC: BALER MANUFACTURER TO WIDE , 86 CUBIC FOOT CHARGE BOX AND 9 DEGREE RAKED
PROVIDE AT A MINIMUM FIVE YEAR WARRANTY ON MAJOR SHEAR BEAM.
STRUCTURAL COMPONENTS. THE STANDARD MANUFACTURE'S 11.BALER SHALL HAVE A HOPPER WHICH HAS TOP LOAD SYSTEM TO
WARRANTY WILL ALSO APPLY, AND COORDINATED WITH SECTION ALLOW FOR MANUAL FEEDING OR THE BALER MUST BE CAPABLE
01010. OF BEING RETROFITTED FOR A FEED CONVEYOR SYSTEM WITH
MATERIAL UNIFORMLY SPREAD OUT ON THE BELT.
AUTOMATED WIRE TIER MANUFACTURE SHALL WARRANT WIRE TIER 12.LAYOUT DRAWING SHOWING BALER LOADS AND ANGLE CLIPS
ASSEMBLY FOR ONE YEAR WITH UNLIMITED HOURS FROM OWNER AND ANCHORAGE LOCATIONS.
ACCEPTANCE.
13.BALER SHALL BE EQUIPPED WITH ALL ASSOCIATED DRIVES,
PUMPS, MOTORS, PIPING, HYDRAULIC MECHANISMS, AND
WARRANTY WORK: ALL WARRANTY WORK MUST BE PERFORMED ELECTRICAL CONTROLS.
COMPLETE BALER SPECIFICATION SHEET MUST BE PROVIDED. BY THE CONTRACTOR OR A RESPONSIVE, REPRESENTATIVE OF ITS 14.BALER SHALL HAVE HOPPER EXTENSION WITH ACCESS DOOR
DRAWING OF THE OVERALL BALER AND ACCESSORIES, AND CHOICE. THE BIDDER WILL IDENTIFY A REPRESENTATIVE, TO SAFETY INTERLOCKS.
DIMENSIONS AND LAYOUT OF ANCHOR CLIPS. HANDLE ALL WARRANTY WORK ON ITS BEHALF IF THE 15.BALE SEPARATION AND OVERSIZE RELEASE IS REQUIRED WITH
VENDOR MUST PROVIDE A SHIPMENT BREAKDOWN FOR CONTRACTOR CHOOSES NOT TO. THE CITY WILL NOT BE MINIMUM SEVEN INCHES OF OVERSIZE RELEASE TRAVEL
SUBCONTRACTOR FOR INSTALLATION. RESPONSIBLE TO PERFORM OR CONTRACT WITH ANOTHER 16.MAIN ELECTRICAL PANEL SHALL INCLUDE MAIN CIRCUIT .
SOURCE TO PERFORM ANY REQUIRED WARRANTY WORK. ALL BREAKER, INSTRUMENTATION PACKAGE, INDIVIDUAL MOTOR .
COSTS INCURRED ON WARRANTY WORK PERFORMED WILL BE THE STARTERS AND BRANCH BREAKERS, PUSHBUTTON PILOT LIGHTS
.
SOLE RESPONSIBILITY OF THE CONTRACTOR. TERMINAL STRIPS, SPEED POT(S)
17.BALER SHOULD HAVE SELF-STANDING OPERATOR CONTROL
PARTS AVAILABILITY: THE MANUFACTURER MUST GUARANTEE PANEL POSITIONED ON THE FLOOR NEAR THE BALER.
PARTS AVAILABILITY FOR A MINIMUM OF FIVE (5) YEARS OR THE 18.UNIT TO INCLUDE A CONTINUOUS GROUND BUS
REASONABLE LIFE OF THE UNIT, WHICHEVER IS GREATER. 19.PANEL SHALL HAVE HINGED DOOR. DOOR TO BE LOCKED
ARCHITECTURAL
EQUIPMENT
PROVIDE ACCESS TO AUTHORIZED PERSONNEL NOTES: BALER &
20.MUST MEET ELECTRICAL POWER REQUIREMENT OF EXISTING WIRE TIER
3 PHASE / 60 HERTZ / 480 VOLT POWER SUPPLY. THE EXISTING
POWER SUPPLY IS SUFFICIENT FOR THE OPERATION OF A BALER
MEETING THESE SPECIFICATIONS.

A101
ARCHITECTURAL EQUIPMENT NOTES: BALER & WIRE TIER - CONTINUED
PART 2 - PRODUCT (CONTINUED) PART 2 - PRODUCT (CONTINUED) PART 3 - INSTALLATION (CONTINUED) PART 3 - INSTALLATION (CONTINUED)
39. 135 GPM HYDRAULIC PUMP CAPACITY. FABRICATION, GENERAL SHOP ASSEMBLY BALER INSTALLATION: G. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE
40. REPLACEABLE OIL FILTRATION FILTERS OF 10-MICRON ALL INSTALLATION ACTIVITY WITH REPRESENTATIVES FROM CBJ
THE BASIS OF DESIGN BALER AND WIRE TIER IS COMPATIBLE WITH
MINIMUM ALLOWED WITH REPLACEABLE RESERVOIR BREATHER AND THE CAPITOL LANDFILL MANAGER OR DESIGNEE. THE
THE EXISTING FOUNDATION. ALL COSTS ASSOCIATED WITH THE
FILTERS. CONTRACTOR IS RESPONSIBLE FOR PROPER REMOVAL AND
BALER AND WIRE TIER'S INSTALLATION INCLUDING ANY
41. THE HORSEPOWER OF THE OIL CIRCULATION PUMP MUST BE DISPOSAL OF ALL WASTE, DEBRIS AND EXCESS MATERIALS.
OFF-LOADING, ELECTRICAL SERVICES, ELECTRICAL CONNECTIONS,
SUFFICIENT FOR CONTINUOUS OPERATION OF THE EQUIPMENT. RECYCLABLE DEBRIS MAY BE LEFT ON SITE IF COORDINATED
ATTACHMENT OF BALER TO CONCRETE FLOOR, AND ANY OTHER
42. THROUGH THE RECYCLING CENTER.
INSTALLATION REQUIREMENTS WILL BE THE SOLE RESPONSIBILITY
43. BALER AND WIRE TIER COATING (PAINT):
OF THE CONTRACTOR AND MUST BE INCLUDED IN THE TOTAL BID.
44. MAIN COMPRESSION CYLINDER SHALL PROVIDE INDUSTRIAL & MARINE COATING MANUFACTURES: H. CONTRACTOR IS RESPONSIBLE FOR TRAINING CBJ AND CAPITOL
MINIMUM FORCE OF 169 TONS AND 209 PSI RAM FACE SHERWIN WILLIAMS LANDFILL PERSONNEL ON MAINTENANCE AND OPERATION OF
PRESSURE. TNEMEC A. THE CONTRACTOR WILL PROVIDE ALL OF THE FOLLOWING: THE BALER. TRAINING MUST COMMENCE UPON COMPLETION OF
45. PRIMER AND TOP COATING SYSTEM FROM SINGLE SOURCE: LABOR INSTALLATION.
46. EJECT COMPRESSION CYLINDER SHALL PROVIDE. COATING SYSTEM RATED FOR A SEVERE SALT WATER EQUIPMENT
MINIMUM FORCE OF 75 TONS AND 138 PSI RAM FACE PRESSURE. MARINE ENVIRONMENT. MATERIALS I. STORAGE AND SECURITY OF ALL MATERIALS AND EQUIPMENT PAUL B GLOE II

47. BALER SURFACES SHALL BE PREPARED FOR COATING SHIPPING ARE THE RESPONSIBILITY OF THE CONTRACTOR. No. A 12249
EJECT NOZZLE. SYSTEM BY SHOT BLASTING OR SAND BLASTING ON ALL
ANY INCIDENTALS
48. BALER SYSTEM OPERATING PRESSURE MUST BE A MINIMUM FOUR EXTERIOR SIDES, PER MANUFACTURE J. NOTIFY CBJ SOLID WASTE COORDINATOR IMMEDIATELY OF ANY
OF 3000 PSIG. REQUIREMENTS. DELIVERY MATERIAL SHORTAGES OR PROBLEMS THAT WOULD CAUSE
49. HYDRAULIC RESERVOIR SHOULD HAVE CAPACITY OF ALL METAL SURFACES MUST BE CLEANED, SCRAPED, OFFLOADING DELAYS.

RECYCLING BALER & TIER INSTALLATION


APPROXIMATELY 500 GALLONS. PRIMED AND GROUND TO REMOVE SHARP EDGES. AND ALL SPECIFICS REQUIRED FOR INSTALLATION OF A
50. RAMS MUST BE POSITIONED BY LASER CONTROL. THE MAIN AND BALER SHALL HAVE ALL EXTERIOR AND INTERIOR COMPLETE BALER AND WIRE TIER SYSTEM. K. AT TIME OF INSTALLATION COMPLETION, AN INSPECTION WILL BE
EJECT CYLINDERS WILL BE POSITIONED BY LASER CONTROL. SURFACES (EXCEPT UNDERSIDE OF FLOOR) PRIMED WITH CONDUCTED WITH CBJ SOLID WASTE COORDINATOR,
ALL OTHER CYLINDERS MAY BE CONTROLLED BY TRANDUCER ONE COAT OF HIGH SOLIDS, LOW VOC, AND RUST-INHIBITIVE THE COMPLETE BALER INSTALLATION WILL REQUIRE SECURING THE MANUFACTURE REPRESENTATIVE, AND RECYCLING CENTER

5600 Tonsgard Ct, (Capitol Disposal)


WITH MAGNET OR APPROVED EQUIVALENT. PRIMER. UNDERSIDE OF FLOOR SHALL RECEIVE AN BALER AND WIRE TIER STAND TO THE EXISTING CONCRETE FLOOR PERSONNEL. ALL PUNCH LIST ITEMS WILL BE CORRECTED WITHIN
51. BALER TO HAVE THE ABILITY FOR INTERNET ACCESS. AS AN ASPHALT-BASED UNDERCOATING. EXTERIOR SIDES SHALL AND EXISTING STEEL PLATE . 5 BUSINESS DAYS.

CITY and BOROUGH of JUNEAU


ETHERNET CONNECTION WOULD BE ACCEPTABLE. HAVE ONE COAT OF HIGH SOLIDS, LOW VOC,
52. REPLACEABLE STANDARD TOOL STEEL RAM KNIFE. POLYURETHANE TOP COAT, OR EQUAL. START-UP AND TRAINING - BALER: THE CONTRACTOR'S

CBJ Contract No. E15-147


HYDRAULIC AND ELECTRICAL CONNECTIONS MUST BE CONSIDERED
53. TOOL STEEL BEAM BLADE. ACCEPTABLE COLORS: RAL5010 GENTIAN BLUE FOR BAILER; REPRESENTATIVE WILL PROVIDE A FACTORY TECHNICIAN FOR A
AND ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
54. 18.8 TON HYDRAULIC STAMPER MOUNTED ABOVE THE RAL1023 TRAFFIC SAFETY YELLOW FOR WIRE TIER MINIMUM OF THREE CONTINUOUS DAYS OF ONSITE TRAINING FOR
INSTALLATION INCLUDES THE BALER UNIT MAIN FRAME, BALER
SHEAR BLADE TO CLEAR SHEAR JAMS. THE CBJ AND CAPITOL LANDFILL PERSONNEL IN THE OPERATION
POWER UNIT, BALER UNIT CONTROL PANEL, BALER HOPPER
55. BALER MAIN EJECT AND DOOR CYLINDER TO BE BOLTED CONNECTIONS: BOLT HOLES ARE TO BE ACCURATELY AND MAINTENANCE OF THE BALER.
EXTENSION, BALE UNIT EJECTION ASSEMBLY WITH WIRE TIER, WIRE

Juneau, Alaska
TRUNNION MOUNT OR APPROVED EQUIVALENT PUNCHED OR DRILLED AND MUST HAVE BURRS REMOVED.
TIER CONTROL PANEL AND WIRE TIER STAND.
56. MAIN COMPRESSION, HIGH CYCLE, CYLINDER TO BE WASHERS AND LOCK WASHERS ARE TO BE USED IN ACCORDANCE START-UP AND TRAINING - WIRE TIER:
HYDRONAMICS 3000 PSI (OR APPROVED EQUIVALENT). WITH APPROPRIATE COMMERCIAL PRACTICE. ALL NUTS, BOLTS, THE AUTOMATIC BALE WIRE TIER MANUFACTURER WILL PROVIDE A
57. BALER TO BE FULLY TESTED TO FULL OPERATING SCREWS AND OTHER HARDWARE ARE TO BE TIGHTENED TO WITHIN B. THE CONTRACTOR WILL PROVIDE FOUNDATION DRAWING FACTORY TECHNICIAN FOR TWO CONTINUOUS DAYS FOR ONSITE
PRESSURES AT FACTORY BEFORE SHIPMENT. MANUFACTURER'S SPECIFICATIONS AND GOOD PRACTICE. SHOWING BALER LOADS, FOR ANCHOR SIZING. TRAINING FOR THE CBJ AND CAPITOL LANDFILL PERSONNEL IN THE
58. BALER TO BE PROPERLY PREPARED FOR A LONG DISTANCE OPERATION AND MAINTENANCE OF THE WIRE TIER SYSTEM.
SHIPMENT FOR ROAD AND BARGE OVER SALT WATER TO RIVETED CONNECTIONS: RIVET HOLES MUST BE ACCURATELY C. ANCHORS, BRACING, SUPPORTS AND OTHER MISCELLANEOUS
ALASKA. PUNCHED OR DRILLED, WITH BURRS REMOVED. RIVETS ARE TO BE HARDWARE ASSOCIATED WITH THE INSTALLATION ARE THE NOTE: IT IS EXPECTED THAT THE VENDOR PROVIDE FIVE
CONTINUOUS DAYS OF TRAINING FOR THIS PROJECT AS SPECIFIED
C:\TH Arch AK\2014-05 CBJ Baler Recy Cntr 2014-09-08\CAD\CD\Arch\A102.dwg, 12/3/2014 8:40:38 AM, DWG To PDF.pc3

STRETCH (SHRINK) WRAPPED SEALED FOR PROTECTION DRIVEN WITH THE APPROPRIATE TOOLS AND WILL COMPLETELY FILL RESPONSIBILITY OF THE CONTRACTOR. SHIMS FOR LEVELING
FROM SALT WATER SPRAY. THE HOLES. HEADS, WHEN NOT COUNTERSUNK OR FLATTENED, BALER ON EXISTING CONCRETE SLAB ARE THE RESPONSIBILITY ABOVE.
MUST BE OF APPROVED SHAPE AND UNIFORM SIZE FOR THE OF THE CONTRACTOR. INSTALLATION CONTRACTOR TO SECURE
AUTOMATIC WIRE TIER REQUIREMENTS: DIAMETER OF THE RIVET. THE BALER TO THE EXISTING CONCRETE SLAB ON GRADE. PROVIDE THE FOLLOWING SUPPLIES:
ACCENT MODEL 470 12 GAUGE. THE WIRE TIER SHALL BE INSTALLED HYDRAULIC OIL APPROX. 475 GALLONS
ON THE BALER WITH SEPARATE TIER CONTROL PANEL COMPLETELY WELDING AND SOLDERING: THE PROCEDURES AND STANDARDS D. THE BALER SHALL BE DESIGNED, ENGINEERED AND BUILT TO START-UP BALING WIRE: ONE STEM OF 12 GAUGE HI-TENSILE
WIRED AND INCORPORATED INTO BALER CONTROLS. USED MUST CONFORM TO NATIONALLY RECOGNIZED CODES AND WITHSTAND THE ENVIRONMENT SUCH AS TYPICALLY FOUND IN WIRE FOR AUTOMATIC TIER.
MUST USE 12 GAUGE WIRE. STANDARDS. THE SURFACES TO BE WELDED ARE TO BE FREE OF THE RECYCLING INDUSTRY AND ALASKA. ALL HARDWARE NECESSARY FOR BALER ASSEMBLY AND
MUST HAVE THERMOSTATICALLY CONTROLLED CONTROL RUST SCALE, PAINT, GREASE OR OTHER FOREIGN MATTER. OPERATION INCLUDING, BUT NOT LIMITED TO, NUTS, BOLTS,
PANEL WITH MODEM DIAGNOSTICS. WASHERS AND O, RINGS FOR THE BALER SUPPLIED BY THE
WIRE TYING EQUIPMENT IS REQUIRED TO HAVE THE CASTINGS: ALL CASTINGS TO BE SOUND AND FREE FROM E. CBJ RESERVES THE RIGHT TO INSPECT THE BALER AND ALL BALER MANUFACTURER.
MAXIMUM SAFETY DEVICES AND GUARDS. PATCHING, WARPING, OR ANY DEFECT, WHICH MIGHT REDUCE EQUIPMENT BEFORE SHIPMENT FROM THE MANUFACTURING
WIRE TYING EQUIPMENT WILL BE SHOP ASSEMBLED WITH RELIABILITY OR PERFORMANCE. FACILITY. MISCELLANEOUS ITEMS:
BALER AND COATED (PAINTED) AS SPECIFIED. 1. INSTALL CONCRETE MEDIAN BARRIERS AS INDICATED ON
INCLUDE ANY AND ALL MOUNTING HARDWARE. MISCELLANEOUS ITEMS: F. THE CONTRACTOR SHALL REMOVE THE EXISTING BALER AND DRAWINGS, WITH 1" DIA PINS IN PREDRILLED HOLES IN
MUST MEET ELECTRICAL POWER REQUIREMENT INCLUDING 1. 10' LONG CONCRETE MEDIAN BARRIER, ALASKA DOT & PF STORE IT ON FLAT BED AT THE EXISTING FACILITY AS INDICATED EXISTING CONCRETE FLOOR SLAB. FIELD LOCATE BARRIERS.
CONNECTIONS AND DISCONNECTS- WITH POWER SUPPLY PRECAST CONCRETE "F" SHAPE BARRIER G-46.10 WITH PIN ON DRAWING SHEET A201. PROTECT BALER WITH STRETCH 2. INSTALL 1/2" EMT TO RUN WIRE FEEDER FROM WIRE TIER
FROM BALER PANEL. SLEEVES EACH END. (SHRINK) WRAP COVER. STAND TO AUTOMATIC WIRE TIER AT BALE DISCHARGE.

FABRICATION: MATERIALS USED IN THE FABRICATION OF THIS 2. 1/2" DIA EMT, (SEE ELECTRICAL SPECIFICATIONS) CLEAN-UP AND INSPECTION: AT THE COMPLETION OF THE
EQUIPMENT MUST BE FREE OF DAMAGING KINKS AND SHARP BENDS. INSTALLATION, THE PROJECT WORK AREA MUST BE FREE OF ALL
FORMING OF MATERIALS IS TO BE ACCOMPLISHED BY METHODS PART 3 - INSTALLATION EQUIPMENT, DEBRIS, CONTAINERS, PACKAGING, ETC.
THAT WILL NOT CAUSE INJURY TO THE MATERIAL. SHEARING,
CHIPPING AND CUTTING IS TO BE NEAT AND ACCURATE. ALL MAJOR PROJECT SITE CONDITIONS: THE INSTALL LOCATION IS IN A
BENDS AND CORNERS MUST BE MADE PROFICIENTLY, ENSURING NON-HEATED AREA CURRENTLY USED FOR RECYCLING
UNIFORMITY OF SIZE AND SHAPE. OPERATIONS. COORDINATE W/ PROPERTY OWNER AS REQUIRED
FOR WORK TO TAKE PLACE DURING BOTH BUSINESS AND
NON-BUSINESS HOURS. .

ARCHITECTURAL
EQUIPMENT
NOTES: BALER &
WIRE TIER - CONT.

A102
C:\TH Arch AK\2014-05 CBJ Baler Recy Cntr 2014-09-08\CAD\CD\Arch\A201.dwg, 12/1/2014 1:41:02 PM, DWG To PDF.pc3

1
OVERALL FLOOR PLAN

CITY and BOROUGH of JUNEAU


.
.
.

RECYCLING BALER & TIER INSTALLATION


OVERALL

5600 Tonsgard Ct, (Capitol Disposal)


No. A 12249
PAUL B GLOE II

FLOOR PLAN

CBJ Contract No. E15-147


A201

Juneau, Alaska
C:\TH Arch AK\2014-05 CBJ Baler Recy Cntr 2014-09-08\CAD\CD\Arch\A401.dwg, 12/3/2014 8:43:23 AM, DWG To PDF.pc3

1
ENLARGED FLOOR PLAN - EQUIPMENT LAYOUT & ALTERNATE NO. 1

CITY and BOROUGH of JUNEAU


.
.
.

RECYCLING BALER & TIER INSTALLATION


5600 Tonsgard Ct, (Capitol Disposal)
ENLARGED
No. A 12249

& ALT NO. 1


PAUL B GLOE II

FLOOR PLAN -

A401

CBJ Contract No. E15-147


EQUIP LAYOUT

Juneau, Alaska
C:\TH Arch AK\2014-05 CBJ Baler Recy Cntr 2014-09-08\CAD\CD\Arch\AD401.dwg, 12/1/2014 1:39:27 PM, DWG To PDF.pc3

1
ENLARGED FLOOR PLAN - DEMOLITION PLAN

CITY and BOROUGH of JUNEAU


.
.
.

PLAN

RECYCLING BALER & TIER INSTALLATION


5600 Tonsgard Ct, (Capitol Disposal)
ENLARGED
No. A 12249
PAUL B GLOE II

DEMOLITION
FLOOR PLAN -

CBJ Contract No. E15-147


Juneau, Alaska
AD401