Anda di halaman 1dari 23

Vendor: Cisco

Exam Code: 650-621

Exam Name: LCSAWALAN - Cisco Lifecycle Services


Advanced Wireless

Version: 17.011
QUESTION 1
Which activity is associated with the wireless technology assessment service component? Select
exactly 1 answer(s) from the following:

A. Perform Infrastructure Audit


B. Execute Test Cases
C. Develop Escalation Plan
D. Develop Project Management

Answer: A

QUESTION 2
Which WLAN service component within the prepare phase assesses the customer's business
and technical requirements and includes a solution value assessment? Select exactly 1
answer(s) from the following:

A. Business Case Development


B. Business Requirements Development
C. High-Level Design Development
D. Technology Strategy Development

Answer: A

QUESTION 3
In which service component of the wireless operate phase are incident trends analyzed to identify
patterns and systemic conditions? Select exactly 1 answer(s) from the following:

A. System Monitoring
B. security Administration
C. Operations Setup
D. Problem Management

Answer: D

QUESTION 4
In the operate phase, providing and maintaining reliable, current information about the WLAN
system hardware, software, and applications pertinent to the system's individual components and
attributes is part of which service component? Select exactly 1 answer(s) from the following:

A. Problem Management
B. Configuration Management
C. Change Management
D. Incident Management

Answer: B

QUESTION 5
Which service component in the optimize phase assesses network vulnerabilities and makes
recommendations to help reduce the risk of attacks over the wireless network? Select exactly 1

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 2
http://www.passleader.com
answer(s) from the following:

A. Security Assessment
B. Technology Assessment
C. Change Management
D. Operations Readiness Assessment
E. Operations Assessment

Answer: A

QUESTION 6
Assessing current network infrastructure to support the proposed WLAN system is an activity of
which service component in the wireless plan phase? Select exactly 1 answer(s) from the
following:

A. WLAN Wired Network Integration Assessment


B. Voice over WLAN Assessment
C. Operations Readiness Assessment
D. Security Architecture Assessment
E. Service Assurance

Answer: A

QUESTION 7
Which service component in the wireless operate phase helps isolate and resolve an incident?
Select exactly 1 answer(s) from the following:

A. Incident Management
B. Change Management
C. Configuration Management
D. Acceptance Test Plan

Answer: A

QUESTION 8
Which wireless service component within the prepare phase identifies activities such as set
solution goals, select business drives, and establish success criteria? Select exactly 1 answer(s)
from the following:

A. Proof of Concept
B. Business Requirements Development
C. High-Level Design Development
D. Technology Strategy Development

Answer: B

QUESTION 9
Which three activities are part of the wireless technology strategy development service
component in the prepare phase? (Choose three.) Select exactly 3 answer(s) from the following:

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 3
http://www.passleader.com
A. Make Preliminary Technical Discovery
B. Hold Technology Strategy Meeting
C. Develop WLAN Technology Strategy
D. Achieve Proof of Concept
E. Define Roles and Responsibilities
F. Form Migration Strategy

Answer: ABC

QUESTION 10
Which three of the following service components are included in the design phase? (Choose
three.) Select exactly 3 answer(s) from the following:

A. Account Qualification and Planning


B. Detailed Design Customer Signoff
C. Staff Training
D. Migration Plan Development
E. Staging Plan Development
F. System Requirements Validation

Answer: BDE

QUESTION 11
Which service component in the wireless design phase develops a plan that identifies the
necessary steps to move from the existing system to the proposed system? Select exactly 1
answer(s) from the following:

A. Business Plan
B. Business Requirements Development
C. Staging Plan
D. Implementation Plan Development

Answer: C

QUESTION 12
Which three of the following activities occur in the problem management service component of
the wireless operate phase? (Choose three.) Select exactly 3 answer(s) from the following:

A. Recover from Incident Outage


B. Track Events and Report on System Availability, Resource Capacity, and Performance
C. Classify Groups of Known Incidents as Problems
D. Conduct Post-Change Evaluations
E. Document Issues Encountered During Software Upgrade and Methods Used to Resolve
Issues
F. Provide Hardware and Software Support to Resolve Incidents

Answer: CEF

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 4
http://www.passleader.com
QUESTION 13
Which service component within the prepare phase implements a test to validate the customer's
WLAN system high-level design and identify any potential design enhancements? Select exactly
1 answer(s) from the following:

A. Proof of concept
B. Technology Strategy Development
C. WLAN Wired Network Integration Assessment
D. High-Level Design Development

Answer: A

QUESTION 14
In the wireless design phase, which service component includes developing and documenting the
test case(s) used to verify that a deployed infrastructure meets the operational, functional, and
interface requirements?" Select exactly 1 answer(s) from the following:

A. Implementation Plan
B. Business Plan
C. Staging Plan
D. Detailed Design Development
E. Systems Acceptance Test Plan Development

Answer: E

QUESTION 15
Identify customer support model for WLAN solution is an activity of which service component in
the plan phase? Select exactly 1 answer(s) from the following:

A. Planning Project Kickoff (Deployment Project Management)


B. System Requirements Validation
C. WLAN Location-Based Services Assessment
D. Operations Readiness Assessment

Answer: D

QUESTION 16
Which service component in the implement phase is typically performed prior to the handover of a
wireless solution to the customer's operations organization? Select exactly 1 answer(s) from the
following:

A. Systems Integration
B. Systems Acceptance Testing
C. Skill Assessment
D. Project Close Out
E. Wireless Check

Answer: B

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 5
http://www.passleader.com
QUESTION 17
Choose the service component in the optimize phase which assesses the WLAN system and
drives continuous improvements by recommending remediation measures including device
configuration optimization, capacity planning, traffic analysis, security assessment, and quality
issue resolution. Select exactly 1 answer(s) from the following:

A. Change Management
B. Security Assessment
C. Operations Assessment
D. Security Administration
E. Operations Readiness Assessment
F. Technology Assessment

Answer: F

QUESTION 18
Which wireless service component is associated with maintaining historical and current
information about the WLAN solution? Select exactly 1 answer(s) from the following:

A. Incident Management
B. Change Management
C. Configuration Management
D. Acceptance Test Plan

Answer: C

QUESTION 19
Assessing the ability of the customer's site facilities for readiness to support the proposed WLAN
system is an activity conducted as part of which service component? Select exactly 1 answer(s)
from the following:

A. Full System Migration


B. System Installation
C. WLAN System Calibration
D. WLAN Site Readiness Assessment (RF survey)
E. Systems Acceptance Testing

Answer: D

QUESTION 20
Which service component in the plan phase identifies current infrastructure modifications required
to support an enterprise WLAN? Select exactly 1 answer(s) from the following:

A. Voice over WLAN Assessment


B. Planning Project Kickoff
C. WLAN Wired Network Integration Assessment
D. Operations Readiness Assessment

Answer: C

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 6
http://www.passleader.com
QUESTION 21
Which wireless service component within the prepare phase creates a business case that
provides both business and financial justification for a customer to use in evaluating adoption of a
WLAN system? Select exactly 1 answer(s) from the following:

A. Business Case Development


B. Customer Education
C. Proposal Development
D. Business Requirements Development
E. Account Planning

Answer: A

QUESTION 22
Which service component standardizes methods and procedures for authorizing, documenting,
and performing changes to an enterprise WLAN system?" Select exactly 1 answer(s) from the
following:

A. Project Management
B. Change Management
C. Operations Setup
D. Operations Assessment

Answer: B

QUESTION 23
Select the two activities that form part of the wireless implementation plan development service
component in the wireless design phase. (Choose two.) Select exactly 2 answer(s) from the
following:

A. Create Site Specific Network Implementation Plan


B. Confirm Project and Milestone Dates
C. Discuss Project Roles and Responsibilities
D. Create Detailed Staff Training Matrix
E. Collect and Verify Site Specific Implementation Requirements

Answer: AE

QUESTION 24
Select two activities that are included in the wireless detailed design development service
component in the design phase. (Choose two.) Select exactly 2 answer(s) from the following:

A. Perform Detailed Analysis for Intrusion Prevention System


B. Develop Detailed Design for Intrusion Prevention System
C. Present Low-Level Design to Customer
D. Design WLAN Infrastructure
E. Create Detailed Staff Training Matrix

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 7
http://www.passleader.com
Answer: CD

QUESTION 25
Which activity is a part of the wireless operations assessment service component in the optimize
phase? Select exactly 1 answer(s) from the following:

A. Design WLAN Infrastructure


B. Execute Test Cases
C. Confirm Project and Milestone Dates
D. Conduct Gap Analysis

Answer: C

QUESTION 26
You work as a Cisco engineer. As far as you know, the following WLAN service components of
High-level Design, Proof of Concept and Technology Strategy Development will all occur in which
phase?

A. the plan phase


B. the prepare phase
C. the design phase
D. the operate phase

Answer: B

QUESTION 27
Which two of these templates, tools, or reference materials are used in the Service Assurance
service component of the operate phase? (Choose two.)

A. Security Assessment Checklist


B. Trouble Ticket System
C. Operations Readiness Assessment
D. Continuous Improvement Plan
E. AS Built Solution Binder

Answer: BD

QUESTION 28
Which of these best describes what happens in the design phase?

A. A detailed design for the WU\N solution is developed, ensuring that the solution meets the
customer business requirements while attempting to anticipate and prevent potential network
bottlenecks and failures.
B. The current network, staff, and processes of the customer are assessed and tested to
determine if the proposed WLAN solution can be supported.
C. The business and technical requirements of the customer are analyzed and evaluated to
identify products or solutions that best meet the customer needs.
D. The new WLAN solution is installed in the customer network while minimizing disruptions and
potential vulnerabilities.

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 8
http://www.passleader.com
E. A newly implemented WLAN solution operates efficiently, has high availability, and meets
customer expectations for performance and reliability.

Answer: A

QUESTION 29
Producing a technology assessment report involves which of these tasks?

A. Compare Customer ProcessesWith Operational Leading Practices for WU\N, and Identify
Gaps
B. Determine Security Procedures and Policy Gaps
C. Establish Escalation Notification Plan
D. Collect Performance, Utilization, and Availability Data for Reporting
E. Review System Component ConfigurationsTo Verify that They Meet Customer Performance,
Capacity, Traffic, Quality of Service, and Resiliency Guidelines

Answer: E

QUESTION 30
Which two templates, tools, or reference materials are used in the Business Case Development
service component of the prepare phase? (Choose two.)

A. income Statement
B. ROI Required Information Checklist
C. Financial Justification Case Study
D. Preliminary Discovery Document-Gap Analysis
E. Value Assessment Worksheet
F. statement of Change in Financial Position

Answer: BC

QUESTION 31
You work as a Cisco engineer. Which of the following service components are not performed
during the wireless implement phase? (Choose two.)

A. Project Planning
B. Configuration Management
C. Systems Acceptance Testing
D. Site Readiness Specification

Answer: BD

QUESTION 32
Which three of these activities occur in the Problem Management service component of the
operate phase? (Choose three.)

A. Recover from Incident Outage


B. Track Events and Report on System Availability, Resource Capacity, and Performance
C. Classify Groups of Known IncidentsAs a Problem

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 9
http://www.passleader.com
D. Conduct Post-Change Evaluations
E. Document Any Issues Encountered During Software Upgrade, as Well as Methods Used to
Resolve the Issues
F. Provide Hardware and Software Support to Resolve Incidents

Answer: CEF

QUESTION 33
Which service component within the prepare phase helps to increase the chances that the
proposed system will meet the customer requirements and expectations?

A. Business Requirements Development


B. Technology Strategy Development
C. WLAN Wired Network Integration Assessment
D. High Level Design Development
E. Business Case Development
F. Proof of Concept

Answer: F

QUESTION 34
Which three of these activities are part of Migration Plan Development? (Choose three.)

A. Develop Implementation Schedule


B. Develop Test Plan for New Operational Processes
C. Collect and Verify Site-Specific Implementation Requirements
D. Define Migration Team Roles and Responsibilities
E. Validate Design WLAN Infrastructure
F. Develop Migration Strategy

Answer: ADF

QUESTION 35
Which three of these templates and tools are essential to completing the service component of
Migration Plan Development? (Choose three.)

A. Staging Plan
B. Migration Plan
C. As Built Solution Binder Do- Escalation Plan
D. Low Level Design
E. Project Management Plan

Answer: B

QUESTION 36
Which three of these activities are associated with Detailed Design Development-Design
Workshop? (Choose three.)

A. Develop Technology Assessment Report

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 10
http://www.passleader.com
B. Develop Operations Readiness Assessment Report
C. Design Project Kickoff
D. Design Interfaces to Third Party Systems and Databases (for example, for Location Based
Services Appliance)
E. Design WLAN Infrastructure
F. Design WLAN Security Architecture

Answer: DEF

QUESTION 37
What are two of the service components of the plan phase for WLAN? (Choose two.)

A. Conduct Planning Project Kickoff Meeting


B. Complete System Requirements Validation
C. Complete the Proposal Development and Deliver Proposal for Customer
D. Conduct Proof of Concept
E. Complete Business Case Development
F. Complete Implementation Plan Development

Answer: AB

QUESTION 38
Which of these activities comprises the service component of WLAN Site Readiness Assessment
(RF Survey)?

A. Conduct Customer Site Survey, Perform Site Gap Analysis, Develop Site Requirements
Specification Report, Gather and Verify Customer Network Information, Perform Gap Analysis
B. Collect and Verify InformationAbout Current Operations Support Infrastructure, Identify
Customer Support for WLAN, Analyze Customer Operational Infrastructure
C. Perform Automated Scan of PortsTo Determine Potential Vulnerabilities; Produce Network
Map of Devices, Operating System, and Services Being Offered To the Network; Research
and Confirm Registration of Target IP Address Space
D. Execute a Series of System Performance Analyses To Provide a Holistic View of the
Converged Network of the Customer, Perform an Infrastructure Audit,Complete Security
Review of WLAN Infrastructure.

Answer: A

QUESTION 39
Which of these is a key deliverable in the design phase?

A. Low Level Design, Staging Plan, Operations Plan, Migration Plan


B. WLAN Site Readiness Assessment Report, Voice over WLAN Assessment Report,
Operations Readiness Assessment Report
C. Business Requirements Document, Preliminary Discovery Document, Technology
Requirements Document, Financial Analysis and Business Case
D. As-Built Solution Binder, Operations Support Plan Report, Change Management Status
Report
E. Escalation Plan, Communications Plan, Staff Training Plan

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 11
http://www.passleader.com
Answer: A

QUESTION 40
Which of these tasks is associated with the Operations Assessment?

A. Operate Change Control Board Tasked With the Evaluation of Requested Changes
B. Perform Device Discovery and Enter Documentation in Knowledge Management System
C. Monitor Availability of Critical Network Elements
D. Compare Customer Operational Personnel, Processes, and Tools to Leading Industry
Practices; Identify and Document Gaps for Potential Improvement in Operating Wireless
Solution
E. Produce Service Level Reporting and Analyze Process Exceptions OF. Survey All
Environments, RF, and Physical Details of Specified Sites

Answer: D

QUESTION 41
You are a help desk trainee. As much as you know, which one of the following activities will not
occur in the problem management service component of the wireless operate phase?

A. Classify Groups of Known Incidents as Problems


B. Conduct Post-Change Evaluations
C. Provide Hardware and Software Support to Resolve Incidents
D. Document Issues Encountered During Software Upgrade and Methods Used to Resolve
Issues

Answer: B

QUESTION 42
You are a help desk trainee. And a customer inquires in which phase the security Assessment
assesses network vulnerabilities and makes recommendations to help reduce the risk of attacks
over the wireless network?

A. the design phase


B. the optimize phase
C. the plan phase
D. the operate phase

Answer: B

QUESTION 43
Systems Engineers should possess which three of these recommended skills related to Lifecycle
Services? (Choose three.)

A. Understanding How To Assess and Document a Wireless Network Topology


B. Account Prospecting
C. Ensure Regular Software Updates on Existing Network Infrastructure
D. Ensure that Post-Implementation Operational Goals areMet
E. Preparation of Proposals and Business Cases

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 12
http://www.passleader.com
F. identification of Technical and Business Requirements and Mapping to Wireless Technologies
and Applications

Answer: AE

QUESTION 44
Which two of these are outputs from the Technology Assessment service component? (Choose
two.)

A. As-Built Solution Binder


B. Remediation Plans as a Result of Performing an Infrastructure Audit and Security Review of
the WLAN Infrastructure
C. Create a System Baseline by Running Performance, Capacity, Traffic,QoS, and Resiliency
Reports.
D. incident Identification and Resolution Reports
E. Optimization Report
F. Operations Support Plan

Answer: BC

QUESTION 45
Which of these tasks should be completed at a Wireless Strategy Development meeting?

A. Present Site Readiness Assessment and RF Site Survey Reports


B. Analyze of Proposed Wireless LAN System, with Respect to Availability, Capacity, Security,
and Integration with Legacy Architecture
C. Identify and Assess Technologies to Meet the Customer Requirements and Goals
D. Identify Network Infrastructure Gaps and Remediation Plan

Answer: C

QUESTION 46
The Cisco Lifecycle Services approach provides a framework for which of these? (Choose the
best answer.)

A. for customers to choose the right products for their network


B. for partners to choose the right products for their customers
C. for partners to have the discussion with customers about the minimum service components
they need to perform in order to successfully deploy a technology solution
D. defining the Answer strategy for advanced technology adoption
E. determining a competitor strategy for adopting advanced technologies

Answer: C

QUESTION 47
Performing Systems Requirements Validation includes which three of these activities? (Choose
three.)

A. Collect and Verify Customer Requirements

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 13
http://www.passleader.com
B. Establish Project Parameters, Identify Key Project Sponsors, Develop Project Governance
Model
C. Perform Validation for the High Level Design
D. Design WLAN Security Architecture
E. Create and Present Remediation Plan to Customer
F. Perform Site Gap Analysis

Answer: ACE

QUESTION 48
One of the activities in the Voice over WLAN Assessment service component of the plan phase
involves analysis of the existing WLAN environment. Which one of these choices includes some
of the tasks in this activity?

A. Verify Device Access Security in the Customer Network, Perform an RF Site Survey,Identify
Network Infrastructure Gaps and Remediation Plan.
B. Perform Gap Analysis According to Leading Practices, Compare Customer Processes with
Operational Leading Practices for WLAN,Identify Legacy Application Integration
Requirements.
C. Identify Potential Interference Sources in the Designated Band, Determine Noise Floor and
Signal Strength, Place Test Access Points in Proposed Locations.
D. Analysis of Proposed WLAN System With Respect to Availability, Capacity, Security, and
Integration with Legacy Architecture.

Answer: C

QUESTION 49
Which three of these activities do you perform to complete an Operations Readiness Assessment
in the plan phase? (Choose three.)

A. Produce Network Map of Devices, Operating System, and Services Being Offered to Network
B. Develop Operational Methods and Procedures for the WLAN System
C. Collect and Verify InformationAbout Current Operations Support Infrastructure
D. Analyze Customer Operational Infrastructure
E. Identify Skills and Knowledge Requirements for Supporting Proposed WLAN System
F. Review Building Blueprints and Coverage Requirements for Voice over WLAN Deployment

Answer: CDE

QUESTION 50
Which three of these activities are associated with the Operations Assessment service
component: (Choose three.)

A. Conduct Gap Analysis


B. Conduct Operational Assessment
C. SetUp Customer for Operational Support
D. Track Events and Report on System Availability, Resource Capacity, and Performance
E. Monitor WLAN System to Identify Occurrences of Service-Level Metrics Dropping Below a
Defined Threshold
F. Prepare for Operational Assessment

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 14
http://www.passleader.com
Answer: ABF

QUESTION 51
Which three of these tasks go into developing a migration strategy? (Choose three.)

A. Define Failure Recovery Procedure and Risk Mitigation Strategy


B. Review Migration Plan and Implementation Schedule
C. Review Low Level Design with Emphasis on Order of Implementation Activities
D. identify Core Infrastructure Implementation Requirements and Timelines
E. Verify High Level Site-Specific Installation Requirements
F. Develop Test Plan, Test Cases, and Execution Methodology

Answer: ACD

QUESTION 52
Which of these activities describes one of the tasks for completing a WLAN Wired Network
Integration Assessment in the plan phase?

A. Identify Potential Interference Sources in the Designated Band


B. Verify Information Regarding Processes, Procedures, and Systems Used To Deliver
Operational and Network Management.
C. Perform Availability Analysis To Identify Potential Infrastructure Design and Configuration
Issues that Could Affect the Network Resiliency and Availability.
D. Gather InformationAbout the Network, Existing Security Policy, and Security Architecture for
the Wired and WLAN Network
E. Develop Application Readiness Assessment Report for Every Component or Subsystem, To
Include Current Configuration, Configuration Best Practices, and Error Prevention

Answer: C

QUESTION 53
The activity of identifying the customer's support model for WLAN is part of Operations
Readiness Assessment, which phase the statement related to?

A. the prepare phase


B. the plan phase
C. the design phase
D. the operate phase

Answer: B

QUESTION 54
Which of these is a deliverable to the customer in the implement phase?

A. WLAN Operations Assessment Report


B. an Executed WLAN Migration Plan
C. Technology Assessment Report
D. Security Vulnerability and Recommendations Report

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 15
http://www.passleader.com
E. WLAN Location-Based Services Assessment Report
F. WLAN Operations Readiness Assessment Report

Answer: B

QUESTION 55
Which three of these tasks occur in the System Monitoring service component? (Choose three.)

A. Perform Vulnerability Assessment on WLAN System


B. Report on Availability, Performance, and Utilization
C. Log and Correlate Events
D. Determine Security Procedures and Policy Gaps
E. Provide Event Notification when Threshold Exceeded
F. Employ a Case Management System

Answer: BCE

QUESTION 56
You are a help desk trainee. Which two activities you recognized are included in the wireless
detailed design development service component in the design phase?

A. Design WU\N Infrastructure


B. Present Low-Level Design to Customer
C. Create Detailed Staff Training Matrix
D. Develop Detailed Design for Intrusion Prevention System

Answer: AB

QUESTION 57
Which of these best describes the structure of Cisco Lifecycle Services? (Choose the best
answer.)

A. Solution Strategies, Service Levels, Activities, and Tasks


B. Service Activities, Tools, Solutions, Components
C. Service Components, Activities, Tasks, and Subtasks
D. Phases, Service Components, Activities, Tasks, Templates, Tools, and Reference Materials
E. Phases, Services, Tasks, Tools, and References

Answer: D

QUESTION 58
Which three templates or tools are important in creating a site-specific network implementation
plan? (Choose three.)

A. Operations Plan.
B. Staging Plan
C. Low Level Design
D. Network Implementation Plan

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 16
http://www.passleader.com
E. Acceptance Test Plan
F. Site Readiness Assessment Report

Answer: CDF

QUESTION 59
The Low Level Design and the Site Readiness Assessment report represent two of several
documents which are important for completing which two key activities for the Implementation
Plan Development service component? (Choose two.)

A. Collect and Verify Site-Specific Implementation Requirements


B. Develop Systems Acceptance Test Plan
C. Collect and Verify Solution Acceptance Requirements
D. Develop Operational Methods and Procedures for the WLAN System
E. Develop a PlanTo Implement New Operational Processes
F. Create a Site-Specific Network Implementation Plan

Answer: AF

QUESTION 60
Which of the following WLAN service components all occur in the prepare phase?

A. High-level Design, Proof of Concept, Technology Strategy Development


B. System Requirements Validation,WLAN wired Network Integration Assessment, Operations
Readiness Assessment
C. Proposal Development, Customer Education, Service Assurance
D. Security Assessment, Security Administration, Staging Plan Development

Answer: A

QUESTION 61
Which service component within the prepare phase provides a technology-focused and/or
business-focused demonstration of the wireless technology solution to highlight the features and
benefits? Select exactly 1 answer(s) from the following.

A. High-Level Design Development


B. Customer Education
C. Technology Strategy Development
D. Proposal Delivery
E. Proof of Concept

Answer: B

QUESTION 62
The activity of identifying the customer's support model for WLAN is part of which service
component in the plan phase? Select exactly 1 answer(s) from the following:

A. Operations Readiness Assessment


B. Site Readiness assessment

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 17
http://www.passleader.com
C. Proposal Delivery
D. Account Planning

Answer: A

QUESTION 63
In the wireless design phase, which service component provides a comprehensive,
implementation-ready design for the customer's wireless solution?" Select exactly 1 answer(s)
from the following:

A. Business Plan
B. Staging Plan
C. Detailed Design Development
D. Systems Acceptance Test Plan Development

Answer: C

QUESTION 64
Which two service components are performed during the wireless implement phase? (Choose
two.) Select exactly 21 answer(s) from the following:

A. Wireless Readiness Assessment


B. Project Planning
C. Site Readiness Specification
D. Systems Acceptance Testing
E. Configuration Management

Answer: BD

QUESTION 65
Which service component within the prepare phase recommends the appropriate wireless
technology to address a business requirement of the customer? Select exactly 1 answer(s) from
the following:

A. Account Qualification and Planning


B. Business Case Development
C. Technology Strategy Development
D. Proof of Concept

Answer: C

QUESTION 66
Analyzing the customer's WLAN design including interference and signal strength, and
recommending design changes to accommodate a voice over WLAN system, are activities
associated with which service component in the plan phase?" Select exactly 1 answer(s) from the
following.

A. WLAN Wired Network Integration Assessment


B. Voice over WLAN Assessment

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 18
http://www.passleader.com
C. Operations Readiness Assessment
D. Security Architecture Assessment
E. Service Assurance

Answer: B

QUESTION 67
Which wireless service component addressees issues related to originating, evaluating, and
scheduling change? Select exactly 1 answer(s) from the following:

A. Incident Management
B. Change Management
C. Configuration Management
D. Acceptance Test Plan

Answer: C

QUESTION 68
Select the wireless service component in the implement phase in which operations
responsibilities are defined and transferred to the operate phase team. Select exactly 1 answer(s)
from the following:

A. staging and System Migration


B. Ongoing Support Handoff Meeting
C. Detailed Design Development
D. Staff Training

Answer: B

QUESTION 69
The Cisco Lifecycle Services approach for wireless solutions provides a framework for which of
the following opportunities? Select exactly 1 answer(s) from the following:

A. customers choosing the right products for their network


B. partners choosing the right products for their customers
C. partners having a discussion with customers about the minimum service components needed
to successfully deploy a wireless solution
D. customers defining the correct strategy for advanced technology adoption
E. customers determining a competitor's strategy for adopting advanced technologies

Answer: C

QUESTION 70
Which of the following wireless service components occur in the implement phase? Select exactly
1 answer(s) from the following:

A. Project Kickoff, Staging, Systems Acceptance Testing, Ongoing Support Handoff Meeting
B. WLAN Change Management, Security Administration, Technology Assessment, Operations
Plan

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 19
http://www.passleader.com
C. Operations Readiness Assessment, Systems Requirements Validation, Planning Project
Kickoff, Service Assurance
D. Security Assessment, Operations Assessment, Supplier Management

Answer: A

QUESTION 71
Which activity is associated with the staff training service component in the wireless implement
phase? Select exactly 1 answer(s) from the following:

A. Determine Engagement Profitability


B. Update Leading Practices
C. Develop Staff Training Program Plan
D. Ensure That Order of Proper Hardware Is Complete
E. Conduct Staff Meeting With Training Partner

Answer: C

QUESTION 72
Developing a comprehensive detailed design that meets business and technical requirements
involves which of the following activities? Select exactly 1 answer(s) from the following:

A. Correctly Implement Customer's Wireless Policies in Wireless Solution Configurations


B. Document and Design Infrastructure, Architecture, and Interfaces to Third-Party Applications
C. Ensure All Necessary Hardware and Software Products Are Included in Design
D. Identify Process to Follow if Issues Arise During Implementation

Answer: B

QUESTION 73
Which service component in the wireless plan phase applies only when customers use the
centralized WLAN solution with the Cisco Wireless Location Appliance? Select exactly 1
answer(s) from the following:

A. Planning Project Kickoff


B. System Requirements Validation
C. WLAN Location-Based Services Assessment
D. WLAN Site Readiness Assessment (RF survey)
E. WLAN Wired Network Integration Assessment

Answer: C

QUESTION 74
Choose three activities that are part of the WLAN site readiness assessment (RF Survey) service
component in the plan phase.(Choose three.) Select exactly 3 answer(s) from the following:

A. Perform Acceptance Test Plan


B. Develop Site Requirements Specification Report
C. Hold Kickoff Meeting

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 20
http://www.passleader.com
D. Confirm Project Roles and Responsibilities
E. Perform Site Gap Analysis
F. Conduct Customer Site Survey(s)

Answer: BEF

QUESTION 75
Which three wireless service components belong to the operate phase? (Choose three.)
Select exactly 3 answer(s) from the following:

A. System Monitoring
B. Operations Implementation
C. Incident Management
D. Operations Plan
E. Security Administration
F. Operations Assessment

Answer: ACE

QUESTION 76
Which of the following best describes the purpose of using lifecycle services for deploying an
advanced wireless solution? Select exactly 1 answer(s) from the following:

A. Maximize the number of services required to support advanced technologies.


B. Provide a consistent, repeatable, and proven method to ensure the network solution that is
deployed delivers upon the customer's goals for reliability and availability.
C. Reinforce customer confidence in partners selling products.
D. More clearly define the roles of account managers, systems engineers, and field engineers.
E. Create a more effective sales strategy for partners.

Answer: B

QUESTION 77
Which definition best describes the staff training service component within the wireless implement
phase? Select exactly 1 answer(s) from the following:

A. helps improve the performance and functionality of the infrastructure operations and network
management system.
B. Provides a step-by-step plan detailing the installation and service-commission requirement
tasks to be staged in a controlled implementation environment that emulates a customer
network.
C. develops a training plan and delivers via a custom workshop or e-learning
D. reduces the risk of downtime caused by facilities-related problems

Answer: C

QUESTION 78
Select two activities that from part of the wireless migration plan development service component
in the wireless design phase. (Choose two.)

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 21
http://www.passleader.com
A. Collect and Verify Site Specific Implementation Requirements
B. Gather and Verify Migration Requirements
C. Confirm Project and Milestone Dates
D. Define Migration Team Roles and Responsibilities
E. Create Detailed Staff Training Matrix
F. Verify Migration Address and Available Stops

Answer: BD

QUESTION 79
Which service component is part of the wireless implement phase and includes class scheduling,
enrolment, a communication plan, course outlines, and developing a training schedule?" Select
exactly 1 answer(s) from the following:

A. Staff Training
B. Change Management
C. Operations Setup
D. Fault Management Tool and Product Selection

Answer: A

QUESTION 80
Which of the following lists the six phases of the Cisco Lifecycle Services framework? Select
exactly 1 answer(s) from the following:

A. Prepare, Plan, Create, Implement, Operate, and Improve


B. Prepare, Plan, Design, Apply, Operate, and Manage
C. Prepare, Plan, Design, Implement, Operate, and Manage
D. Prepare, Plan, Design, Implement, Operate, and Optimize
E. Prepare, Plan, Design, Apply, Operate, and Implement

Answer: D

QUESTION 81
Which activity is part of the wireless system acceptance testing service component? Select
exactly 1 answer(s) from the following:

A. Set up Customer for Operational Support


B. Execute Test Cases
C. Develop Escalation Plan
D. Develop Project Management Plan

Answer: B

QUESTION 82
Which three of the following service components are included in the WLAN optimize phase?
(Choose three.) Select exactly 3 answer(s) from the following:

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 22
http://www.passleader.com
A. Change Management
B. Security Administration
C. Operations Readiness Assessment
D. Security Assessment
E. Operations Assessment
F. Technology Assessment

Answer: DEF

QUESTION 83
Which two of these templates, tools, or reference materials are used in the Service Assurance
service component of the operate phase? (Choose two.)

A. Security Assessment Checklist


B. Trouble Ticket System
C. Operations Readiness Assessment
D. Continuous Improvement Plan
E. AS Built Solution Binder

Answer: BD

QUESTION 84
Which three of these templates and tools are essential to completing the service component of
Migration Plan Development? (Choose three.)

A. Staging Plan
B. Migration Plan
C. As Built Solution Binder Do- Escalation Plan
D. Low Level Design
E. Project Management Plan

Answer: B

QUESTION 85
Which service component within the prepare phase recommends the appropriate wireless
technology to address a business requirement of the customer? Select exactly 1 answer(s) from
the following:

A. Account Qualification and Planning


B. Business Case Development
C. Technology Strategy Development
D. Proof of Concept

Answer: C

Get Latest & Actual 650-621 Exam's Question and Answers from Passleader. 23
http://www.passleader.com

Anda mungkin juga menyukai