Mass Diagram
Total Cut Total Fill Adj. Sum Mass
(bcy) (ccy) Fill(bcy) (bcy) Ordinate
8 9 10 11 12 Total Exavation Volume: (s
- - - - - Cross haul/dozer work within Project: (
811 0 0 811 811
684 0 0 684 1495
656 0 0 656 2151
563 0 0 563 2714
427 0 0 427 3141
458 0 0 458 3599
m
Exavation Volume: (sum 8) 3599 cft
work within Project: (11-8) 0 cft