MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE EZ STATION Report No: FME-170011-DWR-S01
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 EZ-ST-01 24 J1-J2 5.2.2017 Acc Acc Acc 9.2.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA
PL 50MM - S355JR+M - Z3552/28343
PL 12MM - S355J0+N - 352618-1

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 9.2.2017
MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE EZ STATION Report No: FME-170011-DWR-S02
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 EZ-ST-01 16 J1-J2 15.2.2017 Acc Acc Acc 18.2.2017 W-237 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA
PL 50MM - S355JR+M - Z3552/28343
PL 12MM - S355J0+N - 352618-1
PL 20MM - S355JR+AR - 255709-1

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 18.2.2017
MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE EZ STATION Report No: FME-170011-DWR-S03
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 EZ-ST-01 13 J1-J2 16.2.2017 Acc Acc Acc 22.2.2017 W-237 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA
PL 50MM - S355JR+M - Z3552/28343
PL 12MM - S355J0+N - 352618-1
PL 20MM - S355JR+AR - 255709-1

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 22.2.2017
MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE (EZ BRACKET SOUTH BATCH 4) Report No: FME-170011-DWR-S04
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 EZ-TBK-20 38 J1-J3 5.3.2017 Acc Acc Acc 7.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA 15 mm
2 EZ-TBK-21 20 J1-J3 5.3.2017 Acc Acc Acc 7.3.2017 W-684 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA 15 mm
3 EZ-TBK-22 20 J1-J3 PL 15mm - S355J0+N - 364210-1 6.3.2017 Acc Acc Acc 7.3.2017 W-703 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA 15 mm
4 EZ-TBK-23 20 J1-J3 6.3.2017 Acc Acc Acc 7.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA 15 mm
5 EZ-TBK-24 2 J1-J3 6.3.2017 Acc Acc Acc 7.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA 15 mm

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 7.3.2017
MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE (EZ STIFFENER BATCH 02) Report No: FME-170011-DWR-S05
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 EZ-ST-03 6 J1-J2 6.3.2017 Acc Acc Acc 7.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA 12 mm
PL 50MM - S355JR+M - Z3552/28343
2 EZ-ST-04 4 J1-J2 PL 12MM - S355J0+N - 352618-1 6.3.2017 Acc Acc Acc 7.3.2017 W-684 WPS-FRJ-027 Rev 00 PF MAG 25% NA 100% NA 12 mm
PL 20MM - S355JR+AR - 255709-1

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 7.3.2017
MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE (EZ TRANSOM CONNECTION BATReport No: FME-170011-DWR-S06
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 EZ-PTC-09 184 J1-J4 5.3.2017 Acc Acc Acc 7.3.2017 W-703 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
2 EZ-PTC-10 184 J1-J4 PL 6mm - S355J2+N - 351705-3 5.3.2017 Acc Acc Acc 7.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
3 EZ-PTC-11 61 J1-J4 PL 8mm - S355JR - ZU1248 5.3.2017 Acc Acc Acc 7.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
4 EZ-PTC-12 61 J1-J4 5.3.2017 Acc Acc Acc 7.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 7.3.2017