NORTH SOUTH CARRIER-2 WATER PIPELINE PROJECT -

BOTSWANA Client :
CCC / WBHO Joint Venture Ministry of Mineral

SUMMARY - DAILY PROGRESS REPORT (PIPELINE)


MECHANICAL ACTIVITY DATE:
UP TO %
SL.# ACTIVITY TOTAL QTY UNIT TODAY CUMULATIVE BALANCE
PRIVIOUS DAY Completed

1 STRINGING 88986 MTR 88986 0 88986 0 100.00%

2 WELDING 5687 Jts 5687 0 5687 0 100.00%

MAINLINE JOINTS 3162 Jts 3162 3162 0 100.00%

TIE-IN JOINTS 1344 Jts 1344 1344 0 100.00%

STATION WORKS
1180 Jts 1180 1180 0 100.00%
(AV+SC+PS+SHORT SECTION+GW)

3 COATING 5687 Jts 5687 0 5687 0 100.00%

4 INTERNAL LINING 5687 Jts 5687 0 5687 0 100.00%

5 LOWERING 88986 MTR 88986 0 88986 0 100.00%

6 Cathodic Protection 88986 MTR 88986 0 88986 0 100.00%

CIVIL ACTIVITY DATE:


UP TO %
SL.# ACTIVITY TOTAL QTY UNIT TODAY CUMULATIVE BALANCE
PRIVIOUS DAY Completed

1 TRENCHING 88986 MTR. 88986 88986 0 100.00%

2 INSITU BEDDING 88986 MTR. 88986 88986 0 100.00%

3 SELECTED BEDDING 88986 MTR. 88986 88986 0 100.00%

4 HUNCHING 88986 MTR. 88986 88986 0 100.00%

5 PADDING 88986 MTR. 88986 88986 0 100.00%

6 BACKFILLING 88986 MTR. 88986 88986 0 100.00%

7 DRILLING MTR. 5884 5884 COMP.

8 BLASTING MTR. 11139 11139 COMP.

CP - POINT RELEASE FOR


9 96 NOS. 96 96 0 100.00%
BACKFILL

AIR VALVE CHAMBERS


11 107 NOS. 107 107 0 100.00%
INSTALLED

Page 1 of 29
Ministry of Minerals, Energy & Water Resources; Botswana

08.06.2016

08.06.2016
Remarks

Page 2 of 29
NORTH SOUTH CARRIER-2 WATER PIPELINE PROJECT - BOTSWANA

CCC / WBHO Joint Venture DAILY PROGRESS REPORT (PIPELINE)

UP TO
SL.# ACTIVITY QTY UNIT TODAY CUMULATIVE
PRIVIOUS DAY
1 STRINGING 88986 MTR 88986 0 88986
Package-3 32+568 TO 32+640 400 400 400
Package-4 32+640 TO 32+920 280 280 280
Package-5 MORALANE PUMP STATION 60 60 60
Package-6 33+040 TO 56+230 23190 23190 23190
Package-7 56+230 TO 56+300 250 250 250
Package-8.1 56+300 TO 84+672 28372 28372 28372
Package-8.2 84+672 TO 111+964 27292 27292 27292
Package-9 (2.1.2) 112+870 & NSC-1 OUTLET 1853 1853 1853
Package-9 (2.1.1) NSC-1 (PALAPYE RESERVIOR) 1739 1739 1739
NSC-1 (diversion) 0+000 TO 5+550 5550 5550 5550
2 WELDING & TIE-IN 5687 Jts 5687 0 5687
Package-3 32+568 TO 32+640 54 54 54
Package-4 32+640 TO 32+920 15 15 15
Package-5 MORALANE PUMP STATION 18 18 18
Package-6 33+040 TO 56+230 1416 1416 1416
Package-7 56+230 TO 56+300 69 69 69
Package-8.1 56+300 TO 84+672 1729 1729 1729
Package-8.2 84+672 TO 111+964 1738 1738 1738
Package-9 (2.1.2) 112+870 & NSC-1 OUTLET 137 137 137
Package-9 (2.1.1) NSC-1 (PALAPYE RESERVIOR) 154 154 154
NSC-1 (Diversion) 0+000 TO 5+550 357 357 357
3 COATING 5687 Jts 5687 0 5687
Package-3 32+568 TO 32+640 54 54 54
Package-4 32+640 TO 32+920 15 15 15
Package-5 MORALANE PUMP STATION 18 18 18
Package-6 33+040 TO 56+230 1416 1416 1416
Package-7 56+230 TO 56+300 69 69 69
Package-8.1 56+300 TO 84+672 1729 1729 1729
Package-8.2 84+672 TO 111+964 1738 1738 1738
Package-9 (2.1.2) 112+870 & NSC-1 OUTLET 137 137 137
Package-9 (2.1.1) NSC-1 (PALAPYE RESERVIOR) 154 154 154
NSC-1 (diversion) 0+000 TO 5+550 357 357 357
4 INTERNAL LINING 5687 Jts 5687 0 5687
Package-3 32+568 TO 32+640 54 54 54
Package-4 32+640 TO 32+920 15 15 15
Package-5 MORALANE PUMP STATION 18 18 18
Package-6 33+040 TO 56+230 1416 1416 1416
Package-7 56+230 TO 56+300 69 69 69
Package-8.1 56+300 TO 84+672 1729 1729 1729
Package-8.2 84+672 TO 111+964 1738 1738 1738
Package-9 (2.1.2) 112+870 & NSC-1 OUTLET 137 137 137
Package-9 (2.1.1) NSC-1 (PALAPYE RESERVIOR) 154 154 154
NSC-1 (diversion) 0+000 TO 5+550 357 357 357
5 LOWERING 88986 MTR 88986 0 88986
Package-3 32+568 TO 32+640 400 400 400
Package-4 32+640 TO 32+920 280 280 280
Package-5 MORALANE PUMP STATION 60 60 60
Package-6 33+040 TO 56+230 23190 23190 23190
Package-7 56+230 TO 56+300 250 250 250
Package-8.1 56+300 TO 84+672 28372 28372 28372
Package-8.2 84+672 TO 111+964 27292 27292 27292
Package-9 (2.1.2) 112+870 & NSC-1 OUTLET 1853 1853 1853
Package-9 (2.1.1) NSC-1 (PALAPYE RESERVIOR) 1739 1739 1739
NSC-1 (diversion) 0+000 TO 5+550 5550 5550 5550
6 Cathodic Protection 88986 MTR 88986 0 88986
Package-3 32+568 TO 32+640 400 400 400
Package-4 32+640 TO 32+920 280 280 280
Package-5 MORALANE PUMP STATION 60 60 60
Package-6 33+040 TO 56+230 23190 23190 23190
Package-7 56+230 TO 56+300 250 250 250
Package-8.1 56+300 TO 84+672 28372 28372 28372
Package-8.2 84+672 TO 111+964 27292 27292 27292
Package-9 (2.1.2) 112+870 & NSC-1 OUTLET 1853 1853 1853

Page 3 of 29
NORTH SOUTH CARRIER-2 WATER PIPELINE PROJECT - BOTSWANA

CCC / WBHO Joint Venture DAILY PROGRESS REPORT (PIPELINE)

UP TO
SL.# ACTIVITY QTY UNIT TODAY CUMULATIVE
PRIVIOUS DAY
Package-9 (2.1.1) NSC-1 (PALAPYE RESERVIOR) 1739 1739 1739
NSC-1 (diversion) 0+000 TO 5+550 5550 5550 5550

Page 4 of 29
Client

Ministry of Minerals, Energy &


Water Resources; Botswana
DATE: 08.06.2016
BALANCE REMARKS
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Page 5 of 29
Client

Ministry of Minerals, Energy &


Water Resources; Botswana
DATE: 08.06.2016
BALANCE REMARKS
0
0

Page 6 of 29
NORTH SOUTH CARRIER-2 WATER PIPELINE PROJECT -
BOTSWANA

CCC / WBHO Joint Venture DAILY PROGRESS REPORT (PIPELINE)

Sl# Site Management Team Total Sl# HSE Concern


1 Construction Manager 0
2 Site Engineer 0
3 Surveyor 0

Sub Total 0 Working Activies carried out to


Site Supervisor 1 TOUCH-UP PAINT WORKS ONGOING.
1 Safety officer 1 2 PATCHING CHAMBER, CLEANING CHAMBERS.
2 Gen. Foremen 0 3 ROOF SEALING & END SEALING ONGOING.
3 Supervisor 2 4 CHECKING VALVES.
4 Foreman 0 5 EXCAVATING FOR OUTLET DRAIN @KM 64+082 BUTT NO 1.
5 Charge hand 0 6 MIXING MATERIAL AT KM 95 AND LOADING CONCRETE MATERIA
7 LEVELLING OF BORROWPIT@KM 95.
Sub Total 3 8
Direct labour 9
1 Welder 1
2 Rigger 0 Working Activies for next da
3 Fabricator 2 1
4 Grinder 0 2
5 Pipefitter 1 3
6 Wraper 0 4
7 Painter 4
8 Blaster 1
9 Helper/Labour 2
10 Carpenter 0
Sub Total 11
Indirect labour
1 Light Vehicle driver 2 Vender/Sub Contractor
2 Operator 2
3 HDD 1
4 Tractor Driver 0
5 Bus Driver 0
Sub Total 5
Grand Total 19
Equipment Area of Concern
1 Crane 1 1
2 Hiab Truck 1
3 WELDING M/C 2 2
4 BUS 0
5 PICKUP 2 3
6 FLAT TRUCK 0
7 SIDEBOOM 0 Signature Weather
8 WELDING RIG 0 Prepared by : Site Engineer CALM
9 SUV 0 MILD
Sign
10 8 Seater 1 RAINY
11 Gen SET 1 Check by: Construction manager WINDY
12 Compressor 1

Page 7 of 29
Sign
NORTH SOUTH CARRIER-2 WATER PIPELINE PROJECT -
BOTSWANA

CCC / WBHO Joint Venture DAILY PROGRESS REPORT (PIPELINE)

13 WATER TANKER 0
Sign
14 FLAT BED TRAILER 0
Total 9

Page 8 of 29
Client

Ministry of Minerals, Energy & Water


Resources; Botswana
DATE: 08.06.2016
HSE Concern

Working Activies carried out today

TING FOR OUTLET DRAIN @KM 64+082 BUTT NO 1.


MATERIAL AT KM 95 AND LOADING CONCRETE MATERIAL

Working Activies for next day

Vender/Sub Contractor

Area of Concern

Weather condition
CALM
MILD
RAINY X
WINDY

Page 9 of 29
Client

Ministry of Minerals, Energy & Water


Resources; Botswana
DATE: 08.06.2016

Page 10 of 29
HYDROTEST PROGRESS REPORT

CCC / WBHO Joint Venture Ministry of Minerals, Energy &


Water Resources; Botswana
Date: 08.06.2016

Test Pack Work Chainage Chainage Header Thermal HYDRO


Length (LM) Water filling Dewatering Header Cutting Remarks
No Package From To welding Stabilisation TESTING

TP-11 8.1 82+000 75+384 6616 Completed completed completed completed completed completed

TP-12 8.1 75+384 68+930 6454 Completed Completed Completed Completed Completed Completed

TP-13 8.1 68+930 63+032 5898 Completed Completed Completed Completed Completed Completed

TP-13A 8.1 PIGGING STATION #3 30 Completed Completed Completed Completed Completed Completed

TP-15 7 & 8.1 56+460 56+243 217 Completed Completed Completed Completed Completed Completed

TP-14 8.1 63+032 56+300 6732 Completed Completed Completed Completed Completed Completed

TP-16 6 56+243 51+056 5273 Completed Completed Completed Completed Completed Completed

TP-17 6 51+056 44+000 7056 Completed Completed Completed Completed Completed Completed

TP-18 6 44+000 37+798 6202 Completed Completed Completed Completed Completed completed

TP-19 6 37+798 33+041 4757 Completed Completed Completed Completed Completed completed

TP-19A 3 32+486 32+687 201 Completed Completed Completed Completed Completed Completed

TP-19B 3 NEW BPT PUMP HOUSE 365 Completed Completed Completed Completed completed completed

TP-19C 3 BPT BPT 120 Completed Completed Completed Completed Completed Completed

TP-19D 3 MORALANE PUMP HOUSE 4 Completed Completed Completed Completed Completed Completed

TP-19E 3 MORALANE PUMP HOUSE 10 Completed Completed Completed Completed Completed Completed
NRV
TP-19F CHAMBER 33+200 183 Completed Completed Completed Completed Completed Completed

TP-2 9 00+000 794.796 795 Completed Completed Completed Completed Completed completed

TP-3 9 00+000 899.229 899 Completed Completed completed completed completed completed

TP-10 8.1 84+672 82+000 2672 Completed Completed Completed Completed Completed Completed

TP-4 9 112+881 112+052 829 Completed Completed Completed Completed Completed Completed

TP - 1 9 00+000 913.845 914 Completed Completed Completed Completed Completed Completed

TP - 1A 9 PALAPYE RESERVIOR 20 Completed Completed Completed Completed Completed Completed

TP-5 8.2 112+052 84+672 27328 Completed Completed completed completed completed completed
NSC 2.1 WATER TRANSFER PROJECT,BOTS
Scour chamber , Air Valve & Pigging Station chamber-Tie in

WP3 Moralane (Start of Contract to MBPT Inlet Chamber)


Scour Chamber 32560.254 1200 DN / X42 / 8mm SC

WP3 Moralane (Proposed MBPT Outlet Chamber to WP4-32+640)


AV 32591.147 1200 DN / X42 / 8mm Type-2 AV

WP5 (Moralane PUMP Station)


Scour Chamber & Butterfly 32938.000 1200 DN / X42 / 8mm R SC

WP6 (Moralane Pump Station to Dikalate 33+040 to 56+230 )


Pigging Station-1 33180.000 1200 DN / X52 / 8mm Right side PS
AV-01 33600.000 1200 DN / X52 / 8mm Type-4 (L) AV
SC-02 33952.194 1200 DN / X52 / 8mm Type-2 (R) SC
AV-02 34249.644 1200 DN / X52 / 8mm Type-3 (R) AV
AV-03 35177.062 1200 DN / X52 / 8mm Type-2 (R) AV
AV-04 35780.000 1200 DN / X52 / 8mm Type-3 (R) AV
SC-03 36445.300 1200 DN / X52 / 8mm Type-3 (R) SC
AV-06 36986.587 1200 DN / X52 / 8mm Type-3 (R) AV
AV-07 37299.314 1200 DN / X52 / 8mm Type-2 (R) AV
SC-04 37797.031 1200 DN / X52 / 8mm Type-2 SC
AV-08 38232.026 1200 DN / X52 / 8mm Type-3 (R) AV
AV-10 39257.144 1200 DN / X52 / 8mm Type-3 (R) AV
AV-11 39740.000 1200 DN / X52 / 8mm Type-4 (R) AV
AV-12 40310.865 1200 DN / X52 / 8mm Type-2 (R) AV
SC-05 40752.186 1200 DN / X52 / 8mm Type-4 (L) SC
AV-13 41080.000 1200 DN / X52 / 8mm Type-2 (R) AV
SC-07 41662.254 1200 DN / X52 / 8mm Type-2 (L) SC
AV-14 42200.063 1200 DN / X52 / 8mm Type-3 (R) AV
AV-15 42801.571 1200 DN / X52 / 8mm Type-3 AV
AV-16 43350.917 1200 DN / X52 / 8mm Type-2 (R) AV
SC-08 43600.000 1200 DN / X52 / 8mm Type-4 (L) SC
AV-17 44565.052 1200 DN / X42 / 8mm Type-3 (R) AV
AV-18 45120.001 1200 DN / X42 / 8mm Type-2 (R) AV
SC-09 45658.228 1200 DN / X42 / 8mm Type-3 (L) SC
AV-19 46300.687 1200 DN / X42 / 8mm Type-3 (R) AV
AV-20 47100.001 1200 DN / X42 / 8mm Type-2 (R) AV
SC-10 47405.301 1200 DN / X42 / 8mm Type-2 (R) SC
AV-21 48207.730 1200 DN / X42 / 8mm Type-3 (R) AV
AV-22 48715.298 1200 DN / X42 / 8mm Type-2 (R) AV
SC-11 49080.000 1200 DN / X42 / 8mm Type-2 (R) SC
AV-23 49647.030 1200 DN / X42 / 8mm Type-3 (R) AV
AV-24 50200.001 1200 DN / X42 / 8mm Type-2 (R) AV
AV-25 50743.382 1200 DN / X42 / 8mm Type-3 (R) AV
SC-12 51125.301 1200 DN / X42 / 8mm Type-2 (L) SC
AV-26 51703.941 1200 DN / X42 / 8mm Type-3 AV

Page 12 of 29
NSC 2.1 WATER TRANSFER PROJECT,BOTS
Scour chamber , Air Valve & Pigging Station chamber-Tie in

AV-27 52300.000 1200 DN / X42 / 8mm Type-3 (R) AV


AV-28 52788.896 1200 DN / X42 / 8mm Type-4 (R) AV
AV-29 53483.537 1200 DN / X42 / 8mm Type-3 (R) AV
AV-30 54200.001 1200 DN / X42 / 8mm Type-4 (R) AV
AV-31 54876.465 1200 DN / X42 / 8mm Type-3 (R) AV
AV-32 55361.830 1200 DN / X42 / 8mm Type-2 (R) AV
SC-13 55585.301 1200 DN / X42 / 8mm Type-3 (R) SC

WP7 Dikalate (DBPT) 56+230 to 56+300


DK17(AV Chamber Type-2) 56270.451 1200 DN / X42 / 8mm AV

WP8.1 (56+300 to 84+672 )


DK8 (AV-39) 56317.000 1200 DN / X42 / 8mm Type-1 (L) AV
DK11 (Pigging Station)-2 56460.000 1200 DN / X42 / 8mm Left side PS
AV-39B 56480.001 1200 DN / X42 / 8mm Type-1 (R) AV
AV-40 57124.855 1200 DN / X42 / 8mm Type-4 (R) AV
SC-15 57699.937 1200 DN / X42 / 8mm Type-3 (L) SC
AV-41 57912.966 1200 DN / X42 / 8mm Type-2 (R) AV
AV-42 58546.945 1200 DN / X42 / 8mm Type-3 (R) AV
SC-16 59300.000 1200 DN / X42 / 8mm Type-3 (L) SC
AV-43 59800.000 1200 DN / X42 / 8mm Type-4 (R) AV
SC-17 60174.390 1200 DN / X42 / 8mm Type-1 (L) SC
AV-44 60881.551 1200 DN / X42 / 8mm Type-4 (R) AV
AV-44B 61320.000 1200 DN / X42 / 8mm Type-3 (L) AV
SC-18 61760.000 1200 DN / X42 / 8mm Type-3 (L) SC
AV-45 61860.001 1200 DN / X42 / 8mm Type-4 (R) AV
AV-46 62485.300 1200 DN / X42 / 8mm Type-3 (R) AV
SC-19 63129.173 1200 DN / X42 / 8mm Type-4 (L) SC
AV-47 63758.369 1200 DN / X42 / 8mm Type-4 (R) AV
SC-20 64025.023 1200 DN / X42 / 8mm Type-4 (L) SC
AV-48 64613.188 1200 DN / X42 / 8mm Type-4 (R) AV
AV-49 65100.000 1200 DN / X42 / 8mm Type-3 (R) AV
SC-21 65530.000 1200 DN / X42 / 8mm Type-4 (L) SC
AV-50 65940.000 1200 DN / X42 / 8mm Type-3 (R) AV
AV-51 66392.800 1200 DN / X42 / 8mm Type-4 (R) AV
SC-22 66865.624 1200 DN / X42 / 8mm Type-4 (L) SC
AV-52 67325.422 1200 DN / X42 / 8mm Type-4 (R) AV
SC-23 67959.721 1200 DN / X42 / 8mm Type-3 (L) SC
AV-53 68080.000 1200 DN / X42 / 8mm Type-4 (R) AV
Pigging Station-3 68930.000 1200 DN / X42 / 8mm Left side PS
AV-55 69725.183 1200 DN / X42 / 8mm Type-1 (R) AV
SC-27 70654.798 1200 DN / X42 / 8mm Type-3 (L) SC
AV-57 71165.477 1200 DN / X42 / 8mm Type-2 (R) AV
AV-58 71570.203 1200 DN / X42 / 8mm Type-3 (R) AV
SC-28 72254.066 1200 DN / X42 / 8mm Type-4 (L) SC

Page 13 of 29
NSC 2.1 WATER TRANSFER PROJECT,BOTS
Scour chamber , Air Valve & Pigging Station chamber-Tie in

AV71 73184.909 1200 DN / X42 / 8mm Type-2 (R) AV


SC-31 73958.070 1200 DN / X42 / 8mm Type-3 (L) SC
AV72 74180.000 1200 DN / X42 / 8mm Type-2 (R) AV
AV72B 74820.342 1200 DN / X42 / 8mm Type-3 (R) AV
SC-32 75384.699 1200 DN / X42 / 8mm Type-3 (L) SC
AV73 75819.999 1200 DN / X42 / 8mm Type-2 (R) AV
AV74 76537.235 1200 DN / X42 / 8mm Type-3 (R) AV
SC-33 77274.268 1200 DN / X42 / 8mm Type-3 (L) SC
AV75 77479.925 1200 DN / X42 / 8mm Type-2 (R) AV
AV76 78180.000 1200 DN / X42 / 8mm Type-3 (R) AV
AV78 78791.445 1200 DN / X42 / 8mm Type-3 (R) AV
AV78B 79400.000 1200 DN / X42 / 8mm Type-3 (R) AV
AV79 80036.812 1200 DN / X42 / 8mm Type-4 (R) AV
AV80A 80479.403 1200 DN / X42 / 8mm Type-3 (R) AV
AV80 80914.468 1200 DN / X42 / 8mm Type-4 (R) AV
AV81 81619.999 1200 DN / X42 / 8mm Type-3 (R) AV
AV82 82339.999 1200 DN / X52 / 8mm Type-3 (R) AV
AV83 83100.000 1200 DN / X52 / 8mm Type-3 (R) AV
AV84 83699.999 1200 DN / X52 / 8mm Type-3 (R) AV
Pigging Station-4 84600.000 1200 DN / X52 / 8mm Right side PS

WP8.2 (84+672 to 111+965 )

AV87 85360.000 1200 DN / X52 / 8mm Type-4 (R) AV

AV88 86020.000 1200 DN / X52 / 8mm Type-3 (R) AV

AV89 86700.000 1200 DN / X52 / 8mm Type-3 (R) AV

AV90 87380.000 1200 DN / X52 / 8mm Type-3 (R) AV

AV91 88020.000 1200 DN / X52 / 8mm Type-3 (R) AV


SC-37 88700.000 1200 DN / X52 / 8mm Type-4 (L) SC

AV92 88799.999 1200 DN / X52 / 8mm Type-4 (R) AV

AV92A 89260.000 1200 DN / X52 / 8mm Type-3 (R) AV

AV93 89699.999 1200 DN / X52 / 8mm Type-3 (R) AV


SC-38 90399.999 1200 DN / X52 / 8mm Type-3 (L) SC

AV94 90499.492 1200 DN / X52 / 8mm Type-4 (R) AV

AV96 91400.000 1200 DN / X52 / 8mm Type-3 (R) AV


SC-39 92099.999 1200 DN / X52 / 8mm Type-3 (L) SC

AV97 92300.000 1200 DN / X52 / 8mm Type-4 (R) AV


SC-40 92900.000 1200 DN / X52 / 8mm Type-3 (L) SC

AV98 93100.000 1200 DN / X52 / 8mm Type-4 (R) AV


SC-50 93799.999 1200 DN / X52 / 8mm Type-3 (R) SC

AV100 94000.000 1200 DN / X52 / 8mm Type-4 (R) AV

Page 14 of 29
NSC 2.1 WATER TRANSFER PROJECT,BOTS
Scour chamber , Air Valve & Pigging Station chamber-Tie in

SC-51A 94799.999 1200 DN / X52 / 8mm Type-3 (R) SC

AV101 95000.779 1200 DN / X52 / 8mm R AV

Pigging Station-5 95370.000 1200 DN / X52 / 8mm Left side PS

AV101a 95400.000 1200 DN / X52 / 8mm R AV

AV101b 95660.000 1200 DN / X52 / 8mm R AV

SC-51B 96319.568 1200 DN / X52 / 8mm R SC

AV102 96959.568 1200 DN / X52 / 8mm L AV

SC-52 97259.568 1200 DN / X52 / 8mm R SC

AV103 97639.110 1200 DN / X52 / 10mm L AV

SC-53 97979.110 1200 DN / X52 / 10mm R SC

AV104 98271.659 1200 DN / X52 / 8mm L AV

SC-54 98531.660 1200 DN / X52 / 8mm R SC

AV105 99171.660 1200 DN / X52 / 8mm L AV

SC-55 99591.660 1200 DN / X52 / 8mm R SC

AV106 99871.659 1200 DN / X52 / 8mm L AV

SC-56 100097.391 1200 DN / X52 / 8mm R SC

AV106B 100612.091 1200 DN / X52 / 8mm R AV

SC-56B 100805.493 1200 DN / X52 / 8mm L SC

AV106 101104.264 1200 DN / X52 / 8mm R AV

SC-57 101509.376 1200 DN / X52 / 8mm Type-3 (L) SC

AV107 102024.264 1200 DN / X52 / 8mm Type-4 (R) AV

SC-58 102418.968 1200 DN / X52 / 8mm Type-4 (L) SC

AV108 102718.969 1200 DN / X52 / 8mm Type-4 (R) AV

SC-59 103058.969 1200 DN / X52 / 8mm Type-3 (L) SC

AV109 103664.264 1200 DN / X52 / 8mm Type-4 (R) AV

AV109B 104045.894 1200 DN / X52 / 8mm Type-3 (R) AV

Page 15 of 29
NSC 2.1 WATER TRANSFER PROJECT,BOTS
Scour chamber , Air Valve & Pigging Station chamber-Tie in

SC-60 104744.259 1200 DN / X52 / 8mm Type-3 (L) SC

AV110 105178.829 1200 DN / X52 / 8mm Type-4 (R) AV

SC-61 105324.260 1200 DN / X52 / 8mm Type-2 (L) SC

AV111 105657.708 1200 DN / X52 / 8mm Type-4 (R) AV

SC-62 106011.605 1200 DN / X52 / 8mm Type-5 (L) SC

AV112 106160.002 1200 DN / X52 / 8mm Type-4 (R) AV

SC-63 106804.425 1200 DN / X52 / 8mm Type-4 (L) SC

AV113 107104.260 1200 DN / X52 / 8mm Type-4 (L) AV

SC-64 107144.260 1200 DN / X52 / 10mm L SC

AV114 107355.147 1200 DN / X52 / 8mm Type-4 (R) AV

SC-65 107619.339 1200 DN / X52 / 8mm Type-3 (R) SC

AV115 108444.260 1200 DN / X52 / 8mm Type-4 (R) AV

SC-66 108564.260 1200 DN / X52 / 8mm Type-7 (L) SC

AV116 109597.277 1200 DN / X52 / 8mm Type-4 (R) AV

SC-67 109838.971 1200 DN / X52 / 8mm Type-7 (R) SC

AV-117A 110609.559 1200 DN / X52 / 8mm Type-3 (R) AV

AV-117B 111210.002 1200 DN / X52 / 8mm Type-3 (R) AV

AV-117C 111829.570 1200 DN / X52 / 8mm Type-4 (R) AV

AV-117D 111889.571 1200 DN / X52 / 8mm Type-1 (R) AV

Pigging Station-6 111909.000 1200 DN / X52 / 8mm Right side PS

WP9 Palapye (Pipeline 111+965 to Reservoir Inlet Chamber 112+870)


Double AV-118(NSC-1-AV-01 112485.639 1200 DN / X42 / 8mm Type-4 (R) AV
Double AV-119(NSC-1-AV-02 112790.939 1200 DN / X42 / 8mm Type-2 (R) AV

WP9 Palapye (Reservoir Inlet Chamber to Existing NSC1 Tie-In)


Double AV-01(NSC-1-AV-118 499.935 1200 DN / X42 / 8mm L AV
Double AV-02(NSC-1-AV-119 805.236 1200 DN / X42 / 8mm R AV

WP9 Palapye (Reservoir Outlet Chamber to Existing NSC1 Tie-In)


AV01-B 94.636 1200 DN / X42 / 8mm R AV

WP9 - 700/500 Palapye (Reservoir Outlet to PWTW)


AV-01 70.758 700 DN / X42 / 6mm R AV
SC-01 418.845 700 DN / X52 / 8mm R SC
AV-02 685.458 700 DN / X42 / 6mm L AV

Existing NSC1 Pipeline Re-Route, Dam Area CH: 95+220 to 100+774


AV01A 466.735 1200 DN / X42 / 8mm L AV
SC01 1100.000 1200 DN / X42 / 8mm R SC
AV-01B 1760.001 1200 DN / X42 / 8mm L AV
SC02 2040.001 1200 DN / X42 / 8mm R SC

Page 16 of 29
NSC 2.1 WATER TRANSFER PROJECT,BOTS
Scour chamber , Air Valve & Pigging Station chamber-Tie in

AV-02 2418.068 1200 DN / X42 / 8mm L AV


SC03 2758.068 1200 DN / X52 / 10mm R SC
AV-03 3060.001 1200 DN / X42 / 8mm L AV
SC04 3300.000 1200 DN / X42 / 8mm R SC
AV-04 3940.000 1200 DN / X42 / 8mm L AV
SC05 4380.000 1200 DN / X42 / 8mm R SC
AV-05 4660.000 1200 DN / X42 / 8mm L AV
SC06 5100.000 1200 DN / X42 / 8mm R SC
AV-06 5360.001 1200 DN / X52 / 8mm L AV
SC-07 5525.303 1200 DN / X42 / 8mm R SC

Type of Chamber Total No COMPLETED


Air Valve 120 89.4%
Scoure Chamber 59 78.5%

Page 17 of 29
SFER PROJECT,BOTSWANA
ation chamber-Tie in - Daily Progress Report

Wedge Gate Valve

Wedge Gate Valve


Installation of 2nd
Installation of Tee

Installation of 1st

Installation of Air

INSTALLATION
Installation of

Installation of
scour pipe

JAIL BAR
Welding

Flange

Vent
1 1 1 1 1 1 1

1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1

Page 18 of 29
SFER PROJECT,BOTSWANA
ation chamber-Tie in - Daily Progress Report

Wedge Gate Valve

Wedge Gate Valve


Installation of 2nd
Installation of Tee

Installation of 1st

Installation of Air

INSTALLATION
Installation of

Installation of
scour pipe

JAIL BAR
Welding

Flange

Vent
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1 1 1

1 1

1 1

1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1
1 1 1 1 1
1 1 1
1 1 1 1 1
1 1 1

1 1 1 1
1 1 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1 1 1

Page 19 of 29
SFER PROJECT,BOTSWANA
ation chamber-Tie in - Daily Progress Report

Wedge Gate Valve

Wedge Gate Valve


Installation of 2nd
Installation of Tee

Installation of 1st

Installation of Air

INSTALLATION
Installation of

Installation of
scour pipe

JAIL BAR
Welding

Flange

Vent
1 1 1 1
1 1 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1
1 1 1

1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1

Page 20 of 29
SFER PROJECT,BOTSWANA
ation chamber-Tie in - Daily Progress Report

Wedge Gate Valve

Wedge Gate Valve


Installation of 2nd
Installation of Tee

Installation of 1st

Installation of Air

INSTALLATION
Installation of

Installation of
scour pipe

JAIL BAR
Welding

Flange

Vent
1 1 1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1

1 1 1 1

Page 21 of 29
SFER PROJECT,BOTSWANA
ation chamber-Tie in - Daily Progress Report

Wedge Gate Valve

Wedge Gate Valve


Installation of 2nd
Installation of Tee

Installation of 1st

Installation of Air

INSTALLATION
Installation of

Installation of
scour pipe

JAIL BAR
Welding

Flange

Vent
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1
1 1 1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1
1 1 1

1 1 1 1
1 1 1 1

1 1 1

1 1 1
1 1 1
1 1 1

1 1
1 1 1 1 1 1
1 1
1 1 1 1 1 1

Page 22 of 29
1
1
1
1
1
1
1
1
1
1
Welding

59
120
178
SFER PROJECT,BOTSWANA

1
1
1
1
1
1
1
1
1
1

Installation of Tee

59
120
178
Installation of
1
1

54
108
161
Flange

Installation of 1st
1

54
54

N/A
Wedge Gate Valve

Installation of 2nd
1

54
54

N/A Wedge Gate Valve

Page 23 of 29
ation chamber-Tie in - Daily Progress Report

Installation of Air
1

44
81
125

Vent

Installation of
0
0

N/A

scour pipe

JAIL BAR
43

INSTALLATION
LOWERING & TIE-IN
ACTIVITY WELDING (JTS.) LOWERING (MTR.)
CUMULATIVE 353 4230
6/27/2013 2
6/28/2013 2
6/29/2013 2
6/30/2013
7/1/2013 2
7/2/2013 2
7/3/2013 2
7/4/2013 3
7/5/2013 3
7/6/2013 4
7/7/2013
7/8/2013 5
7/9/2013 5
7/10/2013 -
7/11/2013 -
7/12/2013 -
7/13/2013 -
7/14/2013
7/15/2013
7/16/2013
7/17/2013 -
7/18/2013 -
7/19/2013 6
7/20/2013 5
7/21/2013
7/22/2013 6
7/23/2013 5
7/24/2013 5
7/25/2013 5
7/26/2013 6
7/27/2013 4
7/28/2013
7/29/2013 5
7/30/2013 5
7/31/2013 6
8/1/2013 6
8/2/2013 6
8/3/2013 4
8/4/2013
8/5/2013 6
8/6/2013 6
8/7/2013 6
8/8/2013 6
8/9/2013 5
8/10/2013 4
8/11/2013
8/12/2013 6
8/13/2013 6
LOWERING & TIE-IN
ACTIVITY WELDING (JTS.) LOWERING (MTR.)
8/14/2013 6
8/15/2013 6
8/16/2013 6
8/17/2013 4
8/18/2013
8/19/2013 6
8/20/2013 6
8/21/2013 6
8/22/2013 6
8/23/2013 6
8/24/2013 2
8/25/2013
8/26/2013 5 72
8/27/2013 4
8/28/2013 2 72
8/29/2013 2 36
8/30/2013 2 72
8/31/2013 2 72
9/1/2013
9/2/2013 3 36
9/3/2013 4 144
9/4/2013 2 72
9/5/2013 2
9/6/2013 3 108
9/7/2013 2 72
9/8/2013
9/9/2013 4 144
9/10/2013 4 144
9/11/2013 4 144
9/12/2013 4 144
9/13/2013 4 144
9/14/2013 2 72
9/15/2013
9/16/2013 2 144
9/17/2013 4 144
9/18/2013 4 144
9/19/2013 3 108
9/20/2013 4 144
9/21/2013 2 -
9/22/2013
9/23/2013 3 36
9/24/2013 4 180
9/25/2013 4 144
9/26/2013 4 144
9/27/2013 4 144
9/28/2013
9/29/2013
9/30/2013
10/1/2013 3 -
LOWERING & TIE-IN
ACTIVITY WELDING (JTS.) LOWERING (MTR.)
10/2/2013 4 180
10/3/2013 4 90
10/4/2013 5 72
10/5/2013 3 36
10/6/2013
10/7/2013 4 126
10/8/2013 6 252
10/9/2013 6 252
10/10/2013 6 234
10/11/2013 6
10/12/2013 2 72
10/13/2013
10/14/2013 6 36
10/15/2013 6
LOWERING & TIE-IN
REMARKS

NO WORK PERMIT
NO WORK PERMIT
NO WORK PERMIT
NO WORK PERMIT

HOLIDAY
HOLIDAY
NO WORK PERMIT
NO WORK PERMIT
LOWERING & TIE-IN
REMARKS

(205 JTS.) WELDING ABOVE GROUND

(148 JTS.) WELDING IN TRENCH

HOLIDAY

HOLIDAY
LOWERING & TIE-IN
REMARKS

A/G JOINTS

4 NOS. A/G JOINTS


6 NOS. A/G JOINTS