Mustafa Rizk (MSc)

Survey Project Manager, Survey Expert, Survey Engineer, Survey Party Chief, Experienced Land
Surveyor, LOOKING FOR JOB
mustafa.rizk@gmail.com

Summary
I am looking for job in Middle East as:
Survey Project Manager.
Lead Survey Engineer.
Chief Land Surveyor
Project Surveyor.

I am bright, talented and ambitious survey project manager has the required practitioner qualifications along
with comparable experience of working to the highest standards. I have a long track record of ensuring projects
are delivered to the highest quality, within budget by effectively organizing, managing and utilizing all
resources. Able to lead teams on surveying, GIS, rail, metro, roads, bridges, landscaping, sewerage, pipelines,
constructions, tunnels, and other projects. Where the highest standards are routinely demanded. Always
wanting to be actively involved in all aspects of the project life -cycle I can deliver high-value projects in
matrixed organizations and across different geographies. Takes direction well and works hard to manage
clients expectations.

Specialties:

Topographic Survey.
Constriction and Plan Survey.
Railway, Metro, Roads and Bridges Projects.
Cadastral Mapping Projects.
Infrastructure Projects.
Spatial Data Management.
Geographical Information System (GIS).
Geodetic Networks and Control Points
Hydrographic Survey
Remote Sensing
3D Laser Scanning Survey

Experience
Deputy Survey Manager at Parsons

Page1
June 2013 - January 2016 (2 years 8 months)
Using computer, Surveying and mapping software, performs boundary analysis, research, and mathematical
checking of parcel maps, records of survey, tract maps, and other maps and projects for technical correctness
and compliance with Development Authority of Makkah (DAM), regulations, and guidelines and office
policies and procedures.
Answers a variety of complex questions and provides information to private engineers, surveyors,
developers, other County departments, and the general public regarding items such as map check outcomes;
property ownership and boundaries; monumentation and easement location; Development Authority
of Makkah (DAM) local surveying laws, rules, and regulations; and County ordinances, policies, and
procedures.
Researches existing recorded information, including record maps, plans, deeds, easements, and right-of-way
documents; prepares legal descriptions, records of surveys, and corner records.
Constructs countywide Geographic Information Systems (GIS) base map by: coordinating the GIS activities
of various County departments and divisions and community members, including local schools, vendors, and
surveyors; organizing discussions and presentations of GIS hardware, software, and applications; automating
related office functions; and assigning, prioritizing, reviewing, and evaluating the work of technicians and/or
interns.
Reviews applications for certificates of compliance for sufficiency and completeness and survey content for
validity and technical correctness; and prepares reports for technical concurrence by the County Surveyor
and legal review by County Counsel.
Files and indexes maps and record information using personal computers and database software; and
supervises interns performing index-related data entry.

Director of Survey Department at Micro Engineering Tech Inc


November 2012 - May 2013 (7 months)
Follow-up sales operations of Surveying Instruments
Supervising the site survey teams
Prepare quotations and technical specifications
Supervise the training courses and technical support

Survey Projects Manager at Gulf Computers LLC


December 2008 - August 2010 (1 year 9 months)
Responsibilities:

Interfacing with various programs in Abu Dhabi Municipality (TPSS) to understand their survey needs and
creating the appropriate data capture methodologies.
Manage overall Field and Office activities within the operations zone of the company.
Planning operations; Executing the data collection process and back office tasks of managing the data input
and integration with GIS data sets.

Page2
Develop, implement and apply a quality control system that guarantees the highest achievable standard of
products and services.
Advise and implement optimization methods for survey and GIS data base using appropriate technology
(low cost, high efficiency processes and methods)

Survey Manager at Dubai Gulf Contracting LLC


December 2007 - November 2008 (1 year)
Responsibilities:

Manage overall Field and Office activities for various survey jobs required for the project, source teams and
services
Develops project plans to implement strategic goals. Meeting deadlines Conducts project assessment and
performs task planning to identify milestones, resource needs, schedule, and budget recommendations.
Plans, leads and manages all survey tasks including staffing, sourcing equipment, establishing standards,
staff technical training on technology, etc
Identify and suitably deploy personnel and equipment resources to enable work to be performed within the
financial safety and time limits covered by the contract.
Setting up Quality Assurance/Quality Control processes and documentation.
Working with GIS team for data generation activities.

Chief Land Surveyor at Shimizu Corporation


September 2006 - November 2007 (1 year 3 months)
Responsibilities:

Mange and direct all activities of the survey department. Prepare progress report to the project manager.
Schedules survey crews. Establishes and maintain survey crew and survey technician procedure to ensure
efficient and productive performance and accurate survey data transfer to and from the design section.
Assist in the preparation of as-built survey drawings, maps and other shop drawings, and review these
products prior to submit to the engineer.
Monitors the performance of surveyors in the field and technicians in their mapping. Staffs the survey
section as appropriate for current and anticipated workload.
Maintain contact with the engineer and client to obtain and assure a good satisfaction.

Chief Land Surveyor at Obayashi Kajima Yapi Merkezi JV


August 2005 - September 2006 (1 year 2 months)
Responsibilities:

Plan, prioritizes, assign and review the work of staff involved in surveying; monitor work in progress;
supervise and evaluate the work of the professional and technical land surveying staff; provides training and
technical assistance to survey staff.

Page3
Supervises and participates in the work of subordinates engaged in the preparation of topographic survey
maps & bathymetric survey, and profiles and field notes regarding existing roads and utilities.
Assist the design team for all site informations related to surveying works and carry out all function as
assigned by them and managing information flow from design team to field surveyors and vice versa.
Recommends and assists in the implementation of goals and objectives; establishes schedules and methods
for completion of survey; implements policies and procedures.
Evaluates operations and activities of assigned responsibilities; recommends improvements and
modifications; prepare various reports on operations and activities

Head of Survey at Engineering Contracting Company LLC


June 2003 - June 2005 (2 years 1 month)
Responsibilities:

Prepares the five weeks programs for surveying works, weekly progress report, study drawings in details
and raise RFI`s in coordination with construction manager, project coordinator, QA/QC engineer concerning
discrepancies on the drawings relating to dimensions and setting out of the works.
Perform a variety of related office and field tasks to gather, analyze and record data and otherwise assist
surveyors and engineers in preparation projects.
Provides all setting out coordinates and levels as required, maintain records of all levels during surveys
carried out on site and variation schedules.
Prepares quantity take-off and assist in preparation of the project estimation.
Ensure effective communication is maintained within operations surveying team.

Senior Land Surveyor at The Arab Contractors


December 1998 - June 2003 (4 years 7 months)
Responsibilities:

Provides technical support and supervision within surveying team to ensure successful technical and
timescale handover of survey works to achieve the target.
Review distance, drive hubs and stakes and perform survey work in determining topography, elevations,
location of sewer lines, water mains and valves, curbs, sidewalks and other public work and utility as well as
as-built information.
Prepares weekly program/progress reports for all surveying activities, Check and amended setting out
drawings with mechanical drawings to accommodate steel structure works before carry out mechanical
installations.
Check as built drawings and submitted proposed solutions to the consultant if there are any discrepancies,
Prepares cross sections for the roads and assisting the estimating department for quantity calculations

Land Surveyor at STFA Construction Group


December 1996 - January 1998 (1 year 2 months)

Page4
Responsibilities:

Reading & understanding construction drawings; verify and ensure survey equipments are calibrated and
well maintained.
Coordinate with architect & concerned authorities for demarcation points of site and also bench marks prior
to start of the project.
Report to the chief surveyor any deviations observed in the works; coordinate with the QC inspector/
Engineer to carry out inspections

Land Surveyor at Al Dakheel Corporation Company


March 1993 - October 1996 (3 years 8 months)
Responsibilities:

Established reference survey control points and verify its correctness periodically.
Prepare survey reports for each activity including survey checklist and get it approved from Engineer.
Conduct survey check before and after concrete pour and maintain necessary records.

Certifications
Advancing Professional Construction and Program Management (CMAA)
The Construction Management Association of America License ID No. 179381 December 2014

Courses

Survey Projects Manager


Gulf Computers LLC
AutoCAD Map 3D
MapInfo 9.5
Global Mapper 10
ArcGIS 9.3

Chief Land Surveyor


Obayashi Kajima Yapi Merkezi JV
Microsurvey CAD 2005

Senior Land Surveyor


The Arab Contractors
AutoCAD 2D
Leica Liscad 6.2

Page5
Director of Survey Department
Micro Engineering Tech Inc
AutoCAD Civil 3D

Survey Manager
Dubai Gulf Contracting LLC
Primavera 3
12 D
Surfer 9.0

Projects
King Abdullah bin Abdulaziz for the reconstruction of Mecca project
June 2013 to Present
Members:Mustafa Rizk (MSc), Mohamed Youssef A. Sallam, Hosam Shaheen, BADAR AYYAZ, Ahmed
Hassaan Tolba,CCP, Mohammed Nasr , PMP, ITIL, Hasan Zaidi, Mostafa Aly, Bin Hameed, Mohamed
Elsharawy,MSc,PRMG
Under this contract, "Parsons" will be provide consulting services and technical support and management
of the King Abdullah bin Abdulaziz for the reconstruction of Mecca project,, and falls on it to provide the
services, personnel, staff, materials, and all the requirements of the implementation of the project and the
preparation of scopes of work studies, designs and supervision and implementation of related projects,
such as roads, transport and smart cities, the development of services and facilities necessary, and the
hospitality of pilgrims, and partnership with the private sector, and development studies. It also includes
coordination with relevant government agencies and projects to be implemented, doing all topographic
and urban surveying works, full coordination with all parties to meet business requirements, leading to the
preparation of programming time to implement contracts in line with the period specified for the project.
The Survey services Outsourcing for Abu Dhabi Municipality (ADM)
December 2008 to August 2010
Members:Mustafa Rizk (MSc), Satish Bangera, Bala Gopalan, Balaji Krishnamurthy, B S Nath, Feras Assaf,
PMP, Sunny Chandna, sachin nakhate, Subrata Paul
Gulf Computers Est. was awarded The Survey services Outsourcing contract by Town Planning Survey
Sector (TPSS) of Abu Dhabi Municipality (ADM), in 2007, for outsourcing their survey activities. The
deployment started in July 2007. The main task in the project is performing surveying works on behalf of
the department like doing cadastral surveys, topographic surveys, base map surveys, etc. The duration of
contract was for 3 years I have worked about two years and I was the third project manager to manage a total
of 45 resources have been deployed by Gulf Computers Est.
Dubai Metro Project

Page6
August 2005 to September 2006
Members:Mustafa Rizk (MSc), Ashraf Salah, Can Boztepe, Aybek Otceken, Maximo Santos, A Sastrillo, Assoc
CIPD, CHRP, Fuad Aljammaz, John Smith
Planning of the Dubai Metro began under the directive of Dubai's ruler Sheikh Mohammed bin Rashid Al
Maktoum who expected other projects to attract 15 million visitors to Dubai by 2010. The combination of a
rapidly growing population (expected to reach 3 million by 2017) and severe traffic congestion necessitated
the building of an urban rail system to provide additional public transportation capacity, relieve motor traffic,
and provide infrastructure for additional development.
In May 2005, a AED 12.45 billion/US$3.4 billion design and build contract was awarded to the Dubai
Rail Link (DURL) consortium made up of Japanese companies including Mitsubishi Heavy Industries,
Mitsubishi Corporation, Obayashi Corporation, Kajima Corporation and Turkish firm Yap# Merkezi, and the
Project Management ('The Engineer') and Construction Management services contract awarded to a French-
American joint venture between Systra and Parsons Corporation. The first phase (worth AED 15.5 billion/
US$4.2 billion) covers 35 kilometres (22 mi) of the proposed network, including the Red Line between Al
Rashidiya and the Jebel Ali Free Zone set for completion by September 2009 and the Green Line fromAl
Qusais 2 to Al Jaddaf 1. This was to be completed by June 2010. A second phase contract was subsequently
signed in July 2006 and includes extensions to the initial routes. The Red Line partially opened at 9 minutes
and 9 seconds past 9 pm on 9 September 2009 (9/9/9 9:9:9), inaugurated by Sheikh Mohammed bin Rashid
al Maktoum. Upon completion of the Dubai Metro project and will be a total of 166 kilometers (83 mi) of
lines, and 77 stations (including 9 underground stations) lines are under construction, and two others in the
planning stage.
The Palm Jumeirah Marina Apartments Dubai
September 2006 to November 2007
Members:Mustafa Rizk (MSc), Nazakat Ali
The Palm Jumeirah is an artificial archipelago in Dubai, The Palm Island is artificial peninsulas constructed
of sand dredged from the bottom of the Arabian Gulf. The creation of the Palm Jumeirah began in June 2001.
The Palm Jumeirah consists of a tree trunk, a crown with 16 fronds, and a surrounding crescent island that
forms an 11 kilometer-long breakwater. The island itself is 5 kilometers by 5 kilometers. It add 78 kilometers
to the Dubai coastline. Our contract is Constructed 6 towers and 10 town house, with all infrastructures and
facilities buildings as well as all internal roads.
Zabeel Park - Dubai
June 2003 to June 2005
Members:Mustafa Rizk (MSc), Nidal Hassoun, Marios ElBacha, Nazakat Ali, Ziad Al Haffar, Hussein Abu
Hamad , BSc, PMD, MBA
The park, located on three separate plots to the north east of the Dubai World Trade Centre. It is a new
leisure and entertainment park located in the heart of urban Dubai with a total cost Dh200 million, and with
a 'modern technology' theme. Total area 50 hectare with capacity for 2000 people. The park's three plots are
interlinked by pedestrian bridges.
The Tiger Woods Dubai

Page7
December 2007 to November 2008
Members:Mustafa Rizk (MSc), Walid O. DAHER
The Tiger Woods Dubai will encompass the first Tiger Woods designed 13 million sq feet golf course
Al Ruwaya, it was a planned private residential community and resort offering a challenging 18-hole
championship course. The $1.1bn Tiger Woods Dubai project was announced in 2006 and originally
scheduled to open in September 2009. Original plans for the 55 million square foot project included 287
luxury villas and mansions, a boutique hotel and a clubhouse.
Al Juffrah Housing Project
December 1996 to January 1998
Members:Mustafa Rizk (MSc)
CONSRUCTION OF 1500+700 HOUSING UNITS, PUBLIC UTILITIES, CONFERENCE HALL AND
SERVICES, The main scope of the project was to construct a new small town consisting of 1500 single
storey and 700 multi-storey housing units complete with the necessary infrastructures, a kindergarten,
primary school, shopping center, mosque.
King Fahad Bin Abdul Aziz Al Saudi Dam Project.
March 1993 to October 1996
Members:Mustafa Rizk (MSc)
Concrete dam with a height of 103 meters and a length of 507 meters with a thickness of 80 meters at the
bottom, and has a spillway at the top of the dam 224 meters long, surmounted by a concrete bridge has been
created from a previous stress slabs length of 225 meters. The amount of concrete used in the construction
of the dam is about 1.5 million cubic meters of reinforced concrete and regular. The size of the fossils basics
about two million cubic meters, of which about 900,000 cubic meters of rock excavation.

Languages
Arabic (Native or bilingual proficiency)
English (Full professional proficiency)

Skills & Expertise


Surveying
Survey
Construction
Topographic Surveys
Road
GIS
AutoCAD
ArcGIS
GPS
Civil Engineering
ESRI
Microsoft Office
Construction Management

Page8
Excel
Word
Engineering
Problem Solving
Cartography
Bridge
Earthworks
Geomatics
Photogrammetry
Highways
ArcMap
Geodesy
ArcView
Railway
MapInfo Professional
Geography
Rail
Microsoft Word
Laser Scanning
ALTA Surveys
Microstation
Pipelines
CAD
Google Earth
Infrastructure
Spatial Databases
Boundary
Remote Sensing
Metro
Management
Feasibility Studies
Project Planning
Project Management
Spatial Analysis
Leica
Spatial Data Management
Software

Education
Alexandria University
Bachelor's degree, Surveying & Cartography, 1988 - 1992
Grade: Good "
American Global International University
Master, Surveying & Cartography, 2000 - 2004

Page9
Interests
Geographical Information System, Surveying, Mapping, Construction, Civil Engineering, Railway Project,
Infrastructure, Topographic Survey, GIS, Cartography, Consultancy, Building Surveyor, Spatial Data
Management,

Page10
Mustafa Rizk (MSc)
Survey Project Manager, Survey Expert, Survey Engineer, Survey Party Chief, Experienced Land
Surveyor, LOOKING FOR JOB
mustafa.rizk@gmail.com

13 people have recommended Mustafa


"Rizk is a well connected professional that always takes the time to support anyone is his network. He has
a very impressive background and profile and I recommend him as a Survey Manger to connect with and
consider for anything appropriate.""

Mostafa Riyad, Senior Project Accountant, Parsons, worked directly with Mustafa at Parsons

"Mustafa is a personable individual that gets on well with those around him. He is focused and dedicated to
producing his very best at all times. He has shown that he is able to deal with important and precise tasks and
I recommend him highly as a survey project manager he will not let you down!"

Samer Salameh, PMP, IT Manager, Parsons Corporation, worked with Mustafa at Parsons

"Mustafa Rizak did an excellent job in his position; Deputy Survey Manager in PARSONS., and is an asset
to the organization during his tenure with Department. He has excellent written and verbal communication
skills, is extremely organized, can work independently and is able to follow through & thoroughly to ensure
that the job gets done. Mustafa was always willing to offer his assistance and had an excellent rapport with
colleagues, clients, employers, and other professional organizations and persons. He would definitely be an
asset to any employer; in consequence, I recommend him for any endeavor he chooses to pursue and wish
him the success & happiness he aims for... "

Afzaal Hussain Shah, Senior Recruiter / Senior Talent Acquisition Specialist, Saudi Parsons, worked
directly with Mustafa at Parsons

"Ive had the privilege of working with Mustafa and in that time I have known him to be a well-grounded and
down to earth business partner and colleague. He is a calculated risk taker, pragmatic leader and realist who
seems to grasp ideas holistically whilst still taking note to the more acute details. I found this to be incredibly
valuable in working with him, as it allows him (and for those who work with him) the ability to explore and
understand nearly all possible perspectives to an idea and its numerous applications. He is an hard worker and
value creator in the truest sense."

Ahmed Hassaan Tolba,CCP, Senior Quantity Surveyor, Parsons, worked directly with Mustafa at
Parsons

Page11
"Mustafas creative thinking, expertise, positive can-do attitude and drive as a deputy survey manager
professional made his an absolute pleasure to work with. He continually delivered results, went above
and beyond in providing exceptional service and support, and showed genuine integrity and respect as a
service provider. Mustafa is enthusiastic, personable and a brilliant networker. He strengths in staying across
issues, pro-actively offering solutions and ideas and being adept at all aspects of communications make his a
valuable contributor to any situation or team."

Mohamed Elsharawy,MSc,PRMG, Senior Project Controller, Parsons, worked with Mustafa at Parsons

"Mustafa always brought his keen analytical skills to the table and was an excellent leader and doer in
any team situation. His many years as a survey manager were evident in the way he approached tasks and
achieved his outcomes."

Mostafa Aly, Media Manager, Parsons, worked with Mustafa at Parsons

"Eng. Mustafa is a dedicated, ambitious, result driven leader and thoughtful individual. If you ever need
someone to deliver under pressure, no slip-ups, just results, Mustafa is your man! He is great in dealing with
difficult situations and a fantastic problem solver. I recommend him to anyone looking for a Survey Manager.
"

BADAR AYYAZ, Chief Surveyor, Parsons, reported to Mustafa at Parsons

"Mostafa has built a strong (and deserved) reputation as someone with vision, diligence and honor someone
who gets things done! I have no hesitation in recommending Mostafa and know that he will always give of
his best in any endeavor."

Mohammed Nasr , PMP, ITIL, Deputy-IT Manager, Parsons, worked directly with Mustafa at Parsons

"Mustafa is a core GIS professional with extensive experience in Surveying and great managerial skills. He is
also very helpful, friendly, courteous and result-oriented person with positive attitude. I wish him all the best
in all his future endeavors"

Sunny Chandna, GIS Analyst, Gulf Computers, LLC, worked directly with Mustafa at Gulf Computers
LLC

"He is a good project manager you can rely on!"

Glenn Kam, reported to Mustafa at Gulf Computers LLC

"Worked with me in the Group, handling the GIS survey projects executed by our company. A serious
professional who carried out his work in a dedicated and professional manner."

Bala Gopalan, managed Mustafa at Gulf Computers LLC

Page12
""

Subrata Saha, was Mustafa's client

"During his work under my management, Mustafa was hard working, loyal, dedicated and had excellent
knowldge in his career. I wish him good luck."

Nidal Hassoun, managed Mustafa at Engineering Contracting Company LLC