Anda di halaman 1dari 11

Wireless Network

BSNL GERAN/UTRAN
Network
ZXSDR BS8906 MICRO ATP DOCUMENT
ZXSDR BS8906 MICRO ATP

2011 ZTE Corporation. All rights reserved.


ZTE CONFIDENTIAL: This document contains proprietary information of ZTE and is not to be
disclosed or used without the prior written permission of ZTE.
Due to update and improvement of ZTE products and technologies, information in this document
is subjected to change without notice.

ZTE Confidential Proprietary 2011 ZTE Corporation. All rights reserved.


ZXSDR BS8906 MICRO ATP

ZXSDR BS8906 Micro BTS


Acceptance Test Record
(2011-V1.0)

Contract Number __________________


Project Name __________________
User __________________
Acceptance Date __________________

ZTE CORPORATION

ZTE Confidential Proprietary 2011 ZTE Corporation. All rights reserved.


ZXSDR BS8906 MICRO ATP

Legal Information

All rights reserved. No part of this documentation may be excerpted,


reproduced, translated, annotated or duplicated, in any form or by any means
without the prior written permission of ZTE Corporation.

and are the registered trade marks of ZTE Corporation. The


names and logos of ZTE products are proprietary logos or registered trade
marks. The names of other products and companies mentioned in this manual
may be proprietary to their owners respectively. Without the prior written
permission of ZTE or the owners of third-party trade marks or trade names, this
manual does not grant the reader any permission or right to use any marker
appeared in the manual.

The product described herein conforms to the design requirements of


environment protection and human security. The storage, usage, and discard
of the product shall comply with the manual, related contract, or laws and
regulations of related countries.

The actual product may differ from what is described in this standard due to
frequent update of ZTE products and fast development of technologies. Please
contact the local ZTE office for the latest updating information of the product.

For the latest document information, please visit our website:


http://tsm.zte.com.cn

ZTE Confidential Proprietary 2011 ZTE Corporation. All rights reserved.


ZXSDR BS8906 MICRO ATP

Feedback Table
You are invited to give your suggestions and opinions to improve ZTE user manuals and enjoy better
service by sending emails to zheng.junhua@zte.com.cn. Thank you for your cooperation!
Document
ZXSDR BS8906 Acceptance Test Record
Name
Product Document
V1.0
Version No. Version No.
Please provide your information for further contact:
Name Company
Post Code Address
Tel E-mail
Very Good Good Ordinary Bad Very Bad
General View
Work instruction
Convenient to
consult
Comments
Complete test
items
Feasibility of test
items
Well-organized
structure
You may give suggestions from any perspective such as the content, structure, details, depth,
expression, figures/tables, special tools, FAQ and so on. The suggestions are not confined to
this document.

Suggestions

ZTE Confidential Proprietary 2011 ZTE Corporation. All rights reserved.


ZXSDR BS8906 MICRO ATP

Revision Records
Document Prepared/ Prepared/Revise Total Reason for Contents of Revision
Version No. Revised by d on Pages Revision (Key Points Only)

Zhao
V1.0 Jan 29, 2011 15 New
Yanghao

Note 1: This table must be completed before updating the archived document (the document archived in the
archival room of the division or the Company).
Note 2: Fill "None" in "Reason for Revision" and "Contents of Revision" when archiving this document for the
first time.

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. I


ZXSDR BS8906 MICRO ATP

TABLE OF CONTENTS

1 PROJECT INFORMATION ............................................................................................... 1

2 INSTRUCTION .................................................................................................................. 1

3 PARTICIPANTS IN INSTALLATION ACCEPTANCE ...................................................... 1

4 HARDWARE ACCEPTANCE ITEMS ............................................................................... 2

5 ACCEPTANCE CONCLUSION......................................................................................... 3

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. II


ZXSDR BS8906 MICRO ATP

PROJECT INFORMATION
Contract No. ___________________
Project Name ___________________
User Name ___________________
Date of Acceptance___________________

INSTRUCTION
This installation acceptance report is compiled with reference to related standards of
Ministry of Information Industry, and in light of specific situations of the BS8906
base station. It is applicable to the hardware installation acceptance for the BS8906
equipment.

PARTICIPANTS IN INSTALLATION ACCEPTANCE


User Project name

Date of Date of
commencement completion
Person in charge:
Users
Participants:
personnel

Person in charge:
ZTEs
Participants:
personnel

Project Person in charge:


supervisors Participants:
personnel
Person in charge:
Constructors
Participants:
personnel

Remarks

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 1


ZXSDR BS8906 MICRO ATP

H ARDWARE ACCEPTANCE ITEMS


Category SN Items Description Conclusion
1. Make sure the installation location and techniques
of BS8906 cabinet meet the design requirements.
2. Check whether the anchor bolts of the cabinet are
Cabinet firmly fixed. Pass
Cabinet 1
fixing 3. Check whether the vertical or horizontal deviations Fail
of the cabinet meet the requirement
4. Check whether there is enough maintenance space.
5. Check whether the cabinet is firmly fixed.
1. Check whether the cables are laid neatly, and
whether the bundling space meets the requirement.
2. In the DC power supply mode, the connecting
terminal of the power cable is in DPM module. Check
whether the -48V and -48V RTN connecting terminals
are fastened correctly and tightly.
Power
3. In the AC power supply mode, the connecting
cables and Pass
terminal of the power cable is in APM module. Check
2 grounding
cables
whether the AC power plug is placed correctly and Fail
tightly into the socket.
distribution
4. Check whether RSU power cable is connected
correctly and tightly with the DC output terminal of
APM/DPM module.
5. Check whether the protective grounding cable is
connected tightly with the grounding terminal and the
grounding bar.
SA cable 1. Check whether SA cabling meets the requirement.
installation 2. Check whether the SA cable is fastened tightly with Pass
3 without LPU the SA port of BBU.
module Fail
3. Check whether the grounding cable of SA cable is
(optional) connected tightly with the grounding terminal of BBU.
1. Check whether the cabinet-top jumper of the
antenna feeder is laid neatly, and whether the bending
Cables Cabinet-top radius of the jumper meets the requirement.
jumpers of 2. Check whether the cabinet-top jumpers of antenna Pass
4
antenna feeder if bundled. Fail
feeder 3. Check whether the cabinet-top jumpers of the
antenna feeder are connected tightly with the ANT port
of RSU and the port of the main feeder.
1. Check whether the SFP cables between RSU and
FS board is connected correctly. Pass
5 SFP cables
2. Check whether the SFP cabling route meets the Fail
requirement.
1. Check whether the transmission cabling meets the
requirement, and whether there is enough intervals
between bundling points.
2. Check whether E1 cable is connected tightly with
the E1 port of SA board. If LPU module is configured,
check whether E1 cable is connected tightly with the
Transmission E1 port of LPU. Pass
6
cabling 3. Check whether the joint (L9, BNC) of 75 E1 cable Fail
is welded properly, and whether the cable is connected
with DDF correctly.
4. If 120 E1 cable is used, check whether it is
compressed into the connector at DDF.
5. If the parameter for LPU module is not configured
as using IP transmission, check whether the RJ45
ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 2
ZXSDR BS8906 MICRO ATP

Category SN Items Description Conclusion


connector of FE cable is connected tightly with the
ETH0 port of CC board.
6. If IP transmission is used in LPU module, check
whether the RJ45 connector is connected with the
ETH_0 port of LPU through an Ethernet cable, and
then connected from the ETH_A0 port of LPU to the
ETH0 port of CC board through another Ethernet
cable.
1. Check whether the dry contact cabling meets the
requirement, and whether there are enough intervals
between bundling spots.
2. If LPU module is not configured, check whether the
dry contact cable is connected tightly with the
Dry contact input/output interface of the dry contact of SA. If LPU Pass
7
cabling module is configured, check whether the dry contact Fail
cable is connected tightly with the input/output
interface of the dry contact of LPU.
3. Check whether the dry contact cable is connected
with the monitored dry contact in correct line sequence
according to the requirement.
Antistatic Pass
1. Check whether the antistatic bracelet is installed
8 bracelet
installation
correctly. Fail
Other Items
1. Check whether the labels are pasted in the correct Pass
Label
9 location, facing the correct direction, and whether the
distribution
content meets the criteria. Fail

ACCEPTANCE CONCLUSION

Users
comments

Signature: Date:

ZTEs
comments

Signature: Date:

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 3


ZXSDR BS8906 MICRO ATP

Project
supervisors
comments

Signature: Date:

Constructors
comments

Signature: Date:

ZTE Confidential Proprietary 2011 ZTE CORPORATION. All rights reserved. 4

Anda mungkin juga menyukai