PROGRAM RUANG PUSAT PERBELANJAAN DAN APARTEMEN / PERKANTORAN

No Program Ruang Standard Ruang


A PUSAT PERBELANJAAN
1. Anchor Tenant
2. Retail
3. Food court
4. Resto

B APARTEMEN | PERKANTORAN
1. Unit Studio (1 BR) | Tipe 1
2. Unit 2 BR | Tipe 2
3. Unit 3 BR | Tipe 3
4. Fasilitas Club House | Ruang Pertemuan Serbaguna

C RUANG ME & PENDUKUNG


1. Ruang M & E R. Genset
R. Tangki BBM
R. Ground Water Tank
R. Trafo
R. Pompa
R. Chiler
R. Panel listrik
R. Boilerr
R. PABX
R. CCTV
R. STP
R. AHU
R. Janitor
Tempat Sampah

2. Bongkar muat barang Area Loading Dock


3. Gudang Gudang
4. Pengelola

D SIRKULASI VERTIKAL
Transportasi vertikal dan shaft Pusat Perbelanjaan Lift Penumpang
Eskalator
Shaft Sampah
Lift Barang
Tangga Darurat

Transportasi vertikal dan shaft Apartemen/Perkantoran Lift Penumpang


Eskalator
Shaft Sampah
Lift Barang
Tangga Darurat

E AREA PARKIR
Parkir Pusat Perbelanjaan Mobil
Motor
Parkir Apartemen / Kantor Mobil
Motor
NAD : Neufret,Ernest, Data Arsitek, Erlangga, Jakarta, 1992
TSS : De Chiara and John Calender, Time Saver for Building, 1973
SB : Studi Banding
SBT : Sistem Bangunan Tinggi
BPDS : Building Planning Design Standart
DMR : Julius Panero dan Martin Zelnik, Dimensi Manusia dan Ruang interior
Ukuran Standarad Kapasitas Kebutuhan Ruang (m) Literatur

1000 8 unit 8,000


50-100 150-200 unit 12,000
2000 1 area 2,000
300 8 unit 2,400

Sirkulasi 25%
Total

40 120 4,800
60 120 7,200
90 50 4,500
2,000

Sirkulasi 15%
Total

20 m / unit 2 unit 40 TSS


18 m / unit 2 unit 36 TSS
45 m / unit 2 unit 90 TSS
10 m / unit 2 unit 20 TSS
18 m / unit 2 unit 36 TSS
40 m / unit 2 unit 80 SBT
6 m / unit 2 unit 12 TSS
18 m / unit 2 unit 36 TSS
40 m / unit 1 unit 40 TSS
30 m / unit 1 unit 30 SBT
10 m/ unit 2 unit 20 TSS
2 m / unit 10 unit 20 SBT
3 m / unit 2 Unit 6 NAD
50 m / unit 1 Unit 50 SB
Sirkulasi 20%
Total

100 m / track 2 200 TSS


100 m / gudang 2 200 TSS
1 200
Sirkulasi 20%
Total

6,5 m/ lift 2 unit 13 SBT


45 m/ unit 4 unit 180 SBT
1 m/ unit 4 unit 4 SBT
10,5 m/ lift 1 Unit 11 SBT
12 m / unit 4 unit 48 SBT
Sirkulasi 20%
6,5 m/ lift 4 unit 26 SBT
45 m/ unit - 0 SBT
1 m/ unit 2 unit 4 SBT
10,5 m/ lift 1 Unit 11 SBT
12 m / unit 2 unit 24 SBT
Sirkulasi 20%
Total

12.5m / unit 300 3,750 NAD


2 m / unit 300 600 NAD
12.5 m / unit 200 2,500 NAD
2 m / unit 100 600 NAD
Sirkulasi 20%
Total
TOTAL KESELURUHAN