Anda di halaman 1dari 21

DNIT - SR/TO

RODOVIA : BR- 242/TO


TRECHO : DIV. BA/TO DIV. TO/MT (So Flix do Araguaia)
SUBTRECHO : Entr.TO-280(A) - Entr.BR153(A)/TO-365/374/280(B) (Gurupi)
SEGMENTO
EXTENSO
: KM 305,0 - KM 410,7
: 105,7 KM
ORAMENTO
PNV : 242BTO0430; 242BTO0435; 242BTO0440 e 242BTO0450
DATA-BASE : JULHO 2007 (Tabela SICRO 2 - Estado do Tocantins)
QUANT. PREO
CDIGO DESCRIO DOS SERVIOS UNID. CUSTO PARCIAL
TRABALHADA UNITRIO
Mobilizao e Desmobilizao de Equipamentos 1.000 unid 26,146.05 26,146.05
Instalaes provisrias - canteiro e acampamento 174.000 m 155.89 27,124.86
5 S 02 511 51 Micro-Revestimento a Frio - Microflex 0,8 cm BC 739,900.000 m 1.91 1,413,209.00
3 S 02 530 51 Mistura Betuminosa Usinada a Frio AC/BC 200.000 m 72.45 14,490.00
3 S 03 329 51 Concreto de Cimento Portland AC/BC 200.000 m 309.73 61,946.00
3 S 03 370 00 Formas 400.000 m 49.60 19,840.00
3 S 03 950 00 Limpeza de Ponte 5,280.000 m 4.09 21,595.20
3 S 05 000 00 Enrocamento de Pedra Arrumada 1,000.000 m 119.97 119,970.00
3 S 08 100 00 Tapa Buraco 100.000 m 195.07 19,507.00
3 S 08 109 00 Correo de defeitos com Mistura Betuminosa 100.000 m 113.65 11,365.00
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 300.000 m 96.41 28,923.00
3 S 08 300 01 Limpeza de Sarjeta e Meio Fio 148,000.000 m 0.39 57,720.00
3 S 08 301 02 Limpeza de Vala de Drenagem 4,000.000 m 2.36 9,440.00
3 S 08 301 03 Limpeza de Descida D'agua 18,000.000 m 0.79 14,220.00
3 S 08 302 01 Limpeza de Bueiro 3,200.000 m 12.86 41,152.00
3 S 08 302 02 Desobstruo de Bueiro 1,000.000 m 37.53 37,530.00
3 S 08 402 00 Caiao 60,000.000 m 1.53 91,800.00
3 S 08 501 00 Recomposio Mecanizada de Aterro 7,000.000 m 19.47 136,290.00
3 S 08 900 00 Roada Manual 344.000 ha 1,071.52 368,602.88
3 S 08 910 00 Capina Manual 80,000.000 m 0.43 34,400.00
3 S 09 002 00 Transporte Local Basc. 5m3 em Rodov. Pav. 702,283.952 t.km 0.55 386,256.17
3 S 09 002 03 Transporte Local de Material Para Remendos 25,368.000 t.km 0.86 21,816.48
3 S 09 002 41 Transporte Local C/ Carroc. 4T em Rodov. Pav. 3,313.640 t.km 0.83 2,750.32
Material Betuminoso
Aquisio de RR 1C p/ correo de defeitos 2,500.000 m 0.61 1,527.50
Aquisio de RM 1C p/ Mistura Betuminosa usin. a frio 200.000 m 344.98 68,996.40
Aquisio de Emulso Mod. c/ Polmero p/ Micro-revestimento 739,900.000 m 2.70 1,994,770.40
Aquisio de RR 1C p/ Tapa Buraco 100.000 m 16.51 1,651.10
Transporte Material Betuminoso
Transporte de RR 1C p/ correo de defeito 2,500.000 m 0.21 517.50
Transporte de RM 1C p/ Mistura Betuminosa usin. a frio 200.000 m 103.70 20,740.00
Transporte de Emulso Mod. c/ Polmero p/ Micro-revestimento 739,900.000 m 0.73 536,427.50
Transporte de RR 1C p/ Tapa Buraco 100.000 m 5.60 559.90
TOTAL GERAL DO ORAMENTO ( 720 dias ) 5,591,284.27
DNIT - SR/TO
RODOVIA : BR- 242/TO
TRECHO : DIV. BA/TO DIV. TO/MT (So Flix do Araguaia)
SUBTRECHO : Entr.TO-280(A) - Entr.BR153(A)/TO-365/374/280(B) (Gurupi)
SEGMENTO
EXTENSO
: KM 305,0 - KM 410,7
: 105,7 KM
PLANO ANUAL DE TRABALHO E ORAMENTO
PNV : 242BTO0430; 242BTO0435; 242BTO0440 e 242BTO0450
DATA-BASE : JULHO 2007 (Tabela SICRO 2 - Estado do Tocantins)
INVENTRIO NVEL DE ESFORO QUANT. PREO
CDIGO DESCRIO DOS SERVIOS UNIDADE CUSTO PARCIAL
QUANT. UNID. QUANT. UNID. TRABALHADA UNITRIO
Mobilizao e Desmobilizao de Equipamentos 1.000 unid 1.000 vb 1.000 unid 26,146.05 26,146.05
Instalaes provisorias - canteiro e acampamento 174.000 m 1.000 m/m 174.000 m 155.89 27,124.86
5 S 02 511 51 Micro-Revestimento a Frio - Microflex 0,8 cm BC 369,950.00 m 1.000 m/m 369,950.000 m 1.91 706,604.50
3 S 02 530 51 Mistura Betuminosa Usinada a Frio AC/BC 100.000 m 1.000 m/m 100.000 m 72.45 7,245.00
3 S 03 329 51 Concreto de Cimento Portland AC/BC 50.000 kmf 2.000 m/kmf 100.000 m 309.73 30,973.00
3 S 03 370 00 Formas 50.000 kmf 4.000 m/Kmf 200.000 m 49.60 9,920.00
3 S 03 950 00 Limpeza de Ponte 1,320.000 m 2.000 m/m 2,640.000 m 4.09 10,797.60
3 S 05 000 00 Enrocamento de Pedra Arrumada 500.000 m 1.000 m/m 500.000 m 119.97 59,985.00
3 S 08 100 00 Tapa Buraco 10.000 kmf 5.000 m/kmf 50.000 m 195.07 9,753.50
3 S 08 109 00 Correo de defeitos com Mistura Betuminosa 10.000 kmf 5.000 m/kmf 50.000 m 113.65 5,682.50
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 1,500.000 m 0.100 m/m 150.000 m 96.41 14,461.50
3 S 08 300 01 Limpeza de Sarjeta e Meio Fio 37,000.000 m 2.000 m/m 74,000.000 m 0.39 28,860.00
3 S 08 301 02 Limpeza de Vala de Drenagem 1,000.000 m 2.000 m/m 2,000.000 m 2.36 4,720.00
3 S 08 301 03 Limpeza de Descida D'agua 4,500.000 m 2.000 m/m 9,000.000 m 0.79 7,110.00
3 S 08 302 01 Limpeza de Bueiro 80.000 unid 20.000 m/unid 1,600.000 m 12.86 20,576.00
3 S 08 302 02 Desobstruo de Bueiro 25.000 unid 20.000 m/unid 500.000 m 37.53 18,765.00
3 S 08 402 00 Caiao 15,000.000 m 2.000 m/m 30,000.000 m 1.53 45,900.00
3 S 08 501 00 Recomposio Mecanizada de Aterro 3,500.000 m 1.000 m/m 3,500.000 m 19.47 68,145.00
3 S 08 900 00 Roada Manual 86.000 ha 2.000 ha/ha 172.000 ha 1,071.52 184,301.44
3 S 08 910 00 Capina Manual 20,000.000 m 2.000 m/m 40,000.000 m 0.43 17,200.00
3 S 09 002 00 Transporte Local Basc. 5m3 em Rodov. Pav. 351,141.976 t.km 1.000 t.km/t.km 351,141.976 t.km 0.55 193,128.09
3 S 09 002 03 Transporte Local de Material Para Remendos 12,684.000 t.km 1.000 t.km/t.km 12,684.000 t.km 0.86 10,908.24
3 S 09 002 41 Transporte Local C/ Carroc. 4T em Rodov. Pav. 1,656.820 t.km 1.000 t.km/t.km 1,656.820 t.km 0.83 1,375.16
Material Betuminoso
Aquisio de RR 1C p/ correo de defeitos 1,250.000 m 0.61 763.75
Aquisio de RM 1C p/ Mistura Betuminosa usin. a frio 100.000 m 344.98 34,498.20
Aquisio de Emulso Mod. c/ Polmero p/ Micro-revestimento 369,950.000 m 2.70 997,385.20
Aquisio de RR 1C p/ Tapa Buraco 50.000 m 16.51 825.55
Transporte Material Betuminoso
Transporte de RR 1C p/ correo de defeito 1,250.000 m 0.21 258.75
Transporte de RM 1C p/ Mistura Betuminosa usin. a frio 100.000 m 103.70 10,370.00
Transporte de Emulso Mod. c/ Polmero p/ Micro-revestimento 369,950.000 m 0.73 268,213.75
Transporte de RR 1C p/ Tapa Buraco 50.000 m 5.60 279.95
TOTAL GERAL DO ORAMENTO ( 365 dias ) 2,822,277.59
DNIT - SR/TO
RODOVIA : BR- 242/TO
TRECHO : DIV. BA/TO DIV. TO/MT (So Flix do Araguaia)
SUBTRECHO : Entr.TO-280(A) - Entr.BR153(A)/TO-365/374/280(B) (Gurupi)
SEGMENTO : KM 305,0 - KM 410,7 CRONOGRAMA FSICO-FINANCEIRO
EXTENSO : 105,7 KM
PNV : 242BTO0430; 242BTO0435; 242BTO0440 e 242BTO0450
DATA-BASE : JULHO 2007 (Tabela SICRO 2 - Estado do Tocantins)
DISTRIBUIO EM %
CDIGO DISCRIMINAO QUANT. UNID.
I II III IV V VI VII VIII IX X XI XII
Mobilizao e Desmobilizao de Equipamentos 1.000 unid 50.000 - - - - - - - - - - -
Instalaes provisorias - canteiro e acampamento 174.000 m 100.000 - - - - - - - - - - -
5 S 02 511 51 Micro-Revestimento a Frio - Microflex 0,8 cm BC 369,950.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 02 530 51 Mistura Betuminosa Usinada a Frio AC/BC 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 03 329 51 Concreto de Cimento Portland AC/BC 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 03 370 00 Formas 200.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 03 950 00 Limpeza de Ponte 2,640.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 05 000 00 Enrocamento de Pedra Arrumada 500.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 100 00 Tapa Buraco 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 109 00 Correo de defeitos com Mistura Betuminosa 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 150.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 300 01 Limpeza de Sarjeta e Meio Fio 74,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 301 02 Limpeza de Vala de Drenagem 2,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 301 03 Limpeza de Descida D'agua 9,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 302 01 Limpeza de Bueiro 1,600.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 302 02 Desobstruo de Bueiro 500.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 402 00 Caiao 30,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 501 00 Recomposio Mecanizada de Aterro 3,500.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 900 00 Roada Manual 172.000 ha 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 910 00 Capina Manual 40,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 09 002 00 Transporte Local Basc. 5m3 em Rodov. Pav. 351,141.976 t.km 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 09 002 03 Transporte Local de Material Para Remendos 12,684.000 t.km 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 09 002 41 Transporte Local C/ Carroc. 4T em Rodov. Pav. 1,656.820 t.km 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de RR 1C p/ correo de defeitos 1,250.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de RM 1C p/ Mistura Betuminosa usin. a frio 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de Emulso Mod. c/ Polmero p/ Micro-revestimento 369,950.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de RR 1C p/ Tapa Buraco 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de RR 1C p/ correo de defeito 1,250.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de RM 1C p/ Mistura Betuminosa usin. a frio 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de Emulso Mod. c/ Polmero p/ Micro-revestimento 369,950.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de RR 1C p/ Tapa Buraco 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
270,948.43

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55
VALOR MENSAL

1,193,950.63

1,424,701.18

1,655,451.73

1,886,202.28

2,347,703.38

2,578,453.93

2,809,204.48
2,116,952.83
270,948.43

501,698.98

732,449.53

963,200.08

VALOR ACUMULADO
DNIT - SR/TO
RODOVIA : BR- 242/TO
TRECHO : DIV. BA/TO DIV. TO/MT (So Flix do Araguaia)
SUBTRECHO : Entr.TO-280(A) - Entr.BR153(A)/TO-365/374/280(B) (Gurupi)
SEGMENTO : KM 305,0 - KM 410,7 CRONOGRAMA FSICO-FINANCEIRO
EXTENSO : 105,7 KM
PNV : 242BTO0430; 242BTO0435; 242BTO0440 e 242BTO0450
DATA-BASE : JULHO 2007 (Tabela SICRO 2 - Estado do Tocantins)
DISTRIBUIO EM %
CDIGO DISCRIMINAO QUANT. UNID.
XIII XIV XV XVI XVII XVIII XIX XX XXI XXII XXIII XXIV
Mobilizao e Desmobilizao de Equipamentos 1.000 unid - - - - - - - - - - - 50.00
Instalaes provisorias - canteiro e acampamento 174.000 m - - - - - - - - - - -
5 S 02 511 51 Micro-Revestimento a Frio - Microflex 0,8 cm BC 369,950.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 02 530 51 Mistura Betuminosa Usinada a Frio AC/BC 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 03 329 51 Concreto de Cimento Portland AC/BC 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 03 370 00 Formas 200.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 03 950 00 Limpeza de Ponte 2,640.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 05 000 00 Enrocamento de Pedra Arrumada 500.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 100 00 Tapa Buraco 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 109 00 Correo de defeitos com Mistura Betuminosa 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 150.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 300 01 Limpeza de Sarjeta e Meio Fio 74,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 301 02 Limpeza de Vala de Drenagem 2,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 301 03 Limpeza de Descida D'agua 9,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 302 01 Limpeza de Bueiro 1,600.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 302 02 Desobstruo de Bueiro 500.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 402 00 Caiao 30,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 501 00 Recomposio Mecanizada de Aterro 3,500.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 900 00 Roada Manual 172.000 ha 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 08 910 00 Capina Manual 40,000.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 09 002 00 Transporte Local Basc. 5m3 em Rodov. Pav. 351,141.976 t.km 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 09 002 03 Transporte Local de Material Para Remendos 12,684.000 t.km 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
3 S 09 002 41 Transporte Local C/ Carroc. 4T em Rodov. Pav. 1,656.820 t.km 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de RR 1C p/ correo de defeitos 1,250.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de RM 1C p/ Mistura Betuminosa usin. a frio 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de Emulso Mod. c/ Polmero p/ Micro-revestimento 369,950.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Aquisio de RR 1C p/ Tapa Buraco 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de RR 1C p/ correo de defeito 1,250.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de RM 1C p/ Mistura Betuminosa usin. a frio 100.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de Emulso Mod. c/ Polmero p/ Micro-revestimento 369,950.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
Transporte de RR 1C p/ Tapa Buraco 50.000 m 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167 4.167
230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

230,750.55

243,823.74
VALOR MENSAL
3,039,955.03

3,270,705.58

3,501,456.13

3,732,206.68

3,962,957.23

4,193,707.78

4,424,458.33

4,655,208.88

4,885,959.43

5,347,460.53

5,591,284.27
5,116,709.98
VALOR ACUMULADO
DETERMINAO DOS CUSTOS DE MATERIAIS BETUMINOSOS

AQUISIO DE MATERIAL BETUMINOSO ( R$ / t )


PREO C/ ICMS
PREO
18% (R$/t)
C/PREO
ICMS 17%
C/ ICMS
(R$/t)17% + LDI 20,25% (R$/t)
MATERIAL ORIGEM

RR-1C BETIM 1,282.29 1,271.42 1,528.88


RM-1C BETIM 1,446.70 1,434.44 1,724.91
Emulex RL-1C BETIM 1,615.42 1,601.73 1,926.08
Referncia: PETROBRAS DISTRIBUIDORA S/A. GCASF3 044/2007, de 16/07/2007

QUANTITATIVOS DE MATERIAIS BETUMINOSOS


Quantidade de Servios Quant. de Mat. Betum.
Servio Unid. Espessura
Correo de defeitos com Mistura Betuminosa m 50.00 0.04 1,250.00

QUADRO PARA CLCULO DOS PREOS DE MATERIAIS BETUMINOSOS


Tipo de Material Betuminoso1 2 3 4 5
Quantidade de Servios Quantid. Preode Unit. Mat.Preo
Betum.Tot.
/ t Mat.Betum.(R$)
Servio Unid.
Consumo Mat. Bet. (t)
3=(1*2) 5=(3*4)
Aquisio de RR 1C p/ correo de defeitos m RR-1C 1,250.00 0.0004 0.50 1,528.88 764.44
Aquisio de RM 1C p/ Mistura Betuminosa usin. a frio m RM-1C 100.00 0.2000 20.00 1,724.91 34,498.26
Aquisio de Emulso Mod. c/ Polmero p/ Micro-revestimento m Emul.Polim. 369,950.00 0.0014 517.93 1,926.08 997,574.78
Aquisio de RR 1C p/ Tapa Buraco m RR-1C 50.00 0.0108 0.54 1,528.88 825.60
Referncia: De acordo com as instrues do Ofcio Circular n. 001/2002 - GEREST/DNIT
DETERMINAO DOS CUSTOS DE TRANSPORTES DE MATERIAIS BETUMINOSOS

Y = (19,440 + 0,249 x D)x ICMSxLDI A FRIO P/ MS DE JULHO/2007

TRANSPORTE DE MATERIAL BETUMINOSO ( R$ / km )


MATERIAL DISTNCIA (D) (km) RODOVIA PAVIMENTADA
ORIGEM DESTINO
A QUENTE (Y) A FRIO (Y)
RR-1C BETIM CANTEIRO 1,402.00 - 518.50
RM-1C BETIM CANTEIRO 1,402.00 - 518.50
Emulex RL-1C BETIM CANTEIRO 1,402.00 - 518.50
Referncia: Ofcio Circular n. 032/2000 - DFPC/DNER, de 28/06/2000

QUADRO P/ CLCULO DOS PREOS DE TRANSPORTE DE MATERIAIS BETUMINOSOS


Tipo de Material Betuminoso1 2 3 4 5
Quantidade de Servios Quantid. Preo Unit. p/
de Preo
t.kmTot. Mat.Betum.(R$)
Servio Unid.
Consumo Mat. Bet. (t)
3=(1*2) 5=(3*4)
Transporte de RR 1C p/ correo de defeito m RR-1C 1,250.00 0.0004 0.50 518.50 259.25
Transporte de RM 1C p/ Mistura Betuminosa usin. a frio m RM-1C 100.00 0.2000 20.00 518.50 10,370.00
Transporte de Emulso Mod. c/ Polmero p/ Micro-revestimento m Emul.Polim. 369,950.00 0.0014 517.93 518.50 268,546.71
Transporte de RR 1C p/ Tapa Buraco m RR-1C 50.00 0.0108 0.54 518.50 279.99
Referncia: De acordo com as instrues do Ofcio Circular n. 001/2002 - GEREST/DNIT
6
Preo Mat.Betum. / Unid. de Serv.(R$)

6=(5/1)
0.61
344.98
2.70
16.51
MINOSOS

6
Preo Transp. t.km / Unid. de Serv.(R$)

6=(5/1)
0.21
103.70
0.73
5.60
ATUALIZAO DAS FRMULAS DE TRANSPORTES P/ RODOVIAS PAVIMENTADAS

NDICES DE ATUALIZAO DE REAJUSTAMENTO: Conforme IS DG/DNIT n. 01/2004

MS DE REFERNCIA - JULHO 2007

R = (Ii - Io)/Io
DE JUNHO/00 A DEZEMBRO/00: IGP-DI
Io = ndice de preo do ms de origem do oramento ndice Io (Jun/2000) Ii (Dez/2000) ndice Atualiz.
Ii = ndice de preo referente ao ms da licitao (Dez/ IGP-DI 182.236 193.970 0.064

DE DEZEMBRO/2.000 A JULHO/2.007: NDICE DE PAVIMENTAO


Io = ndice de preo do ms de origem do oramento (D ndice Io (Dez/2000) Ii (JULHO_07) ndice Atualiz.
Ii = ndice de preo referente ao ms da licitao (Set/ Pavimentao 100.000 196.537 0.965

A FRIO: A QUENTE:

1 Parcela Reaj. de jun/00 a Dez/00


Reaj. De Dez/00 a JULHO_07
1 Parcela
Reaj. de jun/00 a Dez/00
Reaj. De Dez/00 a JULHO_07

9.293 9.891 19.440 10.325 10.990 21.599

Reaj. de jun/00 a Dez/00


Reaj. De Dez/00 a JULHO_07 Reaj. de jun/00 a Dez/00
Reaj. De Dez/00 a JULHO_07
2 Parcela 2 Parcela
0.119 0.127 0.249 0.132 0.140 0.276

Frmula = Y = (19,440 + 0,249 x D)x ICMSxLDI Frmula = Y = (21,599+ 0,276 x D)xICMSxLDI

Sendo:
ICMS/TO: 17.0%
LDI/DNIT: 20.25
DNIT - SR/TO
RODOVIA : BR- 242/TO
TRECHO : DIV. BA/TO DIV. TO/MT (So Flix do Araguaia)
SUBTRECHO : Entr.TO-280(A) - Entr.BR153(A)/TO-365/374/280(B) (Gurupi)
SEGMENTO : KM 305,0 - KM 410,7 QUADRO DE TRANSPORTES
EXTENSO : 105,7 KM
PNV : 242BTO0430; 242BTO0435; 242BTO0440 e 242BTO0450
DATA-BASE : JULHO 2007 (Tabela SICRO 2 - Estado do Tocantins)

3 S 09 002 00 - Transporte local com basculante de 5,0 m 3


Servio Quantidade Unidade Material Consumo Peso Total Origem Destino DMT Mom. Transp.
5 S 02 511 51 Micro-Revestimento a Frio - Microflex 0,8 cm BC 369,950.000 m brita 0.01200 t/m 4,439.400 fornecedor canteiro 54.85 243,501.090
3 S 02 530 51 Mistura Betuminosa Usinada a Frio AC/BC 100.000 m areia 0.5640 t/m 56.400 fornecedor usina mbuf 64.50 3,637.800
3 S 02 530 51 Mistura Betuminosa Usinada a Frio AC/BC 100.000 m brita 1.3155 t/m 131.550 fornecedor usina mbuf 52.00 6,840.600
3 S 03 329 51 Concreto de Cimento Portland AC/BC 100.000 m areia 1.0200 t/m 102.000 fornecedor usina mbuf 64.50 6,579.000
3 S 03 329 51 Concreto de Cimento Portland AC/BC 100.000 m brita 1.1655 t/m 116.550 fornecedor usina mbuf 52.00 6,060.600
3 S 05 000 00 Enrocamento de Pedra Arrumada 500.000 m pedra 1.8000 t/m 900.000 fornecedor canteiro 20.40 18,360.000
3 S 08 100 00 Tapa Buraco 50.000 m mistura betum. 2.4000 t/m 120.000 fornecedor usina mbuf 4.00 480.000
3 S 08 109 00 Correo de defeitos com Mistura Betuminosa 50.000 m mistura betum. 2.4000 t/m 120.000 fornecedor usina mbuf 4.00 480.000
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 150.000 m areia 0.0431 t/m 6.465 fornecedor canteiro 55.85 361.070
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 150.000 m brita 0.0537 t/m 8.055 fornecedor canteiro 54.85 441.816
3 S 08 501 00 Recomposio Mecanizada de Aterro 3,500.000 m solo 1.8400 t/m 6,440.000 jazida canteiro 10.00 64,400.000
TOTAL 351,141.976

3 S 09 002 03 - Transporte local de material para remendos


Servio Quantidade Unidade Material Consumo Peso Total Origem Destino DMT Mom. Transp.
3 S 08 100 00 Tapa Buraco 50.000 m mistura betum. 2.4000 t/m 120.000 usina mbuf Canteiro 52.85 6,342.000
3 S 08 109 00 Correo de defeitos com Mistura Betuminosa 50.000 m mistura betum. 2.4000 t/m 120.000 usina mbuf Canteiro 52.85 6,342.000
TOTAL 12,684.000

3 S 09 002 41 - Transporte local caminho carroceria


Servio Quantidade Unidade Material Consumo Peso Total Origem Destino DMT Mom. Transp.
3 S 03 329 51 Concreto de Cimento Portland AC/BC 100.000 m cimento 0.3210 t/m 32.100 Fornecedor Canteiro 44.00 1,412.400
3 S 03 370 00 Formas 200.000 m formas 0.0127 t/m 2.540 Fornecedor Canteiro 44.00 111.760
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 150.000 m ao 0.0038 t/m 0.570 Fornecedor Canteiro 44.00 25.080
3 S 08 200 50 Recomposio de Guarda Corpo AC/BC 150.000 m cimento 0.0163 m/m 2.445 Fornecedor Canteiro 44.00 107.580
TOTAL 1,656.820
MINISTRIO DOS TRANSPORTES
DEPARTAMENTO NACIONAL DE INFRA-ESTRUTURA DE TRANSPORTES
2UNIT/DNIT - -UNIDADE
23UNIT/DNIT UNIDADEDE
DEINFRA-ESTRUTURA
INFRA-ESTRUT. TERRESTRE
TERRESTRE
TOCANTINS

SERVIOS DE MANUTENO (CONSERVAO/RECUPERAO) RODOVIRIA


RODOVIA: BR-242/TO
SUBTRECHO: Entr. TO-280(A) - Entr BR153(A)/TO-365/374/280(B)(Gurupi)
SEGMENTO: KM 305,00 AO KM 410,70 Ext. 105,70 km.
MOBILIZAO E INSTALAO DE CANTEIRO
CUSTO CUSTO
ITEM DISCRIMINAO UNID CONSUMO
UNITRIO M2
2 INSTALAO CANTEIRO E ACAMPAMENTO
2.1 Tbua de 2 2,5cmx0,30cm m2 1.08 5.10 5.51
2.2 Pontalete de 2 7,5cmx7,5cm ml 4.90 2.82 13.82
2.3 Sarrafo 2,5cmx0,10cm ml 3.00 0.33 0.99
2.4 Tbua de 2 2,5cmx0,15cm m2 4.00 3.75 15.00
2.5 vigota 6x12 cm ml 0.80 7.10 5.68
2.6 Chapa compensada 10 mm m2 1.90 10.97 20.84
2.7 Telha ondulada de fibrocimento 4 mm m2 1.19 5.82 6.93
2.8 Cumeeira de fibrocimento ml 0.25 10.70 2.68
2.9 Prego 18x27 Kg 0.80 3.50 2.80
2.10 Prego 15x15 Kg 0.20 6.20 1.24
2.11 Cimento Kg 26.18 0.29 7.59
2.12 Areia m3 0.08 20.00 1.61
2.13 Brita m3 0.10 35.00 3.66
2.14 Betoneira h 0.09 10.92 0.93
2.15 Vaso sanitrio branco comum und 0.02 44.97 1.03
2.16 Lavatrio funcional und 0.02 36.01 0.83
2.17 Registro de presso und 0.03 26.51 0.76
2.18 Torneira p/ lavatrio und 0.02 4.75 0.11
2.19 Tubo PVC esgoto und 0.09 36.80 3.20
2.20 Tubo PVC soldavel c/ assessrios m 0.09 2.06 0.19
2.21 Interruptor sist. "X" und 0.11 3.23 0.37
2.22 Tomada sistema "X" und 0.20 3.22 0.65
2.23 Soquete de loua und 0.04 2.20 0.09
2.24 Luminria Fluorescente 2x40w und 0.14 45.40 6.26
2.25 Disjuntor de 15A a 30A und 0.11 5.91 0.68
2.26 Quadro de distribuio und 0.01 33.20 0.38
2.27 Haste de aterramento c/ 1,80 m und 0.01 13.86 0.16
2.28 Fio # 2,5 mm2 m 3.80 0.86 3.27
2.29 Fio # 4,0 mm2 m 1.00 1.39 1.39
2.30 Cal kg 0.10 0.49 0.05
2.31 Pedreiro h 0.30 6.99 2.10
2.32 Carpinteiro h 1.50 6.99 10.49
2.33 Servente h 1.50 4.12 6.18
2.34 Eletricista h 0.07 6.99 0.49
2.35 Ajudante h 0.07 5.54 0.39
2.36 Bombeiro Hidrulico h 0.07 6.99 0.49
2.37 conj. Tubo + caixa de descarga und 0.02 18.95 0.44
2.38 Ajudante h 0.07 5.54 0.39
R$ 129.64
LDI (20,25%) R$ 26.25
TOTAL INSTALAES PROVISRIAS - CANTEIRO E ACAMPAMENTO (M2) R$ 155.89
Obs.: Os servios que foram computados como unitrios (ex.: vaso, lavatrio,torneira, etc), foram calculados de acordo com o lay-out, e suas
quantidades divididas pela rea do canteiro. No caso de alterao da rea, os consumos devero ser recalculados.
LAY-OUT DO CANTEIRO DE OBRAS

1 2 3

60 m

INSTALAES
ITEM DISCRIMINAO QTD.
COMPR. LARG. AREA(m)
1 ADMINISTRAO / ENG OBRA / FISCALIZAO 10.00 4.00 40.00 1.00
2 ALMOXARIFADO / LABORATRIO 10.00 4.00 40.00 1.00
3 SANITRIO / VESTIRIO 4.00 4.00 16.00 1.00
4 USINA DE M.B.U.F. 5.00 8.00 40.00 1.00
5 GUARITA 2.00 1.50 3.00 1.00
6 LAVAGEM / MANUTENO 7.00 5.00 35.00 1.00
CUSTO DAS INSTALAES 174.00
4

USINA

40 m

30 m

CUSTO (R$)
R$/m TOTAL
R$ 155.89 6,235.60
R$ 155.89 6,235.60
R$ 155.89 2,494.24
R$ 155.89 6,235.60
R$ 155.89 467.67
R$ 155.89 5,456.15
155.89 27,124.86
DNIT - DEPARTAMENTO NACIONAL DE INFRA-ESTRUTURA DE TRANSPORTES
23 UNIDADE DE INFRA-ESTRUTURA TERRESTRE - 23 UNIT/DNIT TO
OBRAS DE CONSERVAO RODOVIRIA
CUSTO UNITRIO DE SERVIO

07/07

SERVIO TRANSPORTE DE EQUIPAMENTO PES PRODUO DA EQUIPE: 1 304.00 TKM

CDIGO EQUIPAMEN QUANT. UTILIZAO C. OPERACIONAL CUSTO


PROD. IMPR. PROD. IMPR. HORRIO
E-411 Cavalo Mecn 1.00 1.00 0.00 135.8300 13.2900 135.83
LS-1634/45
- 29,5 t -
-
-
-
-

Custo Horrio do Equipamento R$ 135.83

CODIGO MO DE OBRA SALRIO CUSTO


QUANT. HORA HORRIO
-
-

Custo Horrio de Mo-de-obra R$ -


Adc.M.O. - Ferramentas: (0,00%) -
Custo Horrio Total R$ 135.83

Custo Unitrio de Execuo R$ 0.45

CDIGO MATERIAL QUANT. UNIDADE PREO CUSTO


UNIT. UNITRIO
-
-
-
-
-

Custo Total de Material R$ -

CDIGO OUTRAS ATI QUANT. UNIDADE PREO CUSTO


UNIT. UNITRIO

Custo Total de Outras Atividadesl R$ -

CDIGO TRANSPORTE
TONELADAS/UNIDADES DE SERVIO CUSTO
UNITRIO
-

Custo Total de Transporte R$ 0.00

CDIGO TRANSPORTE
TONELADAS/UNIDADES DE SERVIO CUSTO
UNITRIO

Custo Horrio Direto Total 0.45


Bonificao (0,0%) -

Preo Unitrio Total R$ 0.45


DNIT - SR/TO
RODOVIA : BR- 242/TO
TRECHO : DIV. BA/TO DIV. TO/MT (So Flix do Araguaia)
SUBTRECHO : Entr.TO-280(A) - Entr.BR153(A)/TO-365/374/280(B) (Gurupi)
SEGMENTO
EXTENSO
: KM 305,0 - KM 410,7
: 105,7 KM
MOBILIZAO E DESMOBILIZAO DE OBRA
PNV : 242BTO0430; 242BTO0435; 242BTO0440 e 242BTO0450
DATA-BASE : JULHO 2007 (Tabela SICRO 2 - Estado do Tocantins)
CUSTO DA PASSAGEM (R$) CUSTO TOTAL (R$)
INVENTRIO
TEM MO DE OBRA DISTNCIA KM OBSERVAES
QUANT. UNIDADE
1 Engenheiro 1.00 unid 310.00 30.00 30.00 Viagem de nibus Palmas/Obra
2 Encarregado de pavimentao 1.00 unid 310.00 30.00 30.00 Viagem de nibus Palmas/Obra
3 Encarregado de Turma 1.00 unid 310.00 30.00 30.00 Viagem de nibus Palmas/Obra
4 Motorista 10.00 unid 310.00 30.00 300.00 Viagem de nibus Palmas/Obra
5 Operador de Carregadeira 1.00 unid 310.00 30.00 30.00 Viagem de nibus Palmas/Obra
6 Operador de Retroescavadeira 1.00 unid 310.00 30.00 30.00 Viagem de nibus Palmas/Obra
7 Operador de Trator de esteira 1.00 unid 310.00 30.00 30.00 Viagem de nibus Palmas/Obra
8 Operador de Patrol 1.00 unid 310.00 30.00 30.00 Viagem de nibus Palmas/Obra
Total de Mobilizao de Pessoal: 510.00
INVENTRIO CONSUMO (litros/h) ( C VEL.MDIA
) CUSTO CUSTO TOTAL (R$)
DISTNCIA
TEM VECULOS LEVES E CAMINHES COMUNS
KM (B)
VECULO (km/h) COMBUSTVEL OBSERVAES
QUANT. (A) UNIDADE (D) (E)
1 Caminho Basculante - 5 m 3.00 unid 310.000 19.00 60.0 1.79 527.15 A X B X C/D X E
2 Caminho Carroceria de madeira 15 t 1.00 unid 310.000 25.50 60.0 1.79 235.83
3 Caminho Basculante - 10 m 2.00 unid 310.000 25.50 60.0 1.79 471.66
4 Caminho Tanque 6.000 l 1.00 unid 310.000 23.00 60.0 1.79 212.71
5 Caminho Carroceria - 4 t 1.00 unid 310.000 12.00 80.0 1.79 83.23
6 Automvel at 100 hp 2.00 unid 310.000 8.00 80.0 2.74 169.88
7 Utilitario- Pick-Up 1.00 unid 310.000 19.40 80.0 1.79 134.56
Total de Mobilizao de Veculos Leves e Caminhes Comuns: 1,835.02
INVENTRIO MOMENTO DE CUSTO TOTAL (R$)
DISTNCIA CUSTO
TEM EQUIPAMENTOS DE GRANDE PORTE
KM
PESO (Ton) TRANSPORTES
MOMENTO
OBSERVAES
QUANT. UNIDADE (ton x km)
1 Trator Agrcola - 77 kW 1.00 unid 310.000 3.093 958.83 0.4500 431.47
2 Carregadeira de Pneus - 1,33 m 1.00 unid 310.000 8.553 2651.43 0.4500 1,193.14
3 Rolo Compactador de pneus autopropelido - 21 t 1.00 unid 310.000 8.200 2542 0.4500 1,143.90
4 Retroescavadeira 57kW 1.00 unid 310.000 5.650 1751.5 0.4500 788.18
5 Rolo Compactador Tandem Vibrat. 1,5 t 1.00 unid 310.000 5.130 1590.3 0.4500 715.64
6 Trator de Esteira com lmina 1.00 unid 310.000 7.765 2407.15 0.4500 1,083.22
7 Rolo Compactador p de carneiro autop. 11,25 t 1.00 unid 310.000 11.250 3487.5 0.4500 1,569.38
8 Motoniveladora 1.00 unid 310.000 11.481 3559.11 0.4500 1,601.60
Total de Mobilizao de Equipamentos de Grande Porte: 8,526.52
Total Direto de Mobilizao: 10,871.54
LDI (20,25%): 2,201.49
Total de Mobilizao: 13,073.026
Total de Desmobilizao: 13,073.026 ( = TOTAL DE MOBILIZAO )
TOTAL DE MOBILIZAO E DESMOBILIZAO: 26,146.051
palmas/peixe
palmas/peixe

preo comb em palmas site ANP 07/2007.


CROQUI DAS OCORRNCIAS

BR-242/TO - SR/TO
UL - ( GURUPI-TO )

Betim - 1.402 Km

AREAL USINA

Incio do Trecho-km 305,0 3,00 Km 4,00 Km


KM - 353,2
Br 242/TO
KM - 364,7 KM - 410,7
2,00 Km
GURUPI
PEDREIRA

Transp. Local P/ Remendos = 410,7 - 305,0 = 52,85


2

Usina
Areia
64,50 km

Usina Micro Revest.


Brita
52,00 km 54,85 km