TECHNICAL INFORMATION

RoRo

Straight stern ramps


Planning the straight stern ramp

Photo: ShipPax Information


Our aim is to design a MacGregor stern
ramp which is efficient, economic and
safe, while fully meeting the specific
operating requirements.
The more information that can be given
on these prerequisites, the greater the
chance to find the optimum solution.
Under the following headings informa-
tion requirements can found before
commencing the project. If these answers
are available at the earliest stage possible,
work will be saved during the later stages,
gaining valuable time by shortening the
lead time between initial contact and
delivery.

Interface between ship and quay


In order to establish the length of the
ramp, we require certain important dim-
ensions as well as information on the
maximum angles at the knuckles (point of vehicles, clear height, ground clearance ramp will suffice. However, where the
interchange between straight lines), also and wheelbase. tidal shift is great, there may be a need
the maximum gradient. If the ramp shall interact with a shore to adjust position of ship during loading
Essential measurements are the height based or floating linkspan we need to or unloading.
of the threshold deck above the water get information about this.
level under ballast or full load, together Where there is a need for high vehicle Loading
with the quay edge height above water speeds during loading or unloading, a To arrive at correct dimensioning of the
level at both high and low tide. If either shallower gradient of the ramp will be steel structure and achieve an accept-
the knuckle angles or the gradient are not needed. able strength to weight ratio, we need to
known, please indicate the types of The ramp will then be longer than know the following: What kind of vehicles
if consideration is given only to the will drive over the ramp? How much is
geometrical clearance at the knuckles. the axle loading and the print area of the
Based on these inputs we calculate wheels? How many axles are there and
the requisite length of the ramp to suit how far apart are they?
length
length the various operating conditions. The What will be the required total load
h max longest calculated requisite length carrying capacity of the ramp, based
h min represents the minimum ramp length. on the maximum number of vehicles
Fully laden Ballast In order to dimension the ramp we expected to be on the ramp at the same
must know whether the quayside is time? Will the ramp be provided with a
horizontal or of a sloping design for preventer arrangement and what should
length RoRo ships. For a sloping quay, a shorter be the maximum permissible total load?
length

h min
h max

Low water/tide High water/tide Horizontal quay Sloping quay


Interface between ramp and ship securing devices, for an average size Control options
When designing the stern section of ramp. The shorter the time, the greater Two different systems are available:
the ship, sufficient room should be will be the size and cost of the hydraulics.
reserved for the ramp and its associated Clearly, there is also a limit to the technical Automated control system
equipment. feasibility. Press one button to initiate and
A space of 600 to 900 mm should An indication should be given of complete the whole opening or
be allowed at each side of the ramp, the maximum and minimum ambient closing sequence.
depending on size. This space is required temperatures in which the hydraulic Manual control system
for the kerb, railings, sealing system and system is to operate. Each step in the operation is
operating equipment. If gangways are controlled by hand operated
to be provided extra width should be Regulatory bodies hydraulic valves.
allowed. Please specify which demands are to be The greater the degree of automation
The operating system also requires met by the equipment. In other words, of the system, the easier and faster the
space at each side of the ramp inside which classification societies, national operation.
the ship. In the case of direct operating authorities and other regulations (e.g. IMO) An automated system will be particu-
hydraulic cylinders which demand more are to be satisfied. larly cost effective on shorter runs where
space than other systems, a space of there is a need for fast loading and
2 to 4 m will be required inside the ship, Options unloading. 250 m2, choose wire ropes
depending on the size of the ramp. On the right we show the equipment or operated by hydraulic/electric winch
Here the surface width should also be accessories which require your choice, motors.
between 600 to 900 mm. also optional equipment which may be The manual control system is in practice
Contact us early in the design stage if added to the ramp. These should be restricted to simple ramps, non-tight, in
you require a more accurate estimate studied point by point when making
locations on the ship which are not critical
of the space requirement. If the ramp an initial evaluation, based upon the
for the safety of the ship.
is of such a length that it reaches some particular operating conditions.
5 m or so beyond the cleating hooks,
Operating options
in stowed position, additional locking Flap options
Two different systems are available:
will be required for strength and safety. There is a choice of two flap designs. The
Direct hydraulic cylinders
In such cases a support tower should flap stowed in a vertically upright position
Wires by hydraulic/electric winch
be installed to carry the extra securing offers the most economical solution.
motors
hooks. In cases, where free visibility is required,
For a ramp with an area of less than about
choose the flap stowed in turndown
200 to 250 m2 you use hydraulic cylinders
Hydraulic capacity position.
acting directly on the ramp. This is the
The governing factors in dimensioning If the ramp is of such a length that it still
most cost effective and reliable solution.
the hydraulic system capacity are the obscures the vision, it can be constructed
For a ramp larger than about 250 m2,
size of the ramp, time requirements for foldable in two sections.
choose wire ropes operated by hydraulic/
raising and lowering of the ramp and the The flaps stowed in upright position may
electric winch motors.
outside temperatures to be encountered as an alternative be secured by an internal
during operation. For opening and device to avoid the support beam in front
closing, 2 to 4 minutes are required, of the flaps.
excluding opening and closing of the

Adjustable-length
permanent arrangement
with articulated stays

Direct
hydraulic
Foldable flap
cylinders

Support tower
2-4 m 2-4 m

Wires by hydraulic/electric
Non- winch motors
foldable
0,6-0,9 m Clear width 0,6-0,9 m flap

Temporary preventer
arrangement with
wires

Reserve space for direct hydraulic cylinders Flap options Operating options
denniz@corsman.se
ShipPax Information/Mike Louagie

Preventer stay options


Preventer stays support the ramp during
Foldable handrails docking and service, for example when
Portable handrails transporting equipment for repair and
maintenance, also when loading and
unloading without additional support
at the quay, and so avoid overload
(for example in harbours with limited
Fixed handrails
quayside strength).
The handrail versions can all be combined on the same ramp The first decision is therefore whether
or not you need preventer stays. The
Handrail options next decision is whether a temporary
Handrails are available in three versions which can all be combined on the same solution will suffice, for instance just
ramp. for docking, or is there a need for a
Fixed to the ramp. permanent preventer stay?
Foldable in such a way that it does not protrude into the ship when the ramp is in For temporary use, wire ropes offer the
the closed position. most reasonable alternative. They are
Portable handrails are stowed on board during the voyage. easier to mount and dismount, and can
In all other respects, they are of similar construction. The fixed one is the simplest be stowed on board.
and most cost effective. However, if handrails might impede the cargo, equipment or If a permanent preventer stay is
gangways, the portable or foldable versions are the natural choice. required, there is a choice between
an articulated stay and chain, either
of which may be fixed or hydraulically
Anti-slip options
adjustable.
Four different anti-slip devices are
With the hydraulically adjustable
available. Welded square bars in a
version the height of the ramp can be
herringbone pattern provide a robust
altered to suit the quayside conditions.
skid-resistant but uneven surface with a
high degree of friction. Expanded metal
provides an even running surface with
high friction at lower cost but the design
is more prone to mechanical damage
and wear, all of which may lead to higher
maintenance costs. The design of Nelson
Herringbone Expanded metal
studs is robust and the running surface Preventer stay Wire Stay Chain
is even although the friction is lower
than with the other types. The fourth Temporary X
Permanent
alternative is anti-slip coating consisting
- fixed length X X
of epoxy mastic dressed with resistance - adjustable
friction material, which provides a high length X X
friction and an even surface. Nelson studs Anti-slip coating
MacGregors standard for straight Sealing and securing quality Safety quality
stern ramps The team of MacGregor engineers have Being the market leader, MacGregors
Over the years MacGregor has designed developed an efficient and secure water- ship experts are invited by national
and manufactured a great variety of tight seal. The result is a simple but high- authorities and classification societies to
straight stern ramps for different types performance design. use its expertise and experience, gained
of ships. We therefore promise that your from numerous installations, to help
ramp will meet your needs in terms of Compression Rubber develop and evaluate new rules
quality, efficiency, security and overall bar packing and regulations.
economy. Yet it will be standardised in all Your MacGregor stern ramp will
major functions. incorporate a number of items of safety
In other words, you will be supplied Sealing equipment regulated by classification
with well-proven equipment which is societies and authorities. When the ramp
easy to repair in the event of an accident A rubber packing is placed in and around is closed and cleated, the true status is
and easy to maintain for long-term the perimeter of the opening of the hull. confirmed by the indicator lamps both at
trouble-free operation. We believe in When closing the ramp the rubber is the operating panel and the bridge panel.
high quality in every respect. pressed against compression bars made
of stainless steel. These have a very
Steel structure quality smooth surface to guard against any
The ramp is designed as a flat top plate penetration of water. The packing is of
with an open web construction to meet the sliding type which allows relatively
the demands for torsional strength due large racking deflection of the stern
to the movements of the hull or heel opening.
of the ship. High tensile steel is used The ramp is secured in the closed
throughout the ramp as standard. watertight position by hydraulically
Fixed wheel kerbs are fitted at each operated hook cleats and bolts. They Bridge panel
side of the driveway and fixed or foldable are well-proven MacGregor innovations
handrails wherever possible. Elsewhere, which can be relied upon in all weathers. By-pass valves (float valves) are fitted in
portable handrails are employed. The hooks are placed above the stern the system to ensure that the hydraulic
opening and the bolt cleats at each side cylinders have un-restricted movement
of the opening. when the ramp is supported on the
quay. Custom designed load control
valves are normally fitted directly on the
cylinders. This will prevent the ramp from
falling down in the event of hydraulic or
electrical failure.
Hook cleat Only high quality components of
marine design from approved suppliers
are used in MacGregor equipment.
Open web construction

Quality of fittings
Shafts and pins exposed to the weather
are of stainless steel. Main hinges
and cylinders are fitted with spherical
bearings.

Bolt cleat

MacGregor is the worlds leading brand of engineering solutions and services for handling
marine cargoes and offshore loads. MacGregor products serve the maritime transportation, MacGregor Sweden AB
offshore and naval logistics markets, in ports and terminals as well as on board ships. Our cargo
RoRo
flow solutions integrate cargo access, stowage, care and handling functions to suit a particular
ships cargo profile. This benefits its productivity, environmental impact and profitable service
P.O. Box 4113,
lifetime. SE-400 40 Gothenburg
Sweden
MacGregor is part of Cargotec. Cargotecs class B shared are quoted on NASDAQ OMX Helsinki. Tel. +46 31 85 07 00
Published by MacGregor. Copyright MacGregor January 2014. All rights reserved. No part