Anda di halaman 1dari 28

Op

perational Phiilosoph
hy
Surface
S e Hydraaulic Co
ontrol S
System
m
(ODDIN Valvve)
Ref #:
# SR-1512 230-CN
Rev #:
# A
Date
e: 06-Oct-2
2016

Project Title
e: Supply of Zone 1 Surface Hy
ydraulic Control
System
Customerr: Schlum berger Mid ddle East S
S.A.
End Userr: ADMA O OPCO

INT
TECH Proc
cess Autom CO.
mation FZC
Offic
ce: P.O. Box 614799, Lob 16, Office 16
6618 JAFZA, Duba
ai, UAE
Tel: +971 4 8808423, Fax: +97 71 4 8876553
Faactory: P.O. Box 61479, WT01FD06 , Jebel Ali , Dubai U
UAE
Tel: +971 4 8808423,
8 Fax: +9
971 4 8876553
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

REVISION HISTORY

A 06-Oct-2016 Issues for Information HJ WAW AB

WRT RVW APP APP APP


By By By By By
Rev # Date Description Comments
END
INTECH CUST
USER

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 2 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

NOTICES, COPYRIGHTS AND TRADEMARKS

Electronic controlled copy is available to all corresponding, on the corporate intranet with secure
access controls and respective rights. This Document contains proprietary information of INTECH
Process Automation.
Information contained herein is for the sole use of the customer receiving this document. Acceptance of
the document by the customer constitutes agreement by the customer that they shall not disclose
proprietary information by INTECH Process Automation to any third party and shall not transmit any
documents or copies thereof containing proprietary information of INTECH Process Automation to any
third party except as may by authorized in writing by INTECH Process Automation.
No part of this document may be used, translated into another language, stored in a retrieval system,
or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or
otherwise, without the prior written consent of INTECH Process Automation.
While every effort has been made to ensure the accuracy of this document, INTECH Process
Automation assumes no responsibility for omissions and errors. Neither is any liability assumed for
damages resulting from the use of information contained herein.

Questions or comment regarding this document or the product to which it relates should be directed to:

INTECH Process Automation Inc.


4903 W Sam Houston Parkway N, Suite A100
Houston, Texas 77041, USA
Tel: +1 713 849 1000
Fax: +1 713 856 0785
Email: info@INTECHww.com
URL: www.INTECHww.com

INTECH, TAP and FPM are registered logotypes and trademarks of INTECH Process Automation.

Copyright 2004 INTECH Process Automation Inc. All Rights Reserved.

All other logotypes, trademarks, brands and product names in this document are acknowledged as
properties of their respective companies/owners.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 3 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

TABLE OF CONTENTS

1. INTRODUCTION ............................................................................................. 5
1.1. Scope of Document ....................................................................................................................5
1.2. List of Abbreviations ....................................................................................................................5
2. SHCS FIELD DESCRIPTION .......................................................................... 6
2.1. FCV Overview .............................................................................................................................6
2.2. SHCS and FCV Interconnection .................................................................................................6
2.2.1. INTELLIGENT WELL COMPLETION DIAGRAM .......................................................7
2.3. SHCS Main Objectives ...............................................................................................................7
2.3.1. PRIMARY OBJECTIVE ..............................................................................................7
2.3.2. SECONDARY OBJECTIVE ........................................................................................8
2.3.3. TERTIARY OBJECTIVE .............................................................................................8
3. GENERAL FUNCTIONAL DESCRIPTION ...................................................... 9
3.1. SHCS Overall Schematic ............................................................................................................9
3.2. Hydraulic Supply Section ..........................................................................................................10
3.3. Hydraulic Control Unit ...............................................................................................................12
4. SHCS PRE-CONFIGURATION PARAMETERS ........................................... 12
4.1. Motor Controls...........................................................................................................................12
4.1.1. FLUID RESERVOIR LEVEL .....................................................................................12
4.1.2. HPU PRESSURE .....................................................................................................13
4.1.3. LEAK DETECTION MONITORING ..........................................................................15
4.2. SHCS FCV Pre-Configuration...................................................................................................15
4.2.1. FCV POSITIONS ......................................................................................................16
4.2.2. TIMING AND PRESSURE SET POINTS .................................................................16
5. SHCS HMI CONTROL COMMANDS ............................................................ 20
5.1. SHCS Global Commands .........................................................................................................20
5.2. HPU Commands .......................................................................................................................20
5.3. FCV Commands .......................................................................................................................21
6. FCV OPERATION SEQUENCE .................................................................... 22
6.1. SHCS Field Operations Point of View (POV) ...........................................................................22
6.1.1. VALVE TYPE:- ODIN ...............................................................................................22
6.2. FCV Remote Operation ............................................................................................................24
6.3. FCV Manual Operation .............................................................................................................25
6.3.1. HPU PRESSURE UP ...............................................................................................25
6.3.2. FCV MANUAL PRESSURE UP................................................................................25
6.3.3. FCV PRESSURE HOLD SEQUENCE .....................................................................25
6.3.4. FCV MANUAL PRESSURE BLEED .........................................................................26
6.3.5. ADDITIONAL MANUAL OPERATION NOTES ........................................................26
7. SHCS DISPLAYS AND INDICATIONS ......................................................... 27
7.1. HMI Displays .............................................................................................................................27

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 4 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

1. INTRODUCTION
This documentation provides detailed functionality and operation of INTECH brand Surface Hydraulic
Control System (SHCS) for Intelligent Well Completions (IWC).

1.1. SCOPE OF DOCUMENT


The narrative herein provides specific guidelines and instruction for control, operation and sequencing
of SHCS.

Procedures should be read and adhered to in its entirety and referenced in accordance with normal
industrial and programming practices.

1.2. LIST OF ABBREVIATIONS


IWC Intelligent Well Completions
SHCS Surface Hydraulic Control System
FCV Flow Control Valve
HPU Hydraulic Power Unit
HMU Hydraulic Manifold Unit
HCU Hydraulic Control Unit
PLC Programmable Logic Controller
HMI Human Machine Interface
PSI Pounds per Square Inch
DHPT Downhole Pressure Temperature

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 5 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

2. SHCS FIELD DESCRIPTION


Below describes general description of integrated field operations of typical SHCS along with objectives
required of SHCS.

2.1. FCV OVERVIEW


FCV is located sub-surface within Intelligent Well Completions (IWC). Each IWC FCV consists of
individual control line and return line terminated at individual control/return line outlets at SHCS. Shared
common line configuration is also possible for 2 valves, 3 valves and it can be configured up till 12
ODIN valves. It depends upon SHCS design. High-pressure actuation control line tubings are
connected to FCV for actuation.

ODIN is one of the types of FCVs that can be controlled via SCHS

ODIN
o ODIN valve has 08 total positions: Fully Close, 1, 2, 3, 4, 5, 6, Fully Open
o Each ODIN valve requires 01 Actuation line and 01 common line to operate.
o Upon high fluid pressure of Actuation Line, an embedded slide within sleeve of FCV is
slowly moved passed to move the valve in Intermediate Position.
o Once control line is depressurized, common line is pressurized which slowly pushes the
valve sleeve into Final Position. Upon completion of the pre-configured hold time, pressure
is released from the common line. Next position is achieved and displayed at the HMI.
o Any additional set of sequence increases FCV position by one.
o Full sequencing of all available positions is referred to a one Cycle.

2.2. SHCS AND FCV INTERCONNECTION


Single high-pressure actuation control line tubing is connected to FCV for actuation. Said control line
tubing is laid the full length of the IWC and connected to top-side IWC wellhead and seamlessly
connected to associated SHCS control line outlet, which is located top-side and away from wellhead.

IWC tubing is typically diameter and constructed of high tension, thermal resistant, alloy 316SS
construction capable of withstanding excessive high temperatures and pressures.

Each IWC FCV consists of individual control line and return line terminated at individual control/return
line outlets at SHCS.

FCV and SHCS direct connectivity do not include Down Hole Pressure Temperature (DHPT) gauges,
cabling of any other interconnection media but indirect connectivity is available from WellWatcher
through Modbus.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 6 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

2.2.1. INTELLIGENT WELL COMPLETION DIAGRAM

NEXT PREV CL R ENT

2.3. SHCS MAIN OBJECTIVES


SHCS Main Objectives are based upon IWC production as viewed by the End-User and does not
include any additional operations required for overall SHCS operation beside mentioned in this
document.

2.3.1. PRIMARY OBJECTIVE


SHCS Primary objective is executing IWC FCV Operation Sequence, as described above Section 3.1
AND accurately determining current FCV position for production management purposes.

1. Operator MUST be capable of successfully executing a full FCV Operation Sequence in


order to manage IWC Zone production.
2. Operator MUST be capable of knowing current and intended FCV positions in order to
manage IWC Zone Production.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 7 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

2.3.2. SECONDARY OBJECTIVE


SHCS Secondary objectives are included to help monitor, maintain, trend and analyze certain
parameters when executing Primary Objectives.

1. Fluid Supply Volume As pressurized control line & common line fluid actuates FCV,
fluid volume should be displayed, logged and trended so that Completions Operators may
know and understand supply fluid volume for each FCV Operation Sequence which can
help to predict the position of FCV.
2. Control Line Fluid Return Volume In ODIN valve a common line will be pressurized
which will displace the actuation line volume back to the SCHS tank. Said fluid volume
should be displayed, logged and trended so that Completions Operators may know and
understand return fluid volume for each FCV Operation Sequence.
3. Common Line Fluid Return Volume In ODIN upon pressurizing the control line, fluid
will return from the common like as the actuator is a J-type mechanical lock cylinder /FCV.
Said fluid volume should be displayed, logged and trended so that Completions Operators
may know and understand return fluid volume for each FCV Operation Sequence.
4. Control Line Pressure Individual FCV control lines pressure should be displayed.

2.3.3. TERTIARY OBJECTIVE


SHCS Tertiary objective is overall monitoring of SHCS health, performance and control of SHCS
operations.

1. SHCS HPU pressure


2. SHCS HPU fluid reservoir level
3. SHCS HPU fluid leak detection

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 8 of 28
Issue Date # : 30-Jan-2014
OPERA
ATIONAL PHILOSO
OPHY

Project Title : Supply of Zone 1 Surface Hydra


aulic Control Sys
stem INTE CH Project Code
e : SR-151230
Customer : Schlumberger
S Mid
ddle East S.A. Custo
omer Project # : PO # CAE20118
81A
End User : ADMA OPCO End U
User Project # P
PO # 202494
Ref # : SR-15
51230-CN Rev # A Datte : 06-Oct-2016

3. GENER
G RAL FUN
NCTION
NAL DE
ESCRIP
PTION
SHCSS controls direct hydraulic fluid pressurre supplied byy pumps to a
actuate IWC Flow Control Valves
(FCV)):

3.1.. SHCS OVERA


ALL SCHEMATIC
C
Below
w is a typical overall
o SHCS
S P&ID schem
matics:

FRM # : OPS-WI-20--ST (01)


Issue # : 02 Page 9 of 28
Issue Date # : 30-Jan
n-2014
OPERA
ATIONAL PHILOSO
OPHY

Project Title : Supply of Zone 1 Surface Hydra


aulic Control Sys
stem INTE CH Project Code
e : SR-151230
Customer : Schlumberger
S Mid
ddle East S.A. Custo
omer Project # : PO # CAE20118
81A
End User : ADMA OPCO End U
User Project # P
PO # 202494
Ref # : SR-15
51230-CN Rev # A Datte : 06-Oct-2016

3.2.. HYDRA
AULIC SUPPLY
S SECTIO
ON
Hydraaulic Supply Section houses pump p, filtration, fluid reservvoir, and p
pressure monitoring
instrumentation and electrical so
olenoids to co
ontrol down-h hole FCVs.
Hydraaulic section is o main operat ions:
s sub-categorized into two

1. HPU
H Hydrauulic Power Unit; Controls flu uid power gen
neration via m
motorized pum mp and monittors
ov
verall HPU he ealth of: fluid reservoir, pum
mp pressure, supply and rreturn fluid vo
olume, de-
prressurization of HPU.

FRM # : OPS-WI-20--ST (01)


Issue # : 02 Page 10 of 28
Issue Date # : 30-Jan
n-2014
OPERA
ATIONAL PHILOSO
OPHY

Project Title : Supply of Zone 1 Surface Hydra


aulic Control Sys
stem INTE CH Project Code
e : SR-151230
Customer : Schlumberger
S Mid
ddle East S.A. Custo
omer Project # : PO # CAE20118
81A
End User : ADMA OPCO End U
User Project # P
PO # 202494
Ref # : SR-15
51230-CN Rev # A Datte : 06-Oct-2016

2. HMU
H - Hydraulic Manifold Unit;
U monitors and controlss hydraulic tub
bing circuits to
o control dow
wnhole
FCV operation
ns.

FRM # : OPS-WI-20--ST (01)


Issue # : 02 Page 11 of 28
Issue Date # : 30-Jan
n-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

3.3. HYDRAULIC CONTROL UNIT


Hydraulic Control Unit houses electrical power distribution, RTU and communications, hardwired I/O
termination and motor control contactor.

Power Distribution:
110VAC Single Phase incoming power
24VDC power supply
RTU: Programmable controller

Communications:
Serial Modbus RS-485 to SLB Well Watcher
Modbus TCP/IP (Ethernet copper) to HMI and SCADA
Motor Control:
24VDC relay coil
3 Phase 480/415V incoming power for Electrical Motor

4. SHCS PRE-CONFIGURATION PARAMETERS


Completions Operator will input certain configurations within HMI that will be retained. Below describes
parameters set points HMI Operator will input prior to SHCS operations.

4.1. MOTOR CONTROLS


The motor controls pump pressure within HPU that is applied to valve actuation control lines. Motor is
controlled by fluid reservoir level transducer and main pressure supply header transducer. To
conserve motor life and operational load, motor start command has a 15(Configurable) second
Consecutive Command Delay between sequential start commands. Motor controls are disabled during
Stand-By (Ready for Next Command) until a positioning command is given from HMI.

4.1.1. FLUID RESERVOIR LEVEL


Fluid within reservoir is supplied to pump which supplies fluid pressure to HPU and FCV control lines.
By configuring Reservoir Level configurations at HMI, Motor can be controlled in the event of loss of
reservoir fluid. Input error checking and error trapping are in effect. All fields must have input values or
SHCS is rendered inoperable.

HMI operator may input within set point range of minimum 10% to maximum 100%:

1. Reference Tag: LT-001


2. Reservoir HI Set point: Once fluid level rises above set point, a warning alarm is generated to
indicate to operator that excessive fluid level is approaching.
a. Input percentage value must not be higher than Reservoir HIHI Set point or lower than
Reservoir LO Set point.
b. Alarm indication should be Red in color and read:

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 12 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

i. Caution, High Reservoir Fluid Approaching


3. Reservoir HIHI Set point: Once fluid level rises above set point, Motor Start Command is disabled
until fluid is extracted below Set point. This prevents reservoir overflow due to aerated fluid being
returned to reservoir.

Technical Note* Aerated fluid accumulates several inches above fluid line and will overflow thru tank
reservoir filler cap.

a. Input percentage value must not be higher than 100% or lower than Reservoir HI Set point.
b. Alarm indication should be red in color and read:
i. Reservoir Fluid HIHI; Drain Fluid Before Issuing Next Command
4. Reservoir LO Set point: Once fluid level decreases below set point, a warning alarm is generated
to indicate to operator that deficient fluid level is approaching.
a. Input percentage value must not be higher than Reservoir HI Set point or lower than
Reservoir LOLO Set point.
b. Alarm indication should be Red in color and read:
i. Caution, Low Reservoir Fluid Approaching
5. Reservoir LOLO Set point: Once fluid level decreases below set point, Motor Start Command is
disabled until fluid is added above Set point. This prevents pump cavitation.
a. Input percentage value must not be higher than Reservoir LO Set point or lower than 10%.
b. Alarm indication should be red in color and read:
i. Reservoir Fluid LOLO; Fill Fluid Before Issuing Next Command

Technical Note* LOLO Set point cannot be input below 10%.

4.1.2. HPU PRESSURE


Fluid pressure transducer at HPU pump maintains fluid pressure of HPU and Well Control Lines. By
configuring HPU Pressure configurations at HMI, Motor can be controlled to maintain SHCS operations
within specified fluid pressure range. Input error checking and error trapping are in effect. All fields
must have input values or SHCS is rendered inoperable.

HMI operator may input below set point in pounds per square inch (PSI) from minimum 0psi to
maximum 10,000psi, default value of 0psi shall be put in for testing:

1. Reference Tag: PT-001


2. HPU Pressure HI Set point: Once FCV Operation Sequence is active and motor is energized,
pump pressure will increase during FCV Pressure Up sequence. Once pump header pressure
rises above set point, PLC shall issue Motor Stop Command; this will de-energize motor until pump
pressure falls below HPU Pressure LO Set point.
a. HMI shall display this set point as Pump Stop Set Point, as HI Set point may
indicate an alarming event. However, this is normal operating condition.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 13 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

b. Input PSI value must not be higher than HPU Pressure HIHI Set point or lower than
HPU Pressure LO Set point.
c. There is no alarm or warning associated with this set point as this is normal operation
of SHCS. Motor HMI object will indicate to operator:
i. Motor Control Enabled / Motor Running
3. HPU Pressure HIHI Set point: Should pump header pressure continue to rise above set point,
PLC shall de-energize Motor Start Command and energize HPU Bleed solenoid open to de-
pressurize SHCS.
a. Input PSI value must not be higher than 10,000psi or lower than HPU Pressure HI Set
point.
b. Alarm indication should be red in color and read:
i. Pump Pressure HIHI; For Safety SHCS Automatically Depressurized! Reduce
HPU Pump Stop Set Point Before Issuing Next Command
4. HPU Pressure LO Set point: Once header pressure falls below set point, Motor Start Command
will energize motor until pump pressure reaches HPU Pressure HI Set point.
a. HMI shall display this set point as Pump Start Set Point, as LO Set point may
indicate an alarming event. However, this is normal operating condition.
b. Input PSI value must not be higher than HPU Pressure HI Set point or lower than HPU
Pressure LOLO Set point.
c. There is no alarm or warning associated with this set point as this is normal operation
of SHCS. Motor HMI object will indicate to operator:
i. Motor Control Enabled / Motor Running
5. HPU Pressure LOLO Set point: If header pressure falls below set point while conducting FCV
Operation Sequence, Motor Start Command will de-energize motor. This indicates possible fluid
leak or open isolation valve. HPU
a. Input PSI value must not be higher than HPU Pressure LO Set point or lower than
0psi.
b. Alarm indication should be yellow in color and read:
i. Pump Pressure LOLO; Verify Hand Valves Closed or Possible Fluid Leak
Before Issuing Next Command

Technical Note* Motor start-up bypass timer of 1 minute must be in effect during initial start-up in
order to bypass HPU Pressure LOLO Set point.

Technical Note* Several environmental effects within fluid dynamics result in fluid pressure decreasing
once nominal topside pressure has been achieved within a hydraulic circuit. 1.) Compressed fluid
under pressure may contain trace amounts of compressed air within the extension of tubing circuit. As
the compressed air decompressed due to temperature variations, control line fluid pressure will slowly
decrease. 2.) As fluid pressure is exerted onto downhole FCV slide sleeve, slide will slowly move,
which results in slight abrupt fluid pressure loss. 3.) FCV control line tubing may span such a distance
that inherent tubing resistance may be high enough that topside pump pressure will reach nominal
pressure before downhole fluid pressure is fully exerted onto FCV actuator. This results in a slow

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 14 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

decrease in topside pump pressure as fluid pressure spans the length of the downhole FCV control line
tubing. These effects are considered normal operating conditions.

Technical Note* All Completions instruments and valves have a minimum and maximum actuation
pressure. Ideally, Motor Controls should operate within these actuation parameters. The motor
should stop below the maximum actuation pressure and start above the minimum actuation pressure.
In the event there are multiple ranges of actuation pressures within an Intelligent Well Completions,
motor should stop before pressure reaches the lowest of the combined maximum actuation pressure
and start above the highest of the combined minimum actuation pressure. These parameters can only
be defined by Completions Operators. However, Topside Completions Design Engineers should be
aware of this.

Technical Note* Maximum design pressure of SHCS: 10,000psi


Maximum operating pressure of SHCS: 9,500psi

4.1.3. LEAK DETECTION MONITORING


Leak detection monitoring compares fluid flow rate against low pump pressure to determine if a leak is
present within SHCS. Whereas high fluid flow rate with no pressure increase indicates a ruptured line
or internal valve inadvertently left open. To minimize the amount of fluid loss, operator can input a
specific time in which this condition can exist before de-energizing motor.

HMI operator may input below set points in minutes from a minimum of 1 minute to a maximum of 100
minutes:

1. Leak Detection Timer: If fluid flow and low fluid pressure after timer has elapsed, indicates a leak.
De-energizes motor.
a. Input minute value must not be lower than Pressure Up Time Set point
b. Alarm indication should be Red in color and read:
i. SHCS has Detected a Fluid Leak; Verify Hand Valves Closed or Possible Fluid
Leak Before Issuing Next Command

4.2. SHCS FCV PRE-CONFIGURATION


FCV Pre-Configurations include specific positioning, pressure and timing parameters required for each
individual FCV Operation Sequence to be conducted.

Only FCV Move Commands (Move Next Position, Move X Position, Move Cycle, Reset Sequence &
Resume Sequence ) and positioning parameters (Initial position and X position) can be sent from
SCADA, rest all parameters have be set through HMI.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 15 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

4.2.1. FCV POSITIONS


FCV Initial Position: Operator may have the opportunity to pre-set current FCV position if desired.
FCV Initial Position will be retained during FCV Operation Sequence and begin increments from FCV
Initial Position.

4.2.2. TIMING AND PRESSURE SET POINTS


Fluid pressure transducer at each FCV control line circuit monitors fluid pressure of individual FCV
control line. FCV pressure and timing set point configurations are used to ensure FCV control line
pressure is retained so that FCV positions are accurate.

HMI operator may input below set point in pounds per square inch (PSI), minutes or seconds where
applicable:

1. FCV Pressure HI Set point: During FCV Pressure up Time sequence, once FCV control line
pressure rises above FCV Pressure HI Set point, sequence will enable FCV Pressure Hold
sequence. FCV control line pressure is allowed to decrease below set point without any alarms or
indications as this is considered normal operation.

NOTE* Ideally, FCV Pressure HI Set point will not be above maximum required
actuation pressure of FCV.

a. Input PSI value must not be higher than HPU Pressure HI Set point or lower than FCV
Pressure LO Set point.
b. There is no alarm or warning associated with this set point as this is normal operation of
SHCS.
c. HMI will indicate to Operator:
i. FCV X Pressuring Up
d. Field Input Units: PSI

2. FCV Pressure LO Set point: During FCV Pressure Hold sequence, FCV control line pressure
must remain above FCV Pressure LO Set point to ensure control line pressure is applied to the
minimum required actuation pressure of FCV. In the event pressure decreases below FCV
Pressure LO Set point during FCV Pressure Hold sequence within allotted time, control line
solenoid will de-energize to de-pressurize FCV control line and FCV position will not change.

NOTE* Ideally, FCV Pressure LO Set point will not be set below minimum required actuation pressure
of FCV.

a. Input PSI value must not be higher than FCV Pressure HI Set point or lower than HPU
Pressure LO Set point.
b. Alarm indication should be Red in color and read:
i. FCV Pressure Hold Fail; Control Line De-Pressurized; FCV Position Un-Changed
FRM # : OPS-WI-20-ST (01)
Issue # : 02 Page 16 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

c. Field Input Units: PSI

3. FCV Pressure up Time Set point: Time in which FCV control line must meet FCV Pressure HI Set
point. In the event pressure does not meet FCV Pressure HI Set point within allotted time, control
line solenoid will de-energize to de-pressurize FCV control line and FCV position will not change.
a. Alarm indication should be Red in color and read:
i. FCV Pressure Up Fail; Control Line De-Pressurized; FCV Position Un-Changed
b. Field Input Range/Units: 0 999 / Seconds

4. FCV Pressure Hold Time Set point: Time in which FCV control line must hold pressure once FCV
Pressure HI Set point is met. If pressure drops during this time, HPU will try to maintain the Hold
Pressure but in the event pressure decreases below FCV Pressure LO Set point after FCV
Pressure Hold sequence within allotted time, control line solenoid will de-energize to de-pressurize
FCV control line and FCV position will not change.
a. Alarm indication should be Red in color and read:
i. FCV Pressure Hold Fail; Control Line De-Pressurized; FCV Position Un-Changed
b. Field Input Range/Units: 0 99 / Minutes

5. FCV Pressure Bleed Time Set point: Time in which FCV control line de-pressurizes once FCV
Pressure Hold Time Set point has elapsed. Once FCV Pressure Bleed Time Set point has elapsed
and FCV control line pressure is below 500psi, FCV position will change. In the event pressure
does not decrease below FCV Pressure LO Set point during FCV Pressure Bleed sequence within
allotted time, HPU bleed solenoid will be energized to bleed SHCS HPU. In the event that FCV
control line pressure remains above FCV Pressure LO Set point after FCV control line solenoid has
been de-energized and HPU Bleed solenoid energized, issue alarm and FCV position will not
change. Once FCV control line pressure decreases below 500psi, FCV position must change.
a. Alarm indication should be yellow in color and read:
i. FCV Pressure Bleed Fail; FCV Position Un-Changed
b. Field Input Range/Units: 0 99 / Seconds

6. Delay Time Set point: the FCV which requires common line actuation after control line actuation,
a delay time is deployed before starting the common line sequence.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 17 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

7. Common Line Pressure HI Set point: During Common Line Pressure up Time sequence, once
Common line pressure rises above common line Pressure HI Set point, sequence will enable
Common Line Pressure Hold sequence. Common line pressure is allowed to decrease below set
point without any alarms or indications as this is considered normal operation.

NOTE* Ideally, Common Line Pressure HI Set point will not be above maximum required pressure of
the common line.

a. Input PSI value must not be higher than HPU Pressure HI Set point or lower than common
line Pressure LO Set point.
b. There is no alarm or warning associated with this set point as this is normal operation of
SHCS.
c. HMI will indicate to Operator:
i. Common Line X Pressuring Up
d. Field Input Units: PSI

8. Common Line Pressure LO Set point: During Common Line Pressure Hold sequence, pressure
must remain above common line Pressure LO Set point to ensure control line pressure is applied to
the minimum required actuation pressure of the common line. In the event pressure decreases
below Pressure LO Set point during Pressure Hold sequence within allotted time, common line
solenoid will de-energize to de-pressurize common line and FCV position will not change.

NOTE* Ideally, Common Line Pressure LO Set point will not be set below minimum required actuation
pressure.

a. Input PSI value must not be higher than Pressure HI Set point or lower than HPU Pressure
LO Set point.
b. Alarm indication should be Red in color and read:
i. Common line Pressure Hold Fail; Control Line De-Pressurized; FCV Position Un-
Changed
c. Field Input Units: PSI

9. Common Line Pressure up Time Set point: Time in which common line must meet Pressure HI
Set point. In the event pressure does not meet Pressure HI Set point within allotted time, common
line solenoid will de-energize to de-pressurize common line and FCV position will not change.
a. Alarm indication should be Red in color and read:
i. Common Line Pressure Up Fail; Control Line De-Pressurized; FCV Position Un-
Changed
b. Field Input Range/Units: 0 999 / Seconds

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 18 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

10. Common Line Pressure Hold Time Set point: Time in which common line must hold pressure
once Pressure HI Set point is met. If pressure drops during this time, HPU will try to maintain the
Hold Pressure but in the event pressure decreases below Pressure LO Set point after Pressure
Hold sequence within allotted time, common line solenoid will de-energize to de-pressurize
common line and FCV position will not change.
a. Alarm indication should be Red in color and read:
i. Common Line Pressure Hold Fail; Control Line De-Pressurized; FCV Position Un-
Changed
b. Field Input Range/Units: 0 99 / Minutes
11. Common Line Pressure Bleed Time Set point: Time in which common line de-pressurizes once
Pressure Hold Time Set point has elapsed. Once Pressure Bleed Time Set point has elapsed and
common line pressure is below 500psi, FCV position will change. In the event pressure does not
decrease below Pressure LO Set point during Pressure Bleed sequence within allotted time, HPU
bleed solenoid will be energized to bleed SHCS HPU. In the event that common line pressure
remains above FCV Pressure LO Set point after common line solenoid has been de-energized and
HPU Bleed solenoid energized, issue alarm and FCV position will not change. Once common line
pressure decreases below 500psi, FCV position must change.
a. Alarm indication should be Red in color and read:
i. Common Line Pressure Bleed Fail; FCV Position Un-Changed
b. Field Input Range/Units: 0 99 / Seconds

12. Consecutive command delay time Set point: If move to X position or cycle command is being
executed, a delay is deployed after each position to ensure that system comes to normal before
executing the command for next position.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 19 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

5. SHCS HMI CONTROL COMMANDS


Once SHCS configurations for HPU and FCV(s) have been established and SHCS is
in Ready for Next Command, Operator may begin issuing HPU and FCV commands.

5.1. SHCS GLOBAL COMMANDS


1. SCADA Control: SCADA Control command issues SHCS control commands to 3rd party
SCADA Modbus protocol. All other SHCS HMI commands are not available to Operator with
the exception of HMI Control and HPU Shutdown commands.
2. HMI Control: HMI Control command issues SHCS control commands to PLC via Modbus
TCP/IP protocol. HMI Control is default value at startup.
3. SHCS Reset: SHCS Reset command resets any abnormal alarm, scans for any existing
alarms and resets SHCS to Ready for Next Command.

5.2. HPU COMMANDS


HPU commands are available to HMI Operator when SHCS is indicated as Ready for Next Command.

1. HPU (PUMP) Automatic Mode: While SHCS is in HPU (PUMP) Automatic Mode, all FCV
Operation Sequencing is done via PLC as described in Section FCV Remote Operation. Only
commands as described in Section FCV Commands are required by Operator are necessary to
execute SHCS functionality. HPU Automatic Mode is default value at startup.
2. HPU (PUMP) Manual Mode: While SHCS is in HPU Manual Mode of operation, the
pressurization and de-pressurizing of the HPU is dependent upon HMI Operator. The
pressurization and de-pressurization of the FCV control line is dependent on local field
Operator. Only partial FCV Operation Sequencing will be executed and monitored by PLC as
described in Section FCV Manual Operation. HPU Manual Mode available commands are
described below.
a. HPU Pressure Up: At HPU Pressure Up command, Start Motor Command energizes
motor. All motor controls are in effect as described in Section Motor Controls.
b. HPU Pressure Bleed: At HPU Pressure Bleed command, Start Motor Command is de-
energized to stop motor and HPU Bleed solenoid is energized for 30 seconds to de-
pressurize HPU as described in Section HPU Pressure Bleed.

NOTE* While in HPU Manual Mode and HPU Pressure is above 500psi, switching to HPU Automatic
Mode is not available to Operator.

3. HPU Filtration Mode: While SHCS is in HPU Filtration Mode, only Leak Detection Monitoring
is disabled. This function allows Operator to energize motor in order to circulate fluid without
fluid pressure thru mass filter for optimal cleanliness. This mode may also be used at initial
startup to purge/flush un-wanted air out of hydraulic tubing circuits.
a. Pump Start: Energizes Motor Start Command to energize motor for maintenance
purposes. If HPU pressure exceeds 500psi, Motor Start Command is de-energized.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 20 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

b. Pump Stop: De-energizes Motor Start Command to stop motor once maintenance is
completed.
4. HPU Shutdown/ESD : HPU Shutdown command de-energizes Motor Start Command and
energizes HPU Bleed solenoid for 30 seconds. HPU Shutdown is available to Operator at all
times regardless of HPU Pressure, mode of operation or FCV Operation Sequence. While
HPU Shutdown command is active, no other HPU or FCV Commands are available to
Operator. Only issuing a SHCS Reset command will un-latch HPU Shutdown.

5.3. FCV COMMANDS


Three commands are available for each individual FCV with each well while SHCS is in HPU Automatic
Mode and SHCS indicates Ready for Next Command. FCV Commands are not available for Operator
use while in HPU Manual Mode or SCADA Control. During FCV Operational Sequence, all other FCV
commands are not available.

1. Move to Next Position: At command, FCV control line solenoid is energized Open and Motor
Start Command energizes motor. FCV Operation Sequence is in full effect to increment
intended FCV by one position (N+1). Once FCV Operation Sequence is complete and in final
position, SHCS Ready for Next Command.
2. Move to X Position: At command, Operator must input desired position for intended FCV to
move to. At confirmation of input position, FCV control line solenoid is energized Open and
Motor Start Command energizes motor. FCV Operation Sequence is in full effect to increment
intended FCV by one position until desired final position is achieved (N+X). Once FCV
Operation Sequence is complete and in final position, SHCS Ready for Next Command. Input
error checking and error trapping are in effect. Desired position field must have input value or
command is not allowed.
a. Input whole number value must within FCV Position number range;
3. Cycle Valve: At command, FCV control line solenoid is energized Open and Motor Start
Command energizes motor. FCV Operation Sequence is in full effect to increment intended
FCV by one position (N+1) for the entire FCV Positions available up to and including the
initiating position the FCV rested at the Cycle Command was given. Once FCV Operation
Sequence is complete and in final position, SHCS Ready for Next Command.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 21 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

6. FCV OPERATION SEQUENCE


Any command from HMI to change the valve position will lead to a sequence of steps for every change
in valve position. All steps constitute one complete sequence of valve operation. PLC controller
maintains a count of the valve position based upon successful FCV Operation Sequence. The steps
involved in one move operation (move from position n to position n + 1) are mentioned below in the
same sequence as these will be applied during a sequence.

Whenever a command to move the position of FCV will be issued, the FCV control line solenoid valve
will energize open and Motor Start Command will energize motor. Motor Controls will remain in effect
during complete FCV Operation Sequence.

6.1. SHCS FIELD OPERATIONS POINT OF VIEW (POV)


Below typical operation description assumes SHCS is controlling a single Intelligent Well Completion
(IWC) which comprises one (1) well Zone.

Each Zone comprises of one (1) Flow Control Valve (FCV).

FCV initial position is closed.

SHCS HPU initial supply pressure at 0 psi.

Description is written with Completion Operators perspective at field and will not include detailed
functionality

6.1.1. VALVE TYPE:- ODIN


Completion Operator to operate at HMI as described:

1. Observe SHCS Ready for Next Command


2. Navigate to FCV-X Screen on the HMI
3. Issue command Move to Next Position
4. Observe simultaneous events;
a. FCV-X control line solenoid open
b. Motor energizes and indicates running
c. HPU Pressure begins to rise
d. FCV control line pressure begins to rise
e. HPU supply fluid flow rate indicated
f. HPU supply fluid volume increases
g. Common Line Return fluid flow rate indicated
h. Common Line Return fluid volume Increase
FRM # : OPS-WI-20-ST (01)
Issue # : 02 Page 22 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

i. FCV-X indicates FCV Pressure Up sequence


5. Observe event once FCV Pressure Up sequence reaches pre-configured pressure set-
point for actuation FCV Pressure Hold sequence;
a. FCV-X indicates FCV Pressure Hold sequence for pre-configured time.
6. Observe HPU Pressure reach HPU Pump Stop Set point and motor stops.
7. Observe HPU Pressure;
a. May slowly decrease
b. Motor energizes if HPU Pressure falls below HPU Pump Start Set point
c. Does not fall below FCV Pressure LO Set point
8. Once FCV Pressure Hold time has elapsed; Observe simultaneous;
a. FCV-X indicates Intermediate Position
b. FCV-X indicates FCV Pressure Bleed sequence
c. FCV control line solenoid closes
d. FCV control line pressure decreases
e. FCV return fluid flow rate indicated
f. FCV return volume increases
9. Observe a delay time starts and elapsed between FC-X & Common Line-X Sequences.
10. Observe simultaneous events;
a. Common Line-X control line solenoid open
b. Motor energizes and indicates running
c. HPU Pressure begins to rise
d. Common Line-X pressure begins to rise
e. HPU supply fluid flow rate indicated
f. HPU supply fluid volume increases
g. FCV-X Return fluid flow rate indicated
h. FCV-X Return fluid volume Increase
i. Common Line-X indicates common line Pressure Up sequence
11. Observe event once Common Line Pressure Up sequence reaches pre-configured
pressure set-point for actuation Common Line Pressure Hold sequence;
a. Common Line-X indicates Pressure Hold sequence for pre-configured time.
12. Observe HPU Pressure reach HPU Pump Stop Set point and motor stops.
13. Observe HPU Pressure;
a. May slowly decrease
b. Motor energizes if HPU Pressure falls below HPU Pump Start Set point
FRM # : OPS-WI-20-ST (01)
Issue # : 02 Page 23 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

c. Does not fall below common line Pressure LO Set point


14. Once common line Pressure Hold time has elapsed; Observe simultaneous;
a. Common Line-X indicates Intermediate Position
b. Common Line-X indicates FCV Pressure Bleed sequence
c. Common Line control line solenoid closes
d. Common Line control line pressure decreases
e. Common Line return fluid flow rate indicated
f. Common line return volume increases
g. FCV-X position increments from Closed to Position 2
h. FCV-X indicates Final Position
15. Observe event once Pressure Bleed sequence reaches pre-configured duration of time,
HPU Pressure Bleed sequence;
i. HMI indicates HPU Pressure Bleed sequence for pre-configured time.
j. Motor latched de-energized
k. HPU bleed solenoid opens
l. HPU pump pressure decreases below 500psi
16. Observe Consecutive Command timer elapses
17. Observe SHCS Ready for Next Command.
18. Observe following data is retained and indicated after sequence is complete;
m. Supply fluid volume thru FCV-X & Common Line-X
n. Return fluid volume thru FCV-X
o. Return fluid volume thru Common Line-X
p. Final FCV position

NOTE*: In the event of Move to X Position or Cycle Valve change commands are given, above
sequence will continue until final position is met.

6.2. FCV REMOTE OPERATION


Remote operation refers to any and all commands to SHCS that are done via HMI or 3rd party SCADA.

The sequences will be exactly the same as described in section 6.1.X

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 24 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

6.3. FCV MANUAL OPERATION


FCV manual operation mechanically bypasses a single FCV control line solenoid to actuate downhole
FCV. Each FCV control line circuit contains a SHCS panel mounted hand valve that may be switched
to bypass associated solenoid.

As described in Section HPU Commands-HPU (Pump) Manual Mode, pressurization and de-
pressurization is dependent on HMI commands.

FCV Manual Operation requires diligence and attention from local operator to sequence operation
correctly. Local operator must ensure proper hand valve is used for associated FCV and pressure
duration is sufficient in order to count correct positioning.

Following sub-sections provide details for manual operations for single FCV positioning sequence.

6.3.1. HPU PRESSURE UP


While HPU is in HPU Manual Mode, HMI Operator will issue HPU Pressure Up command to energize
Motor Start Command. Motor Controls will be in effect as described in Section Motor Controls. HPU
pressure will increase and stop at HPU Pressure HI Set point. FCV control line will not be pressurized.

6.3.2. FCV MANUAL PRESSURE UP


Local operator will manually turn associated FCV control line hand valve from Automatic to Manual.
FCV control line pressure will increase to FCV Pressure up Set point and start FCV Pressure Hold
sequence.

Alternately, local operator may position FCV hand valve in Manual prior to manual HPU Pressure Up
command. This will have the same effect.

6.3.3. FCV PRESSURE HOLD SEQUENCE


When FCV Pressure Hold sequence is initiated, the FCV manual hand valve will remain open for the
duration specified in the FCV Pressure Hold Set point. Once FCV Pressure Hold Time has lapsed the
FCV will reach intermediate position.

It is incumbent upon the local operator to ensure FCV hand valve remains open for the entire duration
of the FCV Pressure Hold sequence. The hand valve may remain open indefinitely passed the
required FCV Pressure Hold Time Set point, so long as FCV control line pressure remains above FCV
Pressure LO Set point, FCV will remain in Intermediate Position.

Local operator must observe FCV control line pressure gauge at panel face. Once FCV control line
pressure stabilizes, this is evidence that embedded slide within FCV has reached Intermediate
Position.

If the FCV control line pressure decreases below FCV Pressure LO Set point during FCV Pressure
Hold sequence, FCV Pressure Hold Fail Alarm will be generated and FCV position will not change.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 25 of 28
Issue Date # : 30-Jan-2014
OPERATIONAL PHILOSOPHY

Project Title : Supply of Zone 1 Surface Hydraulic Control System INTECH Project Code : SR-151230
Customer : Schlumberger Middle East S.A. Customer Project # : PO # CAE201181A
End User : ADMA OPCO End User Project # PO # 202494
Ref # : SR-151230-CN Rev # A Date : 06-Oct-2016

6.3.4. FCV MANUAL PRESSURE BLEED


Once FCV has reached Intermediate Position and local operator has observed stable pressure, local
operator may turn associated FCV control line hand valve from Manual to Automatic. FCV control
line will de-pressurize below 500psi. Once FCV Control line pressure has decreased below FCV
Pressure LO Set point, FCV position will increment by one.

Alternately, local operator may keep FCV hand valve in Manual and HMI Operator may issue HPU
Pressure Bleed command to energize HPU bleed solenoid for 30 seconds. This will have the same
effect as turning hand valve to Automatic.

If the FCV control line pressure fails to decrease below FCV Pressure LO Set point, FCV position will
not change.

Note: In ODIN Valve same set of manual operations will be performed on the associated common line
after completing actuation line sequence.

6.3.5. ADDITIONAL MANUAL OPERATION NOTES


As noted, FCV control line pressure up is dependent of local operator moving FCV hand valves. The
automatic FCV Operation Sequence is only partial and is used for pressure monitoring and
incrementing FCV positions.

Ideally, only one FCV hand valve would be changed to Manual at a single time. However, positioning
more than one FCV hand valve is possible either mistakenly or intentionally. In the event this scenario
is present, FCV Operation Sequence must account for all FCV control line pressure increases, FCV
Pressure Hold sequence durations, decreasing below FCV Pressure LO Set point(s) and positioning
increments.

Additionally, FCV control line pressures may increase even while SHCS is not in HPU Manual Mode.
There is no mechanical protection from turning FCV X hand valve to Manual even when FCV Y is in
sequence operation while in HPU Automatic Mode. The FCV Operation Sequence must remain in
effect for all FCV control lines regardless of intended and un-intended commands.

NOTE* Any time any FCV control line(s) pressure increases above FCV Pressure Up Set point,
continues thru FCV Pressure Hold Time and decreases below FCV Pressure LO Set point; the
FCV Operation Sequence must assume the FCV has changed position. This is the Primary
Objective of SHCS.

FRM # : OPS-WI-20-ST (01)


Issue # : 02 Page 26 of 28
Issue Date # : 30-Jan-2014
OPERA
ATIONAL PHILOSO
OPHY

Project Title : Supply of Zone 1 Surface Hydra


aulic Control Sys
stem INTE CH Project Code
e : SR-151230
Customer : Schlumberger
S Mid
ddle East S.A. Custo
omer Project # : PO # CAE20118
81A
End User : ADMA OPCO End U
User Project # P
PO # 202494
Ref # : SR-15
51230-CN Rev # A Datte : 06-Oct-2016

7. SHCS
S DISPLAY
D YS AND
D INDIC
CATION
NS
SHCSS displays and indications are integral for
f Operator tto monitor ge
eneral SHCS vitals while S
SHCS is
CV Operation Sequence or
in FC o Stand-by. Below outlin ne specifies local panel indications an
nd HMI
graph
hic displays.

7.1.. HMI DISPLAYS


S
Thes
se indications and their pre
e-requisites will be displaye
ed on HMI.

1. Ready forr Next Comm mand: This ind dication is pro


ominently dispplayed at HMI interface to
indicate that SHCS is in
n over-all good health, able urther commands and is no
e to accept fu ot
currently undergoing
u ann FCV Operattion Sequence e. May be reeferred to as Stand By. O
Once a
command has been issued and SHC CS is conductting a FCV Op peration Sequ uence, indication will
display SHHCS in Operaation. All following prereq quisites must be true to achhieve Ready for
Next Comm mand status.
a. HP
PU pressure below
b HPU Pressure
P LOLO
O Set point
b. Mo
otor de-energ
gized
c. eservoir fluid level above Reservoir
Re R LOL
LO Set point
d. Re
eservoir fluid level below Reservoir
R HIH I Set point
guration parameters fields contain value
e. Alll SHCS config es
f. HP
PU Shutdown
n is not active
g. HM
MI Control ind
dication is acttive
h. SH urrently undergoing a FCV Operation Se
HCS is not cu equence
i. 15
5(configurable
e) second Con
nsecutive Com
mmand timerr has elapsed
d
i. Consec cutive Comma and timer is aalways enableed anytime a Motor Start
Comma and is de-eneergized. The motor cannott operate withhin this time frrame
even if Motor Start Command
C is rrequested due to FCV Opeeration Seque ence
demand or Motor Co ontrol demand d.
ii. Repetittive and frequ
uent motor sta
arts and stopss have detrimmental effects to the
physica
al hardware ofo motor and sshould be avooided at all tim
mes to ensuree motor
longeviity.
2. SHCS in Operation:
O Thhis indication is prominent ly displayed a
at HMI interfaace to indicate
e that
SHCS is currently unde ergoing a FCV V Operation SSequence or m motor is curreently running. Once
a FCV Ope eration Sequeence is complete, indicatio
on will displayy Ready for NNext Comman nd. All
following prerequisites
p must
m be true to achieve SHHCS in Opera ation status.
a. SH
HCS is curren
ntly undergoin
ng a FCV Ope
eration Seque
ence
b. Mo
otor is energiz
zed and running

FRM # : OPS-WI-20--ST (01)