Medan
15 Oktober 2009
CONTENTS
Installation Line Up
Initial Line Up
INSTALLATION LINE UP
INSTALLATION LINE UP
Un-packing Un-packing
IDU ODU
a material
confirm with
packing list Open Rack Pole
submit NEC Installation Mounting
(If Necessary)
office
IDU ODU
Mounting Mounting
Cable Termination
- Grounding
- Power
- IF
- Traffic
Power On
& Setup
Pre-ATP
UNPACKING IDU-ODU
COMMON INSTALLATION MATERIAL (Sample)
ODU
POLE MOUNT BRACKET
INSTALLATION DIAGRAM (Sample)
complete
finish water
proof
WATERPROOF INSTALLATION
tie up at cable
center on pole
(recommend: if
cable length more
than 0.8m)
CABLE WIRING FORMING
CABLE WIRING FORMING
INITIAL LINE UP
LCT CONNECTION
Relation of
RX Input Level vs RX Level Mon (V)
Calculated Value =
Antenna Orientation SettUp
Location of Adjustment Nut & Bolt
BER Measurement
PICTURE OF INSTALLATION RESULT
PICTURE OF INSTALLATION RESULT
recommend
check mark
PICTURE OF INSTALLATION RESULT
PICTURE OF INSTALLATION RESULT
PICTURE OF INSTALLATION RESULT
PICTURE OF INSTALLATION RESULT
CONTACT INFORMATION
TERIMA KASIH
ZULKIFLI
zulkifli @ nec.co.id
0811-170179
0818143344
08161635361
Basic Equipment Configuration
68.6mm
Weight = 3kg
170mm
INTFC Card
170mm
1U
D1
E3 INTFC
48E1 INTFC
NEO IDU
4P LAN INTFC
STM-1 Opt
STM-1 ELE
LAN/WS INTFC
(for 2P LAN over 150M)
LAN/WS INTFC
Released
WS INTFC
Just released