DAFTAR SATUAN UPAH DAN BAHAN DI LINGKUNGAN PEMERINTAH KOTA YOGYAKARTA

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

TENAGA
1 Tukang kayu hari 30,000.00
2 Kepala tukang kayu hari 32,500.00
3 Tukang batu hari 27,500.00
4 Kepala tukang batu hari 30,000.00
5 Tukang besi hari 25,000.00
6 Kepala tukang besi hari 27,000.00
7 Tukang las hari 27,500.00
8 Kepala tukang las hari 29,000.00
9 Tukang cat hari 25,000.00
10 Kepala tukang cat hari 27,000.00
11 Tukang plitur hari 27,000.00
12 Kepala tukang plitur hari 29,000.00
13 Tukang bor hari 27,500.00
14 Kepala tukang bor hari 29,000.00
15 Tukang listrik hari 29,000.00
16 Tukanng pipa ledeng hari 27,900.00
17 Tukang kapur hari 22,500.00
18 Pekerja hari 20,000.00
19 Mandor hari 32,500.00
20 Pengawas / Ahli Teknik hari 37,200.00
21 Ahli ukur hari 116,300.00
22 Asisten ahli ukur hari 87,200.00
23 Sopir hari 26,000.00
24 Masinis hari 24,900.00
25 Kernet / pembantu sopir hari 22,000.00
26 Mekanik terlatih hari 29,000.00
27 Operator tak terlatih hari 24,000.00
28 Operator terlatih hari 29,000.00
29 Operator semi terlatih hari 25,000.00
30 Butuh terlatih hari 22,600.00
31 Buruh semi terlatih hari 21,200.00
32 Buruh tak terlatih hari 19,600.00
33 Tukang gali hari 34,900.00
34 Juru godog aspal hari 20,000.00
35 Penjaga hari 20,000.00
36 Penyemprot hari 17,500.00
37 Tukang Sungging hari 40,000.00
38 Kepala Tukang Sungging hari 45,000.00
39 Tukang Ukir hari 40,000.00
40 Kepala Tukang Ukir hari 45,000.00
41 Tukang Prodo hari 40,000.00
42 Kepala Tukang Prodo hari 45,000.00
43 Tukang Gambar hari 35,000.00
44 Tukang Grouting hari 30,000.00
45 Kepala tukang Grouting hari 32,500.00
46 Operator mesin sondir hari 75,000.00
47 Analis test sondir hari 120,000.00
CAT
1 Cat kayu se kualitas Patna kg 10,450.00
2 Cat kayu se kualitas Emco biasa kg 32,000.00
3 Cat kayu se kualitas Emco Bintang kg 42,000.00
4 Cat kayu se kualitas Par kg 29,000.00
5 Cat besi se kualitas Patna kg 10,450.00
6 Cat besi se kualitas Emco biasa kg 32,000.00
7 Cat besi se kualitas Emco Bintang kg 42,000.00
8 Cat kayu se kualitas Avian kg 24,750.00
9 Cat tembok/cat semen Maxilite kg 7,600.00
10 Cat tembok/cat emulsi dasar minyak Express kg 8,250.00
11 Cat tembok/cat polivynyl asetat Dulux kg 25,000.00
12 Cat tembok/cat kilap/cat acrilyc Dulux kg 35,000.00
13 Cat ICI Catylac kg 12,000.00
14 Cat tembok se kualitas Decolith kg 9,500.00
15 Cat Sintex kg 7,500.00
16 Cat dasar meni besi type A (cepat kering) Jago kg 12,000.00
17 Cat dasar meni besi type A (cepat kering) Par kg 22,500.00
18 Cat dasar meni kayu Jago kg 12,000.00
19 Cat duco kg 60,000.00
20 Cat genteng air ICI weathershield kg 42,000.00
21 Cat dasar undercoat / alkali resisiting primer kg 27,200.00
22 Cat dinding weathershield Dulux kg 50,000.00
23 Dempul kayu typa A (putih) Jago kg 10,000.00
24 Dempul lilin / kayu bj 9,000.00
25 Plamur Fuji kg 8,500.00
26 Plamur kayu Jago kg 12,000.00
27 Plamur tembok acrilyc kg 17,500.00
28 Plamur jenis sirlak kuning ltr 17,500.00
29 Sirlak putih batangan kg 65,000.00

Bahan - 1
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

30 Sirlak kuning serbuk kg 65,000.00


31 Oker kuning kg 12,000.00
32 Oker hitam kg 9,500.00
33 Oker pewarna politur merah / coklat bks 1,200.00
34 Kalkarium kg 5,000.00
35 Politur jadi ltr 20,000.00
36 Teak oil Fuji ltr 27,500.00
37 Pernis ltr 12,500.00
38 Glass bit ltr 12,000.00
39 Thermo plastik / cat marka kg 49,000.00
40 Cat rettar kg 49,000.00
41 Terpentin ltr 11,500.00
42 Minyak cat ltr 10,000.00
43 Thinner ltr 13,000.00
44 Spiritus ltr 6,500.00
45 Batu kambang kg 7,700.00
46 Kuas roll bh 8,500.00
47 Kuas ukuran 3,5" bh 8,000.00
48 Kuas ukuran 2,5" bh 5,000.00
49 Kuas ukuran kecil 1" bh 2,000.00
50 Soda api kg 15,000.00
51 Sabun deterjen kg 12,000.00
52 Amplas lbr 2,500.00
53 Prodo Mas m2 3,000,000.00
54 Kertas 100 x 100 cm lbr 2,000.00
55 Karbon lbr 3,500.00
BETON DAN BARANG DARI BETON
BATAKO
1 Batako pejal ( 40x20x10 ) bj 2,750.00
Batako beton berlubang ( 40x20x15 ) bh 2,500.00
2 Panel beton pracetak lbr 175,000.00
3 Kolom beton pracetak btg 250,000.00
PIPA
1 Pipa beton 20 x 30 0anjang 1 m m 28,000.00
2 Pipa beton tanpa tulangan dia. 20 cm panjang 1 m m 24,000.00
3 Pipa beton tanpa tulangan dia. 30 cm panjang 1 m m 25,000.00
4 Pipa beton tanpa tulangan dia. 60 cm panjang 0,5 m m 28,000.00
5 Pipa beton tanpa tulangan dia. 80 cm panjang 0,5 m m 32,000.00
6 Pipa beton tanpa tulangan 1/2 dia. 20 cm m 12,000.00
BUIS BETON / KERB
1 Buis beton 1/2 D 20 cm m1 12,000.00
2 Buis beton 1/2 D 25 cm m1 13,000.00
3 Buis beton bulat dia. 15 cm m1 22,000.00
4 Buis beton bulat dia. 20 cm m1 24,000.00
5 Buis beton bulat dia. 30 cm m1 30,000.00
6 Buis beton bulat dia. 40 cm m1 32,000.00
7 Buis beton bulat dia. 50 cm P=0,50 m bh 26,000.00
8 Buis beton bulat dia. 80 cm P=0,5 m bh 32,000.00
9 Buis beton oval dia. 20/30 panjang 1 m m1 30,000.00
10 Buis beton oval dia. 25/37,5 panjang 1 m m1 35,000.00
11 Buis beton oval dia. 30/40, 30/45 panjang 1 m m1 45,000.00
12 Buis beton oval dia. 35/52,5 panjang 1 m m1 65,000.00
13 Buis beton oval dia. 40/60 panjang 1 m m1 50,000.00
14 Buis beton oval dia. 50/75 panjang 0,5 m bh 35,000.00
15 Buis beton oval dia. 60/90 panjang 0,5 m bh 38,000.00
16 Buis beton oval dia. 70/105 panjang 0,5 m bh 47,000.00
17 Buis beton oval dia. 80/120 panjang 0,5 m bh 55,000.00
PERALATAN SANITASI
BAK MANDI
1 Bak mandi teraso uk. 50x50x50 cm bh 150,000.00
2 Bak mandi teraso uk. 60x60x60 cm bh 175,000.00
3 Bak mandi teraso uk. 90x80x80 cm bh 220,000.00
4 Bak mandi (bathtube) dengan shower lux bh 3,250,000.00
5 Bak mandi (bathtube) standar bh 2,475,000.00
6 Bak mandi fiber glass 0,30 m3 bh 275,000.00
7 Bak mandi fiber glass 0,50 m3 bh 825,000.00
KLOSET
1 Kloset jongkok porselin type CE7 standar bh 75,000.00
2 Kloset jongkok porselin type CE8 standar bh 85,000.00
3 Kloset jongkok putih INA bh 65,000.00
4 Kloset jongkok warna INA bh 75,000.00
5 Kloset duduk standar/porselin (dengan tangki KIA standart) "Lolo" bh 950,000.00
6 Kloset duduk porselin lux ( dengan tangki "Toto" ) bh 1,250,000.00
7 Kloset duduk putih dengan tangki "Toto" set 1,250,000.00
8 Kloset duduk warna dengan tangki "Toto" set 1,350,000.00
9 Kloset duduk putih dengan tangki "KIA" set 700,000.00
10 Kloset duduk warna dengan tangki "KIA" set 925,000.00
11 Kloset jongkok standar / keramik bh 55,600.00
12 Kloset jongkok teraso bh 25,000.00
WASTAFEL
1 Wastafel standar INA bh 255,000.00
2 Wastafel lux INA bh 265,000.00

Bahan - 2
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

3 Wastafel putih (KIA) set 139,150.00


4 Wastafel warna (KIA) set 271,340.00
5 Badkip bh 150,000.00
6 Bak cuci stainless steel bh 500,000.00
7 Water drain + asesories set 75,000.00
URINOIR
1 Urinoir standar TOTO U 57 set 785,000.00
2 Urinoir putih set 1,050,000.00
4 Urinoir warna (KIA) set 379,500.00
5 Meja cuci dapur 125 x 50 cm bh 175,000.00
6 Tempat sabun tunggal bh 22,500.00
7 Kran air diameter 3/4" atau 1/2" bh 25,000.00
8 Seal tape bh 2,500.00
9 Floordrain bh 55,000.00
BATA HALAMAN / PAVING BLOCK
1 WARNA NATURAL / ABU-ABU
2 Tipe segi empat, uni, segi 6 tebal = 8 cm K 400 m2 55,000.00
3 Tipe uni dan segi empat tebal = 8 cm K 300 m2 50,400.00
4 Tipe segi empat tebal = 6 cm K 200 m2 38,250.00
5 Tipe segi empat tebal = 8 cm K 200 m2 46,700.00
6 Tipe segi enam tebal = 6 cm K 200 m2 38,100.00
7 Tipe segi enam tebal = 8 cm K 200 m2 46,700.00
8 Tipe uni / tikar tebal = 6 cm K200 m2 38,200.00
9 Tipe uni / tikar tebal = 8 cm K 200 m2 46,800.00
10 Tipe trihex / sarang lebah tebal = 6 cm K 200 m2 38,200.00
11 Tipe lampion tebal = 8 cm K 200 m2 46,800.00
12 Tipe beteng kecil tebal = 6 cm K 200 m2 38,200.00
13 Tipe beteng kecil tebal = 8 cm K 200 m2 46,700.00
14 Tipe kipas tebal = 8 cm K 200 m2 46,800.00
WARNA MERAH / HITAM
1 Tipe segi empat, uni, segi 8 tebal = 8 cm warna K 400 m2 61,700.00
2 Tipe uni dan segi empat tebal = 8 cm warna K 300 m2 56,700.00
3 Tipe segi empat tebal = 6 cm warna K 200 m2 43,500.00
4 Tipe segi empat tebal = 8 cm warna K 200 m2 52,000.00
5 Tipe segi enam tebal = 6 cm warna K 200 m2 43,500.00
6 Tipe segi enam tebal = 8 cm warna K 200 m2 52,000.00
7 Tipe uni / tikar tebal = 6 cm warna K200 m2 43,500.00
8 Tipe uni / tikar tebal = 8 cm warna K 200 m2 52,000.00
9 Tipe trihex / sarang lebah tebal = 6 cm warna K 200 m2 43,500.00
10 Tipe lampion tebal = 8 cm warna K 200 m2 52,000.00
11 Tipe beteng kecil tebal = 6 cm warna K 200 m2 43,500.00
12 Tipe beteng kecil tebal = 8 cm warna K 200 m2 52,000.00
13 Tipe kipas tebal = 8 cm warna K 200 m2 52,000.00
14 Tipe grass blok bulat tebal = 10 cm m2 41,400.00
15 Tipe grass blok tebal = 10 cm m2 41,400.00
ASBES
1 Asbes plat ( 100 x 100 x 0,3 ) lbr 10,000.00
2 Asbes plat ( 200 x 100 x 0,3 ) lbr 19,000.00
3 Asbes plat ( 100 x 100 x 0,6 ) lbr 17,500.00
4 Asbes plat ( 100 x 100 x 0,5 ) lbr 15,000.00
5 Asbes plat ( 100 x 100 x 0,4 ) lbr 12,500.00
6 Asbes plat ( 100 x 100 x 0,35 ) lbr 11,000.00
7 Asbes plat ( 100 x 100 x 0,32 ) lbr 10,000.00
8 Asbes gelombang besar ( 300 x 110 x 0,5 ) lbr 90,275.00
9 Asbes gelombang besar ( 200 x 110 x 0,5 ) lbr 74,900.00
10 Asbes gelombang besar ( 180 x 110 x 0,5 ) lbr 57,354.00
11 Asbes gelombang besar ( 150 x 110 x 0,5 ) lbr 45,650.00
12 Asbes gelombang besar ( 300 x 92 x 0,5 ) lbr 75,495.00
13 Asbes gelombang besar ( 250 x 92 x 0,5 ) lbr 62,960.00
14 Asbes gelombang besar ( 225 x 92 x 0,5 ) lbr 56,620.00
15 Asbes gelombang besar ( 200 x 92 x 0,5 ) lbr 50,330.00
16 Asbes gelombang besar ( 180 x 92 x 0,5 ) lbr 45,290.00
17 Asbes gelombang besar ( 300 x 108 x 0,6 ) lbr 112,830.00
18 Asbes gelombang besar ( 270 x 108 x 0,6 ) lbr 101,500.00
19 Asbes gelombang besar ( 240 x 108 x 0,6 ) lbr 90,265.00
20 Asbes gelombang besar ( 210 x 108 x 0,6 ) lbr 78,980.00
21 Asbes gelombang besar ( 180 x 108 x 0,6 ) lbr 67,690.00
22 Asbes gelombang kecil ( 300 x 105 x 0,4 ) lbr 71,350.00
23 Asbes gelombang kecil ( 270 x 105 x 0,4 ) lbr 69,250.00
24 Asbes gelombang kecil ( 210 x 105 x 0,4 ) lbr 57,500.00
25 Asbes gelombang kecil ( 180 x 105 x 0,4 ) lbr 42,850.00
26 Asbes gelombang kecil ( 150 x 105 x 0,4 ) lbr 35,950.00
27 Asbes gelombang kecil ( 240 x 105 x 0,4 ) lbr 61,000.00
28 Asbes nok gelombang besar lbr 29,000.00
29 Asbes nok gelombang kecil lbr 23,000.00
30 Nok paten lbr 50,000.00
31 Nok stel rata lbr 25,000.00
GENTENG & KERAMIK
1 Genteng beton besar natural 1m 9 biji bh 2,750.00
2 Genteng beton besar warna 1m 9 biji bh 4,420.00
3 Genteng beton kecil natural 1m 11 biji bh 2,350.00
4 Genteng beton kecil warna 1m 11 biji bh 3,950.00

Bahan - 3
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

5 Genteng beton kecil natural 1m 20 biji bh 2,000.00


6 Genteng beton kecil warna 1m 20 biji bh 2,640.00
7 Genteng bubungan beton bh 2,460.00
8 Genteng Wuwung warna bh 4,260.00
9 Nok press beton bh 37,000.00
GENTENG & NOK
1 Genteng keramik lengkung cekung / vlaams bh 600.00
2 Genteng keramik lengkung rata bh 450.00
3 Genteng keramik rata / kodok bh 1,500.00
4 Genteng keramik berglasir KIA, Kanmuri Natural bh 4,500.00
5 Genteng monier bh 2,000.00
6 Genteng paris bh 600.00
7 Nok genteng vlaams tanah liat bh 4,000.00
8 Nok genteng kodok bh 3,000.00
9 Nok genteng kodok berglasir bh 6,050.00
10 Nok genteng vlaams berglasir bh 6,050.00
11 Nok genteng paris bh 1,650.00
12 Nok genteng keramik berglasir KIA, Kanmuri Natural bh 13,500.00
ATAP GENTENG METAL
1 Genteng metal Zinc Alume type Prima Roof m2 95,400.00
2 Genteng metal Zinc Alume type Prima Colour m2 77,760.00
3 Genteng metal Zinc Alume type Super Colour m2 54,000.00
4 Atap metal gelombang t 0,35 mm m2 60,000.00
5 Nok atas (U) type Prima Roof ( 110 x 5 x 6 ) cm bh 35,000.00
6 Nok atas (U) type Prima Colour ( 110 x 5 x 6 ) cm bh 25,000.00
7 Nok atas (U) type Super Colour ( 110 x 5 x 6 ) cm bh 22,000.00
8 Nok atas bulat (C) type Prima Roof, P = 40 cm bh 25,000.00
9 Nok atas bulat (C) type Prima Colour, P = 40 cm bh 20,000.00
10 Nok atlas bulat (C) type Super Colour, P = 40 cm bh 20,000.00
11 Nok pinggir (P) type Prima Roof ( 110 x 7 x 10 ) cm bh 40,000.00
12 Nok pinggir (P) type Prima Colour ( 110 x 7 x 10 ) cm bh 38,000.00
13 Nok pinggir (P) type Super Colour ( 110 x 7 x 10 ) cm bh 28,000.00
14 Wall Flashing type Prima Roof, P = 110 cm, L = 10 cm bh 38,000.00
15 Wall Flashing type Prima Colour, P = 110 cm, L = 10 cm bh 32,000.00
16 Wall Flashing type Super Colour, P = 110 cm, L = 10 cm bh 27,000.00
17 Paku anti karat kg 20,000.00
18 Atap polykarbonat m2 225,000.00
19 Paku skrup anti karat atap metal/polykarbonat bh 1,200.00
KERAMIK BERMOTIF
1 Tegel keramik Roman Bella (25 x 25) dos 47,500.00
2 Tegel keramik Roman Bella (10 x 25) dos 38,000.00
3 Tegel keramik Roman Alice (20 x 20) dos 38,500.00
4 Tegel keramik Roman Latanza (20 x 25) dos 38,000.00
5 Tegel keramik Roman Latanza (8 x 20) bj 20,000.00
6 Tegel keramik Roman Tulip (20 x 25) dos 37,500.00
7 Tegel keramik Roman Tulip (8 x 20) bj 14,000.00
8 Tegel keramik Roman Milano (20 x 25) dos 38,000.00
9 Tegel keramik Roman Milano (8 x 20) bj 20,000.00
ISOLATOR
1 Isolator keramik bentuk rol bh 6,600.00
2 Isolator keramik bentuk T - I bh 1,650.00
3 Isolator keramik bentuk sungkup bh 1,650.00
TEGEL / KERAMIK
1 Tegel teraso 30/30 m2 32,000.00
2 Tegel abu-abu 20/20 m2 20,000.00
3 Tegel warna 20/20 m2 26,000.00
4 Tegel abu-abu 30/30 m2 28,000.00
5 Plint tegel abu-abu 15/20 bh 525.00
6 Tegel warna 20/20 m2 26,000.00
7 Tegel warna 30/30 m2 37,600.00
8 Plint tegel abu-abu 10/20 bh 350.00
9 Plint tegel abu-abu 10/30 bh 750.00
10 Plint tegel warna 10/20 bh 400.00
11 Plint tegel warna 10/30 bh 825.00
12 Tegel porselin 11/11 m2 40,500.00
13 Tegel keramik 10/20 berglasir m2 30,000.00
14 Tegel keramik 20/20 berglasir m2 32,000.00
15 Tegel keramik 30/30 berglasir m2 32,500.00
16 Tegel keramik 40/40 berglasir m2 40,000.00
17 Tegel keramik standar ( MULIA) 20/20 dan 30/30 m2 42,500.00
18 Tegel keramik mosaik m2 52,500.00
19 Stepnosing granito bh 9,350.00
20 List keramik dinding motif 5/20 bh 5,000.00
21 Plint keramik 10 x 30 bh 1,500.00
22 Keramik dinding 20/25 m2 37,500.00
KERB TAMAN
1 Devider Mutiara m 66,000.00
2 Devider /kans teen tebal 30 Mutiara m 22,000.00
3 Devider /kans teen tebal 25 Mutiara m 18,800.00
4 Devider /kans teen tebal 20 Mutiara bh 15,300.00
5 Devider /kans teen tebal 15 Mutiara bh 11,250.00
6 Ramp ( terpasang ) bh 26,000.00

Bahan - 4
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

7 Devider terpasang bh 30,000.00


8 Kerb terpasang bh 28,000.00
KAYU
1 KAYU JATI
2 Kayu jati balok 8/12 ( klas plitur ) m3 20,000,000
3 Kayu jati papan m3 22,000,000
4 Balok kayu kelas I ukuran 8/12 m1 192,000.00
5 Balok kayu kelas I ukuran 8/10 m1 160,000.00
6 Balok kayu kelas I ukuran 6/12 m1 144,000.00
7 Balok kayu kelas I ukuran 6/10 m1 120,000.00
8 Balok kayu kelas I ukuran 6/8 m1 96,000.00
9 Bingkai kayu kelas I ukuran 5/7 m1 70,000.00
10 Bingkai kayu kelas I ukuran 4/6 m1 48,000.00
11 Bingkai kayu kelas I ukuran 3/4, 3/5 m1 24,000.00
12 Bingkai kayu kelas I ukuran 2/3 m1 12,000.00
13 Papan kayu kelas I ukuran 3/20 m1 132,000.00
14 Papan kayu kelas I ukuran 3/18 m1 118,800.00
15 Papan kayu kelas I ukuran 2/25 m1 110,000.00
16 Papan kayu kelas I ukuran 2/20 m1 88,000.00
17 Papan kayu kelas I ukuran 2/15 m1 66,000.00
18 Lis Dan jalusi kayu kelas I ukuran 2/6 m1 24,000.00
19 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 16,000.00
20 Lis Dan jalusi kayu kelas I ukuran 1/5 m1 10,000.00
21 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 6,000.00
22 Kayu jati balok 8/12 (lokal) m3 8,000,000
23 Kayu jati papan (lokal) m3 8,200,000
24 Kaui jati lokal ukuran 5/7 m1 28,000.00
25 Kayu jati lokal ukuran 2/3 m1 4,800.00
26 Kayu jati lokal ukuran 3/4 m1 9,600.00
KAYU KAMPER
1 Kayu kamper balok m3 4,750,000
2 Kayu kamper papan m3 5,500,000
3 Balok kayu kelas I ukuran 8/12 m1 45,600.00
4 Balok kayu kelas I ukuran 8/10 m1 38,000.00
5 Balok kayu kelas I ukuran 6/12 m1 34,200.00
6 Balok kayu kelas I ukuran 6/10 m1 28,500.00
7 Balok kayu kelas I ukuran 6/8 m1 22,800.00
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 16,625.00
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1 11,400.00
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 5,700.00
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1 2,850.00
12 Papan kayu kelas I ukuran 2/15 m1 16,500.00
13 Papan kayu kelas I ukuran 2/20 m1 22,000.00
14 Papan kayu kelas I ukuran 2/25 m1 27,500.00
15 Papan kayu kelas I ukuran 3/18 m1 29,700.00
16 Papan kayu kelas I ukuran 3/20 m1 33,000.00
17 Papan kayu kelas I ukuran 3/30 m1 49,500.00
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 1,425.00
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1 2,375.00
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 2,850.00
KAYU BENGKIRAI
1 Kayu bengkirai balok m3 5,750,000
2 Kayu bengkirai papan m3 6,000,000
3 Balok kayu kelas I ukuran 8/12 m1 55,200.00
4 Balok kayu kelas I ukuran 8/10 m1 46,000.00
5 Balok kayu kelas I ukuran 6/12 m1 41,400.00
6 Balok kayu kelas I ukuran 6/10 m1 34,500.00
7 Balok kayu kelas I ukuran 6/8 m1 27,600.00
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 20,125.00
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1 13,800.00
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 6,900.00
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1 3,450.00
12 Papan kayu kelas I ukuran 2/15 m1 18,000.00
13 Papan kayu kelas I ukuran 2/20 m1 24,000.00
14 Papan kayu kelas I ukuran 2/25 m1 30,000.00
15 Papan kayu kelas I ukuran 3/18 m1 32,400.00
16 Papan kayu kelas I ukuran 3/20 m1 36,000.00
17 Papan kayu kelas I ukuran 3/30 m1 54,000.00
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 1,725.00
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1 2,875.00
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 4,600.00
KAYU KRUING
1 Kayu kruing balok m3 4,350,000
2 Kayu kruing papan m3 4,750,000
3 Balok kayu kelas I ukuran 8/12 m1 41,760.00
4 Balok kayu kelas I ukuran 8/10 m1 34,800.00
5 Balok kayu kelas I ukuran 6/12 m1 31,320.00
6 Balok kayu kelas I ukuran 6/10 m1 26,100.00
7 Balok kayu kelas I ukuran 6/8 m1 20,880.00
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1 15,225.00
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1 10,440.00
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1 5,220.00

Bahan - 5
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1 2,610.00


12 Papan kayu kelas I ukuran 2/15 m1 14,250.00
13 Papan kayu kelas I ukuran 2/20 m1 19,000.00
14 Papan kayu kelas I ukuran 2/25 m1 23,750.00
15 Papan kayu kelas I ukuran 2/30 m1 28,500.00
16 Papan kayu kelas I ukuran 3/18 m1 25,650.00
17 Papan kayu kelas I ukuran 3/20 m1 28,500.00
18 Papan kayu kelas I ukuran 3/25 m1 35,625.00
19 Papan kayu kelas I ukuran 3/30 m1 42,750.00
20 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 1,305.00
21 Lis Dan jalusi kayu kelas I ukuran 1/5 m1 2,175.00
22 Lis Dan jalusi kayu kelas I ukuran 2/4 m1 3,480.00
LIST KAYU PROFIL
1 List kayu profil m1 5,500.00
2 Kayu plepet eternit 1/5 cm m1 2,000.00
KAYU GLUGU, DOLKEN DAN BEGESTENG
1 Kayu glugu balok m3 1,458,000.00
2 Kayu glugu ukuran 5/7 m1 6,300.00
3 Kayu meranti m3 1,678,000.00
4 Papan cetakan / begesteng m3 1,000,000.00
5 Kayu dolken m3 1,000,000.00
6 Kayu dolken 8 - 10/400 cm btg 10,000.00
7 Kayu bakar m3 90,000.00
KAYU LAPIS
1 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr 31,900.00
2 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr 41,250.00
3 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr 90,000.00
4 Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr 101,750.00
5 Akustik soft board 60 x 120 lbr 125,000.00
6 Akustik soft board 40 x 60 lbr 73,000.00
7 Akustik soft board 30 x 60 lbr 55,000.00
8 Melamin wood 90 x 120 cm lbr 50,000.00
9 Melamin wood 120 x 240 cm lbr 65,000.00
10 Formika 4" x 8" x 0,3 cm lbr 65,000.00
11 Teak wood ( 90 x 240 ) lbr 69,500.00
BAHAN TUMBUHAN
1 Bambu petung btg 48,500.00
2 Bambu wulung btg 9,500.00
3 Bambu apus btg 7,000.00
4 Gedek bambu kulit m2 65,000.00
5 Gedek bambu daging m2 27,000.00
6 Ijuk m3 75,000.00
7 Ijuk kg 9,000.00
8 Alang-alang ikat 500.00
LISTRIK
1 Tusuk kontak 2 kutup tanpa pembumian/arde buah 3,900.00
2 Tusuk kontak 2 kutup dengan pembumian/arde buah 6,500.00
3 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 6,175.00
4 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 6,500.00
5 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 7,800.00
6 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 12,000.00
7 Fitting duduk buah 5,000.00
8 Pasang instalasi / titik titik 85,000.00
9 Lampu pijar 5 watt "Phillips" buah 2,275.00
10 Lampu pijar 10 watt "Phillips" buah 3,705.00
11 Lampu pijar 25 watt/ 40 watt "Phillips" buah 3,900.00
12 Lampu pijar 60 watt / 75 watt "Phillips" buah 4,550.00
13 Lampu pijar 100 watt "Phillips" buah 5,200.00
14 Lampu softone 100 watt "Phillips" buah 6,500.00
15 Lampu pijar 150 watt "Phillips" buah 10,400.00
16 Lampu pijar 200 watt "Phillips" buah 11,700.00
17 Lampu TL 10 watt "Phillips" buah 7,150.00
18 Lampu TL 15 watt "Phillips" buah 7,500.00
19 Lampu TL 18 watt "Phillips" buah 11,050.00
20 Lampu TL 36 watt "Phillips" buah 13,650.00
21 Lampu SLE 11 watt "Phillips" buah 71,500.00
22 Lampu SLE 15 watt "Phillips" buah 71,500.00
23 Lampu SLE 20 watt "Phillips" buah 74,750.00
24 Lampu Slang 2 jalur (sekualitas sinyoku) roll 2,400,000.00
25 Lampu Slang 3 jalur (sekualitas sinyoku) roll 2,795,000.00
26 Lampu Rice Light isi 100 "Phillips" pcs 60,000.00
27 Lampu Rice Light isi 140 "Phillips" pcs 72,000.00
28 Lampu Capsul isi 100 "Phillips" pcs 210,000.00
29 Lampu Capsul isi 140 "Phillips" pcs 222,000.00
30 Lampu Anggur isi 100 "Phillips" pcs 65,000.00
31 Lampu Anggur isi 140 "Phillips" pcs 78,000.00
32 Lampu Natal isi 50 "Phillips" pcs 23,000.00
33 Lampu Natal isi 100 "Phillips" pcs 103,500.00
34 Lampu Jenis H.PIT 400 watt "Phillips" buah 1,023,750.00
35 Lampu Jenis H.PIT 250 watt "Phillips" buah 700,000.00
36 Bolam Mercury 80 watt "Phillips" buah 45,500.00
37 Bolam Mercury 125 watt "Phillips" buah 96,000.00

Bahan - 6
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

38 Bolam Mercury 250 watt "Phillips" buah 97,500.00


39 Bolam Mercury 400 watt "Phillips" buah 123,500.00
40 Bolam Natrium 250 watt "Phillips" buah 208,000.00
41 Bolam Natrium 400 watt "Phillips" buah 221,000.00
42 Bolam SON 250 watt buah 227,500.00
43 Bolam SON 150 watt buah 215,800.00
44 Bolam SON 70 watt buah 137,150.00
45 Bolam SON-T 250 watt buah 241,000.00
46 Bolam SON-T 150 watt buah 155,000.00
47 Bolam SON-T 70 watt buah 96,000.00
48 Bolam Halogin 500 watt buah 39,000.00
49 Bolam Halogin 1000 watt buah 65,000.00
50 Bolam HPIT 150 watt buah 260,000.00
51 Bolam HPIT 250 watt buah 292,500.00
52 Bolam HPIT 400 watt buah 296,500.00
53 Bolam Metal Halide 70 watt buah 149,500.00
54 Bolam Metal Halide 100 watt buah 188,548.00
55 Bolam Metal Halide 150 watt buah 156,000.00
56 Bolam Metal Halide 250 watt buah 344,500.00
57 Photo Cell 3 Ampere buah 65,000.00
58 Photo Cell 6 Ampere buah 78,000.00
59 Photo Cell 10 Ampere buah 104,000.00
60 Starter TL 20/40 watt buah 4,550.00
61 Travo TL 10 watt buah 24,050.00
62 Travo TL 20 watt buah 26,000.00
63 Travo TL 40 watt buah 29,250.00
64 Balast Mercury 80 watt buah 96,000.00
65 Balast Mercury 125 watt buah 104,000.00
66 Balast Mercury 250 watt buah 162,500.00
67 Balast Mercury 400 watt buah 195,000.00
68 Balast Natrium 250 watt buah 162,500.00
69 Balast Natrium 400 watt buah 150,000.00
70 Balast SON 250 watt buah 221,000.00
71 Balast SON 150 watt buah 172,500.00
72 Balast SON 70 watt buah 127,000.00
73 Balast Metal Halide 70 watt buah 131,000.00
74 Balast Metal Halide 100 watt buah 256,939.00
75 Balast Metal Halide 150 watt buah 180,000.00
76 Magnetik Kontaktor SK-12 Kw 1 (SN-12) buah 210,000.00
77 Magnetik Kontaktor SK-12 Kw 2 buah 48,000.00
78 Magnetik Kontaktor SK-20 Kw 1 (SN-20) buah 240,000.00
79 Magnetik Kontaktor SK-20 Kw 2 buah 66,000.00
80 Fitting Goliath E.27 Gantung buah 19,500.00
81 Fitting Goliath E.40 Gantung buah 26,000.00
82 Fitting WD E.27 Tegak buah 4,550.00
83 Fitting WD E.40 Tegak buah 16,250.00
84 Fitting Kecil Lampu 2,5 Watt buah 325.00
85 Fitting Plastik Hitam buah 1,300.00
86 Fitting Gantung plastik gantung buah 1,000.00
87 Kap Alumunium E.27 buah 19,500.00
88 Kap Alumunium E.40 buah 19,500.00
89 Kabel Snoor 2 x 0,23 "Supreme" roll 72,000.00
90 Kabel NYA 2,5 sqmm "Supreme" roll 150,000.00
91 Kabel NYA 1,5 sqmm "Supreme" roll 95,000.00
92 Kabel NYA 2,5 sqmm "Supreme" m' 2,475.00
93 Kabel NYA 1,5 sqmm "Supreme" m' 1,650.00
94 Kabel NYM 2 x 1,5 sqmm "Supreme" m1 7,216.00
95 Kabel NYM 2 x 2,5 sqmm "Supreme" m1 10,633.00
96 Kabel NYM 2 x 4 sqmm "Supreme" m1 14,256.00
97 Kabel NYM 3 x 1,5 sqmm "Supreme" m1 9,257.00
98 Kabel NYM 3 x 2,5 sqmm "Supreme" m1 13,200.00
99 Kabel NYM 3 x 4 sqmm "Supreme" m1 19,096.00
100 Kabel NYY 3 x 6 sqmm "Supreme" m1 30,553.00
101 Kabel NYY 3 x 1,5 sqmm "Supreme" m1 12,584.00
102 Kabel NYY 3 x 2,5 sqmm "Supreme" m1 16,896.00
103 Kabel NYY 3 x 4 sqmm "Supreme" m1 23,056.00
104 Kabel NYY 3 x 6 sqmm "Supreme" m1 30,553.00
105 Kabel NYY 3 x 10 sqmm "Supreme" m1 45,408.00
106 Kabel NYY 4 x 10 sqmm "Supreme" m1 61,600.00
107 Kabel NYFGBY 3 x 10 sqmm "Supreme" m1 88,000.00
108 Kabel DX 2 x 10 sqmm "Supreme" m1 5,500.00
109 Kabel DX 2 x 16 sqmm "Supreme" m1 6,600.00
110 Kabel DX 2 x 25 sqmm "Supreme" m1 16,500.00
111 Kabel Ties 15 cm "Supreme" m1 11,050.00
112 Kabel Tis 10 cm "Supreme" m1 6,500.00
113 Ignitor 150 watt - 250 watt buah 45,000.00
114 Ignitor Metal Halide 70 watt buah 68,250.00
115 Ignitor Metal Halide 100 watt buah 50,000.00
116 Ignitor Metal Halide 150 watt buah 73,710.00
117 Firework lamp (DC-001) 8 meter Pcs 17,192,500.00
118 Firework lamp (DC-001) 6 meter Pcs 15,323,750.00
119 NT Fuse kaki besar buah 140,400.00

Bahan - 7
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

120 NT Fuse kaki kecil buah 52,000.00


121 Flassther Lampu Hias Buterfly buah 3,071,250.00
122 Flassther Lampu Hias Kembang Api Besar buah 3,071,250.00
123 Flassther Lampu Hias Kembang Api Kecil buah 3,071,250.00
124 Flassther Lampu Hias Kipas buah 3,071,250.00
125 Skaklar seri OB "Broco" buah 17,550.00
126 Skaklar seri IB "Broco" buah 17,550.00
127 Skaklar engkel OB "Broco" buah 13,000.00
128 Skaklar engkel IB "Broco" buah 13,000.00
129 Stop kontak IB "Broco" buah 13,650.00
130 Stop kontak OB "Broco" buah 13,650.00
131 Kapasitor 25 F buah 52,000.00
132 Kapasitor 20 F buah 48,750.00
133 Kapasitor 12,5 uF buah 26,000.00
134 Kapasitor 8 mF buah 22,750.00
135 Kapasitor Metal Halide 70 watt buah 61,450.00
136 Kapasitor Metal Halide 100 watt buah 115,842.00
137 Kapasitor Metal Halide 150 watt buah 71,650.00
138 MCB 25 Ampere / 16 Ampere "MG" buah 36,000.00
139 MCB 40 Ampere "MG" buah 57,330.00
140 MCB 63 Ampere "MG" buah 108,000.00
141 MCB 10 Ampere + box "MG" buah 42,000.00
142 MCB 6 Ampere "MG" buah 42,000.00
143 Cover MCB "MG" buah 5,200.00
144 Box Kwh Meter 25 x 35 x 20 buah 448,500.00
145 Box panel 30 x 40 x 20 buah 169,000.00
146 Box 25 x 25 x 20 buah 97,500.00
147 Box 20 x 40 x 50 buah 312,000.00
148 UZ 25 buah 6,500.00
149 UZ 63 buah 19,500.00
150 Armatur IP 65 Komplit (sekualitas SRP 822 SON 150 watt) unit 2,834,000.00
151 Armatur IP 65 Komplit (sekualitas SRP 822 SON 250 watt) unit 2,954,000.00
152 Armatur IP 65 Komplit (sekualitas SRP 328 SON 150 watt) unit 3,315,000.00
153 Armatur IP 65 Komplit (sekualitas SRP 328 SON 250 watt) unit 3,445,000.00
154 Armatur IP 65 Komplit (sekualitas SRP 810 SON 70 watt) unit 2,275,000.00
155 Armatur Ekorola Komplit / TLD 18 watt unit 471,900.00
156 Armatur Simbat 40 watt unit 70,200.00
157 Armatur HPIT 100 watt (DVP 311) unit 4,231,500.00
158 Armatur Kota Sorot (Kosong) unit 1,495,000.00
159 Timer Switch TB 388 buah 540,000.00
160 Timer Theben (pakai baterai) buah 660,000.00
161 Timer Heger (pakai baterai) buah 513,000.00
162 Timer Delay H3-BA (omron) buah 110,500.00
163 Timer Delay H3-CR-8 (omron) buah 175,500.00
164 Timer Digital Theben buah 1,033,500.00
165 Tiang Galvanit cb,1, h=9m, base plate unit 3,783,000.00
166 Tiang Galvanit cb,2, h=9m, base plate unit 3,055,500.00
167 Tiang Galvanit cb,2, h=6m, base plate unit 2,665,000.00
168 Tiang Galvanit cb,1, h=7m, base plate unit 2,783,000.00
169 Tiang Galvanit cb,1, h=5m, type tanam dia 2" unit 812,500.00
170 Tiang lampu Highment cb 4, h=20m, hidrolik unit 140,692,000.00
171 Tiang lampu Highment cb 2, h=20m, hidrolik unit 140,692,000.00
172 Tiang GIP cb 1. 2", 3", 4", 5", h = 9m, tanam unit 2,535,000.00
173 Tiang GIP cb 1. 2", 3", 4", h = 7m, tanam unit 2,275,000.00
174 Tiang GIP cb 1. 3", 4", 5", h = 9m, tanam unit 2,340,000.00
175 Slang Ornamenr GIP dia 1", L = 3m unit 162,825.00
176 Slang Ornamenr GIP dia 2", L = 2m unit 193,050.00
177 Slang Ornamenr GIP dia 2", L = 3m unit 210,600.00
178 Slang Ornamenr GIP dia 2", L = 4m unit 222,300.00
179 Slang Ornamenr GIP dia 2", L = 6m unit 305,500.00
180 Pilot Lamp buah 6,850.00
181 Seplendiel lamp (DC-002) Pcs 17,267,000.00
182 Windmill lamp (DC-003) Pcs 16,875,000.00
183 Cottonrose lamp (DC-004) Pcs 16,875,000.00
184 Lucky lamp (DC-005) Pcs 12,950,000.00
185 Fountain lamp Ball (DC-005) Pcs 14,284,000.00
186 Star Flower lamp (DC-007) Pcs 16,090,000.00
187 Chritmas lamp (DC-009) Pcs 14,127,000.00
188 Butterfly lamp (DC-009) Pcs 18,052,000.00
189 No. 1 lamp (DC-010) Pcs 16,482,000.00
190 Hepta lamp (DC-011) Pcs 16,089,000.00
191 Dragon Phonix lamp (DC-013) Pcs 16,089,000.00
192 Fountain lamp (DC-014) Pcs 16,089,000.00
193 Redbud Flower lamp (DC-015) Pcs 16,089,000.00
194 Dragon Flying lamp (DC-016) Pcs 14,520,000.00
195 Floor lamp (DC-017) Pcs 10,988,000.00
196 Octopus lamp (DC-018) Pcs 16,089,000.00
197 Double Plied Fountain lamp (DC-019) Pcs 16,877,000.00
198 Flower Pot lamp (DC-020) Pcs 17,267,000.00
199 Patron Sekering buah 2,050.00
200 Kop sekering buah 3,450.00
201 Isolasi besar buah 6,825.00

Bahan - 8
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

202 Spot + F.MP buah 75,075.00


203 Sabuk Pengaman buah 2,730,000.00
204 Tang Kombinasi buah 34,125.00
205 Obeng +/- buah 23,750.00
206 GZ 30 A buah 40,950.00
207 Multitester buah 116,000.00
208 Sekering buah 2,100.00
209 Bandet buah 4,750.00
210 Wadge Type buah 4,750.00
211 Servis link dan clem buah 4,750.00
212 Stenlist stell 20 x 0,70 roll 614,000.00
213 Stopyng bukie buah 2,100.00
214 BC 6 mm buah 4,750.00
215 Ground Rood buah / batang 30,750.00
216 Terminal Nol buah 23,850.00
217 Mata lampu pijar 25 W -75 W buah 4,350.00
218 Stabilizer 300 A unit 2,934,000.00
219 Tutup panel 30 x 30 buah / ls 28,750.00
220 Pasang panel kontrol unit / ls 86,250.00
221 Penyambungan beban unit 17,250.00
222 Penyetelan dan penyalaan titik 7,000.00
223 Biaya angkutan jam 7,143.00
224 Alat bantu set 86,250.00
225 Retur material existing unit 100,000.00
BAHAN LOGAM BESI/BAJA TULANGAN/BESI BETON
BESI BETON
1 Besi beton polos kg 7,900.00
2 Besi beton ulir kg 8,000.00
3 Besi baja profil kg 8,800.00
4 Besi tuang / cor kg 8,200.00
5 Besi strip kg 7,500.00
6 Besi baja cor ( ring ) 150 kg unit 825,000.00
7 Besi baja cor ( ring ) 80 kg unit 440,000.00
8 Besi baja cor ( ring ) 40 kg unit 220,000.00
9 Besi penutup mahkota assainering unit 57,000.00
10 Besi penutup inlet cor/tuang ( ring + tutup) unit 85,000.00
KAWAT
1 Kawat beton / bindrat kg 9,400.00
2 Kawat ayakan m2 10,000.00
3 Kawat bronjong kg 30,250.00
4 Kawat nyamuk m2 8,250.00
5 Kawat las kg 6,500.00
6 Kawat galvanis kg 7,755.00
7 Kawat duri kg 9,500.00
8 Besi jaring kawat baja kg 9,500.00
9 Kawat seng polos kg 9,500.00
10 Kawat kassa m2 10,000.00
11 Kawat burung m2 15,000.00
12 Kawat jaring lbr 35,000.00
13 Kawat harmonika m2 25,000.00
14 Kawat penggantung rangka hollow m1 500.00
15 Profil Alumunium "T" m1 20,000.00
16 Ramset / dina bolt bh 2,500.00
17 Pipa galvanis dia. 1/2" m1 15,000.00
18 Pipa galvanis dia. 3/4" m1 25,000.00
19 Pipa galvanis dia. 1" m1 37,500.00
20 Pipa galvanis dia. 1 1/2" m1 50,000.00
21 Pipa galvanis dia. 3" m1 85,000.00
22 Pipa galvanis dia. 4" m1 90,000.00
23 Pipa hollow 4 x 4 cm tebal 1.2 mm m1 9,500.00
24 Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putih m1 55,000.00
25 Jendela nako bh 20,000.00
26 Pintu besi baja m2 750,000.00
27 Jendela besi baja m2 750,000.00
28 Jendela besi tahan api m2 1,500,000.00
29 Pintu gulung besi m2 250,000.00
30 Pintu lipat besi m2 500,000.00
31 Sunscreen alumunium m2 250,000.00
32 Roll door m2 200,000.00
33 Pintu alumunium m2 400,000.00
34 Vertikal blind m2 250,000.00
35 Wall paper m2 40,000.00
SENG BJLS
1 Seng BJLS 0,20 gelombang P = 180 cm lbr 38,500.00
2 Seng BJLS 0,20 gelombang P = 200 cm (merk Fumira) lbr 42,000.00
3 Seng BJLS 0,20 gelombang P = 240 cm lbr 60,000.00
4 Seng BJLS 0,20 gelombang P = 300 cm lbr 70,000.00
5 Seng BJLS 0,28 lembaran 40 cm lebar m1 12,500.00
6 Seng BJLS 0,28 lembaran 50 cm lebar m1 16,000.00
7 Seng BJLS 0,20 lembaran 90 cm lebar m1 25,000.00
8 Seng BJLS 0,30 lembaran 40 cm lebar m1 20,000.00
9 Seng BJLS 0,30 lembaran 50 cm lebar m1 18,000.00

Bahan - 9
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

10 Seng BJLS 0,30 lembaran 60 cm lebar m1 20,000.00


11 Seng BJLS 0,30 lembaran 90 cm lebar m1 28,000.00
12 Seng plat 3" x 6" BJLS 28 lbr 44,000.00
13 Seng plat 3" x 6" BJLS 24 lbr 38,500.00
14 Seng gelombang 2" - 5" BJLS 24 lbr 25,000.00
15 Alumunium gelombang tebal 0,55 m2 75,000.00
16 Alumunium foil m2 25,000.00
17 Nok alumunium standar 40 cm 18 SWG 22 m1 25,000.00
PAKU
1 Paku gording 125 x 5,1 mm kg 8,000.00
2 Paku gording 100 x 4,2 mm kg 8,000.00
3 Paku usuk 80 x 3,8 mm kg 8,000.00
4 Paku reng 55 x 3,1 mm kg 8,000.00
5 Paku plepet 40 x 2,1 mm kg 10,000.00
6 Paku eternit 20 x 1,5 mm kg 11,500.00
7 Angkur / baut bh 10,000.00
8 Paku kait bh 8,500.00
9 Paku pancing bh 500.00
10 Paku pancing kg 9,350.00
11 Paku asbes bh 400.00
12 Paku sumbat bh 400.00
13 Paku sekrup 3.5" bh 750.00
14 Paku skrup kg 10,000.00
15 Paku gypsum kg 20,000.00
16 Paku hak panjang 15 cm kg 9,500.00
PENGGANTUNG / PENGUNCI
1 Engsel pintu bh 11,000.00
2 Engsel jendela bh 7,500.00
3 Grendel bh 2,500.00
4 Hak angin bh 5,500.00
5 Selot pintu Union kecil bh 37,500.00
6 Selot pintu Union besar bh 47,500.00
7 Engsel angin bh 3,000.00
8 Kait angin bh 3,000.00
9 Door holder bh 15,000.00
10 Door stop bh 15,000.00
11 Penggantung + rel pintu dorong bh 200,000.00
12 Kunci tanam bh 35,000.00
13 Kunci tanam antik bh 250,000.00
14 Kunci tanam biasa bh 125,000.00
15 Kunci kamar mandi bh 50,000.00
16 Kunci selot bh 50,000.00
17 Kunci silinder bh 75,000.00
18 Kunci lemari bh 12,000.00
19 Spring knip bh 7,500.00
20 Door closer bh 150,000.00
ASPAL
1 Aspal curah kg 9,500.00
2 Aspal drum kg 10,650.00
3 Aspal modifer / asphalt joint kg 60,000.00
4 Drum aspal bekas bh 8,250.00
5 Rubber Filler m1 9,000.00
6 Mata Kucing bh 215,000.00
7 Filler kg 750.00
BATU ALAM / AGREGAT / BAHAN TUMBUHAN
BATU ALAM
1 Batu kali m3 130,000.00
2 Batu hias tempel m2 60,000.00
3 Batu hias bulat putih m3 147,500.00
4 Ubin marmer ( 40 x 40 x 2 ) Baitik/Citatah m2 100,000.00
5 Ubin marmer ( 40 x 60 x 2 ) Baitik m2 450,000.00
6 Ubin marmer ( 15 x 30 x 2 ) Baitik m2 150,000.00
AGREGAT
1 Agregat hakus/pasir klas A ( Uk. butir 5 mm ) m3 79,750.00
2 Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 ) m3 126,500.00
3 Agregat kasar/krikil/pasir klas B ( Uk. 4 - 19 ) m3 132,000.00
4 Batu pecah 2/3 ( split ) m3 138,000.00
5 Batu pecah 3/4 m3 130,000.00
6 Batu pecah 4/6 m3 126,500.00
7 Batu pecah 5/7 m3 132,000.00
8 Batu pecah 1/2 m3 190,000.00
9 Batu belah hitam m3 80,000.00
10 Batu belah putih m3 70,000.00
11 Sirtu Klas A lewat ayakan 1" m3 66,000.00
12 Sirtu klas B lewat ayakan 2" m3 66,000.00
13 Pasir urug darat m3 55,000.00
14 Pasir pasang ( progo ) m3 73,000.00
15 Pasir pasang ( krasak ) m3 76,000.00
16 Krikil beton m3 78,650.00
17 Kerikil tidak tersaring m3 55,000.00
18 Split D 30 - 40 mm m3 120,000.00
19 Split D 10 - 20 mm m3 120,000.00

Bahan - 10
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

20 Split D 1 - 2 cm m3 125,000.00
21 Batu merah ( 5x11x23 ) bj 350.00
22 Batu merah ( 4x9x19 ) bj 250.00
23 Krokos 0,2/0,4 m3 70,000.00
24 Tanah urug m3 35,000.00
25 Sirtu m3 66,000.00
26 Batako bh 1,500.00
27 Roster 25/25 bh 2,000.00
BAHAN PEREKAT HIDROLIS & ORGANIK
1 Portland Cement (PC) Gresik 50 kg 38,200.00
40 kg 31,000.00
2 Portland Cement (PC) Nusantara 50 kg 38,200.00
40 kg 31,000.00
3 Portland Cement (PC) Tiga Roda 40 kg 31,000.00
4 Semen putih 40 kg 52,500.00
5 Semen warna kg 6,000.00
6 Lem kayu (putih) Fox kg 11,000.00
7 Lem plastik Acrylic kg 60,000.00
8 Lem plastik Vinyl kg 19,500.00
9 Lem Aica Aibon kg 27,500.00
KAPUR & GIPS
1 Kapur pasang m3 72,500.00
2 Kapur sirih m3 138,000.00
3 Kapur sirih kg 500.00
4 Semen batu bata m3 80,000.00
5 Tepung Gypsum kg 3,500.00
6 Alkasit kg 300,000.00
7 Gypsum board lbr 42,000.00
8 Kasa gypsum roll 10,000.00
9 List profil gypsum lebar sampai 5 cm m1 4,000.00
10 List profil gypsum lebar sampai 6 - 10 cm m1 8,000.00
11 List profil gypsum lebar lebih 10 cm m1 15,000.00
12 Kalsiboard ( 122 x 244 x 0,35 ) cm lbr 46,200.00
13 Kalsiboard ( 122 x 244 x 0,60 ) cm lbr 60,500.00
BAHAN PELARUT, PELUMAS
1 Oli SAE 30 ltr 21,000.00
2 Minyak bakar / kerosene ltr 1,000.00
3 Bensin premium ltr 4,500.00
4 Solar ltr 4,300.00
5 Minyak pelumas ltr 14,000.00
6 Vet kg 13,000.00
7 Gas Elpiji kg 4,500.00
8 Minyak bekisting ltr 5,000.00
BAHAN KIMIA PEMBANTU UNTUK BETON
1 Bahan kimia B (kuat ikat cepat ) kg 35,000.00
2 Bahan kimia E (kuat ikat cepat ) kg 30,000.00
BAHAN PENGAWET DANBITUMEN
1 Teer kayu box 8,000.00
2 Residu ltr 3,500.00
3 Flincoat ltr 35,000.00
BAHAN KACA
1 Genteng kaca lengkung cekung 3 mm bh 5,500.00
2 Genteng kaca lengkung cekung 5 mm bh 7,000.00
3 Genteng kaca lengkung rata 3 mm bh 5,500.00
4 Genteng kaca lengkung rata 5 mm bh 6,850.00
5 Genteng kaca 3 mm bh 4,000.00
6 Genteng kaca 5 mm bh 6,850.00
7 Kaca buram/kaca es 3 mm m2 53,900.00
8 Kaca buram/kaca es 5 mm m2 66,000.00
9 Kaca bening 3 mm m2 49,500.00
10 Kaca bening 5 mm m2 60,500.00
11 Kaca riben 3 mm m2 57,500.00
12 Kaca riben 5 mm m2 70,000.00
13 Kaca cermin 3 mm m2 75,000.00
14 Kaca cermin 5 mm m2 120,000.00
15 Kaca patri m2 300,000.00
16 Fiber glass lbr 28,000.00
BAHAN PLASTIK
1 Pipa PVC abu-abu dia. 1/2" Wavin btg 12,650.00
2 Pipa PVC abu-abu dia. 3/4" Wavin btg 17,000.00
3 Pipa PVC abu-abu dia. 1" Wavin btg 20,500.00
4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg 45,000.00
5 Pipa PVC abu-abu dia. 2" Wavin btg 60,000.00
6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg 82,000.00
7 Pipa PVC abu-abu dia. 3" Wavin btg 82,000.00
8 Pipa PVC abu-abu dia. 4" Wavin btg 135,000.00
9 Pipa PVC putih dia. 1/2" Wavin btg 12,000.00
10 Pipa PVC putih dia. 3/4" Wavin btg 15,000.00
11 Pipa PVC putih dia. 1" Wavin btg 21,000.00
12 Pipa PVC putih medium dia. 3" Wavin btg 48,000.00
13 Pipa PVC putih tebal dia. 3" Wavin btg 80,000.00
14 Pipa PVC putih medium dia. 4" Wavin btg 135,000.00

Bahan - 11
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

15 Pipa PVC putih tebal dia. 4" Wavin btg 157,000.00


16 Atap plastik gelombang PVC lbr 67,500.00

TANAMAN HIAS / PERINDANG


TANAMAN PERINDANG
1 Angsana, tinggi +/- 2m dia 5 cm batang 75,000.00
2 Asem jawa, tinggi +/- 1,5 m dia 2 cm batang 20,000.00
3 Bauhmis (Orchid tree), tinggi +/- 2 m dia 2 cm batang 17,500.00
4 Beringin, tinggi +/- 1 m dia 2 cm putih batang 50,000.00
5 Beringin, tinggi +/- 2 m dia 3 cm putih batang 125,000.00
6 Biola cantik, tinggi +/- 3 m dia 5 cm batang 300,000.00
7 Biola cantik, tinggi +/- 1,5 m ia 3 cm batang 75,000.00
8 Filisium, tinggi +/- 1,5 m dia 2 cm batang 20,000.00
9 Gayam, tinggi +/- 1,5 m dia 2 cm batang 20,000.00
10 Gidogan Biasa, tinggi +/- 1 m dia 1,5 cm batang 20,000.00
11 Kenari, tinggi +/- 1,5 m dia 2 cm batang 16,000.00
12 Kepel, tinggi +/- 1,5 m dia 3 cm batang 40,000.00
13 Ketepang, tinggi +/- 1,5 m dia 2 cm batang 17,500.00
14 Mahoni, tinggi +/- 1,5 m dia 2 cm batang 25,000.00
15 Sawo Kecik, tinggi +/- 1,5 m dia 2 cm batang 17,500.00
16 Sentul, tinggi +/- 1,5 m dia 2 cm batang 20,000.00
17 Tanjung, tinggi +/- 1 m dia 2 cm batang 25,000.00
18 Tanjung, tinggi +/- 3 m dia 3 cm batang 75,000.00
19 Beringin , tinggi +/- 2-3 m batang 150,000.00
20 Beringin, tinggi +/- 3 m dia 4 cm batang 300,000.00
TANAMAN HIAS
RUMPUT
1 Rumput Gajah (tanam) m2 12,000.00
2 Rumput Gajah (gebalan) m2 15,000.00
3 Rumput Manila (gebalan) m2 10,000.00
4 Rumput golf m2 11,000.00
5 Rumput gebalan m2 5,000.00
PERDU
1 Bougenville, tinggi +/- 0, 5 m batang 40,000.00
2 Bougenville, tinggi +/- 0, 7 m batang 70,000.00
3 Bougenville, tinggi +/- 1, 0 m batang 100,000.00
4 Bougenville varigata, tinggi +/- 0, 8 m batang 150,000.00
5 Classia planisicua, tinggi +/- 0,5 m batang 15,000.00
6 Kembang Sepatu (Bangkok), tinggi +/- 0,2 m batang 10,000.00
7 Kembang Sepatu (lokal), tinggi +/- 0,4 m batang 5,000.00
8 Mawar, tinggi +/- 0,25 m batang 7,500.00
9 Palem botol, tinggi +/- 0,8 m kecil 15 cm rumpun 150,000.00
10 Palem kuning, tinggi +/- 0,6 m rumpun 12,500.00
11 Palem kuning, tinggi +/- 1 m rumpun 20,000.00
12 Palem kuning, tinggi +/- 1,5 - 2 m rumpun 125,000.00
13 Palem kuning, tinggi +/- 2 - 3 m rumpun 175,000.00
14 Palem merah, tinggi +/- 2 - 3 m rumpun 150,000.00
15 Palem wregu, tinggi +/- 0,6 m rumpun 15,000.00
16 Palem putri, tinggi +/- 1 m rumpun 75,000.00
17 Soka pagar, 0,3 m batang 5,000.00
18 Serut, tinggi +/- 1 - 1,5 m batang 450,000.00
19 Puring bangkok, tinggi +/- 0,6 m batang 12,500.00
20 Phonik, tinggi +/- 1 m batang 150,000.00
21 Batavia / Jatropa, tinggi +/- 0,5 m batang 15,000.00
22 Serut, tinggi +/- 1,5 m batang 750,000.00
POHON
1 Cemara kipas, tinggi +/- 0,5 m batang 20,000.00
2 Cemara kipas, tinggi +/- 1,5 m batang 75,000.00
3 Cemara lilin, tinggi +/- 1,5 m batang 40,000.00
4 Cemara rantes, tinggi +/- 1 m batang 40,000.00
5 Cemara udang, tinggi +/- 1 - 1,5 m batang 600,000.00
6 Cemara norvox, tinggi +/- 0,6 m batang 50,000.00
7 Cemara norvox, tinggi +/- 1,5 m batang 80,000.00
8 Cempokok mulyo, tinggi +/- 0,5 m batang 15,000.00
9 Cempokok mulyo, tinggi +/- 1 m batang 40,000.00
10 Ceplok Piring, tinggi +/- 0,5 m batang 7,500.00
11 Ceplok Piring, tinggi +/- 1 m batang 20,000.00
12 Glodogan Pecut, tinggi +/- 1 m batang 14,000.00
13 Glodogan Pecut, tinggi +/- 2 m batang 25,000.00
14 Kelapa gading, tinggi +/- 3 m batang 200,000.00
15 Nusa indah, tinggi +/- 0,5 m batang 10,000.00
16 Nusa indah, tinggi +/- 1 m batang 30,000.00
17 Palem ekor tupai, tinggi +/- 1 m batang 75,000.00
18 Palem ekor tupai, tinggi +/- 2 m batang 150,000.00
19 Palem jepang, tinggi +/- 1 m rumpun 50,000.00
20 Palem jepang, tinggi +/- 2 m rumpun 100,000.00
21 Palem raja, tinggi +/- 4 m batang 150,000.00
22 Palem raja, tinggi +/- 6 m batang 250,000.00
23 Palem raja, tinggi +/- 7 m batang 1,500,000.00
SEMAK
1 Alamanda, tinggi +/- 0,2 m rumpun 5,000.00
2 Canna holland, tinggi +/- 0,3 m rumpun 15,000.00

Bahan - 12
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

3 Canna lokal, tinggi +/- 0,5 m rumpun 7,500.00


4 Cendrawasih, tinggi +/- 0,2 m batang 5,000.00
5 Cantik manis, tinggi +/- 0,2 m batang 3,000.00
6 Dieffenbachia, tinggi +/- 0,2 m batang 10,000.00
7 Dieffenbachia, tinggi +/- 0,5 m batang 20,000.00
8 Hanjuang, tinggi +/- 0,3 m batang 3,000.00
9 Helogenia, tinggi +/- 0,4 m rumpun 4,000.00
10 Kayu besi, tinggi +/- 0,5 m batang 7,500.00
11 Kuping gajah, tinggi +/- 0,3 m rumpun 7,500.00
12 Lantana, tinggi +/- 0,2 m rumpun 4,000.00
13 Lantana, tinggi +/- 0,3 m rumpun 5,000.00
14 Yuliana rumpun 5,000.00
15 Iler rumpun 5,000.00
16 Yuca, tinggi +/- 0,4 m batang 30,000.00
17 Yuca, tinggi +/- 0,75 m batang 70,000.00
18 Melati, tinggi +/- 0,2 m batang 10,000.00
19 Phylodendron, tinggi +/- 0,4 m rumpun 7,500.00
20 Phylodendron, tinggi +/- 0,7 m rumpun 15,000.00
21 Sansiswa rumpun 7,500.00
22 Sirig gading, tinggi +/- 0,3 m rumpun 3,000.00
23 Soka bangkok, tinggi +/- 0,2 m batang 7,500.00
24 Soka jepang, tinggi +/- 0,2 m batang 3,000.00
25 Stevanut, tinggi +/- 0,3 m batang 12,500.00
26 Taiwan beauty, tinggi +/- 0,2 m rumpun 3,000.00
27 Teh-tehan hijau bulat, tinggi +/- 0,3 m batang 5,000.00
28 Teh-tehan hijau bulat, tinggi +/- 0,5 m batang 20,000.00
29 Teh-tehan hijau bulat (pagar), tinggi +/- 0,4 m batang 3,000.00
30 Teh-tehan hijau bulat (pagar), tinggi +/- 0,3 m batang 1,000.00
31 Teh-tehan kuning, tinggi +/- 0,2 m batang 500.00
32 Teh-tehan kuning bulat, tinggi +/- 0,3 m batang 5,000.00
33 Tri colour, tinggi +/- 0,3 m batang 12,500.00
34 Dracaena, tinggi +/- 0,8 m rumpun 15,000.00
35 Bambu pangkas, tinggi +/- 0,2 m batang 12,000.00
36 Patah tulang, tinggi +/- 0,3 m rumpun 3,000.00
37 Kuncira, tinggi +/- 0,3 m rumpun 3,000.00
38 Varent, tinggi +/- 0,3 m rumpun 4,000.00
39 Anthurium tinggi +/- 0,3 m rumpun 20,000.00
40 Bakung tinggi +/- 0,3 m rumpun 4,000.00
41 Nanas merah tinggi +/- 0,2 m rumpun 25,000.00
42 Nanas kuning tinggi +/- 0,2 m rumpun 15,000.00
43 Krisdoren tinggi +/- 0,2 m rumpun 20,000.00
TANAMAN PENUTUP TANAH
1 Adam eva kecil tinggi +/- 0,1 m rumpun 1,500.00
2 Adam eva besar tinggi +/- 0,2 m rumpun 4,000.00
3 Agave, tinggi +/- 0,4 m rumpun 50,000.00
4 Agave, tinggi +/- 0,2 m rumpun 20,000.00
5 Andong, tinggi +/- 0,3 m batang 2,000.00
6 Andong, tinggi +/- 0,2 m batang 1,500.00
7 Aponika, tinggi +/- 0,2 m rumpun 500.00
8 Portulaka rendah/pendek rumpun 2,000.00
9 Portulaka bangkok rumpun 4,000.00
10 Lili paris rumpun 1,500.00
11 Mega mendung, tinggi +/- 0,3 m batang 7,500.00
12 Modogras, tinggi +/- 0,2 m rumpun 800.00
13 Suplier, tinggi +/- 0,4 m rumpun 20,000.00
14 Terang bulan, tinggi +/- 0,4 m rumpun 8,000.00
15 Lili paris brasil tinggi +/- 0,3 m rumpun 4,500.00
16 Pupuk kandang kg 500.00
17 Tanah untuk media tanam m3 60,000.00
PERALATAN KEBERSIHAN
1 Sapu lidi bh 3,000.00
2 Tangkai Sapu bh 5,000.00
3 Tomblok bh 3,500.00
4 Hareg bh 3,000.00
5 Kerug bh 5,000.00
6 Seragam bh 75,000.00
7 Sarung tangan bh 7,500.00
8 Masker bh 7,500.00
9 Gerobak (alat baru) bh 1,500,000.00
10 Gerobak (sewa) bh 1,500.00
11 Serok bh 5,000.00
12 Gunting pangkas bh 35,000.00
13 Mesin potong rumput bh 3,000,000.00
14 Gathul bh 10,000.00
15 Garpu tanah bh 15,000.00
16 Arit bh 20,000.00
17 Gerobak celeng bh 400,000.00
18 Sepatu ps 75,000.00
19 Ember bh 5,000.00
20 Bagor bh 600.00
21 Irus bh 10,000.00
22 Cetok bh 10,000.00

Bahan - 13
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

23 Linggis bh 35,000.00
24 Martil bh 10,000.00
25 Betel bh 12,000.00
26 Pacul bh 30,000.00
27 Sewa kendaraan untuk membuang lumpur hr 118,000.00
28 Gas oksigen 5 kg tb 15,000.00
29 Nipel bh 10,000.00
30 Pipa dia. 3/8" - 15 cm bh 1,500.00
31 Nitobond EC kg 100,000.00
32 Conbextra EP kg 200,000.00
33 Cebex 100 kg 150,000.00
34 Sewa Compressor untuk pekerjaan grouting hr 250,000.00
35 Sewa Mesin Grouting hr 150,000.00
36 Sewa mesin gerinda untuk pekerjaan grouting hr 100,000.00
37 Sewa mixer ubtuk pekerjaan grouting hr 6,000.00
38 Alat bantu pekerjaan grouting ls 5,000.00
39 Alat bantu pekerjaan pekerjaan marka ls 130,000.00
40 Alat bantu pekerjaan pekerjaan expantion joint ls 130,000.00
41 Pelapisan kedap air lantai dengan coating ( terpasang ) m2 40,000.00
42 Pelapisan kedap air lantai dengan membran ( terpasang ) m2 60,000.00
LAIN-LAIN
1 Tiang bendera
-Pondasi umpak buah 31,000.00
-Ompak ornamen buah 65,800.00
-Tiang galvanis 3" m' 23,375.00
-Bendera 120 x 180 buah 39,825.00
2 Rambu lalu lintas (terpasang) buah 150,000.00
3 Papan nama jalan (terpasang) buah 250,000.00
4 Sumur peresapan 5 m buah 495,000.00
3 Minyak Flux liter 12,000.00
4 Asbuton kg 2,350.00
5 Tumpuan konstruksi m 66,700.00
4 Kerikil sungai - royalty m3 5,750.00
5 Batu gunung - royalty m3 5,750.00
6 Uji test besi ( 3 sampel tiap jenis diameter benda uji ) set 150,000.00
5 Uji test aspal ttk 100,000.00
6 Sewa alat sondir hr 100,000.00
7 Sewa Scaffolding unit 20,000.00
6 Benda uji silinder beton bh 3,000.00
7 Biaya tes beton per benda uji bh 5,000.00
8 Biaya analisis tes beton perbeda uji bh 15,000.00

Bahan - 14
HARGA ALAT UNTUK PEKERJAAN ANALISA - E

NO. MACAM ALAT SATUAN HARGA KETERANGAN

1 Mesin penyampur aspal (AMP) E01 Unit 7,500,000,000.00 Alat Baru


2 Aspahlt Finisher E02 Unit 715,000,000.00 Alat Baru
3 Mesin penyemprot aspal 800 liter (Asphlt Sprayer) E03 Unit 145,000,000.00 Alat Baru
4 Buldozer 100 - 150 HP E04 Unit 700,000,000.00 Alat Baru
5 Compressor 4000 - 6500 L/M E05 Unit 175,000,000.00 Alat Baru
6 Concrette Mixer 0,3 - 0,6 m3 E06 Unit 45,000,000.00 Alat Baru
7 Crane 10 - 15 Ton E07 Unit 300,000,000.00 Alat Baru
8 Dump Truck 3 - 4 M3 E08 Unit 100,000,000.00 Alat Baru
9 Dump Truck 8 ton 125 HP E09 Unit 145,000,000.00 Alat Baru
10 Excavator 80 - 140 HP E10 Unit 250,000,000.00 Alat Baru
11 Flat Bed Truck (Truk Bak Terbuka) 3 - 4 m3 E11 Unit 250,000,000.00 Alat Baru
12 Genset 125 KVA E12 Unit 440,000,000.00 Alat Baru
13 Motor Grader > 100 HP E13 Unit 880,000,000.00 Alat Baru
14 Track Loader 75 - 100 HP E14 Unit 300,000,000.00 Alat Baru
15 Wheel Loader 105 HP E15 Unit 840,000,000.00 Alat Baru
16 Mesin Gilas 3 Roda 8 - 10 ton (Three Wheel Roller) E16 Unit 125,000,000.00 Alat Baru
17 Mesin Gilas Tandem 6 - 8 ton (Tandem Roller) E17 Unit 460,000,000.00 Alat Baru
18 Mesin Roda Karet 8 - 10 ton (Pneumatic Tyre Roller) E18 Unit 510,000,000.00 Alat Baru
19 Mesin Gilas getar otomatis 5 - 8 T E19 Unit 500,000,000.00 Alat Baru
20 Alat penggetar beton 4 HP (Concrette Vibrator) E20 Unit 12,000,000.00 Alat Baru
21 Pemecah batu 220 HP (Stone Crusher) E21 Unit 491,500,000.00 Alat Baru
22 Water Pump / Pompa Air 70 - 100 mm E22 Unit 5,000,000.00 Alat Baru
23 Truk tangki air 100 HP 4000 L (Water Tank Truck ) E23 Unit 50,000,000.00 Alat Baru
24 Stamper 5 HP E25 Unit 3,000,000.00 Alat Baru
25 Jack Hammer E26 Unit 3,500,000.00 Alat Baru
26 Fulvi Mixer E27 Unit 100,000,000.00 Alat Baru

27 Mesin penyaring 8 HP jam 50,000.00 Sewa


28 Chip Spreader jam 50,000.00 Sewa
29 Mesin penghampar 1820 MM 30 HP jam 181,000.00 Sewa
30 Thriller gandeng 1 ton jam 184,000.00 Sewa
31 Dump Truck 3,5 ton 44 HP jam 118,000.00 Sewa
32 Pompa air (D 5 cm) 30 m3 / jam jam 11,000.00 Sewa
33 Thriller 1ton jam 15,000.00 Sewa
34 Traktor jam 15,000.00 Sewa
35 Alat Bor jam 150,000.00 Sewa
36 Alat Ukur jam 75,000.00 Sewa
37 Beton Molen jam 25,000.00 Sewa
38 Mata Cutter bh 1,000,000.00 baru
39 Mesin Cutter jam 60,000.00 Sewa
40 Motor Walls jam 20,000.00 Sewa
41 Peralatan Las jam 75,000.00 Sewa
42 Sprayer jam 48,000.00 Sewa
43 Alat bantu untuk pekerjaan analisa - E ls 500.00
ANALISA SATUAN PEKERJAAN

No. Macam Pekerjaan Upah


(1) (2) (3)

PEKERJAAN PERSIAPAN
AK 100.00 m2 Pekerjaan Pengukuran Gedung
8.0000 org Pekerja @ Rp. 20,000.00 160,000.00
2.0000 org Mandor @ Rp. 32,500.00 65,000.00
0.5000 org Pengawas @ Rp. 37,200.00 18,600.00
2.0000 org Asisten Ahli Ukur @ Rp. 87,200.00 174,400.00
1.0000 hr Sewa alat ukur @ Rp. 75,000.00 75,000.00
JUMLAH ( BELUM PPN ) 493,000.00
JASA 10 % 49,300.00
JUMLAH 542,300.00
DIBULATKAN 542,300.00

1.0000 m2 Pekerjaan Pengukuran


0.01 x 542,300.00 5,423.00

SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu meranti 5/7 @ Rp. 1,678,000.00
03-2835-2002 0.0200 kg Paku reng @ Rp. 8,000.00
0.0070 m3 Kayu meranti papan 3/20 @ Rp. 1,678,000.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

SNI 1.0000 m2 Membersihkan lapangan dan perataan


6.8 0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
03-2835-2002 0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 3,625.00
JASA 10 % 362.50
JUMLAH 3,987.50
DIBULATKAN 3,987.00

A4 1.0000 bh Membuat Papan Nama Proyek 80x120 cm


0.0350 m3 Kayu meranti @ Rp. 1,678,000.00
1.4000 m 1
Seng plat lebar 90 cm @ Rp. 25,000.00
0.6000 kg Paku @ Rp. 10,000.00
1.5000 kg Cat kayu @ Rp. 32,000.00
16.8000 kg PC @ Rp. 764.00
0.0270 m3 Pasir beton @ Rp. 73,000.00
0.0405 m3 Kerikil beton @ Rp. 78,650.00
0.0175 org Tukang batu @ Rp. 27,500.00 481.25
1.0000 org Tukang kayu @ Rp. 30,000.00 30,000.00
1.0000 org Tukang cat @ Rp. 25,000.00 25,000.00
2.1000 org Pekerja @ Rp. 20,000.00 42,000.00
1.0050 org Mandor @ Rp. 32,500.00 32,662.50
JUMLAH ( BELUM PPN ) 130,143.75
JASA 10 % 13,014.38
JUMLAH 143,158.13
DIBULATKAN 143,158.00

SNI 1.0000 m2 Pembuatan jalan sementara, tebal 25 cm


6.16 0.2750 m3 Batu belah @ Rp. 80,000.00
0.0300 m3 Kerikil @ Rp. 78,650.00
0.0500 m Pasir
3
@ Rp. 76,000.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 23,250.00
JASA 10 % 2,325.00
JUMLAH 25,575.00
DIBULATKAN 25,575.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pembuatan kantor sementara, dengan lantai plesteran


6.5 1.2500 btg Dolken kayu 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 0.1800 m3 Kayu meranti @ Rp. 1,678,000.00
0.8500 kg Paku biasa @ Rp. 8,000.00
1.1000 kg Baja strip @ Rp. 8,800.00
35.0000 kg PC @ Rp. 764.00
0.1500 m3 Pasir pasang @ Rp. 76,000.00
0.1000 m3 Pasir beton @ Rp. 73,000.00
0.1500 m3 Kerikil beton @ Rp. 78,650.00
30.0000 bh Bata merah @ Rp. 350.00
0.2500 lbr Seng plat 3" x 6 " @ Rp. 38,500.00
2.0000 bh Jendela nako @ Rp. 20,000.00
0.0800 m2 Kaca polos @ Rp. 60,500.00
0.1500 bh Kunci tanam @ Rp. 35,000.00
0.0600 lbr Plywood 4 mm @ Rp. 41,250.00
2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00
0.3000 org Kepala tukang @ Rp. 32,500.00 9,750.00
2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 138,875.00
JASA 10 % 13,887.50
JUMLAH 152,762.50
DIBULATKAN 152,762.00

SNI 1.0000 m1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
6.2 1.2500 btg Dolken kayu 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 2.5000 kg PC @ Rp. 764.00
1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 25,000.00
0.0050 m3 Pasir beton @ Rp. 73,000.00
0.0090 m3 Kerikil beton @ Rp. 78,650.00
0.0250 m3 Kaso 5/7 kayu meranti @ Rp. 1,678,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4000 kg Meni besi @ Rp. 12,000.00
0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00
0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0200 org Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 15,300.00
JASA 10 % 1,530.00
JUMLAH 16,830.00
DIBULATKAN 16,830.00

PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 9,300.00
JASA 10 % 930.00
JUMLAH 10,230.00
DIBULATKAN 10,230.00

SNI 1.0000 m3 Galian tanah biasa sedalam 1 - 2 meter


6.2 0.5260 org Pekerja @ Rp. 20,000.00 10,520.00
0.0526 org Mandor @ Rp. 32,500.00 1,709.50
JUMLAH ( BELUM PPN ) 12,229.50
JASA 10 % 1,222.95
JUMLAH 13,452.45
DIBULATKAN 13,452.00

SNI 1.0000 m3 Galian tanah biasa sedalam 2 - 3 meter


No. Macam Pekerjaan Upah
(1) (2) (3)
6.3 0.7350 org Pekerja @ Rp. 20,000.00 14,700.00
0.0735 org Mandor @ Rp. 32,500.00 2,388.75
JUMLAH ( BELUM PPN ) 17,088.75
JASA 10 % 1,708.88
JUMLAH 18,797.63
DIBULATKAN 18,797.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Galian tanah keras sedalam sampai 1 meter


6.4 0.6250 org Pekerja @ Rp. 20,000.00 12,500.00
0.0620 org Mandor @ Rp. 32,500.00 2,015.00
JUMLAH ( BELUM PPN ) 14,515.00
JASA 10 % 1,451.50
JUMLAH 15,966.50
DIBULATKAN 15,966.00

SNI 1.0000 m3 Galian tanah cadas sedalam sampai 1 meter


6.5 1.2500 org Pekerja @ Rp. 20,000.00 25,000.00
0.1250 org Mandor @ Rp. 32,500.00 4,062.50
JUMLAH ( BELUM PPN ) 29,062.50
JASA 10 % 2,906.25
JUMLAH 31,968.75
DIBULATKAN 31,968.00

SNI 1.0000 m3 Galian tanah lumpur sedalam 1 meter


6.6 0.8230 org Pekerja @ Rp. 20,000.00 16,460.00
0.0830 org Mandor @ Rp. 32,500.00 2,697.50
JUMLAH ( BELUM PPN ) 19,157.50
JASA 10 % 1,915.75
JUMLAH 21,073.25
DIBULATKAN 21,073.00

Mod. SNI 6.3 1.0000 m1 Membuat sumur


2.0000 bh Buis beton D. 80 cm @ Rp. 32,000.00
1.0000 org Tukang gali sumur @ Rp. 34,900.00 34,900.00
0.7350 org Pekerja @ Rp. 20,000.00 14,700.00
0.0735 org Mandor @ Rp. 32,500.00 2,388.75
JUMLAH ( BELUM PPN ) 51,988.75
JASA 10 % 5,198.88
JUMLAH 57,187.63
DIBULATKAN 57,187.00

A6 1.0000 m3 Mengangkut tanah sejauh 30 meter


0.3300 org Pekerja @ Rp. 20,000.00 6,600.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 6,925.00
JASA 10 % 692.50
JUMLAH 7,617.50
DIBULATKAN 7,617.00

SNI 1.0000 m3 Pembuangan tanah sejauh 150 meter


6.8 0.5160 org Pekerja @ Rp. 20,000.00 10,320.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 11,945.00
JASA 10 % 1,194.50
JUMLAH 13,139.50
DIBULATKAN 13,139.00

A14 1.0000 m3 Membuang tanah dengan menghampar


0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 5,325.00
JASA 10 % 532.50
JUMLAH 5,857.50
DIBULATKAN 5,857.00

SNI 1.0000 m3 Urug kembali bekas galian


6.9 0.1920 org Pekerja @ Rp. 20,000.00 3,840.00
0.0190 org Mandor @ Rp. 32,500.00 617.50
JUMLAH ( BELUM PPN ) 4,457.50
No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 % 445.75
JUMLAH 4,903.25
DIBULATKAN 4,903.00
No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m2 Meratakan tanah ditumbuk halus


0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 5,325.00
JASA 10 % 532.50
JUMLAH 5,857.50
DIBULATKAN 5,857.00

A18 1.0000 m3 Urug pasir


1.2000 m3 Pasir urug @ Rp. 55,000.00
0.3000 org Pekerja @ Rp. 20,000.00 6,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 6,325.00
JASA 10 % 632.50
JUMLAH 6,957.50
DIBULATKAN 6,957.00

MOD 1.0000 m3 Urug tanah mendatangkan


A18 1.2000 m3 Tanah urug @ Rp. 35,000.00
0.3000 org Pekerja @ Rp. 20,000.00 6,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 6,325.00
JASA 10 % 632.50
JUMLAH 6,957.50
DIBULATKAN 6,957.00

SNI 1.0000 m3 Urugan sirtu


6.15 1.2000 m3 Sirtu @ Rp. 66,000.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 5,812.50
JASA 10 % 581.25
JUMLAH 6,393.75
DIBULATKAN 6,393.00

SNI 1.0000 m3 Pemasangan lapisan ijuk


6.14 1.2000 m3 Ijuk @ Rp. 75,000.00
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 3,487.50
JASA 10 % 348.75
JUMLAH 3,836.25
DIBULATKAN 3,836.00

MOD 1.0000 m2 Gebalan rumput


B3 0.2000 btg Bambu @ Rp. 7,000.00
1.0000 m2 Gebalan rumput @ Rp. 5,000.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 10,812.50
JASA 10 % 1,081.25
JUMLAH 11,893.75
DIBULATKAN 11,893.00
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN PASANGAN

SNI 1.0000 m3 Pasangan pondasi batu kosong


6.14 1.2000 m3 Batu belah 15/20 cm @ Rp. 80,000.00
03-2836-2002 0.3000 m Pasir urug
3
@ Rp. 55,000.00
0.3900 org Tukang batu @ Rp. 27,500.00 10,725.00
0.0390 org Kepala tukang batu @ Rp. 30,000.00 1,170.00
0.7800 org Pekerja @ Rp. 20,000.00 15,600.00
0.0390 org Mandor @ Rp. 32,500.00 1,267.50
JUMLAH ( BELUM PPN ) 28,762.50
JASA 10 % 2,876.25
JUMLAH 31,638.75
DIBULATKAN 31,638.00

SNI 1.0000 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps


6.9 1.1000 m3 Batu belah (hitam) 15/20 cm @ Rp. 80,000.00
03-2836-2002 0.2290 m3 Kapurr pasang @ Rp. 72,500.00
0.2290 m3 Semen merah @ Rp. 80,000.00
0.5440 m Pasir pasang
3
@ Rp. 76,000.00
0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00
0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00
1.5000 org Pekerja @ Rp. 20,000.00 30,000.00
0.0750 org Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 50,737.50
JASA 10 % 5,073.75
JUMLAH 55,811.25
DIBULATKAN 55,811.00

1.0000 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps


1.2000 m3 Batu belah (hitam) 15/20 cm @ Rp. 80,000.00
95.4200 kg PC @ Rp. 764.00
0.2290 m3 Kapurr pasang @ Rp. 72,500.00
0.3820 m3 Pasir pasang @ Rp. 76,000.00
0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00
0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00
1.5000 org Pekerja @ Rp. 20,000.00 30,000.00
0.0750 org Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 50,737.50
JASA 10 % 5,073.75
JUMLAH 55,811.25
DIBULATKAN 55,811.00

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 3 Kp : 10 Ps


6.12 1.1000 m3 Batu belah (hitam) 15/20 cm @ Rp. 80,000.00
03-2835-2002 61.0000 kg PC @ Rp. 764.00
0.1470 m3 Kapurr pasang @ Rp. 72,500.00
0.4920 m3 Pasir pasang @ Rp. 76,000.00
0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00
0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00
1.5000 org Pekerja @ Rp. 20,000.00 30,000.00
0.0750 org Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 50,737.50
JASA 10 % 5,073.75
JUMLAH 55,811.25
DIBULATKAN 55,811.00

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 4 Ps


6.5 1.1000 m3 Batu belah 15/20 cm @ Rp. 80,000.00
03-2836-2002 163.0000 kg PC @ Rp. 764.00
0.5200 m3 Pasir pasang @ Rp. 76,000.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00
0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00
1.5000 org Pekerja @ Rp. 20,000.00 30,000.00
0.0750 org Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 50,737.50
JASA 10 % 5,073.75
JUMLAH 55,811.25
DIBULATKAN 55,811.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


6.15 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00
03-2837-2002 4.5000 kg PC @ Rp. 764.00
0.0150 m3 Kapur pasang @ Rp. 72,500.00
0.0500 m Pasir pasang
3
@ Rp. 76,000.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00
0.3200 org Pekerja @ Rp. 20,000.00 6,400.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,937.50
JASA 10 % 993.75
JUMLAH 10,931.25
DIBULATKAN 10,931.00

SNI 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


6.11 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00
03-2837-2002 11.5000 kg PC @ Rp. 764.00
0.0430 m3 Pasir pasang @ Rp. 76,000.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00
0.3200 org Pekerja @ Rp. 20,000.00 6,400.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,937.50
JASA 10 % 993.75
JUMLAH 10,931.25
DIBULATKAN 10,931.00

SNI 1.0000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps


6.7 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00
03-2837-2002 10.0800 kg PC @ Rp. 764.00
0.0275 m3 Kapur pasang @ Rp. 72,500.00
0.0925 m 3
Pasir pasang @ Rp. 76,000.00
0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
0.0200 org Kepala tukang batu @ Rp. 30,000.00 600.00
0.6500 org Pekerja @ Rp. 20,000.00 13,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 20,075.00
JASA 10 % 2,007.50
JUMLAH 22,082.50
DIBULATKAN 22,082.00

SNI 1.0000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps


6.4 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00
03-2837-2002 26.4500 kg PC @ Rp. 764.00
0.0980 m3 Pasir pasang @ Rp. 76,000.00
0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
0.0200 org Kepala tukang batu @ Rp. 30,000.00 600.00
0.6500 org Pekerja @ Rp. 20,000.00 13,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 20,075.00
JASA 10 % 2,007.50
JUMLAH 22,082.50
DIBULATKAN 22,082.00

SNI 1.0000 m2 Pasangan dinding bataco


6.18 12.5000 bh Bataco @ Rp. 1,500.00
12.5000 kg PC @ Rp. 764.00
0.0400 m 3
Pasir pasang @ Rp. 76,000.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 13,862.50
JASA 10 % 1,386.25
JUMLAH 15,248.75
DIBULATKAN 15,248.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasangan roster 25/25 cm


6.19 16.0000 bh Roster 25/25 cm @ Rp. 2,000.00
12.5000 kg PC @ Rp. 764.00
0.0400 m3 Pasir pasang @ Rp. 76,000.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 13,862.50
JASA 10 % 1,386.25
JUMLAH 15,248.75
DIBULATKAN 15,248.00

PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 764.00
0.5400 m3 Pasir beton @ Rp. 73,000.00
0.8100 m3 Kerikil beton @ Rp. 78,650.00
0.3500 org Tukang batu @ Rp. 27,500.00 9,625.00
0.0350 org Kepala tukang batu @ Rp. 30,000.00 1,050.00
2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 53,925.00
JASA 10 % 5,392.50
JUMLAH 59,317.50
DIBULATKAN 59,317.00

SNI 1.0000 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


6.1 218.0000 kg PC @ Rp. 764.00
0.5200 m3 Pasir beton @ Rp. 73,000.00
0.8700 m3 Kerikil beton @ Rp. 78,650.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kepala tukang batu @ Rp. 30,000.00 750.00
1.6500 org Pekerja @ Rp. 20,000.00 33,000.00
0.0800 org Mandor @ Rp. 32,500.00 2,600.00
JUMLAH ( BELUM PPN ) 43,225.00
JASA 10 % 4,322.50
JUMLAH 47,547.50
DIBULATKAN 47,547.00

AK 1.0000 m3 Beton cyclope 1pc:3ps:5kr


0.7000 m3 Batu kali (hitam) @ Rp. 80,000.00
61.2500 kg PC @ Rp. 764.00
0.4000 m3 Pasir pasang @ Rp. 76,000.00
0.6500 m3 Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00
0.1000 org Kep. Tk. Batu @ Rp. 30,000.00 3,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 160,250.00
JASA 10 % 16,025.00
JUMLAH 176,275.00
DIBULATKAN 176,275.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr


6.16 400.0000 kg PC @ Rp. 764.00
0.4800 m3 Pasir beton @ Rp. 73,000.00
0.8000 m3 Kerikil beton @ Rp. 78,650.00
0.3500 org Tukang batu @ Rp. 27,500.00 9,625.00
0.0350 org Kepala tukang batu @ Rp. 30,000.00 1,050.00
2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
1.0000 org Mandor @ Rp. 32,500.00 32,500.00
JUMLAH ( BELUM PPN ) 83,175.00
JASA 10 % 8,317.50
JUMLAH 91,492.50
DIBULATKAN 91,492.00

SNI 1.0000 m3 Membuat beton dengan mutu K 225


6.35 388.0000 kg PC @ Rp. 764.00
0.6500 m3 Pasir beton @ Rp. 73,000.00
0.6500 m3 Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00
0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 160,250.00
JASA 10 % 16,025.00
JUMLAH 176,275.00
DIBULATKAN 176,275.00

SNI 1.0000 m3 Membuat beton dengan mutu K 275


6.36 400.0000 kg PC @ Rp. 764.00
0.4000 m3 Pasir beton @ Rp. 73,000.00
0.8200 m3 Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00
0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 160,250.00
JASA 10 % 16,025.00
JUMLAH 176,275.00
DIBULATKAN 176,275.00

1.0000 m3 Membuat beton dengan mutu K 300


430.0000 kg PC @ Rp. 764.00
0.5160 m3 Pasir beton @ Rp. 73,000.00
0.6900 m3 Kerikil beton @ Rp. 78,650.00
1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00
0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 160,250.00
JASA 10 % 16,025.00
JUMLAH 176,275.00
DIBULATKAN 176,275.00

SNI 1.0000 kg Pembesian dengan besi polos


6.25 1.0500 kg Besi beton polos @ Rp. 7,900.00
0.0150 kg Kawat beton @ Rp. 9,400.00
0.0070 org Tukang besi @ Rp. 25,000.00 175.00
0.0007 org Kepala tukang besi @ Rp. 27,000.00 18.90
0.0070 org Pekerja @ Rp. 20,000.00 140.00
0.0003 org Mandor @ Rp. 32,500.00 9.75
JUMLAH ( BELUM PPN ) 343.65
JASA 10 % 34.37
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH 378.02
DIBULATKAN 378.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 kg Pembesian dengan besi ulir


6.25 1.0500 kg Besi beton ulir @ Rp. 8,000.00
0.0150 kg Kawat beton @ Rp. 9,400.00
0.0070 org Tukang besi @ Rp. 25,000.00 175.00
0.0007 org Kepala tukang besi @ Rp. 27,000.00 18.90
0.0070 org Pekerja @ Rp. 20,000.00 140.00
0.0003 org Mandor @ Rp. 32,500.00 9.75
JUMLAH ( BELUM PPN ) 343.65
JASA 10 % 34.37
JUMLAH 378.02
DIBULATKAN 378.00

F.8 1.0000 m2 Cetakan beton / begisting memakai papan


0.0170 m3 Usuk meranti @ Rp. 1,678,000.00
0.0240 m3 Papan cetakan @ Rp. 1,000,000.00
0.4000 kg Paku @ Rp. 8,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0500 org Kep. Tk. Kayu @ Rp. 32,500.00 1,625.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 20,950.00
JASA 10 % 2,095.00
JUMLAH 23,045.00
DIBULATKAN 23,045.00

F.8 1.0000 m2 Cetakan beton / begisting memakai multiplek


0.0170 m3 Usuk meranti @ Rp. 1,678,000.00
0.3470 lbr Multiplek @ Rp. 90,000.00
0.4000 kg Paku @ Rp. 8,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0500 org Kep. Tk. Kayu @ Rp. 32,500.00 1,625.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 20,950.00
JASA 10 % 2,095.00
JUMLAH 23,045.00
DIBULATKAN 23,045.00

F.V 1.0000 m3 Membongkar cetakan


4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
JUMLAH ( BELUM PPN ) 80,000.00
JASA 10 % 8,000.00
JUMLAH 88,000.00
DIBULATKAN 88,000.00

Sup Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )


muko2 0.7000 m 3
Perancah/dolken @ Rp. 1,000,000.00
hal 10.5000 org Tukang kayu @ Rp. 30,000.00 315,000.00
332 1.0500 org Kep. Tk. Kayu @ Rp. 32,500.00 34,125.00
3.5000 org Pekerja @ Rp. 20,000.00 70,000.00
0.1750 org Mandor @ Rp. 32,500.00 5,687.50
JUMLAH ( BELUM PPN ) 424,812.50
JASA 10 % 42,481.25
JUMLAH 467,293.75
DIBULATKAN 467,293.00
No. Macam Pekerjaan Upah
(1) (2) (3)

Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )


32.0000 unit Scafolding @ Rp. 20,000.00
3.5000 org Tukang kayu @ Rp. 30,000.00 105,000.00
0.3500 org Kep. Tk. Kayu @ Rp. 32,500.00 11,375.00
2.2000 org Pekerja @ Rp. 20,000.00 44,000.00
0.1200 org Mandor @ Rp. 32,500.00 3,900.00
JUMLAH ( BELUM TERMASUK PPN ) 164,275.00
JASA 10 % 16,427.50
JUMLAH 180,702.50
DIBULATKAN 180,702.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 100 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 100 kg 37,801.50
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Membongkar cetakan 88,000.00
JUMLAH 415,569.00
DIBULATKAN 415,569.00

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 125 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 125 kg 47,251.88
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Membongkar cetakan 88,000.00
JUMLAH 425,019.38
DIBULATKAN 425,019.00

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 150 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 150 kg 56,702.25
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
E. Membongkar cetakan 88,000.00
JUMLAH 434,469.75
DIBULATKAN 434,469.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 175 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 175 kg 66,152.63
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Membongkar cetakan 88,000.00
JUMLAH 443,920.13
DIBULATKAN 443,920.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 200 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 200 kg 75,603.00
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Membongkar cetakan 88,000.00
JUMLAH 453,370.50
DIBULATKAN 453,370.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)


No. Macam Pekerjaan Upah
(1) (2) (3)

Pek. Beton 1:2:3 dengan memakai dolken, 100 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 100 kg 37,801.50
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Stut werk / perancah 467,293.75
E. Membongkar cetakan 88,000.00
JUMLAH 882,862.75
DIBULATKAN 882,862.00
No. Macam Pekerjaan Upah
(1) (2) (3)

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 125 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 125 kg 47,251.88
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Stut werk / perancah 467,293.75
E. Membongkar cetakan 88,000.00
JUMLAH 892,313.13
DIBULATKAN 892,313.00

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 150 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 150 kg 56,702.25
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Stut werk / perancah 467,293.75
E. Membongkar cetakan 88,000.00
JUMLAH 901,763.50
DIBULATKAN 901,763.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 175 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 175 kg 66,152.63
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Stut werk / perancah 467,293.75
E. Membongkar cetakan 88,000.00
JUMLAH 911,213.88
DIBULATKAN 911,213.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 200 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 200 kg 75,603.00
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Stut werk / perancah 467,293.75
E. Membongkar cetakan 88,000.00
JUMLAH 920,664.25
DIBULATKAN 920,664.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 100 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 100 kg 37,801.50
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Scafolding / perancah 180,702.50
E. Membongkar cetakan 88,000.00
JUMLAH 596,271.50
DIBULATKAN 596,271.00

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 125 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 125 kg 47,251.88
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Scafolding / perancah 180,702.50
No. Macam Pekerjaan Upah
(1) (2) (3)
E. Membongkar cetakan 88,000.00
JUMLAH 605,721.88
DIBULATKAN 605,721.00
No. Macam Pekerjaan Upah
(1) (2) (3)

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 150 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 150 kg 56,702.25
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Scafolding / perancah 180,702.50
E. Membongkar cetakan 88,000.00
JUMLAH 615,172.25
DIBULATKAN 615,172.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 175 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 175 kg 66,152.63
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Scafolding / perancah 180,702.50
E. Membongkar cetakan 88,000.00
JUMLAH 624,622.63
DIBULATKAN 624,622.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 200 kg besi


A. Beton cor 1pc:2ps:3kr 59,317.50
B. Tulangan 200 kg 75,603.00
C. Cetakan memakai papan ( 10 m2 ) 230,450.00
D. Scafolding / perancah 180,702.50
E. Membongkar cetakan 88,000.00
JUMLAH 634,073.00
DIBULATKAN 634,073.00

PEKERJAAN PELESTERAN

G.50.q 1.0000 m2 Plesteran batu kali 1pc:4ps


6.5110 kg PC @ Rp. 764.00
0.0209 m3 Pasir pasang @ Rp. 76,000.00
0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0200 org Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 14,750.00
JASA 10 % 1,475.00
JUMLAH 16,225.00
DIBULATKAN 16,225.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm


6.9 1.8400 kg PC @ Rp. 764.00
03-2837-2002 0.0060 m3 Kapurr pasang @ Rp. 72,500.00
0.0140 m3 Pasir pasang @ Rp. 76,000.00
0.1500 org Tukang batu @ Rp. 27,500.00 4,125.00
0.0150 org Kepala tukang batu @ Rp. 30,000.00 450.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM TERMASUK PPN ) 8,900.00
JASA 10 % 890.00
JUMLAH 9,790.00
DIBULATKAN 9,790.00

SNI 1.0000 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm


6.4 5.2000 kg PC @ Rp. 764.00
03-2837-2002 0.0200 m3 Pasir pasang @ Rp. 76,000.00
0.1500 org Tukang batu @ Rp. 27,500.00 4,125.00
0.0150 org Kepala tukang batu @ Rp. 30,000.00 450.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 8,900.00
JASA 10 % 890.00
JUMLAH 9,790.00
DIBULATKAN 9,790.00

SNI 1.0000 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm


6.30 7.0700 kg PC @ Rp. 764.00
03-2837-2002 0.0210 m3 Pasir pasang @ Rp. 76,000.00
0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
0.0200 org Kepala tukang batu @ Rp. 30,000.00 600.00
0.2600 org Pekerja @ Rp. 20,000.00 5,200.00
0.0130 org Mandor @ Rp. 32,500.00 422.50
JUMLAH ( BELUM PPN ) 11,722.50
JASA 10 % 1,172.25
JUMLAH 12,894.75
DIBULATKAN 12,894.00

SNI 1.0000 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung )


6.31 0.5000 kg PC @ Rp. 764.00
03-2837-2002 0.0020 m3 Pasir pasang @ Rp. 76,000.00
0.0380 org Tukang batu @ Rp. 27,500.00 1,045.00
0.0380 org Kepala tukang batu @ Rp. 30,000.00 1,140.00
0.0570 org Pekerja @ Rp. 20,000.00 1,140.00
0.0020 org Mandor @ Rp. 32,500.00 65.00
JUMLAH ( BELUM PPN ) 3,390.00
JASA 10 % 339.00
JUMLAH 3,729.00
DIBULATKAN 3,729.00

SNI 1.0000 m2 Plesteran siar adukan 1 Pc : 2 Ps


6.35 4.3200 kg PC @ Rp. 764.00
03-2837-2002 0.0160 m Pasir pasang
3
@ Rp. 76,000.00
0.0700 org Tukang batu @ Rp. 27,500.00 1,925.00
0.0070 org Kepala tukang batu @ Rp. 30,000.00 210.00
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0080 org Mandor @ Rp. 32,500.00 260.00
JUMLAH ( BELUM PPN ) 5,395.00
JASA 10 % 539.50
JUMLAH 5,934.50
DIBULATKAN 5,934.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Plesteran Ciprat, 1 Pc : 2 Ps


6.34 4.3200 kg PC @ Rp. 764.00
0.0160 m3 Pasir pasang @ Rp. 55,000.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 8,537.50
JASA 10 % 853.75
JUMLAH 9,391.25
DIBULATKAN 9,391.00

Analisa ZAZ 1.0000 m2 Acian dinding bata


3.5000 kg PC @ Rp. 764.00
0.0330 org Tukang batu @ Rp. 27,500.00 907.50
0.0033 org Kep. Tk. Batu @ Rp. 30,000.00 99.00
0.0700 org Pekerja @ Rp. 20,000.00 1,400.00
0.0035 org Mandor @ Rp. 32,500.00 113.75
JUMLAH ( BELUM PPN ) 2,520.25
JASA 10 % 252.03
JUMLAH 2,772.28
DIBULATKAN 2,772.00

SNI 1.0000 m2 Pasang dinding batu hias tempel


6.74 1.0500 m2 Batu tempel hitam @ Rp. 60,000.00
11.7500 kg PC @ Rp. 764.00
0.0350 m3 Pasir pasang @ Rp. 76,000.00
0.3500 org Tukang batu @ Rp. 27,500.00 9,625.00
0.0350 org Kepala tukang batu @ Rp. 30,000.00 1,050.00
0.6500 org Pekerja @ Rp. 20,000.00 13,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM TERMASUK PPN ) 24,650.00
JASA 10 % 2,465.00
JUMLAH 27,115.00
DIBULATKAN 27,115.00

PEKERJAAN PASANG TEGEL


AK 1.0000 m2 Pasang tegel abu-abu 30/30
1.0000 m2 Tegel abu-abu uk. 30/30 @ Rp. 28,000.00
0.0160 m3 Kapur pasang @ Rp. 72,500.00
0.0320 m3 Pasir pasang @ Rp. 76,000.00
1.0000 kg PC @ Rp. 764.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang tegel abu-abu 20/20


1.0000 m2 Tegel abu-abu uk. 20/20 @ Rp. 20,000.00
0.0160 m3 Kapur pasang @ Rp. 72,500.00
0.0320 m3 Pasir pasang @ Rp. 76,000.00
1.0000 kg PC @ Rp. 764.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

PEKERJAAN KERAMIK
An. 1.0000 m2 Pasang ubin porselin
G.69.c 1.0000 m2 Tegel porselin @ Rp. 40,500.00
4.6800 kg PC @ Rp. 764.00
0.0090 m3 Pasir pasang @ Rp. 76,000.00
1.0000 kg Semen putih @ Rp. 1,312.50
0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0125 org Mandor @ Rp. 32,500.00 406.25
JUMLAH ( BELUM PPN ) 20,656.25
JASA 10 % 2,065.63
JUMLAH 22,721.88
DIBULATKAN 22,721.00

AK 1.0000 m2 Pasang tegel keramik 20/20 dan 30/30


1.0000 m2 Tegel keramik (std) @ Rp. 42,500.00
4.0800 kg PC @ Rp. 764.00
0.0090 m3 Pasir pasang @ Rp. 76,000.00
0.6000 kg Semen putih @ Rp. 1,312.50
0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0125 org Mandor @ Rp. 32,500.00 406.25
JUMLAH ( BELUM PPN ) 20,656.25
JASA 10 % 2,065.63
JUMLAH 22,721.88
DIBULATKAN 22,721.00
AK 1.0000 m2 Pasang tegel keramik 10/20 berglasir
1.0000 m2 Tegel keramik 10/20 @ Rp. 30,000.00
4.0800 kg PC @ Rp. 764.00
0.0090 m3 Pasir pasang @ Rp. 76,000.00
0.6000 kg Semen putih @ Rp. 1,312.50
0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0125 org Mandor @ Rp. 32,500.00 406.25
JUMLAH ( BELUM PPN ) 20,656.25
JASA 10 % 2,065.63
JUMLAH 22,721.88
DIBULATKAN 22,721.00
No. Macam Pekerjaan Upah
(1) (2) (3)
AK 1.0000 m2 Pasang tegel keramik 20/20 berglasir
1.0000 m2 Tegel keramik 20/20 @ Rp. 32,000.00
4.0800 kg PC @ Rp. 764.00
0.0090 m3 Pasir pasang @ Rp. 76,000.00
0.6000 kg Semen putih @ Rp. 1,312.50
0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0125 org Mandor @ Rp. 32,500.00 406.25
JUMLAH ( BELUM PPN ) 20,656.25
JASA 10 % 2,065.63
JUMLAH 22,721.88
DIBULATKAN 22,721.00
AK 1.0000 m2 Pasang tegel keramik 30/30 berglasir
1.0000 m2 Tegel keramik 30/30 @ Rp. 32,500.00
4.0800 kg PC @ Rp. 764.00
0.0090 m3 Pasir pasang @ Rp. 76,000.00
0.6000 kg Semen putih @ Rp. 1,312.50
0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0125 org Mandor @ Rp. 32,500.00 406.25
JUMLAH ( BELUM PPN ) 20,656.25
JASA 10 % 2,065.63
JUMLAH 22,721.88
DIBULATKAN 22,721.00
SNI 1.0000 m1 Pasang plint keramik ukuran 10 x 40 cm
6.24 0.2300 m2 Keramik 40/40 @ Rp. 40,000.00
1.2000 kg PC @ Rp. 764.00
0.0030 m3 Pasir pasang @ Rp. 76,000.00
0.1000 kg Semen warna @ Rp. 6,000.00
0.0300 org Tukang batu @ Rp. 27,500.00 825.00
0.0030 org Kepala tukang batu @ Rp. 30,000.00 90.00
0.0600 org Pekerja @ Rp. 20,000.00 1,200.00
0.0030 org Mandor @ Rp. 32,500.00 97.50
JUMLAH ( BELUM TERMASUK PPN ) 2,212.50
JASA 10 % 221.25
JUMLAH 2,433.75
DIBULATKAN 2,433.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang plint keramik ukuran 10 x 30 cm


6.25 0.1800 m2 Keramik 30/30 @ Rp. 32,500.00
1.6500 kg PC @ Rp. 764.00
0.0032 m3 Pasir pasang @ Rp. 76,000.00
0.1000 kg Semen warna @ Rp. 6,000.00
0.0300 org Tukang batu @ Rp. 27,500.00 825.00
0.0030 org Kepala tukang batu @ Rp. 30,000.00 90.00
0.0600 org Pekerja @ Rp. 20,000.00 1,200.00
0.0030 org Mandor @ Rp. 32,500.00 97.50
JUMLAH ( BELUM TERMASUK PPN ) 2,212.50
JASA 10 % 221.25
JUMLAH 2,433.75
DIBULATKAN 2,433.00

1.0000 m1 Pasang keramik stepnosing granito 5/30


3.6000 bh Stepnosing granito @ Rp. 9,350.00
0.4080 kg PC @ Rp. 764.00
0.0009 m3 Pasir @ Rp. 76,000.00
0.0600 kg Semen putih @ Rp. 1,312.50
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.0500 org Pekerja @ Rp. 20,000.00 1,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 4,131.25
JASA 10 % 413.13
JUMLAH 4,544.38
DIBULATKAN 4,544.00

1.0000 m1 Pasang list keramik dinding 5/20


5.0000 bh List keramik dinding motif @ Rp. 5,000.00
0.4080 kg PC @ Rp. 764.00
0.0009 m3 Pasir @ Rp. 76,000.00
0.0600 kg Semen putih @ Rp. 1,312.50
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.0500 org Pekerja @ Rp. 20,000.00 1,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 4,131.25
JASA 10 % 413.13
JUMLAH 4,544.38
DIBULATKAN 4,544.00

1.0000 m2 Pasang keramik dinding 20/25


1.0000 m2 Tegel keramik 20/25 @ Rp. 37,500.00
9.3000 kg PC @ Rp. 764.00
0.0180 m3 Pasir pasang @ Rp. 76,000.00
1.5000 kg Semen putih @ Rp. 1,312.50
0.6500 org Tukang batu @ Rp. 27,500.00 17,875.00
0.0650 org Kep. Tk. Batu @ Rp. 30,000.00 1,950.00
0.3200 org Pekerja @ Rp. 20,000.00 6,400.00
0.0160 org Mandor @ Rp. 32,500.00 520.00
JUMLAH ( BELUM PPN ) 26,745.00
JASA 10 % 2,674.50
JUMLAH 29,419.50
DIBULATKAN 29,419.00
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN CONBLOCK

AK 1.0000 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200


1.0000 m2 Conblock @ Rp. 38,250.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

AK 1.0000 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200


1.0000 m2 Conblock @ Rp. 46,700.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

AK 1.0000 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200


1.0000 m2 Conblock @ Rp. 38,100.00
0.0500 m 3
Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

AK 1.0000 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200


1.0000 m2 Conblock @ Rp. 46,700.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200


1.0000 m2 Conblock @ Rp. 43,500.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

AK 1.0000 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200


1.0000 m2 Conblock @ Rp. 52,000.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

AK 1.0000 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200


1.0000 m2 Conblock @ Rp. 43,500.00
0.0500 m 3
Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

AK 1.0000 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200


1.0000 m2 Conblock @ Rp. 52,000.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

1.0000 m2 Pasang grassblock bulat tebal 10 cm


1.0000 m2 Grassblock @ Rp. 41,400.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00
No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m2 Pasang grassblock tebal 10 cm


1.0000 m2 Grassblock @ Rp. 41,400.00
0.0500 m3 Pasir urug @ Rp. 55,000.00
0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00
0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 18,437.50
JASA 10 % 1,843.75
JUMLAH 20,281.25
DIBULATKAN 20,281.00

AK 1.0000 bh Pasang buis beton dia. 80 cm


1.0000 bh Buis beton @ Rp. 32,000.00
0.1250 org Tukang batu @ Rp. 27,500.00 3,437.50
0.0125 org Kep. Tk. Batu @ Rp. 30,000.00 375.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
JUMLAH ( BELUM PPN ) 8,812.50
JASA 10 % 881.25
JUMLAH 9,693.75
DIBULATKAN 9,693.00

PEKERJAAN RANGKA ATAP

SNI 1.0000 m3 Membuat kuda-kuda kayu kamper


6.28 1.1000 m3 Kayu kamper @ Rp. 4,750,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 485,500.00
JASA 10 % 48,550.00
JUMLAH 534,050.00
DIBULATKAN 534,050.00

SNI 1.0000 m3 Membuat kuda-kuda kayu kruing


6.30 1.1000 m3 Kayu kruing @ Rp. 4,350,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 485,500.00
JASA 10 % 48,550.00
JUMLAH 534,050.00
DIBULATKAN 534,050.00

SNI 1.0000 m3 Membuat kuda-kuda kayu bengkirai


1.1000 m3 Kayu bengkirai @ Rp. 5,750,000.00
03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 485,500.00
JASA 10 % 48,550.00
JUMLAH 534,050.00
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN 534,050.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Pasang kuda-kuda kayu lama


03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 485,500.00
JASA 10 % 48,550.00
JUMLAH 534,050.00
DIBULATKAN 534,050.00

SNI 1.0000 m3 Pasang Nook,Goording dan Jurai kayu bengkirai


1.1000 m3 Kayu bengkirai @ Rp. 5,750,000.00
0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 485,500.00
JASA 10 % 48,550.00
JUMLAH 534,050.00
DIBULATKAN 534,050.00

SNI 1.0000 m3 Pasang Goording Lama


0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 485,500.00
JASA 10 % 48,550.00
JUMLAH 534,050.00
DIBULATKAN 534,050.00

F.16 1.0000 m2 Pasang usuk 5/7, reng 2/3 lama


0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00

F.16 1.0000 m2 Pasang usuk 5/7, reng 2/3 kayu jati


2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m1 Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m1 Reng kayu bengkirai 2/3 @ Rp. 3,450.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
5.0000 m1 Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
5.0000 m 1
Reng kayu bengkirai 2/3 @ Rp. 3,450.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00
No. Macam Pekerjaan Upah
(1) (2) (3)

F.16 1.0000 m2 Pasang usuk 5/7, reng 3/4 kayu jati


2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
4.0000 m1 Reng jati 3/4 @ Rp. 24,000.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
4.0000 m1 Reng kayu jati 3/4 lokal @ Rp. 9,600.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00

AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
4.0000 m1 Reng kayu bengkirai 3/4 @ Rp. 6,900.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00

PEKERJAAN PINTU DAN JENDELA


SNI 1.0000 m3 Membuat kusen pintu / jendela kayu jati (klas plitur)
6.1 1.1000 m3 Kayu jati (klas plitur) @ Rp. 20,000,000.00
03-3434-2002 20.0000 org Tukang kayu @ Rp. 30,000.00 600,000.00
2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 794,750.00
JASA 10 % 79,475.00
JUMLAH 874,225.00
DIBULATKAN 874,225.00

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu jati (lokal)


6.1 1.1000 m3 Kayu jati (lokal) @ Rp. 8,000,000.00
03-3434-2002 20.0000 org Tukang kayu @ Rp. 30,000.00 600,000.00
2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 794,750.00
No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 % 79,475.00
JUMLAH 874,225.00
DIBULATKAN 874,225.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu kamper


6.2 1.2000 m3 Kayu kamper @ Rp. 4,750,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 30,000.00 540,000.00
2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 734,750.00
JASA 10 % 73,475.00
JUMLAH 808,225.00
DIBULATKAN 808,225.00

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu kruing


1.2000 m3 Kayu kruing @ Rp. 4,350,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 30,000.00 540,000.00
2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 734,750.00
JASA 10 % 73,475.00
JUMLAH 808,225.00
DIBULATKAN 808,225.00

SNI 1.0000 m3 Membuat kusen pintu / jendela kayu bengkirai


1.2000 m3 Kayu bengkirai @ Rp. 5,750,000.00
03-3434-2002 18.0000 org Tukang kayu @ Rp. 30,000.00 540,000.00
2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00
6.0000 org Pekerja @ Rp. 20,000.00 120,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 734,750.00
JASA 10 % 73,475.00
JUMLAH 808,225.00
DIBULATKAN 808,225.00

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu jati


6.19 0.0196 m3 Papan kayu jati @ Rp. 22,000,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 79,475.00
JASA 10 % 7,947.50
JUMLAH 87,422.50
DIBULATKAN 87,422.00

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu jati lokal
6.19 0.0196 m3 Papan kayu jati lokal @ Rp. 8,200,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 79,475.00
JASA 10 % 7,947.50
JUMLAH 87,422.50
DIBULATKAN 87,422.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu kamper


6.20 0.0196 m3 Papan kayu kamper @ Rp. 5,500,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 79,475.00
JASA 10 % 7,947.50
JUMLAH 87,422.50
DIBULATKAN 87,422.00

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu kruing


0.0196 m3 Papan kayu kruing @ Rp. 4,750,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 79,475.00
JASA 10 % 7,947.50
JUMLAH 87,422.50
DIBULATKAN 87,422.00

SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai


0.0196 m3 Papan kayu bengkirai @ Rp. 6,000,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 79,475.00
JASA 10 % 7,947.50
JUMLAH 87,422.50
DIBULATKAN 87,422.00

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu jati


6.9 0.0350 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.8000 org Pekerja @ Rp. 20,000.00 16,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 83,800.00
JASA 10 % 8,380.00
JUMLAH 92,180.00
DIBULATKAN 92,180.00

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu jati lokal
6.9 0.0350 m3 Papan kayu jati lokal @ Rp. 8,200,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.8000 org Pekerja @ Rp. 20,000.00 16,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 83,800.00
JASA 10 % 8,380.00
JUMLAH 92,180.00
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN 92,180.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu kamper


610 0.0350 m3 Papan kayu kamper @ Rp. 5,500,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 6,500.00
0.8000 org Pekerja @ Rp. 20,000.00 16,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 83,800.00
JASA 10 % 8,380.00
JUMLAH 92,180.00
DIBULATKAN 92,180.00

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu kruing


0.0350 m3 Papan kayu kruing @ Rp. 4,750,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 6,500.00
0.8000 org Pekerja @ Rp. 20,000.00 16,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 83,800.00
JASA 10 % 8,380.00
JUMLAH 92,180.00
DIBULATKAN 92,180.00

SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu bengkirai


0.0350 m3 Papan kayu bengkirai @ Rp. 6,000,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 6,500.00
0.8000 org Pekerja @ Rp. 20,000.00 16,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 83,800.00
JASA 10 % 8,380.00
JUMLAH 92,180.00
DIBULATKAN 92,180.00

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu jati


6.7 0.0400 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00
0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 104,750.00
JASA 10 % 10,475.00
JUMLAH 115,225.00
DIBULATKAN 115,225.00

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu jati lokal
6.7 0.0400 m3 Kayu jati papan lokal @ Rp. 8,200,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00
0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 104,750.00
JASA 10 % 10,475.00
JUMLAH 115,225.00
DIBULATKAN 115,225.00

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu kamper


6.8 0.0400 m3 Kayu kamper papan @ Rp. 5,500,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00
0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 104,750.00
JASA 10 % 10,475.00
JUMLAH 115,225.00
DIBULATKAN 115,225.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu kruing


0.0400 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00
0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 104,750.00
JASA 10 % 10,475.00
JUMLAH 115,225.00
DIBULATKAN 115,225.00

SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu bengkirai


0.0400 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00
0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 104,750.00
JASA 10 % 10,475.00
JUMLAH 115,225.00
DIBULATKAN 115,225.00

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu jati


6.12 0.0640 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00
0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 129,500.00
JASA 10 % 12,950.00
JUMLAH 142,450.00
DIBULATKAN 142,450.00

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu jati


6.12 0.0640 m3 Kayu jati papan lokal @ Rp. 8,200,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00
0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.3000 org Mandor @ Rp. 32,500.00 9,750.00
JUMLAH ( BELUM PPN ) 129,500.00
JASA 10 % 12,950.00
JUMLAH 142,450.00
DIBULATKAN 142,450.00

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu kamper


6.13 0.0640 m3 Kayu kamper papan @ Rp. 5,500,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00
0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 121,375.00
JASA 10 % 12,137.50
JUMLAH 133,512.50
DIBULATKAN 133,512.00

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu kruing


0.0640 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00
0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 121,375.00
JASA 10 % 12,137.50
JUMLAH 133,512.50
DIBULATKAN 133,512.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu dan jendela jalusi kayu bengkirai


0.0640 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00
0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 121,375.00
JASA 10 % 12,137.50
JUMLAH 133,512.50
DIBULATKAN 133,512.00

PEKERJAAN PLAFOND
SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 11,556.25
JASA 10 % 1,155.63
JUMLAH 12,711.88
DIBULATKAN 12,711.00

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper


6.39 0.0120 m3 Kayu kamper balok @ Rp. 4,750,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 11,556.25
JASA 10 % 1,155.63
JUMLAH 12,711.88
DIBULATKAN 12,711.00

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing


0.0120 m3 Kayu kruing @ Rp. 4,350,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 11,556.25
JASA 10 % 1,155.63
JUMLAH 12,711.88
DIBULATKAN 12,711.00

SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai


0.0120 m3 Kayu bengkirai @ Rp. 5,750,000.00
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 11,556.25
JASA 10 % 1,155.63
JUMLAH 12,711.88
DIBULATKAN 12,711.00

1.0000 m2 Pasang rangka langit-langit (60 x 120) m, kayu kamper


No. Macam Pekerjaan Upah
(1) (2) (3)
0.0130 m3 Kayu kamper @ Rp. 4,750,000.00
0.1200 kg Paku @ Rp. 8,000.00
0.2700 org Tukang kayu @ Rp. 30,000.00 8,100.00
0.0270 org Kepala tukang kayu @ Rp. 32,500.00 877.50
0.1700 org Pekerja @ Rp. 20,000.00 3,400.00
0.0085 org Mandor @ Rp. 32,500.00 276.25
JUMLAH ( BELUM PPN ) 12,653.75
JASA 10 % 1,265.38
JUMLAH 13,919.13
DIBULATKAN 13,919.00
No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m2 Pasang rangka langit-langit (60 x 120) m, kayu kruing


0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.1200 kg Paku @ Rp. 8,000.00
0.2700 org Tukang kayu @ Rp. 30,000.00 8,100.00
0.0270 org Kepala tukang kayu @ Rp. 32,500.00 877.50
0.1700 org Pekerja @ Rp. 20,000.00 3,400.00
0.0085 org Mandor @ Rp. 32,500.00 276.25
JUMLAH ( BELUM PPN ) 12,653.75
JASA 10 % 1,265.38
JUMLAH 13,919.13
DIBULATKAN 13,919.00

1.0000 m2 Pasang rangka langit-langit (60 x 120) m, kayu bengkirai


0.0130 m3 Kayu bengkirai @ Rp. 5,750,000.00
0.1200 kg Paku @ Rp. 8,000.00
0.2700 org Tukang kayu @ Rp. 30,000.00 8,100.00
0.0270 org Kep. Tk. Kayu @ Rp. 32,500.00 877.50
0.1700 org Pekerja @ Rp. 20,000.00 3,400.00
0.0085 org Mandor @ Rp. 32,500.00 276.25
JUMLAH ( BELUM PPN ) 12,653.75
JASA 10 % 1,265.38
JUMLAH 13,919.13
DIBULATKAN 13,919.00

SNI 1.0000 m2 Langit-langit asbes (1,00 x 1,00) m tanpa plepet


6.1 1.1000 lbr Pelat asbes @ Rp. 10,000.00
03-2838-2002 0.0100 kg Paku eternit @ Rp. 11,500.00
0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.0300 org Pekerja @ Rp. 20,000.00 600.00
0.0015 org Mandor @ Rp. 32,500.00 48.75
JUMLAH ( BELUM PPN ) 2,976.25
JASA 10 % 297.63
JUMLAH 3,273.88
DIBULATKAN 3,273.00

1.0000 m2 Langit-langit asbes (1,00 x 1,00) m memakai plepet


1.1000 lbr Pelat asbes @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.0300 org Pekerja @ Rp. 20,000.00 600.00
0.0015 org Mandor @ Rp. 32,500.00 48.75
JUMLAH ( BELUM PPN ) 2,976.25
JASA 10 % 297.63
JUMLAH 3,273.88
DIBULATKAN 3,273.00

SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet
0.0120 m3 Kayu kamper balok @ Rp. 4,750,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet
0.0120 m3 Kayu kruing balok @ Rp. 4,350,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00

SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet
0.0120 m3 Kayu bengkirai balok @ Rp. 5,750,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00

SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kayu lama dg plepet
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00

SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet
0.0120 m3 Kayu kamper balok @ Rp. 4,750,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00

SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet
0.0120 m3 Kayu kruing balok @ Rp. 4,350,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
No. Macam Pekerjaan Upah
(1) (2) (3)
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka ky bengkirai dg plepet


0.0120 m3 Kayu bengkirai balok @ Rp. 5,750,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00

6.13 1.0000 m2 Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper


0.0130 m3 Kayu kamper @ Rp. 4,750,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00

6.13 1.0000 m2 Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing
0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00

1.0000 m2 Langit2 gypsum t; 9 mm, rangka 60 x 120 ky bengkirai


0.0130 m3 Kayu bengkirai @ Rp. 5,750,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00

1.0000 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow


4.5000 m1 Rangka hollow 4x4 cm @ Rp. 9,500.00
0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.1500 kg Paku skrup @ Rp. 10,000.00
5.0000 m1 Kawat penggantung @ Rp. 500.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00
No. Macam Pekerjaan Upah
(1) (2) (3)

6.13 1.0000 m2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper


0.0130 m3 Kayu kamper @ Rp. 4,750,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00

6.13 1.0000 m2 Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing
0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00

1.0000 m2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky bengkirai


0.0130 m3 Kayu bengkirai @ Rp. 5,750,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00

1.0000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow


4.5000 m1 Rangka hollow 4x4 cm @ Rp. 9,500.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.1500 kg Paku skrup @ Rp. 10,000.00
5.0000 m1 Kawat penggantung @ Rp. 500.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Langit-langit akustik 60 x 120 cm + rangka alumunium


03-3438-2002 3.6000 m1 Profil alumunium "T" @ Rp. 20,000.00
6.18 0.1500 kg Kawat seng polos @ Rp. 9,500.00
1.0000 bh Ramset / dina bolt @ Rp. 2,500.00
1.5000 lbr Akustic Armstrong 60 x 120 cm @ Rp. 125,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0500 org Kepala tukang kayu @ Rp. 32,500.00 1,625.00
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 19,868.75
JASA 10 % 1,986.88
JUMLAH 21,855.63
DIBULATKAN 21,855.00

1.0000 m1 Pasang list profil cornees gypsum lebar sampai 5 cm


1.1000 m1 List profil cornees gypsum @ Rp. 4,000.00
0.7000 kg Tepung gypsum @ Rp. 3,500.00
0.0035 kg Alkasit @ Rp. 300,000.00
0.0375 org Tukang kayu @ Rp. 30,000.00 1,125.00
0.0037 org Kepala tukang kayu @ Rp. 32,500.00 120.25
0.1125 org Pekerja @ Rp. 20,000.00 2,250.00
0.0065 org Mandor @ Rp. 32,500.00 211.25
JUMLAH ( BELUM PPN ) 3,706.50
JASA 10 % 370.65
JUMLAH 4,077.15
DIBULATKAN 4,077.00

1.0000 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm


1.1000 m1 List profil cornees gypsum @ Rp. 8,000.00
0.8750 kg Tepung gypsum @ Rp. 3,500.00
0.0044 kg Alkasit @ Rp. 300,000.00
0.0375 org Tukang kayu @ Rp. 30,000.00 1,125.00
0.0037 org Kepala tukang kayu @ Rp. 32,500.00 120.25
0.1125 org Pekerja @ Rp. 20,000.00 2,250.00
0.0065 org Mandor @ Rp. 32,500.00 211.25
JUMLAH ( BELUM PPN ) 3,706.50
JASA 10 % 370.65
JUMLAH 4,077.15
DIBULATKAN 4,077.00

1.0000 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm


1.1000 m1 List profil cornees gypsum @ Rp. 15,000.00
1.0500 kg Tepung gypsum @ Rp. 3,500.00
0.0053 kg Alkasit @ Rp. 300,000.00
0.0400 org Tukang kayu @ Rp. 30,000.00 1,200.00
0.0040 org Kepala tukang kayu @ Rp. 32,500.00 130.00
0.1125 org Pekerja @ Rp. 20,000.00 2,250.00
0.0065 org Mandor @ Rp. 32,500.00 211.25
JUMLAH ( BELUM PPN ) 3,791.25
JASA 10 % 379.13
JUMLAH 4,170.38
DIBULATKAN 4,170.00

SNI 1.0000 m1 List langit-langit kayu profil


6.19 1.1000 m1 List kayu profil @ Rp. 5,500.00
03-2838-2002 0.0100 kg Paku @ Rp. 10,000.00
0.0500 org Tukang kayu @ Rp. 30,000.00 1,500.00
0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50
0.0500 org Pekerja @ Rp. 20,000.00 1,000.00
0.0030 org Mandor @ Rp. 32,500.00 97.50
JUMLAH ( BELUM PPN ) 2,760.00
JASA 10 % 276.00
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH 3,036.00
DIBULATKAN 3,036.00
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN LISPLANG
1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu jati
0.0048 m3 Kayu jati papan @ Rp. 22,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati


0.0086 m3 Kayu jati papan @ Rp. 22,000,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal


0.0048 m3 Papan kayu jati lokal @ Rp. 8,200,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu kamper


0.0048 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper


6.52 0.0086 m3 Kayu kamper papan @ Rp. 5,500,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00
No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu kruing


0.0048 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing


6.52 0.0086 m3 Kayu kruing papan @ Rp. 4,750,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai


0.0048 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

SNI 1.0000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai


6.52 0.0086 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00

AK 1.0000 m2 Membuat listplank asbes plat ram kayu kamper


0.0250 m3 Ram kayu kamper @ Rp. 4,750,000.00
1.0000 m2 Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 8,000.00
1.8000 org Tukang kayu @ Rp. 30,000.00 54,000.00
0.1800 org Kep. Tk. Kayu @ Rp. 32,500.00 5,850.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 72,825.00
JASA 10 % 7,282.50
JUMLAH 80,107.50
DIBULATKAN 80,107.00

AK 1.0000 m2 Membuat listplank asbes plat ram kayu kruing


0.0250 m3 Ram kayu kruing @ Rp. 4,350,000.00
1.0000 m2 Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 8,000.00
1.8000 org Tukang kayu @ Rp. 30,000.00 54,000.00
0.1800 org Kep. Tk. Kayu @ Rp. 32,500.00 5,850.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 72,825.00
JASA 10 % 7,282.50
JUMLAH 80,107.50
DIBULATKAN 80,107.00
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 1.0000 m2 Membuat listplank asbes plat ram kayu bengkirai


0.0250 m3 Ram kayu bengkirai @ Rp. 5,750,000.00
1.0000 m2 Asbes plat @ Rp. 10,000.00
0.3000 kg Paku reng @ Rp. 8,000.00
1.8000 org Tukang kayu @ Rp. 30,000.00 54,000.00
0.1800 org Kep. Tk. Kayu @ Rp. 32,500.00 5,850.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 72,825.00
JASA 10 % 7,282.50
JUMLAH 80,107.50
DIBULATKAN 80,107.00
No. Macam Pekerjaan Upah
(1) (2) (3)

1.0000 m1 Mengerjakan papan ruiter kayu kamper 2/20


0.0040 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.0800 org Tukang kayu @ Rp. 30,000.00 2,400.00
0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00
0.0280 org Pekerja @ Rp. 20,000.00 560.00
0.0014 org Mandor @ Rp. 32,500.00 45.50
JUMLAH 3,265.50
JASA 10 % 326.55
JUMLAH 3,592.05
DIBULATKAN 3,592.00

1.0000 m1 Mengerjakan papan ruiter kayu kruing 2/20


0.0040 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.0800 org Tukang kayu @ Rp. 30,000.00 2,400.00
0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00
0.0280 org Pekerja @ Rp. 20,000.00 560.00
0.0014 org Mandor @ Rp. 32,500.00 45.50
JUMLAH 3,265.50
JASA 10 % 326.55
JUMLAH 3,592.05
DIBULATKAN 3,592.00

1.0000 m1 Mengerjakan papan ruiter kayu bengkirai 2/20


0.0040 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
0.0200 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.0800 org Tukang kayu @ Rp. 30,000.00 2,400.00
0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00
0.0280 org Pekerja @ Rp. 20,000.00 560.00
0.0014 org Mandor @ Rp. 32,500.00 45.50
JUMLAH 3,265.50
JASA 10 % 326.55
JUMLAH 3,592.05
DIBULATKAN 3,592.00

PEKERJAAN TALANG
SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0096 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 15,853.13
JASA 10 % 1,585.31
JUMLAH 17,438.44
DIBULATKAN 17,438.00

SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0096 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 15,853.13
JASA 10 % 1,585.31
JUMLAH 17,438.44
DIBULATKAN 17,438.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0096 m3 Kayui bengkirai papan @ Rp. 6,000,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 15,853.13
JASA 10 % 1,585.31
JUMLAH 17,438.44
DIBULATKAN 17,438.00

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0190 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13
JASA 10 % 1,365.31
JUMLAH 15,018.44
DIBULATKAN 15,018.00

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0190 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13
JASA 10 % 1,365.31
JUMLAH 15,018.44
DIBULATKAN 15,018.00

SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0190 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13
JASA 10 % 1,365.31
JUMLAH 15,018.44
DIBULATKAN 15,018.00

H.18 10.0000 m1 Pasang talang torong


10.0000 m1 Seng BJLS 0,30 ( 60 cm ) @ Rp. 20,000.00
225.0000 bh Paku sumbat @ Rp. 400.00
3.7500 org Tukang besi @ Rp. 25,000.00 93,750.00
0.3750 org Kep. Tk. Besi @ Rp. 27,000.00 10,125.00
2.2500 org Pekerja @ Rp. 20,000.00 45,000.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.1100 org Mandor @ Rp. 32,500.00 3,575.00
JUMLAH ( BELUM PPN ) 152,450.00

TIAP 1M1 ( BELUM PPN ) 15,245.00


JASA 10 % 1,524.50
JUMLAH 16,769.50
DIBULATKAN 16,769.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Pasang talang lingkaran D - 10 cm, seng BJLS 28


6.20 0.3000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.1000 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0190 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
0.5000 kg Besi strip @ Rp. 8,800.00
0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 11,353.13
JASA 10 % 1,135.31
JUMLAH 12,488.44
DIBULATKAN 12,488.00

SNI 1.0000 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
03-3434-2002 0.0195 m3 Kayu kamper balok @ Rp. 4,750,000.00
6.56 0.0070 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.5600 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
0.4500 org Tukang kayu @ Rp. 30,000.00 13,500.00
0.0450 org Kepala tukang kayu @ Rp. 32,500.00 1,462.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0750 org Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 20,400.00
JASA 10 % 2,040.00
JUMLAH 22,440.00
DIBULATKAN 22,440.00

SNI 1.0000 m2 Pas. dinding pemisah plywoodwood rangkap, rangka ky kamper


03-3434-2002 0.0195 m3 Kayu kamper balok @ Rp. 4,750,000.00
6.57 0.0070 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.5600 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00
0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00
0.0600 org Kepala tukang kayu @ Rp. 32,500.00 1,950.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 24,275.00
JASA 10 % 2,427.50
JUMLAH 26,702.50
DIBULATKAN 26,702.00

SNI 1.0000 m2 Pasang plywood tebal 4 mm, untuk dinding


03-3434-2002 0.4000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00
6.59 0.0500 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.0750 org Tukang kayu @ Rp. 30,000.00 2,250.00
0.0075 org Kepala tukang kayu @ Rp. 32,500.00 243.75
0.0250 org Pekerja @ Rp. 20,000.00 500.00
0.0013 org Mandor @ Rp. 32,500.00 42.25
JUMLAH ( BELUM PPN ) 3,036.00
JASA 10 % 303.60
JUMLAH 3,339.60
DIBULATKAN 3,339.00
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN ATAP

1.0000 m2 Pasang genteng lama


0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00
JASA 10 % 737.50
JUMLAH 8,112.50
DIBULATKAN 8,112.00

H.2 1.0000 m2 Pasang genteng paris


25.0000 bh Genteng paris @ Rp. 600.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00
JASA 10 % 737.50
JUMLAH 8,112.50
DIBULATKAN 8,112.00

H.2A 1.0000 m2 Pasang genteng paris untuk rumah tingkat


25.0000 bh Genteng paris @ Rp. 600.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.3000 org Pekerja @ Rp. 20,000.00 6,000.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50
JASA 10 % 953.75
JUMLAH 10,491.25
DIBULATKAN 10,491.00

H.2A 1.0000 m2 Pasang genteng beton besar Natural ( isi 9 / m2 )


9.0000 bh Genteng beton natural @ Rp. 2,750.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00
JASA 10 % 737.50
JUMLAH 8,112.50
DIBULATKAN 8,112.00

H.2A 1.0000 m2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat
9.0000 bh Genteng beton natural @ Rp. 2,750.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.3000 org Pekerja @ Rp. 20,000.00 6,000.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50
JASA 10 % 953.75
JUMLAH 10,491.25
DIBULATKAN 10,491.00
No. Macam Pekerjaan Upah
(1) (2) (3)

H.2A 1.0000 m2 Pasang genteng beton besar Warna ( isi 9 / m2 )


9.0000 bh Genteng beton Warna @ Rp. 4,420.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00
JASA 10 % 737.50
JUMLAH 8,112.50
DIBULATKAN 8,112.00

H.2A 1.0000 m2 Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat
9.0000 bh Genteng beton Warna @ Rp. 4,420.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.3000 org Pekerja @ Rp. 20,000.00 6,000.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50
JASA 10 % 953.75
JUMLAH 10,491.25
DIBULATKAN 10,491.00

H.6 1.0000 m1 Pasang bubungan genteng paris


5.0000 bh Bubungan genteng paris @ Rp. 1,650.00
0.0152 m3 Kapur pasang @ Rp. 72,500.00
0.0152 m3 Pasir pasang @ Rp. 76,000.00
1.5240 kg PC @ Rp. 764.00
0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0200 org Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 14,750.00
JASA 10 % 1,475.00
JUMLAH 16,225.00
DIBULATKAN 16,225.00

H.6 1.0000 m1 Pasang bubungan genteng beton Natural


5.0000 bh Bubungan genteng beton natural @ Rp. 2,460.00
0.0152 m3 Kapur pasang @ Rp. 72,500.00
0.0152 m3 Pasir pasang @ Rp. 76,000.00
1.5240 kg PC @ Rp. 764.00
0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0200 org Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 14,750.00
JASA 10 % 1,475.00
JUMLAH 16,225.00
DIBULATKAN 16,225.00
No. Macam Pekerjaan Upah
(1) (2) (3)

H.6 1.0000 m1 Pasang bubungan genteng beton Warna


4.0000 bh Bubungan genteng beton warna @ Rp. 4,260.00
0.0152 m 3
Kapur pasang @ Rp. 72,500.00
0.0152 m3 Pasir pasang @ Rp. 76,000.00
1.5240 kg PC @ Rp. 764.00
0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0200 org Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 14,750.00
JASA 10 % 1,475.00
JUMLAH 16,225.00
DIBULATKAN 16,225.00

1.0000 m2 Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm


SNI 0.5000 lbr Asbes gelombang @ Rp. 62,960.00
6.8 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
03-3436-2002 0.0750 org Tukang kayu @ Rp. 30,000.00 2,250.00
0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0080 org Mandor @ Rp. 32,500.00 260.00
JUMLAH ( BELUM PPN ) 5,570.00
JASA 10 % 557.00
JUMLAH 6,127.00
DIBULATKAN 6,127.00

SNI 1.0000 m2 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm


6.10 0.6000 lbr Asbes gelombang @ Rp. 50,330.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,355.00
JASA 10 % 535.50
JUMLAH 5,890.50
DIBULATKAN 5,890.00

SNI 1.0000 m2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm


6.11 0.7500 lbr Asbes gelombang @ Rp. 45,290.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,355.00
JASA 10 % 535.50
JUMLAH 5,890.50
DIBULATKAN 5,890.00

SNI 1.0000 m2 Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm


6.12 0.3500 lbr Asbes gelombang @ Rp. 71,350.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,355.00
JASA 10 % 535.50
JUMLAH 5,890.50
DIBULATKAN 5,890.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm


6.14 0.4400 lbr Asbes gelombang @ Rp. 61,000.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00
JASA 10 % 526.50
JUMLAH 5,791.50
DIBULATKAN 5,791.00

SNI 1.0000 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm


6.15 0.5100 lbr Asbes gelombang @ Rp. 57,500.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00
JASA 10 % 526.50
JUMLAH 5,791.50
DIBULATKAN 5,791.00

SNI 1.0000 m2 Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm


6.16 0.8000 lbr Asbes gelombang @ Rp. 35,950.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00
JASA 10 % 526.50
JUMLAH 5,791.50
DIBULATKAN 5,791.00

SNI 1.0000 m2 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm


6.17 0.3700 lbr Asbes gelombang @ Rp. 112,830.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00
JASA 10 % 526.50
JUMLAH 5,791.50
DIBULATKAN 5,791.00

SNI 1.0000 m2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm


6.19 0.4600 lbr Asbes gelombang @ Rp. 90,265.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00
JASA 10 % 526.50
JUMLAH 5,791.50
DIBULATKAN 5,791.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm


6.20 0.4900 lbr Asbes gelombang @ Rp. 78,980.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00
JASA 10 % 526.50
JUMLAH 5,791.50
DIBULATKAN 5,791.00

SNI 1.0000 m2 Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm


6.21 0.5700 lbr Asbes gelombang @ Rp. 67,690.00
03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00
0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00
0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,265.00
JASA 10 % 526.50
JUMLAH 5,791.50
DIBULATKAN 5,791.00

SNI 1.0000 m1 Pasang bubung stel gelombang 0,92 m


6.22 2.4000 lbr Bubung stel gelombang @ Rp. 29,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 30,000.00 3,750.00
0.0130 org Kepala tukang kayu @ Rp. 32,500.00 422.50
0.0840 org Pekerja @ Rp. 20,000.00 1,680.00
0.0040 org Mandor @ Rp. 32,500.00 130.00
JUMLAH ( BELUM PPN ) 5,982.50
JASA 10 % 598.25
JUMLAH 6,580.75
DIBULATKAN 6,580.00

SNI 1.0000 m1 Pasang nok stel gelombang 1,05 m


6.23 2.1000 lbr Nok stel gelombang @ Rp. 29,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 30,000.00 3,750.00
0.0130 org Kepala tukang kayu @ Rp. 32,500.00 422.50
0.0840 org Pekerja @ Rp. 20,000.00 1,680.00
0.0040 org Mandor @ Rp. 32,500.00 130.00
JUMLAH ( BELUM PPN ) 5,982.50
JASA 10 % 598.25
JUMLAH 6,580.75
DIBULATKAN 6,580.00

SNI 1.0000 m1 Pasang nok stel gelombang 1,08 m


6.24 2.0500 lbr Nok stel gelombang @ Rp. 29,000.00
03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00
0.1250 org Tukang kayu @ Rp. 30,000.00 3,750.00
0.0130 org Kepala tukang kayu @ Rp. 32,500.00 422.50
0.0840 org Pekerja @ Rp. 20,000.00 1,680.00
0.0040 org Mandor @ Rp. 32,500.00 130.00
JUMLAH ( BELUM PPN ) 5,982.50
JASA 10 % 598.25
JUMLAH 6,580.75
DIBULATKAN 6,580.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang atap genteng metal zinc alume type prima roof
03-3436-2002 1.0200 m2 Genteng metal @ Rp. 95,400.00
6.32 0.2000 kg Paku anti karat @ Rp. 20,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0010 org Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 7,357.50
JASA 10 % 735.75
JUMLAH 8,093.25
DIBULATKAN 8,093.00

Mod. SNI 1.0000 m2 Pasang atap metal gelombanmg


03-3436-2002 1.0200 m2 Atap metal gelombang t 3,5 mm @ Rp. 60,000.00
6.32 4.0000 bh Paku/skrup atap anti karat @ Rp. 1,200.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0010 org Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 7,357.50
JASA 10 % 735.75
JUMLAH 8,093.25
DIBULATKAN 8,093.00

SNI 1.0000 m2 Pasang alumunium foil / sisalation


03-3436-2002 1.0500 m2 Sisalation / alumunium foil @ Rp. 25,000.00
6.42 0.0500 org Tukang kayu @ Rp. 30,000.00 1,500.00
0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0080 org Mandor @ Rp. 32,500.00 260.00
JUMLAH ( BELUM PPN ) 4,922.50
JASA 10 % 492.25
JUMLAH 5,414.75
DIBULATKAN 5,414.00

Empiris 1.0000 m2 Pasang atap polikarbonat


1.0500 m2 Plykarbhonat @ Rp. 225,000.00
7.0000 kg Besi rangka @ Rp. 8,800.00
9.0000 bh Paku sekrup @ Rp. 1,200.00
0.5000 org Tukang besi @ Rp. 25,000.00 12,500.00
0.0500 org Kepala tukang besi @ Rp. 27,000.00 1,350.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 23,931.25
JASA 10 % 2,393.13
JUMLAH 26,324.38
DIBULATKAN 26,324.00
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN CAT-CATAN

SNI 1.0000 m2 Mengikis / mengerok permukaan cat tembok lama


6.1 0.0500 kg Soda api @ Rp. 15,000.00
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 3,081.25
JASA 10 % 308.13
JUMLAH 3,389.38
DIBULATKAN 3,389.00

SNI 1.0000 m2 Pengecatan bidang kayu lama


6.7 0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.1700 kg Cat penutup @ Rp. 32,000.00
0.0750 org Tukang cat @ Rp. 25,000.00 1,875.00
0.0075 org Kepala tukang cat @ Rp. 27,000.00 202.50
0.0700 org Pekerja @ Rp. 20,000.00 1,400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 3,558.75
JASA 10 % 355.88
JUMLAH 3,914.63
DIBULATKAN 3,914.00

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.2000 kg Cat meni @ Rp. 12,000.00
0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.2600 kg Cat penutup @ Rp. 32,000.00
0.0900 org Tukang cat @ Rp. 25,000.00 2,250.00
0.0060 org Kepala tukang cat @ Rp. 27,000.00 162.00
0.0700 org Pekerja @ Rp. 20,000.00 1,400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 3,893.25
JASA 10 % 389.33
JUMLAH 4,282.58
DIBULATKAN 4,282.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 12,000.00
0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.3500 kg Cat penutup @ Rp. 32,000.00
0.1050 org Tukang cat @ Rp. 25,000.00 2,625.00
0.0040 org Kepala tukang cat @ Rp. 27,000.00 108.00
0.0700 org Pekerja @ Rp. 20,000.00 1,400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 4,214.25
JASA 10 % 421.43
JUMLAH 4,635.68
DIBULATKAN 4,635.00

SNI 1.0000 m2 Pelaburan bidang kayu dengan politur


6.11 0.1500 ltr Politur @ Rp. 20,000.00
0.3720 ltr Politur jadi @ Rp. 20,000.00
2.0000 lbr Amplas @ Rp. 2,500.00
0.0600 org Tukang cat @ Rp. 25,000.00 1,500.00
0.0160 org Kepala tukang cat @ Rp. 27,000.00 432.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 2,013.25
JASA 10 % 201.33
JUMLAH 2,214.58
DIBULATKAN 2,214.00

SNI 1.0000 m2 Pelaburan bidang kayu dengan vernis


6.13 0.1500 ltr Vernis @ Rp. 12,500.00
0.0500 kg Dempul @ Rp. 10,000.00
0.1000 lbr Amplas @ Rp. 2,500.00
0.0100 bh Kuas @ Rp. 8,000.00
0.1600 org Tukang cat @ Rp. 25,000.00 4,000.00
0.0160 org Kepala tukang cat @ Rp. 27,000.00 432.00
0.1600 org Pekerja @ Rp. 20,000.00 3,200.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 7,713.25
JASA 10 % 771.33
JUMLAH 8,484.58
DIBULATKAN 8,484.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 8,500.00
0.1000 kg Cat dasar @ Rp. 9,500.00
0.2600 kg Cat penutup 2 x @ Rp. 9,500.00
0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00
0.0063 org Kepala tukang cat @ Rp. 27,000.00 170.10
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 2,226.35
JASA 10 % 222.64
JUMLAH 2,448.99
DIBULATKAN 2,448.00

SNI 1.0000 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15 0.1200 kg Cat dasar @ Rp. 9,500.00
0.1800 kg Cat penutup 2 x @ Rp. 9,500.00
0.0420 org Tukang cat @ Rp. 25,000.00 1,050.00
0.0042 org Kepala tukang cat @ Rp. 27,000.00 113.40
0.0280 org Pekerja @ Rp. 20,000.00 560.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 1,804.65
JASA 10 % 180.47
JUMLAH 1,985.12
DIBULATKAN 1,985.00

SNI 1.0000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.1000 kg Cat alkali resisting primer @ Rp. 27,200.00
0.3600 kg Cat ICI Weathershield @ Rp. 50,000.00
0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00
0.0063 org Kepala tukang cat @ Rp. 27,000.00 170.10
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 2,226.35
JASA 10 % 222.64
JUMLAH 2,448.99
DIBULATKAN 2,448.00

SNI 1.0000 m2 Melabur tembok dengan kapur sirih


6.17 0.1000 lbr Amplas @ Rp. 2,500.00
0.2500 ikat Alang-alang @ Rp. 500.00
0.0020 m3 Perancah kayu @ Rp. 1,000,000.00
0.1500 kg Kapur sirih @ Rp. 500.00
0.0010 org Tukang cat @ Rp. 25,000.00 25.00
0.0001 org Kepala tukang cat @ Rp. 27,000.00 2.70
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 3,108.95
JASA 10 % 310.90
JUMLAH 3,419.85
DIBULATKAN 3,419.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)
6.18 0.0020 m3 Perancah kayu @ Rp. 1,000,000.00
0.3000 kg Kapur sirih @ Rp. 500.00
0.0050 org Tukang cat @ Rp. 25,000.00 125.00
0.0005 org Kepala tukang cat @ Rp. 27,000.00 13.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 1,019.75
JASA 10 % 101.98
JUMLAH 1,121.73
DIBULATKAN 1,121.00

SNI 1.0000 m2 Pengecatan bidang besi ( 3 x )


6.9 0.1670 kg Cat meni besi @ Rp. 12,000.00
0.2000 kg Cat besi @ Rp. 32,000.00
0.1500 ltr Thinner @ Rp. 12,000.00
0.1050 org Tukang cat @ Rp. 25,000.00 2,625.00
0.0040 org Kepala tukang cat @ Rp. 27,000.00 108.00
0.0700 org Pekerja @ Rp. 20,000.00 1,400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 4,214.25
JASA 10 % 421.43
JUMLAH 4,635.68
DIBULATKAN 4,635.00

SNI 1.0000 m2 Pengecacatan permukaan baja dengan meni besi


6.20 0.1000 kg Meni besi sinkromat @ Rp. 22,500.00
0.0100 bh Kuas @ Rp. 8,000.00
0.2000 org Tukang cat @ Rp. 25,000.00 5,000.00
0.0200 org Kepala tukang cat @ Rp. 27,000.00 540.00
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 6,265.00
JASA 10 % 626.50
JUMLAH 6,891.50
DIBULATKAN 6,891.00

SNI 1.0000 m2 Pengecacatan permukaan baja dengan meni besi memakai perancah
6.21 0.1000 kg Meni besi sinkromat @ Rp. 22,500.00
0.0100 bh Kuas @ Rp. 8,000.00
0.0020 m3 Perancah kayu @ Rp. 1,000,000.00
0.2250 org Tukang cat @ Rp. 25,000.00 5,625.00
0.0225 org Kepala tukang cat @ Rp. 27,000.00 607.50
0.2250 org Pekerja @ Rp. 20,000.00 4,500.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 10,976.25
JASA 10 % 1,097.63
JUMLAH 12,073.88
DIBULATKAN 12,073.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pengetiran kayu ( 2 x )


0.3500 kg Tir @ Rp. 8,000.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 2,162.50
JASA 10 % 216.25
JUMLAH 2,378.75
DIBULATKAN 2,378.00

Empiris 1.0000 m2 Pekerjaan cat duco 3 x


0.4250 kg Cat duco @ Rp. 60,000.00
0.0570 ltr Thinner @ Rp. 13,000.00
0.1000 lbr Amplas @ Rp. 2,500.00 250.00
0.3000 org Tukang cat @ Rp. 25,000.00 7,500.00
0.0300 org Kep. Tk. Cat @ Rp. 27,000.00 810.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 12,885.00
JASA 10 % 1,288.50
JUMLAH 14,173.50
DIBULATKAN 14,173.00

Empiris 1.0000 m2 Mengerjakan Cat Sungging


Mengerjakan cat dasar
0.1200 kg Cat menie kayu @ Rp. 12,000.00
0.0400 org Tukang cat @ Rp. 25,000.00 1,000.00
0.0040 org Kep. Tk. Cat @ Rp. 27,000.00 108.00
0.0667 org Pekerja @ Rp. 20,000.00 1,334.00
0.0033 org Mandor @ Rp. 32,500.00 107.25
JUMLAH ( A ) 2,549.25

Mengecat dan membuat gradasi tutulan berkali-kali


0.4250 kg Cat kayu @ Rp. 32,000.00
0.1000 ltr Minyak cat @ Rp. 10,000.00
5.0000 org Tukang cat sungging @ Rp. 40,000.00 200,000.00
0.5000 org Kep. Tk. Cat sungging @ Rp. 45,000.00 22,500.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( B ) 226,825.00
JUMLAH A + B ( BELUM PPN ) 229,374.25
JASA 10 % 22,937.43
JUMLAH 252,311.68
DIBULATKAN 252,311.00

31 1.0000 m2 Mengecat genteng


0.3600 kg Cat genteng air ICI Weathershield @ Rp. 42,000.00
0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00
0.0063 org Kep. Tk. Cat @ Rp. 27,000.00 170.10
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH 2,226.35
JASA 10 % 222.64
JUMLAH 2,448.99
DIBULATKAN 2,448.00

PEKERJAAN BONGKARAN

AK 1.0000 m3 Membongkar pasangan batu kali


4.0000 org Tukang batu @ Rp. 27,500.00 110,000.00
0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
JUMLAH ( BELUM PPN ) 118,000.00
JASA 10 % 11,800.00
JUMLAH 129,800.00
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN 129,800.00

AK 1.0000 m3 Membongkar pasangan batu merah dan membersihkan


2.0000 org Tukang batu @ Rp. 27,500.00 55,000.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
JUMLAH ( BELUM PPN ) 57,000.00
JASA 10 % 5,700.00
JUMLAH 62,700.00
DIBULATKAN 62,700.00

AK 1.0000 m3 Membongkar beton bertulang dan membersihkan


0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00
8.0000 org Pekerja @ Rp. 20,000.00 160,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 168,750.00
JASA 10 % 16,875.00
JUMLAH 185,625.00
DIBULATKAN 185,625.00
No. Macam Pekerjaan Upah
(1) (2) (3)

AK 10.0000 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi


2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 43,250.00

TIAP 1M2 ( BELUM PPN ) 4,325.00


JASA 10 % 432.50
JUMLAH 4,757.50
DIBULATKAN 4,757.00

I.6 10.0000 m2 Mengupas plesteran lama


1.2500 org Pekerja @ Rp. 20,000.00 25,000.00
0.1250 org Mandor @ Rp. 32,500.00 4,062.50
JUMLAH ( BELUM PPN ) 29,062.50

TIAP 1M2 ( BELUM PPN ) 2,906.25


JASA 10 % 290.63
JUMLAH 3,196.88
DIBULATKAN 3,196.00

I.7 10.0000 m2 Membongkar genteng / sirap untuk dipergunakan lagi


2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 43,250.00

TIAP 1M2 ( BELUM PPN ) 4,325.00


JASA 10 % 432.50
JUMLAH 4,757.50
DIBULATKAN 4,757.00

I.8 10.0000 m2 Membongkar atap seng


0.5000 org Tukang besi @ Rp. 25,000.00 12,500.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
JUMLAH ( BELUM PPN ) 32,500.00

TIAP 1M2 ( BELUM PPN ) 3,250.00


JASA 10 % 325.00
JUMLAH 3,575.00
DIBULATKAN 3,575.00

I.9 10.0000 m2 Membongkar usuk / reng dipakai lagi


0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00
0.0600 org Kep. Tk. Kayu @ Rp. 32,500.00 1,950.00
2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 63,200.00

TIAP 1M2 ( BELUM PPN ) 6,320.00


JASA 10 % 632.00
JUMLAH 6,952.00
DIBULATKAN 6,952.00

10.0000 m2 Membongkar usuk / reng tidak dipakai lagi


2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 43,250.00

TIAP 1M2 ( BELUM PPN ) 4,325.00


JASA 10 % 432.50
JUMLAH 4,757.50
DIBULATKAN 4,757.00
No. Macam Pekerjaan Upah
(1) (2) (3)

L.12 1.0000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
6.0000 org Tukang kayu @ Rp. 30,000.00 180,000.00
0.6000 org Kep. Tk. Kayu @ Rp. 32,500.00 19,500.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 286,000.00
JASA 10 % 28,600.00
JUMLAH 314,600.00
DIBULATKAN 314,600.00

1.0000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 26,500.00
JASA 10 % 2,650.00
JUMLAH 29,150.00
DIBULATKAN 29,150.00

L.14 1.0000 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar


12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 39,000.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 485,500.00
JASA 10 % 48,550.00
JUMLAH 534,050.00
DIBULATKAN 534,050.00

ANALISA SUPLEMEN

3 1.0000 M Pengelasan Single ( las listrik )


3.0000 kg Kawat las @ Rp. 6,500.00
1.0000 hari Peralatan las @ Rp. 75,000.00
0.5000 org Tukang las @ Rp. 27,500.00 13,750.00
0.0500 org Kepala tukang las @ Rp. 29,000.00 1,450.00
1.0000 Org Pekerja @ Rp. 27,500.00 27,500.00
1.0000 Org Mandor @ Rp. 32,500.00 32,500.00
JUMLAH ( BELUM PPN ) 75,200.00
JASA 10 % 7,520.00
JUMLAH 82,720.00
DIBULATKAN 82,720.00
No. Macam Pekerjaan Upah
(1) (2) (3)

PEKERJAAN SANITASI
SNI 1.0000 bh Memasang kloset duduk/monoblock
1.0000 bh Kloset duduk / monoblock @ Rp. 1,250,000.00
6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,250,000.00
1.1000 org Tukang batu @ Rp. 27,500.00 30,250.00
0.0010 org Kepala tukang batu @ Rp. 30,000.00 30.00
3.3000 org Pekerja @ Rp. 20,000.00 66,000.00
0.1600 org Mandor @ Rp. 32,500.00 5,200.00
JUMLAH ( BELUM PPN ) 101,480.00
JASA 10 % 10,148.00
JUMLAH 111,628.00
DIBULATKAN 111,628.00

SNI 1.0000 bh Memasang kloset jongkok porselen


1.0000 bh Kloset jongkok porselen @ Rp. 75,000.00
6.2 6.0000 kg PC @ Rp. 764.00
0.0100 m3 Pasir pasang @ Rp. 76,000.00
1.5000 org Tukang batu @ Rp. 27,500.00 41,250.00
1.5000 org Kepala tukang batu @ Rp. 30,000.00 45,000.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.1600 org Mandor @ Rp. 32,500.00 5,200.00
JUMLAH ( BELUM PPN ) 111,450.00
JASA 10 % 11,145.00
JUMLAH 122,595.00
DIBULATKAN 122,595.00

SNI 1.0000 bh Memasang urinoir


1.0000 bh Urinoir @ Rp. 785,000.00
6.4 30% x Harga urinoir (Perlengkapan) @ Rp. 785,000.00
6.0000 kg PC @ Rp. 764.00
0.0100 m3 Pasir pasang @ Rp. 76,000.00
1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00
0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 53,750.00
JASA 10 % 5,375.00
JUMLAH 59,125.00
DIBULATKAN 59,125.00

SNI 1.0000 bh Memasang wastafel


1.0000 bh Wastafel @ Rp. 271,340.00
6.5 12% x Harga wastafel (Perlengkapan) @ Rp. 271,340.00
6.0000 kg PC @ Rp. 764.00
0.0100 m3 Pasir pasang @ Rp. 76,000.00
1.4500 org Tukang batu @ Rp. 27,500.00 39,875.00
0.1500 org Kepala tukang batu @ Rp. 30,000.00 4,500.00
1.2000 org Pekerja @ Rp. 20,000.00 24,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 71,625.00
JASA 10 % 7,162.50
JUMLAH 78,787.50
DIBULATKAN 78,787.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 bh Memasang bak mandi fiberglass volume 0,30 m 3


1.0000 bh Bak fiberglass @ Rp. 275,000.00
6.7 18% x Harga bak(Perlengkapan) @ Rp. 275,000.00
2.7000 org Tukang batu @ Rp. 27,500.00 74,250.00
0.5400 org Kepala tukang batu @ Rp. 30,000.00 16,200.00
1.8000 org Pekerja @ Rp. 20,000.00 36,000.00
0.1100 org Mandor @ Rp. 32,500.00 3,575.00
JUMLAH ( BELUM PPN ) 130,025.00
JASA 10 % 13,002.50
JUMLAH 143,027.50
DIBULATKAN 143,027.00

SNI 1.0000 bh Memasang badkip porselen


1.0000 bh Badkip @ Rp. 150,000.00
6.9 20% x Harga badkip (Perlengkapan) @ Rp. 150,000.00
0.0750 org Tukang batu @ Rp. 27,500.00 2,062.50
0.7500 org Kepala tukang batu @ Rp. 30,000.00 22,500.00
org Pekerja @ Rp. 20,000.00 -
0.2500 org Mandor @ Rp. 32,500.00 8,125.00
JUMLAH ( BELUM PPN ) 32,687.50
JASA 10 % 3,268.75
JUMLAH 35,956.25
DIBULATKAN 35,956.00

SNI 1.0000 bh Memasang bak fiberglass volume 1 m 3 air


1.0000 bh Bak fiberglass @ Rp. 825,000.00
6.11 12% x Harga bak (Perlengkapan) @ Rp. 825,000.00
4.5000 org Tukang batu @ Rp. 27,500.00 123,750.00
0.9000 org Kepala tukang batu @ Rp. 30,000.00 27,000.00
3.0000 org Pekerja @ Rp. 20,000.00 60,000.00
0.9000 org Mandor @ Rp. 32,500.00 29,250.00
JUMLAH ( BELUM PPN ) 240,000.00
JASA 10 % 24,000.00
JUMLAH 264,000.00
DIBULATKAN 264,000.00

SNI 1.0000 m1 Memasang pipa beton, diameter 15 cm - 20 cm


1.1000 bh Pipa beton @ Rp. 24,000.00
6.14 16.0000 bh Batu bata @ Rp. 350.00
3.9200 kg PC @ Rp. 764.00
0.0560 m3 Pasir pasang @ Rp. 76,000.00
0.0240 m3 Pasir urug @ Rp. 55,000.00
0.0700 org Tukang batu @ Rp. 27,500.00 1,925.00
0.0070 org Kepala tukang batu @ Rp. 30,000.00 210.00
0.1400 org Pekerja @ Rp. 20,000.00 2,800.00
0.0070 org Mandor @ Rp. 32,500.00 227.50
JUMLAH ( BELUM PPN ) 5,162.50
JASA 10 % 516.25
JUMLAH 5,678.75
DIBULATKAN 5,678.00

SNI 1.0000 m1 Memasang pipa beton, diameter 30 cm - 100 cm


1.1000 bh Pipa beton @ Rp. 25,000.00
6.15 330.0000 bh Batu bata @ Rp. 350.00
10.3000 kg PC @ Rp. 764.00
0.0610 m3 Pasir pasang @ Rp. 76,000.00
0.0690 m3 Pasir urug @ Rp. 55,000.00
0.1900 org Tukang batu @ Rp. 27,500.00 5,225.00
0.0190 org Kepala tukang batu @ Rp. 30,000.00 570.00
0.3800 org Pekerja @ Rp. 20,000.00 7,600.00
0.0190 org Mandor @ Rp. 32,500.00 617.50
JUMLAH ( BELUM PPN ) 14,012.50
No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 % 1,401.25
JUMLAH 15,413.75
DIBULATKAN 15,413.00

SNI 1.0000 bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm
87.0000 bh Batu bata @ Rp. 350.00
6.16 44.0000 kg PC @ Rp. 764.00
0.0700 m3 Pasir pasang @ Rp. 76,000.00
0.0700 m3 Batu kerikil @ Rp. 55,000.00
1.6000 kg Besi beton @ Rp. 7,900.00
0.0600 m3 Pasir beton @ Rp. 73,000.00
1.0150 org Tukang batu @ Rp. 27,500.00 27,912.50
0.0015 org Kepala tukang batu @ Rp. 30,000.00 45.00
3.2000 org Pekerja @ Rp. 20,000.00 64,000.00
0.0160 org Mandor @ Rp. 32,500.00 520.00
JUMLAH ( BELUM PPN ) 92,477.50
JASA 10 % 9,247.75
JUMLAH 101,725.25
DIBULATKAN 101,725.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 bh Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm
150.0000 bh Batu bata @ Rp. 350.00
6.17 77.0000 kg PC @ Rp. 764.00
0.1300 m3 Pasir pasang @ Rp. 76,000.00
0.0200 m 3
Batu kerikil @ Rp. 55,000.00
2.6000 kg Besi beton @ Rp. 7,900.00
0.0900 m3 Pasir beton @ Rp. 73,000.00
0.4730 org Tukang batu @ Rp. 27,500.00 13,007.50
0.0470 org Kepala tukang batu @ Rp. 30,000.00 1,410.00
1.4200 org Pekerja @ Rp. 20,000.00 28,400.00
0.0710 org Mandor @ Rp. 32,500.00 2,307.50
JUMLAH ( BELUM PPN ) 45,125.00
JASA 10 % 4,512.50
JUMLAH 49,637.50
DIBULATKAN 49,637.00

SNI 1.0000 bh Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm
222.0000 bh Batu bata @ Rp. 350.00
6.18 114.0000 kg PC @ Rp. 764.00
0.1840 m3 Pasir pasang @ Rp. 76,000.00
0.0330 m 3
Batu kerikil @ Rp. 55,000.00
4.8500 kg Besi beton @ Rp. 7,900.00
0.1200 m3 Pasir beton @ Rp. 73,000.00
0.7200 org Tukang batu @ Rp. 27,500.00 19,800.00
0.0720 org Kepala tukang batu @ Rp. 30,000.00 2,160.00
2.1600 org Pekerja @ Rp. 20,000.00 43,200.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 68,410.00
JASA 10 % 6,841.00
JUMLAH 75,251.00
DIBULATKAN 75,251.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 1/2"


1.2000 m1 Pipa galvanis @ Rp. 15,000.00
6.19 35% x Harga pipa (Perlengkapan) @ Rp. 15,000.00
0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00
0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00
0.0540 org Pekerja @ Rp. 20,000.00 1,080.00
0.0270 org Mandor @ Rp. 32,500.00 877.50
JUMLAH ( BELUM PPN ) 4,702.50
JASA 10 % 470.25
JUMLAH 5,172.75
DIBULATKAN 5,172.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 3/4"


1.2000 m1 Pipa galvanis @ Rp. 25,000.00
6.20 35% x Harga pipa (Perlengkapan) @ Rp. 25,000.00
0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00
0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00
0.0540 org Pekerja @ Rp. 20,000.00 1,080.00
0.0270 org Mandor @ Rp. 32,500.00 877.50
JUMLAH ( BELUM PPN ) 4,702.50
JASA 10 % 470.25
JUMLAH 5,172.75
DIBULATKAN 5,172.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 1"


1.2000 m1 Pipa galvanis @ Rp. 37,500.00
6.21 35% x Harga pipa (Perlengkapan) @ Rp. 37,500.00
0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00
0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0540 org Pekerja @ Rp. 20,000.00 1,080.00
0.0270 org Mandor @ Rp. 32,500.00 877.50
JUMLAH ( BELUM PPN ) 4,702.50
JASA 10 % 470.25
JUMLAH 5,172.75
DIBULATKAN 5,172.00

SNI 1.0000 m1 Memasang pipa galvanis diameter 1 1/2"


1.2000 m1 Pipa galvanis @ Rp. 50,000.00
6.22 35% x Harga pipa (Perlengkapan) @ Rp. 50,000.00
0.1800 org Tukang batu @ Rp. 27,500.00 4,950.00
0.0180 org Kepala tukang batu @ Rp. 30,000.00 540.00
0.1080 org Pekerja @ Rp. 20,000.00 2,160.00
0.0054 org Mandor @ Rp. 32,500.00 175.50
JUMLAH ( BELUM PPN ) 7,825.50
JASA 10 % 782.55
JUMLAH 8,608.05
DIBULATKAN 8,608.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1/2"


1.2000 m1 Pipa PVC @ Rp. 3,162.50
6.25 35% x Harga pipa (Perlengkapan) @ Rp. 3,162.50
0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00
0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00
0.0360 org Pekerja @ Rp. 20,000.00 720.00
0.0018 org Mandor @ Rp. 32,500.00 58.50
JUMLAH ( BELUM PPN ) 2,608.50
JASA 10 % 260.85
JUMLAH 2,869.35
DIBULATKAN 2,869.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3/4"


1.2000 m1 Pipa PVC @ Rp. 4,250.00
6.26 35% x Harga pipa (Perlengkapan) @ Rp. 4,250.00
0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00
0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00
0.0360 org Pekerja @ Rp. 20,000.00 720.00
0.0018 org Mandor @ Rp. 32,500.00 58.50
JUMLAH ( BELUM PPN ) 2,608.50
JASA 10 % 260.85
JUMLAH 2,869.35
DIBULATKAN 2,869.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1"


1.2000 m1 Pipa PVC @ Rp. 5,125.00
6.27 35% x Harga pipa (Perlengkapan) @ Rp. 5,125.00
0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00
0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00
0.0360 org Pekerja @ Rp. 20,000.00 720.00
0.0018 org Mandor @ Rp. 32,500.00 58.50
JUMLAH ( BELUM PPN ) 2,608.50
JASA 10 % 260.85
JUMLAH 2,869.35
DIBULATKAN 2,869.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1 1/2"


1.2000 m1 Pipa PVC @ Rp. 11,250.00
6.28 35% x Harga pipa (Perlengkapan) @ Rp. 11,250.00
0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00
0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00
0.0360 org Pekerja @ Rp. 20,000.00 720.00
0.0018 org Mandor @ Rp. 32,500.00 58.50
JUMLAH ( BELUM PPN ) 2,608.50
JASA 10 % 260.85
JUMLAH 2,869.35
DIBULATKAN 2,869.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2"


1.2000 m1 Pipa PVC @ Rp. 15,000.00
6.29 35% x Harga pipa (Perlengkapan) @ Rp. 15,000.00
0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00
0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00
0.0544 org Pekerja @ Rp. 20,000.00 1,088.00
0.0027 org Mandor @ Rp. 32,500.00 87.75
JUMLAH ( BELUM PPN ) 3,920.75
JASA 10 % 392.08
JUMLAH 4,312.83
DIBULATKAN 4,312.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2 1/2"


1.2000 m1 Pipa PVC @ Rp. 20,500.00
6.30 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00
0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00
0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00
0.0360 org Pekerja @ Rp. 20,000.00 720.00
0.0018 org Mandor @ Rp. 32,500.00 58.50
JUMLAH ( BELUM PPN ) 2,608.50
JASA 10 % 260.85
JUMLAH 2,869.35
DIBULATKAN 2,869.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3"


1.2000 m1 Pipa PVC @ Rp. 20,500.00
6.31 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00
0.1350 org Tukang batu @ Rp. 27,500.00 3,712.50
0.0135 org Kepala tukang batu @ Rp. 30,000.00 405.00
0.0810 org Pekerja @ Rp. 20,000.00 1,620.00
0.0410 org Mandor @ Rp. 32,500.00 1,332.50
JUMLAH ( BELUM PPN ) 7,070.00
JASA 10 % 707.00
JUMLAH 7,777.00
DIBULATKAN 7,777.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 4"


1.2000 m1 Pipa PVC @ Rp. 33,750.00
6.32 35% x Harga pipa (Perlengkapan) @ Rp. 33,750.00
0.1350 org Tukang batu @ Rp. 27,500.00 3,712.50
0.0135 org Kepala tukang batu @ Rp. 30,000.00 405.00
0.0810 org Pekerja @ Rp. 20,000.00 1,620.00
0.0410 org Mandor @ Rp. 32,500.00 1,332.50
JUMLAH ( BELUM PPN ) 7,070.00
JASA 10 % 707.00
JUMLAH 7,777.00
DIBULATKAN 7,777.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 bh Memasang bak cuci piring stainless steel


1.0000 bh Bak cuci stainless steel @ Rp. 500,000.00
6.33 1.0000 set Water drain + asesories @ Rp. 75,000.00
0.3000 org Tukang batu @ Rp. 27,500.00 8,250.00
0.0300 org Kepala tukang batu @ Rp. 30,000.00 900.00
0.0300 org Pekerja @ Rp. 20,000.00 600.00
0.0015 org Mandor @ Rp. 32,500.00 48.75
JUMLAH ( BELUM PPN ) 9,798.75
JASA 10 % 979.88
JUMLAH 10,778.63
DIBULATKAN 10,778.00

SNI 1.0000 bh Memasang kran diameter 3/4" atau 1/2"


1.0000 bh Kran air @ Rp. 25,000.00
6.35 0.0250 bh Seal tape @ Rp. 2,500.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 3,412.50
JASA 10 % 341.25
JUMLAH 3,753.75
DIBULATKAN 3,753.00

SNI 1.0000 bh Memasang floor drain


1.0000 bh Floor drain @ Rp. 55,000.00
6.35 0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 3,412.50
JASA 10 % 341.25
JUMLAH 3,753.75
DIBULATKAN 3,753.00

PEKERJAAN BESI DAN ALUMUNIUM

3 1.0000 M Pengelasan Single ( las listrik )


3.0000 kg Kawat las @ Rp. 6,500.00
1.0000 hari Peralatan las @ Rp. 75,000.00
0.5000 org Tukang las @ Rp. 27,500.00 13,750.00
0.0500 org Kepala tukang las @ Rp. 29,000.00 1,450.00
1.0000 Org Pekerja @ Rp. 27,500.00 27,500.00
1.0000 Org Mandor @ Rp. 32,500.00 32,500.00
JUMLAH ( BELUM PPN ) 75,200.00
JASA 10 % 7,520.00
JUMLAH 82,720.00
DIBULATKAN 82,720.00

SNI 1.0000 kg Pasang rangka atap baja


1.1000 kg Baja profil IWF @ Rp. 8,800.00
6.1 0.0800 kg Meni besi @ Rp. 22,500.00
0.0060 org Tukang besi @ Rp. 25,000.00 150.00
0.0060 org Kepala tukang besi @ Rp. 27,000.00 162.00
0.0600 org Pekerja @ Rp. 20,000.00 1,200.00
0.0003 org Mandor @ Rp. 32,500.00 9.75
JUMLAH ( BELUM PPN ) 1,521.75
JASA 10 % 152.18
JUMLAH 1,673.93
DIBULATKAN 1,673.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang pintu besi baja


1.0000 m2 Pintu besi baja @ Rp. 750,000.00
6.2 0.6500 org Tukang besi konstruksi @ Rp. 25,000.00 16,250.00
0.0650 org Kepala tukang besi @ Rp. 27,000.00 1,755.00
0.6500 org Pekerja @ Rp. 20,000.00 13,000.00
0.0320 org Mandor @ Rp. 32,500.00 1,040.00
JUMLAH ( BELUM PPN ) 32,045.00
JASA 10 % 3,204.50
JUMLAH 35,249.50
DIBULATKAN 35,249.00

SNI 1.0000 m2 Pasang pintu gulung besi


1.0000 m2 Pintu gulung besi @ Rp. 250,000.00
6.5 1.2000 org Tukang besi konstruksi @ Rp. 25,000.00 30,000.00
0.1200 org Kepala tukang besi @ Rp. 27,000.00 3,240.00
1.2000 org Pekerja @ Rp. 20,000.00 24,000.00
0.0060 org Mandor @ Rp. 32,500.00 195.00
JUMLAH ( BELUM PPN ) 57,435.00
JASA 10 % 5,743.50
JUMLAH 63,178.50
DIBULATKAN 63,178.00

SNI 1.0000 m2 Pasang pintu lipat


1.0000 m2 Pintu lipat @ Rp. 500,000.00
6.6 1.0500 org Tukang besi konstruksi @ Rp. 25,000.00 26,250.00
0.1050 org Kepala tukang besi @ Rp. 27,000.00 2,835.00
1.0500 org Pekerja @ Rp. 20,000.00 21,000.00
0.0052 org Mandor @ Rp. 32,500.00 169.00
JUMLAH ( BELUM PPN ) 50,254.00
JASA 10 % 5,025.40
JUMLAH 55,279.40
DIBULATKAN 55,279.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang Rolling door


1.0000 m2 Roll door @ Rp. 200,000.00
6.8 1.5000 org Tukang besi konstruksi @ Rp. 25,000.00 37,500.00
0.1050 org Kepala tukang besi @ Rp. 27,000.00 2,835.00
1.0500 org Pekerja @ Rp. 20,000.00 21,000.00
0.0052 org Mandor @ Rp. 32,500.00 169.00
JUMLAH ( BELUM PPN ) 61,504.00
JASA 10 % 6,150.40
JUMLAH 67,654.40
DIBULATKAN 67,654.00

SNI 1.0000 m2 Pasang pintu alumunium


1.0000 m2 Pintu alumunium @ Rp. 400,000.00
6.9 1.0500 org Tukang besi konstruksi @ Rp. 25,000.00 26,250.00
0.1050 org Kepala tukang besi @ Rp. 27,000.00 2,835.00
1.0500 org Pekerja @ Rp. 20,000.00 21,000.00
0.0052 org Mandor @ Rp. 32,500.00 169.00
JUMLAH ( BELUM PPN ) 50,254.00
JASA 10 % 5,025.40
JUMLAH 55,279.40
DIBULATKAN 55,279.00

SNI 1.0000 m2 Pasang teralis besi


11.5000 m1 Baja strip 2 x 3 @ Rp. 8,800.00
6.12 1.2000 org Tukang las @ Rp. 27,500.00 33,000.00
0.0120 org Kepala tukang las @ Rp. 29,000.00 348.00
1.2000 org Pekerja @ Rp. 20,000.00 24,000.00
0.0006 org Mandor @ Rp. 32,500.00 19.50
JUMLAH ( BELUM PPN ) 57,367.50
JASA 10 % 5,736.75
JUMLAH 63,104.25
DIBULATKAN 63,104.00

SNI 1.0000 m2 Pasang kawat harmonika


1.1000 m2 Kawat harmonika @ Rp. 25,000.00
6.13 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00
0.0018 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0005 org Mandor @ Rp. 32,500.00 16.25
JUMLAH ( BELUM PPN ) 5,341.25
JASA 10 % 534.13
JUMLAH 5,875.38
DIBULATKAN 5,875.00
No. Macam Pekerjaan Upah
(1) (2) (3)

SNI 1.0000 m2 Pasang kawat nyamuk


1.1000 m2 Kawat nyamuk @ Rp. 8,250.00
6.14 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00
0.0018 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0005 org Mandor @ Rp. 32,500.00 16.25
JUMLAH ( BELUM PPN ) 5,341.25
JASA 10 % 534.13
JUMLAH 5,875.38
DIBULATKAN 5,875.00

SNI 1.0000 m2 Pasang kawat kassa


1.1000 m2 Kawat kassa @ Rp. 10,000.00
6.15 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00
0.0018 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0005 org Mandor @ Rp. 32,500.00 16.25
JUMLAH ( BELUM PPN ) 5,341.25
JASA 10 % 534.13
JUMLAH 5,875.38
DIBULATKAN 5,875.00

SNI 1.0000 m2 Pasang jendela nako & tralis


1.1000 m2 Jendela nako @ Rp. 20,000.00
6.17 0.0200 kg Paku skrup @ Rp. 10,000.00
0.0250 m2 Besi strip @ Rp. 7,500.00
0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0010 org Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 10,682.50
JASA 10 % 1,068.25
JUMLAH 11,750.75
DIBULATKAN 11,750.00

PEKERJAAN KUNCI DAN KACA

6.1 1.0000 bh Pasang kunci tanam antik


1.0000 bh Kunci tanam antik @ Rp. 250,000.00
0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00
0.0600 org Kepala tukang kayu @ Rp. 32,500.00 1,950.00
0.0600 org Pekerja @ Rp. 20,000.00 1,200.00
0.0030 org Mandor @ Rp. 32,500.00 97.50
JUMLAH ( BELUM PPN ) 21,247.50
JASA 10 % 2,124.75
JUMLAH 23,372.25
DIBULATKAN 23,372.00
No. Macam Pekerjaan Upah
(1) (2) (3)

6.2 1.0000 bh Pasang kunci tanam biasa


1.0000 bh Kunci tanam biasa @ Rp. 125,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 15,687.50
JASA 10 % 1,568.75
JUMLAH 17,256.25
DIBULATKAN 17,256.00

6.3 1.0000 bh Pasang kunci tanam kamar mandi


1.0000 bh Kunci tanam kamar mandi @ Rp. 50,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50
0.0050 org Pekerja @ Rp. 20,000.00 100.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 15,343.75
JASA 10 % 1,534.38
JUMLAH 16,878.13
DIBULATKAN 16,878.00

6.4 1.0000 bh Pasang kunci tanam silinder


1.0000 bh Kunci silinder @ Rp. 75,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50
0.0050 org Pekerja @ Rp. 20,000.00 100.00
0.0003 org Mandor @ Rp. 32,500.00 8.13
JUMLAH ( BELUM PPN ) 15,270.63
JASA 10 % 1,527.06
JUMLAH 16,797.69
DIBULATKAN 16,797.00

6.5 1.0000 bh Pasang engsel pintu


1.0000 bh Engsel pintu @ Rp. 11,000.00
0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00
0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50
0.0150 org Pekerja @ Rp. 20,000.00 300.00
0.0008 org Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 5,311.88
JASA 10 % 531.19
JUMLAH 5,843.06
DIBULATKAN 5,843.00

6.6 1.0000 bh Pasang engsel jendela kupu-kupu


1.0000 bh Engsel jendela @ Rp. 7,500.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 3,687.50
JASA 10 % 368.75
JUMLAH 4,056.25
DIBULATKAN 4,056.00

6.7 1.0000 bh Pasang engsel angin


1.0000 bh Engsel angin @ Rp. 3,000.00
0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0100 org Mandor @ Rp. 32,500.00 325.00
JUMLAH ( BELUM PPN ) 7,375.00
JASA 10 % 737.50
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH 8,112.50
DIBULATKAN 8,112.00
No. Macam Pekerjaan Upah
(1) (2) (3)

6.8 1.0000 bh Pasang spring knip


1.0000 bh Spring knip @ Rp. 7,500.00
0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00
0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50
0.0150 org Pekerja @ Rp. 20,000.00 300.00
0.0008 org Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 5,311.88
JASA 10 % 531.19
JUMLAH 5,843.06
DIBULATKAN 5,843.00

6.9 1.0000 bh Pasang kait angin


1.0000 bh Kait angin @ Rp. 3,000.00
0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00
0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50
0.0150 org Pekerja @ Rp. 20,000.00 300.00
0.0008 org Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 5,311.88
JASA 10 % 531.19
JUMLAH 5,843.06
DIBULATKAN 5,843.00

6.10 1.0000 bh Pasang door closer


1.0000 bh Door closer @ Rp. 150,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0500 org Kepala tukang kayu @ Rp. 32,500.00 1,625.00
0.0500 org Pekerja @ Rp. 20,000.00 1,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 17,706.25
JASA 10 % 1,770.63
JUMLAH 19,476.88
DIBULATKAN 19,476.00

6.11 1.0000 bh Pasang kunci selot


1.0000 bh Kunci selot @ Rp. 50,000.00
0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0010 org Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 7,082.50
JASA 10 % 708.25
JUMLAH 7,790.75
DIBULATKAN 7,790.00

6.12 1.0000 bh Pasang pegangan pintu / door holder


1.0000 bh Door holder @ Rp. 15,000.00
0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00
0.0500 org Kepala tukang kayu @ Rp. 32,500.00 1,625.00
0.0500 org Pekerja @ Rp. 20,000.00 1,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 17,706.25
JASA 10 % 1,770.63
JUMLAH 19,476.88
DIBULATKAN 19,476.00

6.13 1.0000 bh Pasang door stop


1.0000 bh Door stop @ Rp. 15,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0005 org Mandor @ Rp. 32,500.00 16.25
JUMLAH ( BELUM PPN ) 3,541.25
JASA 10 % 354.13
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH 3,895.38
DIBULATKAN 3,895.00
No. Macam Pekerjaan Upah
(1) (2) (3)

6.14 1.0000 bh Pasang rel pintu dorong


1.0000 bh Rel pintu dorong @ Rp. 200,000.00
0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00
0.0600 org Kepala tukang kayu @ Rp. 32,500.00 1,950.00
0.0600 org Pekerja @ Rp. 20,000.00 1,200.00
0.0030 org Mandor @ Rp. 32,500.00 97.50
JUMLAH ( BELUM PPN ) 21,247.50
JASA 10 % 2,124.75
JUMLAH 23,372.25
DIBULATKAN 23,372.00

6.15 1.0000 bh Pasang kunci lemari


1.0000 bh Kunci lemari @ Rp. 12,000.00
0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.0250 org Pekerja @ Rp. 20,000.00 500.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 8,853.13
JASA 10 % 885.31
JUMLAH 9,738.44
DIBULATKAN 9,738.00

6.16 1.0000 m2 Pasang kaca, tebal 3 mm


1.1000 m2 Kaca polos @ Rp. 49,500.00
0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00
0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50
0.0150 org Pekerja @ Rp. 20,000.00 300.00
0.0008 org Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 5,311.88
JASA 10 % 531.19
JUMLAH 5,843.06
DIBULATKAN 5,843.00

6.17 1.0000 m2 Pasang kaca, tebal 5 mm


1.1000 m2 Kaca polos @ Rp. 60,500.00
0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00
0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50
0.0150 org Pekerja @ Rp. 20,000.00 300.00
0.0008 org Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 5,311.88
JASA 10 % 531.19
JUMLAH 5,843.06
DIBULATKAN 5,843.00

6.20 1.0000 m2 Pasang kaca cermin, tebal 5 mm


1.1000 m2 Kaca cermin @ Rp. 120,000.00
0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00
0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50
0.0150 org Pekerja @ Rp. 20,000.00 300.00
0.0008 org Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 5,311.88
JASA 10 % 531.19
JUMLAH 5,843.06
DIBULATKAN 5,843.00

6.24 1.0000 m2 Pasang kaca patri, tebal 5 mm


1.1000 m2 Kaca patri @ Rp. 300,000.00
0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00
0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50
0.0150 org Pekerja @ Rp. 20,000.00 300.00
0.0008 org Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 5,311.88
No. Macam Pekerjaan Upah
(1) (2) (3)
JASA 10 % 531.19
JUMLAH 5,843.06
DIBULATKAN 5,843.00
No. Macam Pekerjaan Upah
(1) (2) (3)

6.17 1.0000 m1 Pasang kusen alumunium


1.1000 m1 Kusen alumunium @ Rp. 55,000.00
15% x Harga kusen (Perlengkapan) @ Rp. 55,000.00
0.1500 oh Tukang alumunium @ Rp. 25,000.00 3,750.00
0.0150 oh Kepala tukang @ Rp. 27,000.00 405.00
0.0150 oh Pekerja @ Rp. 20,000.00 300.00
0.0008 oh Mandor @ Rp. 32,500.00 24.38
JUMLAH ( BELUM PPN ) 4,479.38
JASA 10 % 447.94
JUMLAH 4,927.31
DIBULATKAN 4,927.00
Bahan Jumlah
(4) (5)

-
-
-
-
-
- 493,000.00
49,300.00
542,300.00
542,300.00

- 5,423.00

20,136.00
160.00
11,746.00
Bahan Jumlah
(4) (5)

32,042.00 37,529.50
3,204.20 3,752.95
35,246.20 41,282.45
35,246.00 41,282.00

- 3,625.00
362.50
3,987.50
3,987.00

58,730.00
35,000.00
6,000.00
48,000.00
12,835.20
1,971.00
3,185.33

165,721.53 295,865.28
16,572.15 29,586.53
182,293.68 325,451.80
182,293.00 325,451.00

22,000.00
2,359.50
3,800.00

28,159.50 51,409.50
2,815.95 5,140.95
30,975.45 56,550.45
30,975.00 56,550.00
Bahan Jumlah
(4) (5)

12,500.00
302,040.00
6,800.00
9,680.00
26,740.00
11,400.00
7,300.00
11,797.50
10,500.00
9,625.00
40,000.00
4,840.00
5,250.00
2,475.00

460,947.50 599,822.50
46,094.75 59,982.25
507,042.25 659,804.75
507,042.00 659,804.00

12,500.00
1,910.00
30,000.00
365.00
707.85
41,950.00
480.00
4,800.00

92,712.85 108,012.85
9,271.29 10,801.29
101,984.14 118,814.14
101,984.00 118,814.00

- 9,300.00
930.00
10,230.00
10,230.00

- 12,229.50
1,222.95
13,452.45
13,452.00
Bahan Jumlah
(4) (5)

- 17,088.75
1,708.88
18,797.63
18,797.00
Bahan Jumlah
(4) (5)

- 14,515.00
1,451.50
15,966.50
15,966.00

- 29,062.50
2,906.25
31,968.75
31,968.00

- 19,157.50
1,915.75
21,073.25
21,073.00

64,000.00

64,000.00 115,988.75
6,400.00 11,598.88
70,400.00 127,587.63
70,400.00 127,587.00

6,925.00
692.50
7,617.50
7,617.00

- 11,945.00
1,194.50
13,139.50
13,139.00

5,325.00
532.50
5,857.50
5,857.00

4,457.50
Bahan Jumlah
(4) (5)
445.75
4,903.25
4,903.00
Bahan Jumlah
(4) (5)

5,325.00
532.50
5,857.50
5,857.00

66,000.00

66,000.00 72,325.00
6,600.00 7,232.50
72,600.00 79,557.50
72,600.00 79,557.00

42,000.00

42,000.00 48,325.00
4,200.00 4,832.50
46,200.00 53,157.50
46,200.00 53,157.00

79,200.00

79,200.00 85,012.50
7,920.00 8,501.25
87,120.00 93,513.75
87,120.00 93,513.00

90,000.00

90,000.00 93,487.50
9,000.00 9,348.75
99,000.00 102,836.25
99,000.00 102,836.00

1,400.00
5,000.00

6,400.00 17,212.50
640.00 1,721.25
7,040.00 18,933.75
7,040.00 18,933.00
Bahan Jumlah
(4) (5)

96,000.00
16,500.00

112,500.00 141,262.50
11,250.00 14,126.25
123,750.00 155,388.75
123,750.00 155,388.00

88,000.00
16,602.50
18,320.00
41,344.00

164,266.50 215,004.00
16,426.65 21,500.40
180,693.15 236,504.40
180,693.00 236,504.00

96,000.00
72,900.88
16,602.50
29,032.00

214,535.38 265,272.88
21,453.54 26,527.29
235,988.92 291,800.17
235,988.00 291,800.00

88,000.00
46,604.00
10,657.50
37,392.00

182,653.50 233,391.00
18,265.35 23,339.10
200,918.85 256,730.10
200,918.00 256,730.00

88,000.00
124,532.00
39,520.00
Bahan Jumlah
(4) (5)

252,052.00 302,789.50
25,205.20 30,278.95
277,257.20 333,068.45
277,257.00 333,068.00
Bahan Jumlah
(4) (5)

24,500.00
3,438.00
1,087.50
3,800.00

32,825.50 42,763.00
3,282.55 4,276.30
36,108.05 47,039.30
36,108.00 47,039.00

24,500.00
8,786.00
3,268.00

36,554.00 46,491.50
3,655.40 4,649.15
40,209.40 51,140.65
40,209.00 51,140.00

49,000.00
7,701.12
1,993.75
7,030.00

65,724.87 85,799.87
6,572.49 8,579.99
72,297.36 94,379.86
72,297.00 94,379.00

49,000.00
20,207.80
7,448.00

76,655.80 96,730.80
7,665.58 9,673.08
84,321.38 106,403.88
84,321.00 106,403.00

18,750.00
9,550.00
3,040.00
Bahan Jumlah
(4) (5)

31,340.00 45,202.50
3,134.00 4,520.25
34,474.00 49,722.75
34,474.00 49,722.00
Bahan Jumlah
(4) (5)

32,000.00
9,550.00
3,040.00

44,590.00 58,452.50
4,459.00 5,845.25
49,049.00 64,297.75
49,049.00 64,297.00

-
256,704.00
39,420.00
63,706.50

359,830.50 413,755.50
35,983.05 41,375.55
395,813.55 455,131.05
395,813.00 455,131.00

166,552.00
37,960.00
68,425.50

272,937.50 316,162.50
27,293.75 31,616.25
300,231.25 347,778.75
300,231.00 347,778.00

56,000.00
46,795.00
30,400.00
51,122.50

184,317.50 344,567.50
18,431.75 34,456.75
202,749.25 379,024.25
202,749.00 379,024.00
Bahan Jumlah
(4) (5)

305,600.00
35,040.00
62,920.00

403,560.00 486,735.00
40,356.00 48,673.50
443,916.00 535,408.50
443,916.00 535,408.00

296,432.00
47,450.00
51,122.50

395,004.50 555,254.50
39,500.45 55,525.45
434,504.95 610,779.95
434,504.00 610,779.00

305,600.00
29,200.00
64,493.00

399,293.00 559,543.00
39,929.30 55,954.30
439,222.30 615,497.30
439,222.00 615,497.00

328,520.00
37,668.00
54,268.50

420,456.50 580,706.50
42,045.65 58,070.65
462,502.15 638,777.15
462,502.00 638,777.00

8,295.00
141.00

8,436.00 8,779.65
843.60 877.97
Bahan Jumlah
(4) (5)
9,279.60 9,657.62
9,279.00 9,657.00
Bahan Jumlah
(4) (5)

8,400.00
141.00

8,541.00 8,884.65
854.10 888.47
9,395.10 9,773.12
9,395.00 9,773.00

28,526.00
24,000.00
3,200.00

55,726.00 76,676.00
5,572.60 7,667.60
61,298.60 84,343.60
61,298.00 84,343.00

28,526.00
31,230.00
3,200.00

62,956.00 83,906.00
6,295.60 8,390.60
69,251.60 92,296.60
69,251.00 92,296.00

- 80,000.00
8,000.00
88,000.00
88,000.00

700,000.00

700,000.00 1,124,812.50
70,000.00 112,481.25
770,000.00 1,237,293.75
770,000.00 1,237,293.00
Bahan Jumlah
(4) (5)

640,000.00

640,000.00 804,275.00
64,000.00 80,427.50
704,000.00 884,702.50
704,000.00 884,702.00

395,813.55 455,131.05
927,960.00 965,761.50
612,986.00 843,436.00
- 88,000.00
1,936,759.55 2,352,328.55
1,936,759.00 2,352,328.00

395,813.55 455,131.05
1,159,950.00 1,207,201.88
612,986.00 843,436.00
- 88,000.00
2,168,749.55 2,593,768.93
2,168,749.00 2,593,768.00

395,813.55 455,131.05
1,391,940.00 1,448,642.25
612,986.00 843,436.00
- 88,000.00
2,400,739.55 2,835,209.30
2,400,739.00 2,835,209.00

395,813.55 455,131.05
1,623,930.00 1,690,082.63
612,986.00 843,436.00
- 88,000.00
2,632,729.55 3,076,649.68
2,632,729.00 3,076,649.00

395,813.55 455,131.05
1,855,920.00 1,931,523.00
612,986.00 843,436.00
- 88,000.00
2,864,719.55 3,318,090.05
2,864,719.00 3,318,090.00
Bahan Jumlah
(4) (5)

395,813.55 455,131.05
927,960.00 965,761.50
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
2,706,759.55 3,589,622.30
2,706,759.00 3,589,622.00
Bahan Jumlah
(4) (5)

395,813.55 455,131.05
1,159,950.00 1,207,201.88
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
2,938,749.55 3,831,062.68
2,938,749.00 3,831,062.00

395,813.55 455,131.05
1,391,940.00 1,448,642.25
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
3,170,739.55 4,072,503.05
3,170,739.00 4,072,503.00

395,813.55 455,131.05
1,623,930.00 1,690,082.63
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
3,402,729.55 4,313,943.43
3,402,729.00 4,313,943.00

395,813.55 455,131.05
1,855,920.00 1,931,523.00
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
3,634,719.55 4,555,383.80
3,634,719.00 4,555,383.00

395,813.55 455,131.05
927,960.00 965,761.50
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
2,640,759.55 3,237,031.05
2,640,759.00 3,237,031.00

395,813.55 455,131.05
1,159,950.00 1,207,201.88
612,986.00 843,436.00
704,000.00 884,702.50
Bahan Jumlah
(4) (5)
- 88,000.00
2,872,749.55 3,478,471.43
2,872,749.00 3,478,471.00
Bahan Jumlah
(4) (5)

395,813.55 455,131.05
1,391,940.00 1,448,642.25
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
3,104,739.55 3,719,911.80
3,104,739.00 3,719,911.00

395,813.55 455,131.05
1,623,930.00 1,690,082.63
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
3,336,729.55 3,961,352.18
3,336,729.00 3,961,352.00

395,813.55 455,131.05
1,855,920.00 1,931,523.00
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
3,568,719.55 4,202,792.55
3,568,719.00 4,202,792.00

4,974.40
1,588.40

6,562.80 21,312.80
656.28 2,131.28
7,219.08 23,444.08
7,219.00 23,444.00
Bahan Jumlah
(4) (5)

1,405.76
435.00
1,064.00

2,904.76 11,804.76
290.48 1,180.48
3,195.24 12,985.24
3,195.00 12,985.00

3,972.80
1,520.00

5,492.80 14,392.80
549.28 1,439.28
6,042.08 15,832.08
6,042.00 15,832.00

5,401.48
1,596.00

6,997.48 18,719.98
699.75 1,872.00
7,697.23 20,591.98
7,697.00 20,591.00

382.00
152.00

534.00 3,924.00
53.40 392.40
587.40 4,316.40
587.00 4,316.00

3,300.48
1,216.00

4,516.48 9,911.48
451.65 991.15
4,968.13 10,902.63
4,968.00 10,902.00
Bahan Jumlah
(4) (5)

3,300.48
880.00

4,180.48 12,717.98
418.05 1,271.80
4,598.53 13,989.78
4,598.00 13,989.00

2,674.00

2,674.00 5,194.25
267.40 519.43
2,941.40 5,713.68
2,941.00 5,713.00

63,000.00
8,977.00
2,660.00

74,637.00 99,287.00
7,463.70 9,928.70
82,100.70 109,215.70
82,100.00 109,215.00

28,000.00
1,160.00
2,432.00
764.00

32,356.00 50,793.50
3,235.60 5,079.35
35,591.60 55,872.85
35,591.00 55,872.00
Bahan Jumlah
(4) (5)

20,000.00
1,160.00
2,432.00
764.00

24,356.00 42,793.50
2,435.60 4,279.35
26,791.60 47,072.85
26,791.00 47,072.00

40,500.00
3,575.52
684.00
1,312.50

46,072.02 66,728.27
4,607.20 6,672.83
50,679.22 73,401.10
50,679.00 73,401.00

42,500.00
3,117.12
684.00
787.50

47,088.62 67,744.87
4,708.86 6,774.49
51,797.48 74,519.36
51,797.00 74,519.00

30,000.00
3,117.12
684.00
787.50

34,588.62 55,244.87
3,458.86 5,524.49
38,047.48 60,769.36
38,047.00 60,769.00
Bahan Jumlah
(4) (5)

32,000.00
3,117.12
684.00
787.50

36,588.62 57,244.87
3,658.86 5,724.49
40,247.48 62,969.36
40,247.00 62,969.00

32,500.00
3,117.12
684.00
787.50

37,088.62 57,744.87
3,708.86 5,774.49
40,797.48 63,519.36
40,797.00 63,519.00

9,200.00
916.80
228.00
600.00

10,944.80 13,157.30
1,094.48 1,315.73
12,039.28 14,473.03
12,039.00 14,473.00
Bahan Jumlah
(4) (5)

5,850.00
1,260.60
243.20
600.00

7,953.80 10,166.30
795.38 1,016.63
8,749.18 11,182.93
8,749.00 11,182.00

33,660.00
311.71
68.40
78.75

34,118.86 38,250.11
3,411.89 3,825.01
37,530.75 42,075.12
37,530.00 42,075.00

25,000.00
311.71
68.40
78.75

25,458.86 29,590.11
2,545.89 2,959.01
28,004.75 32,549.12
28,004.00 32,549.00

37,500.00
7,105.20
1,368.00
1,968.75

47,941.95 74,686.95
4,794.20 7,468.70
52,736.15 82,155.65
52,736.00 82,155.00
Bahan Jumlah
(4) (5)

38,250.00
2,750.00

41,000.00 59,437.50
4,100.00 5,943.75
45,100.00 65,381.25
45,100.00 65,381.00

46,700.00
2,750.00

49,450.00 67,887.50
4,945.00 6,788.75
54,395.00 74,676.25
54,395.00 74,676.00

38,100.00
2,750.00

40,850.00 59,287.50
4,085.00 5,928.75
44,935.00 65,216.25
44,935.00 65,216.00

46,700.00
2,750.00

49,450.00 67,887.50
4,945.00 6,788.75
54,395.00 74,676.25
54,395.00 74,676.00
Bahan Jumlah
(4) (5)

43,500.00
2,750.00

46,250.00 64,687.50
4,625.00 6,468.75
50,875.00 71,156.25
50,875.00 71,156.00

52,000.00
2,750.00

54,750.00 73,187.50
5,475.00 7,318.75
60,225.00 80,506.25
60,225.00 80,506.00

43,500.00
2,750.00

46,250.00 64,687.50
4,625.00 6,468.75
50,875.00 71,156.25
50,875.00 71,156.00

52,000.00
2,750.00

54,750.00 73,187.50
5,475.00 7,318.75
60,225.00 80,506.25
60,225.00 80,506.00

41,400.00
2,750.00

44,150.00 62,587.50
4,415.00 6,258.75
48,565.00 68,846.25
48,565.00 68,846.00
Bahan Jumlah
(4) (5)

41,400.00
2,750.00

44,150.00 62,587.50
4,415.00 6,258.75
48,565.00 68,846.25
48,565.00 68,846.00

32,000.00

32,000.00 40,812.50
3,200.00 4,081.25
35,200.00 44,893.75
35,200.00 44,893.00

5,225,000.00
112,500.00
6,400.00

5,343,900.00 5,829,400.00
534,390.00 582,940.00
5,878,290.00 6,412,340.00
5,878,290.00 6,412,340.00

4,785,000.00
112,500.00
6,400.00

4,903,900.00 5,389,400.00
490,390.00 538,940.00
5,394,290.00 5,928,340.00
5,394,290.00 5,928,340.00

6,325,000.00
112,500.00
6,400.00

6,443,900.00 6,929,400.00
644,390.00 692,940.00
7,088,290.00 7,622,340.00
Bahan Jumlah
(4) (5)
7,088,290.00 7,622,340.00
Bahan Jumlah
(4) (5)

112,500.00
6,400.00

118,900.00 604,400.00
11,890.00 60,440.00
130,790.00 664,840.00
130,790.00 664,840.00

6,325,000.00
6,400.00

6,331,400.00 6,816,900.00
633,140.00 681,690.00
6,964,540.00 7,498,590.00
6,964,540.00 7,498,590.00

6,400.00

6,400.00 491,900.00
640.00 49,190.00
7,040.00 541,090.00
7,040.00 541,090.00

1,200.00
800.00

2,000.00 7,406.25
200.00 740.63
2,200.00 8,146.88
2,200.00 8,146.00

154,000.00
60,000.00
1,200.00
800.00

216,000.00 221,406.25
21,600.00 22,140.63
237,600.00 243,546.88
237,600.00 243,546.00
Bahan Jumlah
(4) (5)

154,000.00
17,250.00
1,200.00
800.00

173,250.00 178,656.25
17,325.00 17,865.63
190,575.00 196,521.88
190,575.00 196,521.00

44,275.00
60,000.00
1,200.00
800.00

106,275.00 111,681.25
10,627.50 11,168.13
116,902.50 122,849.38
116,902.00 122,849.00

44,275.00
17,250.00
1,200.00
800.00

63,525.00 68,931.25
6,352.50 6,893.13
69,877.50 75,824.38
69,877.00 75,824.00
Bahan Jumlah
(4) (5)

154,000.00
96,000.00
1,200.00
800.00

252,000.00 257,406.25
25,200.00 25,740.63
277,200.00 283,146.88
277,200.00 283,146.00

44,275.00
38,400.00
1,200.00
800.00

84,675.00 90,081.25
8,467.50 9,008.13
93,142.50 99,089.38
93,142.00 99,089.00

44,275.00
27,600.00
1,200.00
800.00

73,875.00 79,281.25
7,387.50 7,928.13
81,262.50 87,209.38
81,262.00 87,209.00

22,000,000.00

22,000,000.00 22,794,750.00
2,200,000.00 2,279,475.00
24,200,000.00 25,074,225.00
### 25,074,225.00

8,800,000.00

8,800,000.00 9,594,750.00
Bahan Jumlah
(4) (5)
880,000.00 959,475.00
9,680,000.00 10,554,225.00
9,680,000.00 10,554,225.00
Bahan Jumlah
(4) (5)

5,700,000.00

5,700,000.00 6,434,750.00
570,000.00 643,475.00
6,270,000.00 7,078,225.00
6,270,000.00 7,078,225.00

5,220,000.00

5,220,000.00 5,954,750.00
522,000.00 595,475.00
5,742,000.00 6,550,225.00
5,742,000.00 6,550,225.00

6,900,000.00

6,900,000.00 7,634,750.00
690,000.00 763,475.00
7,590,000.00 8,398,225.00
7,590,000.00 8,398,225.00

431,200.00
240.00
3,300.00
69,500.00

504,240.00 583,715.00
50,424.00 58,371.50
554,664.00 642,086.50
554,664.00 642,086.00

160,720.00
240.00
3,300.00
69,500.00

233,760.00 313,235.00
23,376.00 31,323.50
257,136.00 344,558.50
257,136.00 344,558.00
Bahan Jumlah
(4) (5)

107,800.00
240.00
3,300.00
69,500.00

180,840.00 260,315.00
18,084.00 26,031.50
198,924.00 286,346.50
198,924.00 286,346.00

93,100.00
240.00
3,300.00
69,500.00

166,140.00 245,615.00
16,614.00 24,561.50
182,754.00 270,176.50
182,754.00 270,176.00

117,600.00
240.00
3,300.00
69,500.00

190,640.00 270,115.00
19,064.00 27,011.50
209,704.00 297,126.50
209,704.00 297,126.00

770,000.00

770,000.00 853,800.00
77,000.00 85,380.00
847,000.00 939,180.00
847,000.00 939,180.00

287,000.00

287,000.00 370,800.00
28,700.00 37,080.00
315,700.00 407,880.00
Bahan Jumlah
(4) (5)
315,700.00 407,880.00
Bahan Jumlah
(4) (5)

192,500.00

192,500.00 276,300.00
19,250.00 27,630.00
211,750.00 303,930.00
211,750.00 303,930.00

166,250.00

166,250.00 250,050.00
16,625.00 25,005.00
182,875.00 275,055.00
182,875.00 275,055.00

210,000.00

210,000.00 293,800.00
21,000.00 29,380.00
231,000.00 323,180.00
231,000.00 323,180.00

880,000.00

880,000.00 984,750.00
88,000.00 98,475.00
968,000.00 1,083,225.00
968,000.00 1,083,225.00

328,000.00

328,000.00 432,750.00
32,800.00 43,275.00
360,800.00 476,025.00
360,800.00 476,025.00

220,000.00
Bahan Jumlah
(4) (5)
220,000.00 324,750.00
22,000.00 32,475.00
242,000.00 357,225.00
242,000.00 357,225.00
Bahan Jumlah
(4) (5)

190,000.00

190,000.00 294,750.00
19,000.00 29,475.00
209,000.00 324,225.00
209,000.00 324,225.00

240,000.00

240,000.00 344,750.00
24,000.00 34,475.00
264,000.00 379,225.00
264,000.00 379,225.00

1,408,000.00

1,408,000.00 1,537,500.00
140,800.00 153,750.00
1,548,800.00 1,691,250.00
1,548,800.00 1,691,250.00

524,800.00

524,800.00 654,300.00
52,480.00 65,430.00
577,280.00 719,730.00
577,280.00 719,730.00

352,000.00

352,000.00 473,375.00
35,200.00 47,337.50
387,200.00 520,712.50
387,200.00 520,712.00

304,000.00
Bahan Jumlah
(4) (5)
304,000.00 425,375.00
30,400.00 42,537.50
334,400.00 467,912.50
334,400.00 467,912.00
Bahan Jumlah
(4) (5)

384,000.00

384,000.00 505,375.00
38,400.00 50,537.50
422,400.00 555,912.50
422,400.00 555,912.00

800.00

800.00 12,356.25
80.00 1,235.63
880.00 13,591.88
880.00 13,591.00

57,000.00
800.00

57,800.00 69,356.25
5,780.00 6,935.63
63,580.00 76,291.88
63,580.00 76,291.00

52,200.00
800.00

53,000.00 64,556.25
5,300.00 6,455.63
58,300.00 71,011.88
58,300.00 71,011.00

69,000.00
800.00

69,800.00 81,356.25
6,980.00 8,135.63
76,780.00 89,491.88
76,780.00 89,491.00
Bahan Jumlah
(4) (5)
61,750.00
960.00

62,710.00 75,363.75
6,271.00 7,536.38
68,981.00 82,900.13
68,981.00 82,900.00
Bahan Jumlah
(4) (5)

56,550.00
960.00

57,510.00 70,163.75
5,751.00 7,016.38
63,261.00 77,180.13
63,261.00 77,180.00

74,750.00
960.00

75,710.00 88,363.75
7,571.00 8,836.38
83,281.00 97,200.13
83,281.00 97,200.00

11,000.00
115.00

11,115.00 14,091.25
1,111.50 1,409.13
12,226.50 15,500.38
12,226.00 15,500.00

11,000.00
5,200.00
115.00
100.00

16,415.00 19,391.25
1,641.50 1,939.13
18,056.50 21,330.38
18,056.00 21,330.00

57,000.00
600.00
11,000.00

68,600.00 83,132.50
6,860.00 8,313.25
75,460.00 91,445.75
75,460.00 91,445.00
Bahan Jumlah
(4) (5)

52,200.00
600.00
11,000.00

63,800.00 78,332.50
6,380.00 7,833.25
70,180.00 86,165.75
70,180.00 86,165.00

69,000.00
600.00
11,000.00

80,600.00 95,132.50
8,060.00 9,513.25
88,660.00 104,645.75
88,660.00 104,645.00

600.00
11,000.00
5,200.00
115.00
100.00

17,015.00 31,547.50
1,701.50 3,154.75
18,716.50 34,702.25
18,716.00 34,702.00

57,000.00
600.00
11,000.00
5,200.00
115.00
100.00

74,015.00 88,547.50
7,401.50 8,854.75
81,416.50 97,402.25
81,416.00 97,402.00

52,200.00
600.00
11,000.00
Bahan Jumlah
(4) (5)
5,200.00
115.00
100.00

69,215.00 83,747.50
6,921.50 8,374.75
76,136.50 92,122.25
76,136.00 92,122.00
Bahan Jumlah
(4) (5)

69,000.00
600.00
11,000.00
5,200.00
115.00
100.00

86,015.00 100,547.50
8,601.50 10,054.75
94,616.50 110,602.25
94,616.00 110,602.00

61,750.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00

81,805.00 99,297.50
8,180.50 9,929.75
89,985.50 109,227.25
89,985.00 109,227.00

56,550.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00

76,605.00 94,097.50
7,660.50 9,409.75
84,265.50 103,507.25
84,265.00 103,507.00

74,750.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00
Bahan Jumlah
(4) (5)
94,805.00 112,297.50
9,480.50 11,229.75
104,285.50 123,527.25
104,285.00 123,527.00

42,750.00
15,120.00
500.00
1,575.00
900.00
1,500.00
2,500.00

64,845.00 82,337.50
6,484.50 8,233.75
71,329.50 90,571.25
71,329.00 90,571.00
Bahan Jumlah
(4) (5)

61,750.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00

83,317.00 100,809.50
8,331.70 10,080.95
91,648.70 110,890.45
91,648.00 110,890.00

56,550.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00

78,117.00 95,609.50
7,811.70 9,560.95
85,928.70 105,170.45
85,928.00 105,170.00

74,750.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00

96,317.00 113,809.50
9,631.70 11,380.95
105,948.70 125,190.45
105,948.00 125,190.00

42,750.00
16,632.00
500.00
1,575.00
900.00
1,500.00
2,500.00
Bahan Jumlah
(4) (5)

66,357.00 83,849.50
6,635.70 8,384.95
72,992.70 92,234.45
72,992.00 92,234.00
Bahan Jumlah
(4) (5)

72,000.00
1,425.00
2,500.00
187,500.00

263,425.00 283,293.75
26,342.50 28,329.38
289,767.50 311,623.13
289,767.00 311,623.00

4,400.00
2,450.00
1,050.00

7,900.00 11,606.50
790.00 1,160.65
8,690.00 12,767.15
8,690.00 12,767.00

8,800.00
3,062.50
1,320.00

13,182.50 16,889.00
1,318.25 1,688.90
14,500.75 18,577.90
14,500.00 18,577.00

16,500.00
3,675.00
1,590.00

21,765.00 25,556.25
2,176.50 2,555.63
23,941.50 28,111.88
23,941.00 28,111.00

6,050.00
100.00

6,150.00 8,910.00
615.00 891.00
Bahan Jumlah
(4) (5)
6,765.00 9,801.00
6,765.00 9,801.00
Bahan Jumlah
(4) (5)

105,600.00
480.00

106,080.00 111,567.50
10,608.00 11,156.75
116,688.00 122,724.25
116,688.00 122,724.00

189,200.00
480.00

189,680.00 195,167.50
18,968.00 19,516.75
208,648.00 214,684.25
208,648.00 214,684.00

39,360.00
480.00

39,840.00 45,327.50
3,984.00 4,532.75
43,824.00 49,860.25
43,824.00 49,860.00

26,400.00
480.00

26,880.00 32,367.50
2,688.00 3,236.75
29,568.00 35,604.25
29,568.00 35,604.00

47,300.00
480.00

47,780.00 53,267.50
4,778.00 5,326.75
52,558.00 58,594.25
52,558.00 58,594.00
Bahan Jumlah
(4) (5)

22,800.00
480.00

23,280.00 28,767.50
2,328.00 2,876.75
25,608.00 31,644.25
25,608.00 31,644.00
Bahan Jumlah
(4) (5)

40,850.00
480.00

41,330.00 46,817.50
4,133.00 4,681.75
45,463.00 51,499.25
45,463.00 51,499.00

28,800.00
480.00

29,280.00 34,767.50
2,928.00 3,476.75
32,208.00 38,244.25
32,208.00 38,244.00

51,600.00
480.00

52,080.00 57,567.50
5,208.00 5,756.75
57,288.00 63,324.25
57,288.00 63,324.00

118,750.00
10,000.00
2,400.00

131,150.00 203,975.00
13,115.00 20,397.50
144,265.00 224,372.50
144,265.00 224,372.00

108,750.00
10,000.00
2,400.00

121,150.00 193,975.00
12,115.00 19,397.50
133,265.00 213,372.50
133,265.00 213,372.00
Bahan Jumlah
(4) (5)

143,750.00
10,000.00
2,400.00

156,150.00 228,975.00
15,615.00 22,897.50
171,765.00 251,872.50
171,765.00 251,872.00
Bahan Jumlah
(4) (5)

22,000.00
160.00

22,160.00 25,425.50
2,216.00 2,542.55
24,376.00 27,968.05
24,376.00 27,968.00

19,000.00
160.00

19,160.00 22,425.50
1,916.00 2,242.55
21,076.00 24,668.05
21,076.00 24,668.00

24,000.00
160.00

24,160.00 27,425.50
2,416.00 2,742.55
26,576.00 30,168.05
26,576.00 30,168.00

22,000.00
120.00
52,800.00
8,750.00

83,670.00 99,523.13
8,367.00 9,952.31
92,037.00 109,475.44
92,037.00 109,475.00

22,000.00
120.00
45,600.00
8,750.00
Bahan Jumlah
(4) (5)
76,470.00 92,323.13
7,647.00 9,232.31
84,117.00 101,555.44
84,117.00 101,555.00
Bahan Jumlah
(4) (5)

22,000.00
120.00
57,600.00
8,750.00

88,470.00 104,323.13
8,847.00 10,432.31
97,317.00 114,755.44
97,317.00 114,755.00

22,000.00
120.00
104,500.00
8,750.00

135,370.00 149,023.13
13,537.00 14,902.31
148,907.00 163,925.44
148,907.00 163,925.00

22,000.00
120.00
90,250.00
8,750.00

121,120.00 134,773.13
12,112.00 13,477.31
133,232.00 148,250.44
133,232.00 148,250.00

22,000.00
120.00
114,000.00
8,750.00

144,870.00 158,523.13
14,487.00 15,852.31
159,357.00 174,375.44
159,357.00 174,375.00

200,000.00
90,000.00
Bahan Jumlah
(4) (5)

290,000.00 442,450.00

29,000.00 44,245.00
2,900.00 4,424.50
31,900.00 48,669.50
31,900.00 48,669.00
Bahan Jumlah
(4) (5)

13,200.00
800.00
114,000.00
4,400.00

132,400.00 143,753.13
13,240.00 14,375.31
145,640.00 158,128.44
145,640.00 158,128.00

92,625.00
38,500.00
800.00
6,160.00

138,085.00 158,485.00
13,808.50 15,848.50
151,893.50 174,333.50
151,893.00 174,333.00

92,625.00
38,500.00
800.00
6,160.00
41,250.00

179,335.00 203,610.00
17,933.50 20,361.00
197,268.50 223,971.00
197,268.00 223,971.00

16,500.00
400.00

16,900.00 19,936.00
1,690.00 1,993.60
18,590.00 21,929.60
18,590.00 21,929.00
Bahan Jumlah
(4) (5)

- 7,375.00
- 737.50
- 8,112.50
- 8,112.00

15,000.00

15,000.00 22,375.00
1,500.00 2,237.50
16,500.00 24,612.50
16,500.00 24,612.00

15,000.00

15,000.00 24,537.50
1,500.00 2,453.75
16,500.00 26,991.25
16,500.00 26,991.00

24,750.00

24,750.00 32,125.00
2,475.00 3,212.50
27,225.00 35,337.50
27,225.00 35,337.00

24,750.00

24,750.00 34,287.50
2,475.00 3,428.75
27,225.00 37,716.25
27,225.00 37,716.00
Bahan Jumlah
(4) (5)

39,780.00

39,780.00 47,155.00
3,978.00 4,715.50
43,758.00 51,870.50
43,758.00 51,870.00

39,780.00

39,780.00 49,317.50
3,978.00 4,931.75
43,758.00 54,249.25
43,758.00 54,249.00

8,250.00
1,102.00
1,155.20
1,164.34

11,671.54 26,421.54
1,167.15 2,642.15
12,838.69 29,063.69
12,838.00 29,063.00

12,300.00
1,102.00
1,155.20
1,164.34

15,721.54 30,471.54
1,572.15 3,047.15
17,293.69 33,518.69
17,293.00 33,518.00
Bahan Jumlah
(4) (5)

17,040.00
1,102.00
1,155.20
1,164.34

20,461.54 35,211.54
2,046.15 3,521.15
22,507.69 38,732.69
22,507.00 38,732.00

31,480.00
1,122.00

32,602.00 38,172.00
3,260.20 3,817.20
35,862.20 41,989.20
35,862.00 41,989.00

30,198.00
1,122.00

31,320.00 36,675.00
3,132.00 3,667.50
34,452.00 40,342.50
34,452.00 40,342.00

33,967.50
1,122.00

35,089.50 40,444.50
3,508.95 4,044.45
38,598.45 44,488.95
38,598.00 44,488.00

24,972.50
1,122.00

26,094.50 31,449.50
2,609.45 3,144.95
28,703.95 34,594.45
28,703.00 34,594.00
Bahan Jumlah
(4) (5)

26,840.00
1,122.00

27,962.00 33,227.00
2,796.20 3,322.70
30,758.20 36,549.70
30,758.00 36,549.00

29,325.00
1,122.00

30,447.00 35,712.00
3,044.70 3,571.20
33,491.70 39,283.20
33,491.00 39,283.00

28,760.00
1,122.00

29,882.00 35,147.00
2,988.20 3,514.70
32,870.20 38,661.70
32,870.00 38,661.00

41,747.10
1,122.00

42,869.10 48,134.10
4,286.91 4,813.41
47,156.01 52,947.51
47,156.00 52,947.00

41,521.90
1,122.00

42,643.90 47,908.90
4,264.39 4,790.89
46,908.29 52,699.79
46,908.00 52,699.00
Bahan Jumlah
(4) (5)

38,700.20
1,122.00

39,822.20 45,087.20
3,982.22 4,508.72
43,804.42 49,595.92
43,804.00 49,595.00

38,583.30
1,122.00

39,705.30 44,970.30
3,970.53 4,497.03
43,675.83 49,467.33
43,675.00 49,467.00

69,600.00
4,500.00

74,100.00 80,082.50
7,410.00 8,008.25
81,510.00 88,090.75
81,510.00 88,090.00

60,900.00
4,500.00

65,400.00 71,382.50
6,540.00 7,138.25
71,940.00 78,520.75
71,940.00 78,520.00

59,450.00
4,500.00

63,950.00 69,932.50
6,395.00 6,993.25
70,345.00 76,925.75
70,345.00 76,925.00
Bahan Jumlah
(4) (5)

97,308.00
4,000.00

101,308.00 108,665.50
10,130.80 10,866.55
111,438.80 119,532.05
111,438.00 119,532.00

61,200.00
4,800.00

66,000.00 73,357.50
6,600.00 7,335.75
72,600.00 80,693.25
72,600.00 80,693.00

26,250.00

26,250.00 31,172.50
2,625.00 3,117.25
28,875.00 34,289.75
28,875.00 34,289.00

236,250.00
61,600.00
10,800.00

308,650.00 332,581.25
30,865.00 33,258.13
339,515.00 365,839.38
339,515.00 365,839.00
Bahan Jumlah
(4) (5)

750.00

750.00 3,831.25
75.00 383.13
825.00 4,214.38
825.00 4,214.00

1,800.00
5,440.00
5,440.00

12,680.00 16,238.75
1,268.00 1,623.88
13,948.00 17,862.63
13,948.00 17,862.00

at dasar, 2 lapis cat penutup


2,400.00
1,800.00
5,440.00
8,320.00

17,960.00 21,853.25
1,796.00 2,185.33
19,756.00 24,038.58
19,756.00 24,038.00
Bahan Jumlah
(4) (5)

at dasar, 3 lapis cat penutup


2,400.00
1,800.00
5,440.00
11,200.00

20,840.00 25,054.25
2,084.00 2,505.43
22,924.00 27,559.68
22,924.00 27,559.00

3,000.00
7,440.00
5,000.00

15,440.00 17,453.25
1,544.00 1,745.33
16,984.00 19,198.58
16,984.00 19,198.00

1,875.00
500.00
250.00
80.00

2,705.00 10,418.25
270.50 1,041.83
2,975.50 11,460.08
2,975.00 11,460.00
Bahan Jumlah
(4) (5)

sar, 2 lapis cat penutup)


850.00
950.00
2,470.00

4,270.00 6,496.35
427.00 649.64
4,697.00 7,145.99
4,697.00 7,145.00

1,140.00
1,710.00

2,850.00 4,654.65
285.00 465.47
3,135.00 5,120.12
3,135.00 5,120.00

2,720.00
18,000.00

20,720.00 22,946.35
2,072.00 2,294.64
22,792.00 25,240.99
22,792.00 25,240.00

250.00
125.00
2,000.00
75.00

2,450.00 5,558.95
245.00 555.90
2,695.00 6,114.85
2,695.00 6,114.00
Bahan Jumlah
(4) (5)

2,000.00
150.00

2,150.00 3,169.75
215.00 316.98
2,365.00 3,486.73
2,365.00 3,486.00

2,004.00
6,400.00
1,800.00

10,204.00 14,418.25
1,020.40 1,441.83
11,224.40 15,860.08
11,224.00 15,860.00

2,250.00
80.00

2,330.00 8,595.00
233.00 859.50
2,563.00 9,454.50
2,563.00 9,454.00

akai perancah
2,250.00
80.00
2,000.00

4,330.00 15,306.25
433.00 1,530.63
4,763.00 16,836.88
4,763.00 16,836.00
Bahan Jumlah
(4) (5)

2,800.00

2,800.00 4,962.50
280.00 496.25
3,080.00 5,458.75
3,080.00 5,458.00

25,500.00
741.00

26,241.00 39,126.00
2,624.10 3,912.60
28,865.10 43,038.60
28,865.00 43,038.00

1,440.00

1,440.00 3,989.25

13,600.00
1,000.00

14,600.00 241,425.00
16,040.00 245,414.25
1,604.00 24,541.43
17,644.00 269,955.68
17,644.00 269,955.00

15,120.00

15,120.00 17,346.35
1,512.00 1,734.64
16,632.00 19,080.99
16,632.00 19,080.00

- 118,000.00
- 11,800.00
- 129,800.00
Bahan Jumlah
(4) (5)
- 129,800.00

- 57,000.00
- 5,700.00
- 62,700.00
- 62,700.00

- 168,750.00
- 16,875.00
- 185,625.00
- 185,625.00
Bahan Jumlah
(4) (5)

- 43,250.00

- 4,325.00
- 432.50
- 4,757.50
- 4,757.00

- 29,062.50

- 2,906.25
- 290.63
- 3,196.88
- 3,196.00

- 43,250.00

- 4,325.00
- 432.50
- 4,757.50
- 4,757.00

- 32,500.00

- 3,250.00
- 325.00
- 3,575.00
- 3,575.00

- 63,200.00

- 6,320.00
- 632.00
- 6,952.00
- 6,952.00

- 43,250.00

- 4,325.00
- 432.50
- 4,757.50
- 4,757.00
Bahan Jumlah
(4) (5)

mbatan untuk digunakan lagi

- 286,000.00
- 28,600.00
- 314,600.00
- 314,600.00

mbatan tidak digunakan lagi

- 26,500.00
- 2,650.00
- 29,150.00
- 29,150.00

- 485,500.00
- 48,550.00
- 534,050.00
- 534,050.00

19,500.00
75,000.00

94,500.00 169,700.00
9,450.00 16,970.00
103,950.00 186,670.00
103,950.00 186,670.00
Bahan Jumlah
(4) (5)

1,250,000.00
75,000.00

1,325,000.00 1,426,480.00
132,500.00 142,648.00
1,457,500.00 1,569,128.00
1,457,500.00 1,569,128.00

75,000.00
4,584.00
760.00

80,344.00 191,794.00
8,034.40 19,179.40
88,378.40 210,973.40
88,378.00 210,973.00

785,000.00
235,500.00
4,584.00
760.00

1,025,844.00 1,079,594.00
102,584.40 107,959.40
1,128,428.40 1,187,553.40
1,128,428.00 1,187,553.00

271,340.00
32,560.80
4,584.00
760.00

309,244.80 380,869.80
30,924.48 38,086.98
340,169.28 418,956.78
340,169.00 418,956.00
Bahan Jumlah
(4) (5)

275,000.00
49,500.00

324,500.00 454,525.00
32,450.00 45,452.50
356,950.00 499,977.50
356,950.00 499,977.00

150,000.00
30,000.00

180,000.00 212,687.50
18,000.00 21,268.75
198,000.00 233,956.25
198,000.00 233,956.00

825,000.00
99,000.00

924,000.00 1,164,000.00
92,400.00 116,400.00
1,016,400.00 1,280,400.00
1,016,400.00 1,280,400.00

26,400.00
5,600.00
2,994.88
4,256.00
1,320.00

40,570.88 45,733.38
4,057.09 4,573.34
44,627.97 50,306.72
44,627.00 50,306.00

27,500.00
115,500.00
7,869.20
4,636.00
3,795.00

159,300.20 173,312.70
Bahan Jumlah
(4) (5)
15,930.02 17,331.27
175,230.22 190,643.97
175,230.00 190,643.00

30,450.00
33,616.00
5,320.00
3,850.00
12,640.00
4,380.00

90,256.00 182,733.50
9,025.60 18,273.35
99,281.60 201,006.85
99,281.00 201,006.00
Bahan Jumlah
(4) (5)

52,500.00
58,828.00
9,880.00
1,100.00
20,540.00
6,570.00

149,418.00 194,543.00
14,941.80 19,454.30
164,359.80 213,997.30
164,359.00 213,997.00

77,700.00
87,096.00
13,984.00
1,815.00
38,315.00
8,760.00

227,670.00 296,080.00
22,767.00 29,608.00
250,437.00 325,688.00
250,437.00 325,688.00

18,000.00
5,250.00

23,250.00 27,952.50
2,325.00 2,795.25
25,575.00 30,747.75
25,575.00 30,747.00

30,000.00
8,750.00

38,750.00 43,452.50
3,875.00 4,345.25
42,625.00 47,797.75
42,625.00 47,797.00

45,000.00
13,125.00
Bahan Jumlah
(4) (5)

58,125.00 62,827.50
5,812.50 6,282.75
63,937.50 69,110.25
63,937.00 69,110.00

60,000.00
17,500.00

77,500.00 85,325.50
7,750.00 8,532.55
85,250.00 93,858.05
85,250.00 93,858.00
Bahan Jumlah
(4) (5)

3,795.00
1,106.88

4,901.88 7,510.38
490.19 751.04
5,392.06 8,261.41
5,392.00 8,261.00

5,100.00
1,487.50

6,587.50 9,196.00
658.75 919.60
7,246.25 10,115.60
7,246.00 10,115.00

6,150.00
1,793.75

7,943.75 10,552.25
794.38 1,055.23
8,738.13 11,607.48
8,738.00 11,607.00

13,500.00
3,937.50

17,437.50 20,046.00
1,743.75 2,004.60
19,181.25 22,050.60
19,181.00 22,050.00
Bahan Jumlah
(4) (5)

18,000.00
5,250.00

23,250.00 27,170.75
2,325.00 2,717.08
25,575.00 29,887.83
25,575.00 29,887.00

24,600.00
7,175.00

31,775.00 34,383.50
3,177.50 3,438.35
34,952.50 37,821.85
34,952.00 37,821.00

24,600.00
7,175.00

31,775.00 38,845.00
3,177.50 3,884.50
34,952.50 42,729.50
34,952.00 42,729.00

40,500.00
11,812.50

52,312.50 59,382.50
5,231.25 5,938.25
57,543.75 65,320.75
57,543.00 65,320.00
Bahan Jumlah
(4) (5)

500,000.00
75,000.00

575,000.00 584,798.75
57,500.00 58,479.88
632,500.00 643,278.63
632,500.00 643,278.00

25,000.00
62.50

25,062.50 28,475.00
2,506.25 2,847.50
27,568.75 31,322.50
27,568.00 31,322.00

55,000.00

55,000.00 58,412.50
5,500.00 5,841.25
60,500.00 64,253.75
60,500.00 64,253.00

19,500.00
75,000.00

94,500.00 169,700.00
9,450.00 16,970.00
103,950.00 186,670.00
103,950.00 186,670.00

9,680.00
1,800.00

11,480.00 13,001.75
1,148.00 1,300.18
12,628.00 14,301.93
12,628.00 14,301.00
Bahan Jumlah
(4) (5)

750,000.00

750,000.00 782,045.00
75,000.00 78,204.50
825,000.00 860,249.50
825,000.00 860,249.00

250,000.00

250,000.00 307,435.00
25,000.00 30,743.50
275,000.00 338,178.50
275,000.00 338,178.00

500,000.00

500,000.00 550,254.00
50,000.00 55,025.40
550,000.00 605,279.40
550,000.00 605,279.00
Bahan Jumlah
(4) (5)

200,000.00

200,000.00 261,504.00
20,000.00 26,150.40
220,000.00 287,654.40
220,000.00 287,654.00

400,000.00

400,000.00 450,254.00
40,000.00 45,025.40
440,000.00 495,279.40
440,000.00 495,279.00

101,200.00

101,200.00 158,567.50
10,120.00 15,856.75
111,320.00 174,424.25
111,320.00 174,424.00

27,500.00
200.00
9,900.00

37,600.00 42,941.25
3,760.00 4,294.13
41,360.00 47,235.38
41,360.00 47,235.00
Bahan Jumlah
(4) (5)

9,075.00
200.00
9,900.00

19,175.00 24,516.25
1,917.50 2,451.63
21,092.50 26,967.88
21,092.00 26,967.00

11,000.00
200.00
9,900.00

21,100.00 26,441.25
2,110.00 2,644.13
23,210.00 29,085.38
23,210.00 29,085.00

22,000.00
200.00
187.50

22,387.50 33,070.00
2,238.75 3,307.00
24,626.25 36,377.00
24,626.00 36,377.00

250,000.00

250,000.00 271,247.50
25,000.00 27,124.75
275,000.00 298,372.25
275,000.00 298,372.00
Bahan Jumlah
(4) (5)

125,000.00

125,000.00 140,687.50
12,500.00 14,068.75
137,500.00 154,756.25
137,500.00 154,756.00

50,000.00

50,000.00 65,343.75
5,000.00 6,534.38
55,000.00 71,878.13
55,000.00 71,878.00

75,000.00

75,000.00 90,270.63
7,500.00 9,027.06
82,500.00 99,297.69
82,500.00 99,297.00

11,000.00

11,000.00 16,311.88
1,100.00 1,631.19
12,100.00 17,943.06
12,100.00 17,943.00

7,500.00

7,500.00 11,187.50
750.00 1,118.75
8,250.00 12,306.25
8,250.00 12,306.00

3,000.00

3,000.00 10,375.00
300.00 1,037.50
Bahan Jumlah
(4) (5)
3,300.00 11,412.50
3,300.00 11,412.00
Bahan Jumlah
(4) (5)

7,500.00

7,500.00 12,811.88
750.00 1,281.19
8,250.00 14,093.06
8,250.00 14,093.00

3,000.00

3,000.00 8,311.88
300.00 831.19
3,300.00 9,143.06
3,300.00 9,143.00

150,000.00

150,000.00 167,706.25
15,000.00 16,770.63
165,000.00 184,476.88
165,000.00 184,476.00

50,000.00

50,000.00 57,082.50
5,000.00 5,708.25
55,000.00 62,790.75
55,000.00 62,790.00

15,000.00

15,000.00 32,706.25
1,500.00 3,270.63
16,500.00 35,976.88
16,500.00 35,976.00

15,000.00

15,000.00 18,541.25
1,500.00 1,854.13
Bahan Jumlah
(4) (5)
16,500.00 20,395.38
16,500.00 20,395.00
Bahan Jumlah
(4) (5)

200,000.00

200,000.00 221,247.50
20,000.00 22,124.75
220,000.00 243,372.25
220,000.00 243,372.00

12,000.00

12,000.00 20,853.13
1,200.00 2,085.31
13,200.00 22,938.44
13,200.00 22,938.00

54,450.00

54,450.00 59,761.88
5,445.00 5,976.19
59,895.00 65,738.06
59,895.00 65,738.00

66,550.00

66,550.00 71,861.88
6,655.00 7,186.19
73,205.00 79,048.06
73,205.00 79,048.00

132,000.00

132,000.00 137,311.88
13,200.00 13,731.19
145,200.00 151,043.06
145,200.00 151,043.00

330,000.00

330,000.00 335,311.88
Bahan Jumlah
(4) (5)
33,000.00 33,531.19
363,000.00 368,843.06
363,000.00 368,843.00
Bahan Jumlah
(4) (5)

60,500.00
8,250.00

68,750.00 73,229.38
6,875.00 7,322.94
68,750.00 73,677.31
68,750.00 73,677.00
ANALISA KPUT
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

AN. 1.0000 m2 Menghampar dan mengisi bahan perkerasan


KPUT 1.5000 org Pekerja @ Rp. 20,000.00 30,000.00 -
AN. 0.0730 org Mandor @ Rp. 32,500.00 2,372.50 -
JUMLAH ( BELUM TERMASUK PPN ) 32,372.50 - 32,372.50
DIBULATKAN 32,372.00

1.0000 m3 Menyawur pasir


1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
JUMLAH ( BELUM TERMASUK PPN ) 20,000.00 - 20,000.00
DIBULATKAN 20,000.00

KPUT 1.0000 hari Menggilas dengan motor walls


M.3 1.0000 org Masinis @ Rp. 24,900.00 24,900.00
1.0000 org Kenek @ Rp. 22,000.00 22,000.00
1.0000 org Penjaga @ Rp. 20,000.00 20,000.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
1.0000 ltr Olie @ Rp. 21,000.00 21,000.00
1.0000 ltr Olie SAE @ Rp. 21,000.00 21,000.00
0.7500 ltr Vet @ Rp. 13,000.00 9,750.00
16.0000 ltr Solar @ Rp. 4,300.00 68,800.00
JUMLAH ( BELUM TERMASUK PPN ) 86,900.00 120,550.00 207,450.00
DIBULATKAN 207,450.00

KPUT 100.0000 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
10.8 5.0000 m3 Pasair pasang @ Rp. 76,000.00 380,000.00
23.0000 m3 Batu belah 15/20 @ Rp. 80,000.00 1,840,000.00
3.0000 m3 Batu pecah 5/7 cm @ Rp. 132,000.00 396,000.00
6.5000 m3 Pasir urug @ Rp. 55,000.00 357,500.00
26.0000 m Isi batu berkerasan
3
@ Rp. 32,372.00 841,672.00
6.5000 Tng Menyawur pasir @ Rp. 20,000.00 130,000.00
JUMLAH ( BELUM TERMASUK PPN ) 971,672.00 2,973,500.00 3,945,172.00
DIBULATKAN 3,945,172.00

Tiap m2
1/100 x 971,672.00 + 2,973,500.00 9,716.72 29,735.00
Biaya menggilas
1/200 x 86,900.00 + 120,550.00 434.50 602.75
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 30,337.75 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

100.0000 m2 Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat


5.0000 m3 Pasair urug @ Rp. 55,000.00 275,000.00
17.5000 m Batu belah 15/20
3
@ Rp. 80,000.00 1,400,000.00
3.0000 m3 Batu pecah 5/7 cm @ Rp. 126,500.00 379,500.00
6.5000 m Pasir urug (pengisi)
3
@ Rp. 55,000.00 357,500.00
20.5000 m3 Isi batu berkerasan @ Rp. 32,372.00 663,626.00
5.0000 Tng Menyawur pasir @ Rp. 20,000.00 100,000.00
JUMLAH ( BELUM TERMASUK PPN ) 763,626.00 2,412,000.00 3,175,626.00
DIBULATKAN 3,175,626.00

Tiap m2
1/100 x 763,626.00 + 2,412,000.00 7,636.26 24,120.00
Biaya menggilas
1/200 x 86,900.00 + 120,550.00 434.50 602.75
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 24,722.75 #REF!
JASA 10 % #REF!

Analisa KPUT - 200


No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH #REF!
DIBULATKAN #REF!

Analisa KPUT - 201


No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

100.0000 m2 Pembuatan lapis pondasi atas (base) tebal 10 cm padat


10.0000 m3 Batu koral 5/7 cm @ Rp. 132,000.00 1,320,000.00
2.0000 m3 Batu koral 3/4 cm @ Rp. 130,000.00 260,000.00
1.0000 m Batu koral 2/3 cm
3
@ Rp. 138,000.00 138,000.00
3.2500 m3 Pasir urug (pengisi) @ Rp. 55,000.00 178,750.00
13.0000 m Isi batu berkerasan
3
@ Rp. 32,372.00 420,836.00
3.2500 Tng Menyawur pasir @ Rp. 20,000.00 65,000.00
JUMLAH ( BELUM TERMASUK PPN ) 485,836.00 1,896,750.00 2,382,586.00
DIBULATKAN 2,382,586.00

Tiap m2
1/100 x 485,836.00 + 1,896,750.00 4,858.36 18,967.50
Biaya menggilas
1/150 x 86,900.00 + 120,550.00 579.33 803.67
Sewa motor walls
1/150 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 19,771.17 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

Tiap m2 Pembuatan lapis pondasi atas (base) tebal 8 cm padat


8/10 x 4,858.36 + 18,967.50 3,886.69 15,174.00
Biaya menggilas
1/150 x 86,900.00 + 120,550.00 579.33 803.67
Sewa motor walls
1/150 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 15,977.67 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

Tiap m2 Pembuatan lapis pondasi atas (base) tebal 7 cm padat


7/ 10 x 4,858.36 + 18,967.50 3,400.85 13,277.25
Biaya menggilas
1/150 x 86,900.00 + 120,550.00 579.33 803.67
Sewa motor walls
1/150 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 14,080.92 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

100.0000 m2 Lapisan Penetrasi 4 cm padat


0.2400 m3 Krokos D 20 - 40 mm @ Rp. 70,000.00 16,800.00
0.4800 m3 Split D 10 mm @ Rp. 120,000.00 57,600.00
3.5000 m Split D 30 - 40 mm
3
@ Rp. 120,000.00 420,000.00
1.2000 m3 Split D 10 - 20 mm @ Rp. 120,000.00 144,000.00
1.2500 m 3
Kayu bakar @ Rp. 90,000.00 112,500.00
14.0000 org Pekerja @ Rp. 20,000.00 280,000.00
1.0000 org Mandor @ Rp. 32,500.00 32,500.00
1.5000 org Juru godog aspal @ Rp. 20,000.00 30,000.00
1.0000 org Masinis @ Rp. 24,900.00 24,900.00
1.0000 org Kenek @ Rp. 22,000.00 22,000.00
1.0000 org Penyemprot @ Rp. 17,500.00 17,500.00
400.0000 kg Aspal @ Rp. 10,650.00 4,260,000.00
80.0000 kg Aspal lem @ Rp. 10,650.00 852,000.00
1.0000 hr Sprayer (sewa) @ Rp. #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) 406,900.00 #REF! #REF!
DIBULATKAN #REF!

Analisa KPUT - 202


No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

Tiap m2
1/100 x 406,900.00 + #REF! 4,069.00 #REF!
Biaya menggilas
4/12,5/200 x 86,900.00 + 120,550.00 139.04 192.88
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

KPUT 100.0000 m2 Pengaspalan sand sheet (latasir), tebal 1 cm jereng


M.8 125.0000 kg Aspal 10,650.00 1,331,250.00
1.0000 m Pasair pasang
3
@ Rp. 76,000.00 76,000.00
0.9000 m3 Kayu bakar @ Rp. 90,000.00 81,000.00
0.2500 org Juru godog aspal @ Rp. 20,000.00 5,000.00
8.1000 org Pekerja @ Rp. 20,000.00 162,000.00
0.4000 org Mandor @ Rp. 32,500.00 13,000.00
JUMLAH ( BELUM TERMASUK PPN ) 180,000.00 1,488,250.00 1,668,250.00
DIBULATKAN 1,668,250.00

Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat)
2/100 x 180,000.00 + 1,488,250.00 3,600.00 29,765.00
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) #REF! 35,331.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat)
3/100 x 180,000.00 + 1,488,250.00 5,400.00 44,647.50
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) #REF! 50,213.60 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

KPUT 100.0000 m2 Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
M.8 - kg Aspal 10,650.00 -
1.0000 m3 Pasair pasang @ Rp. 76,000.00 76,000.00
0.9000 m3 Kayu bakar @ Rp. 90,000.00 81,000.00
0.2500 org Juru godog aspal @ Rp. 20,000.00 5,000.00
8.1000 org Pekerja @ Rp. 20,000.00 162,000.00
0.4000 org Mandor @ Rp. 32,500.00 13,000.00
JUMLAH ( BELUM TERMASUK PPN ) 180,000.00 157,000.00 337,000.00
DIBULATKAN 337,000.00

Analisa KPUT - 203


No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 180,000.00 + 157,000.00 3,600.00 3,140.00
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) #REF! 3,381.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat) tanpa aspal
3/100 x 180,000.00 + 157,000.00 5,400.00 4,710.00
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) #REF! 4,951.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

10.0000 m2 Mengecat marka jalan dengan Rettar


4.2500 kg Cat rettar @ Rp. 49,000.00 208,250.00
0.5700 ltr Minyak cat @ Rp. 10,000.00 5,700.00
2.2500 org Tukang cat @ Rp. 25,000.00 56,250.00
0.2300 org Kepala tukang cat @ Rp. 27,000.00 6,210.00
2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
JUMLAH ( BELUM TERMASUK PPN ) 102,460.00 213,950.00 316,410.00
DIBULATKAN 316,410.00

Tiap m2 Mengecat marka jalan dengan rettar


1/ 10 x 102,460.00 + 213,950.00 10,246.00 21,395.00
JUMLAH ( BELUM TERMASUK PPN ) 10,246.00 21,395.00 31,641.00
JASA 10 % 3,164.10
JUMLAH 34,805.10
DIBULATKAN 34,805.00

1.0000 m2 Mengecat marka jalan dengan Thermoplastic


1.6575 kg Cat marka @ Rp. 49,000.00 81,217.50
0.4500 kg Glasbit @ Rp. 12,000.00 5,400.00
1.0500 ltr Thinner @ Rp. 13,000.00 13,650.00
0.0750 jam Sewa Compressor @ Rp. #REF! #REF!
0.0750 jam Sewa Dumptruck @ Rp. #REF! #REF!
0.0100 ls Alat bantu @ Rp. 130,000.00 1,300.00
0.2250 org Tukang cat @ Rp. 25,000.00 5,625.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0750 org Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM TERMASUK PPN ) 20,062.50 #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

Analisa KPUT - 204


No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

350.0000 m1 Pemotongan aspal dengan mesin potong (cutter), 2 sisi


2.0000 bh Cutter @ Rp. 1,000,000.00 2,000,000.00
2.0000 hr Sewa mesin cutter @ Rp. #REF! #REF!
15.0000 ltr Solar @ Rp. 4,300.00 64,500.00
2.0000 org Tk. Cutter / masinis @ Rp. 24,900.00 49,800.00
2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
JUMLAH ( BELUM TERMASUK PPN ) 89,800.00 #REF! #REF!
DIBULATKAN #REF!

Tiap m1 Pemotongan aspal dengan mesin potong (cutter), 2 sisi


1/350 x 89,800.00 + #REF! 256.57 #REF!
JUMLAH ( BELUM TERMASUK PPN ) 256.57 #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

Tiap m1 Pemotongan aspal dengan mesin potong (cutter), 1 sisi


1/700 x 89,800.00 + #REF! 128.29 #REF!
JUMLAH ( BELUM TERMASUK PPN ) 128.29 #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

1.0000 m2 Pembongkaran aspal dengan Jack Hammer


0.6600 hari Sewa mesin Jack Hammer @ Rp. #REF! #REF!
1.3200 ltr Solar @ Rp. 4,300.00 5,676.00
0.0400 org Tk. Jack Hammer / masinis @ Rp. 24,900.00 996.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0630 org Mandor @ Rp. 32,500.00 2,047.50
JUMLAH ( BELUM TERMASUK PPN ) 8,043.50 #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

ANALISA EXPANTION JOINT


No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

1.0000 m1 Expantion joint


18.5000 kg Ashpaltic Joint @ Rp. 60,000.00 1,110,000.00
5.5000 kg Plate baja 5 mm @ Rp. 8,800.00 48,400.00
1.0000 m1 Joint Filler @ Rp. 9,000.00 9,000.00
0.0150 m3 Split 1/2 cm @ Rp. 190,000.00 2,850.00
6.5000 kg Gas Elpiji @ Rp. 4,500.00 29,250.00
0.1000 hr Sewa Jack Hammer @ Rp. #REF! #REF!
0.1000 hr Sewa Genset 2000 watt @ Rp. #REF! #REF!
0.1000 hr Sewa Compressor @ Rp. #REF! #REF!
0.1000 hr Sewa Stamper @ Rp. #REF! #REF!
0.1000 bh Mata cutter @ Rp. 1,000,000.00 100,000.00
0.1000 hr Sewa mesin cutter @ Rp. #REF! #REF!
1.0000 ls Alat bantu @ Rp. 130,000.00 130,000.00
1.0000 org Mekanik terlatih @ Rp. 29,000.00 29,000.00
4.5000 org Operator terlatih @ Rp. 29,000.00 130,500.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM TERMASUK PPN ) 162,750.00 #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!

Analisa KPUT - 205


ANJALISA PEKERJAAN LISTRIK
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

1. 1.0000 m1 Pasang Kabel NYY 3 x 6 sqmm


0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00
0.0050 org Pekerja @ Rp. 20,000.00 100.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 407.50 - 407.50
JASA 10 % 40.75
JUMLAH 448.25
DIBULATKAN 448.00

2. 1.0000 m1 Pasang Kabel NYY 3 x 4 sqmm


0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00
0.0050 org Pekerja @ Rp. 20,000.00 100.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 407.50 - 407.50
JASA 10 % 40.75
JUMLAH 448.25
DIBULATKAN 448.00

3. 1.0000 m1 Pasang Kabel NYM 2 x 2,5 sqmm


0.0050 org Tukang Listrik @ Rp. 29,000 145.00
0.0050 org Pekerja @ Rp. 20,000 100.00
0.0050 org Mandor @ Rp. 32,500 162.50
JUMLAH ( BELUM PPN ) 407.50 - 407.50
JASA 10 % 40.75
JUMLAH 448.25
DIBULATKAN 448.00

4. 1.0000 m1 Pasang Kabel NYM 2 x 1,5 sqmm


0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00
0.0050 org Pekerja @ Rp. 20,000.00 100.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 407.50 - 407.50
JASA 10 % 40.75
JUMLAH 448.25
DIBULATKAN 448.00

5. 1.0000 m1 Pasang Kabel NYA 1 x 2,5 sqmm


0.0025 org Tukang Listrik @ Rp. 29,000.00 72.50
0.0025 org Pekerja @ Rp. 20,000.00 50.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 203.75 - 203.75
JASA 10 % 20.38
JUMLAH 224.13
DIBULATKAN 224.00

6. 50.0000 m1 Pasang Kabel DX 2x10 sqmm + Accessories (antar tiang / gawang)


50.0000 m1
Kabel DX 2x10 qmm + Accessories @ Rp. 6,875.00 343,750.00
0.1250 org Tenaga Ahli @ Rp. 37,200.00 4,650.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.2500 org Mandor @ Rp. 32,500.00 8,125.00
1.0000 ls Penyambungan beban @ Rp. 17,250.00 17,250.00
JUMLAH ( BELUM PPN ) 54,525.00 343,750.00 398,275.00
JASA 10 % 39,827.50
JUMLAH 438,102.50
DIBULATKAN 438,102.00

Analisa Gedung - 206


(1) (2) (3) (4) (5)

7. 50.0000 m1 Pasang Kabel DX 2x16 sqmm + Accessories (antar tiang / gawang)


50.0000 m1
Kabel DX 2x16 qmm + Accessories @ Rp. 8,250.00 412,500.00
0.1250 org Tenaga Ahli @ Rp. 37,200.00 4,650.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.2500 org Mandor @ Rp. 32,500.00 8,125.00
1.0000 ls Penyambungan beban @ Rp. 17,250.00 17,250.00
JUMLAH ( BELUM PPN ) 54,525.00 412,500.00 467,025.00
JASA 10 % 46,702.50
JUMLAH 513,727.50
DIBULATKAN 513,727.00

8. 1.0000 m1 Pasang Kabel NYY 3x10 sqmm


1.0000 m Kabel NYY 3x10 Sqmm
1
@ Rp. 45,408.00 45,408.00
0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00
0.0050 org Pekerja @ Rp. 20,000.00 100.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 407.50 45,408.00 45,815.50
JASA 10 % 4,581.55
JUMLAH 50,397.05
DIBULATKAN 50,397.00

9. 1.0000 unit Pasang Box Panel dan Panel Kontrol 1 Unit


0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
0.7500 org Pekerja @ Rp. 20,000.00 15,000.00
0.2500 org Mandor @ Rp. 32,500.00 8,125.00
1.0000 unit Pasang panel kontrol @ Rp. 86,250.00 86,250.00
JUMLAH ( BELUM PPN ) 109,375.00 14,500.00 123,875.00
JASA 10 % 12,387.50
JUMLAH 136,262.50
DIBULATKAN 136,262.00

10. 1.0000 unit Pasang Box KWH dan Meter (1 Unit)


0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
0.7500 org Pekerja @ Rp. 20,000.00 15,000.00
0.2500 org Mandor @ Rp. 32,500.00 8,125.00
1.0000 unit Pasang panel kontrol @ Rp. 86,250.00 86,250.00
JUMLAH ( BELUM PPN ) 109,375.00 14,500.00 123,875.00
JASA 10 % 12,387.50
JUMLAH 136,262.50
DIBULATKAN 136,262.00

11. 1.0000 unit Pasang tiang lampu antik (b3)


0.6600 org Tukang batu @ Rp. 27,500.00 18,150.00
0.6600 org Tukang listrik @ Rp. 29,000.00 19,140.00
5.3300 org Pekerja @ Rp. 20,000.00 106,600.00
0.6660 org Mandor @ Rp. 32,500.00 21,645.00
0.6660 set Alat bantu @ Rp. 86,250.00 57,442.50
4.6000 jam Angkutan @ Rp. 7,143.00 32,857.80
JUMLAH ( BELUM PPN ) 165,535.00 90,300.30 255,835.30
JASA 10 % 25,583.53
JUMLAH 281,418.83
DIBULATKAN 281,418.00

12. 1.0000 unit Pasang tiang lampu antik (b3)


0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.5000 org Tukang listrik @ Rp. 29,000.00 14,500.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.5000 org Mandor @ Rp. 32,500.00 16,250.00
0.5000 set Alat bantu @ Rp. 86,250.00 43,125.00
3.5000 jam Angkutan @ Rp. 7,143.00 25,000.50
JUMLAH ( BELUM PPN ) 124,500.00 68,125.50 192,625.50
JASA 10 % 19,262.55
JUMLAH 211,888.05
DIBULATKAN 211,888.00

Analisa Gedung - 207


(1) (2) (3) (4) (5)

13. 1.0000 set Pemasangan armatur komplit


0.5000 org Tukang listrik @ Rp. 29,000.00 14,500.00
0.7500 org Pekerja @ Rp. 20,000.00 15,000.00
0.2500 org Mandor @ Rp. 32,500.00 8,125.00
1.0000 set Alat bantu @ Rp. 86,250.00 86,250.00
JUMLAH ( BELUM PPN ) 37,625.00 86,250.00 123,875.00
JASA 10 % 12,387.50
JUMLAH 136,262.50
DIBULATKAN 136,262.00

14. 1.0000 unit Pemasangan komponen + Box


0.6660 org Tukang listrik @ Rp. 29,000.00 19,314.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.3330 org Mandor @ Rp. 32,500.00 10,822.50
1.0000 set Alat bantu @ Rp. 86,250.00 86,250.00
JUMLAH ( BELUM PPN ) 50,136.50 86,250.00 136,386.50
JASA 10 % 13,638.65
JUMLAH 150,025.15
DIBULATKAN 150,025.00

15. 1.0000 set Bongkar komponen


0.4000 org Tukang listrik @ Rp. 29,000.00 11,600.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
1.0000 set Alat bantu @ Rp. 86,250.00 86,250.00
JUMLAH ( BELUM PPN ) 30,100.00 86,250.00 116,350.00
JASA 10 % 11,635.00
JUMLAH 127,985.00
DIBULATKAN 127,985.00

16. 1.0000 unit Bongkar Armatur


0.3300 org Tukang Listrik @ Rp. 29,000.00 9,570.00
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.1666 org Mandor @ Rp. 32,500.00 5,414.50
1.0000 jam Angkutan @ Rp. 7,143.00 7,143.00
JUMLAH ( BELUM PPN ) 24,984.50 7,143.00 32,127.50
JASA 10 % 3,212.75
JUMLAH 35,340.25
DIBULATKAN 35,340.00

17. 1.0000 set Bongkar Tiang Lampu Antik (b.1)


0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.5000 org Mandor @ Rp. 32,500.00 16,250.00
0.5000 set Alat bantu @ Rp. 86,250.00 43,125.00
3.5000 jam Angkutan @ Rp. 7,143.00 25,000.50
JUMLAH ( BELUM PPN ) 124,500.00 68,125.50 192,625.50
JASA 10 % 19,262.55
JUMLAH 211,888.05
DIBULATKAN 211,888.00

18. 1.0000 set Bongkar Tiang Lampu Antik (b.1)


0.6600 org Tukang batu @ Rp. 27,500.00 18,150.00
0.6600 org Tukang Listrik @ Rp. 29,000.00 19,140.00
5.3330 org Pekerja @ Rp. 20,000.00 106,660.00
0.6660 org Mandor @ Rp. 32,500.00 21,645.00
0.6660 set Alat bantu @ Rp. 86,250.00 57,442.50
4.6000 jam Angkutan @ Rp. 7,143.00 32,857.80
JUMLAH ( BELUM PPN ) 165,595.00 90,300.30 255,895.30
JASA 10 % 25,589.53
JUMLAH 281,484.83
DIBULATKAN 281,484.00

Analisa Gedung - 208


(1) (2) (3) (4) (5)

19. 1.0000 m1 Pasang Kabel NYM 2x2,5 sqmm


1.0000 m Kabel NYM 2 x 2,5 qmm
1
@ Rp. 10,633.00 10,633.00
0.2500 org Tukang Listrik @ Rp. 29,000.00 7,250.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 7,612.50 10,633.00 18,245.50
JASA 10 % 1,824.55
JUMLAH 20,070.05
DIBULATKAN 20,070.00

20. 1.0000 m1 Pasang Kabel NYA 2,5 sqmm


1.0000 m1 Kabel NYA 2,5 qmm @ Rp. 150,000.00 150,000.00
0.2500 org Tukang Listrik @ Rp. 29,000.00 7,250.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 7,612.50 150,000.00 157,612.50
JASA 10 % 15,761.25
JUMLAH 173,373.75
DIBULATKAN 173,373.00

21. 1.0000 m1 Pasang Pralon 3" Kabel NYY 3x6 sqmm


1.0000 m1 Pipa pralon 3" @ Rp. 20,500.00 20,500.00
0.0100 org Pekerja @ Rp. 20,000.00 200.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 362.50 20,500.00 20,862.50
JASA 10 % 2,086.25
JUMLAH 22,948.75
DIBULATKAN 22,948.00

22. 1.0000 bh Pasang tutup panel ukuran 30x30


1.0000 bh Tutup panel 30x30 @ Rp. 28,750.00 28,750.00
0.0500 org Tukang listrik @ Rp. 29,000.00 1,450.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 4,262.50 28,750.00 33,012.50
JASA 10 % 3,301.25
JUMLAH 36,313.75
DIBULATKAN 36,313.00

23. 1.0000 bh Pasang MCB Ampere + box tutup panel ukuran 30 x 30


1.0000 bh MCB 10 Ampere + box @ Rp. 42,000.00 42,000.00
0.0500 org Tukang listrik @ Rp. 29,000.00 1,450.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 4,262.50 42,000.00 46,262.50
JASA 10 % 4,626.25
JUMLAH 50,888.75
DIBULATKAN 50,888.00

24. 1.0000 bh Pasang Kapasitor 12,5 uF


1.0000 bh Kapasitor 12,5 uF @ Rp. 26,000.00 26,000.00
0.0500 org Tukang listrik @ Rp. 29,000.00 1,450.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0250 org Mandor @ Rp. 32,500.00 812.50
JUMLAH ( BELUM PPN ) 4,262.50 26,000.00 30,262.50
JASA 10 % 3,026.25
JUMLAH 33,288.75
DIBULATKAN 33,288.00

Analisa Gedung - 209


(1) (2) (3) (4) (5)

25. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
1.2500 org Pengawas @ Rp. 37,200.00 46,500.00
0.5000 org Mandor @ Rp. 32,500.00 16,250.00
JUMLAH (A) 87,250.00 - 87,250.00

26. Pengetesan dan Penyalaan


1.0000 ttk @ Rp. 7,000.00 7,000.00
JUMLAH (B) 7,000.00 - 7,000.00

JUMLAH ( A + B ) ( BELUM PPN ) 94,250.00


JASA 10 % 9,425.00
JUMLAH 103,675.00
DIBULATKAN 103,675.00

27. 1.0000 set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
0.8750 org Pekerja @ Rp. 20,000.00 17,500.00
0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00
1.8033 org Pengawas @ Rp. 37,200.00 67,082.76
0.7413 org Mandor @ Rp. 32,500.00 24,093.23
JUMLAH (C) 134,050.99 - 134,050.99

JUMLAH ( B + C ) ( BELUM PPN ) 141,050.99


JASA 10 % 14,105.10
JUMLAH 155,156.08
DIBULATKAN 155,156.00

28. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
1.2500 org Pengawas @ Rp. 37,200.00 46,500.00
0.5000 org Mandor @ Rp. 32,500.00 16,250.00
JUMLAH (D) 87,250.00 - 87,250.00

JUMLAH ( B + D ) ( BELUM PPN ) 94,250.00


JASA 10 % 9,425.00
JUMLAH 103,675.00
DIBULATKAN 103,675.00

29. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
2.8500 org Pekerja @ Rp. 20,000.00 57,000.00
2.8500 org Tukang Listrik @ Rp. 29,000.00 82,650.00
2.0075 org Pengawas @ Rp. 37,200.00 74,679.00
1.0000 org Mandor @ Rp. 32,500.00 32,500.00
JUMLAH (E) 246,829.00 1,811,856.24 2,058,685.24

JUMLAH ( B + E ) ( BELUM PPN ) 2,065,685.24


JASA 10 % 206,568.52
JUMLAH 2,272,253.76
DIBULATKAN 2,272,253.00

30. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
3.1000 org Pekerja @ Rp. 20,000.00 62,000.00
3.1000 org Tukang Listrik @ Rp. 29,000.00 89,900.00
2.5000 org Pengawas @ Rp. 37,200.00 93,000.00
1.2100 org Mandor @ Rp. 32,500.00 39,325.00
JUMLAH (F) 284,225.00 1,811,856.24 2,096,081.24

JUMLAH ( B + F ) ( BELUM PPN ) 2,103,081.24


JASA 10 % 210,308.12
JUMLAH 2,313,389.36
DIBULATKAN 2,313,389.00

Analisa Gedung - 210


(1) (2) (3) (4) (5)

31. 1.0000 set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
3.3000 org Pekerja @ Rp. 20,000.00 66,000.00
3.3000 org Tukang Listrik @ Rp. 29,000.00 95,700.00
2.5782 org Pengawas @ Rp. 37,200.00 95,909.04
1.2433 org Mandor @ Rp. 32,500.00 40,407.25
JUMLAH (G) 298,016.29 1,811,856.24 2,109,872.53

JUMLAH ( B + G) ( BELUM PPN ) 2,116,872.53


JASA 10 % 211,687.25
JUMLAH 2,328,559.78
DIBULATKAN 2,328,559.00

32. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
3.8100 org Pekerja @ Rp. 20,000.00 76,200.00
3.8100 org Tukang Listrik @ Rp. 29,000.00 110,490.00
2.6626 org Pengawas @ Rp. 37,200.00 99,048.72
1.2650 org Mandor @ Rp. 32,500.00 41,112.50
JUMLAH (H) 326,851.22 1,811,856.24 2,138,707.46

JUMLAH ( B + H) ( BELUM PPN ) 2,145,707.46


JASA 10 % 214,570.75
JUMLAH 2,360,278.20
DIBULATKAN 2,360,278.00

33. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
4.2500 org Pekerja @ Rp. 20,000.00 85,000.00
4.2500 org Tukang Listrik @ Rp. 29,000.00 123,250.00
2.9287 org Pengawas @ Rp. 37,200.00 108,947.64
1.2939 org Mandor @ Rp. 32,500.00 42,051.75
JUMLAH (I) 359,249.39 1,811,856.24 2,171,105.63

JUMLAH ( B + I) ( BELUM PPN ) 2,178,105.63


JASA 10 % 217,810.56
JUMLAH 2,395,916.19
DIBULATKAN 2,395,916.00

34. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
0.9000 org Pekerja @ Rp. 20,000.00 18,000.00
0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00
2.1044 org Pengawas @ Rp. 37,200.00 78,283.68
0.8418 org Mandor @ Rp. 32,500.00 27,358.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (J) 154,742.18 - 154,742.18

JUMLAH ( B + J) ( BELUM PPN ) 161,742.18


JASA 10 % 16,174.22
JUMLAH 177,916.40
DIBULATKAN 177,916.00

35. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
0.8750 org Pekerja @ Rp. 20,000.00 17,500.00
0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00
1.6995 org Pengawas @ Rp. 37,200.00 63,221.40
0.6798 org Mandor @ Rp. 32,500.00 22,093.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (K) 133,189.90 - 133,189.90

JUMLAH ( B + K) ( BELUM PPN ) 140,189.90


JASA 10 % 14,018.99
JUMLAH 154,208.89
DIBULATKAN 154,208.00

Analisa Gedung - 211


(1) (2) (3) (4) (5)

36. 1.0000 set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
0.9000 org Pekerja @ Rp. 20,000.00 18,000.00
0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00
2.1044 org Pengawas @ Rp. 37,200.00 78,283.68
0.8418 org Mandor @ Rp. 32,500.00 27,358.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (L) 154,742.18 - 154,742.18

JUMLAH ( B + L) ( BELUM PPN ) 161,208.00


JASA 10 % 16,120.80
JUMLAH 177,328.80
DIBULATKAN 177,328.00

37. 1.0000 set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
0.8500 org Pekerja @ Rp. 20,000.00 17,000.00
0.8500 org Tukang Listrik @ Rp. 29,000.00 24,650.00
1.9554 org Pengawas @ Rp. 37,200.00 72,740.88
0.7822 org Mandor @ Rp. 32,500.00 25,421.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (M) 144,812.38 - 144,812.38

JUMLAH ( B + M) ( BELUM PPN ) 151,812.38


JASA 10 % 15,181.24
JUMLAH 166,993.62
DIBULATKAN 166,993.00

Analisa Gedung - 212


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PLANT E01

2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 50.00 Ton/jam
4 Alat Baru : a. Umur Ekonomis A 10.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 7,500,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 10.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,500.00 Jam Alat Baru
c. Harga Alat B' 7,500,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 750,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.23852 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengmbalian Modal = ( B-C)xD E 1,073,352.41 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 10,000.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 1,083,352.41 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 80,625.00 Rupiah


Bahan bakar pemanasan = 12 x 0,7 Cp x Ms H2 1,806,000.00 Rupiah Khusus AMP
material
2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 21,000.00 Rupiah
3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 625,000.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 3 org / Jam ) x U2 M 8,250.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 2,544,500.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 3,627,852.41 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 213


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHER E02

2 Tenaga Pw 47.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 715,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 6.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 715,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 71,500,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.30071 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 96,752.07 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 715.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 97,467.07 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 25,262.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 6,580.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 44,687.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 82,905.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 180,372.07 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 214


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYER E03

2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 800.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 14,500,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 21,818.28 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 145.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 21,963.28 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 8,062.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 2,100.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 9,062.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 25,600.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 47,563.28 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 215


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER 100 -150 HP E04

2 Tenaga Pw 140.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 700,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 700,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 70,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 105,329.61 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 700.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 106,029.61 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 75,250.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 19,600.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 43,750.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 144,975.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 251,004.61 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 216


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000 - 6500 L/M E05

2 Tenaga Pw 80.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 175,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 175,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 17,500,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 26,332.40 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 175.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 26,507.40 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 43,000.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 11,200.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 10,937.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 71,512.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 98,019.90 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 217


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER 1,0 - 1,6 M3 E15

2 Tenaga Pw 105.00 HP
3 Kapasitas Cp 1.50 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 840,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 840,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 84,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 126,395.53 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 840.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 127,235.53 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 56,437.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,700.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 52,500.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 130,012.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 257,248.03 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 218


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6 - 8 T E17

2 Tenaga Pw 50.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 460,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 460,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 46,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 69,216.60 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 460.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 69,676.60 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 26,875.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 7,000.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 28,750.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 69,000.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 138,676.60 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 219


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TYRE ROLLER 8 - 10 T E18

2 Tenaga Pw 60.00 HP
3 Kapasitas Cp 10.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 1,800.00 Jam
c Harga Alat B 510,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 1,800.00 Jam Alat Baru
c Harga Alat B' 510,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 51,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 85,266.82 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 566.67 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 85,833.49 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 32,250.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 8,400.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 35,416.67 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 82,441.67 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 168,275.16 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 220


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK E09

2 Tenaga Pw 125.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 14,500,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 21,818.28 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 145.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 21,963.28 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 67,187.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 17,500.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 9,062.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 100,125.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 122,088.28 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 221


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan GENERATOR SET E12

2 Tenaga Pw 175.00 HP
3 Kapasitas Cp 125.00 KVA
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 440,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 440,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 44,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 66,207.18 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 440.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 66,647.18 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 94,062.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 24,500.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 27,500.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 152,437.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 219,084.68 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 222


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER > 100 HP E12

2 Tenaga Pw 125.00 HP
3 Kapasitas Cp - -
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 880,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 880,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 88,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 132,414.36 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 880.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 133,294.36 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 67,187.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 17,500.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 55,000.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 146,062.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 279,356.86 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 223


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER 5 - 8 T E19

2 Tenaga Pw 75.00 HP
3 Kapasitas Cp 7.00 Ton
4 Alat Baru Umur Ekonomis A 4.00 Tahun
Jam Kerja dalam 1 Tahun W 2,000.00 Jam
Harga Alat B 500,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 4.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 500,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 50,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 86,915.05 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 500.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 87,415.05 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 40,312.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 10,500.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 31,250.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam =( H1 + H2 + I + K + L + M ) P 88,437.50 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 175,852.55 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 224


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan WATER TANK TRUCK 3000 - 4000 L E23

2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4,000.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 50,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 50,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 5,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 7,523.54 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 50.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 7,573.54 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 53,750.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,000.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 3,125.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 77,250.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 84,823.54 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 225


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER E26

2 Tenaga Pw 3.00 HP
3 Kapasitas Cp - Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,500,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 350,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 1,216.81 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 7.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 1,223.81 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 1,612.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 420.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 437.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 8,845.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 10,068.81 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 226


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan TAMPER E25

2 Tenaga Pw 5.00 HP
3 Kapasitas Cp 0.170 Ton
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 300,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 1,042.98 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 6.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 1,048.98 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 2,687.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 700.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 375.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 10,137.50 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 11,186.48 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 227


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan STONE CRUSHER E21

2 Tenaga Pw 220.00 HP
3 Kapasitas Cp 50.00 Ton/Jam
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 491,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 491,500,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 49,150,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 73,956.43 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 491.50 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 74,447.93 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 118,250.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 30,800.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 30,718.75 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 2 org / Jam ) x U2 M 5,500.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 188,893.75 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 263,341.68 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 228


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL ROLLER 6 - 8 T E16

2 Tenaga Pw 55.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 125,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 125,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 12,500,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 18,808.86 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 125.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 18,933.86 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 29,562.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 7,700.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 7,812.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 51,450.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 70,383.86 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 229


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRATOR E20

2 Tenaga Pw 10.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 12,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 12,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 1,200,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 4,171.92 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 24.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 4,195.92 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 5,375.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 1,400.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 1,500.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 14,650.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 18,845.92 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 230


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3 - 0.6 M3 E06

2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 500.00 Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 45,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 45,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 4,500,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 7,822.35 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 45.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 7,867.35 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 8,062.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 2,100.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 2,812.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 19,350.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 27,217.35 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 231


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan CRANE 10 - 15 TON E07

2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 15.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 30,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a Biaya Pengembalian Modal = ( B-C)xD E 45,141.26 Rupiah
W'
b Asuransi dll = 0,002 x B ' F 300.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 45,441.26 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 80,625.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 21,000.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 18,750.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 126,750.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 172,191.26 Rp

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 232


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3 - 4 M3 E08

2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 10,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 15,047.09 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 100.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 15,147.09 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 53,750.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,000.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 6,250.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 80,375.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 95,522.09 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 233


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80 - 140 HP E10

2 Tenaga Pw 80.00 HP
3 Kapasitas Cp 0.50 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 25,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 37,617.72 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 250.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 37,867.72 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 43,000.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 11,200.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 15,625.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 76,200.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 114,067.72 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 234


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3 - 4 M3 E11

2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4.00 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 25,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 37,617.72 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 250.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 37,867.72 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 53,750.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,000.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 15,625.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 89,750.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 127,617.72 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 235


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70 - 100 mm E22

2 Tenaga Pw 6.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 2.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 5,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 2.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 5,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 500,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.65455 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 1,472.73 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 5.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 1,477.73 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 3,225.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 840.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 312.50 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 10,752.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 12,230.23 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 236


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan FULVI MIXER E27

2 Tenaga Pw 75.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 10,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 15,047.09 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 100.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 15,147.09 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 40,312.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 10,500.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 6,250.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 63,437.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 78,584.59 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 237


URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN KET.

I URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75 - 100 HP E14

2 Tenaga Pw 90.00 HP
3 Kapasitas Cp 1.60 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 30,000,000.00 Rupiah


2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -
( 1 + i )^A'-1
3 Biaya pasti per jam
a. Biaya Pengembalian Modal = ( B-C)xD E 45,141.26 Rupiah
W'
b. Asuransi dll = 0,002 x B ' F 300.00 Rupiah
W'
Biaya Pasti Perjam = ( E + F ) G 45,441.26 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 48,375.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 12,600.00 Rupiah


3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 18,750.00 Rupiah
W'
4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah
5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 86,100.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 131,541.26 Rupiah

V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Analisa Alat - 238


FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : LATASTON ( HRS )


SATUAN : M2 Analisa EI - 633

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.0113 2,500.00 28.34
2 Mandor ( L 03 ) Jam 0.0016 4,062.50 6.58

JUMLAH HARGA TENAGA 34.92

B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0121 126,500.00 1,532.51
2 Agregat Halus ( M 04 ) M3 0.0232 79,750.00 1,850.41
3 Filler ( M 05 ) Kg 4.8004 750.00 3,600.33
4 Aspal ( M 10 ) Kg 5.2962 10,650.00 56,404.89

JUMLAH HARGA BAHAN 63,388.13

C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0011 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0016 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0016 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.0143 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0020 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0017 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 239
URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )
SATUAN : M2 Analisa EI - 633

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan padat t 0.03 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -

8 Komposisi campuran HRS ( Spesifikasi )


- Coarse Agregat 20 - 40 % CA 29.50 %
- Fine Agregat 47 - 67 % FA 56.50 %
- Fraksi Filler 5 - 9 % FF 6.49 %
- Aspal minimum 7,3 % As 7.51 %

9 Berat jenis bahan


- HRS D1 2.24 t / m3
- Coarse Agregat dan fine agregat D2 1.80 t / m3
- Fraksi Filler D3 2.00 t / m3
- Aspal D4 1.03 t / m3

II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
a Agregat kasar = {( CA x D1 x t m3 ) x ( Fh 1 )}/ D2 M03 0.0121 m3
b Agregat halus = {( FA x D1 x t m3 ) x ( Fh 1 )}/ D2 M04 0.0232 m3
c Filler = {( FF x D1 x t m3 ) x ( Fh 1 )} M05 4.8004 Kg
d Aspal = {( AS x D1 x t m3 ) x ( Fh 2 )}x1000 M10 5.2962 Kg

2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit

Kap Produksi / Jam = D2 x V x Fb x Fa x 60 Q1 900.40 m2


D1 x t x Ts1
Koefisien Alat / m2 = 1 / Q1 ( E 15 ) 0.0011 Jam

Analisa - E 240
No URAIAN KODE KOEF. SATUAN KET.

b Aspalt Mixing Plant ( AMP ) ( E 01 )


Kapasitas produksi V 50.00 ton / jam
faktor Efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = V x Fa Q2 617.56 m2


D1 x t

Koefisien Alat / m2 = 1 / Q2 ( E 01 ) 0.0016 Jam

c Generator Set ( Genset ) ( E 12 )


Kapasitas produksi / jam = sama dengan AMP Q3 617.56 m2

Koefisien Alat / m2 = 1 / Q3 ( E 12 ) 0.0016 Jam

d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch HRS Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 30.00 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 24.00 menit
Ts2 85.00 menit

Kapasitas Produksi / jam = V x Fa x 60 Q4 69.75 m2


D1 x t x Ts2

Koefisien Alat / m2 = 1 / Q4 ( E 09 ) 0.0143 Jam

e Finisher ( E 02 )
Kapasitas produksi V 40.00 km / jam
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = V x Fa Q5 494.05 m2


D1 x t

Koefisien Alat / m2 = 1 / Q5 ( E 02 ) 0.0020 Jam

f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km/jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x Fa Q6 581.00 m2


n

Koefisien Alat / m2 = 1 / Q6 ( E 17 ) 0.0017 Jam

Analisa - E 241
No URAIAN KODE KOEF. SATUAN KET.

g Pneumatic Tire Roller ( E 18 )


Kecepatan rata rata alat v 5.00 km / jam
Lebar efektif pemadatan b 1.50 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x Fa Q7 778.13 m2


n

Koefisien Alat / m2 = 1 / Q7 ( E 18 ) 0.0013 Jam

h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan

3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56 m2 / jam
Produksi HRS / hari = Tk x Q2 Qt 4,322.92 m2

Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien tenaga /m2 :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.0113 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0016 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = . . . . . . . M2

Analisa - E 242
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : LASTON ( AC )


SATUAN : M2 Analisa EI - 634

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.0217 2,500.00 54.22
2 Mandor ( L 03 ) Jam 0.0022 4,062.50 8.81

JUMLAH HARGA TENAGA 63.03

B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0336 126,500.00 4,254.51
2 Agregat Halus ( M 04 ) M3 0.0149 79,750.00 1,184.29
3 Filler ( M 05 ) Kg 4.8015 750.00 3,601.13
4 Aspal ( M 10 ) Kg 6.6150 10,650.00 70,449.75

JUMLAH HARGA BAHAN 79,489.67

C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0015 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0022 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0022 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.0348 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0027 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0016 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 243
URAIAN ANALISA HARGA SATUAN LASTON ( AC )
SATUAN : M2 Analisa EI - 634

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( AC ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -

8 Komposisi campuran AC ( Spesifikasi )


- Coarse Agregat 30 - 50 % CA 61.15 %
- Fine Agregat 39 - 59 % FA 27.00 %
- Filler 4,5 - 7,5 % FF 4.85 %
- Aspal minimum 6,7 % As 7.00 %

9 Berat jenis bahan


- AC D1 2.25 t / m3
- Coarse Agregat dan fine agregat D2 1.80 t / m3
- Filler D3 2.00 t / m3
- Aspal D4 1.03 t / m3

II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
a Agregat kasar = {( CA x D1 x t m3 ) x ( Fh 1 )}/ D2 M03 0.034 m3
b Agregat halus = {( FA x D1 x t m3 ) x ( Fh 1 )}/ D2 M04 0.015 m3
c Filler = {( FF x D1 x t m3 ) x ( Fh 1 )} M05 4.802 Kg
d Aspal = {( AS x D1 x t m3 ) x ( Fh 2 )}x1000 M10 6.615 Kg

2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit

Kap Produksi / Jam = D2 x V x Fb x Fa x 60 Q1 672.30 m3


D1 x t x Ts1
Koefisien Alat / m2 = 1 / Q1 ( E 15 ) 0.0015 Jam

Analisa - E 244
No URAIAN KODE KOEF. SATUAN KET.

b Aspalt Mixing Plant ( AMP ) ( E 01 )


Kapasitas produksi V 50.00 ton / jam
faktor Efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = V x Fa Q2 461.11 m2


D1 x t

Koefisien Alat / m2 = 1 / Q2 ( E 01 ) 0.0022 Jam

c Generator Set ( Genset ) ( E 12 )


Kapasitas produksi / jam = sama dengan AMP Q3 461.11 m2

Koefisien Alat / m2 = 1 / Q3 ( E 12 ) 0.0022 Jam

d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 4.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch AC Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 8.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 76.98 menit

Kapasitas Produksi / jam = V x Fa x 60 Q4 28.75 m2


D1 x t x Ts2

Koefisien Alat / m2 = 1 / Q4 ( E 09 ) 0.0348 Jam

e Finisher ( E 02 )
Kapasitas produksi V 40.00 ton / jam
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = V x Fa Q5 368.89 m2


D1 x t

Koefisien Alat / m2 = 1 / Q5 ( E 02 ) 0.0027 Jam

f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 2.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 4.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x Fa Q6 622.50 m2


n

Koefisien Alat / m2 = 1 / Q6 ( E 17 ) 0.0016 Jam

Analisa - E 245
No URAIAN KODE KOEF. SATUAN KET.

g Pneumatic Tire Roller ( E 18 )


Kecepatan rata rata alat v 3.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x Fa Q7 435.75 m2


n

Koefisien Alat / m2 = 1 / Q7 ( E 18 ) 0.0023 Jam

h Alat Bantu
Diperlukan :
- Rambu = 2 bh
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan

3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11 m2 / jam
Produksi AC / hari = Tk x Q2 Qt 3,227.78 m2

Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien tenaga /m2 :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.0217 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0022 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = . . . . . . . M2

Analisa - E 246
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : ASPHALT TREATED BASE ( ATB )


SATUAN : M3 Analisa EI - 635

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.3880 2,500.00 969.88
2 Mandor ( L 03 ) Jam 0.0554 4,062.50 225.15

JUMLAH HARGA TENAGA 1,195.03

B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7028 126,500.00 88,901.39
2 Agregat Halus ( M 04 ) M3 0.5341 79,750.00 42,595.36
3 Filler ( M 05 ) Kg 139.2 750.00 104,399.98
4 Aspal ( M 10 ) Kg 157.0 10,650.00 1,672,049.95

JUMLAH HARGA BAHAN 1,907,946.68

C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0380 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0554 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0554 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.4906 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0767 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0430 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 247
URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )

SATUAN : M3 Analisa EI - 635

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Menggunakan alat berat ( Cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( ATB ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -

8 Komposisi campuran ATB ( Spesifikasi )


- Coarse Agregat 40 - 60 % CA 50.00 %
- Fine Agregat 26 - 49,5 % FA 38.00 %
- Fraksi Filler 4,5 - 7,5 % FF 5.50 %
- Aspal minimum 6 % As 6.50 %

9 Berat jenis bahan


- ATB D1 2.30 t / m3
- Coarse Agregat dan fine agregat D2 1.80 t/m3
- Fraksi Filler D3 2.00 t/m3
- Aspal D4 1.03 t/m3

II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
a Agregat kasar = {( CA x D1 x 1 m3 ) x ( Fh 1 )}/ D2 M03 0.7028 m3
b Agregat halus = {( FA x D1 x 1 m3 ) x ( Fh 1 )}/ D2 M04 0.5341 m3
c Filler = {( FF x D1 x 1 m3 ) x ( Fh 1 )} M05 139.2 Kg
d Aspal = {( AS x D1 x 1 m3 ) x ( Fh 2 )} M10 157.0 Kg

2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit

Kap Produksi / Jam = D2 x V x Fb x Fa x 60 Q1 26.31 m3


D1 x Ts1
Koefisien Alat / m2 = 1 / Q1 ( E 15 ) 0.0380 Jam

Analisa - E 248
No URAIAN KODE KOEF. SATUAN KET.

b Aspalt Mixing Plant ( AMP ) ( E 01 )


Kapasitas produksi V 50.00 ton / jam
Faktor Efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = V x Fa Q2 18.04 m3


D1

Koefisien Alat / m3 = 1 / Q2 ( E 01 ) 0.0554 Jam

c Generator Set ( Genset ) ( E 12 )


Kapasitas produksi / jam = sama dengan AMP Q3 18.04 m3

Koefisien Alat / m3 = 1 / Q3 ( E 12 ) 0.0554 Jam

d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch ATB Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 84.99 menit

Kapasitas Produksi / jam = V x Fa x 60 Q4 2.04 m3


D1 x Ts2

Koefisien Alat / m3 = 1 / Q4 ( E 09 ) 0.4906 Jam

e Finisher
Kapasitas produksi V 40.00 ton/jam
Faktor efisiensi alat Fa 0.75 -

Kapasitas produksi / jam = V x Fa Q5 13.04 m3


D1

Koefisien Alat / m3 = 1 / Q5 ( E 02 ) 0.0767 Jam

f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x t x Fa Q6 23.24 m3


n

Koefisien Alat / m3 = 1 / Q6 ( E 17 ) 0.0430 Jam

Analisa - E 249
No URAIAN KODE KOEF. SATUAN KET.

g Pneumatic Tire Roller ( E 18 )


Kecepatan rata rata alat v 5.00 km / jam
Lebar efektif pemadatan b 1.50 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x t x Fa Q7 31.13 m3


n

Koefisien Alat / m3 = 1 / Q7 ( E 18 ) 0.0321 Jam

h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan

3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04 m3 / jam
Produksi ATB / hari = Tk x Q2 Qt 126.30 m3

Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien tenaga /m2 :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.3880 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0554 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / M3

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = . . . . . . . . M2

Analisa - E 250
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT (PRIME COAT)


SATUAN : LITER Analisa EI - 611

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 2,500.00 75.30
2 Mandor ( L 03 ) Jam 0.0060 4,062.50 24.47

JUMLAH HARGA TENAGA 99.77

B BAHAN
1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417 10,650.00 6,834.30
2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889 1,000.00 488.90

JUMLAH HARGA BAHAN 7,323.19

C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF! #REF!
2 Compresor ( E 05 ) Jam 0.0031 #REF! #REF!
3 Dump Truck ( E 08 ) Jam 0.0030 #REF! #REF!

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 251
URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT

SATUAN : L Analisa EI - 611

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 56 % 100 Bagian
- Minyak Flux / pencair K 44 % 80 Bagian

7 Berat jenis bahan


- Aspal AC - 10 atau AC - 20 D1 1.05 Kg / Lt
- Minyak Flux / pencair D2 0.80 Kg / Lt

8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan

II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
Untuk mendapatkan 1 liter lapis resap pengikat diperlukan
( 1 Liter x Fh ) PC 1.1000 liter Campuran
a Aspal = AS x PC x D1 M10 0.6417 kg
b Kerosene = K x PC M11 0.4889 liter

2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 jam

Kap Produksi / Jam = V x Fa Q1 332.00 liter


Ts
Koefisien Alat / Liter = 1 / Q1 ( E 03 ) 0.0030 jam

b Air Compresor ( E 05 )
Kapasitas alat -----------> Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80 liter / m2

Kapasitas produksi / jam = V x Ap Q2 320.00 liter

Koefisien Alat / liter = 1 / Q2 ( E 05 ) 0.0031 jam

Analisa - E 252
No URAIAN KODE KOEF. SATUAN KET.

c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer

Kapasitas Produksi / jam = V x Fa Q3 332.00 liter


Ts

Koefisien Alat / m2 = 1 / Q3 ( E 08 ) 0.0030 jam

3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00 Liter

Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang

Koefisien tenaga /liter :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.0301 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0060 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / LITER

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = . . . . . . . . Liter

Analisa - E 253
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT KLAS A


SATUAN : M3 Analisa EI - 511

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 2,500.00 1,093.26
2 Mandor ( L 03 ) Jam 0.0625 4,062.50 253.79

JUMLAH HARGA TENAGA 1,347.05

B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7680 126,500.00 97,152.00
2 Agregat Halus ( M 04 ) M3 0.4320 79,750.00 34,452.00

JUMLAH HARGA BAHAN 131,604.00

C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 #REF! #REF!
2 Dump Truck ( E 09 ) Jam 0.1994 #REF! #REF!
3 Motor Grader ( E 13 ) Jam 0.0117 #REF! #REF!
4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF! #REF!
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF! #REF!
6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF! #REF!
7 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

UNTUK 1 M2 TEBAL 20 CM #REF!


UNTUK 1 M2 TEBAL 15 CM #REF!
UNTUK 1 M2 TEBAL 10 CM #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 254
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A

SATUAN : M3 Analisa EI - 511

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Menggunakan alat berat Cara mekanik
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 64.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 36.00 %

II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
a Agregat kasar = Ak x 1 m3 x Fk M03 0.7680 m3
b Agregat halus = Ah x 1 m3 x Fk M04 0.4320 m3

2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit

Kap Produksi / Jam = V x Fb x Fa x 60 Q1 16.01 m3


Fk x Ts1
Koefisien Alat / m3 = 1 / Q1 ( E 15 ) 0.0625 Jam

b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit

Ts2 49.65 menit

Analisa - E 255
No URAIAN KODE KOEF. SATUAN KET.

Kapasitas Produksi / jam = V x Fa x 60 Q2 5.02 m3


Fk x Ts2

Koefisien Alat / m3 = 1 / Q2 ( E 09 ) 0.1994 Jam

c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit

Kapasitas produksi / jam = Lh x b x t x Fa x 60 Q3 85.37 m3


n x Ts 3

Koefisien Alat / m3 = 1 / Q3 ( E 02 ) 0.0117 Jam

d Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x t x Fa Q4 56.03 m3


n

Koefisien Alat / m3 = 1 / Q4 ( E 19 ) 0.0178 Jam

e Pneumatic Tire Roller ( E 18 )


Kecepatan rata rata alat v 5.00 km/jam
Lebar efektif pemadatan b 1.50 m
Jumlah lintasan n 4.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x t x Fa Q5 233.44 m3


n

Koefisien Alat / m3 = 1 / Q5 ( E 18 ) 0.0043 Jam

f Water Tank Truck ( E 23 )


Volume tangki air v 4.00 m3
Kebutuhan air / m3 agregat padat Wc 0.07 m3
Pengisian tangki / jam n 1.00 kali
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = v x n x Fa Q6 47.43 m3


Wc

Koefisien Alat / m3 = 1 / Q6 ( E 23 ) 0.0211 Jam

Analisa - E 256
No URAIAN KODE KOEF. SATUAN KET.

g Alat Bantu
Diperlukan :

- Kereta dorong = 2 bh Lump sum


- Skop = 3 bh
- Garpu = 2 bh

3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3

Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien tenaga /m2 :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.4373 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0625 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = . . . . . . . . M3

Analisa - E 257
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT KLAS B


SATUAN : M3 Analisa EI - 512

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 2,500.00 1,093.26
2 Mandor ( L 03 ) Jam 0.0625 4,062.50 253.79

JUMLAH HARGA TENAGA 1,347.05

B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7080 126,500.00 89,562.00
2 Agregat Halus ( M 04 ) M3 0.4920 79,750.00 39,237.00

JUMLAH HARGA BAHAN 128,799.00

C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 #REF! #REF!
2 Dump Truck ( E 09 ) Jam 0.1994 #REF! #REF!
3 Motor Grader ( E 13 ) Jam 0.0117 #REF! #REF!
4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF! #REF!
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF! #REF!
6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF! #REF!
7 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

UNTUK 1 M2 TEBAL 20 CM #REF!


UNTUK 1 M2 TEBAL 15 CM #REF!
UNTUK 1 M2 TEBAL 10 CM #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 258
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B

SATUAN : M3 Analisa EI - 512

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 59.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 41.00 %

II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan
motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
a Agregat kasar = Ak x 1 m3 x Fk M03 0.7080 m3
b Agregat halus = Ah x 1 m3 x Fk M04 0.4920 m3

2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit

Kap Produksi / Jam = V x Fb x Fa x 60 Q1 16.01 m3


Fk x Ts1
Koefisien Alat / m2 = 1 / Q1 ( E 15 ) 0.0625 Jam

b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit

Ts2 49.65 menit

Analisa - E 259
No URAIAN KODE KOEF. SATUAN KET.

Kapasitas Produksi / jam = V x Fa x 60 Q2 5.02 m3


Fk x Ts2

Koefisien Alat / m2 = 1 / Q2 ( E 09 ) 0.1994 Jam

c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit

Kapasitas produksi / jam = Lh x b x t x Fa x 60 Q3 85.37 m3


n x Ts 3

Koefisien Alat / m2 = 1 / Q3 ( E 02 ) 0.0117 Jam

d Vibratory Roller ( E 17 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x t x Fa Q4 56.03 m3


n

Koefisien Alat / m2 = 1 / Q4 ( E 17 ) 0.0178 Jam

e Pneumatic Tire Roller ( E 18 )


Kecepatan rata rata alat v 5.00 km / jam
Lebar efektif pemadatan b 1.50 m
Jumlah lintasan n 4.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x t x Fa Q5 233.44 m3


n

Koefisien Alat / m2 = 1 / Q5 ( E 18 ) 0.0043 Jam

f Water Tank Truck ( E 23 )


Volume tangki air v 4.00 km / jam
Kebutuhan air / m3 agregat padat Wc 0.07 m3
Pengisian tangki / jam n 1.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = v x n x Fa Q6 47.43 m3


Wc

Koefisien Alat / m2 = 1 / Q6 ( E 23 ) 0.0211 Jam

Analisa - E 260
No URAIAN KODE KOEF. SATUAN KET.

g Alat Bantu
Diperlukan :

- Kereta dorong = 2 bh Lump sum


- Skop = 3 bh
- Garpu = 2 bh

3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3 / jam

Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang

Koefisien tenaga /m2 :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.4373 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0625 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaa = . . . . . . . . M2

Analisa - E 261
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : LAPIS PEREKAT (TACK COAT)


SATUAN : LITER Analisa EI - 612

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 2,500.00 75.30
2 Mandor ( L 03 ) Jam 0.0060 4,062.50 24.47

JUMLAH HARGA TENAGA 99.77

B BAHAN
1 Aspal ( M 10 ) Kg 0.8880 10,650.00 9,456.82
2 Kerosene ( M 11 ) Liter 0.2530 1,000.00 253.00

JUMLAH HARGA BAHAN 9,709.82

C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF! #REF!
2 Compresor ( E 05 ) Jam 0.0063 #REF! #REF!
3 Dump Truck ( E 08 ) Jam 0.0030 #REF! #REF!

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 262
URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT

SATUAN : M3 Analisa EI - 612

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 77 % 100 Bagian
- Minyak Flux / pencair K 23 % 30 Bagian

7 Berat jenis bahan


- Aspal AC - 10 atau AC - 20 D1 1.05 Kg / Lt
- Minyak Flux / pencair D2 0.80 Kg / Lt

8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi


Pekerjaan

II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran
aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air
kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg
akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
Untuk mendapatkan 1 liter lapis resap pengikat diperlukan
( 1 Liter x Fh ) PC 1.1000 Liter Campuran
a Aspal = AS x PC x D1 M10 0.8880 Kg
b Kerosene = K x PC M11 0.2530 Liter

2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 Liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 Jam

Kap Produksi / Jam = V x Fa Q1 332.00 Liter


Ts
Koefisien Alat / Liter = 1 / Q1 ( E 03 ) 0.0030 Jam

b Air Compresor ( E 05 )
Kapasitas alat . . . . . Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40 Liter / m2

Kapasitas produksi / jam = V x Ap Q2 160.00 Liter

Koefisien Alat / liter = 1 / Q2 ( E 05 ) 0.0063 Jam

Analisa - E 263
No URAIAN KODE KOEF. SATUAN KET.

c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer

Kapasitas Produksi / jam = V x Fa Q3 332.00 Liter


Ts

Koefisien Alat / m2 = 1 / Q3 ( E 08 ) 0.0030 Jam

3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00 Liter

Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang

Koefisien tenaga /liter :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.0301 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0060 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / Liter

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = . . . . . . . . Liter

Analisa - E 264
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN

JENIS PEKERJAAN : PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN)


SATUAN : M2 Analisa EI - 33

HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja ( L 01 ) Jam 0.0161 2,500.00 40.16
2 Mandor ( L 02 ) Jam 0.0040 4,062.50 16.32

JUMLAH HARGA TENAGA 56.48

B BAHAN

JUMLAH HARGA BAHAN

C PERALATAN
1 Motor Grader ( E 13 ) Jam 0.0025 #REF! #REF!
2 Vibratory Roller ( E 19 ) Jam 0.0040 #REF! #REF!
3 Water Tank Truck ( E 23 ) Jam 0.0105 #REF! #REF!
4 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN #REF!

JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya

Analisa - E 265
URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN
( PEMADATAN DAN PERATAAN )

SATUAN : M2 Analisa EI - 33

No URAIAN KODE KOEF. SATUAN KET.

I ASUMSI
1 Pekerjaan dilakukan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi jalan : jelek / belum padat
5 Jam kerja efektif per hari Tk 7.00 Jam

II URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu

III PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
Tidak diperlukan bahan / material

2 ALAT
a Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 2.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 1
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50 menit
- Lain lain T2 1.00 menit
Ts 1 2.50 menit

Kapasitas produksi / jam = Lh x b x Fa x 60 Q1 398.40 m3


n x Ts 1

Koefisien Alat / m3 = 1 / Q1 ( E 02 ) 0.0025 Jam

b Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 2.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = ( v x 1000 ) x b x Fa Q2 249.00 m3


n

Koefisien Alat / m3 = 1 / Q2 ( E 19 ) 0.0040 Jam

c Water Tank Truck ( E 23 )


Volume tangki air v 4.00 m3
Kebutuhan air / m3 agregat padat Wc 0.07 m3
Pengisian tangki / jam n 2.00 kali
Faktor efisiensi alat Fa 0.83 -

Analisa - E 266
No URAIAN KODE KOEF. SATUAN KET.

Kapasitas produksi / jam = v x n x Fa Q3 94.86 m3


Wc

Koefisien Alat / m3 = 1 / Q3 ( E 23 ) 0.0105 Jam

g Alat Bantu
Diperlukan :

- Skop = 3 bh Lump sum

3 TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00 m3 / jam
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,743.00 m3

Kebutuhan tenaga
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga /m2 :


- Pekerja = ( Tk x P ) / Qt ( L 01 ) 0.0161 jam
- Mandor = ( Tk x M ) / Qt ( L 03 ) 0.0040 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing
- nasing Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN

Rp #REF! / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan = . . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = . . . . . . . . M3

Analisa - E 267
REKAPITULASI ANALISA

HARGA HARGA JUMLAH


NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA

PEKERJAAN PERSIAPAN
1 1M 2
Pekerjaan Pengukuran Gedung 5,423.00 - 542,300.00
2 1 M1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran 6,036.00 35,246.00 41,282.00
3 1 M2 Membersihkan lapangan dan perataan 3,987.00 - 3,987.00
4 1 buah Membuat Papan Nama Proyek 80x120 cm 143,158.00 182,293.00 325,451.00
5 1 M2 Pembuatan jalan sementara, tebal 25 cm 25,575.00 30,975.00 56,550.00
6 1M 2
Pembuatan kantor sementara, dengan lantai plesteran 152,762.00 507,042.00 659,804.00
7 1 M1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 16,830.00 101,984.00 118,814.00

PEKERJAAN TANAH
1 1M 3
Galian tanah biasa sedalam sampai 1 meter 10,230.00 - 10,230.00
2 1 M3 Galian tanah biasa sedalam 1 - 2 meter 13,452.00 - 13,452.00
3 1 M3 Galian tanah biasa sedalam 2 - 3 meter 18,797.00 - 18,797.00
4 1M 3
Galian tanah keras sedalam sampai 1 meter 15,966.00 - 15,966.00
5 1 M3 Galian tanah cadas sedalam sampai 1 meter 31,968.00 - 31,968.00
6 1 M3 Galian tanah lumpur sedalam 1 meter 21,073.00 - 21,073.00
7 1 M1 Membuat sumur 57,187.00 70,400.00 127,587.00
8 1 M3 Mengangkut tanah sejauh 30 meter 7,617.00 - 7,617.00
9 1 M3 Pembuangan tanah sejauh 150 meter 13,139.00 - 13,139.00
10 1 M3 Membuang tanah dengan menghampar 5,857.00 - 5,857.00
11 1 M3 Urug kembali bekas galian 4,903.00 - 4,903.00
12 1M 2
Meratakan tanah ditumbuk halus 5,857.00 - 5,857.00
13 1 M3 Urug pasir 6,957.00 72,600.00 79,557.00
14 1 M3 Urug tanah mendatangkan 6,957.00 46,200.00 53,157.00
15 1M 3
Urugan sirtu 6,393.00 87,120.00 93,513.00
16 1 M3 Pemasangan lapisan ijuk 3,836.00 99,000.00 102,836.00
17 1 M2 Gebalan rumput 11,893.00 7,040.00 18,933.00

PEKERJAAN PASANGAN
1 1 M3 Pasangan pondasi batu kosong 31,638.00 123,750.00 155,388.00
2 1 M3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 55,811.00 180,693.00 236,504.00
3 1M 3
Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 55,811.00 235,988.00 291,800.00
4 1M 3
Pasangan pondasi 1 Pc : 3 Kp : 10 Ps 55,811.00 200,918.00 256,730.00
5 1 M3 Pasangan pondasi 1 Pc : 4 Ps 55,811.00 277,257.00 333,068.00
6 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 10,931.00 36,108.00 47,039.00
7 1M 2
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 10,931.00 40,209.00 51,140.00
8 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 22,082.00 72,297.00 94,379.00
9 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 22,082.00 84,321.00 106,403.00
10 1 M2 Pasangan dinding bataco 15,248.00 34,474.00 49,722.00
11 1M 2
Pasangan roster 25/25 cm 15,248.00 49,049.00 64,297.00

PEKERJAAN BETON
1 1M 3
Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr 59,317.00 395,813.00 455,131.00
2 1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 47,547.00 300,231.00 347,778.00
3 1 M3 Beton cyclope 1pc:3ps:5kr 176,275.00 202,749.00 379,024.00
4 1 M3 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr 91,492.00 443,916.00 535,408.00
5 1M 3
Membuat beton dengan mutu K 225 176,275.00 434,504.00 610,779.00
6 1 M3 Membuat beton dengan mutu K 275 176,275.00 439,222.00 615,497.00
7 1 M3 Membuat beton dengan mutu K 300 176,275.00 462,502.00 638,777.00
8 1 kg Pembesian dengan besi polos 9,657.00 9,279.00 9,657.00
9 1 kg Pembesian dengan besi ulir 9,773.00 9,395.00 9,773.00
10 1 M2 Cetakan beton / begisting memakai papan 23,045.00 61,298.00 84,343.00
11 1 M2 Cetakan beton / begisting memakai multiplek 23,045.00 69,251.00 92,296.00
12 1M 3
Membongkar cetakan 88,000.00 - 88,000.00

Rekapitulasi - 268
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
13 1 M3 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken ) 467,293.00 770,000.00 1,237,293.00
14 1M 3
Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding ) 884,702.00 704,000.00 884,702.00
15 1 M3 Pek. Beton 1:2:3 tanpa dolken, 100 kg besi 415,569.00 1,936,759.00 2,352,328.00
16 1 M3 Pek. Beton 1:2:3 tanpa dolken, 125 kg besi 425,019.00 2,168,749.00 2,593,768.00
17 1 M3 Pek. Beton 1:2:3 tanpa dolken, 150 kg besi 434,469.00 2,400,739.00 2,835,209.00
18 1M 3
Pek. Beton 1:2:3 tanpa dolken, 175 kg besi 443,920.00 2,632,729.00 3,076,649.00
19 1 M3 Pek. Beton 1:2:3 tanpa dolken, 200 kg besi 453,370.00 2,864,719.00 3,318,090.00
20 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 100 kg besi 882,862.00 2,706,759.00 3,589,622.00
21 1M 3
Pek. Beton 1:2:3 dengan memakai dolken, 125 kg besi 892,313.00 2,938,749.00 3,831,062.00
22 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 150 kg besi 901,763.00 3,170,739.00 4,072,503.00
23 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 175 kg besi 911,213.00 3,402,729.00 4,313,943.00
24 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 200 kg besi 920,664.00 3,634,719.00 4,555,383.00
25 1M 3
Pek. Beton 1:2:3 dengan memakai scaffolding, 100 kg besi 596,271.00 2,640,759.00 3,237,031.00
26 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 125 kg besi 605,721.00 2,872,749.00 3,478,471.00
27 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 150 kg besi 615,172.00 3,104,739.00 3,719,911.00
28 1M 3
Pek. Beton 1:2:3 dengan memakai scaffolding, 175 kg besi 624,622.00 3,336,729.00 3,961,352.00
29 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 200 kg besi 634,073.00 3,568,719.00 4,202,792.00

PEKERJAAN PELESTERAN
1 1 M2 Plesteran batu kali 1pc:4ps 16,225.00 7,219.00 23,444.00
2 1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 9,790.00 3,195.00 12,985.00
3 1M 2
Plesteran 1 Pc : 4 Ps, tebal 15 mm 9,790.00 6,042.00 15,832.00
4 1 M2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 12,894.00 7,697.00 20,591.00
5 1 M1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 3,729.00 587.00 4,316.00
6 1 M2 Plesteran siar adukan 1 Pc : 2 Ps 5,934.00 4,968.00 10,902.00
7 1 M2 Plesteran Ciprat, 1 Pc : 2 Ps 9,391.00 4,598.00 13,989.00
8 1 M2 Acian dinding bata 2,772.00 2,941.00 5,713.00
9 1 M2 Pasang dinding batu hias tempel 27,115.00 82,100.00 109,215.00

PEKERJAAN PASANG TEGEL


1 1 M2 Pasang tegel abu-abu 30/30 20,281.00 35,591.00 55,872.00
2 1 M2 Pasang tegel abu-abu 20/20 20,281.00 26,791.00 47,072.00

PEKERJAAN KERAMIK
1 1 M2 Pasang ubin porselin 22,721.00 50,679.00 73,401.00
2 1 M2 Pasang tegel keramik 20/20 dan 30/30 22,721.00 51,797.00 74,519.00
3 1M 2
Pasang tegel keramik 10/20 berglasir 22,721.00 38,047.00 60,769.00
4 1 M2 Pasang tegel keramik 20/20 berglasir 22,721.00 40,247.00 62,969.00
5 1 M2 Pasang tegel keramik 30/30 berglasir 22,721.00 40,797.00 63,519.00
6 1M 1
Pasang plint keramik ukuran 10 x 40 cm 2,433.00 12,039.00 14,473.00
7 1 M1 Pasang plint keramik ukuran 10 x 30 cm 2,433.00 8,749.00 11,182.00
8 1 M1 Pasang keramik stepnosing granito 5/30 4,544.00 37,530.00 42,075.00
9 1 M1 Pasang list keramik dinding 5/20 4,544.00 28,004.00 32,549.00
10 1M 2
Pasang keramik dinding 20/25 29,419.00 52,736.00 82,155.00

PEKERJAAN CONBLOCK
1 1 M2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 20,281.00 45,100.00 65,381.00
2 1M 2
Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 20,281.00 54,395.00 74,676.00
3 1 M2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 20,281.00 44,935.00 65,216.00
4 1 M2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 20,281.00 54,395.00 74,676.00
5 1M 2
Pasang conblock tipe segi-empat warna 6 cm, K-200 20,281.00 50,875.00 71,156.00
6 1 M2 Pasang conblock tipe segi-empat warna 8 cm, K-200 20,281.00 60,225.00 80,506.00
7 1 M2 Pasang conblock tipe segi-enam warna 6 cm, K-200 20,281.00 50,875.00 71,156.00
8 1 M2 Pasang conblock tipe segi-enam warna 8 cm, K-200 20,281.00 60,225.00 80,506.00
9 1M 2
Pasang grassblock bulat tebal 10 cm 20,281.00 48,565.00 68,846.00
10 1 M2 Pasang grassblock tebal 10 cm 20,281.00 48,565.00 68,846.00
11 1 bh Pasang buis beton dia. 80 cm 9,693.00 35,200.00 44,893.00

Rekapitulasi - 269
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
PEKERJAAN RANGKA ATAP
1 1 M3 Membuat kuda-kuda kayu kamper 534,050.00 5,878,290.00 6,412,340.00
2 1 M3 Membuat kuda-kuda kayu kruing 534,050.00 5,394,290.00 5,928,340.00
3 1M 3
Membuat kuda-kuda kayu bengkirai 534,050.00 7,088,290.00 7,622,340.00
4 1M3 Pasang kuda-kuda kayu lama 534,050.00 130,790.00 664,840.00
5 1M3 Pasang Nook,Goording dan Jurai kayu bengkirai 534,050.00 6,964,540.00 7,498,590.00
6 1M3 Pasang Goording Lama 534,050.00 7,040.00 541,090.00
7 1M2 Pasang usuk 5/7, reng 2/3 lama 5,946.00 2,200.00 8,146.00
8 1 M2 Pasang usuk 5/7, reng 2/3 kayu jati 5,946.00 237,600.00 243,546.00
9 1 M2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai 5,946.00 190,575.00 196,521.00
10 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati 5,946.00 116,902.00 122,849.00
11 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai 5,946.00 69,877.00 75,824.00
12 1 M2 Pasang usuk 5/7, reng 3/4 kayu jati 5,946.00 277,200.00 283,146.00
13 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal 5,946.00 93,142.00 99,089.00
14 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai 5,946.00 81,262.00 87,209.00
15 1 M3 Membuat kusen pintu / jendela kayu jati (klas plitur) 874,225.00 24,200,000.00 25,074,225.00
16 1 M3 Membuat kusen pintu / jendela kayu jati (lokal) 874,225.00 9,680,000.00 10,554,225.00
17 1 M3 Membuat kusen pintu / jendela kayu kamper 808,225.00 6,270,000.00 7,078,225.00
18 1M 3
Membuat kusen pintu / jendela kayu kruing 808,225.00 5,742,000.00 6,550,225.00
19 1 M3 Membuat kusen pintu / jendela kayu bengkirai 808,225.00 8,398,225.00 8,398,225.00
20 1 M2 Pasang pintu teakwood rangkap, rangka kayu jati 87,422.00 554,664.00 642,086.00
21 1M 2
Pasang pintu teakwood rangkap, rangka kayu jati lokal 87,422.00 257,136.00 344,558.00
22 1 M2 Pasang pintu teakwood rangkap, rangka kayu kamper 87,422.00 198,924.00 286,346.00
23 1 M2 Pasang pintu teakwood rangkap, rangka kayu kruing 87,422.00 182,754.00 270,176.00
24 1 M2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 87,422.00 209,704.00 297,126.00
25 1M 2
Pasang pintu dan jendela kaca kayu jati 92,180.00 847,000.00 939,180.00
26 1 M2 Pasang pintu dan jendela kaca kayu jati lokal 92,180.00 315,700.00 407,880.00
27 1 M2 Pasang pintu dan jendela kaca kayu kamper 92,180.00 211,750.00 303,930.00
28 1M 2
Pasang pintu dan jendela kaca kayu kruing 92,180.00 182,875.00 275,055.00
29 1 M2 Pasang pintu dan jendela kaca kayu bengkirai 92,180.00 231,000.00 323,180.00
30 1 M2 Mengerjakan daun pintu / jendela panil kayu jati 115,225.00 968,000.00 1,083,225.00
31 1 M2 Mengerjakan daun pintu / jendela panil kayu jati lokal 115,225.00 360,800.00 476,025.00
32 1M 2
Mengerjakan daun pintu / jendela panil kayu kamper 115,225.00 242,000.00 357,225.00
33 1 M2 Mengerjakan daun pintu / jendela panil kayu kruing 115,225.00 209,000.00 324,225.00
34 1 M2 Mengerjakan daun pintu / jendela panil kayu bengkirai 115,225.00 264,000.00 379,225.00
35 1 M2 Pasang pintu dan jendela jalusi kayu jati 142,450.00 1,548,800.00 1,691,250.00
36 1 M2 Pasang pintu dan jendela jalusi kayu jati 142,450.00 577,280.00 719,730.00
37 1 M2 Pasang pintu dan jendela jalusi kayu kamper 133,512.00 387,200.00 520,712.00
38 1 M2 Pasang pintu dan jendela jalusi kayu kruing 133,512.00 334,400.00 467,912.00
39 1M 2
Pasang pintu dan jendela jalusi kayu bengkirai 133,512.00 422,400.00 555,912.00
40 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 12,711.00 63,580.00 76,291.00
41 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 12,711.00 58,300.00 71,011.00
42 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 12,711.00 76,780.00 89,491.00
43 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu kamper 13,919.00 68,981.00 82,900.00
44 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu kruing 13,919.00 63,261.00 77,180.00
45 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu bengkirai 13,919.00 83,281.00 97,200.00
46 1M 2
Langit-langit asbes (1,00 x 1,00) m tanpa plepet 3,273.00 12,226.00 15,500.00
47 1 M2 Langit-langit asbes (1,00 x 1,00) m memakai plepet 3,273.00 18,056.00 21,330.00
48 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet 15,985.00 75,460.00 91,445.00
49 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet 15,985.00 70,180.00 86,165.00
50 1M 2
Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet 15,985.00 88,660.00 104,645.00
51 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet 15,985.00 81,416.00 97,402.00
52 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet 15,985.00 76,136.00 92,122.00
53 1M 2
Langit2 asbes (1,00 x 1,00) m, rangka ky bengkirai dg plepet 15,985.00 94,616.00 110,602.00
54 1 M2 Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper 19,241.00 89,985.00 109,227.00
55 1 M2 Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing 19,241.00 84,265.00 103,507.00
56 1 M2 Langit2 gypsum t; 9 mm, rangka 60 x 120 ky bengkirai 19,241.00 104,285.00 123,527.00
57 1M 2
Langit-langit gypsum board tebal 9 mm, rangka hollow 19,241.00 71,329.00 90,571.00
58 1 M2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper 19,241.00 91,648.00 110,890.00
59 1 M2 Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing 19,241.00 85,928.00 105,170.00

Rekapitulasi - 270
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
60 1 M2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky bengkirai 19,241.00 105,948.00 125,190.00
61 1M 2
Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 19,241.00 72,992.00 92,234.00
62 1 M2 Langit-langit akustik 60 x 120 cm + rangka alumunium 21,855.00 289,767.00 311,623.00
63 1 M1 Pasang list profil cornees gypsum lebar sampai 5 cm 4,077.00 8,690.00 12,767.00
64 1 M1 Pasang list profil cornees gypsum lebar 5 - 10 cm 4,077.00 14,500.00 18,577.00
65 1M 1
Pasang list profil cornees gypsum lebar lebih dari 10 cm 4,170.00 23,941.00 28,111.00
66 1 M1 List langit-langit kayu profil 3,036.00 6,765.00 9,801.00
67 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati 6,036.00 116,688.00 122,724.00
68 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati 6,036.00 208,648.00 214,684.00
69 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal 6,036.00 43,824.00 49,860.00
70 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu kamper 6,036.00 29,568.00 35,604.00
71 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 6,036.00 52,558.00 58,594.00
72 1M 1
Pasang lisplank ukuran (2 x 20) cm, kayu kruing 6,036.00 25,608.00 31,644.00
73 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 6,036.00 45,463.00 51,499.00
74 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai 6,036.00 32,208.00 38,244.00
75 1M 1
Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 6,036.00 57,288.00 63,324.00
76 1 M2 Membuat listplank asbes plat ram kayu kamper 80,107.00 144,265.00 224,372.00
77 1 M2 Membuat listplank asbes plat ram kayu kruing 80,107.00 133,265.00 213,372.00
78 1 M2 Membuat listplank asbes plat ram kayu bengkirai 80,107.00 171,765.00 251,872.00
79 1M 1
Mengerjakan papan ruiter kayu kamper 2/20 3,592.00 24,376.00 27,968.00
80 1 M1 Mengerjakan papan ruiter kayu kruing 2/20 3,592.00 21,076.00 24,668.00
81 1 M1 Mengerjakan papan ruiter kayu bengkirai 2/20 3,592.00 26,576.00 30,168.00
82 1 M1 Pasang talang datar, seng BJLS 28, papan kayu kamper 17,438.00 92,037.00 109,475.00
83 1 M1 Pasang talang datar, seng BJLS 28, papan kayu kruing 17,438.00 84,117.00 101,555.00
84 1 M1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai 17,438.00 97,317.00 114,755.00
85 1 M1 Pasang talang miring, seng BJLS 28, papan kayu kamper 15,018.00 148,907.00 163,925.00
86 1 M1 Pasang talang miring, seng BJLS 28, papan kayu kruing 15,018.00 133,232.00 148,250.00
87 1 M1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai 15,018.00 159,357.00 174,375.00
88 1 M1 Pasang talang torong 16,769.00 31,900.00 48,669.00
89 1 M1 Pasang talang lingkaran D - 10 cm, seng BJLS 28 12,488.00 145,640.00 158,128.00
90 1 M2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper 22,440.00 151,893.00 174,333.00
91 1 M2 Pas. dinding pemisah plywoodwood rangkap, rangka ky kamper 26,702.00 197,268.00 223,971.00
92 1 M2 Pasang plywood tebal 4 mm, untuk dinding 3,339.00 18,590.00 21,929.00

PEKERJAAN ATAP
1 1 M2 Pasang genteng lama 8,112.00 - 8,112.00
2 1 M2 Pasang genteng paris 8,112.00 16,500.00 24,612.00
3 1 M2 Pasang genteng paris untuk rumah tingkat 10,491.00 16,500.00 26,991.00
4 1 M2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 8,112.00 27,225.00 35,337.00
5 1 M2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat 10,491.00 27,225.00 37,716.00
6 1 M2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 8,112.00 43,758.00 51,870.00
7 1M 2
Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat 10,491.00 43,758.00 54,249.00
8 1 M1 Pasang bubungan genteng paris 16,225.00 12,838.00 29,063.00
9 1 M1 Pasang bubungan genteng beton Natural 16,225.00 17,293.00 33,518.00
10 1M 1
Pasang bubungan genteng beton Warna 16,225.00 22,507.00 38,732.00
11 1 M2 Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm 6,127.00 35,862.00 41,989.00
12 1 M2 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm 5,890.00 34,452.00 40,342.00
13 1 M2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm 5,890.00 38,598.00 44,488.00
14 1M 2
Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm 5,890.00 28,703.00 34,594.00
15 1 M2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm 5,791.00 30,758.00 36,549.00
16 1 M2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm 5,791.00 33,491.00 39,283.00
17 1M 2
Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm 5,791.00 32,870.00 38,661.00
18 1 M2 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm 5,791.00 47,156.00 52,947.00
19 1 M2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm 5,791.00 46,908.00 52,699.00
20 1 M2 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm 5,791.00 43,804.00 49,595.00
21 1M 2
Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm 5,791.00 43,675.00 49,467.00
22 1 M1 Pasang bubung stel gelombang 0,92 m 6,580.00 81,510.00 88,090.00

Rekapitulasi - 271
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
23 1 M1 Pasang nok stel gelombang 1,05 m 6,580.00 71,940.00 78,520.00
24 1M 1
Pasang nok stel gelombang 1,08 m 6,580.00 70,345.00 76,925.00
25 1 M1 Pasang atap genteng metal zinc alume type prima roof 8,093.00 111,438.00 119,532.00
26 1 M1 Pasang atap metal gelombanmg 8,093.00 72,600.00 80,693.00
27 1 M2 Pasang alumunium foil / sisalation 5,414.00 28,875.00 34,289.00
28 1M 2
Pasang atap polikarbonat 26,324.00 339,515.00 365,839.00

PEKERJAAN CAT-CATAN
1 1M 2
Mengikis / mengerok permukaan cat tembok lama 3,389.00 825.00 4,214.00
2 1 M2 Pengecatan bidang kayu lama 3,914.00 13,948.00 17,862.00
3 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis 4,282.00 19,756.00 24,038.00
cat penutup
4 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis 4,635.00 22,924.00 27,559.00
cat penutup
5 1 M2 Pelaburan bidang kayu dengan politur 2,214.00 16,984.00 19,198.00
1 1 M2 Pelaburan bidang kayu dengan vernis 8,484.00 2,975.00 11,460.00
6 1M 2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat 2,448.00 4,697.00 7,145.00
penutup)
7 1 M2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 1,985.00 3,135.00 5,120.00
8 1 M2 Pengecatan tembok tidak terlindung dari panas dan hujan 2,448.00 22,792.00 25,240.00
9 1 M2 Melabur tembok dengan kapur sirih 3,419.00 2,695.00 6,114.00
10 1M 2
Melabur tembok lama dengan kapur sirih (untuk pemeliharaan) 1,121.00 2,365.00 3,486.00
11 1 M2 Pengecatan bidang besi ( 3 x ) 4,635.00 11,224.00 15,860.00
12 1 M2 Pengecacatan permukaan baja dengan meni besi 6,891.00 2,563.00 9,454.00
13 1 M2 Pengecacatan permukaan baja dengan meni besi memakai perancah 12,073.00 4,763.00 16,836.00
14 1 M2 Pengetiran kayu ( 2 x ) 2,378.00 3,080.00 5,458.00
15 1 M2 Pekerjaan cat duco 3 x 14,173.00 28,865.00 43,038.00
16 1 M2 Mengerjakan Cat Sungging 252,311.00 17,644.00 269,955.00
17 1M 2
Mengecat genteng 2,448.00 16,632.00 19,080.00

PEKERJAAN BONGKARAN
1 1 M3 Membongkar pasangan batu kali 129,800.00 - 129,800.00
2 1M 3
Membongkar pasangan batu merah dan membersihkan 62,700.00 - 62,700.00
3 1 M3 Membongkar beton bertulang dan membersihkan 185,625.00 - 185,625.00
4 1 M2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 4,757.00 - 4,757.00
5 1 M2 Mengupas plesteran lama 3,196.00 - 3,196.00
6 1M 2
Membongkar genteng / sirap untuk dipergunakan lagi 4,757.00 - 4,757.00
7 1 M2 Membongkar atap seng 3,575.00 - 3,575.00
8 1 M2 Membongkar usuk / reng dipakai lagi 6,952.00 - 6,952.00
9 1M 2
Membongkar usuk / reng tidak dipakai lagi 4,757.00 - 4,757.00
10 1 M3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk 314,600.00 - 314,600.00
digunakan lagi
11 1 M3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak 29,150.00 - 29,150.00
digunakan lagi
12 1 M3 Mengerjakan kembali bangunan kayu yang telah dibongkar 534,050.00 - 534,050.00

ANALISA SUPLEMEN
1 1M 1
Pengelasan Single ( las listrik ) 82,720.00 103,950.00 186,670.00

PEKERJAAN SANITASI
2 1 bh Memasang kloset duduk/monoblock 111,628.00 1,457,500.00 1,569,128.00
3 1 bh Memasang kloset jongkok porselen 122,595.00 88,378.00 210,973.00
4 1 bh Memasang urinoir 59,125.00 1,128,428.00 1,187,553.00
5 1 bh Memasang wastafel 78,787.00 340,169.00 418,956.00
6 1 bh Memasang bak mandi fiberglass volume 0,30 m3 143,027.00 356,950.00 499,977.00
7 1 bh Memasang badkip porselen 35,956.00 198,000.00 233,956.00
8 1 bh Memasang bak fiberglass volume 1 m3 air 264,000.00 1,016,400.00 1,280,400.00
9 1 M1 Memasang pipa beton, diameter 15 cm - 20 cm 5,678.00 44,627.00 50,306.00
10 1 M1 Memasang pipa beton, diameter 30 cm - 100 cm 15,413.00 175,230.00 190,643.00

Rekapitulasi - 272
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
11 1 bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm 101,725.00 99,281.00 201,006.00
12 1 bh Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm 49,637.00 164,359.00 213,997.00
13 1 bh Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm 75,251.00 250,437.00 325,688.00
14 1 M1 Memasang pipa galvanis diameter 1/2" 5,172.00 25,575.00 30,747.00
15 1 M1 Memasang pipa galvanis diameter 3/4" 5,172.00 42,625.00 47,797.00
16 1 M1 Memasang pipa galvanis diameter 1" 5,172.00 63,937.00 69,110.00
17 1 M1 Memasang pipa galvanis diameter 1 1/2" 8,608.00 85,250.00 93,858.00
18 1 M1 Memasang pipa PVC tipe AW diameter 1/2" 2,869.00 5,392.00 8,261.00
19 1 M1 Memasang pipa PVC tipe AW diameter 3/4" 2,869.00 7,246.00 10,115.00
20 1 M1 Memasang pipa PVC tipe AW diameter 1" 2,869.00 8,738.00 11,607.00
21 1M 1
Memasang pipa PVC tipe AW diameter 1 1/2" 2,869.00 19,181.00 22,050.00
22 1 M1 Memasang pipa PVC tipe AW diameter 2" 4,312.00 25,575.00 29,887.00
23 1 M1 Memasang pipa PVC tipe AW diameter 2 1/2" 2,869.00 34,952.00 37,821.00
24 1 M1 Memasang pipa PVC tipe AW diameter 3" 7,777.00 34,952.00 42,729.00
25 1M 1
Memasang pipa PVC tipe AW diameter 4" 7,777.00 57,543.00 65,320.00
26 1 bh Memasang bak cuci piring stainless steel 10,778.00 632,500.00 643,278.00
27 1 bh Memasang kran diameter 3/4" atau 1/2" 3,753.00 27,568.00 31,322.00
28 1 bh Memasang floor drain 3,753.00 60,500.00 64,253.00

PEKERJAAN BESI DAN ALUMUNIUM


1 1 kg Pasang rangka atap baja 1,673.00 12,628.00 14,301.00
2 1 M2 Pasang pintu besi baja 35,249.00 825,000.00 860,249.00
3 1 M2 Pasang pintu gulung besi 63,178.00 275,000.00 338,178.00
4 1 M2 Pasang pintu lipat 55,279.00 550,000.00 605,279.00
5 1 M2 Pasang Rolling door 67,654.00 220,000.00 287,654.00
6 1M 2
Pasang pintu alumunium 55,279.00 440,000.00 495,279.00
7 1 M2 Pasang teralis besi 63,104.00 111,320.00 174,424.00
8 1 M2 Pasang kawat harmonika 5,875.00 41,360.00 47,235.00
9 1 M2 Pasang kawat nyamuk 5,875.00 21,092.00 26,967.00
10 1M 2
Pasang kawat kassa 5,875.00 23,210.00 29,085.00
11 1 M2 Pasang jendela nako & tralis 11,750.00 24,626.00 36,377.00

PEKERJAAN KUNCI DAN KACA


1 1 bh Pasang kunci tanam antik 23,372.00 275,000.00 298,372.00
2 1 bh Pasang kunci tanam biasa 17,256.00 137,500.00 154,756.00
3 1 bh Pasang kunci tanam kamar mandi 16,878.00 55,000.00 71,878.00
4 1 bh Pasang kunci tanam silinder 16,797.00 82,500.00 99,297.00
5 1 bh Pasang engsel pintu 5,843.00 12,100.00 17,943.00
6 1 bh Pasang engsel jendela kupu-kupu 4,056.00 8,250.00 12,306.00
7 1 bh Pasang engsel angin 8,112.00 3,300.00 11,412.00
8 1 bh Pasang spring knip 5,843.00 8,250.00 14,093.00
9 1 bh Pasang kait angin 5,843.00 3,300.00 9,143.00
10 1 bh Pasang door closer 19,476.00 165,000.00 184,476.00
11 1 bh Pasang kunci selot 7,790.00 55,000.00 62,790.00
12 1 bh Pasang pegangan pintu / door holder 19,476.00 16,500.00 35,976.00
13 1 bh Pasang door stop 3,895.00 16,500.00 20,395.00
14 1 bh Pasang rel pintu dorong 23,372.00 220,000.00 243,372.00
15 1 bh Pasang kunci lemari 9,738.00 13,200.00 22,938.00
16 1 M2 Pasang kaca, tebal 3 mm 5,843.00 59,895.00 65,738.00
17 1 M2 Pasang kaca, tebal 5 mm 5,843.00 73,205.00 79,048.00
18 1M 2
Pasang kaca cermin, tebal 5 mm 5,843.00 145,200.00 151,043.00
19 1 M2 Pasang kaca patri, tebal 5 mm 5,843.00 363,000.00 368,843.00

Rekapitulasi - 273
No. Jenis Pekerjaan Volume Sat Harga Satuan Jumlah Harga

A Pekerjaan Persiapan
Uitzet bouplank
Brak, gudang, keet pengawas
Pembersihan dan penataan tanah

B Pekerjaan Tanah
1 Galian tanah foot plate
2 Galian tanah pondasi
3 Urug tanah kembali
4 Urug tanah peninggian peil 30 cm sisa tanah
5 Urug pasir bawah lantai dan pondasi

C Pekerjaan Beton Bertulang K-225


1 Lantai kerja 1:3:5
2 Beton foot plate 15 buah
3 Beton sloof 15/25
4 Beton kolom struktur 15/40
5 Beton kolom struktur 15/30
6 Beton kolom struktur 15/25

Anda mungkin juga menyukai