I. SITE PREPARATION
a. Demolish wall partition 125.67 sq. m
b. Demolish stairs 12.83 sq. m
IV. DOORS
a. PVC Door 4.00 pcs
b. Glass Door 1.00 pcs
V. GLASS WORKS
a. Glass wall partition 8.91 sq. m
VII. ROOFING
a. GA. 24 pre-painted roofing 142.11 sq. m
b. Polycarbonate roofing 62.60 sq.m
I. GENERAL REQUIREMENTS
a. Permits 1 lot AS PER OWNER
b. Mobilization 1 lot 25,000.00 25,000.00
c. Supervision 1 lot 25,000.00 25,000.00
d. Power & Water 1 lot
V DEMOBILIZATION
a. General cleaning & clearing 1.00 lot 15,000.00 15,000.00
b. Hauling 1.00 lot 15,000.00 15,000.00