The document is a bill of quantities for demolition and rectification works. It includes quantities, methods, outputs, plants, labour, and durations for demolishing structures like drainage, fencing and gates. It also includes rectification works like removing flooring, wall tiles, ceilings and doors. The total duration for all the works is estimated to be 61 days.
The document is a bill of quantities for demolition and rectification works. It includes quantities, methods, outputs, plants, labour, and durations for demolishing structures like drainage, fencing and gates. It also includes rectification works like removing flooring, wall tiles, ceilings and doors. The total duration for all the works is estimated to be 61 days.
The document is a bill of quantities for demolition and rectification works. It includes quantities, methods, outputs, plants, labour, and durations for demolishing structures like drainage, fencing and gates. It also includes rectification works like removing flooring, wall tiles, ceilings and doors. The total duration for all the works is estimated to be 61 days.
Item Quantit Method Output Plant Labour Duration Reference
y (days) BQ NO.2 DEMOLITIO N AND RECTIFICATI ON WORKS
Demolition Demolish including foundation base, remove all debris
Works away from site, make good all defects (fill measured separately). 176m - Monsoon Drain 3.4 m/hr Back hoe 4 labours 19 days Appendix 198m - Chain Link Fencing 3.4 m/hr Dump track 4 labours 21 days 2(a) Bill 2 Dismantle including foundation base, remove all debris Demolition away from site, make good all defects (fill measured separately). 1 NO - Main Gates Back hoe 3 labours 1 day Dump truck Rectification Hack off and remove surplus spoil from site to Works Contractors own dump. 90m2 - Concrete floor slab 0.4m2/hr 5 labours 1 day Appendix 20m2 - Concrete floor surface 0.4m2/hr Concrete 1 day 2(b) - Floor tile 10m2 8m2/hr breaker/Ha 2 days Bill 2 - Wall tile 1365m2 - Aluminium foil 1.2m2/hr cker 41 day Rectificatio 1481m2 - Composite timber louvre panel 1.1 m2/hr Air 41 day n works 54m2 - Ceiling finishes 4.8 m2/hr compressor 7 day 700m2 3.5 m2/hr 61 day
Dismantle and remove surplus soil from site to
Contractors own dump. - Door frame 7 NO - Door leaf 0.4 no/hr 2 labours 1 day 7 NO 0.6 no/hr Jack 1 day hammer