This document is a form providing project details for the "Construction of Flood Control/Slope/Embankment Protection Works along Marikina-Infanta Road, Brgy. San Jose" located in Antipolo City. It lists the project location, contract duration of 19 calendar days, approved budget of 19.4 million Philippine pesos, and major categories of work including flood control, hydraulics, drainage, and maintenance flood control. Tables further describe codes and units of measurement for different categories of construction and maintenance work.
This document is a form providing project details for the "Construction of Flood Control/Slope/Embankment Protection Works along Marikina-Infanta Road, Brgy. San Jose" located in Antipolo City. It lists the project location, contract duration of 19 calendar days, approved budget of 19.4 million Philippine pesos, and major categories of work including flood control, hydraulics, drainage, and maintenance flood control. Tables further describe codes and units of measurement for different categories of construction and maintenance work.
This document is a form providing project details for the "Construction of Flood Control/Slope/Embankment Protection Works along Marikina-Infanta Road, Brgy. San Jose" located in Antipolo City. It lists the project location, contract duration of 19 calendar days, approved budget of 19.4 million Philippine pesos, and major categories of work including flood control, hydraulics, drainage, and maintenance flood control. Tables further describe codes and units of measurement for different categories of construction and maintenance work.
Project/Contract ID : Project/Contract Name : Construction of Flood Control/Slope/Embankment Protection Works along Marikina-Infanta Road, Brgy. San Jose Project Location : Antipolo City Contract Duration (CD) : Calendar Days Approved Budget for the Contract (ABC) : PhP 19,400,000.00 Name of Newspaper for this Advertiseme : Date of Advertisement : Submission of Interest for Eligibility Processing (Form NR 0 : Issuance of Bidding Documen: to Cost of Bid Documents : PhP Cost Estimate for Unit of Each Major Major Categories of Work Dimension Similar Categories of Work Measure Flood Control/Hydraulics/Drainage Category of Work FHR,FHD,FHG PhP P 10,500,000.00 Maintenance Flood Control 8,900,000.00 FHR,FHD,FHG,FHN
T O T A L PhP 19,400,000.00
Major Categories of Work Table
Dimensi Dimensio on Unit Code Category of Work Description n Unit of Code Category of Work Description of Measure Measure BCB Bridges-Construction-Bailey l.m. MBG Maintenance Buildings stories BCC Bridges-Construction-Concrete l.m. MFC Maintenance Flood Control cu.m. BCS Bridges-Construction-Steel l.m. MRB Maintenance Roads and Bridges km. BCP Bridges-Construction-With Bored Piles l.m. PHC Ports/Harbors-Causeway l.m. BIH Buildings/Industrial Plant-HIGH Rise stories PHW Ports/Harbors-Wharf l.m. BIL Buildings/Industrial Plant-LOW Rise stories RCA Roads-New Construction-Asphalt km. BRB Bridges-Rehabilitation-Bailey l.m. RCG Roads-New Construction-Gravel km. BRC Bridges-Rehabilitation-Concrete l.m. RCP Roads-New Construction-PCCP km. BRR Bridges-Rehabilitation-Retrofitting l.m. RRA Roads-Rehabilitation-Asphalt km. BRS Bridges-Rehabilitation-Steel l.m. RRG Roads-Rehabilitation-Gravel km. BRP Bridges-Rehabilitation-With Bored Piles l.m. RRP Roads-Rehabilitation-PCCP km. FHG Flood Control/Hydraulics/Dredging cu.m. TEA Traffic Engineering-Signage piece FHD Flood Control/Hydraulics/Dams cu.m. TEP Traffic Engineering-Pavement Markings l.m. FHP Flood Control/Hydraulics/Pumping Stati unit TES Traffic Engineering-Signalization set FHN Flood Control/Hydraulics/Drainage l.m. TEG Traffic Engineering-Guardrail set FHR Flood Control/Hydraulics/River Control l.m. TEP-P TEP-Propile Marking set FHW Flood Control/Hydraulics/Water Supply l.m. TES-S Traffic Pavement Studs set
Implementing Office Signatur : Date :
Notes : 1. This form should be submitted by the Implementing Office to DPWH Central BAC-TWG Office at least 10 CD before its 1st day of Advertisement. 2. All blanks should be completely filled-up.