Date:

FORM NR 002
April 2001

Region/District Office : 13DN0107


Project/Contract ID :
Project/Contract Name : Construction of Flood Control/Slope/Embankment Protection Works along Marikina-Infanta Road, Brgy. San Jose
Project Location : Antipolo City
Contract Duration (CD) : Calendar Days
Approved Budget for the Contract (ABC) : PhP 19,400,000.00
Name of Newspaper for this Advertiseme :
Date of Advertisement :
Submission of Interest for Eligibility Processing (Form NR 0 :
Issuance of Bidding Documen: to
Cost of Bid Documents : PhP
Cost Estimate for
Unit of
Each Major
Major Categories of Work Dimension Similar Categories of Work
Measure
Flood Control/Hydraulics/Drainage
Category of Work FHR,FHD,FHG
PhP P 10,500,000.00
Maintenance Flood Control 8,900,000.00 FHR,FHD,FHG,FHN

T O T A L PhP 19,400,000.00

Major Categories of Work Table


Dimensi
Dimensio
on Unit
Code Category of Work Description n Unit of Code Category of Work Description
of
Measure
Measure
BCB Bridges-Construction-Bailey l.m. MBG Maintenance Buildings stories
BCC Bridges-Construction-Concrete l.m. MFC Maintenance Flood Control cu.m.
BCS Bridges-Construction-Steel l.m. MRB Maintenance Roads and Bridges km.
BCP Bridges-Construction-With Bored Piles l.m. PHC Ports/Harbors-Causeway l.m.
BIH Buildings/Industrial Plant-HIGH Rise stories PHW Ports/Harbors-Wharf l.m.
BIL Buildings/Industrial Plant-LOW Rise stories RCA Roads-New Construction-Asphalt km.
BRB Bridges-Rehabilitation-Bailey l.m. RCG Roads-New Construction-Gravel km.
BRC Bridges-Rehabilitation-Concrete l.m. RCP Roads-New Construction-PCCP km.
BRR Bridges-Rehabilitation-Retrofitting l.m. RRA Roads-Rehabilitation-Asphalt km.
BRS Bridges-Rehabilitation-Steel l.m. RRG Roads-Rehabilitation-Gravel km.
BRP Bridges-Rehabilitation-With Bored Piles l.m. RRP Roads-Rehabilitation-PCCP km.
FHG Flood Control/Hydraulics/Dredging cu.m. TEA Traffic Engineering-Signage piece
FHD Flood Control/Hydraulics/Dams cu.m. TEP Traffic Engineering-Pavement Markings l.m.
FHP Flood Control/Hydraulics/Pumping Stati unit TES Traffic Engineering-Signalization set
FHN Flood Control/Hydraulics/Drainage l.m. TEG Traffic Engineering-Guardrail set
FHR Flood Control/Hydraulics/River Control l.m. TEP-P TEP-Propile Marking set
FHW Flood Control/Hydraulics/Water Supply l.m. TES-S Traffic Pavement Studs set

Implementing Office Signatur : Date :


Notes : 1. This form should be submitted by the Implementing Office to DPWH Central BAC-TWG Office at least
10 CD before its 1st day of Advertisement.
2. All blanks should be completely filled-up.