EQUIPMENT PRODUCTIVITY

Code Work Item Rate

EARTHWORKS

Clearing & Grubbing


EP1.1.1 Clearing & Grubbing (Volume) 92.05 m3/hr
EP1.1.2 Clearing & Grubbing (Area) 613.64 m2/hr

Ground Dressing
EP1.2.1 Dressing (t < 250mm) (Volume) 103.32 m3/hr
EP1.2.2 Dressing (t < 250mm) (Area) 413.27 m2/hr

Ground Leveling
EP1.3.1 Leveling (t > 250mm) (Volume) 97.70 m3/hr
EP1.3.2 Leveling (t >250mm) (Area) 325.68 m2/hr
EP1.3.3 Leveling (t > 500mm) (Volume) 88.24 m3/hr
EP1.3.4 Leveling (t >500mm) (Area) 176.47 m2/hr

EXCAVATION & BACKFILLING

Bulk Excavation
EP2.1.1 Bulk Excavation (Cap=0.8m3, Normal Soil) 55.86 m3/hr
EP2.1.2 Bulk Excavation (Cap=0.8m3, Hard Soil) 33.27 m3/hr
EP2.1.3 Bulk Excavation (Cap=0.8m3, Rocky Soil) 22.76 m3/hr
EP2.1.4 Bulk Excavation (Cap=1.0m3, Normal Soil) 56.01 m3/hr
EP2.1.5 Bulk Excavation (Cap=1.0m3, Hard Soil) 33.36 m3/hr
EP2.1.6 Bulk Excavation (Cap=1.0m3, Rocky Soil) 22.82 m3/hr

Foundation Excavation
EP2.2.1 Foundation Excavation (Cap=0.8m3, Normal Soil) 40.16 m3/hr
EP2.2.2 Foundation Excavation (Cap=0.8m3, Hard Soil) 26.99 m3/hr
EP2.2.3 Foundation Excavation (Cap=0.8m3, Rocky Soil) 19.63 m3/hr
EP2.2.4 Foundation Excavation (Cap=1.0m3, Normal Soil) 40.26 m3/hr
EP2.2.5 Foundation Excavation (Cap=1.0m3, Hard Soil) 27.05 m3/hr
EP2.2.6 Foundation Excavation (Cap=1.0m3, Rocky Soil) 19.68 m3/hr

Trench Excavation
EP2.3.1 Trench Excavation (Cap=0.4m3, Normal Soil) 33.30 m3/hr
EP2.3.2 Trench Excavation (Cap=0.4m3, Hard Soil) 21.10 m3/hr
EP2.3.3 Trench Excavation (Cap=0.4m3, Rocky Soil) 16.32 m3/hr
EP2.3.4 Trench Excavation (Cap=0.5m3, Normal Soil) 33.41 m3/hr
EP2.3.5 Trench Excavation (Cap=0.5m3, Hard Soil) 21.17 m3/hr
EP2.3.6 Trench Excavation (Cap=0.5m3, Rocky Soil) 16.37 m3/hr
Foundation Backfilling
EP2.4.1 Foundation Backfilling (Cap=0.8m3, Normal Soil) 22.42 m3/hr
EP2.4.2 Foundation Backfilling (Cap=1.0m3, Normal Soil) 23.08 m3/hr

Trench Backfilling
EP2.5.1 Trench Backfilling (Cap=0.4m3, Normal Soil) 18.42 m3/hr
EP2.5.2 Trench Backfilling (Cap=0.5m3, Normal Soil) 18.75 m3/hr

EMBANKMENT WORKS

Embankment Grading
EP3.1.1 Embankment Grading (Volume) 47.01 m3/hr
EP3.1.2 Embankment Grading (Area) 235.06 m2/hr

Embankment Compaction
EP3.2.1 Embankment Compaction (Volume) 63.03 m3/hr
EP3.2.2 Embankment Compaction (Area) 420.17 m2/hr

QUARRYING & EARTH HANDLING WORKS

Soil Loading / Filling


EP4.1.1 Load/Fill by Backhoe (Cap=0.8m3) 42.69 m3/hr
EP4.1.2 Load/Fill by Backhoe (Cap=1.0m3) 43.90 m3/hr
EP4.1.3 Load/Fill by Loader (Cap=1.5m3) 58.57 m3/hr
EP4.1.4 Load/Fill by Loader (Cap=2.4m3) 65.82 m3/hr

Soil Hauling (loading by Backhoe)


EP4.2.1 Hauling (AHD= 30km Cap=15m3) (load by backhoe) 8.33 m3/hr
EP4.2.2 Hauling (AHD= 25km Cap=15m3) (load by backhoe) 9.42 m3/hr
EP4.2.3 Hauling (AHD= 20km Cap=15m3) (load by backhoe) 10.83 m3/hr
EP4.2.4 Hauling (AHD= 15km Cap=15m3) (load by backhoe) 12.75 m3/hr
EP4.2.5 Hauling (AHD= 10km Cap=15m3) (load by backhoe) 15.49 m3/hr
EP4.2.6 Hauling (AHD= 7km Cap=15m3) (load by backhoe) 17.79 m3/hr
EP4.2.7 Hauling (AHD= 5km Cap=15m3) (load by backhoe) 19.74 m3/hr
EP4.2.8 Hauling (Free Haul Cap=15m3) (load by backhoe) 25.29 m3/hr

Soil Hauling (loading by Payloader)


EP4.3.1 Hauling (AHD= 30km Cap=15m3) (load by payloader) 8.79 m3/hr
EP4.3.2 Hauling (AHD= 25km Cap=15m3) (load by payloader) 10.01 m3/hr
EP4.3.3 Hauling (AHD= 20km Cap=15m3) (load by payloader) 11.63 m3/hr
EP4.3.4 Hauling (AHD= 15km Cap=15m3) (load by payloader) 13.87 m3/hr
EP4.3.5 Hauling (AHD= 10km Cap=15m3) (load by payloader) 15.40 m3/hr
EP4.3.6 Hauling (AHD= 7km Cap=15m3) (load by payloader) 20.06 m3/hr
EP4.3.7 Hauling (AHD= 5km Cap=15m3) (load by payloader) 22.58 m3/hr
EP4.3.8 Hauling (Free Haul Cap=15m3) (load by payloader) 30.13 m3/hr

Rock Breaking
EP4.4.1 Rock Breaking by Backhoe with Breaker 21.63 m3/hr

Rock Loading / Filling


EP4.5.1 Rock Load/Fill by Loader (Cap=1.5m3) 43.93 m3/hr
EP4.5.2 Rock Load/Fill by Loader (Cap=2.4m3) 49.37 m3/hr

Rock Hauling (loading by Payloader)


EP4.6.1 Hauling (AHD= 30km Cap=15m3) (load by payloader) 5.84 m3/hr
EP4.6.2 Hauling (AHD= 25km Cap=15m3) (load by payloader) 6.70 m3/hr
EP4.6.3 Hauling (AHD= 20km Cap=15m3) (load by payloader) 7.88 m3/hr
EP4.6.4 Hauling (AHD= 15km Cap=15m3) (load by payloader) 9.55 m3/hr
EP4.6.5 Hauling (AHD= 10km Cap=15m3) (load by payloader) 11.89 m3/hr
EP4.6.6 Hauling (AHD= 7km Cap=15m3) (load by payloader) 14.46 m3/hr
EP4.6.7 Hauling (AHD= 5km Cap=15m3) (load by payloader) 16.60 m3/hr

Stone Loading
EP4.7.1 Stone Load/Fill by Loader (Cap=1.5m3) 49.78 m3/hr
EP4.7.2 Stone Load/Fill by Loader (Cap=2.4m3) 55.95 m3/hr

Stone Hauling
EP4.8.1 Stone Hauling AHD=30kms 6.61 m3/hr
EP4.8.2 Stone Hauling AHD=25kms 7.60 m3/hr
EP4.8.3 Stone Hauling AHD=20kms 8.93 m3/hr
EP4.8.4 Stone Hauling AHD=15kms 10.82 m3/hr
EP4.8.5 Stone Hauling AHD=10kms 13.48 m3/hr
EP4.8.6 Stone Hauling AHD=7kms 16.39 m3/hr
EP4.8.7 Stone Hauling AHD=5kms 18.81 m3/hr

Boulder Loading / Filling


EP4.9.1 Boulder Load/Fill by Loader (Cap=1.5m3) 24.85 m3/hr
EP4.9.2 Boulder Load/Fill by Loader (Cap=2.4m3) 29.62 m3/hr

Boulder Hauling
EP4.10.1 Boulder Hauling AHD=30kms 3.33 m3/hr
EP4.10.2 Boulder Hauling AHD=25kms 3.83 m3/hr
EP4.10.3 Boulder Hauling AHD=20kms 4.52 m3/hr
EP4.10.4 Boulder Hauling AHD=15kms 5.50 m3/hr
EP4.10.5 Boulder Hauling AHD=10kms 6.89 m3/hr
EP4.10.6 Boulder Hauling AHD=7kms 8.42 m3/hr
EP4.10.7 Boulder Hauling AHD=5kms 9.72 m3/hr

PAVEMENT BREAKING
Asphalt Pavement Breaking
EP5.1.1 Asphalt Breaking t=50mm (Area) 23.40 m2/hr
EP5.1.2 Asphalt Breaking t=50mm (Volume) 1.17 m3/hr
EP5.1.3 Asphalt Breaking t>50mm (Area) 22.20 m2/hr
EP5.1.4 Asphalt Breaking t>50mm (Volume) 1.66 m3/hr

Concrete Pavement Breaking


EP5.2.1 Concrete Breaking t=150mm (Area) 17.18 m2/hr
EP5.2.2 Concrete Breaking t=150mm (Volume) 2.58 m3/hr
EP5.2.3 Concrete Breaking t=200mm (Area) 13.75 m2/hr
EP5.2.4 Concrete Breaking t=200mm (Volume) 3.16 m3/hr
EP5.2.5 Concrete Breaking t=300mm (Area) 12.76 m2/hr
EP5.2.6 Concrete Breaking t=300mm (Volume) 3.19 m3/hr

WATERING

EP6.1.1 Watering (Area) 479.83 m2/hr


EP6.1.2 Watering (Volume) 71.97 m3/hr

PILEWORKS

Pile Driving
EP7.1.1 Pile Driving (PC 400mmx400mm) 2.54 lm/hr
EP7.1.2 Pile Driving (Steel H350mmx350mm) 3.21 lm/hr
EP7.1.3 Pile Driving (Sheet Type 2) 5.71 lm/hr

Pile Extraction
EP7.2.1 Pile Extraction (Sheet Type 2) 8.09 lm/hr

Pile Load / Unload


EP7.3.1 Load/Unload (PC 400mmx400mm) 36.00 lm/hr
EP7.3.2 Load/Unload (Steel H350mmx350mm) 36.61 lm/hr
EP7.3.3 Load/Unload (Sheet Type 2) 43.86 lm/hr

PIPELAYING WORKS

Pipe Laying
EP8.1.1 Pipe Laying 1600mm-2000mm by Crane 5.45 lm/hr
EP8.1.2 Pipe Laying 1200mm - 1500mm by Crane 5.54 lm/hr
EP8.1.3 Pipe Laying 600mm - 1000mm by Crane 5.63 lm/hr
EP8.1.4 Pipe Laying 300mm - 500mm by Crane 5.71 lm/hr

Pipe Loading / Unloading


EP8.2.1 Pipe Load/Unload 1600mm-2000mm by Crane 7.50 lm/hr
EP8.2.2 Pipe Load/Unload 1200mm - 1500mm by Crane 7.66 lm/hr
EP8.2.3 Pipe Load/Unload 600mm - 1000mm by Crane 7.83 lm/hr
EP8.2.4 Pipe Load/Unload 300mm - 500mm by Crane 8.00 lm/hr
Pipe Hauling

AHD = 30kms
EP8.3.1.1 Pipe Hauling 1600mm-2000mm AHD=30kms 2.45 lm/hr
EP8.3.1.2 Pipe Hauling 1200mm - 1500mm AHD=30kms 2.90 lm/hr
EP8.3.1.3 Pipe Hauling 600mm - 1000mm AHD=30kms 3.40 lm/hr
EP8.3.1.4 Pipe Hauling 300mm - 500mm AHD=30kms 3.85 lm/hr
AHD = 25kms
EP8.3.2.1 Pipe Hauling 1600mm-2000mm AHD=25kms 2.58 lm/hr
EP8.3.2.2 Pipe Hauling 1200mm - 1500mm AHD=25kms 3.01 lm/hr
EP8.3.2.3 Pipe Hauling 600mm - 1000mm AHD=25kms 3.47 lm/hr
EP8.3.2.4 Pipe Hauling 300mm - 500mm AHD=25kms 3.87 lm/hr
AHD = 20kms
EP8.3.3.1 Pipe Hauling 1600mm-2000mm AHD=20kms 2.73 lm/hr
EP8.3.3.2 Pipe Hauling 1200mm - 1500mm AHD=20kms 3.13 lm/hr
EP8.3.3.3 Pipe Hauling 600mm - 1000mm AHD=20kms 3.54 lm/hr
EP8.3.3.4 Pipe Hauling 300mm - 500mm AHD=20kms 3.89 lm/hr
AHD = 15kms
EP8.3.4.1 Pipe Hauling 1600mm-2000mm AHD=15kms 2.89 lm/hr
EP8.3.4.2 Pipe Hauling 1150mm - 1500mm AHD=15kms 3.25 lm/hr
EP8.3.4.3 Pipe Hauling 600mm - 1000mm AHD=15kms 3.61 lm/hr
EP8.3.4.4 Pipe Hauling 300mm - 500mm AHD=15kms 3.91 lm/hr
AHD = 10kms
EP8.3.5.1 Pipe Hauling 1600mm-2000mm AHD=10kms 3.08 lm/hr
EP8.3.5.2 Pipe Hauling 1100mm - 1500mm AHD=10kms 3.38 lm/hr
EP8.3.5.3 Pipe Hauling 600mm - 1000mm AHD=10kms 3.69 lm/hr
EP8.3.5.4 Pipe Hauling 300mm - 500mm AHD=10kms 3.94 lm/hr
AHD = 7kms
EP8.3.6.1 Pipe Hauling 1600mm-2000mm AHD=7kms 3.20 lm/hr
EP8.3.6.2 Pipe Hauling 1200mm - 1500mm AHD=7kms 3.47 lm/hr
EP8.3.6.3 Pipe Hauling 600mm - 1000mm AHD=7kms 3.73 lm/hr
EP8.3.6.4 Pipe Hauling 300mm - 500mm AHD=7kms 3.95 lm/hr
AHD = 5kms
EP8.3.7.1 Pipe Hauling 1600mm-2000mm AHD=5kms 3.29 lm/hr
EP8.3.7.2 Pipe Hauling 1200mm - 1500mm AHD=5kms 3.53 lm/hr
EP8.3.7.3 Pipe Hauling 600mm - 1000mm AHD=5kms 3.76 lm/hr
EP8.3.7.4 Pipe Hauling 300mm - 500mm AHD=5kms 3.96 lm/hr

CONCRETING

EP9.1.1 Concreting (Crane & Bucket) 5.56 m3/hr


EP9.2.1 Concreting (Truck Mounted Pump) 23.65 m3/hr

MATERIALS HANDLING

Materials Loading / Unloading


EP10.1.1 Rebar Load/Unload 13.04 tons/hr
EP10.1.2 Formworks Load/Unload 96.00 sqm/hr
EP10.1.3 Cement Load/Unload bags/hr
Materials Hauling AHD=30kms
EP10.2.1.1 Rebar Hauling AHD=30kms 4.20 kgs/hr
EP10.2.1.2 Formworks Hauling AHD=30kms 30.86 sqm/hr
EP10.2.1.3 Cement Hauling AHD=30kms 45.92 bags/hr

Materials Hauling AHD=25kms


EP10.2.2.1 Rebar Hauling AHD=25kms 4.46 kgs/hr
EP10.2.2.2 Formworks Hauling AHD=25kms 32.68 sqm/hr
EP10.2.2.3 Cement Hauling AHD=25kms 47.12 bags/hr

Materials Hauling AHD=20kms


EP10.2.3.1 Rebar Hauling AHD=20kms 4.74 kgs/hr
EP10.2.3.2 Formworks Hauling AHD=20kms 34.73 sqm/hr
EP10.2.3.3 Cement Hauling AHD=20kms 48.39 bags/hr

Materials Hauling AHD=15kms


EP10.2.4.1 Rebar Hauling AHD=15kms 5.06 kgs/hr
EP10.2.4.2 Formworks Hauling AHD=15kms 37.06 sqm/hr
EP10.2.4.3 Cement Hauling AHD=15kms 49.72 bags/hr

Materials Hauling AHD=10kms


EP10.2.5.1 Rebar Hauling AHD=10kms 5.43 kgs/hr
EP10.2.5.2 Formworks Hauling AHD=10kms 38.38 sqm/hr
EP10.2.5.3 Cement Hauling AHD=10kms 51.14 bags/hr

Materials Hauling AHD=7kms


EP10.2.6.1 Rebar Hauling AHD=7kms 5.67 kgs/hr
EP10.2.6.2 Formworks Hauling AHD=7kms 41.51 sqm/hr
EP10.2.6.3 Cement Hauling AHD=7kms 52.02 bags/hr

Materials Hauling AHD=5kms


EP10.2.7.1 Rebar Hauling AHD=5kms 5.85 tons/hr
EP10.2.7.2 Formworks Hauling AHD=5kms 42.80 sqm/hr
EP10.2.7.3 Cement Hauling AHD=5kms 52.63 bags/hr

Water Hauling
EP10.3.1 Water Hauling AHD=30kms 2.33 m3/hr
EP10.3.2 Water Hauling AHD=25kms 2.63 m3/hr
EP10.3.3 Water Hauling AHD=20kms 3.02 m3/hr
EP10.3.4 Water Hauling AHD=15kms 3.54 m3/hr
EP10.3.5 Water Hauling AHD=10kms 4.27 m3/hr
EP10.3.6 Water Hauling AHD=7kms 4.88 m3/hr
EP10.3.7 Water Hauling AHD=5kms 5.39 m3/hr

Fuel Hauling (by Fuel Truck)


EP10.4.1 Water Hauling AHD=30kms 1.63 li/hr
EP10.4.2 Water Hauling AHD=25kms 1.67 li/hr
EP10.4.3 Water Hauling AHD=20kms 1.71 li/hr
EP10.4.4 Water Hauling AHD=15kms 1.75 li/hr
EP10.4.5 Water Hauling AHD=10kms 1.80 li/hr
EP10.4.6 Water Hauling AHD=7kms 1.83 li/hr
EP10.4.7 Water Hauling AHD=5kms 1.85 li/hr

Asphalt Hauling
EP10.5.1 Asphalt Hauling AHD=30kms 4.05 m3/hr
EP10.5.2 Asphalt Hauling AHD=25kms 4.48 m3/hr
EP10.5.3 Asphalt Hauling AHD=20kms 5.02 m3/hr
EP10.5.4 Asphalt Hauling AHD=15kms 5.70 m3/hr
EP10.5.5 Asphalt Hauling AHD=10kms 6.52 m3/hr
EP10.5.6 Asphalt Hauling AHD=7kms 7.27 m3/hr
EP10.5.7 Asphalt Hauling AHD=5kms 7.82 m3/hr
EP10.5.8 Asphalt Hauling AHD=30kms 8.91 tons/hr
EP10.5.9 Asphalt Hauling AHD=25kms 9.86 tons/hr
EP10.5.10 Asphalt Hauling AHD=20kms 11.03 tons/hr
EP10.5.11 Asphalt Hauling AHD=15kms 12.53 tons/hr
EP10.5.12 Asphalt Hauling AHD=10kms 14.33 tons/hr
EP10.5.13 Asphalt Hauling AHD=7kms 16.00 tons/hr
EP10.5.14 Asphalt Hauling AHD=5kms 17.20 tons/hr

Piles Hauling
EP10.6.1 PC Hauling Piles 17.55 lm/hr
EP10.6.2 Steel Hauling Piles 17.90 lm/hr
EP10.6.3 Steel Sheet Hauling Piles 21.91 lm/hr

PAVING WORK

Concrete Paving
EP11.1.1 Concrete Paving t=230mm (Volume) 9.76 m3/hr
EP11.1.2 Concrete Paving t=230mm (Area) 42.44 m2/hr
EP11.1.3 Concrete Paving t=270mm (Volume) 11.08 m3/hr
EP11.1.4 Concrete Paving t=270mm (Area) 41.04 m2/hr
EP11.1.5 Concrete Paving t=300mm (Volume) 11.73 m3/hr
EP11.1.6 Concrete Paving t=300mm (Area) 39.11 m2/hr

Asphalt Paving
EP11.2.1 Asphalt Paving t=50mm (Weight) 39.06 tons/hr
EP11.2.2 Asphalt Paving t=50mm (Area) 355.14 m2/hr
EP11.2.3 Asphalt Paving t=75mm (Weight) 45.98 tons/hr
EP11.2.4 Asphalt Paving t=75mm (Area) 278.64 m2/hr
EP11.2.5 Asphalt Paving t=100mm (Weight) 52.24 tons/hr
EP11.2.6 Asphalt Paving t=100mm (Area) 237.47 m2/hr

Asphalt Compaction
EP11.3.1 Asphalt Compaction t=50mm (Weight) 9.49 tons/hr
EP11.3.2 Asphalt Compaction t=50mm (Area) 86.27 m2/hr
EP11.3.3 Asphalt Compaction t=75mm (Weight) 12.58 tons/hr
EP11.3.4 Asphalt Compaction t=75mm (Area) 76.26 m2/hr
EP11.3.5 Asphalt Compaction t=100mm (Weight) 15.35 tons/hr
EP11.3.6 Asphalt Compaction t=100mm (Area) 69.78 m2/hr

Asphalt Spraying
EP11.4.1 Prime Coat Application (Weight) 0.62 tons/hr
EP11.4.2 Prime Coat Application (Area) 388.35 m2/hr
EP11.4.3 Tack Coat Application (Weight) 0.73 tons/hr
EP11.4.4 Tack Coat Application (Area) 1,224.42 m2/hr
EP11.4.5 Asphalt Spraying (1L/sqm) (Weight) 0.97 tons/hr
EP11.4.6 Asphalt Spraying (1L/sqm) (Area) 1,014.00 m2/hr
EP11.4.7 Asphalt Spraying (2L/sqm) (Weight) 1.24 tons/hr
EP11.4.8 Asphalt Spraying (2L/sqm) (Area) 776.71 m2/hr

BRIDGE WORK
EP12.1.1 PC Girder Installation Type 1 1.71 lm/hr
EP12.1.2 PC Girder Installation Type 2 2.10 lm/hr
EP12.1.3 PC Girder Installation Type 3 3.72 lm/hr
EP12.1.4 PC Girder Installation Type 4 6.00 lm/hr
EP12.1.5 PC Girder Installation Type 5 7.74 lm/hr

PC Items Handling

PC Item (1-2 tons/pc)


EP13.1.1 PC Item (1-2 tons/pc) Hauling AHD=30kms 5.31 tons/hr
EP13.1.2 PC Item (1-2 tons/pc) Hauling AHD=25kms 5.71 tons/hr
EP13.1.3 PC Item (1-2 tons/pc) Hauling AHD=20kms 6.19 tons/hr
EP13.1.4 PC Item (1-2 tons/pc) Hauling AHD=15kms 6.74 tons/hr
EP13.1.5 PC Item (1-2 tons/pc) Hauling AHD=10kms 7.36 tons/hr
EP13.1.6 PC Item (1-2 tons/pc) Hauling AHD=70kms 7.87 tons/hr
EP13.1.7 PC Item (1-2 tons/pc) Hauling AHD=5kms 8.22 tons/hr
PRODUCTIVITY CALCULATIONS
Clearing and Grubbing

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Depth of Cut 0.15 m
Area of Embankment 250.00 sm
Volume 37.50 m3

Equipment Specifications Bulddozer D7


Parameter Quantity Unit
Forward Speed 1.35 km/hr
Reverse Speed 1.35 km/hr
Blade Width 3.70 m
Blade Capacity 3.50 m3
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

First Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 1.35 0.04 2.22
Maneuver 0.01 0.83
Reverse to 50m 1.35 0.04 2.22
First Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 1.35 0.04 2.22
Maneuver 0.01 0.83
Reverse to 50m 1.35 0.04 2.22

2nd Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 1.35 0.04 2.22
Maneuver 0.01 0.83
Reverse to 50m 1.35 0.04 2.22
2nd Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 1.35 0.04 2.22
Maneuver 0.01 0.83
Reverse to 50m 1.35 0.04 2.22

Total 0.41 24.44

Productivity 92.05 m3/hr


Productivity 613.64 m2/hr
PRODUCTIVITY CALCULATIONS
Dressing

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Depth of Cut 0.25 m
Area of Embankment 250.00 sm
Volume 62.50 m3

Equipment Specifications Bulldozer D7


Parameter Quantity Unit
Forward Speed 0.81 km/hr
Reverse Speed 0.81 km/hr
Blade Width 3.70 m
Blade Capacity 3.50 m3
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

First Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 0.81 0.06 3.70
Maneuver 0.01 0.83
Reverse to 50m 0.81 0.06 3.70
First Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 0.81 0.06 3.70
Maneuver 0.01 0.83
Reverse to 50m 0.81 0.06 3.70

2nd Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 0.81 0.06 3.70
Maneuver 0.01 0.83
Reverse to 50m 0.81 0.06 3.70
2nd Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 0.81 0.06 3.70
Maneuver 0.01 0.83
Reverse to 50m 0.81 0.06 3.70

Total 0.60 36.30

Productivity 103.32 m3/hr


Productivity 413.27 m2/hr
PRODUCTIVITY CALCULATIONS
Ground Leveling

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Thickness 0.30 m
Area of Embankment 250.00 sm
Volume 75.00 m3

Equipment Specifications Bulldozer D7


Parameter Quantity Unit
Forward Speed 1.04 km/hr
Reverse Speed 0.96 km/hr
Blade Width 3.70 m
Blade Capacity 3.50 m3
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

First Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 1.04 0.05 2.88
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13
First Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 1.04 0.05 2.88
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13

2nd Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 1.04 0.05 2.88
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13
2nd Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 1.04 0.05 2.88
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13

3rd Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 1.04 0.05 2.88
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13
3rd Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 1.04 0.05 2.88
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13

Total 0.77 46.06

Productivity 97.70 m3/hr

Productivity 325.68 m2/hr


PRODUCTIVITY CALCULATIONS
Ground Cutting

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Depth of Cut 0.50 m
Area of Embankment 250.00 sm
Volume 125.00 m3

Equipment Specifications Bulldozer D7


Parameter Quantity Unit
Forward Speed 0.32 km/hr
Reverse Speed 0.96 km/hr
Blade Width 3.70 m
Blade Capacity 3.50 m3
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

First Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 0.32 0.16 9.38
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13
First Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 0.32 0.16 9.38
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13

2nd Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 0.32 0.16 9.38
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13
2nd Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 0.32 0.16 9.38
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13

3rd Pass (one side)


Maneuver 0.01 0.83
Push Earth to 50m 0.32 0.16 9.38
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13
3rd Pass (other side)
Maneuver 0.01 0.83
Push Earth to 50m 0.32 0.16 9.38
Maneuver 0.01 0.83
Reverse to 50m 0.96 0.05 3.13

Total 1.42 85.00

Productivity 88.24 m3/hr

Productivity 176.47 m2/hr


PRODUCTIVITY CALCULATIONS
Embankment Grading

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 7.50 m
Thickness 0.20 m
Area of Embankment 375.00 m2
Volume 75.00 m3

Equipment Specifications Grader 125HP


Parameter Quantity Unit
Forward Speed (Loaded) 6.12 km/hr
Reverse Speed (Empty) 6.48 km/hr
Blade Width 3.70 m
Blade Capacity 1.33 m3
Fuel Consumption 16.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

First Pass (one side)


Maneuver 0.13 7.50
Push Earth to 50m 6.12 0.01 0.49
Maneuver 0.13 7.50
Reverse to 50m 6.48 0.01 0.46
First Pass (other side)
Maneuver 0.13 7.50
Push Earth to 50m 6.12 0.01 0.49
Maneuver 0.13 7.50
Reverse to 50m 6.48 0.01 0.46

2nd Pass (one side)


Maneuver 0.13 7.50
Push Earth to 50m 6.12 0.01 0.49
Maneuver 0.13 7.50
Reverse to 50m 6.48 0.01 0.46
2nd Pass (other side)
Maneuver 0.13 7.50
Push Earth to 50m 6.12 0.01 0.49
Maneuver 0.13 7.50
Reverse to 50m 6.48 0.01 0.46

3rd Pass (one side)


Maneuver 0.13 7.50
Push Earth to 50m 6.12 0.01 0.49
Maneuver 0.13 7.50
Reverse to 50m 6.48 0.01 0.46
3rd Pass (other side)
Maneuver 0.13 7.50
Push Earth to 50m 6.12 0.01 0.49
Maneuver 0.13 7.50
Reverse to 50m 6.48 0.01 0.46

Total 1.60 95.72

Productivity 47.01 m3/hr

Productivity 235.06 m2/hr


PRODUCTIVITY CALCULATIONS
Compaction

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Thickness 0.15 m
Area of Embankment 250.00 sm
Volume 37.50 m3

Equipment Specifications Road Roller 10T


Parameter Quantity Unit
Forward Speed 1.88 km/hr
Reverse Speed 1.88 km/hr
Drum Width 1.65 m
Fuel Consumption 12.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

1st Pass
Maneuver 0.03 2.00
Compact to 50m 1.88 0.03 1.60
Maneuver 0.03 2.00
Compact to 50m (Return) 1.88 0.03 1.60
Maneuver 0.01 0.50
Compact to 50m 1.88 0.03 1.60
Maneuver 0.03 2.00
Compact to 50m (Return) 1.88 0.03 1.60

2nd Pass
Maneuver 0.01 0.50
Compact to 50m 1.88 0.03 1.60
Maneuver 0.03 2.00
Compact to 50m (Return) 1.88 0.03 1.60
Maneuver 0.01 0.50
Compact to 50m 1.88 0.03 1.60
Maneuver 0.03 2.00
Compact to 50m (Return) 1.88 0.03 1.60

3rd Pass
Maneuver 0.01 0.50
Compact to 50m 1.88 0.03 1.60
Maneuver 0.03 2.00
Compact to 50m (Return) 1.88 0.03 1.60
Maneuver 0.01 0.50
Compact to 50m 1.88 0.03 1.60
Maneuver 0.03 2.00
Compact to 50m (Return) 1.88 0.03 1.60

Total 0.60 35.70

Productivity 63.03 m3/hr

Productivity 420.17 m2/hr


PRODUCTIVITY CALCULATIONS
Embankment Watering

Trial Strip
Parameter Quantity Unit
Segment Length 200.00 m
Segment Width 7.50 m
Layer Thickness 0.15 m
Area of Embankment 1,500.00 sm
Volume 225.00 m3
Distance from Water Source 25.00 km

Equipment Specifications Water Truck


Parameter Quantity Unit
Travel Speed (Loaded) 40.00 km/hr
Travel Speed (Empty) 60.00 km/hr
Watering Speed (Loaded) 2.50 km/hr
Tank Capacity 4,000.00 li
Water Loading Rate 3,000.00 li/hr
Spray Rate 3,600.00 li/hr
Sprayer Width 3.00 m
Fuel Consumption 16.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Load & Haul Water


Load Water 1.33 80.00
Haul Water 40.00 0.63 37.50

First Pass (one side)


Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80
Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80
First Pass (other side)
Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80
Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80

2nd Pass (one side)


Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80
Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80
2nd Pass (other side)
Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80
Maneuver 0.01 0.83
Spray Water 2.50 0.08 4.80

Return to Base
Travel to Base 60.00 0.42 25.00

Total 3.13 187.57

Productivity 71.97 m3/hr

Productivity 479.83 m2/hr


Water
Dispensed
(li)

-
-

-
288.00
-
288.00

-
288.00
-
288.00

-
288.00
-
288.00
-
288.00
-
288.00

2,304.00

1.54
PRODUCTIVITY CALCULATIONS
Bulk Excavation (Excavation & Stockpiling)

Trial Excavation Area


Parameter Quantity Unit
Segment Length 15.00 m
Segment Width 5.00 m
Depth of Cut 1.00 m
Area of Excavation 75.00 sm
Maximum Volume 75.00 m3

BACKHOE Cap = 0.80 cu.m

NORMAL SOIL

Equipment Specifications Backhoe Cap = 0.80 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 45.00 secs
Area Covered / Position 30.00 m2
Volume / Position 30.00 m3
Excavation Duration / Position 0.47 hrs
Number of Positions 2.50 positions
Total Excavation Duration 1.17 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

HARD SOIL
Equipment Specifications Backhoe Cap = 0.80 cu.m
Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 80.00 secs
Area Covered / Position 30.00 m2
Volume / Position 30.00 m3
Excavation Duration / Position 0.83 hrs
Number of Positions 2.50 positions
Total Excavation Duration 2.08 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

ROCKY SOIL

Equipment Specifications Backhoe Cap = 0.80 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 120.00 secs
Area Covered / Position 30.00 m2
Volume / Position 30.00 m3
Excavation Duration / Position 1.25 hrs
Number of Positions 2.50 positions
Total Excavation Duration 3.13 hrs Excluding Travel
Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

BACKHOE Cap = 1.00 cu.m

NORMAL SOIL

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 1.00 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 45.00 secs
Area Covered / Position 30.00 m2
Volume / Position 30.00 m3
Excavation Duration / Position 0.38 hrs
Number of Positions 2.50 positions
Total Excavation Duration 0.94 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

HARD SOIL

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 1.00 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 80.00 secs
Area Covered / Position 30.00 m2
Volume / Position 30.00 m3
Excavation Duration / Position 0.67 hrs
Number of Positions 2.50 positions
Total Excavation Duration 1.67 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

ROCKY SOIL

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 1.00 m3
Fuel Consumption 16.00 li/hr
Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 120.00 secs
Area Covered / Position 30.00 m2
Volume / Position 30.00 m3
Excavation Duration / Position 1.00 hrs
Number of Positions 2.50 positions
Total Excavation Duration 2.50 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity
Case Description
Case Description
15.00 Cut-Swing-Unload-Swing
25.00 Transfer Position
30.00
35.00 Maneuver

Stockpile Volume Position 30.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.01 0.75 0.80 0.80
- 0.01 0.75 0.80 1.60
- 0.01 0.75 0.80 2.40
- 0.01 0.75 0.80 3.20
- 0.01 0.75 0.80 4.00
- 0.01 0.75 0.80 4.80
- 0.01 0.75 0.80 5.60
- 0.01 0.75 0.80 6.40
- 0.01 0.75 0.80 7.20
- 0.01 0.75 0.80 8.00
- 0.01 0.75 0.80 8.80
- 0.01 0.75 0.80 9.60
- 0.01 0.75 0.80 10.40
- 0.01 0.75 0.80 11.20
- 0.01 0.75 0.80 12.00
- 0.01 0.75 0.80 12.80
- 0.01 0.75 0.80 13.60
- 0.01 0.75 0.80 14.40
- 0.01 0.75 0.80 15.20
- 0.01 0.75 0.80 16.00
- 0.01 0.75 0.80 16.80
- 0.01 0.75 0.80 17.60
- 0.01 0.75 0.80 18.40
- 0.01 0.75 0.80 19.20
- 0.01 0.75 0.80 20.00
- 0.01 0.75 0.80 20.80
- 0.01 0.75 0.80 21.60
- 0.01 0.75 0.80 22.40
- 0.01 0.75 0.80 23.20
- 0.01 0.75 0.80 24.00
- 0.01 0.75 0.80 24.80
- 0.01 0.75 0.80 25.60
- 0.01 0.75 0.80 26.40
- 0.01 0.75 0.80 27.20
- 0.01 0.75 0.80 28.00
- 0.01 0.75 0.80 28.80
- 0.01 0.75 0.80 29.60
- 0.01 0.75 0.80 30.40
0.00 0.00 0.14 - -
- 0.01 0.75 0.80 0.80
- 0.01 0.75 0.80 1.60
- 0.01 0.75 0.80 2.40
- 0.01 0.75 0.80 3.20
- 0.01 0.75 0.80 4.00
- 0.01 0.75 0.80 4.80
- 0.01 0.75 0.80 5.60
- 0.01 0.75 0.80 6.40
- 0.01 0.75 0.80 7.20
- 0.01 0.75 0.80 8.00
- 0.01 0.75 0.80 8.80
- 0.01 0.75 0.80 9.60
- 0.01 0.75 0.80 10.40
- 0.01 0.75 0.80 11.20
- 0.01 0.75 0.80 12.00
- 0.01 0.75 0.80 12.80
- 0.01 0.75 0.80 13.60
- 0.01 0.75 0.80 14.40
- 0.01 0.75 0.80 15.20
- 0.01 0.75 0.80 16.00
- 0.01 0.75 0.80 16.80
- 0.01 0.75 0.80 17.60
- 0.01 0.75 0.80 18.40
- 0.01 0.75 0.80 19.20
- 0.01 0.75 0.80 20.00
- 0.01 0.75 0.80 20.80
- 0.01 0.75 0.80 21.60
- 0.01 0.75 0.80 22.40
- 0.01 0.75 0.80 23.20
- 0.01 0.75 0.80 24.00
- 0.01 0.75 0.80 24.80
- 0.01 0.75 0.80 25.60
- 0.01 0.75 0.80 26.40
- 0.01 0.75 0.80 27.20
- 0.01 0.75 0.80 28.00
- 0.01 0.75 0.80 28.80
- 0.01 0.75 0.80 29.60
- 0.01 0.75 0.80 30.40
0.00 0.00 0.14 - -
- 0.01 0.75 0.80 0.80
- 0.01 0.75 0.80 1.60
- 0.01 0.75 0.80 2.40
- 0.01 0.75 0.80 3.20
- 0.01 0.75 0.80 4.00
- 0.01 0.75 0.80 4.80
- 0.01 0.75 0.80 5.60
- 0.01 0.75 0.80 6.40
- 0.01 0.75 0.80 7.20
- 0.01 0.75 0.80 8.00
- 0.01 0.75 0.80 8.80
- 0.01 0.75 0.80 9.60
- 0.01 0.75 0.80 10.40
- 0.01 0.75 0.80 11.20
- 0.01 0.75 0.80 12.00
- 0.01 0.75 0.80 12.80
- 0.01 0.75 0.80 13.60
- 0.01 0.75 0.80 14.40
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.35 25.75

55.86 m3/hr 75.2 m3


Stockpile Volume Position 30.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.33 0.80 0.80
- 0.02 1.33 0.80 1.60
- 0.02 1.33 0.80 2.40
- 0.02 1.33 0.80 3.20
- 0.02 1.33 0.80 4.00
- 0.02 1.33 0.80 4.80
- 0.02 1.33 0.80 5.60
- 0.02 1.33 0.80 6.40
- 0.02 1.33 0.80 7.20
- 0.02 1.33 0.80 8.00
- 0.02 1.33 0.80 8.80
- 0.02 1.33 0.80 9.60
- 0.02 1.33 0.80 10.40
- 0.02 1.33 0.80 11.20
- 0.02 1.33 0.80 12.00
- 0.02 1.33 0.80 12.80
- 0.02 1.33 0.80 13.60
- 0.02 1.33 0.80 14.40
- 0.02 1.33 0.80 15.20
- 0.02 1.33 0.80 16.00
- 0.02 1.33 0.80 16.80
- 0.02 1.33 0.80 17.60
- 0.02 1.33 0.80 18.40
- 0.02 1.33 0.80 19.20
- 0.02 1.33 0.80 20.00
- 0.02 1.33 0.80 20.80
- 0.02 1.33 0.80 21.60
- 0.02 1.33 0.80 22.40
- 0.02 1.33 0.80 23.20
- 0.02 1.33 0.80 24.00
- 0.02 1.33 0.80 24.80
- 0.02 1.33 0.80 25.60
- 0.02 1.33 0.80 26.40
- 0.02 1.33 0.80 27.20
- 0.02 1.33 0.80 28.00
- 0.02 1.33 0.80 28.80
- 0.02 1.33 0.80 29.60
- 0.02 1.33 0.80 30.40
0.00 0.00 0.14 - -
- 0.02 1.33 0.80 0.80
- 0.02 1.33 0.80 1.60
- 0.02 1.33 0.80 2.40
- 0.02 1.33 0.80 3.20
- 0.02 1.33 0.80 4.00
- 0.02 1.33 0.80 4.80
- 0.02 1.33 0.80 5.60
- 0.02 1.33 0.80 6.40
- 0.02 1.33 0.80 7.20
- 0.02 1.33 0.80 8.00
- 0.02 1.33 0.80 8.80
- 0.02 1.33 0.80 9.60
- 0.02 1.33 0.80 10.40
- 0.02 1.33 0.80 11.20
- 0.02 1.33 0.80 12.00
- 0.02 1.33 0.80 12.80
- 0.02 1.33 0.80 13.60
- 0.02 1.33 0.80 14.40
- 0.02 1.33 0.80 15.20
- 0.02 1.33 0.80 16.00
- 0.02 1.33 0.80 16.80
- 0.02 1.33 0.80 17.60
- 0.02 1.33 0.80 18.40
- 0.02 1.33 0.80 19.20
- 0.02 1.33 0.80 20.00
- 0.02 1.33 0.80 20.80
- 0.02 1.33 0.80 21.60
- 0.02 1.33 0.80 22.40
- 0.02 1.33 0.80 23.20
- 0.02 1.33 0.80 24.00
- 0.02 1.33 0.80 24.80
- 0.02 1.33 0.80 25.60
- 0.02 1.33 0.80 26.40
- 0.02 1.33 0.80 27.20
- 0.02 1.33 0.80 28.00
- 0.02 1.33 0.80 28.80
- 0.02 1.33 0.80 29.60
- 0.02 1.33 0.80 30.40
0.00 0.00 0.14 - -
- 0.02 1.33 0.80 0.80
- 0.02 1.33 0.80 1.60
- 0.02 1.33 0.80 2.40
- 0.02 1.33 0.80 3.20
- 0.02 1.33 0.80 4.00
- 0.02 1.33 0.80 4.80
- 0.02 1.33 0.80 5.60
- 0.02 1.33 0.80 6.40
- 0.02 1.33 0.80 7.20
- 0.02 1.33 0.80 8.00
- 0.02 1.33 0.80 8.80
- 0.02 1.33 0.80 9.60
- 0.02 1.33 0.80 10.40
- 0.02 1.33 0.80 11.20
- 0.02 1.33 0.80 12.00
- 0.02 1.33 0.80 12.80
- 0.02 1.33 0.80 13.60
- 0.02 1.33 0.80 14.40
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

2.26 38.00

33.27 m3/hr 75.2 m3


Stockpile Volume Position 30.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.03 2.00 0.80 0.80
- 0.03 2.00 0.80 1.60
- 0.03 2.00 0.80 2.40
- 0.03 2.00 0.80 3.20
- 0.03 2.00 0.80 4.00
- 0.03 2.00 0.80 4.80
- 0.03 2.00 0.80 5.60
- 0.03 2.00 0.80 6.40
- 0.03 2.00 0.80 7.20
- 0.03 2.00 0.80 8.00
- 0.03 2.00 0.80 8.80
- 0.03 2.00 0.80 9.60
- 0.03 2.00 0.80 10.40
- 0.03 2.00 0.80 11.20
- 0.03 2.00 0.80 12.00
- 0.03 2.00 0.80 12.80
- 0.03 2.00 0.80 13.60
- 0.03 2.00 0.80 14.40
- 0.03 2.00 0.80 15.20
- 0.03 2.00 0.80 16.00
- 0.03 2.00 0.80 16.80
- 0.03 2.00 0.80 17.60
- 0.03 2.00 0.80 18.40
- 0.03 2.00 0.80 19.20
- 0.03 2.00 0.80 20.00
- 0.03 2.00 0.80 20.80
- 0.03 2.00 0.80 21.60
- 0.03 2.00 0.80 22.40
- 0.03 2.00 0.80 23.20
- 0.03 2.00 0.80 24.00
- 0.03 2.00 0.80 24.80
- 0.03 2.00 0.80 25.60
- 0.03 2.00 0.80 26.40
- 0.03 2.00 0.80 27.20
- 0.03 2.00 0.80 28.00
- 0.03 2.00 0.80 28.80
- 0.03 2.00 0.80 29.60
- 0.03 2.00 0.80 30.40
0.00 0.00 0.14 - -
- 0.03 2.00 0.80 0.80
- 0.03 2.00 0.80 1.60
- 0.03 2.00 0.80 2.40
- 0.03 2.00 0.80 3.20
- 0.03 2.00 0.80 4.00
- 0.03 2.00 0.80 4.80
- 0.03 2.00 0.80 5.60
- 0.03 2.00 0.80 6.40
- 0.03 2.00 0.80 7.20
- 0.03 2.00 0.80 8.00
- 0.03 2.00 0.80 8.80
- 0.03 2.00 0.80 9.60
- 0.03 2.00 0.80 10.40
- 0.03 2.00 0.80 11.20
- 0.03 2.00 0.80 12.00
- 0.03 2.00 0.80 12.80
- 0.03 2.00 0.80 13.60
- 0.03 2.00 0.80 14.40
- 0.03 2.00 0.80 15.20
- 0.03 2.00 0.80 16.00
- 0.03 2.00 0.80 16.80
- 0.03 2.00 0.80 17.60
- 0.03 2.00 0.80 18.40
- 0.03 2.00 0.80 19.20
- 0.03 2.00 0.80 20.00
- 0.03 2.00 0.80 20.80
- 0.03 2.00 0.80 21.60
- 0.03 2.00 0.80 22.40
- 0.03 2.00 0.80 23.20
- 0.03 2.00 0.80 24.00
- 0.03 2.00 0.80 24.80
- 0.03 2.00 0.80 25.60
- 0.03 2.00 0.80 26.40
- 0.03 2.00 0.80 27.20
- 0.03 2.00 0.80 28.00
- 0.03 2.00 0.80 28.80
- 0.03 2.00 0.80 29.60
- 0.03 2.00 0.80 30.40
0.00 0.00 0.14 - -
- 0.03 2.00 0.80 0.80
- 0.03 2.00 0.80 1.60
- 0.03 2.00 0.80 2.40
- 0.03 2.00 0.80 3.20
- 0.03 2.00 0.80 4.00
- 0.03 2.00 0.80 4.80
- 0.03 2.00 0.80 5.60
- 0.03 2.00 0.80 6.40
- 0.03 2.00 0.80 7.20
- 0.03 2.00 0.80 8.00
- 0.03 2.00 0.80 8.80
- 0.03 2.00 0.80 9.60
- 0.03 2.00 0.80 10.40
- 0.03 2.00 0.80 11.20
- 0.03 2.00 0.80 12.00
- 0.03 2.00 0.80 12.80
- 0.03 2.00 0.80 13.60
- 0.03 2.00 0.80 14.40
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

3.30 52.00

22.76 m3/hr 75.2 m3

Stockpile Volume Position 30.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.01 0.75 1.00 1.00
- 0.01 0.75 0.80 1.80
- 0.01 0.75 0.80 2.60
- 0.01 0.75 0.80 3.40
- 0.01 0.75 0.80 4.20
- 0.01 0.75 0.80 5.00
- 0.01 0.75 0.80 5.80
- 0.01 0.75 0.80 6.60
- 0.01 0.75 0.80 7.40
- 0.01 0.75 0.80 8.20
- 0.01 0.75 0.80 9.00
- 0.01 0.75 0.80 9.80
- 0.01 0.75 0.80 10.60
- 0.01 0.75 0.80 11.40
- 0.01 0.75 0.80 12.20
- 0.01 0.75 0.80 13.00
- 0.01 0.75 0.80 13.80
- 0.01 0.75 0.80 14.60
- 0.01 0.75 0.80 15.40
- 0.01 0.75 0.80 16.20
- 0.01 0.75 0.80 17.00
- 0.01 0.75 0.80 17.80
- 0.01 0.75 0.80 18.60
- 0.01 0.75 0.80 19.40
- 0.01 0.75 0.80 20.20
- 0.01 0.75 0.80 21.00
- 0.01 0.75 0.80 21.80
- 0.01 0.75 0.80 22.60
- 0.01 0.75 0.80 23.40
- 0.01 0.75 0.80 24.20
- 0.01 0.75 0.80 25.00
- 0.01 0.75 0.80 25.80
- 0.01 0.75 0.80 26.60
- 0.01 0.75 0.80 27.40
- 0.01 0.75 0.80 28.20
- 0.01 0.75 0.80 29.00
- 0.01 0.75 0.80 29.80
- 0.01 0.75 0.80 30.60
0.00 0.00 0.14 - -
- 0.01 0.75 0.80 0.80
- 0.01 0.75 0.80 1.60
- 0.01 0.75 0.80 2.40
- 0.01 0.75 0.80 3.20
- 0.01 0.75 0.80 4.00
- 0.01 0.75 0.80 4.80
- 0.01 0.75 0.80 5.60
- 0.01 0.75 0.80 6.40
- 0.01 0.75 0.80 7.20
- 0.01 0.75 0.80 8.00
- 0.01 0.75 0.80 8.80
- 0.01 0.75 0.80 9.60
- 0.01 0.75 0.80 10.40
- 0.01 0.75 0.80 11.20
- 0.01 0.75 0.80 12.00
- 0.01 0.75 0.80 12.80
- 0.01 0.75 0.80 13.60
- 0.01 0.75 0.80 14.40
- 0.01 0.75 0.80 15.20
- 0.01 0.75 0.80 16.00
- 0.01 0.75 0.80 16.80
- 0.01 0.75 0.80 17.60
- 0.01 0.75 0.80 18.40
- 0.01 0.75 0.80 19.20
- 0.01 0.75 0.80 20.00
- 0.01 0.75 0.80 20.80
- 0.01 0.75 0.80 21.60
- 0.01 0.75 0.80 22.40
- 0.01 0.75 0.80 23.20
- 0.01 0.75 0.80 24.00
- 0.01 0.75 0.80 24.80
- 0.01 0.75 0.80 25.60
- 0.01 0.75 0.80 26.40
- 0.01 0.75 0.80 27.20
- 0.01 0.75 0.80 28.00
- 0.01 0.75 0.80 28.80
- 0.01 0.75 0.80 29.60
- 0.01 0.75 0.80 30.40
0.00 0.00 0.14 - -
- 0.01 0.75 0.80 0.80
- 0.01 0.75 0.80 1.60
- 0.01 0.75 0.80 2.40
- 0.01 0.75 0.80 3.20
- 0.01 0.75 0.80 4.00
- 0.01 0.75 0.80 4.80
- 0.01 0.75 0.80 5.60
- 0.01 0.75 0.80 6.40
- 0.01 0.75 0.80 7.20
- 0.01 0.75 0.80 8.00
- 0.01 0.75 0.80 8.80
- 0.01 0.75 0.80 9.60
- 0.01 0.75 0.80 10.40
- 0.01 0.75 0.80 11.20
- 0.01 0.75 0.80 12.00
- 0.01 0.75 0.80 12.80
- 0.01 0.75 0.80 13.60
- 0.01 0.75 0.80 14.40
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.35 25.75

56.01 m3/hr 75.4 m3

Stockpile Volume Position 30.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.33 1.00 1.00
- 0.02 1.33 0.80 1.80
- 0.02 1.33 0.80 2.60
- 0.02 1.33 0.80 3.40
- 0.02 1.33 0.80 4.20
- 0.02 1.33 0.80 5.00
- 0.02 1.33 0.80 5.80
- 0.02 1.33 0.80 6.60
- 0.02 1.33 0.80 7.40
- 0.02 1.33 0.80 8.20
- 0.02 1.33 0.80 9.00
- 0.02 1.33 0.80 9.80
- 0.02 1.33 0.80 10.60
- 0.02 1.33 0.80 11.40
- 0.02 1.33 0.80 12.20
- 0.02 1.33 0.80 13.00
- 0.02 1.33 0.80 13.80
- 0.02 1.33 0.80 14.60
- 0.02 1.33 0.80 15.40
- 0.02 1.33 0.80 16.20
- 0.02 1.33 0.80 17.00
- 0.02 1.33 0.80 17.80
- 0.02 1.33 0.80 18.60
- 0.02 1.33 0.80 19.40
- 0.02 1.33 0.80 20.20
- 0.02 1.33 0.80 21.00
- 0.02 1.33 0.80 21.80
- 0.02 1.33 0.80 22.60
- 0.02 1.33 0.80 23.40
- 0.02 1.33 0.80 24.20
- 0.02 1.33 0.80 25.00
- 0.02 1.33 0.80 25.80
- 0.02 1.33 0.80 26.60
- 0.02 1.33 0.80 27.40
- 0.02 1.33 0.80 28.20
- 0.02 1.33 0.80 29.00
- 0.02 1.33 0.80 29.80
- 0.02 1.33 0.80 30.60
0.00 0.00 0.14 - -
- 0.02 1.33 0.80 0.80
- 0.02 1.33 0.80 1.60
- 0.02 1.33 0.80 2.40
- 0.02 1.33 0.80 3.20
- 0.02 1.33 0.80 4.00
- 0.02 1.33 0.80 4.80
- 0.02 1.33 0.80 5.60
- 0.02 1.33 0.80 6.40
- 0.02 1.33 0.80 7.20
- 0.02 1.33 0.80 8.00
- 0.02 1.33 0.80 8.80
- 0.02 1.33 0.80 9.60
- 0.02 1.33 0.80 10.40
- 0.02 1.33 0.80 11.20
- 0.02 1.33 0.80 12.00
- 0.02 1.33 0.80 12.80
- 0.02 1.33 0.80 13.60
- 0.02 1.33 0.80 14.40
- 0.02 1.33 0.80 15.20
- 0.02 1.33 0.80 16.00
- 0.02 1.33 0.80 16.80
- 0.02 1.33 0.80 17.60
- 0.02 1.33 0.80 18.40
- 0.02 1.33 0.80 19.20
- 0.02 1.33 0.80 20.00
- 0.02 1.33 0.80 20.80
- 0.02 1.33 0.80 21.60
- 0.02 1.33 0.80 22.40
- 0.02 1.33 0.80 23.20
- 0.02 1.33 0.80 24.00
- 0.02 1.33 0.80 24.80
- 0.02 1.33 0.80 25.60
- 0.02 1.33 0.80 26.40
- 0.02 1.33 0.80 27.20
- 0.02 1.33 0.80 28.00
- 0.02 1.33 0.80 28.80
- 0.02 1.33 0.80 29.60
- 0.02 1.33 0.80 30.40
0.00 0.00 0.14 - -
- 0.02 1.33 0.80 0.80
- 0.02 1.33 0.80 1.60
- 0.02 1.33 0.80 2.40
- 0.02 1.33 0.80 3.20
- 0.02 1.33 0.80 4.00
- 0.02 1.33 0.80 4.80
- 0.02 1.33 0.80 5.60
- 0.02 1.33 0.80 6.40
- 0.02 1.33 0.80 7.20
- 0.02 1.33 0.80 8.00
- 0.02 1.33 0.80 8.80
- 0.02 1.33 0.80 9.60
- 0.02 1.33 0.80 10.40
- 0.02 1.33 0.80 11.20
- 0.02 1.33 0.80 12.00
- 0.02 1.33 0.80 12.80
- 0.02 1.33 0.80 13.60
- 0.02 1.33 0.80 14.40
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

2.26 38.00

33.36 m3/hr 75.4 m3


Stockpile Volume Position 30.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.03 2.00 1.00 1.00
- 0.03 2.00 0.80 1.80
- 0.03 2.00 0.80 2.60
- 0.03 2.00 0.80 3.40
- 0.03 2.00 0.80 4.20
- 0.03 2.00 0.80 5.00
- 0.03 2.00 0.80 5.80
- 0.03 2.00 0.80 6.60
- 0.03 2.00 0.80 7.40
- 0.03 2.00 0.80 8.20
- 0.03 2.00 0.80 9.00
- 0.03 2.00 0.80 9.80
- 0.03 2.00 0.80 10.60
- 0.03 2.00 0.80 11.40
- 0.03 2.00 0.80 12.20
- 0.03 2.00 0.80 13.00
- 0.03 2.00 0.80 13.80
- 0.03 2.00 0.80 14.60
- 0.03 2.00 0.80 15.40
- 0.03 2.00 0.80 16.20
- 0.03 2.00 0.80 17.00
- 0.03 2.00 0.80 17.80
- 0.03 2.00 0.80 18.60
- 0.03 2.00 0.80 19.40
- 0.03 2.00 0.80 20.20
- 0.03 2.00 0.80 21.00
- 0.03 2.00 0.80 21.80
- 0.03 2.00 0.80 22.60
- 0.03 2.00 0.80 23.40
- 0.03 2.00 0.80 24.20
- 0.03 2.00 0.80 25.00
- 0.03 2.00 0.80 25.80
- 0.03 2.00 0.80 26.60
- 0.03 2.00 0.80 27.40
- 0.03 2.00 0.80 28.20
- 0.03 2.00 0.80 29.00
- 0.03 2.00 0.80 29.80
- 0.03 2.00 0.80 30.60
0.00 0.00 0.14 - -
- 0.03 2.00 0.80 0.80
- 0.03 2.00 0.80 1.60
- 0.03 2.00 0.80 2.40
- 0.03 2.00 0.80 3.20
- 0.03 2.00 0.80 4.00
- 0.03 2.00 0.80 4.80
- 0.03 2.00 0.80 5.60
- 0.03 2.00 0.80 6.40
- 0.03 2.00 0.80 7.20
- 0.03 2.00 0.80 8.00
- 0.03 2.00 0.80 8.80
- 0.03 2.00 0.80 9.60
- 0.03 2.00 0.80 10.40
- 0.03 2.00 0.80 11.20
- 0.03 2.00 0.80 12.00
- 0.03 2.00 0.80 12.80
- 0.03 2.00 0.80 13.60
- 0.03 2.00 0.80 14.40
- 0.03 2.00 0.80 15.20
- 0.03 2.00 0.80 16.00
- 0.03 2.00 0.80 16.80
- 0.03 2.00 0.80 17.60
- 0.03 2.00 0.80 18.40
- 0.03 2.00 0.80 19.20
- 0.03 2.00 0.80 20.00
- 0.03 2.00 0.80 20.80
- 0.03 2.00 0.80 21.60
- 0.03 2.00 0.80 22.40
- 0.03 2.00 0.80 23.20
- 0.03 2.00 0.80 24.00
- 0.03 2.00 0.80 24.80
- 0.03 2.00 0.80 25.60
- 0.03 2.00 0.80 26.40
- 0.03 2.00 0.80 27.20
- 0.03 2.00 0.80 28.00
- 0.03 2.00 0.80 28.80
- 0.03 2.00 0.80 29.60
- 0.03 2.00 0.80 30.40
0.00 0.00 0.14 - -
- 0.03 2.00 0.80 0.80
- 0.03 2.00 0.80 1.60
- 0.03 2.00 0.80 2.40
- 0.03 2.00 0.80 3.20
- 0.03 2.00 0.80 4.00
- 0.03 2.00 0.80 4.80
- 0.03 2.00 0.80 5.60
- 0.03 2.00 0.80 6.40
- 0.03 2.00 0.80 7.20
- 0.03 2.00 0.80 8.00
- 0.03 2.00 0.80 8.80
- 0.03 2.00 0.80 9.60
- 0.03 2.00 0.80 10.40
- 0.03 2.00 0.80 11.20
- 0.03 2.00 0.80 12.00
- 0.03 2.00 0.80 12.80
- 0.03 2.00 0.80 13.60
- 0.03 2.00 0.80 14.40
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

3.30 52.00

22.82 m3/hr 75.4 m3


Stockpile 75.00 cu.m
Volume (m3)
Stockpile
Cycle Running Total

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
0.80 6.40
0.80 7.20
0.80 8.00
0.80 8.80
0.80 9.60
0.80 10.40
0.80 11.20
0.80 12.00
0.80 12.80
0.80 13.60
0.80 14.40
0.80 15.20
0.80 16.00
0.80 16.80
0.80 17.60
0.80 18.40
0.80 19.20
0.80 20.00
0.80 20.80
0.80 21.60
0.80 22.40
0.80 23.20
0.80 24.00
0.80 24.80
0.80 25.60
0.80 26.40
0.80 27.20
0.80 28.00
0.80 28.80
0.80 29.60
0.80 30.40
- 30.40
0.80 31.20
0.80 32.00
0.80 32.80
0.80 33.60
0.80 34.40
0.80 35.20
0.80 36.00
0.80 36.80
0.80 37.60
0.80 38.40
0.80 39.20
0.80 40.00
0.80 40.80
0.80 41.60
0.80 42.40
0.80 43.20
0.80 44.00
0.80 44.80
0.80 45.60
0.80 46.40
0.80 47.20
0.80 48.00
0.80 48.80
0.80 49.60
0.80 50.40
0.80 51.20
0.80 52.00
0.80 52.80
0.80 53.60
0.80 54.40
0.80 55.20
0.80 56.00
0.80 56.80
0.80 57.60
0.80 58.40
0.80 59.20
0.80 60.00
0.80 60.80
- 60.80
0.80 61.60
0.80 62.40
0.80 63.20
0.80 64.00
0.80 64.80
0.80 65.60
0.80 66.40
0.80 67.20
0.80 68.00
0.80 68.80
0.80 69.60
0.80 70.40
0.80 71.20
0.80 72.00
0.80 72.80
0.80 73.60
0.80 74.40
0.80 75.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

75.2 m3
Stockpile 75.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
0.80 6.40
0.80 7.20
0.80 8.00
0.80 8.80
0.80 9.60
0.80 10.40
0.80 11.20
0.80 12.00
0.80 12.80
0.80 13.60
0.80 14.40
0.80 15.20
0.80 16.00
0.80 16.80
0.80 17.60
0.80 18.40
0.80 19.20
0.80 20.00
0.80 20.80
0.80 21.60
0.80 22.40
0.80 23.20
0.80 24.00
0.80 24.80
0.80 25.60
0.80 26.40
0.80 27.20
0.80 28.00
0.80 28.80
0.80 29.60
0.80 30.40
- 30.40
0.80 31.20
0.80 32.00
0.80 32.80
0.80 33.60
0.80 34.40
0.80 35.20
0.80 36.00
0.80 36.80
0.80 37.60
0.80 38.40
0.80 39.20
0.80 40.00
0.80 40.80
0.80 41.60
0.80 42.40
0.80 43.20
0.80 44.00
0.80 44.80
0.80 45.60
0.80 46.40
0.80 47.20
0.80 48.00
0.80 48.80
0.80 49.60
0.80 50.40
0.80 51.20
0.80 52.00
0.80 52.80
0.80 53.60
0.80 54.40
0.80 55.20
0.80 56.00
0.80 56.80
0.80 57.60
0.80 58.40
0.80 59.20
0.80 60.00
0.80 60.80
- 60.80
0.80 61.60
0.80 62.40
0.80 63.20
0.80 64.00
0.80 64.80
0.80 65.60
0.80 66.40
0.80 67.20
0.80 68.00
0.80 68.80
0.80 69.60
0.80 70.40
0.80 71.20
0.80 72.00
0.80 72.80
0.80 73.60
0.80 74.40
0.80 75.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

75.2 m3
Stockpile 75.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
0.80 6.40
0.80 7.20
0.80 8.00
0.80 8.80
0.80 9.60
0.80 10.40
0.80 11.20
0.80 12.00
0.80 12.80
0.80 13.60
0.80 14.40
0.80 15.20
0.80 16.00
0.80 16.80
0.80 17.60
0.80 18.40
0.80 19.20
0.80 20.00
0.80 20.80
0.80 21.60
0.80 22.40
0.80 23.20
0.80 24.00
0.80 24.80
0.80 25.60
0.80 26.40
0.80 27.20
0.80 28.00
0.80 28.80
0.80 29.60
0.80 30.40
- 30.40
0.80 31.20
0.80 32.00
0.80 32.80
0.80 33.60
0.80 34.40
0.80 35.20
0.80 36.00
0.80 36.80
0.80 37.60
0.80 38.40
0.80 39.20
0.80 40.00
0.80 40.80
0.80 41.60
0.80 42.40
0.80 43.20
0.80 44.00
0.80 44.80
0.80 45.60
0.80 46.40
0.80 47.20
0.80 48.00
0.80 48.80
0.80 49.60
0.80 50.40
0.80 51.20
0.80 52.00
0.80 52.80
0.80 53.60
0.80 54.40
0.80 55.20
0.80 56.00
0.80 56.80
0.80 57.60
0.80 58.40
0.80 59.20
0.80 60.00
0.80 60.80
- 60.80
0.80 61.60
0.80 62.40
0.80 63.20
0.80 64.00
0.80 64.80
0.80 65.60
0.80 66.40
0.80 67.20
0.80 68.00
0.80 68.80
0.80 69.60
0.80 70.40
0.80 71.20
0.80 72.00
0.80 72.80
0.80 73.60
0.80 74.40
0.80 75.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

75.2 m3

Stockpile 75.00 cu.m


Volume (m )
3

Stockpile
Cycle Running Total

1.00 1.00
0.80 1.80
0.80 2.60
0.80 3.40
0.80 4.20
0.80 5.00
0.80 5.80
0.80 6.60
0.80 7.40
0.80 8.20
0.80 9.00
0.80 9.80
0.80 10.60
0.80 11.40
0.80 12.20
0.80 13.00
0.80 13.80
0.80 14.60
0.80 15.40
0.80 16.20
0.80 17.00
0.80 17.80
0.80 18.60
0.80 19.40
0.80 20.20
0.80 21.00
0.80 21.80
0.80 22.60
0.80 23.40
0.80 24.20
0.80 25.00
0.80 25.80
0.80 26.60
0.80 27.40
0.80 28.20
0.80 29.00
0.80 29.80
0.80 30.60
- 30.60
0.80 31.40
0.80 32.20
0.80 33.00
0.80 33.80
0.80 34.60
0.80 35.40
0.80 36.20
0.80 37.00
0.80 37.80
0.80 38.60
0.80 39.40
0.80 40.20
0.80 41.00
0.80 41.80
0.80 42.60
0.80 43.40
0.80 44.20
0.80 45.00
0.80 45.80
0.80 46.60
0.80 47.40
0.80 48.20
0.80 49.00
0.80 49.80
0.80 50.60
0.80 51.40
0.80 52.20
0.80 53.00
0.80 53.80
0.80 54.60
0.80 55.40
0.80 56.20
0.80 57.00
0.80 57.80
0.80 58.60
0.80 59.40
0.80 60.20
0.80 61.00
- 61.00
0.80 61.80
0.80 62.60
0.80 63.40
0.80 64.20
0.80 65.00
0.80 65.80
0.80 66.60
0.80 67.40
0.80 68.20
0.80 69.00
0.80 69.80
0.80 70.60
0.80 71.40
0.80 72.20
0.80 73.00
0.80 73.80
0.80 74.60
0.80 75.40
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

75.4 m3

Stockpile 75.00 cu.m


Volume (m3)
Stockpile
Cycle Running Total

1.00 1.00
0.80 1.80
0.80 2.60
0.80 3.40
0.80 4.20
0.80 5.00
0.80 5.80
0.80 6.60
0.80 7.40
0.80 8.20
0.80 9.00
0.80 9.80
0.80 10.60
0.80 11.40
0.80 12.20
0.80 13.00
0.80 13.80
0.80 14.60
0.80 15.40
0.80 16.20
0.80 17.00
0.80 17.80
0.80 18.60
0.80 19.40
0.80 20.20
0.80 21.00
0.80 21.80
0.80 22.60
0.80 23.40
0.80 24.20
0.80 25.00
0.80 25.80
0.80 26.60
0.80 27.40
0.80 28.20
0.80 29.00
0.80 29.80
0.80 30.60
- 30.60
0.80 31.40
0.80 32.20
0.80 33.00
0.80 33.80
0.80 34.60
0.80 35.40
0.80 36.20
0.80 37.00
0.80 37.80
0.80 38.60
0.80 39.40
0.80 40.20
0.80 41.00
0.80 41.80
0.80 42.60
0.80 43.40
0.80 44.20
0.80 45.00
0.80 45.80
0.80 46.60
0.80 47.40
0.80 48.20
0.80 49.00
0.80 49.80
0.80 50.60
0.80 51.40
0.80 52.20
0.80 53.00
0.80 53.80
0.80 54.60
0.80 55.40
0.80 56.20
0.80 57.00
0.80 57.80
0.80 58.60
0.80 59.40
0.80 60.20
0.80 61.00
- 61.00
0.80 61.80
0.80 62.60
0.80 63.40
0.80 64.20
0.80 65.00
0.80 65.80
0.80 66.60
0.80 67.40
0.80 68.20
0.80 69.00
0.80 69.80
0.80 70.60
0.80 71.40
0.80 72.20
0.80 73.00
0.80 73.80
0.80 74.60
0.80 75.40
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

75.4 m3
Stockpile 75.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

1.00 1.00
0.80 1.80
0.80 2.60
0.80 3.40
0.80 4.20
0.80 5.00
0.80 5.80
0.80 6.60
0.80 7.40
0.80 8.20
0.80 9.00
0.80 9.80
0.80 10.60
0.80 11.40
0.80 12.20
0.80 13.00
0.80 13.80
0.80 14.60
0.80 15.40
0.80 16.20
0.80 17.00
0.80 17.80
0.80 18.60
0.80 19.40
0.80 20.20
0.80 21.00
0.80 21.80
0.80 22.60
0.80 23.40
0.80 24.20
0.80 25.00
0.80 25.80
0.80 26.60
0.80 27.40
0.80 28.20
0.80 29.00
0.80 29.80
0.80 30.60
- 30.60
0.80 31.40
0.80 32.20
0.80 33.00
0.80 33.80
0.80 34.60
0.80 35.40
0.80 36.20
0.80 37.00
0.80 37.80
0.80 38.60
0.80 39.40
0.80 40.20
0.80 41.00
0.80 41.80
0.80 42.60
0.80 43.40
0.80 44.20
0.80 45.00
0.80 45.80
0.80 46.60
0.80 47.40
0.80 48.20
0.80 49.00
0.80 49.80
0.80 50.60
0.80 51.40
0.80 52.20
0.80 53.00
0.80 53.80
0.80 54.60
0.80 55.40
0.80 56.20
0.80 57.00
0.80 57.80
0.80 58.60
0.80 59.40
0.80 60.20
0.80 61.00
- 61.00
0.80 61.80
0.80 62.60
0.80 63.40
0.80 64.20
0.80 65.00
0.80 65.80
0.80 66.60
0.80 67.40
0.80 68.20
0.80 69.00
0.80 69.80
0.80 70.60
0.80 71.40
0.80 72.20
0.80 73.00
0.80 73.80
0.80 74.60
0.80 75.40
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

75.4 m3
PRODUCTIVITY CALCULATIONS
Foundation Excavation Excavation & Stockpiling

Trial Excavation Area


Parameter Quantity Unit Remark
Segment Length 26.00 m
Segment Width 8.00 m
Depth of Excavation 2.00 m
Area of Excavation 40.00 sm 10 Footings
Maximum Volume 80.00 m3

BACKHOE Cap = 0.80 cu.m

NORMAL SOIL

Equipment Specifications Backhoe Cap = 0.80 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 60.00 secs
Area Covered / Position 4.00 m2
Volume / Position 8.00 m3
Excavation Duration / Position 0.17 hrs
Number of Positions 10.00 positions
Total Excavation Duration 1.67 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity
HARD SOIL

Equipment Specifications Backhoe Cap = 0.80 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 95.00 secs
Area Covered / Position 4.00 m2
Volume / Position 8.00 m3
Excavation Duration / Position 0.26 hrs
Number of Positions 10.00 positions
Total Excavation Duration 2.64 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

ROCKY SOIL

Equipment Specifications Backhoe Cap = 0.80 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 135.00 secs
Area Covered / Position 4.00 m2
Volume / Position 8.00 m3
Excavation Duration / Position 0.38 hrs
Number of Positions 10.00 positions
Total Excavation Duration 3.75 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

BACKHOE Cap = 1.00 cu.m

NORMAL SOIL

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 1.00 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 60.00 secs
Area Covered / Position 4.00 m2
Volume / Position 8.00 m3
Excavation Duration / Position 0.13 hrs
Number of Positions 10.00 positions
Total Excavation Duration 1.33 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

HARD SOIL

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 1.00 m3
Fuel Consumption 16.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 95.00 secs
Area Covered / Position 4.00 m2
Volume / Position 8.00 m3
Excavation Duration / Position 0.21 hrs
Number of Positions 10.00 positions
Total Excavation Duration 2.11 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Transfer Position - -
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
Cut-Swing-Unload-Swing - 0.03
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

ROCKY SOIL

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 1.00 m3
Fuel Consumption 16.00 li/hr
Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 135.00 secs
Area Covered / Position 4.00 m2
Volume / Position 8.00 m3
Excavation Duration / Position 0.30 hrs
Number of Positions 10.00 positions
Total Excavation Duration 3.00 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Transfer Position - -
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
Cut-Swing-Unload-Swing - 0.04
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity
Case Description
Remarks Case Description
15.00 Cut-Swing-Unload-Swing
25.00 Transfer Position
30.00
Length: 2.00 m Width: 2.00 m 35.00 Maneuver

Stockpile Volume Position 8.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.99 31.06

40.16 m3/hr 80 m3
Stockpile Volume Position 8.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

2.96 42.73

26.99 m3/hr 80 m3
Stockpile Volume Position 8.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

4.08 56.06

19.63 m3/hr 80 m3

Stockpile Volume Position 8.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.00 1.00 1.00
- 0.02 1.00 0.80 1.80
- 0.02 1.00 0.80 2.60
- 0.02 1.00 0.80 3.40
- 0.02 1.00 0.80 4.20
- 0.02 1.00 0.80 5.00
- 0.02 1.00 0.80 5.80
- 0.02 1.00 0.80 6.60
- 0.02 1.00 0.80 7.40
- 0.02 1.00 0.80 8.20
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
0.02 0.02 1.06 - -
- 0.02 1.00 0.80 0.80
- 0.02 1.00 0.80 1.60
- 0.02 1.00 0.80 2.40
- 0.02 1.00 0.80 3.20
- 0.02 1.00 0.80 4.00
- 0.02 1.00 0.80 4.80
- 0.02 1.00 0.80 5.60
- 0.02 1.00 0.80 6.40
- 0.02 1.00 0.80 7.20
- 0.02 1.00 0.80 8.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.99 31.06

40.26 m3/hr 80.2 m3

Stockpile Volume Position 8.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.03 1.58 1.00 1.00
- 0.03 1.58 0.80 1.80
- 0.03 1.58 0.80 2.60
- 0.03 1.58 0.80 3.40
- 0.03 1.58 0.80 4.20
- 0.03 1.58 0.80 5.00
- 0.03 1.58 0.80 5.80
- 0.03 1.58 0.80 6.60
- 0.03 1.58 0.80 7.40
- 0.03 1.58 0.80 8.20
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
0.02 0.02 1.06 - -
- 0.03 1.58 0.80 0.80
- 0.03 1.58 0.80 1.60
- 0.03 1.58 0.80 2.40
- 0.03 1.58 0.80 3.20
- 0.03 1.58 0.80 4.00
- 0.03 1.58 0.80 4.80
- 0.03 1.58 0.80 5.60
- 0.03 1.58 0.80 6.40
- 0.03 1.58 0.80 7.20
- 0.03 1.58 0.80 8.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

2.96 42.73

27.05 m3/hr 80.2 m3


Stockpile Volume Position 8.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.04 2.25 1.00 1.00
- 0.04 2.25 0.80 1.80
- 0.04 2.25 0.80 2.60
- 0.04 2.25 0.80 3.40
- 0.04 2.25 0.80 4.20
- 0.04 2.25 0.80 5.00
- 0.04 2.25 0.80 5.80
- 0.04 2.25 0.80 6.60
- 0.04 2.25 0.80 7.40
- 0.04 2.25 0.80 8.20
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
0.02 0.02 1.06 - -
- 0.04 2.25 0.80 0.80
- 0.04 2.25 0.80 1.60
- 0.04 2.25 0.80 2.40
- 0.04 2.25 0.80 3.20
- 0.04 2.25 0.80 4.00
- 0.04 2.25 0.80 4.80
- 0.04 2.25 0.80 5.60
- 0.04 2.25 0.80 6.40
- 0.04 2.25 0.80 7.20
- 0.04 2.25 0.80 8.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

4.08 56.06

19.68 m3/hr 80.2 m3


Description
wing-Unload-Swing
er Position

uver

Stockpile 80.00 cu.m


Volume (m3)
Stockpile
Cycle Running Total

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
0.80 6.40
0.80 7.20
0.80 8.00
- 8.00
0.80 8.80
0.80 9.60
0.80 10.40
0.80 11.20
0.80 12.00
0.80 12.80
0.80 13.60
0.80 14.40
0.80 15.20
0.80 16.00
- 16.00
0.80 16.80
0.80 17.60
0.80 18.40
0.80 19.20
0.80 20.00
0.80 20.80
0.80 21.60
0.80 22.40
0.80 23.20
0.80 24.00
- 24.00
0.80 24.80
0.80 25.60
0.80 26.40
0.80 27.20
0.80 28.00
0.80 28.80
0.80 29.60
0.80 30.40
0.80 31.20
0.80 32.00
- 32.00
0.80 32.80
0.80 33.60
0.80 34.40
0.80 35.20
0.80 36.00
0.80 36.80
0.80 37.60
0.80 38.40
0.80 39.20
0.80 40.00
- 40.00
0.80 40.80
0.80 41.60
0.80 42.40
0.80 43.20
0.80 44.00
0.80 44.80
0.80 45.60
0.80 46.40
0.80 47.20
0.80 48.00
- 48.00
0.80 48.80
0.80 49.60
0.80 50.40
0.80 51.20
0.80 52.00
0.80 52.80
0.80 53.60
0.80 54.40
0.80 55.20
0.80 56.00
- 56.00
0.80 56.80
0.80 57.60
0.80 58.40
0.80 59.20
0.80 60.00
0.80 60.80
0.80 61.60
0.80 62.40
0.80 63.20
0.80 64.00
- 64.00
0.80 64.80
0.80 65.60
0.80 66.40
0.80 67.20
0.80 68.00
0.80 68.80
0.80 69.60
0.80 70.40
0.80 71.20
0.80 72.00
- 72.00
0.80 72.80
0.80 73.60
0.80 74.40
0.80 75.20
0.80 76.00
0.80 76.80
0.80 77.60
0.80 78.40
0.80 79.20
0.80 80.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

80 m3
Stockpile 80.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
0.80 6.40
0.80 7.20
0.80 8.00
- 8.00
0.80 8.80
0.80 9.60
0.80 10.40
0.80 11.20
0.80 12.00
0.80 12.80
0.80 13.60
0.80 14.40
0.80 15.20
0.80 16.00
- 16.00
0.80 16.80
0.80 17.60
0.80 18.40
0.80 19.20
0.80 20.00
0.80 20.80
0.80 21.60
0.80 22.40
0.80 23.20
0.80 24.00
- 24.00
0.80 24.80
0.80 25.60
0.80 26.40
0.80 27.20
0.80 28.00
0.80 28.80
0.80 29.60
0.80 30.40
0.80 31.20
0.80 32.00
- 32.00
0.80 32.80
0.80 33.60
0.80 34.40
0.80 35.20
0.80 36.00
0.80 36.80
0.80 37.60
0.80 38.40
0.80 39.20
0.80 40.00
- 40.00
0.80 40.80
0.80 41.60
0.80 42.40
0.80 43.20
0.80 44.00
0.80 44.80
0.80 45.60
0.80 46.40
0.80 47.20
0.80 48.00
- 48.00
0.80 48.80
0.80 49.60
0.80 50.40
0.80 51.20
0.80 52.00
0.80 52.80
0.80 53.60
0.80 54.40
0.80 55.20
0.80 56.00
- 56.00
0.80 56.80
0.80 57.60
0.80 58.40
0.80 59.20
0.80 60.00
0.80 60.80
0.80 61.60
0.80 62.40
0.80 63.20
0.80 64.00
- 64.00
0.80 64.80
0.80 65.60
0.80 66.40
0.80 67.20
0.80 68.00
0.80 68.80
0.80 69.60
0.80 70.40
0.80 71.20
0.80 72.00
- 72.00
0.80 72.80
0.80 73.60
0.80 74.40
0.80 75.20
0.80 76.00
0.80 76.80
0.80 77.60
0.80 78.40
0.80 79.20
0.80 80.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

80 m3
Stockpile 80.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
0.80 6.40
0.80 7.20
0.80 8.00
- 8.00
0.80 8.80
0.80 9.60
0.80 10.40
0.80 11.20
0.80 12.00
0.80 12.80
0.80 13.60
0.80 14.40
0.80 15.20
0.80 16.00
- 16.00
0.80 16.80
0.80 17.60
0.80 18.40
0.80 19.20
0.80 20.00
0.80 20.80
0.80 21.60
0.80 22.40
0.80 23.20
0.80 24.00
- 24.00
0.80 24.80
0.80 25.60
0.80 26.40
0.80 27.20
0.80 28.00
0.80 28.80
0.80 29.60
0.80 30.40
0.80 31.20
0.80 32.00
- 32.00
0.80 32.80
0.80 33.60
0.80 34.40
0.80 35.20
0.80 36.00
0.80 36.80
0.80 37.60
0.80 38.40
0.80 39.20
0.80 40.00
- 40.00
0.80 40.80
0.80 41.60
0.80 42.40
0.80 43.20
0.80 44.00
0.80 44.80
0.80 45.60
0.80 46.40
0.80 47.20
0.80 48.00
- 48.00
0.80 48.80
0.80 49.60
0.80 50.40
0.80 51.20
0.80 52.00
0.80 52.80
0.80 53.60
0.80 54.40
0.80 55.20
0.80 56.00
- 56.00
0.80 56.80
0.80 57.60
0.80 58.40
0.80 59.20
0.80 60.00
0.80 60.80
0.80 61.60
0.80 62.40
0.80 63.20
0.80 64.00
- 64.00
0.80 64.80
0.80 65.60
0.80 66.40
0.80 67.20
0.80 68.00
0.80 68.80
0.80 69.60
0.80 70.40
0.80 71.20
0.80 72.00
- 72.00
0.80 72.80
0.80 73.60
0.80 74.40
0.80 75.20
0.80 76.00
0.80 76.80
0.80 77.60
0.80 78.40
0.80 79.20
0.80 80.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

80 m3

Stockpile 80.00 cu.m


Volume (m )
3

Stockpile
Cycle Running Total

1.00 1.00
0.80 1.80
0.80 2.60
0.80 3.40
0.80 4.20
0.80 5.00
0.80 5.80
0.80 6.60
0.80 7.40
0.80 8.20
- 8.20
0.80 9.00
0.80 9.80
0.80 10.60
0.80 11.40
0.80 12.20
0.80 13.00
0.80 13.80
0.80 14.60
0.80 15.40
0.80 16.20
- 16.20
0.80 17.00
0.80 17.80
0.80 18.60
0.80 19.40
0.80 20.20
0.80 21.00
0.80 21.80
0.80 22.60
0.80 23.40
0.80 24.20
- 24.20
0.80 25.00
0.80 25.80
0.80 26.60
0.80 27.40
0.80 28.20
0.80 29.00
0.80 29.80
0.80 30.60
0.80 31.40
0.80 32.20
- 32.20
0.80 33.00
0.80 33.80
0.80 34.60
0.80 35.40
0.80 36.20
0.80 37.00
0.80 37.80
0.80 38.60
0.80 39.40
0.80 40.20
- 40.20
0.80 41.00
0.80 41.80
0.80 42.60
0.80 43.40
0.80 44.20
0.80 45.00
0.80 45.80
0.80 46.60
0.80 47.40
0.80 48.20
- 48.20
0.80 49.00
0.80 49.80
0.80 50.60
0.80 51.40
0.80 52.20
0.80 53.00
0.80 53.80
0.80 54.60
0.80 55.40
0.80 56.20
- 56.20
0.80 57.00
0.80 57.80
0.80 58.60
0.80 59.40
0.80 60.20
0.80 61.00
0.80 61.80
0.80 62.60
0.80 63.40
0.80 64.20
- 64.20
0.80 65.00
0.80 65.80
0.80 66.60
0.80 67.40
0.80 68.20
0.80 69.00
0.80 69.80
0.80 70.60
0.80 71.40
0.80 72.20
- 72.20
0.80 73.00
0.80 73.80
0.80 74.60
0.80 75.40
0.80 76.20
0.80 77.00
0.80 77.80
0.80 78.60
0.80 79.40
0.80 80.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

80.2 m3

Stockpile 80.00 cu.m


Volume (m )
3

Stockpile
Cycle Running Total

1.00 1.00
0.80 1.80
0.80 2.60
0.80 3.40
0.80 4.20
0.80 5.00
0.80 5.80
0.80 6.60
0.80 7.40
0.80 8.20
- 8.20
0.80 9.00
0.80 9.80
0.80 10.60
0.80 11.40
0.80 12.20
0.80 13.00
0.80 13.80
0.80 14.60
0.80 15.40
0.80 16.20
- 16.20
0.80 17.00
0.80 17.80
0.80 18.60
0.80 19.40
0.80 20.20
0.80 21.00
0.80 21.80
0.80 22.60
0.80 23.40
0.80 24.20
- 24.20
0.80 25.00
0.80 25.80
0.80 26.60
0.80 27.40
0.80 28.20
0.80 29.00
0.80 29.80
0.80 30.60
0.80 31.40
0.80 32.20
- 32.20
0.80 33.00
0.80 33.80
0.80 34.60
0.80 35.40
0.80 36.20
0.80 37.00
0.80 37.80
0.80 38.60
0.80 39.40
0.80 40.20
- 40.20
0.80 41.00
0.80 41.80
0.80 42.60
0.80 43.40
0.80 44.20
0.80 45.00
0.80 45.80
0.80 46.60
0.80 47.40
0.80 48.20
- 48.20
0.80 49.00
0.80 49.80
0.80 50.60
0.80 51.40
0.80 52.20
0.80 53.00
0.80 53.80
0.80 54.60
0.80 55.40
0.80 56.20
- 56.20
0.80 57.00
0.80 57.80
0.80 58.60
0.80 59.40
0.80 60.20
0.80 61.00
0.80 61.80
0.80 62.60
0.80 63.40
0.80 64.20
- 64.20
0.80 65.00
0.80 65.80
0.80 66.60
0.80 67.40
0.80 68.20
0.80 69.00
0.80 69.80
0.80 70.60
0.80 71.40
0.80 72.20
- 72.20
0.80 73.00
0.80 73.80
0.80 74.60
0.80 75.40
0.80 76.20
0.80 77.00
0.80 77.80
0.80 78.60
0.80 79.40
0.80 80.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

80.2 m3
Stockpile 80.00 cu.m
Volume (m3)
Stockpile
Cycle Running Total

1.00 1.00
0.80 1.80
0.80 2.60
0.80 3.40
0.80 4.20
0.80 5.00
0.80 5.80
0.80 6.60
0.80 7.40
0.80 8.20
- 8.20
0.80 9.00
0.80 9.80
0.80 10.60
0.80 11.40
0.80 12.20
0.80 13.00
0.80 13.80
0.80 14.60
0.80 15.40
0.80 16.20
- 16.20
0.80 17.00
0.80 17.80
0.80 18.60
0.80 19.40
0.80 20.20
0.80 21.00
0.80 21.80
0.80 22.60
0.80 23.40
0.80 24.20
- 24.20
0.80 25.00
0.80 25.80
0.80 26.60
0.80 27.40
0.80 28.20
0.80 29.00
0.80 29.80
0.80 30.60
0.80 31.40
0.80 32.20
- 32.20
0.80 33.00
0.80 33.80
0.80 34.60
0.80 35.40
0.80 36.20
0.80 37.00
0.80 37.80
0.80 38.60
0.80 39.40
0.80 40.20
- 40.20
0.80 41.00
0.80 41.80
0.80 42.60
0.80 43.40
0.80 44.20
0.80 45.00
0.80 45.80
0.80 46.60
0.80 47.40
0.80 48.20
- 48.20
0.80 49.00
0.80 49.80
0.80 50.60
0.80 51.40
0.80 52.20
0.80 53.00
0.80 53.80
0.80 54.60
0.80 55.40
0.80 56.20
- 56.20
0.80 57.00
0.80 57.80
0.80 58.60
0.80 59.40
0.80 60.20
0.80 61.00
0.80 61.80
0.80 62.60
0.80 63.40
0.80 64.20
- 64.20
0.80 65.00
0.80 65.80
0.80 66.60
0.80 67.40
0.80 68.20
0.80 69.00
0.80 69.80
0.80 70.60
0.80 71.40
0.80 72.20
- 72.20
0.80 73.00
0.80 73.80
0.80 74.60
0.80 75.40
0.80 76.20
0.80 77.00
0.80 77.80
0.80 78.60
0.80 79.40
0.80 80.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

80.2 m3
PRODUCTIVITY CALCULATIONS
Bulk Excavation (Excavation & Stockpiling)

Trial Excavation Area


Parameter Quantity Unit
Segment Length 15.00 m
Segment Width 2.00 m
Depth of Cut 1.00 m
Area of Excavation 30.00 sm
Maximum Volume 30.00 m3

BACKHOE Cap = 0.80 cu.m

NORMAL SOIL

Equipment Specifications Backhoe Cap = 0.40 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.40 m3
Fuel Consumption 14.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 35.00 secs
Area Covered / Position 4.00 m2
Volume / Position 4.00 m3
Excavation Duration / Position 0.10 hrs
Number of Positions 8.00 positions
Total Excavation Duration 0.78 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

HARD SOIL
Equipment Specifications Backhoe Cap = 0.40 cu.m
Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.40 m3
Fuel Consumption 14.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 60.00 secs
Area Covered / Position 4.00 m2
Volume / Position 4.00 m3
Excavation Duration / Position 0.17 hrs
Number of Positions 8.00 positions
Total Excavation Duration 1.33 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

ROCKY SOIL

Equipment Specifications Backhoe Cap = 0.40 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.40 m3
Fuel Consumption 14.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 80.00 secs
Area Covered / Position 4.00 m2
Volume / Position 4.00 m3
Excavation Duration / Position 0.22 hrs
Number of Positions 8.00 positions
Total Excavation Duration 1.78 hrs Excluding Travel
Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

BACKHOE Cap = 0.50 cu.m

NORMAL SOIL

Equipment Specifications Backhoe Cap = 0.50 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.50 m3
Fuel Consumption 14.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 35.00 secs
Area Covered / Position 4.00 m2
Volume / Position 4.00 m3
Excavation Duration / Position 0.08 hrs
Number of Positions 8.00 positions
Total Excavation Duration 0.62 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Transfer Position - -
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
Cut-Swing-Unload-Swing - 0.01
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

HARD SOIL

Equipment Specifications Backhoe Cap = 0.50 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.50 m3
Fuel Consumption 14.00 li/hr

Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 60.00 secs
Area Covered / Position 4.00 m2
Volume / Position 4.00 m3
Excavation Duration / Position 0.13 hrs
Number of Positions 8.00 positions
Total Excavation Duration 1.07 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity

ROCKY SOIL

Equipment Specifications Backhoe Cap = 0.50 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.50 m3
Fuel Consumption 14.00 li/hr
Productivity Rates
Parameter Quantity Unit
Cut-Swing-Unload-Swing 80.00 secs
Area Covered / Position 4.00 m2
Volume / Position 4.00 m3
Excavation Duration / Position 0.18 hrs
Number of Positions 8.00 positions
Total Excavation Duration 1.42 hrs Excluding Travel

Time-Motion Table
Time Required (hours)
Activity Rate Manuever & Cut-Swing
Wait Load-Swing

Maneuver 0.17 -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Transfer Position - -
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
Cut-Swing-Unload-Swing - 0.02
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total

Productivity
Case Description
Case Description
15.00 Cut-Swing-Unload-Swing
25.00 Transfer Position
30.00
35.00 Maneuver

Stockpile Volume Position 4.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

0.90 21.71

33.30 m3/hr 30 m3
Stockpile Volume Position 4.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.42 30.04

21.10 m3/hr 30 m3
Stockpile Volume Position 4.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.84 36.71

16.32 m3/hr 30 m3

Stockpile Volume Position 4.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.01 0.58 0.50 0.50
- 0.01 0.58 0.40 0.90
- 0.01 0.58 0.40 1.30
- 0.01 0.58 0.40 1.70
- 0.01 0.58 0.40 2.10
- 0.01 0.58 0.40 2.50
- 0.01 0.58 0.40 2.90
- 0.01 0.58 0.40 3.30
- 0.01 0.58 0.40 3.70
- 0.01 0.58 0.40 4.10
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- 0.01 0.58 0.40 2.40
- 0.01 0.58 0.40 2.80
- 0.01 0.58 0.40 3.20
- 0.01 0.58 0.40 3.60
- 0.01 0.58 0.40 4.00
0.00 0.00 0.04 - -
- 0.01 0.58 0.40 0.40
- 0.01 0.58 0.40 0.80
- 0.01 0.58 0.40 1.20
- 0.01 0.58 0.40 1.60
- 0.01 0.58 0.40 2.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

0.90 21.71

33.41 m3/hr 30.1 m3

Stockpile Volume Position 4.00 cu.m


Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.00 0.50 0.50
- 0.02 1.00 0.40 0.90
- 0.02 1.00 0.40 1.30
- 0.02 1.00 0.40 1.70
- 0.02 1.00 0.40 2.10
- 0.02 1.00 0.40 2.50
- 0.02 1.00 0.40 2.90
- 0.02 1.00 0.40 3.30
- 0.02 1.00 0.40 3.70
- 0.02 1.00 0.40 4.10
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- 0.02 1.00 0.40 2.40
- 0.02 1.00 0.40 2.80
- 0.02 1.00 0.40 3.20
- 0.02 1.00 0.40 3.60
- 0.02 1.00 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.00 0.40 0.40
- 0.02 1.00 0.40 0.80
- 0.02 1.00 0.40 1.20
- 0.02 1.00 0.40 1.60
- 0.02 1.00 0.40 2.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.42 30.04

21.17 m3/hr 30.1 m3


Stockpile Volume Position 4.00 cu.m
Time Required (hours) Time Required Volume (m
Transfer Total (minutes) Position
Position Cycle Running Total

- 0.17 10.00
- 0.02 1.33 0.50 0.50
- 0.02 1.33 0.40 0.90
- 0.02 1.33 0.40 1.30
- 0.02 1.33 0.40 1.70
- 0.02 1.33 0.40 2.10
- 0.02 1.33 0.40 2.50
- 0.02 1.33 0.40 2.90
- 0.02 1.33 0.40 3.30
- 0.02 1.33 0.40 3.70
- 0.02 1.33 0.40 4.10
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- 0.02 1.33 0.40 2.40
- 0.02 1.33 0.40 2.80
- 0.02 1.33 0.40 3.20
- 0.02 1.33 0.40 3.60
- 0.02 1.33 0.40 4.00
0.00 0.00 0.04 - -
- 0.02 1.33 0.40 0.40
- 0.02 1.33 0.40 0.80
- 0.02 1.33 0.40 1.20
- 0.02 1.33 0.40 1.60
- 0.02 1.33 0.40 2.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.84 36.71

16.37 m3/hr 30.1 m3


Stockpile 30.00 cu.m
Volume (m3)
Stockpile
Cycle Running Total

0.40 0.40
0.40 0.80
0.40 1.20
0.40 1.60
0.40 2.00
0.40 2.40
0.40 2.80
0.40 3.20
0.40 3.60
0.40 4.00
- 4.00
0.40 4.40
0.40 4.80
0.40 5.20
0.40 5.60
0.40 6.00
0.40 6.40
0.40 6.80
0.40 7.20
0.40 7.60
0.40 8.00
- 8.00
0.40 8.40
0.40 8.80
0.40 9.20
0.40 9.60
0.40 10.00
0.40 10.40
0.40 10.80
0.40 11.20
0.40 11.60
0.40 12.00
- 12.00
0.40 12.40
0.40 12.80
0.40 13.20
0.40 13.60
0.40 14.00
0.40 14.40
0.40 14.80
0.40 15.20
0.40 15.60
0.40 16.00
- 16.00
0.40 16.40
0.40 16.80
0.40 17.20
0.40 17.60
0.40 18.00
0.40 18.40
0.40 18.80
0.40 19.20
0.40 19.60
0.40 20.00
- 20.00
0.40 20.40
0.40 20.80
0.40 21.20
0.40 21.60
0.40 22.00
0.40 22.40
0.40 22.80
0.40 23.20
0.40 23.60
0.40 24.00
- 24.00
0.40 24.40
0.40 24.80
0.40 25.20
0.40 25.60
0.40 26.00
0.40 26.40
0.40 26.80
0.40 27.20
0.40 27.60
0.40 28.00
- 28.00
0.40 28.40
0.40 28.80
0.40 29.20
0.40 29.60
0.40 30.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

30 m3
Stockpile 30.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

0.40 0.40
0.40 0.80
0.40 1.20
0.40 1.60
0.40 2.00
0.40 2.40
0.40 2.80
0.40 3.20
0.40 3.60
0.40 4.00
- 4.00
0.40 4.40
0.40 4.80
0.40 5.20
0.40 5.60
0.40 6.00
0.40 6.40
0.40 6.80
0.40 7.20
0.40 7.60
0.40 8.00
- 8.00
0.40 8.40
0.40 8.80
0.40 9.20
0.40 9.60
0.40 10.00
0.40 10.40
0.40 10.80
0.40 11.20
0.40 11.60
0.40 12.00
- 12.00
0.40 12.40
0.40 12.80
0.40 13.20
0.40 13.60
0.40 14.00
0.40 14.40
0.40 14.80
0.40 15.20
0.40 15.60
0.40 16.00
- 16.00
0.40 16.40
0.40 16.80
0.40 17.20
0.40 17.60
0.40 18.00
0.40 18.40
0.40 18.80
0.40 19.20
0.40 19.60
0.40 20.00
- 20.00
0.40 20.40
0.40 20.80
0.40 21.20
0.40 21.60
0.40 22.00
0.40 22.40
0.40 22.80
0.40 23.20
0.40 23.60
0.40 24.00
- 24.00
0.40 24.40
0.40 24.80
0.40 25.20
0.40 25.60
0.40 26.00
0.40 26.40
0.40 26.80
0.40 27.20
0.40 27.60
0.40 28.00
- 28.00
0.40 28.40
0.40 28.80
0.40 29.20
0.40 29.60
0.40 30.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

30 m3
Stockpile 30.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

0.40 0.40
0.40 0.80
0.40 1.20
0.40 1.60
0.40 2.00
0.40 2.40
0.40 2.80
0.40 3.20
0.40 3.60
0.40 4.00
- 4.00
0.40 4.40
0.40 4.80
0.40 5.20
0.40 5.60
0.40 6.00
0.40 6.40
0.40 6.80
0.40 7.20
0.40 7.60
0.40 8.00
- 8.00
0.40 8.40
0.40 8.80
0.40 9.20
0.40 9.60
0.40 10.00
0.40 10.40
0.40 10.80
0.40 11.20
0.40 11.60
0.40 12.00
- 12.00
0.40 12.40
0.40 12.80
0.40 13.20
0.40 13.60
0.40 14.00
0.40 14.40
0.40 14.80
0.40 15.20
0.40 15.60
0.40 16.00
- 16.00
0.40 16.40
0.40 16.80
0.40 17.20
0.40 17.60
0.40 18.00
0.40 18.40
0.40 18.80
0.40 19.20
0.40 19.60
0.40 20.00
- 20.00
0.40 20.40
0.40 20.80
0.40 21.20
0.40 21.60
0.40 22.00
0.40 22.40
0.40 22.80
0.40 23.20
0.40 23.60
0.40 24.00
- 24.00
0.40 24.40
0.40 24.80
0.40 25.20
0.40 25.60
0.40 26.00
0.40 26.40
0.40 26.80
0.40 27.20
0.40 27.60
0.40 28.00
- 28.00
0.40 28.40
0.40 28.80
0.40 29.20
0.40 29.60
0.40 30.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

30 m3

Stockpile 30.00 cu.m


Volume (m )
3

Stockpile
Cycle Running Total

0.50 0.50
0.40 0.90
0.40 1.30
0.40 1.70
0.40 2.10
0.40 2.50
0.40 2.90
0.40 3.30
0.40 3.70
0.40 4.10
- 4.10
0.40 4.50
0.40 4.90
0.40 5.30
0.40 5.70
0.40 6.10
0.40 6.50
0.40 6.90
0.40 7.30
0.40 7.70
0.40 8.10
- 8.10
0.40 8.50
0.40 8.90
0.40 9.30
0.40 9.70
0.40 10.10
0.40 10.50
0.40 10.90
0.40 11.30
0.40 11.70
0.40 12.10
- 12.10
0.40 12.50
0.40 12.90
0.40 13.30
0.40 13.70
0.40 14.10
0.40 14.50
0.40 14.90
0.40 15.30
0.40 15.70
0.40 16.10
- 16.10
0.40 16.50
0.40 16.90
0.40 17.30
0.40 17.70
0.40 18.10
0.40 18.50
0.40 18.90
0.40 19.30
0.40 19.70
0.40 20.10
- 20.10
0.40 20.50
0.40 20.90
0.40 21.30
0.40 21.70
0.40 22.10
0.40 22.50
0.40 22.90
0.40 23.30
0.40 23.70
0.40 24.10
- 24.10
0.40 24.50
0.40 24.90
0.40 25.30
0.40 25.70
0.40 26.10
0.40 26.50
0.40 26.90
0.40 27.30
0.40 27.70
0.40 28.10
- 28.10
0.40 28.50
0.40 28.90
0.40 29.30
0.40 29.70
0.40 30.10
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

30.1 m3

Stockpile 30.00 cu.m


Volume (m3)
Stockpile
Cycle Running Total

0.50 0.50
0.40 0.90
0.40 1.30
0.40 1.70
0.40 2.10
0.40 2.50
0.40 2.90
0.40 3.30
0.40 3.70
0.40 4.10
- 4.10
0.40 4.50
0.40 4.90
0.40 5.30
0.40 5.70
0.40 6.10
0.40 6.50
0.40 6.90
0.40 7.30
0.40 7.70
0.40 8.10
- 8.10
0.40 8.50
0.40 8.90
0.40 9.30
0.40 9.70
0.40 10.10
0.40 10.50
0.40 10.90
0.40 11.30
0.40 11.70
0.40 12.10
- 12.10
0.40 12.50
0.40 12.90
0.40 13.30
0.40 13.70
0.40 14.10
0.40 14.50
0.40 14.90
0.40 15.30
0.40 15.70
0.40 16.10
- 16.10
0.40 16.50
0.40 16.90
0.40 17.30
0.40 17.70
0.40 18.10
0.40 18.50
0.40 18.90
0.40 19.30
0.40 19.70
0.40 20.10
- 20.10
0.40 20.50
0.40 20.90
0.40 21.30
0.40 21.70
0.40 22.10
0.40 22.50
0.40 22.90
0.40 23.30
0.40 23.70
0.40 24.10
- 24.10
0.40 24.50
0.40 24.90
0.40 25.30
0.40 25.70
0.40 26.10
0.40 26.50
0.40 26.90
0.40 27.30
0.40 27.70
0.40 28.10
- 28.10
0.40 28.50
0.40 28.90
0.40 29.30
0.40 29.70
0.40 30.10
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

30.1 m3
Stockpile 30.00 cu.m
Volume (m )
3

Stockpile
Cycle Running Total

0.50 0.50
0.40 0.90
0.40 1.30
0.40 1.70
0.40 2.10
0.40 2.50
0.40 2.90
0.40 3.30
0.40 3.70
0.40 4.10
- 4.10
0.40 4.50
0.40 4.90
0.40 5.30
0.40 5.70
0.40 6.10
0.40 6.50
0.40 6.90
0.40 7.30
0.40 7.70
0.40 8.10
- 8.10
0.40 8.50
0.40 8.90
0.40 9.30
0.40 9.70
0.40 10.10
0.40 10.50
0.40 10.90
0.40 11.30
0.40 11.70
0.40 12.10
- 12.10
0.40 12.50
0.40 12.90
0.40 13.30
0.40 13.70
0.40 14.10
0.40 14.50
0.40 14.90
0.40 15.30
0.40 15.70
0.40 16.10
- 16.10
0.40 16.50
0.40 16.90
0.40 17.30
0.40 17.70
0.40 18.10
0.40 18.50
0.40 18.90
0.40 19.30
0.40 19.70
0.40 20.10
- 20.10
0.40 20.50
0.40 20.90
0.40 21.30
0.40 21.70
0.40 22.10
0.40 22.50
0.40 22.90
0.40 23.30
0.40 23.70
0.40 24.10
- 24.10
0.40 24.50
0.40 24.90
0.40 25.30
0.40 25.70
0.40 26.10
0.40 26.50
0.40 26.90
0.40 27.30
0.40 27.70
0.40 28.10
- 28.10
0.40 28.50
0.40 28.90
0.40 29.30
0.40 29.70
0.40 30.10
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

30.1 m3
PRODUCTIVITY CALCULATIONS
Trench Backfilling - Backhoe

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Thickness 0.25 m
Area of Embankment 250.00 sm
Volume 62.50 m3

Equipment Specifications Backhoe Cap = 0.40 cu.m


Excavation Vol = 5.00 cu.m
Parameter Quantity Unit
Forward Speed 2.63 km/hr 0.73
Reverse Speed 2.63 km/hr 0.73
Bucket Capacity 0.40 m3
Swing Bucket Cycle 8.00 secs
Lower - Load Bucket Cycle 13.00 secs
Swing / Unload Bucket Cycle 8.00 secs
Fuel Consumption 16.00 li/hr

Time-Motion Table Excavation Volume


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
- -
- -
- -
- -
- -
- -
- -
- -
Total 0.27 16.28

Productivity 18.42 m3/hr

Equipment Specifications Backhoe Cap = 0.50 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr 0.73
Reverse Speed 2.63 km/hr 0.73
Bucket Capacity 0.50 m3
Swing Bucket Cycle 10.00 secs
Lower - Load Bucket Cycle 16.00 secs
Swing / Unload Bucket Cycle 10.00 secs
Fuel Consumption 16.00 li/hr

Time-Motion Table Excavation Volume


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total 0.27 16.00

Productivity 18.75 m3/hr


m/s
m/s

Excavation Volume = 5.00 cu.m


Volume Running
Volume
(m3) (m3)

0.40 0.40
0.40 0.80
0.40 1.20
0.40 1.60
0.40 2.00
0.40 2.40
0.40 2.80
0.40 3.20
0.40 3.60
0.40 4.00
0.40 4.40
0.40 4.80
0.40 5.20
- 5.20
- 5.20
- 5.20
- 5.20
- 5.20
- 5.20
- 5.20
- 5.20
m/s
m/s

Excavation Volume = 5.00 cu.m


Volume Running
Volume
(m3) (m3)

0.50 0.50
0.50 1.00
0.50 1.50
0.50 2.00
0.50 2.50
0.50 3.00
0.50 3.50
0.50 4.00
0.50 4.50
0.50 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
PRODUCTIVITY CALCULATIONS
Foundation Backfilling - Backhoe

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Thickness 0.25 m
Area of Embankment 250.00 sm
Volume 62.50 m3

Equipment Specifications Backhoe Cap = 0.80 cu.m


Excavation Vol = 5.00 cu.m
Parameter Quantity Unit
Forward Speed 2.63 km/hr 0.73
Reverse Speed 2.63 km/hr 0.73
Bucket Capacity 0.80 m3
Swing Bucket Cycle 8.00 secs
Lower - Load Bucket Cycle 13.00 secs
Swing / Unload Bucket Cycle 8.00 secs
Fuel Consumption 16.00 li/hr

Time-Motion Table Excavation Volume


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
Dig-Raise-Dump-Lower Empty 0.008 0.48
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total 0.22 13.38

Productivity 22.42 m3/hr

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr 0.73
Reverse Speed 2.63 km/hr 0.73
Bucket Capacity 1.00 m3
Swing Bucket Cycle 10.00 secs
Lower - Load Bucket Cycle 16.00 secs
Swing / Unload Bucket Cycle 10.00 secs
Fuel Consumption 16.00 li/hr

Time-Motion Table Excavation Volume


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
Dig-Swing-Unload-Swing 0.010 0.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total 0.22 13.00

Productivity 23.08 m3/hr


m/s
m/s

Excavation Volume = 5.00 cu.m


Volume Running
Volume
(m3) (m3)

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
- 5.60
m/s
m/s

Excavation Volume = 5.00 cu.m


Volume Running
Volume
(m3) (m3)

1.00 1.00
1.00 2.00
1.00 3.00
1.00 4.00
1.00 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
- 5.00
PRODUCTIVITY CALCULATIONS
Loading from Stockpile - Loader

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Thickness 0.25 m
Area of Embankment 250.00 sm
Volume 62.50 m3

Equipment Specifications Loader 100HP Cap = 1.50 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 6.40 km/hr 1.78
Reverse Speed 7.70 km/hr 2.14
Bucket Capacity 1.50 m3
Dig - Raise Cycle 16.40 secs
Reverse-Forward Cycle 10.30 secs
Dump - Lower Empty Cycle 5.50 secs
Fuel Consumption 15.00 li/hr

Time-Motion Table Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total 0.26 15.37

Productivity 58.57 m3/hr

Equipment Specifications Loader 117HP Cap = 2.40 cu.m


Parameter Quantity Unit
Forward Speed 7.10 km/hr 1.97
Reverse Speed 7.80 km/hr 2.17
Bucket Capacity 2.40 m3
Dig - Raise Cycle 16.60 secs
Reverse-Forward Cycle 9.69 secs
Dump - Lower Empty Cycle 5.20 secs
Fuel Consumption 19.00 li/hr

Time-Motion Table Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total 0.23 13.67

Productivity 65.82 m3/hr


m/s
m/s

Dump Truck Capacity = 15.00 cu.m


Volume Running
Volume
(m3) (m3)

1.50 1.50
1.50 3.00
1.50 4.50
1.50 6.00
1.50 7.50
1.50 9.00
1.50 10.50
1.50 12.00
1.50 13.50
1.50 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
m/s
m/s

Dump Truck Capacity = 15.00 cu.m


Volume Running
Volume
(m3) (m3)

2.40 2.40
2.40 4.80
2.40 7.20
2.40 9.60
2.40 12.00
2.40 14.40
2.40 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
- 16.80
PRODUCTIVITY CALCULATIONS
Loading from Stockpile - Backhoe

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 5.00 m
Thickness 0.25 m
Area of Embankment 250.00 sm
Volume 62.50 m3

Equipment Specifications Backhoe Cap = 0.80 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 2.63 km/hr 0.73
Reverse Speed 2.63 km/hr 0.73
Bucket Capacity 0.80 m3
Swing Bucket Cycle 10.00 secs
Lower - Load Bucket Cycle 15.00 secs
Swing / Unload Bucket Cycle 10.00 secs
Fuel Consumption 16.00 li/hr

Time-Motion Table Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
Dig-Raise-Dump-Lower Empty 0.010 0.58
- -
- -
Total 0.35 21.08

Productivity 42.69 m3/hr

Equipment Specifications Backhoe Cap = 1.00 cu.m


Parameter Quantity Unit
Forward Speed 2.63 km/hr 0.73
Reverse Speed 2.63 km/hr 0.73
Bucket Capacity 1.00 m3
Swing Bucket Cycle 12.00 secs
Lower - Load Bucket Cycle 18.00 secs
Swing / Unload Bucket Cycle 12.00 secs
Fuel Consumption 16.00 li/hr

Time-Motion Table Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
Dig-Swing-Unload-Swing 0.012 0.70
- -
- -
- -
- -
- -
- -

Total 0.34 20.50

Productivity 43.90 m3/hr


m/s
m/s

Dump Truck Capacity = 15.00 cu.m


Volume Running
Volume
(m3) (m3)

0.80 0.80
0.80 1.60
0.80 2.40
0.80 3.20
0.80 4.00
0.80 4.80
0.80 5.60
0.80 6.40
0.80 7.20
0.80 8.00
0.80 8.80
0.80 9.60
0.80 10.40
0.80 11.20
0.80 12.00
0.80 12.80
0.80 13.60
0.80 14.40
0.80 15.20
- 15.20
- 15.20
m/s
m/s

Dump Truck Capacity = 15.00 cu.m


Volume Running
Volume
(m3) (m3)

1.00 1.00
1.00 2.00
1.00 3.00
1.00 4.00
1.00 5.00
1.00 6.00
1.00 7.00
1.00 8.00
1.00 9.00
1.00 10.00
1.00 11.00
1.00 12.00
1.00 13.00
1.00 14.00
1.00 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
- 15.00
PRODUCTIVITY CALCULATIONS
Soil Hauling by Dump Truck

Equipment Specifications Dump Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 40.00 km/hr
Empty Speed 60.00 km/hr
Load Capacity 15.00 m3
Fuel Consumption 15.00 li/hr

LOADING BY BACKHOE

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.13 7.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.08 5.00

Total 0.76 45.58

Productivity AHD= 5.000 km(s) 19.74 m3/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.18 10.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.12 7.00

Total 0.84 50.58

Productivity AHD= 7.000 km(s) 17.79 m3/hr


AHD = 10.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.25 15.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.17 10.00

Total 0.97 58.08

Productivity AHD= 10.000 km(s) 15.49 m3/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.38 22.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.25 15.00

Total 1.18 70.58

Productivity AHD= 15.000 km(s) 12.75 m3/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.50 30.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.33 20.00
Total 1.38 83.08

Productivity AHD= 20.000 km(s) 10.83 m3/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.63 37.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.42 25.00

Total 1.59 95.58

Productivity AHD= 25.000 km(s) 9.42 m3/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.75 45.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.50 30.00

Total 1.80 108.08

Productivity AHD= 30.000 km(s) 8.33 m3/hr

LOADING BY WHEEL LOADER

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.13 7.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.08 5.00

Total 0.66 39.87

Productivity AHD= 5.000 km(s) 22.58 m3/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.18 10.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.12 7.00

Total 0.75 44.87

Productivity AHD= 7.000 km(s) 20.06 m3/hr

AHD = 10.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.35 21.08
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.17 10.00

Total 0.97 58.45

Productivity AHD= 10.000 km(s) 15.40 m3/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.38 22.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.25 15.00

Total 1.08 64.87

Productivity AHD= 15.000 km(s) 13.87 m3/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.50 30.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.33 20.00

Total 1.29 77.37

Productivity AHD= 20.000 km(s) 11.63 m3/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.63 37.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.42 25.00

Total 1.50 89.87

Productivity AHD= 25.000 km(s) 10.01 m3/hr


AHD = 30.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.75 45.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.50 30.00

Total 1.71 102.37

Productivity AHD= 30.000 km(s) 8.79 m3/hr

FREE HAUL - LOADING BY BACKHOE

AHD = 1.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.35 21.08
Travel (Loaded) 40.00 0.03 1.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.02 1.00

Total 0.59 35.58

Productivity AHD= 1.000 km(s) 25.29 m3/hr

FREE HAUL - LOADING BY WHEEL LOADER

AHD = 1.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.26 15.37
Travel (Loaded) 40.00 0.03 1.50
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.02 1.00

Total 0.50 29.87

Productivity AHD= 1.000 km(s) 30.13 m3/hr


PRODUCTIVITY CALCULATIONS
Quarrying

Related Productivities

Ground Cutting Bulldozer D7 88.24 m3/hr


(Excavation & Stockpiling) Backhoe Cap = 0.80 cu.m 55.86 m3/hr
Backhoe Cap = 1.00 cu.m 56.01 m3/hr
Soil Hauling by Dump Truck Dump Truck Cap = 15.00 cu.m
Speed Loaded 40.00 AHD= 5.000 km(s) 19.74 m3/hr
Speed Empty 60.00 AHD= 7.000 km(s) 17.79 m3/hr
Time to Dump 0.03 AHD= 10.000 km(s) 15.49 m3/hr
AHD= 15.000 km(s) 12.75 m3/hr
AHD= 20.000 km(s) 10.83 m3/hr
AHD= 25.000 km(s) 9.42 m3/hr
AHD= 30.000 km(s) 8.33 m3/hr
Trial Strip
Parameter Quantity Unit
Length 12.50 m
Width 10.00 m
Cut Depth 0.50 m
Area 125.00 sm
Volume 62.50 m3
AHD 10.00 km(s)

Bulldozer Backhoe Dumptruck 1


Productivity : 88.24 m3/hr Productivity : 56.01 m3/hr Productivity : ### 15.49 m3/hr
Work Item Volume Time Needed Time Elapsed Work Item Volume Time Needed Time Elapsed Work Item Volume Time Needed Time Elapsed

Clearing/Pushing 31.500 cu m 0.36 0.36 Wait 0.36 0.36 Wait 0.36 0.36
Clearing/Pushing 15.750 cu m 0.18 0.54 Dig/Swing/Load 15.750 cu m 0.28 0.64 Wait (Loading) 0.28 0.64
Clearing/Pushing 15.750 cu m 0.18 0.71 Dig/Swing/Load 15.750 cu m 0.28 0.92 Haul & Dump 15.000 cu m 0.45 1.09
Clearing/Pushing 15.750 cu m 0.18 0.89 Dig/Swing/Load 15.750 cu m 0.28 1.20 1.09
Dig/Swing/Load 15.750 cu m 0.28 1.48 Wait 0.39 1.48
Wait (0.39) 1.09 Wait (Loading) 0.28 1.76
Dig/Swing/Load 15.750 cu m 0.28 1.76 Haul & Dump 15.000 cu m 0.21 1.97
Return 0.05 2.02
78.750 cu m 78.750 cu m 44.67

Dumptruck 2 Dumptruck 3 Dumptruck 4


Productivity : ### 15.49 m3/hr Productivity : ### 15.49 m3/hr Productivity : ### 15.49 m3/hr
Work Item Volume Time Needed Time Elapsed Work Item Volume Time Needed Time Elapsed Work Item Volume Time Needed Time Elapsed

Wait 0.36 0.36 Wait 0.36 0.36 Wait 0.36 0.36


Wait 0.28 0.64 Wait 0.28 0.64 Wait 0.28 0.64
Wait (Loading) 0.28 0.92 Wait 0.28 0.92 Wait 0.28 0.92
Haul & Dump 15.000 cu m 0.45 1.37 Wait (Loading) 0.28 1.20 Wait 0.28 1.20
1.37 Haul & Dump 15.000 cu m 0.45 1.65 Wait (Loading) 0.28 1.48
1.65 Haul & Dump 15.000 cu m 0.45 1.93
1.93

Total Time Elapsed 2.02 Quarry Productivity 38.93 m3/hr Quarry Productivity 311.41 m3/day

Legend: Bull Dozer Productivity 88.24 m3/hr


Activities OVERLAPPED by LATER Activities of other Equipment. Backhoe Productivity 38.93 m3/hr
Dump Truck 38.93 m3/hr
Second Load

Carry Over to SUMMARY SHEET


PRODUCTIVITY CALCULATIONS
Pavement Breaking

Pavement Breaking Asphalt Thickness = 50.00 mm

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Segment Width 3.00 m
Pavement Thickness 0.05 m
Area of Embankment 150.00 sm
Volume 7.50 m3

Equipment Specifications Backhoe w/ Breaker


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates - Breaking


Breaker Penetration Rate 6.00 mm/sec
21.60 m/hr
Duration per Breaking Stroke 0.002 hrs
Swing-Lower/Raise-Swing Cycle 35.00 secs
Area Covered / Penetration 0.80 m2
Direct Area Breaking Rate 345.60 m2/hr
Area Covered / Position 18.75 m2
Duration per Position 0.06 hrs
Number of Positions 8.00 positions
Total Duration (Breaking) 0.51 hrs Excluding Travel

Productivity Rates - Scraping & Loading


Volume / Digging Stroke 0.28 m3
Swing-Scrape-Swing-Load Cycle 35.00 secs
Scraping - Loading Rate 28.80 m3/hr
Area Covered / Position 18.75 m2
Volume Covered / Position 0.94 m3
Duration per Position 0.03 hrs
Number of Positions 8.00 positions
Total Duration (Scraping & Loading) 0.26 hrs Excluding Travel

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Breaking
Fix Breaker, Maneuver, Wait 1.25 75.00
Moving Forward, Positioning 0.82 49.14
Breaking 0.51 30.71
Fix Bucket, Maneuver, Wait 1.25 75.00

Scraping & Loading Debris


Manuever, Wait 0.75 45.00
Moving Forward, Positioning 0.82 49.14
Scraping & Loading Debris 0.26 15.63
Manuever, Wait 0.75 45.00

Total 6.41 384.62

Productivity 1.17 m3/hr

Productivity 23.40 m2/hr

Pavement Breaking Asphalt Thickness = 75.00 mm

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Width 3.00 m
Pavement Thickness 0.08 m
Area of Embankment 150.00 sm
Volume 11.25 m3

Equipment Specifications Backhoe w/ Breaker


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates - Breaking


Breaker Penetration Rate 6.00 mm/sec
21.60 m/hr
Duration per Breaking Stroke 0.003 hrs
Swing-Lower/Raise-Swing Cycle 35.00 secs
Area Covered / Penetration 0.80 m2
Direct Area Breaking Rate 230.40 m2/hr
Area Covered / Position 18.75 m2
Duration per Position 0.09 hrs
Number of Positions 8.00 positions
Total Duration (Breaking) 0.73 hrs Excluding Travel

Productivity Rates - Scraping & Loading


Volume / Digging Stroke 0.28 m3
Swing-Scrape-Swing-Load Cycle 35.00 secs
Scraping - Loading Rate 28.80 m3/hr
Area Covered / Position 18.75 m2
Volume Covered / Position 1.41 m3
Duration per Position 0.05 hrs
Number of Positions 8.00 positions
Total Duration (Scraping & Loading) 0.39 hrs Excluding Travel

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Breaking
Change Attach., Maneuver, Wait 1.25 75.00
Moving Forward, Positioning 0.82 49.14
Breaking 0.73 43.73
Change Attach., Maneuver, Wait 1.25 75.00

Scraping & Loading Debris


Manuever, Wait 0.75 45.00
Moving Forward, Positioning 0.82 49.14

Total 6.76 405.45

Productivity 1.66 m3/hr

Productivity 22.20 m2/hr

Pavement Breaking Concrete Thickness = 150.00 mm

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Width 3.00 m
Pavement Thickness 0.15 m
Area of Embankment 150.00 sm
Volume 22.50 m3

Equipment Specifications Backhoe w/ Breaker


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates - Breaking


Breaker Penetration Rate 3.50 mm/sec
12.60 m/hr
Duration per Breaking Stroke 0.012 hrs
Swing-Lower/Raise-Swing Cycle 35.00 secs
Area Covered / Penetration 0.80 m2
Direct Area Breaking Rate 67.20 m2/hr
Area Covered / Position 18.75 m2
Duration per Position 0.29 hrs
Number of Positions 8.00 positions
Total Duration (Breaking) 2.31 hrs Excluding Travel

Productivity Rates - Scraping & Loading


Volume / Digging Stroke 0.28 m3
Swing-Scrape-Swing-Load Cycle 35.00 secs
Scraping - Loading Rate 28.80 m3/hr
Area Covered / Position 18.75 m2
Volume Covered / Position 2.81 m3
Duration per Position 0.10 hrs
Number of Positions 8.00 positions
Total Duration (Scraping & Loading) 0.78 hrs Excluding Travel

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Breaking
Fix Breaker, Maneuver, Wait 1.25 75.00
Moving Forward, Positioning 0.82 49.14
Breaking 2.31 138.60
Fix Bucket, Maneuver, Wait 1.25 75.00

Scraping & Loading Debris


Manuever, Wait 0.75 45.00
Moving Forward, Positioning 0.82 49.14
Scraping & Loading Debris 0.78 46.88
Manuever, Wait 0.75 45.00

Total 8.73 523.76

Productivity 2.58 m3/hr

Productivity 17.18 m2/hr

Pavement Breaking Concrete Thickness = 230.00 mm

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Width 3.00 m
Pavement Thickness 0.23 m
Area of Embankment 150.00 sm
Volume 34.50 m3

Equipment Specifications Backhoe w/ Breaker


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates - Breaking


Breaker Penetration Rate 3.00 mm/sec
10.80 m/hr
Duration per Breaking Stroke 0.021 hrs
Swing-Lower/Raise-Swing Cycle 35.00 secs
Area Covered / Penetration 0.80 m2
Direct Area Breaking Rate 37.57 m2/hr
Area Covered / Position 18.75 m2
Duration per Position 0.51 hrs
Number of Positions 8.00 positions
Total Duration (Breaking) 4.07 hrs Excluding Travel

Productivity Rates - Scraping & Loading


Volume / Digging Stroke 0.28 m3
Swing-Scrape-Swing-Load Cycle 35.00 secs
Scraping - Loading Rate 28.80 m3/hr
Area Covered / Position 18.75 m2
Volume Covered / Position 4.31 m3
Duration per Position 0.15 hrs
Number of Positions 8.00 positions
Total Duration (Scraping & Loading) 1.20 hrs Excluding Travel

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Breaking
Fix Breaker, Maneuver, Wait 1.25 75.00
Moving Forward, Positioning 0.82 49.14
Breaking 4.07 244.25
Fix Bucket, Maneuver, Wait 1.25 75.00

Scraping & Loading Debris


Manuever, Wait 0.75 45.00
Moving Forward, Positioning 0.82 49.14
Scraping & Loading Debris 1.20 71.88
Manuever, Wait 0.75 45.00
Total 10.91 654.41

Productivity 3.16 m3/hr

Productivity 13.75 m2/hr

Pavement Breaking Concrete Thickness = 250.00 mm

Trial Strip
Parameter Quantity Unit
Segment Length 50.00 m
Width 3.00 m
Pavement Thickness 0.25 m
Area of Embankment 150.00 sm
Volume 37.50 m3

Equipment Specifications Backhoe w/ Breaker


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates - Breaking


Breaker Penetration Rate 2.75 mm/sec
9.90 m/hr
Duration per Breaking Stroke 0.025 hrs
Swing-Lower/Raise-Swing Cycle 35.00 secs
Area Covered / Penetration 0.80 m2
Direct Area Breaking Rate 31.68 m2/hr
Area Covered / Position 18.75 m2
Duration per Position 0.60 hrs
Number of Positions 8.00 positions
Total Duration (Breaking) 4.81 hrs Excluding Travel

Productivity Rates - Scraping & Loading


Volume / Digging Stroke 0.28 m3
Swing-Scrape-Swing-Load Cycle 35.00 secs
Scraping - Loading Rate 28.80 m3/hr
Area Covered / Position 18.75 m2
Volume Covered / Position 4.69 m3
Duration per Position 0.16 hrs
Number of Positions 8.00 positions
Total Duration (Scraping & Loading) 1.30 hrs Excluding Travel

Time-Motion Table
Time Required Time Required
Activity Rate
Activity Rate hrs minutes

Breaking
Fix Breaker, Maneuver, Wait 1.25 75.00
Moving Forward, Positioning 0.82 49.14
Breaking 4.81 288.76
Fix Bucket, Maneuver, Wait 1.25 75.00

Scraping & Loading Debris


Manuever, Wait 0.75 45.00
Moving Forward, Positioning 0.82 49.14
Scraping & Loading Debris 1.30 78.13
Manuever, Wait 0.75 45.00

Total 11.75 705.17

Productivity 3.19 m3/hr

Productivity 12.76 m2/hr


PRODUCTIVITY CALCULATIONS
Pile Driving Works

Pile Driving - PC Piles

Trial Pile Set


Parameter Quantity Unit Remarks
Pile Dimension 1 400.00 mm
Pile Dimension 2 400.00 mm
Pile Length 12.00 m
Quantity of Piles 10.00 nos
Total Pile Length 120.00 m

Equipment Specifications Crane 40.00 Tons w/ Vibratory Hammer


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 40.00 tons
Fuel Consumption 27.00 li/hr
Pile Penetration Rate 3.00 lm/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up
Setting-Up of Rig 1.50 90.00

Pile Driving - Pile No. 1


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 2


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 3


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 4


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 5


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 6


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 7


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 8


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 9


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 10


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 3.00 4.00 240.00
Release Pile 0.08 5.00

Total 47.33 2,840.00

Productivity 2.54 lm/hr

Pile Driving - H Piles

Trial Pile Set


Parameter Quantity Unit Remarks
Pile Dimension 1 350.00 mm
Pile Dimension 2 350.00 mm
Pile Length 12.00 m
Quantity of Piles 10.00 nos
Total Pile Length 120.00 m

Equipment Specifications Crane 40.00 Tons w/ Vibratory Hammer


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 40.00 tons
Fuel Consumption 27.00 li/hr
Pile Penetration Rate 4.00 lm/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up
Setting-Up of Rig 1.50 90.00

Pile Driving - Pile No. 1


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 2


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 3


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 4


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 5


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00
Pile Driving - Pile No. 6
Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 7


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 8


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 9


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 10


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.25 15.00
Drive Pile 4.00 3.00 180.00
Release Pile 0.08 5.00

Total 37.33 2,240.00

Productivity 3.21 lm/hr

Pile Driving - Sheet Piles

Trial Pile Set


Parameter Quantity Unit Remarks
Pile Dimension 1 100.00 mm
Pile Dimension 2 400.00 mm
Pile Length 12.00 m
Quantity of Piles 10.00 nos
Total Pile Length 120.00 m

Equipment Specifications Crane 40.00 Tons w/ Vibratory Hammer


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 40.00 tons
Fuel Consumption 27.00 li/hr
Pile Penetration Rate 8.00 lm/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up
Setting-Up of Pile Driver 1.00 60.00

Pile Driving - Pile No. 1


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 2


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 3


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 4


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 5


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 6


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 7


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 8


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 9


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Pile Driving - Pile No. 10


Maneuver to Position 0.25 15.00
Pick-Up Pile 0.17 10.00
Drive Pile 8.00 1.50 90.00
Release Pile 0.08 5.00

Total 21.00 1,260.00

Productivity 5.71 lm/hr

Pile Extraction - Sheet Piles

Trial Pile Set


Parameter Quantity Unit Remarks
Pile Dimension 1 100.00 mm
Pile Dimension 2 400.00 mm
Pile Length 12.00 m
Quantity of Piles 10.00 nos
Total Pile Length 120.00 m

Equipment Specifications Crane 40.00 Tons w/ Vibratory Hammer


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 40.00 tons
Fuel Consumption 27.00 li/hr
Pile Extraction Rate 12.00 lm/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes
Equipment Set-up
Setting-Up of Pile Driver 1.50 90.00

Pile Driving - Pile No. 1


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 2


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 3


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 4


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 5


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 6


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 7


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 8


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 9


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Pile Driving - Pile No. 10


Maneuver to Position 0.25 15.00
Drive Pile 12.00 1.00 60.00
Lay Pile to Ground 0.08 5.00

Total 14.83 890.00

Productivity 8.09 lm/hr

Pile Loading / Unloading - PC Piles

Trial Pile Set


Parameter Quantity Unit Remarks
Pile Dimension 1 400.00 mm
Pile Dimension 2 400.00 mm
Pile Length 12.00 m
Pile Weight 4,608.00 kgs
Quantity of Piles 5.00 nos
Total Pile Length 60.00 m
Total Pile Weight 23,040.00 kgs

Equipment Specifications Crane 40.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 40.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 120.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Pile No. 1
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 2.00
Unrig Pile 0.05 3.00

Pile No. 2
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 2.00
Unrig Pile 0.05 3.00

Pile No. 3
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 2.00
Unrig Pile 0.05 3.00
Pile No. 4
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 2.00
Unrig Pile 0.05 3.00

Pile No. 5
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 2.00
Unrig Pile 0.05 3.00

Total 1.67 100.00

Productivity 36.00 lm/hr

Pile Loading / Unloading - Steel Piles

Trial Pile Set


Parameter Quantity Unit Remarks
Pile Dimension 1 350.00 mm
Pile Dimension 2 350.00 mm
Pile Length 12.00 m
Pile Weight 1,980.00 kgs
Quantity of Piles 5.00 nos
Total Pile Length 60.00 m
Total Pile Weight 9,900.00 kgs

Equipment Specifications Crane 40.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 40.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 100.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Pile No. 1
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 1.67
Unrig Pile 0.05 3.00
Pile No. 2
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 1.67
Unrig Pile 0.05 3.00

Pile No. 3
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 1.67
Unrig Pile 0.05 3.00

Pile No. 4
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 1.67
Unrig Pile 0.05 3.00

Pile No. 5
Maneuver to Position 0.15 9.00
Rig Pile 0.10 6.00
Swing-Hoist Up-Swing-Hoist Down 0.03 0.03 1.67
Unrig Pile 0.05 3.00

Total 1.64 98.33

Productivity 36.61 lm/hr

Pile Loading / Unloading - Sheet Piles

Trial Pile Set


Parameter Quantity Unit Remarks
Pile Dimension 1 400.00 mm
Pile Dimension 2 100.00 mm
Pile Length 12.00 m
Pile Weight 50.00 kgs
Quantity of Piles 5.00 nos
Total Pile Length 60.00 m
Total Pile Weight 250.00 kgs

Equipment Specifications Crane 40.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 40.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 85.00 secs
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Pile No. 1
Maneuver to Position 0.15 9.00
Rig Pile 0.05 3.00
Swing-Hoist Up-Swing-Hoist Down 0.02 0.02 1.42
Unrig Pile 0.05 3.00

Pile No. 2
Maneuver to Position 0.15 9.00
Rig Pile 0.05 3.00
Swing-Hoist Up-Swing-Hoist Down 0.02 0.02 1.42
Unrig Pile 0.05 3.00

Pile No. 3
Maneuver to Position 0.15 9.00
Rig Pile 0.05 3.00
Swing-Hoist Up-Swing-Hoist Down 0.02 0.02 1.42
Unrig Pile 0.05 3.00

Pile No. 4
Maneuver to Position 0.15 9.00
Rig Pile 0.05 3.00
Swing-Hoist Up-Swing-Hoist Down 0.02 0.02 1.42
Unrig Pile 0.05 3.00

Pile No. 5
Maneuver to Position 0.15 9.00
Rig Pile 0.05 3.00
Swing-Hoist Up-Swing-Hoist Down 0.02 0.02 1.42
Unrig Pile 0.05 3.00

Total 1.37 82.08

Productivity 43.86 lm/hr

PILES HAULING

PC PILES

Equipment Specifications Trailer Truck Cap = 40,000.00 kgs


Parameter Quantity Unit
Loaded Speed 25.00 km/hr
Empty Speed 40.00 km/hr
Load Capacity (Weight) 40,000.00 kgs.
Load Capacity (lm) 104.00 lm
Fuel Consumption 15.00 li/hr

AHD = 1.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 36.00 lm/hr 2.89 173.33
Travel (Loaded) 25.00 0.04 2.40
Wait While Unloading 36.00 lm/hr 2.89 173.33
Travel (Empty) 40.00 0.03 1.50

Total 5.93 355.57

Productivity AHD= 1.000 km(s) 17.55 lm/hr

STEEL PILES

Equipment Specifications Cargo Truck Cap = 20,000.00 kgs


Parameter Quantity Unit
Loaded Speed 25.00 km/hr
Empty Speed 40.00 km/hr
Load Capacity (Weight) 20,000.00 kgs.
Load Capacity (lm) 121.00 lm
Fuel Consumption 15.00 li/hr

AHD = 1.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 36.61 lm/hr 3.31 198.31
Travel (Loaded) 25.00 0.04 2.40
Wait While Unloading 36.61 lm/hr 3.31 198.31
Travel (Empty) 40.00 0.03 1.50

Total 6.76 405.51

Productivity AHD= 1.000 km(s) 17.90 lm/hr

STEEL SHEET PILES


Equipment Specifications Cargo Truck Cap = 20,000.00 kgs
Parameter Quantity Unit
Loaded Speed 25.00 km/hr
Empty Speed 40.00 km/hr
Load Capacity (Weight) 20,000.00 kgs.
Load Capacity (lm) 4,800.00 lm
Fuel Consumption 15.00 li/hr

AHD = 1.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 43.86 lm/hr 109.44 6,566.67
Travel (Loaded) 25.00 0.04 2.40
Wait While Unloading 43.86 lm/hr 109.44 6,566.67
Travel (Empty) 40.00 0.03 1.50

Total 219.04 13,142.23

Productivity AHD= 1.000 km(s) 21.91 lm/hr


PRODUCTIVITY CALCULATIONS
Pipe Laying Works

RC Pipe Laying 1600 mm to 2000 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 120.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Laying 1
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 2
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 3
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 4
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 5
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 6
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 7
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 8
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 9
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 10
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Total 1.83 110.00

Productivity 5.45 lm/hr

RC Pipe Laying 1200 mm to 1500 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 4,417.86 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 110.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Laying 1
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 2
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 3
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 4
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 5
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 6
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 7
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 8
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 9
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 10
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Total 1.81 108.33

Productivity 5.54 lm/hr

RC Pipe Laying 600 mm to 1000 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 1,963.50 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 100.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Laying 1
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 2
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 3
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 4
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 5
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 6
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00
Pipe Laying 7
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 8
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 9
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 10
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Total 1.78 106.67

Productivity 5.63 lm/hr

RC Pipe Laying 300 mm to 500 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 490.87 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 90.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Laying 1
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 2
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 3
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 4
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 5
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 6
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 7
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 8
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 9
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Pipe Laying 10
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Align Pipe 0.05 3.00
Unrig Pipe 0.03 2.00

Total 1.75 105.00

Productivity 5.71 lm/hr

RC Pipe Loading / Unloading 1600 mm to 2000 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 120.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Loading / Unloading 1


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 2


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 3


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 4


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 5


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 6


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 7


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 8


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 9


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 10


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Pipe 0.03 2.00

Total 1.33 80.00


Productivity 7.50 lm/hr

RC Pipe Loading / Unloading 1200 mm to 1500 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 4,417.86 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 110.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Loading / Unloading 1


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 2


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 3


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 4


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00
Pipe Loading / Unloading 5
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 6


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 7


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 8


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 9


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 10


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 110.00 0.03 1.83
Unrig Pipe 0.03 2.00

Total 1.31 78.33

Productivity 7.66 lm/hr

RC Pipe Loading / Unloading 600 mm to 1000 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 1,963.50 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 100.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Loading / Unloading 1


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 2


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 3


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 4


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 5


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 6


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 7


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 8


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 9


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 10


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 100.00 0.03 1.67
Unrig Pipe 0.03 2.00

Total 1.28 76.67

Productivity 7.83 lm/hr

RC Pipe Loading / Unloading 300 mm to 500 mm

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 490.87 kgs

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 90.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Pipe Loading / Unloading 1


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00
Pipe Loading / Unloading 2
Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 3


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 4


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 5


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 6


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 7


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 8


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 9


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Pipe Loading / Unloading 10


Rig Pipe 0.03 2.00
Swing-Hoist Up-Swing-Hoist Down 90.00 0.03 1.50
Unrig Pipe 0.03 2.00

Total 1.25 75.00

Productivity 8.00 lm/hr


RC Pipe Hauling 1600 mm to 2000 mm
Hauling Distance: 30.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Pipe Volume (Cube Volume) 4.00 m3
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs
Total Pipe Volume 40.00 m3
Hauling Distance 30.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 10.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.50 1.33 80.00
Travel (Loaded) 40.00 0.75 45.00
Unloading of Pipes 7.50 1.33 80.00
Travel (Empty) 60.00 0.50 30.00

Total 4.08 245.00

Productivity 2.45 lm/hr

RC Pipe Hauling 1200 mm to 1500 mm


Hauling Distance: 30.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Pipe Volume (Cube Volume) 2.25 m3
Quantity of Pipes 17.00 no(s)
Total Pipe Length 17.00 m
Total Pipe Weight 7,510.37 kgs
Total Pipe Volume 38.25 m3
Hauling Distance 30.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 17.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.66 2.22 133.17
Travel (Loaded) 40.00 0.75 45.00
Unloading of Pipes 7.66 2.22 133.17
Travel (Empty) 60.00 0.50 30.00

Total 5.86 351.33

Productivity 2.90 lm/hr

RC Pipe Hauling 600 mm to 1000 mm


Hauling Distance: 30.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Pipe Volume (Cube Volume) 1.00 m3
Quantity of Pipes 37.00 no(s)
Total Pipe Length 37.00 m
Total Pipe Weight 7,264.93 kgs
Total Pipe Volume 37.00 m3
Hauling Distance 30.00 km
Equipment Specifications Truck with Liting Boom
Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 37.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.83 4.73 283.67
Travel (Loaded) 40.00 0.75 45.00
Unloading of Pipes 7.83 4.73 283.67
Travel (Empty) 60.00 0.50 30.00

Total 10.87 652.33

Productivity 3.40 lm/hr

RC Pipe Hauling 300 mm to 500 mm


Hauling Distance: 30.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Pipe Volume (Cube Volume) 0.25 m3
Quantity of Pipes 145.00 no(s)
Total Pipe Length 145.00 m
Total Pipe Weight 7,117.67 kgs
Total Pipe Volume 36.25 m3
Hauling Distance 30.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 145.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 8.00 18.13 1,087.50
Travel (Loaded) 40.00 0.75 45.00
Unloading of Pipes 8.00 18.13 1,087.50
Travel (Empty) 60.00 0.50 30.00

Total 37.67 2,260.00

Productivity 3.85 lm/hr

RC Pipe Hauling 1600 mm to 2000 mm


Hauling Distance: 25.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Pipe Volume (Cube Volume) 4.00 m3
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs
Total Pipe Volume 40.00 m3
Hauling Distance 25.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 10.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.50 1.33 80.00
Travel (Loaded) 40.00 0.63 37.50
Unloading of Pipes 7.50 1.33 80.00
Travel (Empty) 60.00 0.42 25.00

Total 3.88 232.50

Productivity 2.58 lm/hr

RC Pipe Hauling 1200 mm to 1500 mm


Hauling Distance: 25.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Pipe Volume (Cube Volume) 2.25 m3
Quantity of Pipes 17.00 no(s)
Total Pipe Length 17.00 m
Total Pipe Weight 7,510.37 kgs
Total Pipe Volume 38.25 m3
Hauling Distance 25.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 17.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.66 2.22 133.17
Travel (Loaded) 40.00 0.63 37.50
Unloading of Pipes 7.66 2.22 133.17
Travel (Empty) 60.00 0.42 25.00

Total 5.65 338.83

Productivity 3.01 lm/hr

RC Pipe Hauling 600 mm to 1000 mm


Hauling Distance: 25.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Pipe Volume (Cube Volume) 1.00 m3
Quantity of Pipes 37.00 no(s)
Total Pipe Length 37.00 m
Total Pipe Weight 7,264.93 kgs
Total Pipe Volume 37.00 m3
Hauling Distance 25.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 37.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.83 4.73 283.67
Travel (Loaded) 40.00 0.63 37.50
Unloading of Pipes 7.83 4.73 283.67
Travel (Empty) 60.00 0.42 25.00

Total 10.66 639.83

Productivity 3.47 lm/hr


RC Pipe Hauling 300 mm to 500 mm
Hauling Distance: 25.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Pipe Volume (Cube Volume) 0.25 m3
Quantity of Pipes 145.00 no(s)
Total Pipe Length 145.00 m
Total Pipe Weight 7,117.67 kgs
Total Pipe Volume 36.25 m3
Hauling Distance 25.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 145.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 8.00 18.13 1,087.50
Travel (Loaded) 40.00 0.63 37.50
Unloading of Pipes 8.00 18.13 1,087.50
Travel (Empty) 60.00 0.42 25.00

Total 37.46 2,247.50

Productivity 3.87 lm/hr

RC Pipe Hauling 1600 mm to 2000 mm


Hauling Distance: 20.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Pipe Volume (Cube Volume) 4.00 m3
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs
Total Pipe Volume 40.00 m3
Hauling Distance 20.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 10.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.50 1.33 80.00
Travel (Loaded) 40.00 0.50 30.00
Unloading of Pipes 7.50 1.33 80.00
Travel (Empty) 60.00 0.33 20.00

Total 3.67 220.00

Productivity 2.73 lm/hr

RC Pipe Hauling 1200 mm to 1500 mm


Hauling Distance: 20.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Pipe Volume (Cube Volume) 2.25 m3
Quantity of Pipes 17.00 no(s)
Total Pipe Length 17.00 m
Total Pipe Weight 7,510.37 kgs
Total Pipe Volume 38.25 m3
Hauling Distance 20.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 17.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.66 2.22 133.17
Travel (Loaded) 40.00 0.50 30.00
Unloading of Pipes 7.66 2.22 133.17
Travel (Empty) 60.00 0.33 20.00

Total 5.44 326.33

Productivity 3.13 lm/hr

RC Pipe Hauling 600 mm to 1000 mm


Hauling Distance: 20.00 km(s)

Parameter Quantity Unit Remarks


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Pipe Volume (Cube Volume) 1.00 m3
Quantity of Pipes 37.00 no(s)
Total Pipe Length 37.00 m
Total Pipe Weight 7,264.93 kgs
Total Pipe Volume 37.00 m3
Hauling Distance 20.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 37.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.83 4.73 283.67
Travel (Loaded) 40.00 0.50 30.00
Unloading of Pipes 7.83 4.73 283.67
Travel (Empty) 60.00 0.33 20.00

Total 10.46 627.33

Productivity 3.54 lm/hr

RC Pipe Hauling 300 mm to 500 mm


Hauling Distance: 20.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Pipe Volume (Cube Volume) 0.25 m3
Quantity of Pipes 145.00 no(s)
Total Pipe Length 145.00 m
Total Pipe Weight 7,117.67 kgs
Total Pipe Volume 36.25 m3
Hauling Distance 20.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 145.00 pcs
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 8.00 18.13 1,087.50
Travel (Loaded) 40.00 0.50 30.00
Unloading of Pipes 8.00 18.13 1,087.50
Travel (Empty) 60.00 0.33 20.00

Total 37.25 2,235.00

Productivity 3.89 lm/hr

RC Pipe Hauling 1600 mm to 2000 mm


Hauling Distance: 15.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Pipe Volume (Cube Volume) 4.00 m3
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs
Total Pipe Volume 40.00 m3
Hauling Distance 15.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 10.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.50 1.33 80.00
Travel (Loaded) 40.00 0.38 22.50
Unloading of Pipes 7.50 1.33 80.00
Travel (Empty) 60.00 0.25 15.00

Total 3.46 207.50

Productivity 2.89 lm/hr

RC Pipe Hauling 1200 mm to 1500 mm


Hauling Distance: 15.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Pipe Volume (Cube Volume) 2.25 m3
Quantity of Pipes 17.00 no(s)
Total Pipe Length 17.00 m
Total Pipe Weight 7,510.37 kgs
Total Pipe Volume 38.25 m3
Hauling Distance 15.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 17.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.66 2.22 133.17
Travel (Loaded) 40.00 0.38 22.50
Unloading of Pipes 7.66 2.22 133.17
Travel (Empty) 60.00 0.25 15.00

Total 5.23 313.83

Productivity 3.25 lm/hr


RC Pipe Hauling 600 mm to 1000 mm
Hauling Distance: 15.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Pipe Volume (Cube Volume) 1.00 m3
Quantity of Pipes 37.00 no(s)
Total Pipe Length 37.00 m
Total Pipe Weight 7,264.93 kgs
Total Pipe Volume 37.00 m3
Hauling Distance 15.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 37.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.83 4.73 283.67
Travel (Loaded) 40.00 0.38 22.50
Unloading of Pipes 7.83 4.73 283.67
Travel (Empty) 60.00 0.25 15.00

Total 10.25 614.83

Productivity 3.61 lm/hr

RC Pipe Hauling 300 mm to 500 mm


Hauling Distance: 15.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Pipe Volume (Cube Volume) 0.25 m3
Quantity of Pipes 145.00 no(s)
Total Pipe Length 145.00 m
Total Pipe Weight 7,117.67 kgs
Total Pipe Volume 36.25 m3
Hauling Distance 15.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 145.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 8.00 18.13 1,087.50
Travel (Loaded) 40.00 0.38 22.50
Unloading of Pipes 8.00 18.13 1,087.50
Travel (Empty) 60.00 0.25 15.00

Total 37.04 2,222.50

Productivity 3.91 lm/hr

RC Pipe Hauling 1600 mm to 2000 mm


Hauling Distance: 10.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Pipe Volume (Cube Volume) 4.00 m3
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs
Total Pipe Volume 40.00 m3
Hauling Distance 10.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 10.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.50 1.33 80.00
Travel (Loaded) 40.00 0.25 15.00
Unloading of Pipes 7.50 1.33 80.00
Travel (Empty) 60.00 0.17 10.00

Total 3.25 195.00

Productivity 3.08 lm/hr

RC Pipe Hauling 1200 mm to 1500 mm


Hauling Distance: 10.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Pipe Volume (Cube Volume) 2.25 m3
Quantity of Pipes 17.00 no(s)
Total Pipe Length 17.00 m
Total Pipe Weight 7,510.37 kgs
Total Pipe Volume 38.25 m3
Hauling Distance 10.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 17.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.66 2.22 133.17
Travel (Loaded) 40.00 0.25 15.00
Unloading of Pipes 7.66 2.22 133.17
Travel (Empty) 60.00 0.17 10.00

Total 5.02 301.33

Productivity 3.38 lm/hr

RC Pipe Hauling 600 mm to 1000 mm


Hauling Distance: 10.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Pipe Volume (Cube Volume) 1.00 m3
Quantity of Pipes 37.00 no(s)
Total Pipe Length 37.00 m
Total Pipe Weight 7,264.93 kgs
Total Pipe Volume 37.00 m3
Hauling Distance 10.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 37.00 pcs
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.83 4.73 283.67
Travel (Loaded) 40.00 0.25 15.00
Unloading of Pipes 7.83 4.73 283.67
Travel (Empty) 60.00 0.17 10.00

Total 10.04 602.33

Productivity 3.69 lm/hr

RC Pipe Hauling 300 mm to 500 mm


Hauling Distance: 10.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Pipe Volume (Cube Volume) 0.25 m3
Quantity of Pipes 145.00 no(s)
Total Pipe Length 145.00 m
Total Pipe Weight 7,117.67 kgs
Total Pipe Volume 36.25 m3
Hauling Distance 10.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 145.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 8.00 18.13 1,087.50
Travel (Loaded) 40.00 0.25 15.00
Unloading of Pipes 8.00 18.13 1,087.50
Travel (Empty) 60.00 0.17 10.00

Total 36.83 2,210.00

Productivity 3.94 lm/hr

RC Pipe Hauling 1600 mm to 2000 mm


Hauling Distance: 7.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Pipe Volume (Cube Volume) 4.00 m3
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs
Total Pipe Volume 40.00 m3
Hauling Distance 7.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 10.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.50 1.33 80.00
Travel (Loaded) 40.00 0.18 10.50
Unloading of Pipes 7.50 1.33 80.00
Travel (Empty) 60.00 0.12 7.00

Total 3.13 187.50


Productivity 3.20 lm/hr

RC Pipe Hauling 1200 mm to 1500 mm


Hauling Distance: 7.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Pipe Volume (Cube Volume) 2.25 m3
Quantity of Pipes 17.00 no(s)
Total Pipe Length 17.00 m
Total Pipe Weight 7,510.37 kgs
Total Pipe Volume 38.25 m3
Hauling Distance 7.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 17.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.66 2.22 133.17
Travel (Loaded) 40.00 0.18 10.50
Unloading of Pipes 7.66 2.22 133.17
Travel (Empty) 60.00 0.12 7.00

Total 4.90 293.83

Productivity 3.47 lm/hr

RC Pipe Hauling 600 mm to 1000 mm


Hauling Distance: 7.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Pipe Volume (Cube Volume) 1.00 m3
Quantity of Pipes 37.00 no(s)
Total Pipe Length 37.00 m
Total Pipe Weight 7,264.93 kgs
Total Pipe Volume 37.00 m3
Hauling Distance 7.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 37.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.83 4.73 283.67
Travel (Loaded) 40.00 0.18 10.50
Unloading of Pipes 7.83 4.73 283.67
Travel (Empty) 60.00 0.12 7.00

Total 9.91 594.83

Productivity 3.73 lm/hr

RC Pipe Hauling 300 mm to 500 mm


Hauling Distance: 7.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Pipe Volume (Cube Volume) 0.25 m3
Quantity of Pipes 145.00 no(s)
Total Pipe Length 145.00 m
Total Pipe Weight 7,117.67 kgs
Total Pipe Volume 36.25 m3
Hauling Distance 7.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 145.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 8.00 18.13 1,087.50
Travel (Loaded) 40.00 0.18 10.50
Unloading of Pipes 8.00 18.13 1,087.50
Travel (Empty) 60.00 0.12 7.00

Total 36.71 2,202.50

Productivity 3.95 lm/hr

RC Pipe Hauling 1600 mm to 2000 mm


Hauling Distance: 5.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 2.00 m
Pipe Length 1.00 m
Pipe Weight 785.40 kgs
Pipe Volume (Cube Volume) 4.00 m3
Quantity of Pipes 10.00 no(s)
Total Pipe Length 10.00 m
Total Pipe Weight 7,853.98 kgs
Total Pipe Volume 40.00 m3
Hauling Distance 5.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 10.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.50 1.33 80.00
Travel (Loaded) 40.00 0.13 7.50
Unloading of Pipes 7.50 1.33 80.00
Travel (Empty) 60.00 0.08 5.00

Total 3.04 182.50

Productivity 3.29 lm/hr

RC Pipe Hauling 1200 mm to 1500 mm


Hauling Distance: 5.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.50 m
Pipe Length 1.00 m
Pipe Weight 441.79 kgs
Pipe Volume (Cube Volume) 2.25 m3
Quantity of Pipes 17.00 no(s)
Total Pipe Length 17.00 m
Total Pipe Weight 7,510.37 kgs
Total Pipe Volume 38.25 m3
Hauling Distance 5.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 17.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 7.66 2.22 133.17
Travel (Loaded) 40.00 0.13 7.50
Unloading of Pipes 7.66 2.22 133.17
Travel (Empty) 60.00 0.08 5.00

Total 4.81 288.83

Productivity 3.53 lm/hr

RC Pipe Hauling 600 mm to 1000 mm


Hauling Distance: 5.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 1.00 m
Pipe Length 1.00 m
Pipe Weight 196.35 kgs
Pipe Volume (Cube Volume) 1.00 m3
Quantity of Pipes 37.00 no(s)
Total Pipe Length 37.00 m
Total Pipe Weight 7,264.93 kgs
Total Pipe Volume 37.00 m3
Hauling Distance 5.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 37.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes
Waiting / Maneuvering 0.17 10.00
Loading of Pipes 7.83 4.73 283.67
Travel (Loaded) 40.00 0.13 7.50
Unloading of Pipes 7.83 4.73 283.67
Travel (Empty) 60.00 0.08 5.00

Total 9.83 589.83

Productivity 3.76 lm/hr

RC Pipe Hauling 300 mm to 500 mm


Hauling Distance: 5.00 km(s)

Trial Pipe Set


Parameter Quantity Unit Remarks
Pipe Diameter 0.50 m
Pipe Length 1.00 m
Pipe Weight 49.09 kgs
Pipe Volume (Cube Volume) 0.25 m3
Quantity of Pipes 145.00 no(s)
Total Pipe Length 145.00 m
Total Pipe Weight 7,117.67 kgs
Total Pipe Volume 36.25 m3
Hauling Distance 5.00 km

Equipment Specifications Truck with Liting Boom


Parameter Quantity Unit Remarks
Speed (Loaded) 40.00 km/hr
Speed (Empty) 60.00 km/hr
Load Capacity 20.00 tons
Fuel Consumption 10.00 li/hr
Loading Bay Width 3.00 m
Loading Bay Length 6.00 m
Loading Bay Height 2.00 m
Loading Bay Volume 36.00 m3
Capacity (number of Pipes) 145.00 pcs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Waiting / Maneuvering 0.17 10.00


Loading of Pipes 8.00 18.13 1,087.50
Travel (Loaded) 40.00 0.13 7.50
Unloading of Pipes 8.00 18.13 1,087.50
Travel (Empty) 60.00 0.08 5.00

Total 36.63 2,197.50


Productivity 3.96 lm/hr
PRODUCTIVITY CALCULATIONS
Concreting

Concreting by Crane and Bucket

Equipment Specifications Crane 25 Tons with 0.5 m3 Bucket


Parameter Quantity Unit
Forward Speed 40.00 km/hr
Reverse Speed 10.00 km/hr
Capacity 25.00 tons
Bucket Capacity 0.50 m3
Fuel Consumption 10.00 li/hr

Time-Motion Table Volume = 8.00 cu.m


Time Required Time Required
Activity Rate hrs minutes

Maneuver 0.08 5.00


Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00
Swing Boom w/ Empty Bucket 0.01 0.33
Load Concrete 0.02 1.00
Swing Boom w/ Loaded Bucket 0.01 0.75
Unload Concrete 0.05 3.00

Total 1.44 86.33

Productivity 5.56 m3/hr

Concreting by Truck-Mounted Concrete Pump

Equipment Specifications Truck-mounted Concrete


Parameter Quantity Unit
Forward Speed 60.00 km/hr
Reverse Speed 10.00 km/hr
Pump Rate 50.00 m3/hr
Fuel Consumption 10.00 li/hr
Time-Motion Table Volume = 80.00 cu.m
Time Required Time Required
Activity Rate hrs minutes

Maneuver / Set-up 0.25 15.00


Extend / Swing / Position Boom 0.17 10.00
Prime / Grout Pump 0.17 10.00
Pre-load Pump 0.03 2.00
Pump Concrete (Mixer 1) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 2) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 3) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 4) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 5) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 6) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 7) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 8) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 9) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Pump Concrete (Mixer 10) 50.00 0.16 9.60
Wait / Reposition Boom 0.08 5.00
Clean-up 0.25 15.00
Swing / Retract Boom 0.08 5.00

Total 3.38 203.00

Productivity 23.65 m3/hr


PRODUCTIVITY CALCULATIONS
MATERIALS HANDLING

MATERIALS LOADING/UNLOADING

REBAR LOADING/UNLOADING

Load Assumptions
Parameter Quantity Unit Remarks
Weight per Bundle 2,500.00 kgs
Maximum Truck Capacity 20,000.00 kgs
Total Number of Bundles 8.00 bundles

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 120.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Loading/Unloading
Tie/Rig Bundle 0.05 3.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Bundle 0.05 3.00
Misc. Waiting 0.02 1.00

Loading/Unloading Cycle 1.05 63.00

Total 1.53 92.00

Productivity 13.04 ton(s)/hr

FORMWORKS LOADING / UNLOADING

Load Assumptions
Parameter Quantity Unit Remarks
Weight per Load/Lift 1,235.50 kgs
Volume per Load/Lift 3.65 m3
Area / Load 28.80 m2
Maximum Truck Capacity (Weight) 10,000.00 kgs
Maximum Truck Capacity (Volume) 15.00 m3
Total Number of Loads/Lifts 4.00 loads/lifts
Total Area 115.20 m2

Equipment Specifications Crane 25.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 25.00 tons
Fuel Consumption 27.00 li/hr
Swing-Hoist Up-Swing-Hoist Down 120.00 secs

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Set-up / Waiting


Set-up / Waiting / Maneuvering 0.33 20.00

Loading/Unloading
Tie/Rig Load 0.08 5.00
Swing-Hoist Up-Swing-Hoist Down 120.00 0.03 2.00
Unrig Load 0.08 5.00
Misc. Waiting 0.02 1.00

Loading/Unloading Cycle 0.65 39.00

Total 1.20 72.00

Productivity 96.00 m2/hr

MATERIALS HAULING

REINFORCING BAR HAULING

Equipment Specifications Flat Bed Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 35.00 km/hr
Empty Speed 40.00 km/hr
Load Capacity (Weight) 20,000.00 kgs.
Fuel Consumption 15.00 li/hr

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes
Maneuver & Wait 0.08 5.00
Wait While Loading 13.04 ton(s)/hr 1.53 92.00
Travel (Loaded) 35.00 0.14 8.57
Wait While Unloading 13.04 ton(s)/hr 1.53 92.00
Travel (Empty) 40.00 0.13 7.50

Total 3.42 205.07

Productivity AHD= 5.000 km(s) 5.85 ton(s)/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 13.04 ton(s)/hr 1.53 92.00
Travel (Loaded) 35.00 0.20 12.00
Wait While Unloading 13.04 ton(s)/hr 1.53 92.00
Travel (Empty) 40.00 0.18 10.50

Total 3.53 211.50

Productivity AHD= 7.000 km(s) 5.67 ton(s)/hr

AHD = 10.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 13.04 ton(s)/hr 1.53 92.00
Travel (Loaded) 35.00 0.29 17.14
Wait While Unloading 13.04 ton(s)/hr 1.53 92.00
Travel (Empty) 40.00 0.25 15.00

Total 3.69 221.14

Productivity AHD= 10.000 km(s) 5.43 ton(s)/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes
Activity Rate

Maneuver & Wait 0.08 5.00


Wait While Loading 13.04 ton(s)/hr 1.53 92.00
Travel (Loaded) 35.00 0.43 25.71
Wait While Unloading 13.04 ton(s)/hr 1.53 92.00
Travel (Empty) 40.00 0.38 22.50

Total 3.95 237.21

Productivity AHD= 15.000 km(s) 5.06 ton(s)/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 13.04 ton(s)/hr 1.53 92.00
Travel (Loaded) 35.00 0.57 34.29
Wait While Unloading 13.04 ton(s)/hr 1.53 92.00
Travel (Empty) 40.00 0.50 30.00

Total 4.22 253.29

Productivity AHD= 20.000 km(s) 4.74 ton(s)/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 13.04 ton(s)/hr 1.53 92.00
Travel (Loaded) 35.00 0.71 42.86
Wait While Unloading 13.04 ton(s)/hr 1.53 92.00
Travel (Empty) 40.00 0.63 37.50

Total 4.49 269.36

Productivity AHD= 25.000 km(s) 4.46 ton(s)/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 13.04 ton(s)/hr 1.53 92.00
Travel (Loaded) 35.00 0.86 51.43
Wait While Unloading 13.04 ton(s)/hr 1.53 92.00
Travel (Empty) 40.00 0.75 45.00

Total 4.76 285.43

Productivity AHD= 30.000 km(s) 4.20 ton(s)/hr

FORMWORKS HAULING

Equipment Specifications Cargo Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 40.00 km/hr
Empty Speed 60.00 km/hr
Load Capacity (Form Area) 115.20 m2
Load Capacity (Weight) 4,941.99 kgs.
Fuel Consumption 15.00 li/hr

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 96.00 1.20 72.00
Travel (Loaded) 40.00 0.13 7.50
Wait While Unloading 96.00 1.20 72.00
Travel (Empty) 60.00 0.08 5.00

Total 2.69 161.50

Productivity AHD= 5.000 km(s) 42.80 m2/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 96.00 1.20 72.00
Travel (Loaded) 40.00 0.18 10.50
Wait While Unloading 96.00 1.20 72.00
Travel (Empty) 60.00 0.12 7.00

Total 2.78 166.50

Productivity AHD= 7.000 km(s) 41.51 m2/hr

AHD = 10.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 96.00 1.20 72.00
Travel (Loaded) 40.00 0.35 21.08
Wait While Unloading 96.00 1.20 72.00
Travel (Empty) 60.00 0.17 10.00

Total 3.00 180.08

Productivity AHD= 10.000 km(s) 38.38 m2/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 96.00 1.20 72.00
Travel (Loaded) 40.00 0.38 22.50
Wait While Unloading 96.00 1.20 72.00
Travel (Empty) 60.00 0.25 15.00

Total 3.11 186.50

Productivity AHD= 15.000 km(s) 37.06 m2/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 96.00 1.20 72.00
Travel (Loaded) 40.00 0.50 30.00
Wait While Unloading 96.00 1.20 72.00
Travel (Empty) 60.00 0.33 20.00

Total 3.32 199.00

Productivity AHD= 20.000 km(s) 34.73 m2/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 96.00 1.20 72.00
Travel (Loaded) 40.00 0.63 37.50
Wait While Unloading 96.00 1.20 72.00
Travel (Empty) 60.00 0.42 25.00

Total 3.53 211.50

Productivity AHD= 25.000 km(s) 32.68 m2/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 96.00 1.20 72.00
Travel (Loaded) 40.00 0.75 45.00
Wait While Unloading 96.00 1.20 72.00
Travel (Empty) 60.00 0.50 30.00

Total 3.73 224.00

Productivity AHD= 30.000 km(s) 30.86 m2/hr

CEMENT (IN BAGS) HAULING

Equipment Specifications Cargo Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 40.00 km/hr
Empty Speed 60.00 km/hr
Load Capacity (Weight) 15,000.00 kgs.
Load Capacity (Bags) 375.00 kgs.
Fuel Consumption 15.00 li/hr

Cement Loading / Unloading Rate 109.76 bags/hr Refer to Labor Productivity

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 109.76 3.42 205.00
Travel (Loaded) 40.00 0.13 7.50
Wait While Unloading 109.76 3.42 205.00
Travel (Empty) 60.00 0.08 5.00

Total 7.13 427.50

Productivity AHD= 5.000 km(s) 52.63 bags/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 109.76 3.42 205.00
Travel (Loaded) 40.00 0.18 10.50
Wait While Unloading 109.76 3.42 205.00
Travel (Empty) 60.00 0.12 7.00

Total 7.21 432.50

Productivity AHD= 7.000 km(s) 52.02 bags/hr

AHD = 10.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 109.76 3.42 205.00
Travel (Loaded) 40.00 0.25 15.00
Wait While Unloading 109.76 3.42 205.00
Travel (Empty) 60.00 0.17 10.00
Total 7.33 440.00

Productivity AHD= 10.000 km(s) 51.14 bags/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 109.76 3.42 205.00
Travel (Loaded) 40.00 0.38 22.50
Wait While Unloading 109.76 3.42 205.00
Travel (Empty) 60.00 0.25 15.00

Total 7.54 452.50

Productivity AHD= 15.000 km(s) 49.72 bags/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 109.76 3.42 205.00
Travel (Loaded) 40.00 0.50 30.00
Wait While Unloading 109.76 3.42 205.00
Travel (Empty) 60.00 0.33 20.00

Total 7.75 465.00

Productivity AHD= 20.000 km(s) 48.39 bags/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 109.76 3.42 205.00
Travel (Loaded) 40.00 0.63 37.50
Wait While Unloading 109.76 3.42 205.00
Travel (Empty) 60.00 0.42 25.00

Total 7.96 477.50

Productivity AHD= 25.000 km(s) 47.12 bags/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 109.76 3.42 205.00
Travel (Loaded) 40.00 0.75 45.00
Wait While Unloading 109.76 3.42 205.00
Travel (Empty) 60.00 0.50 30.00

Total 8.17 490.00

Productivity AHD= 30.000 km(s) 45.92 bags/hr


Material Dimension Unit Weight
Plywood 2.4mx1.2mx12mm 300 kg/m3
Timber/Wood 100mm x 50mm x 6m 500 kg/m3
Scaffolds 1500mm x 1200mm 7850 kg/m3
For Columns / Walls:
Plywood 1 m2
Timber/Wood 10.4 lm 10.4
Scaffolds 0 pcs

For Slab
Plywood 1 m2
Timber/Wood 9 lm 9
Scaffolds 2 pcs 2
to Labor Productivity
Volume / Pc. Weight / Pc. No. of Pcs. Total Volume Total Weight Total Area
0.03 cu.m 10.37 kgs 10 0.35 cu.m 103.68 kgs 28.80 sq.m
0.03 cu.m 15.00 kgs 50 1.5 cu.m 750.00 kgs
0.09 cu.m 19.09 kgs 20 1.8 cu.m 381.82 kgs
Total 3.65 cu.m 1235.50 kgs 28.80 kgs
0.01 m3/m2 3.60 kgs/m2 0.42
lm/m 2
0.05 m3/m2 26.00 kgs/m2 5.00

Total 29.60 kgs/m2

0.01 m3/m2 3.60 kgs/m2 0.42


lm/m 2
0.05 m3/m2 22.50 kgs/m2 4.00
pcs/m2 0.18 m3/m2 38.18 kgs/m2 2.00
Total 64.28 kgs/m2
Remarks
pc
pcs/pc of plywood USE

pc
pcs/pc of plywood
pcs/pc of plywood USE
PRODUCTIVITY CALCULATIONS
Concrete Paving

Concrete Paving t = 230.00 mm

Equipment Specifications Somero 160 - Concrete Paver/Finisher


Parameter Quantity Unit
Forward Speed 6.10 km/hr
Reverse Speed 3.00 km/hr
Capacity (area/pass) 14.90 m2/pass
Screed Width 2.44 m
Boom Speed 108.00 m/hr

Trial Strip
Parameter Quantity Unit
Pavement Length 30.00 m
Pavement Width 3.65 m
Pavement Thickness 230.00 mm
Area of Pavement 109.50 m2
Volume 25.19 m3
No of Setups / Positions 13.00

Time-Motion Table Volume = 25.19 cu.m


Time Required Time Required
Activity Rate hrs minutes

Mobilization / Setup / Wait 0.67 40.00

Move Forward 6.10 0.00 0.02


Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 108.00 0.03 2.03
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
0 - - -
0 - - -
0 - -
0 - - -
0 - -
0 - - -
0 - - -
0 - -
0 - - -
0 - -

Cleanup / Demobilization 0.67 40.00

Total 2.58 154.82

Productivity 9.76 m3/hr

Productivity 42.44 m2/hr

Concrete Paving t = 270.00 mm

Equipment Specifications Somero 160 - Concrete Paver/Finisher


Parameter Quantity Unit
Forward Speed 6.10 km/hr
Reverse Speed 3.00 km/hr
Capacity (area/pass) 14.90 m2/pass
Screed Width 2.44 m
Boom Speed 90.00 m/hr

Trial Strip
Parameter Quantity Unit
Pavement Length 30.00 m
Pavement Width 3.65 m
Pavement Thickness 270.00 mm
Area of Pavement 109.50 m2
Volume 29.57 m3
No of Setups / Positions 13.00

Time-Motion Table Volume = 29.57 cu.m


Time Required Time Required
Activity Rate hrs minutes

Mobilization / Setup / Wait 0.67 40.00

Move Forward 6.10 0.00 0.02


Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 90.00 0.04 2.43
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
0 - - -
0 - - -
0 - -
0 - - -
0 - -
0 - - -
0 - - -
0 - -
0 - - -
0 - -

Cleanup / Demobilization 0.67 40.00

Total 2.67 160.09

Productivity 11.08 m3/hr

Productivity 41.04 m2/hr

Concrete Paving t = 300.00 mm

Equipment Specifications Somero 160 - Concrete Paver/Finisher


Parameter Quantity Unit
Forward Speed 6.10 km/hr
Reverse Speed 3.00 km/hr
Capacity (area/pass) 14.90 m2/pass
Screed Width 2.44 m
Boom Speed 72.00 m/hr

Trial Strip
Parameter Quantity Unit
Pavement Length 30.00 m
Pavement Width 3.65 m
Pavement Thickness 300.00 mm
Area of Pavement 109.50 m2
Volume 32.85 m3
No of Setups / Positions 13.00
Time-Motion Table Volume = 32.85 cu.m
Time Required Time Required
Activity Rate hrs minutes

Mobilization / Setup / Wait 0.67 40.00

Move Forward 6.10 0.00 0.02


Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
Move Forward 6.10 0.00 0.02
Extend Boom 72.00 0.05 3.04
Lower Boom / Adjust 0.01 0.50
Retract Boom / Pave Concrete 81.00 0.05 2.70
Raise Boom / Adjust 0.01 0.50
0 - - -
0 - - -
0 - -
0 - - -
0 - -
0 - - -
0 - - -
0 - -
0 - - -
0 - -

Cleanup / Demobilization 0.67 40.00

Total 2.80 168.00

Productivity 11.73 m3/hr

Productivity 39.11 m2/hr


Setup Number

1.00

2.00

3.00
4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00
13.00

13.00

Setup Number

1.00
2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00
12.00

13.00

13.00

13.00

-
Setup Number

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00
9.00

10.00

11.00

12.00

13.00

13.00

13.00

-
PRODUCTIVITY CALCULATIONS
Asphalt Paving

Asphalt Paver Specifications


Paver Width Working Speed Travel Speed
Paver Type / Make / Model
(m) (km/hr) (km/hr)

Dynapac F300 CS 16.00 1.2 3.6


Dynapac F182 CS 6.10 1.38 5
Dynapac F181 C 3.00 1.2 3.8
Dynapac F141 CS 5.10 1.2 4.6

Asphalt Paving t = 50.00 mm

Trial Strip
Parameter Quantity Unit
Pavement Length 300.00 m
Pavement Width 3.65 m
Pavement Thickness 50.00 mm
Area of Pavement 1,095.00 m2
Volume 54.75 m3
Tonnage 120.45 tons
Number of Load(s) 9.00
Length Paved / Load 33.33 m

Time-Motion Table Tonnage = 120.45 tons


Time Required Time Required
Activity Rate hrs minutes

Mobilization / Setup / Wait 0.67 40.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.20 0.03 1.67
Stop & Wait 0.08 5.00

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -
0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

Cleanup / Demobilization 0.67 40.00

Total 3.08 185.00

Productivity 39.06 ton(s)/hr

Productivity 355.14 m2/hr

Asphalt Paving t = 75.00 mm

Trial Strip
Parameter Quantity Unit
Pavement Length 300.00 m
Pavement Width 3.65 m
Pavement Thickness 75.00 mm
Area of Pavement 1,095.00 m2
Volume 82.13 m3
Tonnage 180.68 tons
Number of Load(s) 14.00
Length Paved / Load 21.43 m

Time-Motion Table Tonnage = 180.68 tons


Time Required Time Required
Activity Rate hrs minutes

Mobilization / Setup / Wait 0.67 40.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.14 0.02 1.13
Stop & Wait 0.08 5.00

0 - -
0 - - -
0 - -
0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

Cleanup / Demobilization 0.67 40.00

Total 3.93 235.79

Productivity 45.98 ton(s)/hr

Productivity 278.64 m2/hr

Asphalt Paving t = 100.00 mm

Trial Strip
Parameter Quantity Unit
Pavement Length 300.00 m
Pavement Width 3.65 m
Pavement Thickness 100.00 mm
Area of Pavement 1,095.00 m2
Volume 109.50 m3
Tonnage 240.90 tons
Number of Load(s) 18.00
Length Paved / Load 16.67 m

Time-Motion Table Tonnage = 240.90 tons


Time Required Time Required
Activity Rate hrs minutes

Mobilization / Setup / Wait 0.67 40.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00

Load 0.08 5.00


Pave 1.08 0.02 0.93
Stop & Wait 0.08 5.00
0 0.08 5.00
0 1.08 0.02 0.93
0 0.08 5.00

0 0.08 5.00
0 1.08 0.02 0.93
0 0.08 5.00

0 0.08 5.00
0 1.08 0.02 0.93
0 0.08 5.00

0 0.08 5.00
0 1.08 0.02 0.93
0 0.08 5.00

0 - -
0 - - -
0 - -

0 - -
0 - - -
0 - -

Cleanup / Demobilization 0.67 40.00

Total 4.61 276.67

Productivity 52.24 ton(s)/hr

Productivity 237.47 m2/hr


Laying Thickness Hopper Capacity
(mm) (m3) tons

350 6.80 15.00


350 7.80 18.10
300 6.00 13.00
300 6.00 13.00

Setup Number

1.00

2.00

3.00
4.00

5.00

6.00

7.00

8.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00
9.00

9.00

6.00 truckloads

30.83 mins/truckloads

Setup Number

1.00

2.00
3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

14.00
14.00

14.00

14.00

6.00 truckloads

39.30 mins/truckloads

Setup Number

1.00
2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00
15.00

16.00

17.00

18.00

18.00

18.00

6.00 truckloads

46.11 mins/truckloads
PRODUCTIVITY CALCULATIONS
Asphalt Compacting

Asphalt Compactor Specifications


Drum Width Working Speed Travel Speed
Paver Type / Make / Model
(m) (km/hr) (km/hr)

Dynapac CC142 1.30 1 10


Dynapac CG223HF 1.45 1.2 12
Dynapac CC322 1.68 1.3 13

Asphalt Paving t = 50.00 mm

Asphalt Compactor Specifications


Parameter Quantity Unit
Forward Speed 1.30 km/hr
Reverse Speed 1.30 km/hr
Drum Width 1.68 m

Trial Strip
Parameter Quantity Unit
Pavement Length 33.33 m
Pavement Width 3.65 m
Pavement Thickness 50.00 mm
Area of Pavement 121.67 m2
Volume 6.08 m3
Tonnage 13.38 tons
No. of Passes (per drum width) 7.00 passes
Total No. of Passes 3.00 passes

Time-Motion Table Tonnage = 13.38 tons


Time Required Time Required
Activity Rate hrs minutes

Wait 0.17 10.00

Move Forward 1.30 0.03 1.54


Reverse 1.30 0.03 1.54

Move Forward 1.30 0.03 1.54


Reverse 1.30 0.03 1.54

Move Forward 1.30 0.03 1.54


Reverse 1.30 0.03 1.54

Move Forward 1.30 0.03 1.54


Reverse 1.30 0.03 1.54

Move Forward 1.30 0.03 1.54


Reverse 1.30 0.03 1.54

Move Forward 1.30 0.03 1.54


Reverse 1.30 0.03 1.54

Move Forward 1.30 0.03 1.54


Reverse 1.30 0.03 1.54

0 - - -
0 - - -

0 - - -
0 - - -

0 - - -
0 - - -

0 - - -
0 - - -

0 - - -
0 - - -

Compaction Cycle 3 cycles 1.08 21.54

Wait 0.17 10.00

Total 1.41 41.54

Productivity 9.49 ton(s)/hr

Productivity 86.27 m2/hr

Asphalt Paving t = 75.00 mm

Asphalt Compactor Specifications


Parameter Quantity Unit
Forward Speed 1.30 km/hr
Reverse Speed 1.30 km/hr
Drum Width 1.68 m
Trial Strip
Parameter Quantity Unit
Pavement Length 21.43 m
Pavement Width 3.65 m
Pavement Thickness 75.00 mm
Area of Pavement 78.21 m2
Volume 5.87 m3
Tonnage 12.91 tons
No. of Passes (per drum width) 7.00 passes
Total No. of Passes 3.00 passes

Time-Motion Table Tonnage = 12.91 tons


Time Required Time Required
Activity Rate hrs minutes

Wait 0.17 10.00

Move Forward 1.30 0.02 0.99


Reverse 1.30 0.02 0.99

Move Forward 1.30 0.02 0.99


Reverse 1.30 0.02 0.99

Move Forward 1.30 0.02 0.99


Reverse 1.30 0.02 0.99

Move Forward 1.30 0.02 0.99


Reverse 1.30 0.02 0.99

Move Forward 1.30 0.02 0.99


Reverse 1.30 0.02 0.99

Move Forward 1.30 0.02 0.99


Reverse 1.30 0.02 0.99

Move Forward 1.30 0.02 0.99


Reverse 1.30 0.02 0.99

0 - - -
0 - - -

0 - - -
0 - - -

0 - - -
0 - - -
0 - - -
0 - - -

0 - - -
0 - - -

Compaction Cycle 3 cycles 0.69 13.85

Wait cycles 0.17 10.00

Total 1.03 33.85

Productivity 12.58 ton(s)/hr

Productivity 76.26 m2/hr

Asphalt Paving t = 100.00 mm

Asphalt Compactor Specifications


Parameter Quantity Unit
Forward Speed 1.30 km/hr
Reverse Speed 1.30 km/hr
Drum Width 1.68 m

Trial Strip
Parameter Quantity Unit
Pavement Length 16.67 m
Pavement Width 3.65 m
Pavement Thickness 100.00 mm
Area of Pavement 60.83 m2
Volume 6.08 m3
Tonnage 13.38 tons
No. of Passes (per drum width) 7.00 passes
Total No. of Passes 3.00 passes

Time-Motion Table Tonnage = 13.38 tons


Time Required Time Required
Activity Rate hrs minutes

Wait 0.17 10.00

Move Forward 1.30 0.01 0.77


Reverse 1.30 0.01 0.77

Move Forward 1.30 0.01 0.77


Reverse 1.30 0.01 0.77

Move Forward 1.30 0.01 0.77


Reverse 1.30 0.01 0.77

Move Forward 1.30 0.01 0.77


Reverse 1.30 0.01 0.77

Move Forward 1.30 0.01 0.77


Reverse 1.30 0.01 0.77

Move Forward 1.30 0.01 0.77


Reverse 1.30 0.01 0.77

Move Forward 1.30 0.01 0.77


Reverse 1.30 0.01 0.77

0 - - -
0 - - -

0 - - -
0 - - -

0 - - -
0 - - -

0 - - -
0 - - -

0 - - -
0 - - -

Compaction Cycle 3 cycles 0.54 10.77

Wait 0.17 10.00

Total 0.87 30.77

Productivity 15.35 ton(s)/hr

Productivity 69.78 m2/hr


Weight
(tons)

4.40
8.20
8.80

Setup Number

1.00

2.00
3.00

4.00

5.00

6.00

7.00

7.00

7.00

7.00

7.00

7.00
Setup Number

1.00

2.00

3.00

4.00

5.00

6.00

7.00

7.00

7.00

7.00
7.00

7.00

Setup Number
1.00

2.00

3.00

4.00

5.00

6.00

7.00

7.00

7.00

7.00

7.00

7.00
PRODUCTIVITY CALCULATIONS
Prime Coat Distributing

Asphalt Distributor Specifications


Parameter Quantity Unit
Tank Capacity 5.00 tons
Tank Capacity 6,250.00 li
Travel Speed (Loaded) 30.00 km/hr
Travel Speed (Empty) 50.00 km/hr
Pump (Rated) Capacity 15.00 m3/hr
Application Rate 1.00 li/m2
Application Rate 0.0008 tons/m2
Application Rate 15,000.00 m2/hr
Spray Bar Length 6.20 m
Application Speed 2,419.35 m/hr
Application Speed 40.32 m/min
Area per Truckload 6,250.00 m2

Site Conditions
Parameter Quantity Unit
Pavement Length 500.00 m
Pavement Width 7.30 m
Area of Pavement 3,650.00 m2
Application Requirement 2.00 li/m2
Volume 7,300.00 li
Distance to/from Plant 30.00 kms

Time-Motion Table Tonnage = 5.84 tons


Time Required Time Required
Activity Rate hrs minutes

Load Bitumen 2.34 140.16


Travel to Site (Loaded) 30.00 1.00 60.00
Wait at Site 0.35 21.00
Unload Bitumen 1,209.68 0.41 24.80
Travel to Plant (Empty) 50.00 0.60 36.00

Adjustment Factor 4.70

Total 9.40 281.96

Productivity 0.62 ton(s)/hr

Productivity 388.35 m2/hr


Setup Number
PRODUCTIVITY CALCULATIONS
Tack Coat Distributing

Asphalt Distributor Specifications


Parameter Quantity Unit
Tank Capacity 5.00 tons
Tank Capacity 6,250.00 li
Travel Speed (Loaded) 30.00 km/hr
Travel Speed (Empty) 50.00 km/hr
Pump (Rated) Capacity 15.00 m3/hr
Application Rate 1.00 li/m2
Application Rate 0.0008 tons/m2
Application Rate 15,000.00 m2/hr
Spray Bar Length 6.20 m
Application Speed 2,419.35 m/hr
Application Speed 40.32 m/min
Area per Truckload 6,250.00 m2

Site Conditions
Parameter Quantity Unit
Pavement Length 500.00 m
Pavement Width 7.30 m
Area of Pavement 3,650.00 m2
Application Requirement 0.75 li/m2
Volume 2,737.50 li
Distance to/from Plant 30.00 kms

Time-Motion Table Tonnage = 2.19 tons


Time Required Time Required
Activity Rate hrs minutes

Load Bitumen 0.88 52.56


Travel to Site (Loaded) 30.00 1.00 60.00
Wait at Site 0.35 21.00
Unload Bitumen 3,225.81 0.16 9.30
Travel to Plant (Empty) 50.00 0.60 36.00

Adjustment Factor -

Total 2.98 178.86

Productivity 0.73 ton(s)/hr

Productivity 1,224.42 m2/hr


Setup Number
PRODUCTIVITY CALCULATIONS
Asphalt Material Application (1)

Asphalt Distributor Specifications


Parameter Quantity Unit
Tank Capacity 5.00 tons
Tank Capacity 6,250.00 li
Travel Speed (Loaded) 30.00 km/hr
Travel Speed (Empty) 50.00 km/hr
Pump (Rated) Capacity 15.00 m3/hr
Application Rate 1.00 li/m2
Application Rate 0.0008 tons/m2
Application Rate 15,000.00 m2/hr
Spray Bar Length 6.20 m
Application Speed 2,419.35 m/hr
Application Speed 40.32 m/min
Area per Truckload 6,250.00 m2

Site Conditions
Parameter Quantity Unit
Pavement Length 500.00 m
Pavement Width 7.30 m
Area of Pavement 3,650.00 m2
Application Requirement 1.20 li/m2
Volume 4,380.00 li
Distance to/from Plant 30.00 kms

Time-Motion Table Tonnage = 3.50 tons


Time Required Time Required
Activity Rate hrs minutes

Load Bitumen 1.40 84.10


Travel to Site (Loaded) 30.00 1.00 60.00
Wait at Site 0.35 21.00
Unload Bitumen 2,016.13 0.25 14.88
Travel to Plant (Empty) 50.00 0.60 36.00

Adjustment Factor -

Total 3.60 215.98

Productivity 0.97 ton(s)/hr

Productivity 1,014.00 m2/hr


Setup Number
PRODUCTIVITY CALCULATIONS
Asphalt Material Application (2)

Asphalt Distributor Specifications


Parameter Quantity Unit
Tank Capacity 5.00 tons
Tank Capacity 6,250.00 li
Travel Speed (Loaded) 30.00 km/hr
Travel Speed (Empty) 50.00 km/hr
Pump (Rated) Capacity 15.00 m3/hr
Application Rate 1.00 li/m2
Application Rate 0.0008 tons/m2
Application Rate 15,000.00 m2/hr
Spray Bar Length 6.20 m
Application Speed 2,419.35 m/hr
Application Speed 40.32 m/min
Area per Truckload 6,250.00 m2

Site Conditions
Parameter Quantity Unit
Pavement Length 500.00 m
Pavement Width 7.30 m
Area of Pavement 3,650.00 m2
Application Requirement 2.00 li/m2
Volume 7,300.00 li
Distance to/from Plant 30.00 kms

Time-Motion Table Tonnage = 5.84 tons


Time Required Time Required
Activity Rate hrs minutes

Load Bitumen 2.34 140.16


Travel to Site (Loaded) 30.00 1.00 60.00
Wait at Site 0.35 21.00
Unload Bitumen 1,209.68 0.41 24.80
Travel to Plant (Empty) 50.00 0.60 36.00

Adjustment Factor 4.70

Total 4.70 281.96

Productivity 1.24 ton(s)/hr

Productivity 776.71 m2/hr


Setup Number
PRODUCTIVITY CALCULATIONS
Water Hauling by Water Truck

Equipment Specifications Water Truck Cap = 4.00 cu.m


Parameter Quantity Unit
Loaded Speed 45.00 km/hr
Empty Speed 60.00 km/hr
Load Capacity 4.00 m3
Fuel Consumption 15.00 li/hr
Suction/Discharge Rate 350.00 li/m

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 350.000 lpm 0.19 11.43
Travel (Loaded) 45.00 0.11 6.67
Maneuver & Wait 0.08 5.00
Discharge Load 350.000 lpm 0.19 11.43
Travel (Empty) 60.00 0.08 5.00

Total 0.74 44.52

Productivity AHD= 5.000 km(s) 5.39 m3/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 350.000 lpm 0.19 11.43
Travel (Loaded) 45.00 0.16 9.33
Maneuver & Wait 0.08 5.00
Discharge Load 350.000 lpm 0.19 11.43
Travel (Empty) 60.00 0.12 7.00

Total 0.82 49.19

Productivity AHD= 7.000 km(s) 4.88 m3/hr


AHD = 10.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 350.000 lpm 0.19 11.43
Travel (Loaded) 45.00 0.22 13.33
Maneuver & Wait 0.08 5.00
Discharge Load 350.000 lpm 0.19 11.43
Travel (Empty) 60.00 0.17 10.00

Total 0.94 56.19

Productivity AHD= 10.000 km(s) 4.27 m3/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 350.000 lpm 0.19 11.43
Travel (Loaded) 45.00 0.33 20.00
Maneuver & Wait 0.08 5.00
Discharge Load 350.000 lpm 0.19 11.43
Travel (Empty) 60.00 0.25 15.00

Total 1.13 67.86

Productivity AHD= 15.000 km(s) 3.54 m3/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 350.000 lpm 0.19 11.43
Travel (Loaded) 45.00 0.44 26.67
Maneuver & Wait 0.08 5.00
Discharge Load 350.000 lpm 0.19 11.43
Travel (Empty) 60.00 0.33 20.00

Total 1.33 79.52


Productivity AHD= 20.000 km(s) 3.02 m3/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 350.000 lpm 0.19 11.43
Travel (Loaded) 45.00 0.56 33.33
Maneuver & Wait 0.08 5.00
Discharge Load 350.000 lpm 0.19 11.43
Travel (Empty) 60.00 0.42 25.00

Total 1.52 91.19

Productivity AHD= 25.000 km(s) 2.63 m3/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 350.000 lpm 0.19 11.43
Travel (Loaded) 45.00 0.67 40.00
Maneuver & Wait 0.08 5.00
Discharge Load 350.000 lpm 0.19 11.43
Travel (Empty) 60.00 0.50 30.00

Total 1.71 102.86

Productivity AHD= 30.000 km(s) 2.33 m3/hr


PRODUCTIVITY CALCULATIONS
Fuel Hauling Hauling by Fuel Truck

Equipment Specifications Fuel Truck Cap = 13.00 cu.m


Parameter Quantity Unit
Loaded Speed 45.00 km/hr
Empty Speed 60.00 km/hr
Load Capacity 13.00 m3
Fuel Consumption 15.00 li/hr
Suction/Discharge Rate 65.00 li/m

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 65.000 lpm 3.33 200.00
Travel (Loaded) 45.00 0.11 6.67
Maneuver & Wait 0.08 5.00
Discharge Load 65.000 lpm 3.33 200.00
Travel (Empty) 60.00 0.08 5.00

Total 7.03 421.67

Productivity AHD= 5.000 km(s) 1.85 m3/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 65.000 lpm 3.33 200.00
Travel (Loaded) 45.00 0.16 9.33
Maneuver & Wait 0.08 5.00
Discharge Load 65.000 lpm 3.33 200.00
Travel (Empty) 60.00 0.12 7.00

Total 7.11 426.33

Productivity AHD= 7.000 km(s) 1.83 m3/hr


AHD = 10.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 65.000 lpm 3.33 200.00
Travel (Loaded) 45.00 0.22 13.33
Maneuver & Wait 0.08 5.00
Discharge Load 65.000 lpm 3.33 200.00
Travel (Empty) 60.00 0.17 10.00

Total 7.22 433.33

Productivity AHD= 10.000 km(s) 1.80 m3/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 65.000 lpm 3.33 200.00
Travel (Loaded) 45.00 0.33 20.00
Maneuver & Wait 0.08 5.00
Discharge Load 65.000 lpm 3.33 200.00
Travel (Empty) 60.00 0.25 15.00

Total 7.42 445.00

Productivity AHD= 15.000 km(s) 1.75 m3/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 65.000 lpm 3.33 200.00
Travel (Loaded) 45.00 0.44 26.67
Maneuver & Wait 0.08 5.00
Discharge Load 65.000 lpm 3.33 200.00
Travel (Empty) 60.00 0.33 20.00

Total 7.61 456.67


Productivity AHD= 20.000 km(s) 1.71 m3/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 65.000 lpm 3.33 200.00
Travel (Loaded) 45.00 0.56 33.33
Maneuver & Wait 0.08 5.00
Discharge Load 65.000 lpm 3.33 200.00
Travel (Empty) 60.00 0.42 25.00

Total 7.81 468.33

Productivity AHD= 25.000 km(s) 1.67 m3/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 65.000 lpm 3.33 200.00
Travel (Loaded) 45.00 0.67 40.00
Maneuver & Wait 0.08 5.00
Discharge Load 65.000 lpm 3.33 200.00
Travel (Empty) 60.00 0.50 30.00

Total 8.00 480.00

Productivity AHD= 30.000 km(s) 1.63 m3/hr


PRODUCTIVITY CALCULATIONS
Rock Breaking

Rock Breaking Diameter = 5000.00 mm

Trial Boulder
Parameter Quantity Unit
Boulder Length 5.00 m
Boulder Width 5.00 m
Boulder Height 5.00 m
Area of Boulder 25.00 sm
Volume 125.00 m3

Equipment Specifications Backhoe w/ Breaker


Parameter Quantity Unit
Forward Speed 2.63 km/hr
Reverse Speed 2.63 km/hr
Bucket Capacity 0.80 m3
Fuel Consumption 16.00 li/hr

Productivity Rates - Breaking


Breaker Penetration Rate 4.00 mm/sec
14.40 m/hr
Duration per Breaking Stroke 0.347 hrs
Swing-Lower/Raise-Swing Cycle 35.00 secs
Area Covered / Penetration 2.00 m2
Direct Area Breaking Rate 5.76 m2/hr
Area Covered / Position 12.50 m2
Duration per Position 2.18 hrs
Number of Positions 2.00 positions
Total Duration (Breaking) 4.36 hrs Excluding Travel

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Breaking
Fix Breaker, Maneuver, Wait 1.00 60.00
Moving Forward, Positioning 0.17 10.23
Breaking 4.36 261.58
Maneuver, Wait 0.25 15.00

Total 5.78 346.81

Productivity 21.63 m3/hr


PRODUCTIVITY CALCULATIONS
Rock Loading from Stockpile - Loader

Trial Pile
Parameter Quantity Unit
Pile Length 5.00 m
Pile Width 5.00 m
Height 4.00 m
Area of Pile 25.00 sm
Volume 33.33 m3

Equipment Specifications Loader 100HP Cap = 1.50 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 6.40 km/hr 1.78
Reverse Speed 7.70 km/hr 2.14
Actual Bucket Capacity : 75.000% 1.13 m3
Dig - Raise Cycle 16.40 secs
Reverse-Forward Cycle 10.30 secs
Dump - Lower Empty Cycle 5.50 secs
Fuel Consumption 15.00 li/hr

Time-Motion Table 75% Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total 0.26 15.37

Productivity 43.93 m3/hr

Equipment Specifications Loader 117HP Cap = 2.40 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 7.10 km/hr 1.97
Reverse Speed 7.80 km/hr 2.17
Actual Bucket Capacity : 75.000% 1.80 m3
Dig - Raise Cycle 16.60 secs
Reverse-Forward Cycle 9.69 secs
Dump - Lower Empty Cycle 5.20 secs
Fuel Consumption 19.00 li/hr

Time-Motion Table 75% Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total 0.23 13.67

Productivity 49.37 m3/hr


m/s
m/s

Dump Truck Capacity = 11.25 cu.m


Volume Running
Volume
(m3) (m3)

1.13 1.13
1.13 2.25
1.13 3.38
1.13 4.50
1.13 5.63
1.13 6.75
1.13 7.88
1.13 9.00
1.13 10.13
1.13 11.25
- 11.25
- 11.25
- 11.25
- 11.25
- 11.25
- 11.25
- 11.25
- 11.25
- 11.25
- 11.25
- 11.25
m/s
m/s

Dump Truck Capacity = 11.25 cu.m


Volume Running
Volume
(m3) (m3)

1.80 1.80
1.80 3.60
1.80 5.40
1.80 7.20
1.80 9.00
1.80 10.80
1.80 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
- 12.60
PRODUCTIVITY CALCULATIONS
Rock Hauling by Dump Truck

Equipment Specifications Dump Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 30.00 km/hr
Empty Speed 60.00 km/hr
Actual Capacity : 75.000% 11.25 m3
Fuel Consumption 15.00 li/hr

LOADING BY WHEEL LOADER

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.17 10.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.08 5.00

Total 0.68 40.67

Productivity AHD= 5.000 km(s) 16.60 m3/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.23 14.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.12 7.00

Total 0.78 46.67

Productivity AHD= 7.000 km(s) 14.46 m3/hr


AHD = 10.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.35 21.08
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.17 10.00

Total 0.95 56.76

Productivity AHD= 10.000 km(s) 11.89 m3/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.50 30.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.25 15.00

Total 1.18 70.67

Productivity AHD= 15.000 km(s) 9.55 m3/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.67 40.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.33 20.00
Total 1.43 85.67

Productivity AHD= 20.000 km(s) 7.88 m3/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.83 50.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.42 25.00

Total 1.68 100.67

Productivity AHD= 25.000 km(s) 6.70 m3/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 1.00 60.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.50 30.00

Total 1.93 115.67

Productivity AHD= 30.000 km(s) 5.84 m3/hr


PRODUCTIVITY CALCULATIONS
Stone Loading from Stockpile - Loader

Trial Pile
Parameter Quantity Unit
Pile Length 5.00 m
Pile Width 5.00 m
Height 4.00 m
Area of Pile 25.00 sm
Volume 33.33 m3

Equipment Specifications Loader 100HP Cap = 1.50 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 6.40 km/hr 1.78
Reverse Speed 7.70 km/hr 2.14
Actual Bucket Capacity : 85.000% 1.28 m3
Dig - Raise Cycle 16.40 secs
Reverse-Forward Cycle 10.30 secs
Dump - Lower Empty Cycle 5.50 secs
Fuel Consumption 15.00 li/hr

Time-Motion Table 85% Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
Dig-Raise-Dump-Lower Empty 0.009 0.54
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total 0.26 15.37

Productivity 49.78 m3/hr

Equipment Specifications Loader 117HP Cap = 2.40 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 7.10 km/hr 1.97
Reverse Speed 7.80 km/hr 2.17
Actual Bucket Capacity : 85.000% 2.04 m3
Dig - Raise Cycle 16.60 secs
Reverse-Forward Cycle 9.69 secs
Dump - Lower Empty Cycle 5.20 secs
Fuel Consumption 19.00 li/hr

Time-Motion Table 85% Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total 0.23 13.67

Productivity 55.95 m3/hr


m/s
m/s

Dump Truck Capacity = 12.75 cu.m


Volume Running
Volume
(m3) (m3)

1.28 1.28
1.28 2.55
1.28 3.83
1.28 5.10
1.28 6.38
1.28 7.65
1.28 8.93
1.28 10.20
1.28 11.48
1.28 12.75
- 12.75
- 12.75
- 12.75
- 12.75
- 12.75
- 12.75
- 12.75
- 12.75
- 12.75
- 12.75
- 12.75
m/s
m/s

Dump Truck Capacity = 12.75 cu.m


Volume Running
Volume
(m3) (m3)

2.04 2.04
2.04 4.08
2.04 6.12
2.04 8.16
2.04 10.20
2.04 12.24
2.04 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
- 14.28
PRODUCTIVITY CALCULATIONS
Stone Hauling by Dump Truck

Equipment Specifications Dump Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 30.00 km/hr
Empty Speed 60.00 km/hr
Actual Capacity : 85.000% 12.75 m3
Fuel Consumption 15.00 li/hr

LOADING BY WHEEL LOADER

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.17 10.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.08 5.00

Total 0.68 40.67

Productivity AHD= 5.000 km(s) 18.81 m3/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.23 14.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.12 7.00

Total 0.78 46.67

Productivity AHD= 7.000 km(s) 16.39 m3/hr


AHD = 10.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.35 21.08
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.17 10.00

Total 0.95 56.76

Productivity AHD= 10.000 km(s) 13.48 m3/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.50 30.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.25 15.00

Total 1.18 70.67

Productivity AHD= 15.000 km(s) 10.82 m3/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.67 40.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.33 20.00
Total 1.43 85.67

Productivity AHD= 20.000 km(s) 8.93 m3/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.83 50.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.42 25.00

Total 1.68 100.67

Productivity AHD= 25.000 km(s) 7.60 m3/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 1.00 60.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 60.00 0.50 30.00

Total 1.93 115.67

Productivity AHD= 30.000 km(s) 6.61 m3/hr


PRODUCTIVITY CALCULATIONS
Boulder Loading from Stockpile - Loader

Trial Pile
Parameter Quantity Unit
Pile Length 5.00 m
Pile Width 5.00 m
Height 4.00 m
Area of Pile 25.00 sm
Volume 33.33 m3

Equipment Specifications Loader 100HP Cap = 1.50 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 6.40 km/hr 1.78
Reverse Speed 7.70 km/hr 2.14
Actual Bucket Capacity : 45.000% 0.68 m3
Dig - Raise Cycle 21.40 secs
Reverse-Forward Cycle 10.30 secs
Dump - Lower Empty Cycle 6.10 secs
Fuel Consumption 15.00 li/hr

Time-Motion Table 45% Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
Dig-Raise-Dump-Lower Empty 0.011 0.63
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total 0.27 16.30

Productivity 24.85 m3/hr

Equipment Specifications Loader 117HP Cap = 2.40 cu.m


Dump Truck Cap = 15.00 cu.m
Parameter Quantity Unit
Forward Speed 7.10 km/hr 1.97
Reverse Speed 7.80 km/hr 2.17
Actual Bucket Capacity : 45.000% 1.08 m3
Dig - Raise Cycle 16.60 secs
Reverse-Forward Cycle 9.69 secs
Dump - Lower Empty Cycle 5.20 secs
Fuel Consumption 19.00 li/hr

Time-Motion Table 45% Dump Truck Capacity


Time Required Time Required
Activity Rate hrs minutes

Maneuver & Waiting Time 0.167 10.00


Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
Dig-Raise-Dump-Lower Empty 0.009 0.52
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

Total 0.23 13.67

Productivity 29.62 m3/hr


m/s
m/s

Dump Truck Capacity = 6.75 cu.m


Volume Running
Volume
(m3) (m3)

0.68 0.68
0.68 1.35
0.68 2.03
0.68 2.70
0.68 3.38
0.68 4.05
0.68 4.73
0.68 5.40
0.68 6.08
0.68 6.75
- 6.75
- 6.75
- 6.75
- 6.75
- 6.75
- 6.75
- 6.75
- 6.75
- 6.75
- 6.75
- 6.75
m/s
m/s

Dump Truck Capacity = 6.75 cu.m


Volume Running
Volume
(m3) (m3)

1.08 1.08
1.08 2.16
1.08 3.24
1.08 4.32
1.08 5.40
1.08 6.48
1.08 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
- 7.56
PRODUCTIVITY CALCULATIONS
Stone Hauling by Dump Truck

Equipment Specifications Dump Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 30.00 km/hr
Empty Speed 50.00 km/hr
Actual Capacity : 45.000% 6.75 m3
Fuel Consumption 15.00 li/hr

LOADING BY WHEEL LOADER

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.17 10.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 50.00 0.10 6.00

Total 0.69 41.67

Productivity AHD= 5.000 km(s) 9.72 m3/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.23 14.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 50.00 0.14 8.40

Total 0.80 48.07

Productivity AHD= 7.000 km(s) 8.42 m3/hr


AHD = 10.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.35 21.08
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 50.00 0.20 12.00

Total 0.98 58.76

Productivity AHD= 10.000 km(s) 6.89 m3/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.50 30.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 50.00 0.30 18.00

Total 1.23 73.67

Productivity AHD= 15.000 km(s) 5.50 m3/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.67 40.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 50.00 0.40 24.00
Total 1.49 89.67

Productivity AHD= 20.000 km(s) 4.52 m3/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 0.83 50.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 50.00 0.50 30.00

Total 1.76 105.67

Productivity AHD= 25.000 km(s) 3.83 m3/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.23 13.67
Travel (Loaded) 30.00 1.00 60.00
Maneuver & Wait 0.08 5.00
Dump 0.03 2.00
Travel (Empty) 50.00 0.60 36.00

Total 2.03 121.67

Productivity AHD= 30.000 km(s) 3.33 m3/hr


PRODUCTIVITY CALCULATIONS
Asphalt Hauling by Dump Truck

Equipment Specifications Dump Truck Cap = 15.00 cu.m


Parameter Quantity Unit
Loaded Speed 30.00 km/hr
Empty Speed 60.00 km/hr
Load Capacity 10.50 m3
Load Capacity 23.10 tons
Fuel Consumption 15.00 li/hr
Unloading Rate 39.30 mins/truckload

Equipment Specifications Asphalt Plant Cap = 100.00 tph


Parameter Quantity Unit
Loading Rate 85.00 tons/hr

Asphalt Specifications
Parameter Quantity Unit
Density 2.20 tons/m3

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.27 16.31
Travel (Loaded) 30.00 0.17 10.00
Maneuver & Wait 0.08 5.00
Dump 0.65 39.30
Travel (Empty) 60.00 0.08 5.00

Total 1.34 80.60

Productivity AHD= 5.000 km(s) 7.82 m3/hr

Productivity AHD= 5.000 km(s) 17.20 tons/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.27 16.31
Travel (Loaded) 30.00 0.23 14.00
Maneuver & Wait 0.08 5.00
Dump 0.65 39.30
Travel (Empty) 60.00 0.12 7.00

Total 1.44 86.60

Productivity AHD= 7.000 km(s) 7.27 m3/hr

Productivity AHD= 7.000 km(s) 16.00 tons/hr

AHD = 10.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.27 16.31
Travel (Loaded) 30.00 0.35 21.08
Maneuver & Wait 0.08 5.00
Dump 0.65 39.30
Travel (Empty) 60.00 0.17 10.00

Total 1.61 96.69

Productivity AHD= 10.000 km(s) 6.52 m3/hr

Productivity AHD= 10.000 km(s) 14.33 tons/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.27 16.31
Travel (Loaded) 30.00 0.50 30.00
Maneuver & Wait 0.08 5.00
Dump 0.65 39.30
Travel (Empty) 60.00 0.25 15.00

Total 1.84 110.60

Productivity AHD= 15.000 km(s) 5.70 m3/hr

Productivity AHD= 15.000 km(s) 12.53 tons/hr


AHD = 20.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.27 16.31
Travel (Loaded) 30.00 0.67 40.00
Maneuver & Wait 0.08 5.00
Dump 0.65 39.30
Travel (Empty) 60.00 0.33 20.00

Total 2.09 125.60

Productivity AHD= 20.000 km(s) 5.02 m3/hr

Productivity AHD= 20.000 km(s) 11.03 tons/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.27 16.31
Travel (Loaded) 30.00 0.83 50.00
Maneuver & Wait 0.08 5.00
Dump 0.65 39.30
Travel (Empty) 60.00 0.42 25.00

Total 2.34 140.60

Productivity AHD= 25.000 km(s) 4.48 m3/hr

Productivity AHD= 25.000 km(s) 9.86 tons/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Wait While Loading 0.27 16.31
Travel (Loaded) 30.00 1.00 60.00
Maneuver & Wait 0.08 5.00
Dump 0.65 39.30
Travel (Empty) 60.00 0.50 30.00

Total 2.59 155.60

Productivity AHD= 30.000 km(s) 4.05 m3/hr

Productivity AHD= 30.000 km(s) 8.91 tons/hr


PRODUCTIVITY CALCULATIONS
PC Girder Setting

AASHTO TYPE 1 Length : 8.000 m

Equipment Specifications Crane 80.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 80.00 tons
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Mobilization / Waiting


Mobilization/Waiting 0.75 45.00

Loading/Unloading
Tie/Rig Girder 0.25 15.00
Swing-Hoist Up-Swing-Hoist Up 0.42 25.00
Set - Hoist Down - Untie/Rig Girder 0.25 15.00
Swing-Hoist Up 0.17 10.00

Demobilization -
Demobilization 0.50 30.00

Total 2.33 140.00

Number of Units 2 nos.


Total Time for 2 Units 4.67 hrs

Productivity 1.71 lm/hr

AASHTO TYPE 2 Length : 10.000 m

Equipment Specifications Crane 80.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 80.00 tons
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate
Activity Rate hrs minutes

Equipment Mobilization / Waiting


Mobilization/Waiting 0.75 45.00

Loading/Unloading
Tie/Rig Girder 0.25 15.00
Swing-Hoist Up-Swing-Hoist Up 0.47 28.00
Set - Hoist Down - Untie/Rig Girder 0.25 15.00
Swing-Hoist Up 0.17 10.00

Demobilization -
Demobilization 0.50 30.00

Total 2.38 143.00

Number of Units 2 nos.


Total Time for 2 Units 4.77 hrs

Productivity 2.10 lm/hr

AASHTO TYPE 3 Length : 18.000 m

Equipment Specifications Crane 80.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 80.00 tons
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Mobilization / Waiting


Mobilization/Waiting 0.75 45.00

Loading/Unloading
Tie/Rig Girder 0.25 15.00
Swing-Hoist Up-Swing-Hoist Up 0.50 30.00
Set - Hoist Down - Untie/Rig Girder 0.25 15.00
Swing-Hoist Up 0.17 10.00

Demobilization -
Demobilization 0.50 30.00

Total 2.42 145.00


Number of Units 2 nos.
Total Time for 2 Units 4.83 hrs

Productivity 3.72 lm/hr

AASHTO TYPE 4 Length : 30.000 m

Equipment Specifications Crane 80.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 80.00 tons
Fuel Consumption 27.00 li/hr

Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Mobilization / Waiting


Mobilization/Waiting 0.75 45.00

Loading/Unloading
Tie/Rig Girder 0.25 15.00
Swing-Hoist Up-Swing-Hoist Up 0.58 35.00
Set - Hoist Down - Untie/Rig Girder 0.25 15.00
Swing-Hoist Up 0.17 10.00

Demobilization -
Demobilization 0.50 30.00

Total 2.50 150.00

Number of Units 2 nos.


Total Time for 2 Units 5.00 hrs

Productivity 6.00 lm/hr

AASHTO TYPE 5 Length : 40.000 m

Equipment Specifications Crane 80.00 Tons


Parameter Quantity Unit Remarks
Forward Speed 2.00 km/hr
Reverse Speed 2.00 km/hr
Lifting Capacity 80.00 tons
Fuel Consumption 27.00 li/hr
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Equipment Mobilization / Waiting


Mobilization/Waiting 0.75 45.00

Loading/Unloading
Tie/Rig Girder 0.25 15.00
Swing-Hoist Up-Swing-Hoist Up 0.67 40.00
Set - Hoist Down - Untie/Rig Girder 0.25 15.00
Swing-Hoist Up 0.17 10.00

Demobilization -
Demobilization 0.50 30.00

Total 2.58 155.00

Number of Units 2 nos.


Total Time for 2 Units 5.17 hrs

Productivity 7.74 lm/hr


PRODUCTIVITY CALCULATIONS
PC Panel Hauling by Truck with Lifting Crane

Equipment Specifications Boom Truck Cap = 20.00 tons


Parameter Quantity Unit
Loaded Speed 30.00 km/hr
Empty Speed 50.00 km/hr
Actual Capacity : 100.000% 20.00 tons
Fuel Consumption 15.00 li/hr
Loading/Unloading Rate 20.00 tons/hr

Self Loading

AHD = 5.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Load 1.00 60.00
Travel (Loaded) 30.00 0.17 10.00
Maneuver & Wait 0.08 5.00
Unload 1.00 60.00
Travel (Empty) 50.00 0.10 6.00

Total 2.43 146.00

Productivity AHD= 5.000 km(s) 8.22 tons/hr

AHD = 7.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Load 1.00 60.00
Travel (Loaded) 30.00 0.23 14.00
Maneuver & Wait 0.08 5.00
Unload 1.00 60.00
Travel (Empty) 50.00 0.14 8.40

Total 2.54 152.40

Productivity AHD= 7.000 km(s) 7.87 tons/hr


AHD = 10.000 km(s)
Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Load 1.00 60.00
Travel (Loaded) 30.00 0.35 21.08
Maneuver & Wait 0.08 5.00
Unload 1.00 60.00
Travel (Empty) 50.00 0.20 12.00

Total 2.72 163.08

Productivity AHD= 10.000 km(s) 7.36 tons/hr

AHD = 15.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Load 1.00 60.00
Travel (Loaded) 30.00 0.50 30.00
Maneuver & Wait 0.08 5.00
Unload 1.00 60.00
Travel (Empty) 50.00 0.30 18.00

Total 2.97 178.00

Productivity AHD= 15.000 km(s) 6.74 tons/hr

AHD = 20.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Load 1.00 60.00
Travel (Loaded) 30.00 0.67 40.00
Maneuver & Wait 0.08 5.00
Unload 1.00 60.00
Travel (Empty) 50.00 0.40 24.00
Total 3.23 194.00

Productivity AHD= 20.000 km(s) 6.19 tons/hr

AHD = 25.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Load 1.00 60.00
Travel (Loaded) 30.00 0.83 50.00
Maneuver & Wait 0.08 5.00
Unload 1.00 60.00
Travel (Empty) 50.00 0.50 30.00

Total 3.50 210.00

Productivity AHD= 25.000 km(s) 5.71 tons/hr

AHD = 30.000 km(s)


Time-Motion Table
Time Required Time Required
Activity Rate hrs minutes

Maneuver & Wait 0.08 5.00


Load 1.00 60.00
Travel (Loaded) 30.00 1.00 60.00
Maneuver & Wait 0.08 5.00
Unload 1.00 60.00
Travel (Empty) 50.00 0.60 36.00

Total 3.77 226.00

Productivity AHD= 30.000 km(s) 5.31 tons/hr