Anda di halaman 1dari 5

PROJECT:

Prepared by:
Checked by:
HORIZONTAL DIRECTIONAL DRILLING CALCULATION

Ldepth Lcrossing Rarc1 Rarc2 in


20 600 720 720 10 10
L1 Larc1 L2 Larc2 L3 Ltot
52.18 125.66 247.17 125.66 52.18 602.86

DESIGN DATA
Pipeline Diameter D 36 inch 914.4 mm 3 ft
thickness (min) t 15.9 mm 18.3 mm (D/t should be < 60)
0.626 in
Pipeline Material Grade X60
SMYS of Pipeline S 415 Mpa 60190.77 lb/in2
Steel Density s 7850 kg/m 3

Water Density w 1000 kg/m3


Soil Density 1800 kg/m3 112.37 lb/ft3
Mud Density 1437.8 kg/m3 89.76 lb/ft3
Drilling Fluid Density d 11 lb/gal 1318.09 Kg/m3
Soil friction Angle 30 degree
Poisson Ratio for Steel 0.3
Modulus of Elasticity E 207000 Mpa 30022866 lb/in2
Installation Temperature T1 13 degC
Operating Temperature T2 65 degC
Steel Coefficient Thermal 0.0000117 mm/mm/C
Friction Factor of Soil s 0.5 Assumed
Fluid (mud) Drag Coefficient mud 0.05 lb/in 2
344.73785 Pa
Test Pressue PT 137.1 Bar (Test pressure =95 % SMYS)
Design Pressure P 63.5 Bar 921 lb/in2

CALCULATIONS
Pipe Cross Sectional Area 656692.89 mm2 0.657 m2
Steel Cross Sectional Area As 44881.26 mm2 0.045 m2
Uncorroded weight of Pipe Ws 352.32 kg/m
Displace Mud Weight W mud 944.20 kg/m
Effective (submerged) weigth of pipe W sub -591.89 kg/m
Wsub = Ws - Wmud
Earth Pressure Coefficient K 0.577
Arching Factor 0.148

Page 1 of 5
PROJECT:

Prepared by:
Checked by:
HORIZONTAL DIRECTIONAL DRILLING CALCULATION

INSTALLATION STRESSES

Pulling Loads
Straight Section L1
Frcition Force |Ff1| 15208.75 kg
|Ff1| = W sub x L1 cos (in) x s
Fluid Drag FD1 51678.38 kg
FD1 = x D x L1 X mud

Pipe Weight (longitudinal direction) W p1 8555.98 kg


W p1 = W sub x L1 sin (in)
Pulling load at end of L1 T1 58331.14 kg
T1 = |Ff1| + FD1 - W p1

Curve Section Larc1


Frcition Force |Ffarc1| 37189.31 kg considered 0deg for conservatism
|Ffarc1| = W sub x Larc1 cos () x s
Fluid Drag FDarc1 124447.14 kg
FDarc1 = x D x Larc1 X mud

Pipe Weight (longitudinal direction) W parc1 0.00 kg considered 0deg for conservatism
W parc1 = W sub x Larc1 sin ()
Pulling load at end of Larc1 Tarc1 219967.59 kg
Tarc1 = T1 + |Ffarc1| + FDarc1 - W parc1

Straight Section L2
Frcition Force |Ff2| 73146.80 kg = 0deg for straight section
|Ff2| = W sub x L2 cos () x s
Fluid Drag FD2 244772.22 kg
FD2 = x D x L2 X mud

Pipe Weight (longitudinal direction) W p2 0.00 kg = 0deg for straight section


W p2 = W sub x L2 sin ()
Pulling load at end of L1 T2 537886.61 kg
T2 = Tarc1 + |Ff2| + FD2 - W p2

Curve Section Larc2


Frcition Force |Ffarc2| 37189.31 kg considered 0deg for conservatism
|Ffarc2| = W sub x Larc2 cos () x s

Fluid Drag FDarc2 124447.14 kg


FDarc2 = x D x Larc2 X mud
Pipe Weight (longitudinal direction) W parc2 118652.20 kg considered 90deg for conservatism
W parc2 = W sub x Larc2 sin ()

Pulling load at end of Larc2 Tarc2 818175.26 kg


Tarc2 = T2 + |Ffarc2| + FDarc2 + W parc2

Straight Section L3
Frcition Force |Ff3| 15208.75 kg
|Ff3| = W sub x L3 cos (Fout) x s
Fluid Drag FD3 51678.38 kg
FD3 = x D x L3 X mud

Pipe Weight (longitudinal direction) W p1 8555.98 kg


W p3 = Wsub x L3 sin (out)

Pulling load at end of L1 T3 893618.37 kg

Page 2 of 5
PROJECT:

Prepared by:
Checked by:
HORIZONTAL DIRECTIONAL DRILLING CALCULATION

T3 = Tarc2 + |Ff3| + FD3 + W p3

Pulling Loads = 893618.37 kg

Page 3 of 5
PROJECT:

Prepared by:
Checked by:
HORIZONTAL DIRECTIONAL DRILLING CALCULATION

Tensile Stress
Tensile stress t 19.91 MPa
t = Pulling Loads / Steel Area

Allowable Tensile Stress : 90% of SMYS 373.50 MPa


Condition : OK

Bending Stress
Bending Stress b 131.45 MPa
b = E D / 2R

Allowable Bending Stress


D/t 57.51

for D/t < 24.921 Fb = 45143.08 lb/in2 311.251 MPa


24.92 < for D/t < 49.842 Fb = 38485.01 lb/in 2
265.345 MPa
for D/t > 49.842 Fb = 39312.27 lb/in2 271.049 MPa

Allowable Bending Stress (Sb) : 265.34 MPa


Condition : OK

Hoop (External Pressure) Stress


External Pressure Pext 60 kPa (Ranging from 30 kPa to 60 kPa)
0.06 MPa
Hoop Stress due to External Pressure hext 1.73 MPa
Elastic Hoop Buckling Stress
Fhe 0194318 psi 6E+008 MPa
Critical Hoop Buckling Stress
Fhc 87380194318 psi Fhe < 33104.9
Fhc 15728462063 psi 33104.92 < Fhe < 96305.2
Fhc 68565.10 psi 96305.23 < Fhe < 373183
Fhc 60190.77 psi 373182.77 < Fhe
Critical Hoop Buckling Stress : 15728462063 psi = 108443971.09 MPa
Allowable hoop stress = 67% of Critical Hoop Buckling Stress = 72657460.63 MPa
Condition : OK

Combined Installation Stress


Combined Installation Stress should satisfy the following condition:

t / 0.9S + b / Sb < 1 Condition : OK


A2 + B2 + 2|A|B < 1 Condition : OK

A = [ (t + b - 0.5hext) / 1.25] / S 0.4533


B = 1.5 hext / Fhc 0.0000

Page 4 of 5
PROJECT:

Prepared by:
Checked by:
HORIZONTAL DIRECTIONAL DRILLING CALCULATION

OPERATING STRESSES
Hoop Stress due to Internal Pressure h 182.59 MPa
h = P D / 2t

Bending Stress b 131.45 MPa


b = E D / 2R

Thermal Expansion th -125.94 MPa


th = E (T1-T2)
External Pressure Pe 52108.43 Pa 0.0521 MPa 7.56 psi

Allowable Operating Stress

Total circumferential stress C 180.87 MPa


C = h - hext

Net Logitudinal Stress L 59.77 MPa


L = b + th + C

CRITERIA : L 0.9 S = 373.50 MPa Hence : OK


Combined stress
(1) SE1 = | C - L | sE1 121.10 MPa
(2) SE2 = ( C + L - CL ) sE2
2 2 1/2
159.61 MPa
Combined stress, SE = Max (SE1, SE2) sE 159.61 MPa
CRITERIA : SE 0.9 S = 373.50 MPa Hence : OK

Page 5 of 5