Injection machine cost ($/hr): 0.00 Mold maintenance time (hrs/yr): 0.00 0.00
Mold maintenance cost ($/hr): 0.00 QC time (hrs/week): 0.00 0.00
Setup time (hrs):
QC cost ($/hr): 0.00 (Time to achieve acceptable process)
0.00 0.00
Setup cost ($/hr): 0.00 Number of setups/year: 0.00 0.00
(process engineer / setup technician)
(Including substrate)
$12 $1 $12.000
Bef ore Af ter $1 Bef ore Af ter Bef ore Af ter
$10 $1 $10.000
$1
$8 $8.000
$1
$6 $1
$6.000
$0
$4 $0 $4.000
$0
$2 $0 $2.000
$0
$0 $0.000
Machine cost ($) Total material cost ($) Mold maintenance / Setup cost ($) QC & sorting /
Total Production Cost ($) repair costs ($) inspection cost ($) Estimated Piece Price ($)
(Including substrate)
Number of Existing Molds to Total Technology License Cost: $0 (see BTI for price details)
Application Info
0
retrofit with Rheological Control: Total Design Cost: $0 (see BTI for price details)
Implementation cost per installation: $0
Number of New Molds designed
0 Other misc costs per installation: $0
with Rheological Control each year:
Annual Investment: $0
$1
$1 With Rheological Control
$1
$1
$1
$1
$0
$0
$0
$0
$0
Machine cost ($) Total material cost Mold maintenance / Setup cost ($) QC & sorting /
($) repair costs ($) inspection cost ($)
(Including
substrate)
Prepared by:
David A. Hoffman, 814-899-6390 ext. 131 dhoffman@beaumontinc.com
Return On Investment for
Rheological Control Technologies
This form calculates Return On Investment based upon various criteria. Contact BTI for help in modifying the form if needed.
The Top Section calculates the ROI for one mold. The Bottom Section calculates the annual projected ROI for multiple molds using the data from the
Top Section.
Contact: Mr. Shear Genius Company Name: Problematic Molds, Inc.
Date: 18-Apr-07 Company Location: Imbalanced, State USA
(Including substrate)
Technology License Cost: $3,100 Mold maintenance / repair costs ($) $4,710 $2,490
Design Cost: $350 Setup cost ($) $600 $300
Implementation Costs: $1,250 QC & sorting / inspection cost ($) $920 $597
(inserts, machining, runner bars)
Number of Existing Molds to Total Technology License Cost: $12,400 (see BTI for price details)
Application Info
5
retrofit with Rheological Control: Total Design Cost: $1,750 (see BTI for price details)
Implementation cost per installation: $500
Number of New Molds designed
5 Other misc costs per installation: $0
with Rheological Control each year:
Annual Investment: $19,150
$35,000
With Rheological Control
$30,000
$25,000
$20,000
$15,000
$10,000
$5,000
$0
Machine cost ($) Total material cost Mold maintenance / Setup cost ($) QC & sorting /
($) repair costs ($) inspection cost ($)
(Including
substrate)
Prepared by:
David A. Hoffman, 814-899-6390 ext. 131 dhoffman@beaumontinc.com