Anda di halaman 1dari 9

45.

30 mtr
310 330 457.5 367.5 400 400 400 400 367.5 457.5 330 310

K2 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K2

KD4
KD3
KD4

KD3

KD3
310

KD3

KD3

KD3

KD3

KD3
KD3
K1 K1
KD4 KD4
FINISH EDITED
330

DETIL-K4 DETIL-K4

K1 K3 K3 K3 K3 K3 K3 K3 K1
KD3 K4 KD3
K4

KD2

KD1

KD1
KD1

KD1

KD1

KD2
457.5
21.95 mtr

K3 K3
K1 T1 T1 K1
KD3 KD2 KD2 KD3
KD2

KD1

KD1
457.5

KD1

KD1

KD1

KD2
DETIL-K4
K4 K4
K1 KD3 KD3 K1
K3x K3x K3x K3x K3x K3x K3x

KD3
DETIL-K4
330

DETIL-K1 DETIL-K1x
KD4 KD4

KD3
INI SAJA
K1 INI SAJA K1
KD3

KD3

KD3
K6
KD3

KD3

KD3

KD3

KD4
KD4

K6
310

K1 K1 K1 K1 K1 K1
K2 K1 K1 K1 K1 K1 K2
KD5 K5 K5 KD5
330 K1 K1x

200
310
DST DENAH KOLOM DAN KUDA-KUDA
KD6 K5 T2 K5 KD6

600
K1 K6 K6 K1x SEMUA JARAK UKURAN ADALAH AS-AS
K5
SATUAN CENTIMETER

360
KD6

K3x DAN K1x ADALAH KOLOM DENGAN


310

CONTOH PEMASANGAN PLAT SEPATU K2 K1 K2


GMBAR HAL.3-A..TARIKAN BENANG DAN PLAT SEPATU DG LUBANG BULAT
UKURAN HARUS AS-AS (TDK LUBANG KAPSUL)
360 360
720 04 Oktober 2015
DST
PENGADILAN JEMBER 1
A. KOLOM K1 WF200 x 493mm x 37bh C. KOLOM K3 WF200 x 4300mm x 16bh E. PLAT SEPATU BUAT 54 BH
151 D. KOLOM K4 WF200 x 4272mm x 4bh - Plat 10mmx300x200mm x 54 ptg
203
20 60

93
20 85 130 85 18mm
6

220

280
6

200

140
TAMPAK A
60 60

TAMPAK B

50 100
244
25 TAMPAK B
45 20 60 20 35
40

200
70
60

EDIT

776
18mm

50
70

836
5

493 LUAR
5
100

5 300
400

70
18mm
F. PLAT SEPATU BUAT 9 BH

130
60

4 TAMPAK A
- Plat 10mmx300x200mm x 9 ptg
1
3 85 130 85 18mm

60
4300 LUAR
TAMPAK A TAMPAK B

50 100
4272 LUAR
1. WF200 x 483 mm (jd 493 mm) x 37 ptg 2

200
2. PLat sepatu x 35 ptg (Gbr Hal.2 - E)
Plat sepatu x 2 ptg (Gbr Hal2 - F) TAMPAK B

50
3. PLat gerbil x 74 ptg (Gbr Hal 2 - G)
4. Plat gerbil x 74 ptg (Gbr Hal.2 - I) psng bolak balik
5. Plat RIB x 74 ptg ( Gbr Hal.2- H1) pasang bolak balik 300
6. Pikres x 37 bh (Gbr Hal.4-C) DIKERJAKAN BENGKEL G. PLAT GERBIL SPT BUAT 126 PTG
B. KOLOM K2 WF200 x 480mm x 6bh - Plat strip 5mm x 70mm x 150mm x 126 ptg
BAHAN ADA DIBENGKEL LUMAJANG
65

4
210

18.3
TAMPAK A 1 4
3 70
1
3
150
2
1. WF200 x 4290 mm ( jd 4300 mm) x 16 ptg
H. RIB-RIB
5 2
480 LUAR

2. PLat sepatu x 9 ptg (Gbr Hal.2 - E ) 1. Plat strip 8mm x 50mm x 195mm x 74 ptg
PLat sepatu x 7 ptg (Gbr Hal.2 - F ) 1. WF200 x 4262 mm ( jd 4272 mm) x 4 ptg
415

2. Plat strip 8mm x 50mm x 185mm x 12 ptg


3. PLat gerbil x 32 ptg (Gbr Hal 2- G ) 2. PLat sepatu x 4 ptg (Gbr Hal.2 - E )
3. Plat strip 8mm x 50mm x 253mm x 32 ptg
4. Plat gerbil x 32 ptg (Gbr Hal.2 - I ) psng bolak balik 3. PLat gerbil x 12 ptg (Gbr Hal 2- G )
4. Plat strip 8mm x 50mm x 215mm x 8 ptg
4 5. Plat RIB x 32 ptg ( Gbr Hal.1- H3) pasang bolak balik 4. Plat gerbil x 12 ptg (Gbr Hal.2 - I ) psng bolak balik
5. Plat strip 8mm x 50mm x 180mm x 700 ptg
6. Pikres x 16bh (Gbr Hal.4- C) DIKERJAKAN BENGKEL 5. Plat RIB x 12 ptg ( Gbr Hal.1- H4) pasang bolak balik
1
3
I. PLAT GERBIL BUAT 126 PTG
- Plat 8mm x 90mm x 150mm x 126 ptg
2
1. WF200 x 470 mm (jd 480 mm) x 6 ptg 90
2. PLat sepatu x 6 ptg (Gbr Hal.2 - E)
3. PLat gerbil x 12 ptg (Gbr Hal 2- G)
4. Plat gerbil x 12 ptg (Gbr Hal.2 - I) psng bolak balik 150 04 Oktober 2015
5. Plat RIB x 12 ptg ( Gbr Hal.2- H2) pasang bolak balik PENGADILAN JEMBER 2
A. PLAT DI DYNABOLT KE BETON 63BH B. GERBIL-GERBIL C. PLAT KOPEL SUDUT 25 & 18
- 1/2WF200 x 160mm x 21 ptg - 1/2WF200 x 385mm x 29 ptg
G1 G5 - PLat 10mm x 400 x 100mm x 78 ptg
GERBIL ATAS KUDA2 sudut 45 GERBIL ATAS KUDA2 sudut 25
40 110 110 40 60 100 18mm
60 60 60 60
18mm
85 130 85

60 20
30
160
100

45
A

20
180
A 25
100

240
D. PLAT KOPEL SUDUT 45 & 35

300
160
385 - PLat 10mm x 460 x 100mm x 54 ptg
G2 - 1/2WF200 x 300mm x 21 ptg - 1/2WF200 x 400mm x 37 ptg
100

18mm
GERBIL BAWAH KUDA2 sudut 45 G6 GERBIL BAWAH KUDA2 sudut 25
60 60 130 70 70 70
30

60 20
300 11mm

2 112 158
3

20
45 123 291
DI LAS DI LAS 72mm 25 E. KOLOM WF200 K5 x 873mm x 5 BH
atau 300 400
lebih 160
1 8mm 180 203
4mm
DI LAS

200
TAMPAK B

280
POTONGAN A-A 3 SEPERTI HAL.2
- 1/2WF200 x 280mm x 6 ptg 45
G3 GERBIL ATAS JURAI sudut 35 G7 - 1/2WF200 x 585mm x 9 ptg EDIT
1. Plat 12mmx300x300 mm x 63 ptg GERBIL ATAS JURAI sudut 18

PENTING !!!

873 LUAR
2
YG DI BOR DIAMETER 18mm SAJA ADALAH

580
SEBANYAK JUMLAH KOLOM BETON 196
35
BAGIAN TENGAH YG TELAH DIPASANGI 190
ANGKUR . 18
SEBELUM MELAKUKAN PEMOTONGAN
280 1
STUT DRAT 5/8" PJG 80mm, HRS DI CEK
DULU KETINGGIAN TIAP-TIAP TITIK KOLOM, 585
JIKA SELURUH TITIK KOLOM WATERPASS G4 - 1/2WF200 x 348mm x 6 ptg EDIT
STUT DRAT 5/8" DAPAT DIPOTONG 80mm, GERBIL BAWAH JURAI sudut 35 G8 - 1/2WF200 x 494mm x 8 ptg
AKAN TETAPI JIKA TINGGI KOLOM TIDAK GERBIL BAWAH JURAI sudut 18

93
25
WATERPAS, MAKA PANJANG STUT DRAT 5/8"
ADALAH = SELISIH TITIK KOLOM YG PALING
RENDAH DAN YG PALING TINGGI BERAPA, 195 1. WF200 x 873 mm x 5 ptg
112 35
DITMBAH DG 80mm. 123 398 2. Plat RIB x 10 ptg ( Gbr Hal.2- H4) pasang bolak balik
18 3. Pikres x 5bh (Gbr Hal.4-C) DIKERJAKAN BENGKEL
2. Stut drat 5/8" x 80mm x 252 ptg 348
3. Mur 5/8" x 504 bh 196 494
4. Dinabolt M10x60 x 258 bh 190
(MATA BOR BETON 12mm) 04 Oktober 2015
PENGADILAN JEMBER 3
A. PLAT KOPEL SEGI-8 sudut 25 & 18 B. PLAT KOPEL SEGI-8 SUDUT 45 & 35
- PLat 10mm x 400 x 104mm x 3 ptg - PLat 10mm x 460 x 104mm x 9 ptg F. KOPEL SEGI-8 SUDUT 45 G. KOPEL SEGI-8 SUDUT 25
60 60 100 60 60 60 18mm 60 60 130 70 70 70 18mm
BUAT 3 BH (T1) BUAT 1 BH (T2)

60 20

60 20
250 LU AR 240 LU AR

20

20
1 1
C. PIKRES D. STUT-STUT

104

100
AS-LUAR
- SIKU 70x70 x 100mm x 313 ptg LAS

AS-LUAR
2 2

120mm
125mm
11mm

50 1. 515 mm LUAR x 12 bh
EDIT
2. 895mm LUAR x 40 bh
3. 1195mm LUAR x 260 bh
20 15 15 20 4. 1245mm LUAR x 184 bh 104 100
BUAT MAL DG UKURAN BUAT MAL DG UKURAN
1. Beton 10mm x +/- 500mm x 12 ptg S E P E R T I IN I B IL A M E R A K IT S E P E R T I IN I B IL A M E R A K IT
2. Beton 10mm x +/- 880mm x 40 ptg 240 LU AR
250 LU AR
3. Beton 10mm x +/- 1180mm x 260 ptg
4. Beton 10mm x +/- 1230mm x 184 ptg
5. Baut 3/8"x3/4" x 992 bh

240 LU AR
250 LU AR

100
E. SILANG-SILANG

104
DRAT KIRI DAN KANAN
BUKA 1/4"-1/4" JRM KERAS 12mm
BETON 12mm MASUK,
DITEKUK BALIK,DILAS 1/4 1/4 1/4 1/4

1. 8000 mm LUAR x 12 bh
2. 7700 mm LUAR x 8 bh 104 100
3. 7370 mm LUAR x 8 bh 1. WF250 x 400mm x 1 pt
4. 7200 mm LUAR x 4 bh 1. WF250 x 460mm x 3 pt
(BIBIR WF DIPOTONG (ATI WF DIPOTONG DISAMBUNG LAGI
5. 7500 mm LUAR x 4 bh
KIRI-KANAN JADI 104mm) JADI 240mm LUAR,BIBIR WF DIPOTONG
6. 4200 mm LUAR x 4 bh
2. Plat kopel x 9 ptg (Gbr huruf B diatas) KIRI-KANAN JADI 100mm)
JIKA MERAKIT PLAT INI,BIBIR PLAT 2. Plat kopel x 3 ptg (Gbr huruf A diatas)
1. Beton 12mm x 7800 mm x 12 ptg IKA MERAKIT PLAT INI,BIBIR PLAT
YG PANJANG 460mm KIRI-KANAN
2. Beton 12mm x 7500 mm x 8 ptg YG PANJANG 400mm KIRI-KANAN
DI PINGUL 45 derajat.
3. Beton 12mm x 7170 mm x 8 ptg DI PINGUL 45 derajat.
4. Beton 12mm x 7000 mm x 4 ptg
5. Beton 12mm x 7300 mm x 4 ptg
6. Beton 12mm x 4000 mm x 4 ptg
7. Beton 12mm x 300 mm x 40 ptg
(DI BENTUK U DAN LAS PADA KUDA2) DIKERJAKAN P.TULIN
8. Jarum keras 1/2" x 40 bh
BENGKEL LMJANG
04 Oktober 2015
PENGADILAN JEMBER 4
A. KUDA-KUDA (KD1) WF200 BUAT 10 BH SUDUT 45 drjt
LUAR 6328 mm
1. WF200 x 6308 mm (jd 6328 mm) x 10 ptg SUDUT 45 drjt
291 1250 1250 1250 1250 1037 2. WF200 gerbil bawah x 10 ptg (Gbr Hal.3-G2)
200 3. WF200 gerbil atas x 10 ptg (Gbr Hal 3 - G1)
6
4. Plat kopel x 20 ptg (Gbr Hal.3-D)
5. Plat RIB x 120 ptg ( Gbr Hal.2- H5) pasang bolak balik
4 5 6. Pikres x 50 bh (Gbr Hal.4-C)

4
200 3 1 2

YG DIPOTONG/ DIKURANGI

FINISH EDITED
ADALAH POSISI WUWUNG
INI,AGAR POSISI SIKU PIKRES
(RINCIAN NO.6) TIDAK BERUBAH

B. KUDA-KUDA (KD2) WF200 BUAT 6 BH SUDUT 45 drjt


LUAR 6158 mm

121 1250 1250 1250 1250 1037


200 1. WF200 x 6138 mm (jd 6158 mm) x 6 ptg SUDUT 45 drjt
6 2. WF200 gerbil bawah x 6 ptg (Gbr Hal.3-G2)
3. WF200 gerbil atas x 6 ptg (Gbr Hal 3 - G1)
4 5 4. Plat kopel x 12 ptg (Gbr Hal.3-D)
5. Plat RIB x 72 ptg ( Gbr Hal.2- H5) pasang bolak balik
6. Pikres x 30 bh (Gbr Hal.4-C)
4
200 3 1 2

C. KUDA-KUDA (KD3) WF200 BUAT 24 BH SUDUT 25 drjt


LUAR 6841 mm

92 900 1200 1200 1200 1200 1049


93
6 1. WF200 x 6821 mm (jd 6841 mm) x 24 ptg SUDUT 25 drjt
2. WF200 gerbil bawah x 24 ptg (Gbr Hal.3-G6)
3. WF200 gerbil atas x 24 ptg (Gbr Hal 3 - G5)
4 5 4. Plat kopel x 48 ptg (Gbr Hal.3-C)
5. Plat RIB x 336 ptg ( Gbr Hal.2- H5) pasang bolak balik
3 2 4 6. Pikres x 144 bh (Gbr Hal.4-C) DIKERJAKAN BENGKEL
93
1 SELESAI

PENGADILAN JEMBER 5
A. JURAI (JR1) WF200 BUAT 4 BH SUDUT 35 drjt
LUAR 7629 mm
1. WF200 x 7609 mm (jd 7629 mm) x 4 ptg SUDUT 35 drjt
sisa 1526 1526 1526 1266 2. WF200 gerbil bawah x 4 ptg (Gbr Hal.3-G4)
140 3. WF200 gerbil atas x 4 ptg (Gbr Hal 3 - G3)
4. Plat kopel x 8 ptg (Gbr Hal.3-D)
5. Plat RIB x 48 ptg ( Gbr Hal.2- H5) pasang bolak balik
4 5

4
140 3 1 2

B. JURAI (JR2) WF200 BUAT 4 BH SUDUT 18 drjt


FINISH EDITED
LUAR 9305 mm

sisa 1618 1618 1618 1618 1414


65
1. WF200 x 9285 mm (jd 9305 mm) x 4 ptg SUDUT 18 drjt
2. WF200 gerbil bawah x 4 ptg (Gbr Hal.3-G8)
4 5 3. WF200 gerbil atas x 4 ptg (Gbr Hal 3 - G7)
4. Plat kopel x 8 ptg (Gbr Hal.3-C)
3 4 5. Plat RIB x 56 ptg ( Gbr Hal.2- H5) pasang bolak balik
1 2
65

C. KUDA-KUDA (KD5) WF200 BUAT 2 BH SUDUT 25 drjt

LUAR 3862 mm

1490

1. WF200 x 3842 mm (jd 3862 mm) x 2 ptg SUDUT 25 drjt


2. WF200 gerbil bawah x 2 ptg (Gbr Hal.3-G6)
3. WF200 gerbil atas x 2 ptg (Gbr Hal 3 - G5)
7 4. Plat kopel x 4 ptg (Gbr Hal.3-C)
5. Plat RIB x 20 ptg ( Gbr Hal.2- H5) pasang bolak balik
123 1200 1049 6. Pikres x 4 bh (Gbr Hal.4-C)
93 7. KOLOM K5 x 2 ptg (GMBR HAL.3-E)
6

4 5

3 2 4
93
1
04 Oktober 2015
PENGADILAN JEMBER 6
A. KUDA-KUDA (KD6) WF200 BUAT 3 BH SUDUT 25 drjt C. KOLOM WF200 K6 x 817mm x 4 BH
LUAR 3729 mm

1357

140
TAMPAK B

244
SEPERTI HAL.2
35

817 LUAR
1200 1049
2
123
93

612
6

4 5
1
3 2 4
93
1
1. WF200 x 3709 mm (jd 3729 mm) x 3 ptg SUDUT 25 drjt

65
18
2. WF200 gerbil bawah x 3 ptg (Gbr Hal.3-G6)
3. WF200 gerbil atas x 3 ptg (Gbr Hal 3 - G5)
4. Plat kopel x 6 ptg (Gbr Hal.3-C) 1. WF200 x 817 mm x 3 ptg
5. Plat RIB x 30 ptg ( Gbr Hal.2- H5) pasang bolak balik 2. Plat RIB x 8 ptg ( Gbr Hal.2- H2) pasang bolak balik
B. JURAI (JR3) WF200 BUAT 2 BH SUDUT 18 drjt 6. Pikres x 6 bh (Gbr Hal.4-C)
7. KOLOM K5 x 3 ptg (GMBR HAL.3-E)
LUAR 5121 mm

1881

1826 1414
65

4 5

3 2 4
65
1
1. WF200 x 5101 mm (jd 5121 mm) x 2 ptg SUDUT 18 drjt
2. WF200 gerbil bawah x 2 ptg (Gbr Hal.3-G8)
3. WF200 gerbil atas x 2 ptg (Gbr Hal 3 - G7)
4. Plat kopel x 4 ptg (Gbr Hal.3-C)
5. Plat RIB x 20 ptg ( Gbr Hal.2- H5) pasang bolak balik
6. KOLOM K6 x 2 ptg (GMBR HURUF-C DIATAS) 04 Oktober 2015
PENGADILAN JEMBER 7
GORDING-GORDING C10 - CNP150x50x3mm x 306 mm x 8 ptg
( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg)
C1 - CNP150x50x3mm x 3990mm x 96 ptg
100 100 11 m m DIPOTONG
11 m m
sisa
sisa 75
50
50 75 50
10 20 171 105
10 20 1265 1400 1265 20 10
C9 - CNP150x50x3mm x 1191 mm x 8 ptg
- CNP150x50x3mm x 3665mm x 52 ptg ( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg)
C2
100 100 11 m m DIPOTONG
11 m m
sisa
sisa 75
50
50 75 50
10 20 1056 105
10 20 1180 1235 1180 20 10
C8 - CNP150x50x3mm x 2076 mm x 8 ptg

C3 - CNP150x50x3mm x 4565mm x 56 ptg


100
FINISH EDITED 100
( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg)
11 m m
100 DIPOTONG
11 m m
sisa
sisa 75
50
50 75 50
10 20 1490 451 105
10 20 1490 1525 1490 20 10
C7 - CNP150x50x3mm x 2961 mm x 8 ptg
( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg) DIPOTONG
C4 - CNP150x50x3mm x 3290mm x 24 ptg 100
11 m m
100
11 m m
sisa
sisa 75 50
50 75 50 10 20 1490 1336 105
10 20 1610 1610 20 10
C6 - CNP150x50x3mm x 3846 mm x 8 ptg
( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg)
- CNP150x50x3mm x 4731 mm x 8 ptg DIPOTONG
C5 100 100
( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg) 11 m m
DIPOTONG
100 100 sisa
11 m m
50
sisa 75
10 20 1490 1525 696 105
50 75
10 20 1490 1525 1581 105 05 Oktober 2015 PENGADILAN JEMBER
8

Anda mungkin juga menyukai