30 mtr
310 330 457.5 367.5 400 400 400 400 367.5 457.5 330 310
K2 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K2
KD4
KD3
KD4
KD3
KD3
310
KD3
KD3
KD3
KD3
KD3
KD3
K1 K1
KD4 KD4
FINISH EDITED
330
DETIL-K4 DETIL-K4
K1 K3 K3 K3 K3 K3 K3 K3 K1
KD3 K4 KD3
K4
KD2
KD1
KD1
KD1
KD1
KD1
KD2
457.5
21.95 mtr
K3 K3
K1 T1 T1 K1
KD3 KD2 KD2 KD3
KD2
KD1
KD1
457.5
KD1
KD1
KD1
KD2
DETIL-K4
K4 K4
K1 KD3 KD3 K1
K3x K3x K3x K3x K3x K3x K3x
KD3
DETIL-K4
330
DETIL-K1 DETIL-K1x
KD4 KD4
KD3
INI SAJA
K1 INI SAJA K1
KD3
KD3
KD3
K6
KD3
KD3
KD3
KD3
KD4
KD4
K6
310
K1 K1 K1 K1 K1 K1
K2 K1 K1 K1 K1 K1 K2
KD5 K5 K5 KD5
330 K1 K1x
200
310
DST DENAH KOLOM DAN KUDA-KUDA
KD6 K5 T2 K5 KD6
600
K1 K6 K6 K1x SEMUA JARAK UKURAN ADALAH AS-AS
K5
SATUAN CENTIMETER
360
KD6
93
20 85 130 85 18mm
6
220
280
6
200
140
TAMPAK A
60 60
TAMPAK B
50 100
244
25 TAMPAK B
45 20 60 20 35
40
200
70
60
EDIT
776
18mm
50
70
836
5
493 LUAR
5
100
5 300
400
70
18mm
F. PLAT SEPATU BUAT 9 BH
130
60
4 TAMPAK A
- Plat 10mmx300x200mm x 9 ptg
1
3 85 130 85 18mm
60
4300 LUAR
TAMPAK A TAMPAK B
50 100
4272 LUAR
1. WF200 x 483 mm (jd 493 mm) x 37 ptg 2
200
2. PLat sepatu x 35 ptg (Gbr Hal.2 - E)
Plat sepatu x 2 ptg (Gbr Hal2 - F) TAMPAK B
50
3. PLat gerbil x 74 ptg (Gbr Hal 2 - G)
4. Plat gerbil x 74 ptg (Gbr Hal.2 - I) psng bolak balik
5. Plat RIB x 74 ptg ( Gbr Hal.2- H1) pasang bolak balik 300
6. Pikres x 37 bh (Gbr Hal.4-C) DIKERJAKAN BENGKEL G. PLAT GERBIL SPT BUAT 126 PTG
B. KOLOM K2 WF200 x 480mm x 6bh - Plat strip 5mm x 70mm x 150mm x 126 ptg
BAHAN ADA DIBENGKEL LUMAJANG
65
4
210
18.3
TAMPAK A 1 4
3 70
1
3
150
2
1. WF200 x 4290 mm ( jd 4300 mm) x 16 ptg
H. RIB-RIB
5 2
480 LUAR
2. PLat sepatu x 9 ptg (Gbr Hal.2 - E ) 1. Plat strip 8mm x 50mm x 195mm x 74 ptg
PLat sepatu x 7 ptg (Gbr Hal.2 - F ) 1. WF200 x 4262 mm ( jd 4272 mm) x 4 ptg
415
60 20
30
160
100
45
A
20
180
A 25
100
240
D. PLAT KOPEL SUDUT 45 & 35
300
160
385 - PLat 10mm x 460 x 100mm x 54 ptg
G2 - 1/2WF200 x 300mm x 21 ptg - 1/2WF200 x 400mm x 37 ptg
100
18mm
GERBIL BAWAH KUDA2 sudut 45 G6 GERBIL BAWAH KUDA2 sudut 25
60 60 130 70 70 70
30
60 20
300 11mm
2 112 158
3
20
45 123 291
DI LAS DI LAS 72mm 25 E. KOLOM WF200 K5 x 873mm x 5 BH
atau 300 400
lebih 160
1 8mm 180 203
4mm
DI LAS
200
TAMPAK B
280
POTONGAN A-A 3 SEPERTI HAL.2
- 1/2WF200 x 280mm x 6 ptg 45
G3 GERBIL ATAS JURAI sudut 35 G7 - 1/2WF200 x 585mm x 9 ptg EDIT
1. Plat 12mmx300x300 mm x 63 ptg GERBIL ATAS JURAI sudut 18
PENTING !!!
873 LUAR
2
YG DI BOR DIAMETER 18mm SAJA ADALAH
580
SEBANYAK JUMLAH KOLOM BETON 196
35
BAGIAN TENGAH YG TELAH DIPASANGI 190
ANGKUR . 18
SEBELUM MELAKUKAN PEMOTONGAN
280 1
STUT DRAT 5/8" PJG 80mm, HRS DI CEK
DULU KETINGGIAN TIAP-TIAP TITIK KOLOM, 585
JIKA SELURUH TITIK KOLOM WATERPASS G4 - 1/2WF200 x 348mm x 6 ptg EDIT
STUT DRAT 5/8" DAPAT DIPOTONG 80mm, GERBIL BAWAH JURAI sudut 35 G8 - 1/2WF200 x 494mm x 8 ptg
AKAN TETAPI JIKA TINGGI KOLOM TIDAK GERBIL BAWAH JURAI sudut 18
93
25
WATERPAS, MAKA PANJANG STUT DRAT 5/8"
ADALAH = SELISIH TITIK KOLOM YG PALING
RENDAH DAN YG PALING TINGGI BERAPA, 195 1. WF200 x 873 mm x 5 ptg
112 35
DITMBAH DG 80mm. 123 398 2. Plat RIB x 10 ptg ( Gbr Hal.2- H4) pasang bolak balik
18 3. Pikres x 5bh (Gbr Hal.4-C) DIKERJAKAN BENGKEL
2. Stut drat 5/8" x 80mm x 252 ptg 348
3. Mur 5/8" x 504 bh 196 494
4. Dinabolt M10x60 x 258 bh 190
(MATA BOR BETON 12mm) 04 Oktober 2015
PENGADILAN JEMBER 3
A. PLAT KOPEL SEGI-8 sudut 25 & 18 B. PLAT KOPEL SEGI-8 SUDUT 45 & 35
- PLat 10mm x 400 x 104mm x 3 ptg - PLat 10mm x 460 x 104mm x 9 ptg F. KOPEL SEGI-8 SUDUT 45 G. KOPEL SEGI-8 SUDUT 25
60 60 100 60 60 60 18mm 60 60 130 70 70 70 18mm
BUAT 3 BH (T1) BUAT 1 BH (T2)
60 20
60 20
250 LU AR 240 LU AR
20
20
1 1
C. PIKRES D. STUT-STUT
104
100
AS-LUAR
- SIKU 70x70 x 100mm x 313 ptg LAS
AS-LUAR
2 2
120mm
125mm
11mm
50 1. 515 mm LUAR x 12 bh
EDIT
2. 895mm LUAR x 40 bh
3. 1195mm LUAR x 260 bh
20 15 15 20 4. 1245mm LUAR x 184 bh 104 100
BUAT MAL DG UKURAN BUAT MAL DG UKURAN
1. Beton 10mm x +/- 500mm x 12 ptg S E P E R T I IN I B IL A M E R A K IT S E P E R T I IN I B IL A M E R A K IT
2. Beton 10mm x +/- 880mm x 40 ptg 240 LU AR
250 LU AR
3. Beton 10mm x +/- 1180mm x 260 ptg
4. Beton 10mm x +/- 1230mm x 184 ptg
5. Baut 3/8"x3/4" x 992 bh
240 LU AR
250 LU AR
100
E. SILANG-SILANG
104
DRAT KIRI DAN KANAN
BUKA 1/4"-1/4" JRM KERAS 12mm
BETON 12mm MASUK,
DITEKUK BALIK,DILAS 1/4 1/4 1/4 1/4
1. 8000 mm LUAR x 12 bh
2. 7700 mm LUAR x 8 bh 104 100
3. 7370 mm LUAR x 8 bh 1. WF250 x 400mm x 1 pt
4. 7200 mm LUAR x 4 bh 1. WF250 x 460mm x 3 pt
(BIBIR WF DIPOTONG (ATI WF DIPOTONG DISAMBUNG LAGI
5. 7500 mm LUAR x 4 bh
KIRI-KANAN JADI 104mm) JADI 240mm LUAR,BIBIR WF DIPOTONG
6. 4200 mm LUAR x 4 bh
2. Plat kopel x 9 ptg (Gbr huruf B diatas) KIRI-KANAN JADI 100mm)
JIKA MERAKIT PLAT INI,BIBIR PLAT 2. Plat kopel x 3 ptg (Gbr huruf A diatas)
1. Beton 12mm x 7800 mm x 12 ptg IKA MERAKIT PLAT INI,BIBIR PLAT
YG PANJANG 460mm KIRI-KANAN
2. Beton 12mm x 7500 mm x 8 ptg YG PANJANG 400mm KIRI-KANAN
DI PINGUL 45 derajat.
3. Beton 12mm x 7170 mm x 8 ptg DI PINGUL 45 derajat.
4. Beton 12mm x 7000 mm x 4 ptg
5. Beton 12mm x 7300 mm x 4 ptg
6. Beton 12mm x 4000 mm x 4 ptg
7. Beton 12mm x 300 mm x 40 ptg
(DI BENTUK U DAN LAS PADA KUDA2) DIKERJAKAN P.TULIN
8. Jarum keras 1/2" x 40 bh
BENGKEL LMJANG
04 Oktober 2015
PENGADILAN JEMBER 4
A. KUDA-KUDA (KD1) WF200 BUAT 10 BH SUDUT 45 drjt
LUAR 6328 mm
1. WF200 x 6308 mm (jd 6328 mm) x 10 ptg SUDUT 45 drjt
291 1250 1250 1250 1250 1037 2. WF200 gerbil bawah x 10 ptg (Gbr Hal.3-G2)
200 3. WF200 gerbil atas x 10 ptg (Gbr Hal 3 - G1)
6
4. Plat kopel x 20 ptg (Gbr Hal.3-D)
5. Plat RIB x 120 ptg ( Gbr Hal.2- H5) pasang bolak balik
4 5 6. Pikres x 50 bh (Gbr Hal.4-C)
4
200 3 1 2
YG DIPOTONG/ DIKURANGI
FINISH EDITED
ADALAH POSISI WUWUNG
INI,AGAR POSISI SIKU PIKRES
(RINCIAN NO.6) TIDAK BERUBAH
PENGADILAN JEMBER 5
A. JURAI (JR1) WF200 BUAT 4 BH SUDUT 35 drjt
LUAR 7629 mm
1. WF200 x 7609 mm (jd 7629 mm) x 4 ptg SUDUT 35 drjt
sisa 1526 1526 1526 1266 2. WF200 gerbil bawah x 4 ptg (Gbr Hal.3-G4)
140 3. WF200 gerbil atas x 4 ptg (Gbr Hal 3 - G3)
4. Plat kopel x 8 ptg (Gbr Hal.3-D)
5. Plat RIB x 48 ptg ( Gbr Hal.2- H5) pasang bolak balik
4 5
4
140 3 1 2
LUAR 3862 mm
1490
4 5
3 2 4
93
1
04 Oktober 2015
PENGADILAN JEMBER 6
A. KUDA-KUDA (KD6) WF200 BUAT 3 BH SUDUT 25 drjt C. KOLOM WF200 K6 x 817mm x 4 BH
LUAR 3729 mm
1357
140
TAMPAK B
244
SEPERTI HAL.2
35
817 LUAR
1200 1049
2
123
93
612
6
4 5
1
3 2 4
93
1
1. WF200 x 3709 mm (jd 3729 mm) x 3 ptg SUDUT 25 drjt
65
18
2. WF200 gerbil bawah x 3 ptg (Gbr Hal.3-G6)
3. WF200 gerbil atas x 3 ptg (Gbr Hal 3 - G5)
4. Plat kopel x 6 ptg (Gbr Hal.3-C) 1. WF200 x 817 mm x 3 ptg
5. Plat RIB x 30 ptg ( Gbr Hal.2- H5) pasang bolak balik 2. Plat RIB x 8 ptg ( Gbr Hal.2- H2) pasang bolak balik
B. JURAI (JR3) WF200 BUAT 2 BH SUDUT 18 drjt 6. Pikres x 6 bh (Gbr Hal.4-C)
7. KOLOM K5 x 3 ptg (GMBR HAL.3-E)
LUAR 5121 mm
1881
1826 1414
65
4 5
3 2 4
65
1
1. WF200 x 5101 mm (jd 5121 mm) x 2 ptg SUDUT 18 drjt
2. WF200 gerbil bawah x 2 ptg (Gbr Hal.3-G8)
3. WF200 gerbil atas x 2 ptg (Gbr Hal 3 - G7)
4. Plat kopel x 4 ptg (Gbr Hal.3-C)
5. Plat RIB x 20 ptg ( Gbr Hal.2- H5) pasang bolak balik
6. KOLOM K6 x 2 ptg (GMBR HURUF-C DIATAS) 04 Oktober 2015
PENGADILAN JEMBER 7
GORDING-GORDING C10 - CNP150x50x3mm x 306 mm x 8 ptg
( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg)
C1 - CNP150x50x3mm x 3990mm x 96 ptg
100 100 11 m m DIPOTONG
11 m m
sisa
sisa 75
50
50 75 50
10 20 171 105
10 20 1265 1400 1265 20 10
C9 - CNP150x50x3mm x 1191 mm x 8 ptg
- CNP150x50x3mm x 3665mm x 52 ptg ( SEPERTI GMBAR 4 ptg, KEBALIKANNYA 4 ptg)
C2
100 100 11 m m DIPOTONG
11 m m
sisa
sisa 75
50
50 75 50
10 20 1056 105
10 20 1180 1235 1180 20 10
C8 - CNP150x50x3mm x 2076 mm x 8 ptg