Minimum PPE required: Hard hat, safety glasses or goggles, hi-viz jacket, Cover-all, safety shoes
LS Likelihood / Frequency
CS Severity of consequence
XXX Hyundai Samsung Joint Venture
E - Environmental
Consequence: H Health
S Safety
Page 1
Installation of steel structures and Decking sheets.-JHA -
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
WORK SPECIFIC
Page 2
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 4
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 5
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 6
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 7
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Welding, Gas Unauthorized Serious injury. Use wet cloth or fire 1 3 3 Subcontra L Yes
Cutting and operation. Property blanket for protecting ctor
Grinding Exposure to damage. man, Machine & supervisor
operations electricity Fatality material from .
(Continues) Fumes generated slag/splatters produced
Electric shock
from welding.
from the welding YYYY
Serious injury operation.
Hot surface Eye injury or area
If work performed at
Slag irritation. supervisor
heights proper
Respiratory to monitor
protection must be
diseases made for the slag falling
Burn by providing fire
Injury Burn, blanket.
Fire Ensure a fire watcher
always present while
welding activity is
carried out and he
should ensure that no
smoldering shall occur
after welding is
completed.
Fire extinguishers to be
provided at
site(DCP&CO2)
P01-Training
P31-Welding operation
P34-Hot works.
P-42-Machine and hand
tool tagging system.
P-06 Fire prevention.
Page 8
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Use of hand Power tools, Serious injury, Use all power tools with
and power Unguarded Trip, 3 2 6 guards, 1 2 2 Subcontra L
machines, entanglement, Unguarded machines No
tools. ctor
Manual handling. Slip, fall. should be replaced or supervisor
Sharp hand tools. Property repaired, maintain good
housekeeping at working .
Defective or damage
incorrect tools Fire and area,
Tools falling from Electrocution Only competent workers to YYYY
height. use power tools. area
Sharp edged tools. All hand tools should be supervisor
maintained defect free, to
Safe storage of sharp hand monitor .
tools,
Regular removal of wood
waste, color cording of
hand and power tools,
Designated de-nailing area
in carpentry yard,
Competent supervision,
TBT and PPE.
Retains string on the
tools to secure falling
from height.
Follow XXX procedure.
P01-Training
P-42 machine &Tools.
P-15 Color coding.
Page 9
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Manual Contact with sharp Injury to body 3 3 9 Use mechanical 2 1 2 Subcontra L Yes
handling of edges, parts due to equipment instead of ctor
steel erection Ergonomic poor handling, manual handling where supervisor
parts. hazards, Back injuries, possible. .
Over exertion, Abdominal As far as practicable,
Repetitive actions, hernia, Muscle materials will be stored
YYYY
Incorrect lifting and joint as close as possible to
area
technique, poor. injuries, Impact the appropriate work
injuries station. supervisor
Housekeeping.
The load will be to
lightened and suitably monitor .
shaped for safe manual
handling.
Use of adequate and
appropriate PPE.
Laborers will be trained
in proper methods of
lifting and carrying by
manually.
Laborers must be
medically fit for
strenuous work.
Follow XXX procedure.
P-39 Manual handling.
Page 10
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Erection of Unsafe Crane radius Personal 4 4 16 Job planning and correct 2 2 4 Subcontra M Yes.
steel structure and boom length. injury. placement of crane prior to lift. ctor
Fatality. Rigger or Steel erector to supervisor
Sharp edges on
(Lifting of Fire. discuss the method of lifting .
steel. with the crane operator.
columns, Serious injury.
Placement of Load swinging from Trip,
Only one person signalling the YYYY
side to side. lifting activity.
column on to Entanglement area
Barricade the lifting area with
holding down Unbalanced load. , supervisor
adequate warning signages.
bolt, Hook and Slip, fall. to
Guide column in to Rigger/Steel erector must warn
unhook of Property monitor .
position. all employees that a load is
slings on damage. about to be lifted.
columns, Access to top of Electrocution
A whistle will be used for
Erecting tie column.
alarming others.
beams, Bolting steel in Use of taglines at all lifting
Employees position. operations.
moving on Slings must be protected
Slip and fall.
steel work in a against sharp edges by
elevated area, Safety harness padding.
Tighten /Install improper anchor All lifting gears must be
bolts.) points. inspected, third party certified
(Continues) and color coded.
Loose and falling
Certified & Competent person to
material.
signal the lifting operation.
Slippery surfaces. Steel parts to be level during a
Faulty hand & power lift maintain the center of gravity.
Erection of Unsafe crane radius Personal 4 4 16 A ladder can be placed and 2 2 4 Subcontra M Yes.
steel structure and boom length. injury. 100% secured to the column for ctor
Fatality. access to unhook the sling. supervisor
Sharp edges on Depending on the height of the
(Lifting of Fire. column.
.
steel.
columns, Serious injury.
A man cage with an additional
Placement of Load swinging from Trip, YYYY
crane can be used to unhook
column on to side to side. Entanglement slings in hard to reach areas. area
holding down Unbalanced load. , The sling will be pulled down supervisor
bolt, Hook and Slip, fall. with the guide rope to ground to monitor
Guide column in to
unhook of Property level if there are no cleats on
position. the column.
slings on damage.
columns, Access to top of Electrocution Employees to use ladders
column. secured to the structure to bolt
Erecting tie
beams in position and to
beams, Bolting steel in unhook slings.
Employees position. Double lanyard full body
moving on harnesses will be used and
Slip and fall.
steel work in a comply 100% tie off.
elevated area, Safety harness If the steel work is too big for the
Tighten anchor points. lanyard to be secured a nylon
building/Install Loose and falling sling with the correct S.W.L will
bolts.) be wrapped around the steel to
material. attach the hook of the safety
(Continues)
Slippery surfaces. harness.
A horizontal lifeline can be
Faulty hand & power
erected were practical possible
tools. (Inspected and erected by a
Falling equipment. competent person)
Employees moving on steel
In correct erection
work must always be attached.
method.
Fall protection equipment to be
Working with in use.
electrical impact Only trained, experienced and
wrench. medical fit employees to work in
elevated areas.
Tripping hazards. Page 12
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Erection of Crane radius and Personal 4 4 16 Employees must secure 2 2 4 Subcontra M Yes.
steel structure boom length. injury. material or use tool bag. ctor
Fatality. All hand tools and electrical supervisor
Sharp edges on
(Lifting of Fire. equipment used in elevated .
steel. areas must have lanyards.
columns, Serious injury.
Placement of Load swinging from Entanglement
No steel erection to be done in YYYY
side to side. adverse weather conditions i.e.
column on to . area
Winds above 9m/s
holding down Unbalanced load. Slip, trip, fall. supervisor
Rain.
bolt, Hook and Property to monitor
Guide column in to Lightning.
unhook of damage.
position.
slings on Electrocution Employees working on steel
Erection of Collision or dropping Personal 4 4 16 Tandem lifts must be planned 2 2 4 Subcontra M Yes.
steel structure of the load. Fatality and carried out under a ctor
by tandem Collapse of Property competent persons supervision. supervisor
lifting Where equipment. damage. Correct placement of crane and .
two cranes are Unsafe Crane radius Serious injury. ensure ground conditions must
and boom length. Lose of be stable prior to placing the
YYYY
required to cranes.
Production area
raise a load Load swinging from Select the same type of cranes supervisor
side to side. with sufficient capacity for the to monitor
(Lifting of job.
Unbalanced load.
columns, Only one person signalling the
Placement of Fall from height. lifting activity and this person
column on to Sling breakage. must be direct for giving
holding down Faulty slinging. instruction to crane operators
Overloading of and control the lifting operation.
bolt, Hook and
slings Signal person should be
unhook of
Mechanical failure. positioned to view the total
slings on Strong winds. operation and should maintain
columns) Over load of crane. radio contact with the operators.
Crane hooks failure. The weight and center of gravity
Moving crane jib to and load each crane will carry
must be determined exactly for
others property.
the load being hoisted.
Sharp edges of steel
Boom length and boom angles
structures.
of the cranes must be
determined exactly.
Both cranes and load
movements should be made as
smoothly as possible.
Assess the wind and weather
conditions to ensure the safe
operation of the tandem lifting.
Lifting operation must be
suspended in adverse weather
conditions.(Wind speed more
than 9.6 m/s) loads and crane
boom must be returned to a
Page 14
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Erection of Collision or dropping Personal Cranes and all lifting gears must 2 2 4 Subcontra M Yes.
steel structure of the load. Fatality be inspected, third party ctor
by tandem Collapse of Property certified and color coded. supervisor
lifting Where equipment. damage. Use licensed and third party .
two cranes are Unsafe Crane radius Serious injury. certified operators and
signalman.
and boom length. Lose of YYYY
required to Lifting tackles should be
Production properly stacked and area
raise a load Load swinging from maintained to avoid damages. supervisor
side to side. To be given tool box talk before
to monitor
(Lifting of starting the task.
Unbalanced load. Restrict boom movements
columns, within property limits.
Placement of Fall from height. Cranes to be checked before
column on to Sling breakage. entering site by authorized
Working at People falling from Serious injury / 4 4 16 Ensure safe means of 2 2 4 Subcontra M No
height. height Fatality access and egress are ctor
Falling objects provided supervisor
Edge protection must be
.
provided to all areas
where a fall of 1.8 meters.
Ensure that the working YYYY
platform and surrounding area
area adequately protected supervisor
from falling debris/objects. to monitor
Appropriate PPE must be
provided / used all time
Ensure that full body
harness must be used
and hooked in an
anchorage point always.
Follow XXX procedure P-
25 working at height.
Page 16
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Working on Scaffold collapse. Serious injury / 4 4 16 Before commence any 2 2 4 Subcontra M No.
mobile tower & Overloading of fatality activity on scaffold check ctor
Property the status of scafftag.
stationary scaffold Scaffoldings should be supervisor
scaffolding Falling from damage .
erected, maintained, altered
working scaffold. and dismantled by
certificated scaffolders.
platforms Falling YYYY
Ensure that full body
objects/materials harness must be used and area
Erecting by hooked in an anchorage supervisor
incompetent point. to monitor
Ensure that the working
workers.
platform and surrounding
Unsafe means of area adequately protected
access. from falling debris/objects.
Ensure that safe means of
access and egress to
working platform.
When moving from one
point to other workers must
ensure that one lanyard is
attached all the times in
anchorage point to prevent
them from falling off.
Ensure working platforms
are decked to the full width
and adequately restrained
against displacement.
Ensure the guard rails and
toe boards are erected on
platform to protect from
falling of person and
material.
Do not alter or modify
scaffolding without
permission from scaffolding
supervisor.
Do not overreaching from
the working platform
Do not throw any materials
from the scaffolding.
Page 17
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 18
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 20
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 21
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 23
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 24
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 25
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 26
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 27
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
GENERAL RISK
Page 28
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 30
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
.
Use of Fall from height 4 3 12 TBM to be conducted 2 2 4 Subcon M YES
scaffolding / Falling of objects/ Serious before the work starts. tractor
Ladder materials injuries Full body harness to be supervi
Collapse of worn and secured . sor.
structure Safe access and egress
must be in place.
YYYY
Scaff tag system to be
area
followed.
supervi
Ensure all workers
sor to
attended work at height
monitor
training
.
Follow applicable XXX
procedure under P-21
Scaffolding.
Page 31
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Page 32
Installation of steel structures.-JHA
1stRisk 2nd Action
Residual PTW
Hazards Control Measures by Risk Needed
Hazards Assessment Risk Assessment (Due date)
Consequence
Activities LS CS RATING LS CS RATING
Night Working Working in poor Fatality 4 4 16 Ensure proper and 2 2 4 Subcon M Yes
lighting/poor Serious sufficient level of tractor
visibility injuriy. illuminiation is supplied. supervi
Avoid glaring/shadowing sor.
effect.
Safe access and egress
must be in place. YYYY
Use of beacon lights. area
Follw applicable XXX supervi
procedure sor to
-P08-Risk Assessment. monitor
-P-33-Night working.
Prepared by: Signature / Date Reviewed by: Signature / Date Approved by: Signature / Date
Subcontractor YYYY
YYYY Site Manager
Site Manager HSE Manager
Page 33
Installation of steel structures.-JHA