Anda di halaman 1dari 42

PROJECT NO. REV.

A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-190 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

rf

)
~
-1'-
~,...
d>
t)
~
"'
~ ~ v
3

"'~~~eY
~l pi PIN G
>~ "'
rr:~?
<~?
1---) I

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" O.D. X 3/ 4" MNPT CONNECTOR, S.S.
2 20 FT. 1/2" O.D. X .035" WALL TUBING, S.S.
3 2 1/2" O.D. X 1/2" MNPT CONNECTOR, SS

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS 1" PER FOOT DOWN TO TAPS. DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-190 Idrawn by: SE Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER (GAS SERVICE) F60-260414-191 1 OF 1
W/ ELECTRIC HEATED ENCLOSURE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

3
w~R~D !RicA~
---- ' ' po ~~~c
----- ' '
''
/ B'~'
---
' '
'''
--_,
I ' '
I
I
',
'-..,
(f
,.. ... "" I
II ~ ' '
/
' I
I
I ':_, / I
I

l a; r'l
' I
I
I
I
--~I
....... ~:
----- J

',
I
I
--
4 '
',
-.-I
I ,""
'

~ ~~!1 ~

~ r~ow

B'~'
piPING
<~~
~
r~

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT 1/2" O.D. X .035" WALL TUBE, S.S.
2 2 3/4" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL
4 2 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TAP, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-191 Idrawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-192 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
ELECT TRACED W/HEATED ENCLOSURE appr. by date
MM-DD-YY

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT 1/2" O.D. X .035" WALL TUBE, S.S.
2 2 3/4" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL
4 2 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TAP, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-192 drawn by: S.E. date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-193 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
STEAM TRACED W/ENCLOSURE appr. by date
MM-DD-YY

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
2 2 1/2" O.D. X 3/8" O.D. TUBE UNION, S.S.
3 40 FT. 1/2" O.D. X .035" WALL PROCESS TUBE, S.S. W/ 3/8" O.D. X .035" WALL TRACER, S.S. -
PREINSULATED TUBING.
4 2 3/8" O.D. X 3/8" O.D. TUBE UNION, S.S.
5 5 FT. 1/2" O.D. X .035" WALL TUBING, S.S.
6 1 HEATED INSTRUMENT ENCLOSURE, O'BRIEN OR EQUAL.
7 1 TVS 2000 TRAP VALVE STATION, S.S., ARMSTRONG OR EQUAL.
8 2 1/2" O.D x 3/4" MNPT CONNECTOR, S.S.

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-193 drawn by: SE date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-194 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

r~o'/'1

piPING
B'~''>
~.

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT 1/2" O.D. X .035" WALL TUBE, S.S.
2 4 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 2 1/2" O.D. TUBE TEE, S.S.
4 2 1/2" O.D X 1/2" FNPT BALL VALVE SS
5 2 1/2" MNPT PLUG, S.S.
6 2 1/2" O.D. x 3/4" MNPT CONNECTOR, SS

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER

AMBITECH STANDARD DRAWING: F60- 260414-194 drawn by: S.E. date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-195 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
W/ ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

r~ow

piPING
B'l'';>
~.

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT 1/2" O.D. X .035" WALL TUBE, S.S.
2 4 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL
4 2 1/2" O.D. TUBE TEE, S.S.
5 2 1/2" OD x 1/2" FNPT BALL VALVE SS
6 2 1/2" MNPT PLUG, S.S.
7 2 1/2" OD X 3/4 MNPT CONNECTOR, SS

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-195 drawn by: SE date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-196 1 OF 1
LIQUID SERVICE (ELEC. TRACE) drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

~
....
I '

' I ,.,.

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT THERMON TUBETRACE TYPE PRE-INSULATED PRE- TRACED TUBING, 2 PROCESS TUBES
1/2" O.D. 316SS POL YETHELENE JACKET, OR EQUAL.
2 2 EA. 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 2 EA. 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.
4 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER

AMBITECH STANDARD DRAWING: F60- 260414-196 drawn by: S.E. date: 04-23-12 rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-197 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
STEAM TRACED W/ENCLOSURE appr. by date
MM-DD-YY

I ' '

I
I
J

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. O'BRIEN TRACEPAK SERIES STEAM TRACED IMPULSE LINE OR EQUAL
2 2 1/2" O.D. X 3/ 4" MNPT CONNECTOR SS
3 2 3/8" MNPT X 3/8" TUBE COMPRESSION FITTING, SS
4 1 3/4" MNPT X 3/8" TUBE COMPRESSION FITTING, SS
5 1 TVS 2000 TRAP VALVE STATION, SS, ARMSTRONG OR EQUAL
6 20 FT. O'BRIEN PREINSULATED 3/8" SINGLE TUBE, S-LINE SS OR EQUAL
7 1 HEATED INSTRUMENT ENCLOSURE, O'BRIEN OR EQUAL
8 1 1/2" MNPT X 3/8" TUBE, TUBE FITTING, SS
9 2 1/2" O.D. x 1/2" MNPT CONNECTOR, SS

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING EVERY 5 FEET
2. SLOPE PROCESS LEADS DOWN TO INSTRUMENT. DO NOT POCKET.
3. CONTRACTOR TO PROVIDE SHRINK END SEAL BOOT AS NECESSARY ON O'BRIEN PRE INSULATED TUBING
4. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER

AMBITECH STANDARD DRAWING: F60- 260414-197 drawn by: S.E. date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P LEVEL TRANSMITTER F60- 260414-300 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. 1/2" O.D. X .035" WALL TUBE, S.S.
2 4 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 2 1/2" O.D. TUBE TEE, S.S.
4 2 1/2" O.D. X 1/2" FNPT BALL VALVE, S.S.
5 2 1/2" MNPT PLUG, S.S.
6 2 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-300 date: MM-DD-YY rev.: A


PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P LEVEL TRANSMITTER F60-260414-301 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

I ' '
I

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. 1/2" O.D. X .035" WALL TUBE, S.S.
2 4 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 HEATED INSTRUMENT ENCLOSURE, O'BRIEN OR EQUAL
4 2 1/2" O.D. TUBE TEE, S.S.
4 2 1/2" O.D. X 1/2" FNPT BALL VALVE, S.S.
4 2 1/2" MNPT PLUG, S.S.
4 2 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-301 drawn by: S.E. date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P LEVEL TRANSMITTER F60-260414-302 1 OF 1
LIQUID SERVICE ELECTRIC TRACED drawn by date
SE MM-DD-YY
W/HEATED ENCLOSURE appr. by date
MM-DD-YY

~
.....
I ..._

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. THERMON TUBETRACE TYPE PRE -INSULATED PRE- TRACED TUBING, 1 PROCESS TUBE,
1/2" O.D. 316SS POL YETHELENE JACKET, OR EQUAL.
2 4 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL.
4 2 1/2" O.D. TUBE TEE, S.S.
5 2 1/2" O.D. X 1/2" FNPT BALL VALVE, S.S.
6 2 1/2" MNPT PLUG, S.S.
7 2 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-302 drawn by: S.E. date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P LEVEL TRANSMITTER F60-260414-303 1 OF 1
STEAM TRACED W/ ENCLOSURE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

BILL OF MATERIAL
r
ITEM QTY DESCRIPTION
1 20 FT O'BRIEN TRACEPAK SERIES STEAM TRACED IMPULSE LINE, OR EQUAL.
2 2 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 2 3/8" MNPT X 3/8" TUBE COMPRESSION FITTING, S.S.
4 2 3/4" MNPT X 3/8" TUBE COMPRESSION FITTING, S.S.
5 A.R FT O'BRIEN PREINSULATED 3/8" SINGLE TUBE, S.S. OR EQUAL.
6 2 3/4" MNPT X 1/2" TUBE COMPRESSION FITTING, S.S.
7 2 TVS 2000 TRAP VALVE STATION, S.S., ARMSTRONG OR EQUAL.
8 1 3/8" TUBE UNION FITTING, PARKER 6-6 HBZ316 S.S.
9 2 1/2" MNPT X 3/8" TUBE, TUBE CONNECTOR, S.S.
10 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL.
NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING EVERY 5 FEET.
2. SLOPE PROCESS LEADS 1" PER FOOT DOWN TO INSTRUMENT. DO NOT POCKET.
3. CONTRACTOR TO PROVIDE SHRINK END SEAL BOOT AS NECESSARY ON O'BRIEN PRE INSULATED TUBING.
4. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.
AMBITECH STANDARD DRAWING: F60-260414-303 drawn by: SE date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P F60-260414-31 0 1 OF 1
LEVEL TRANSMITTER drown by dote
SE MM-DD-YY
W/ REMOTE DIAPHRAGM SEAL oppr. by dote
MM-DD-YY

X
,, '
BY PIPING

~CAPILLARY
TUBING

LJ
I r
u

~
~
i1"-
t>< ~I;
c_

:,...,--,
_j
~COIL
~

1\ ) BY PIPING
& SUPPORT
~ _/ CAPILLARY TUBE
@ INSTRUMENT.
~
-
SEE NOTE 1

NO INSTALLATION MATERIAL REQUIRED

BILL OF MATERIAL
ITEM QTY DESCRIPTION

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT CAPILLARY TUBING IN BRACKET OR U-CHANNEL.


THE MAXIMUM UNSUPPORTED DISTANCE SHALL NOT EXCEED 1 FT.
2. FLUSH RING W/PLUG SUPPLIED W/REMOTE SEAL.
3. BOLT SET AND GASKET PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-310 Idrown by: SE Ioppr. by: Idote: MM-DD- YY Irev.: A
PROJECT NO. REV.
A
DWG. NO. SHEET
LEVEL MEASUREMENT BUBBLER F60-260414-311 1 OF 1
drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

TO
D/P TRANSMITTER
ro

~
~,, ~ Jp [

J
jf-

if ~0~
,....,
cp
~,..--
,....,
FOR CONT. SEE
~'
TO OPEN VESSEL r
~
OH
~
cr STD F60-260414-500

AND NOTE 3
2
OR SUMP\

3
8

~ 4~
I 6"

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 1 112" MNPT PLUG, 316SS
2 1 112" TEE, 316SS
3 4 114" O.D. X 1I 4" MNPT CONNECTOR, 316SS
4 1 114" BALL VALVE, 316SS
5 1 114" O.D. X 1 12" MNPT CONNECTOR, 316SS
6 AIR 114" O.D. X .035" WALL, SS TUBE
7 1 1I 4" TUBE TEE, 316SS
8 1 PURGE FLOW CONTROLLER (CONSTANT DIFF. RELAY, MOORE MODEL# 62VA OR EQUAL)

NOTES:
1. MATERIALS SHOWN ARE FOR ONE ASSEMBL~

2. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


3. FIELD ROUTE TO NEAREST INSTRUMENT AIR HEADER

AMBITECH STANDARD DRAWING: F60-260414-311 Idrawn by: SE Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P F60-260414-312 1 OF 1
REMOTE LEVEL TRANSMITTER drawn by date
SPL
W/DIAPHRAGM SEAL appr. by date
04-02-14

X
,, ,.
BY PIPING BY PIPING

_:m
0
~
L"H

[COIL & SUPPORT


CAPILLARY TUBES
@ INSTRUMENT.
SEE NOTE 1

I\ / BY PIPING

~~/
-

NO INSTALLATION MATERIAL REQUIRED

BILL OF MATERIAL
ITEM QTY DESCRIPTION

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT CAPILLARY TUBING IN BRACKET OR U-CHANNEL.


THE MAXIMUM UNSUPPORTED DISTANCE SHALL NOT EXCEED 1 FT.

2. FLUSH RING WITH 1/2" 316 SS BALL VALVE WITH PLUG SUPPLIED BY CONTRACTOR.
3. BOLT SET AND GASKET PROVIDED BY CONTRACTOR

AMBITECH STANDARD DRAWING: F60- 260414-312 Idrawn by: SPL Iappr. by: Idate: 04/04/14 Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60- 260414-400 1 OF 1
GAS SERVICE drown by dote
SE MM-DD-YY
oppr. by dote
MM-DD-YY

pf

;:s

s~ \
0

G\ ~piPING B'{

A.J f oR
fO piP fN 1
u1P~
fO

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 10 FT. 1/2" O.D. X .035" WALL TUBE, S.S.
2 1 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. SLOPE PROCESS LEADS DOWN TO TAP, DO NOT POCKET.
3. 2-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-400 Idrown by: S.E. Ioppr. by: Idote: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60-260414-401 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 10 FT. 1/2" O.D. X .035" WALL TUBE, S.S.
2 1 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.
3 1 1/2" OD X 1/2" MNPT CONNECTOR, S.S.
4 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TAP, DO NOT POCKET.
3. 2-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-401 Idrawn by: S. E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
123456 A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60-260414-402 1 OF 1
GAS SERVICE (ELEC TRACED) drawn by date
SE MM-DD-YY
W/HEATED ENCLOSURE appr. by date
MM-DD-YY

/ ~?
"'-.

(/ v~
I ""' ""' ~ :Y I
~~v) ;'1-
l I ro a'
~ pow~JRicA~
~
/
B"'-. V ~~~c
3

lioN
~~~ ,,
~~X ~~~'(~~
(B
R~IN~c'f.)
'
B'f ~~
~c'f.
-\ IY

oR
'fOtJ~::~NI
~Q
piPING
B'f

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 10 FT THERMON TUBETRACE TYPE PRE-INSULATED PRE- TRACED TUBING, 1 PROCESS TUBE
1/2" O.D. 316SS POL YETHELENE JACKET OR EQUAL.
2 1 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 1/2" O.D. X 3/4" MNPT ELBOW, S.S.
4 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TAP, DO NOT POCKET.
3. 2-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-402 Idrawn by: SE Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
123456 A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60-260414-403 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
STEAM TRACED W/ENCLOSURE appr. by date
MM-DD-YY

3
A <'~,/~
't fO
~ 4 ~AcfO~~~s~~N
I coNf fO N~f~ ~~
~1 / ~tJN ~NsA
coN~~~
~
8 J>
rl.J sA f~ ~~A
e slfl' o~N
Ac~. coN 0uf
/Vf~ 1N

I:
piP~ ~Nf
fO tJIP~
vcO N fO f~A~ ~~
~tJ C~ S ~~AD
fO
cfO~ ~sf
Nf~A N~A~

~Q f~A pL.'(
suP
piPING
B'f

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
2 1 1/2" O.D. X 3/8" O.D. TUBE UNION, S.S.
3 40 FT. 1/2" O.D. X .035" WALL PROCESS TUBE, S.S. W/ 3/8" O.D. X .035" WALL TRACER, S.S. -
PREINSULATED TUBING.
4 2 3/8" O.D. X 3/8" O.D. TUBE UNION, S.S.
5 5 FT. 1/2" O.D. X .035" WALL TUBING, S.S.
6 1 HEATED INSTRUMENT ENCLOSURE, O'BRIEN OR EQUAL.
7 1 TVS 2000 TRAP VALVE, S.S., ARMSTRONG OR EQUAL.
8 2 1/2" O.D x 3/4" MNPT CONNECTOR, S.S.

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-403 Idrawn by: SE Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60-260414-41 0 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
appr. by date
?? MM-DD-YY

piPING
oR B'{
p1P~Nf
fauiP~ ~1
~

~ pf

;t

~
~
~
Vi1
\
~
TRANSMITTER BELOW
PRESSURE TAP cv--)~
(LIQUID & STEAM SERVICE)
5

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 10 FT 1/2" O.D. X .035" WALL TUBE, S.S.
2 2 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 1/2" TEE, S.S.
4 1 1/2" VALVE, S. S.
5 1 1/2" NPT PLUG, S.S.
6 1 1/2" O.D. X 3/4" NPT CONNECTOR, S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 2-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-410 Idrawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60-260414-411 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

-<>-
~\ .....,
~ 0
BY PIPING
TO PIP OR
EOUIPMENT
'
~D B'~'
pow~JRicAl-
\ rtfc ~
~ // ', ' f l
/
/

~
/ ~ '
'
I ' ' pf '/1
I ' /

:
' / I
I
I
~
~'t;:1/
~
'
' I / /
j
/
I /
' ... /

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 10 FT. 1/2" O.D. X .035" WALL TUBE, S.S.
2 1 1/2" O.D. X 1/2" MPT CONNECTOR, S.S.
3 1 1/2" O.D. X 3/4" MPT CONNECTOR, S.S.
4 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. FOR MOUNTING DETAIL SEE DWG.
3. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
4. MATERIALS SHOWN ARE FOR ONE ASSEMBLY.
5. 2-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-411 Idrawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60-260414-412 1 OF 1
LIQUID SERVICE (ELEC. TRACE) drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

piPING
Nf B'l'
1P~f
fOU
oR
p1Pf
fO
_Q~~
~....,
~~~-
lioN
~INA )
rfR fCf
/~ c awfR leA~
fO B'l'
'{ f~ / P fciR
(B /
/ ~' f~
~
/
'

'~
~
/ ' '
I
' '
' 1
I ',! ,..,.."' ~
---CD
I~-
~ ~ ,_ ~ I

", ~)
'""I ,..
' I
/

' ' ... /


/

s~
~ ... B
'{ f~
fCf

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 10 FT THERMON TUBETRACE TYPE PRE-INSULATED PRE- TRACED TUBING, 1 PROCESS TUBE
1/2" O.D. 316SS POL YETHELENE JACKET, OR EQUAL
2 1 EA. 1/2" O.D. X 1/2" MNPT CONNECTOR, S.S.
3 1 EA. 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.
4 1 HEATED ENCLOSURE, O'BRIEN OR EQUAL

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 2-VALVE MANIFOLD PROVIDED W/TRANSMITTER

AMBITECH STANDARD DRAWING: F60-260414-212 Idrawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.:
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE TRANSMITTER F60-260414-413 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
STEAM TRACED W/ENCLOSURE appr. by date
MM-DD-YY

~~

(
CONTRACTOR TO PIPE TO
NEAREST CONDENSATE RETURN HEADER

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. O'BRIEN TRACEPAK SERIES STEAM TRACED IMPULSE LINE.
2 1 1/2" O.D. X 1/2" NPT CONNECTOR, SS
3 2 3/8" MNPT X 3/8" TUBE COMPRESSION FITTING, SS
4 1 3/4" MNPT X 3/8" TUBE COMPRESSION FITTING, SS
5 1 1/2" O.D. X 3/4" NPT CONNECTOR, SS
6 20 FT. O'BRIEN PREINSULATED 3/8" SINGLE TUBE, S-LINE SS
7 1 TVS 2000 TRAP VALVE STATION, SS, ARMSTRONG (OR EQUAL)
8 1 1/2" NPT X 3/8" TUBE, TUBE FITTING, SS
9 1 HEATED ENCLOSURE O'BRIEN OR EQUAL

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING EVERY 5 FEET
2. SLOPE PROCESS LEADS 1" PER FOOT DOWN TO INSTRUMENT. DO NOT POCKET.
3. CONTRACTOR TO PROVIDE SHRINK END SEAL BOOT AS NECESSARY ON O'BRIEN PRE INSULATED TUBING
4. 2-VALVE MANIFOLD W/TRANSMITTER

AMBITECH STANDARD DRAWING: F60-260414-413 drawn by: SE date: MM-DD-YY rev.: A


PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE TRANSMITTER F60-260414-420 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

pDf

)
~
~ ~~
~
"'""~
v
3

~
~~l~
l ~au
1P~~
Nf

0~

~II
piP~
fO

w;:Gl ~au
1P~~
Nf

0~
piP~
fO

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" O.D. X 3/4" NMPT CONNECTOR, S.S.
2 20 FT. 1/2" O.D. X .035" WALL TUBING, S.S.
3 2 1 /2" O.D. X 1/2" NMPT CONNECTOR, SS

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.

2. SLOPE PROCESS LEADS 1" PER FOOT DOWN TO TAPS.


DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER

AMBITECH STANDARD DRAWING: F60- 260414-420 drawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE TRANSMITTER F60-260414-421 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

e'i
~R~D t..
pO !RicA
~~..~c

~~
~ ~"

~~
piPING
._.,

~/
y/

e'i \...
(D----
~
?'o
-9--A
~a
~<!)
~
~v
90-A
~<"'4-?'
piPING
e'i

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. 1/2" O.D. X 0.035" WALL TUBE, 316SS
2 2 1/2" O.D. X 1/2" NPT CONNECTOR, 8-8-FBZ 316SS
3 2 1/2" O.D. X 3/4" NPT CONNECTOR, PARKER 8-12-FBZ, 316SS
4 1 HEATED ENCLOSURE O'BRIEN OR EQUAL

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING EVERY 5 FEET


2. SLOPE PROCESS LEADS DOWN TO TAPS, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED WITH TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-421 Idrawn by: S.E. appr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
D/P FLOW TRANSMITTER F60-260414-422 1 OF 1
GAS SERVICE (ELECTRIC TRACED) drawn by date
SE MM-DD-YY
W/HEATED ENCLOSURE appr. by date
MM-DD-YY

~
r
I

BY ELECTRICAL

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" O.D. X 1/2" MPT CONNECTOR, S.S.
2 2 1/2" O.D. X 3/4" MNPT, S.S.
3 40 FT. THERMON TUBE TRACE TYPE PRE -INSULATED PRE- TRACED TUBING, 2 PROCESS TUBE
4 1 HEATED INSTRUMENT ENCLOSURE, O'BRIEN OR EQUAL

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-422 drawn by: SE date: MM-DD-YY rev.: A


PROJECT NO. REV.
123456 A
INSTALLATION DETAIL DWG. NO. SHEET
D/P TRANSMITTER F60-260414-423 1 OF 1
GAS SERVICE drawn by date
SE MM-DD-YY
STEAMED TRACED W/ENCLOSURE appr. by date
MM-DD-YY

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" O.D. X 1/2" MPT CONNECTOR, S.S.
2 2 1/2" O.D. X 3/8" O.D. TUBE UNION, S.S.
3 40 FT. 1/2" O.D. X .035" WALL PROCESS TUBE, S.S. W/ 3/8" O.D. X .035" WALL TRACER, S.S. -
PREINSULATED TUBING
4 2 3/8" O.D. X 3/8" O.D. TUBE UNION, S.S.
5 5 FT. 1/2" O.D. X .035" WALL TUBING, S.S.
6 1 HEATED INSTRUMENT ENCLOSURE, O'BRIEN OR EQUAL
7 1 TVS 2000 TRAP VALUE SS, ARMSTRONG OR EQUAL
8 2 1/2" O.D x 3/4" MNPT CONNECTOR SS

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-423 drawn by: SE date: MM-DD-YY rev.: A


PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE TRANSMITTER F60-260414-430 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

'fOpiP~tJIP~~NI
oR ~ c< 6

~~ piP~ tJIP~~NI
~
piPING 0
B'~' I ~Q
piPING oR
B'~'
/
~
6

G( ......_
I'-

~~
........

(~
~ ~ 0
(~ ( ~3

~
~~
cg-~~ ~ ~
5

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT 1/2" O.D. X .035" WALL TUBE, 316SS
2 4 1/2" O.D. X 1 /2" MNPT CONNECTOR, 316SS
3 2 1/2" TEE, 316SS
4 2 1/2" FNPT VALVE
5 2 1/2" NPT PLUG, 316SS
6 2 1/2" O.D. X 3/4" NMPT CONNECTOR, SS

NOTES:

1. MATERIALS SHOWN ARE FOR ONE ASSEMBLY.


2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
.3 . CONTRACTOR TO ROUTE AND SUPPORT TUBING .
4. .3 VALVE MANIFOLD PROVIDED W/TRANSMITTER
AMBITECH STANDARD DRAWING: F60-260414-430 Idrawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE TRANSMITTER F60-260414-431 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

<

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. 1/2" O.D. X .035" WALL TUBE, S.S.
2 2 1/2" O.D. X 1/2" MPT CONNECTOR, S.S.
3 1 HEATED ENCLOSURE O'BRIEN OR EQUAL.
4 2 1/2" O.D. TUBE TEE, S.S.
5 2 1/2" O.D. X 1/2" FNPT BALL VALVE, S.S.
6 2 1/2" NPT PLUG, S.S.
7 2 1/2" O.D. X 3/4" MNPT CONNECTOR, S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60- 260414-431 drawn by: S. E. Iappr. by: Idate: MM-DD- YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE TRANSMITTER F60- 260414-432 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
W/ELECTRIC HEATED ENCLOSURE appr. by date
MM-DD-YY

o'
p1Pf ~f~f c'~
f 0~otJIP
>
t:J

B'~'
piPING ~r/ 7

piPING
/" B'~'

<~,?> piP~ o'~Nf


fO~otJIP~
By
ci 1'--
/
/'
~
' ' /~
w~R~~c.A~
pO ~cfR
/
/

~
/
'
1', fl ' ,,
'
~ ~
/

~ ~~
I
r I

~' '
'

d;
~,.,...-/ ~I
~-'
't;1"
I
_,"

/
_,
_,
I

J
(2):~ ( I
',.."
_,

~.~ ~> -
cg-~ ~N) 1

~~
BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. 1/2" O.D. X .035" WALL TUBE, S.S.
2 2 1/2" O.D. X 1/2" MPT CONNECTOR, S.S.
3 1 HEATED ENCLOSURE O'BRIEN OR EQUAL.
4 2 1/2" O.D. X TUBE TEE, S.S.
5 2 1/2" O.D. X 1/2" FNPT BALL VALVE, S.S.
6 2 1 /2" NPT PLUG S.S.
7 2 1 /2" O.D. X 3/4" MNPT CONNECTOR S.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
3. MATERIALS SHOWN ARE FOR ONE ASSEMBLY.
4. 3-VALVE MANIFOLD PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-432 ldrawn by: S.E. Iappr. by: Idate: MM-DD- YY Irev.: A
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE TRANSMITTER F60-260414-433 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
STEAM TRACED W/ENCLOSURE appr. by date
MM-DD-YY

r
CONTRACTOR TO PIPE TO
NEAREST CONDENSATE RETURN HEADER

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT. O'BRIEN TRACEPAK SERIES STEAM TRACED IMPULSE LINE.
2 2 1 2" O.D. X 1 2" NPT CONNECTOR, SS
2 3/8" MNPT X 3/8" TUBE COMPRESSION FITTING, SS
4 2 3 4" MNPT X 3 8" TUBE COMPRESSION FITTING SS
5 2 1 2" O.D. X 3 4" NPT CONNECTOR, SS
20 FT. O'BRIEN PREINSULATED 3 8" SINGLE TUBE S-LINE SS
7 2 TVS 2000 TRAP VALVE STATION SS ARMSTRONG OR EQUAL
8 1 3 8" TUBE UNION FITTING, SS
2 1 2" NPT X 3 8" TUBE, TUBE FITTING, SS
10 1 HEATED ENCLOSURE O'BRIEN OR EQUAL
NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING EVERY 5 FEET
2. SLOPE PROCESS LEADS 1" PER FOOT DOWN TO INSTRUMENT. DO NOT POCKET.
3. CONTRACTOR TO PIPE TO NEAREST TRACE STEAM SUPPLY HEADER.
4. CONTRACTOR TO PROVIDE SHRINK END SEAL BOOT AS NECESSARY ON O'BRIEN PRE INSULATED TUBING
5. 3-VALVE MANIFOLD W/TRANSMITTER

AMBITECH STANDARD DRAWING: F60- 260414-433 date: MM-DD-YY rev.: A


PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE SWITCH/GAUGE F60-260414-440 1 OF 1
drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

PSH/L OR PI

-~~
4
2 -
- _I '@
5 CD- BY PIPING
r

~~
'l '
l

OR

PSH/L OR PI
~r'

~-~- 1- - 2
I
5
__j 1
BY PIPING

~L. 4

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" NPT x 3"LG. SCH. 80 NIPPLE, S.S.
2 1 1/2" FNPT, TEE, S.S.
3 1 1/2" NPT PLUG SQUARE HEAD SCR'D SS
4 1 1/2" FNPT, GATE VALVE SS
5 1
3/4" MNPT x 1/2" FNPT REDUCING BUSHING SS

AMBITECH STANDARD DRAWING: F60-260414-440 Idrawn by: SE Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE SWITCH/GAUGE F60- 260414-441 1 OF 1
W/THREADED DIAPHRAGM SEAL drown by dote
SE MM-DD-YY
oppr. by dote
MM-DD-YY
PSH/L OR PI

1rtL

2
-
-
-I
_I
~~
_(5) BY PIPING
r

'
z 'l
~

OR
PSH/L OR PI

1rtL

~-
-{X """ I
- ~
r-

BY PIPING
~
~ 4
3

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 3 1/2" NPT x 3"LG. SCH. 80 NIPPLE, S.S.
2 1 1/2" FNPT, TEE, SS
3 1 1/2" PLUG SQUARE HEAD SCR'D SS
4 1 1/2" FNPT GATE VALVE SS
5 1 3/4" MNPT x 1/2" FNPT REDUCING BUSHING SS

AMBITECH STANDARD DRAWING: F60-260414-441 Idrown by: S.E. Ioppr. by: Idote: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE SWITCH/GAUGE F60-260414-442 1 OF 1
W/FLANGED DIAPHRAGM SEAL drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

PSH/L OR PI

1I::Il.

X BY PIPING

'
( (

OR
PSH/L OR PI

BILL OF MATERIAL
ITEM QTY DESCRIPTION

NOTES:

1. FLUSH RING W/PLUG SUPPLIED W/REMOTE SEAL.


2. BOLT SET AND GASKET PROVIDED W/TRANSMITTER.

AMBITECH STANDARD DRAWING: F60-260414-442 Idrawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
PRESSURE SWITCH GAUGE F60-260414-443 1 OF 1
STEAM SERVICE drawn by date
?? MM-DD-YY
appr. by date
?? MM-DD-YY

PSH/L OR PI

D ~
BY PIPING
PSH/L OR PI

~
SIPHON
iiil
'pill
~
4
(
' NOTE 2 ~
SIPHON
!>< I I
"
L..
I-
2
(
c::
' NOTE 2

6
'cb ~--{3) I
~:J I- 2

!
BY PIPING
- e:::
l ~
J(b' ;{D (-@
~ 6

HORIZONTAL LINE INSTALLATION VERTICAL LINE INSTALLATION

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 2 1/2" NIPPLE MNPT 3" LONG SS
2 1 1 /2" TEE FNPT SS
3 1 3/4" MNPT x 1/2" FNPT REDUCING BRUSHING SS
4 1 1/2" VALVE, WITH GRAFOIL PACKING (OR EQUAL)
5 1 1/2" MNPT COUPLING
6 1 1 /2" NPT PLUG SS

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. FURNISHED WITH PRESSURE GAUGE.

AMBITECH STANDARD DRAWING: F60-260414-443 Idrawn by: S. E. Iappr. by: date: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
MOUNTING DETAIL DWG. NO. SHEET
SINGLE UNIT PI PEST AND F60-260414-600 1 OF 1
drawn by date
WLB MM-DD-YY
appr. by date
MM-DD-YY

1/2" ANCHOR BOLT, WASHER, CONCRETE ANCHOR

~
(\j
[[)

\0 ()
~

8 C)
......
() \0

lOU

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 1 EA. INSTRUMENT STAND, OBRIEN FP52 OR EQUAL
2 4 EA. 1/2" ANCHOR BOLT, WASHER, CONCRETE ANCHOR

NOTES:
1. MATERIALS SHOWN ARE FOR ONE ASSEMBL~

AMBITECH STANDARD DRAWING: F60-260414-600 Idrawn by: WLB appr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE INDICATOR F60-260414-450 1 OF 1
VAPOR SERVICE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

DPI

~
FIELD SURFACE
MOUNT AS REQUIRED

~ ~
~
~
l'o
t j:llj:l
QlJij:~~ 0~
t~l' v ~
B~ lj:~l~c 4
~t 1
5
~

1
~
~ /
~ l'oj:l

4 I
By
~ l'

j:llj:~l
~c

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 20 FT 1/2" O.D. X .035" WALL TUBE, S.S.
2 2 3/ 4" MNPT x 1/2" NPT REDUCING BUSHING SS
3 2 1/2" TUBE TEE SS
4 2 1/2" MNPT x 1/2" TUBE BALL VALVE SS
5 1 1/2" x 1/2" TUBE BALL VALVE SS
6 2 1/2" FNPT x 1/2" TUBE CONNECTOR SS

NOTES:

1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.


2. FOR MOUNTING DETAIL SEE DWG.
3. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.

AMBITECH STANDARD DRAWING: F60-260414-450 Idrawn by: S.E. Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
DIFFERENTIAL PRESSURE INDICATOR F60-260414-451 1 OF 1
LIQUID SERVICE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

FIELD SURFACE
MOUNT AS
REQUIRED

BILL OF MATERIAL
ITEM QTY DESCRIPTION

1 20 FT. 1
')"
L 0.0. X .035" WALL TUBE, 316SS
')"
2 2 1 L MNPT x 1 2" TUBE CONNECTORS
')"
3 4 1 L TUBE TEE, SS
4 2 1 /2" FNPT x 1/2" TUBE BALL VALVE, ss
5 2 1 /2" NPT PLUG
6 2 1 /2" MNPT x 1/2" TUBE BALL VALVE ss
7 2 3 4 NPT x 1 2 NPT REDUCING BUSHING ss
')"
8 1 1 L X 1 2" TUBE BALL VALVE SS
NOTES:
1. MATERIALS SHOWN ARE FOR ONE ASSEMBLY.
2. GAUGE MUST BE VISIBLE FROM PLATFORM OR GRADE, ADD FITTINGS AS NECESSARY.
3. SLOPE PROCESS LEADS DOWN TO TRANSMITTER, DO NOT POCKET.
CONTRACTOR TO ROUTE AND SUPPORT TUBING EVERY 5 FEET.

AMBITECH STANDARD DRAWING: F60-260414-451 drawn by: S.E. date: MM-DD-YY rev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
INSTRUMENT AIR HEADER F60-260414-500 1 OF 1
(SINGLE OR MULTIPLE USERS) drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

'.
SUB-HEADER cr .
I

I I BY
L-- ~
PIPING

''
~

ru
r.. 'USER #1
1..

f'J

2
.T r.~
I.'USER #2

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 1 3/4" FPT GATE VALVE, C.S
2 1 3/4" NPT X 3" LG. SCH. 40 NIPPLE, c.s.
3 AS REQ'D 3/4" NPT, 90 DEG. ELBOW, c.s
4 2 3/4" NPT TEE, C.S
5 AS REQ'D 3/4" NPT, UNION, C.S
6 20 FT. 3/4" SCH. 40 PIPE, SEAMLESS, C.S (APPROX. BASED ON # OF USERS)
7 1 3/ 4" X 1/2" REDUCING BUSHING, C.S
8 AS REQ'D 1/2" SCH. 40 PIPE, SEAMLESS, C.S.

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT SUB-HEADER.
2. MATERIALS SHOWN ARE FOR ONE ASSEMBLY.
3*. QUANTITY IS FOR 1 USER, MULTIPLY X NO. OF USERS.

AMBITECH STANDARD DRAWING: F60- 260414-500 drawn by: SE Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
INSTALLATION DETAIL DWG. NO. SHEET
CONTROL VALVE F60-260414-600 1 OF 1
WITH SOLENOID VALVE drawn by date
SE MM-DD-YY
appr. by date
MM-DD-YY

PROVIDED W/CONTROL VALVE

sv

~ I"Cf
*
1-------..,(
-udn FOR CONT. SEE F60-260414-500
DWG. AND NOTE 3
y
d)
2

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 10 FT. 1/4" O.D. X .035" WALL TUBE, COPPER
2 1 1/4" O.D. X 1/4" MPT CONNECTOR, BRASS
3 1 1/4" O.D. X 1/2" MNPT CONNECTOR, BRASS
4 1 1/2" FNPT CLASS 200 BRONZE SCREWED GATE VALVE, STOCKHAM B-135 OR EQUAL

NOTES:
1. CONTRACTOR TO ROUTE AND SUPPORT TUBING.
2. FILTER REGULATOR ARE PRE-PIPED AND MOUNTED TO CONTROL VALVE BY MANUFACTURER.
3. FIELD ROUTE TO NEAREST INSTRUMENT AIR HEADER.

AMBITECH STANDARD DRAWING: F60-260414-600 Idrawn by: SE Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
MOUNTING DETAIL DWG. NO. SHEET
MULTIPLE UNIT PIPESTAND F60- 260414-700 1 OF 1
drawn by date
WLB MM-DD-YY
appr. by date
MM-DD-YY

- ,--- - - ,---

__.
"A" /'
/
ill
~ ...
'
v 4
I 6:11 llil 0 0 0 0 0 0 llil <Il
4
I 6:11 (Q) llil (o)l
0 0 0 0 0 0

L."A"
52"
~ ~

--1r- ----@
4 C'J
..--

----@ ~
m
w ::cD ---
G( r-:
......

1- 12"
""'.I
---
--1r-
-'--
DETAIL "A-A"

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 3 EA. RIGHT ANGLE ELBOW EXTENSION, OBRIEN WE16M OR EQUAL
2 2 EA .. INSTRUMENT STAND, OBRIEN FP52 OR EQUAL
3 4 EA. 2" U-BOLTS, WASHERS, NUTS
4 ~S REQ'D SECONDARY SUPPORT, UNISTRUT P1 OOOG OR EQUAL

NOTES:

MATERIALS ARE SHOWN FOR ONE ASSEMBLY.

AMBITECH STANDARD DRAWING: F60- 260414-700 Idrawn by: WLB Iappr. by: Idate: MM-DD-YY Irev.: A
PROJECT NO. REV.
A
MOUNTING DETAIL DWG. NO. SHEET
SINGLE UNIT PI PEST AND F60-260414-600 1 OF 1
drawn by date
WLB MM-DD-YY
appr. by date
MM-DD-YY

1/2" ANCHOR BOLT, WASHER, CONCRETE ANCHOR

~
(\j
[[)

\0 ()
~

8 C)
......
() \0

lOU

BILL OF MATERIAL
ITEM QTY DESCRIPTION
1 1 EA. INSTRUMENT STAND, OBRIEN FP52 OR EQUAL
2 4 EA. 1/2" ANCHOR BOLT, WASHER, CONCRETE ANCHOR

NOTES:
1. MATERIALS SHOWN ARE FOR ONE ASSEMBL~

AMBITECH STANDARD DRAWING: F60-260414-600 Idrawn by: WLB appr. by: Idate: MM-DD-YY Irev.: A

Anda mungkin juga menyukai