Bull Eng Geol Environ (2005) 64: 5565
DOI 10.1007/s10064-004-0270-5 ORIGINAL PAPER

V. Marinos
P. Marinos
The geological strength index: applications
E. Hoek and limitations

Received: 7 September 2004


Abstract The geological strength in- ground water, the aperture and the
Accepted: 9 October 2004 dex (GSI) is a system of rock-mass inlling of discontinuities and the
Published online: 2 February 2005 characterization that has been properties of weathered rock masses
Springer-Verlag 2005 developed in engineering rock and soft rocks.
mechanics to meet the need for reli-
able input data, particularly those Resume Le Geological Strength In-
related to rock-mass properties re- dex (GSI) est un syste`me de classi-
quired as inputs into numerical cation des massifs rocheux
analysis or closed form solutions for developpe en mecanique des roches.
designing tunnels, slopes or founda- Il permet dobtenir les donnees rel-
tions in rocks. The geological char- atives aux proprietes de masses
acter of rock material, together with rocheuses, donnees necessaires pour
the visual assessment of the mass it des simulations numeriques ou per-
forms, is used as a direct input to the mettant le dimensionnement douv-
selection of parameters relevant for rages:tunnels, pentes ou fondations
the prediction of rock-mass strength rocheuses. Les caracteristiques
and deformability. This approach geologiques de la matrice rocheuse
enables a rock mass to be considered ainsi que celles relatives a` la struc-
as a mechanical continuum without ture du massif correspondant sont
losing the inuence geology has on its directement utilisees pour obtenir les
mechanical properties. It also pro- parame`tres appropries relatifs a` la
vides a eld method for characteriz- deformabilite et la resistance de la
ing dicult-to-describe rock masses. masse rocheuse. Cette approche
After a decade of application of the permet de considerer une masse
GSI and its variations in quantitative rocheuse comme un milieu continu,
characterization of rock mass, this le role des caracteristiques geologi-
paper attempts to answer questions ques sur les proprietes mecaniques
that have been raised by the users netant pas oblite`re. Elle apporte
about the appropriate selection of the aussi une methode de terrain pour
V. Marinos (&) P. Marinos caracteriser des masses rocheuses
School of Civil Engineering, index for a range of rock masses un-
Geotechnical Department, der various conditions. Recommen- diciles a` decrire. Apre`s une decen-
National Technical University of Athens, dations on the use of GSI are given nie dapplication du Geological
9 Iroon Polytechniou str., and, in addition, cases where the GSI Strength Index et de ses variantes
157 80 Athens, Greece pour caracteriser des masses roche-
E-mail: vmarinos@central.ntua.gr
is not applicable are discussed. More
particularly, a discussion and sug- uses, cet article tente de repondre
E-mail: marinos@central.ntua.gr
gestions are presented on issues such aux questions formulees par les
E. Hoek utilisateurs concernant le choix le
Consulting Engineer, as the size of the rock mass to be
Vancouver, Canada considered, its anisotropy, the inu- plus approprie de cet index pour une
E-mail: ehoek@attglobal.net ence of great depth, the presence of large gamme de massifs rocheux.
56

Des recommandations quant a` deau, louverture et le remplissage Mots cles Geological Strength
lusage du GSI sont donnees et, de des discontinuites ainsi que les pro- Index Massif rocheux Structure
plus, des cas ou` le GSI nest pas prietes des masses rocheuses alterees geologique Proprietes mecaniques
applicable sont discutes. Plus par- et des roches tendres. Conditions dutilisation du GSI
ticulie`rement, des suggestions sont
apportees sur des questions relatives Keywords Geological Strength
a` la taille de masse rocheuse a` con- Index Rock mass Geological
siderer, son anisotropie, linuence structure Mechanical properties
des grandes profondeurs, la presence Selection of the GSI

Introduction the discontinuities in the rock mass. This resulted in the


development of the rock-mass failure criterion by Hoek
Design in rock masses and Brown (1980).

A few decades ago, the tools for designing tunnels


started to change. Although still crude, numerical The Geological Strength Index (GSI): development
methods were being developed that oered the promise history
for much more detailed analysis of dicult underground
excavation problems which, in a number of cases, fall Hoek and Brown recognized that a rock-mass failure
outside the ideal range of application of the tunnel criterion would have no practical value unless it could be
reinforcement classications such as the RMR system related to geological observations that could be made
introduced by Bieniawski (1973) and the Q system quickly and easily by an engineering geologist or geol-
published by Barton et al. (1974) both furthermore ex- ogist in the eld. They considered developing a new
panded in the following years. There is absolutely no classication system during the evolution of the criterion
problem with the concept of these classications and in the late 1970s but they soon gave up the idea and
there are hundreds of kilometres of tunnels that have settled for the already published RMR system. It was
been successfully constructed on the basis of their appreciated that the RMR system (and the Q system)
application. However, this approach is ideally suited to were developed for the estimation of underground
situations in which the rock mass behaviour is relatively excavation and support, and that they included param-
simple, for example for RMR values between about 30 eters that are not required for the estimation of rock-
70 and moderate stress levels. In other words, sliding mass properties. The groundwater and structural
and rotation of intact rock pieces essentially control the orientation parameters in RMR and the groundwater
failure process. These approaches are less reliable for and stress parameters in Q are dealt with explicitly in
squeezing, swelling, clearly dened structural failures or eective stress numerical analyses and the incorporation
spalling, slabbing and rock-bursting under very high of these parameters into the rock-mass property estimate
stress conditions. More importantly, these classication results is inappropriate. Hence, it was recommended
systems are of little help in providing information for the that only the rst four parameters of the RMR system
design of sequentially installed temporary reinforcement (intact rock strength, RQD rating, joint spacing and
and the support required to control progressive failure in joint conditions) should be used for the estimation of
dicult tunnelling conditions. rock-mass properties, if this system had to be used.
Numerical tools available today allow the tunnel In the early days the use of the RMR classication
designer to analyse these progressive failure processes (modied as described above) worked well because most
and the sequentially installed reinforcement and support of the problems were in reasonable quality rock masses
necessary to maintain the stability of the advancing (30<RMR<70) under moderate stress conditions.
tunnel until the nal reinforcing or supporting structure However, it soon became obvious that the RMR system
can be installed. However, these numerical tools require was dicult to apply to rock masses that are of very
reliable input information on the strength and defor- poor quality. The relationship between RMR and the
mation characteristics of the rock mass surrounding the constants m and s of the HoekBrown failure criterion
tunnel. As it is practically impossible to determine this begins to break down for severely fractured and weak
information by direct in situ testing (except for back- rock masses.
analysis of already constructed tunnels) there was a need Both the RMR and the Q classications include and
for some method for estimating the rock-mass properties are heavily dependent upon the RQD classication
from the intact rock properties and the characteristics of introduced by Deere (1964). Since RQD in most of the
57

weak rock masses is essentially zero or meaningless, it and its use for the Hoek and Brown failure criterion was
became necessary to consider an alternative classica- further developed by Hoek (1994), Hoek et al. (1995)
tion system. The required system would not include and Hoek and Brown (1997) but it was still a hard rock
RQD, would place greater emphasis on basic geological system roughly equivalent to RMR. Since 1998, Evert
observations of rock-mass characteristics, reect the Hoek and Paul Marinos, dealing with incredibly dicult
material, its structure and its geological history and materials encountered in tunnelling in Greece, developed
would be developed specically for the estimation of the GSI system to the present form to include poor
rock mass properties rather than for tunnel reinforce- quality rock masses (Fig. 1) (Hoek et al. 1998; Marinos
ment and support. This new classication, now called and Hoek 2000, 2001). They also extended its applica-
GSI, started life in Toronto with engineering geology tion for heterogeneous rock masses as shown in Fig. 2
input from David Wood (Hoek et al. 1992). The index (Marinos and Hoek 2001).

Fig. 1 General chart for GSI


estimates from the geological
observations
58

Fig. 2 Geological strength


index estimates for heteroge-
neous rock masses such as
Flysch

Functions of the Geological Strength Index faces in the rock mass and it is estimated from visual
examination of the rock mass exposed in outcrops, in
The heart of the GSI classication is a careful engi- surface excavations such as road cuts and in tunnel faces
neering geology description of the rock mass which is and borehole cores. The GSI, by combining the two
essentially qualitative, because it was felt that the num- fundamental parameters of the geological process, the
bers associated with RMR and Q-systems were largely blockiness of the mass and the conditions of disconti-
meaningless for the weak and heterogeneous rock mas- nuities, respects the main geological constraints that
ses. Note that the GSI system was never intended as a govern a formation and is thus a geologically sound
replacement for RMR or Q as it has no rock-mass index that is simple to apply in the eld.
reinforcement or support design capabilityits only Once a GSI number has been decided upon, this
function is the estimation of rock-mass properties. number is entered into a set of empirically developed
This index is based upon an assessment of the equations to estimate the rock-mass properties which
lithology, structure and condition of discontinuity sur- can then be used as input into some form of numerical
59

analysis or closed-form solution. The index is used in case of a slope when the dominant structural disconti-
conjunction with appropriate values for the unconned nuity set dips into the slope and failure may occur
compressive strength of the intact rock rci and the pet- through the rock mass). For rock masses with a struc-
rographic constant mi, to calculate the mechanical ture such as that shown in the sixth (last) row of the GSI
properties of a rock mass, in particular the compressive chart (Fig. 1), anisotropy is not a major issue as the
strength of the rock mass (rcm) and its deformation dierence in the strength of the rock and that of the
modulus (E). Updated values of mi, can be found in discontinuities within it is small.
Marinos and Hoek (2000) or in the RocLab program. It is also inappropriate to assign GSI values to
Basic procedures are explained in Hoek and Brown excavated faces in strong hard rock with a few discon-
(1997) but a more recent renement of the empirical tinuities spaced at distances of similar magnitude to the
equations and the relation between the HoekBrown dimensions of the tunnel or slope under consideration.
and the MohrCoulomb criteria have been addressed by In such cases the stability of the tunnel or slope will be
Hoek et al. (2002) for appropriate ranges of stress controlled by the three-dimensional geometry of the
encountered in tunnels and slopes. This paper and the intersecting discontinuities and the free faces created by
associated program RocLab can be downloaded from the excavation. Obviously, the GSI classication does
http://www.rocscience.com. not apply to such cases.
Note that attempts to quantify the GSI classica-
tion to satisfy the perception that engineers are happier
with numbers (Cai et al. 2004; Sonmez and Ulusay Geological description in the GSI chart
1999) are interesting but have to be applied with caution.
The quantication processes used are related to the In dealing with specic rock masses it is suggested that
frequency and orientation of discontinuities and are the selection of the appropriate case in the GSI chart
limited to rock masses in which these numbers can easily should not be limited to the visual similarity with the
be measured. The quantications do not work well in sketches of the structure of the rock mass as they appear
tectonically disturbed rock masses in which the struc- in the charts. The associated descriptions must also be
tural fabric has been destroyed. In such rock masses the read carefully, so that the most suitable structure is
authors recommend the use of the original qualitative chosen. The most appropriate case may well lie at some
approach based on careful visual observations. intermediate point between the limited number of sket-
ches or descriptions included in the charts.

Suggestions for using GSI


Projection of GSI values into the ground
After a decade of application of the GSI and its varia-
tions for the characterization of the rock mass, this pa- Outcrops, excavated slopes tunnel faces and borehole
per attempts to answer questions that have been raised cores are the most common sources of information for
by users about the appropriate selection of the index for the estimation of the GSI value of a rock mass. How
various rock masses under various conditions. should the numbers estimated from these sources be
projected or extrapolated into the rock mass behind a
slope or ahead of a tunnel?
When not to use GSI Outcrops are an extremely valuable source of data in
the initial stages of a project but they suer from the
The GSI classication system is based upon the disadvantage that surface relaxation, weathering and/or
assumption that the rock mass contains a sucient alteration may have signicantly inuenced the appear-
number of randomly oriented discontinuities such ance of the rock-mass components. This disadvantage
that it behaves as an isotropic mass. In other words, the can be overcome (where permissible) by trial trenches
behaviour of the rock mass is independent of the but, unless these are machine excavated to considerable
direction of the applied loads. Therefore, it is clear that depth, there is no guarantee that the eects of deep
the GSI system should not be applied to those rock weathering will have been eliminated. Judgement is
masses in which there is a clearly dened dominant therefore required in order to allow for these weathering
structural orientation. Undisturbed slate is an example and alteration eects in assessing the most probable GSI
of a rock mass in which the mechanical behaviour is value at the depth of the proposed excavation.
highly anisotropic and which should not be assigned a Excavated slope and tunnel faces are probably the
GSI value based upon the charts presented in Figs. 1, 2. most reliable source of information for GSI estimates
However, the HoekBrown criterion and the GSI chart provided that these faces are reasonably close to and in
can be applied with caution if the failure of such rock the same rock mass as the structure under investigation.
masses is not controlled by their anisotropy (e.g. in the In hard strong rock masses it is important that an
60

appropriate allowance be made for damage due to mass is already disintegrated or sheared and this damage
mechanical excavation or blasting. As the purpose of persists with depth.
estimating GSI is to assign properties to the undisturbed
rock mass in which a tunnel or slope is to be excavated,
failure to allow for the eects of blast damage when Anisotropy
assessing GSI will result in the assignment of values that
are too conservative. Therefore, if borehole data are As discussed above, the HoekBrown criterion (and
absent, it is important that the engineering geologist or other similar criteria) requires that the rock mass behave
geologist attempts to look behind the surface damage isotropically and that failure does not follow a prefer-
and try to assign the GSI value on the basis of the ential direction imposed by the orientation of a specic
inherent structures in the rock mass. This problem be- discontinuity or a combination of two or three discon-
comes less signicant in weak and tectonically disturbed tinuities. In these cases, the use of GSI is meaningless as
rock masses as excavation is generally carried out by the failure is governed by the shear strength of these
gentle mechanical means and the amount of surface discontinuities and not of the rock mass. Cases, how-
damage is negligible compared to that which already ever, where the criterion and the GSI chart can rea-
exists in the rock mass. sonably be used were discussed above.
Borehole cores are the best source of data at depth, However, in a numerical analysis involving a single
but it has to be recognized that it is necessary to well-dened discontinuity such as a shear zone or fault,
extrapolate the one-dimensional information provided it is sometimes appropriate to apply the HoekBrown
by the core to the three-dimensional in situ rock mass. criterion to the overall rock mass and to superimpose the
However, this is a problem common to all borehole discontinuity as a signicantly weaker element. In this
investigations, and most experienced engineering geolo- case, the GSI value assigned to the rock mass should
gists are comfortable with this extrapolation process. ignore the single major discontinuity. The properties of
Multiple boreholes and inclined boreholes can be of this discontinuity may t the lower portion of the GSI
great help in the interpretation of rock-mass character- chart or they may require a dierent approach such as
istics at depth. laboratory shear testing of soft clay llings.
For stability analysis of a slope, the evaluation is
based on the rock mass through which it is anticipated
that a potential failure plane could pass. The estimation Aperture of discontinuities
of GSI values in these cases requires considerable judg-
ment, particularly when the failure plane can pass The strength and deformation characteristics of a rock
through several zones of dierent quality. Mean values mass are dependent upon the interlocking of the indi-
may not be appropriate in this case. vidual pieces of intact rock that make up the mass.
For tunnels, the index should be assessed for the Obviously, the aperture of the discontinuities that sep-
volume of rock involved in carrying loads, e.g. for about arate these individual pieces has an important inuence
one diameter around the tunnel in the case of tunnel upon the rock-mass properties.
behaviour or more locally in the case of a structure such There is no specic reference to the aperture of the
as an elephant foot. discontinuities in the GSI charts but a disturbance
For particularly sensitive or critical structures, such factor D has been provided in the most recent version
as underground powerhouse caverns, the information of the HoekBrown failure criterion (Hoek et al. 2002).
obtained from the sources discussed above may not be This factor ranges from D=0 for undisturbed rock
considered adequate, particularly as the design advances masses, such as those excavated by a tunnel boring
beyond the preliminary stages. In these cases, the use of machine, to D=1 for extremely disturbed rock masses
small exploration tunnels can be considered and this such as open pit mine slopes that have been subjected to
method of data gathering will often be found to be very heavy production blasting. The factor allows for
highly cost eective. the disruption of the interlocking of the individual rock
Figure 3 provides a visual summary of some of the pieces as a result of opening of the discontinuities.
adjustments discussed in the previous paragraphs. When The incorporation of the disturbance factor D into
direct assessment of depth conditions is not available, the empirical equations used to estimate the rock-mass
upward adjustment of the GSI value to allow for the strength and deformation characteristics is based upon
eects of surface disturbance, weathering and alteration back-analysis of excavated tunnels and slopes. At this
are indicated in the upper (white) part of the GSI chart. stage (2004) there is relatively little experience in the use
Obviously, the magnitude of the shift will vary from case of this factor, and it may be necessary to adjust its
to case and will depend upon the judgement and expe- participation in the equations as more eld evidence
rience of the observer. In the lower (shaded) part of the is accumulated. However, the limited experience that
chart, adjustments are not normally required as the rock is available suggests that this factor does provide a
61

Fig. 3 Suggested projection of


information from observations
in outcrops to depth. White
area: a shifting to the left or to
the left and upwards is recom-
mended; the extent of the shift
shown in the chart is indicative
and should be based on geo-
logical judgement. Shadowed
area: shifting is less or not
applicable as poor quality is
retained in depth in brecciated,
mylonitized or shear zones

reasonable estimate of the inuence of damage due to each excavation perimeter to a depth of about 2 m
stress relaxation or blasting of excavated rock faces. (Cheng and Liu 1990). Carefully controlled blasting was
Note that this damage decreases with depth into the used in this cavern excavation and the limited extent of
rock mass and, in numerical modelling, it is generally the blast damage can be considered typical of that for
appropriate to simulate this decrease by dividing the civil engineering tunnels excavated by drill and blast
rock mass into a number of zones with decreasing values methods. On the other hand, in very large open pit mine
of D being applied to successive zones as the distance slopes in which blasts can involve many tons of explo-
from the face increases. In one example, which involved sives, blast damage has been observed up to 100 m or
the construction of a large underground powerhouse more behind the excavated slope face. Hoek and Karz-
cavern in interbedded sandstones and siltstones, it was ulovic (2000) have given some guidance on the extent of
found that the blast damaged zone was surrounding this damage and its impact on rock mass properties.
62

Geological Strength Index at great depth ered granites) then the constant mi and the unconned
strength of the rci of the Hoek and Brown criterion must
In hard rock, great depth (e.g. 1,000 m or more) the also be reduced. If the weathering has penetrated the
rock-mass structure is so tight that the mass behaviour rock to the extent that the discontinuities and the struc-
approaches that of the intact rock. In this case, the GSI ture have been lost, then the rock mass must be assessed
value approaches 100 and the application of the GSI as a soil and the GSI system no longer applies.
system is no longer meaningful.
The failure process that controls the stability of
underground excavations under these conditions is Heterogeneous and lithologically varied sedimentary
dominated by brittle fracture initiation and propagation, rock masses
which leads to spalling, slabbing and, in extreme cases,
rock-bursts. Considerable research eort has been de- The GSI has recently been extended to accommodate
voted to the study of these brittle fracture processes and some of the most variable of rock masses, including
a recent paper by Diederichs et al. (2004) provides a extremely poor quality sheared rock masses of weak
useful summary of this work. Cundall et al. (2003) have schistose materials (such as siltstones, clay shales or
introduced a set of post-failure ow rules for numerical phyllites) sometime inter-bedded with strong rock (such
modelling which cover the transition from tensile to as sandstones, limestones or quartzites). A GSI chart for
shear fracture that occurs during the process of brittle ysch has been published in Marinos and Hoek (2001)
fracture propagation around highly stressed excavations and is reproduced in Fig. 2. For lithologically varied but
in hard rock masses. tectonically undisturbed rock masses, such as the
When tectonic disturbance is important and persists molasses, a new GSI chart is (Hoek et al. 2005).
with depth, these comments do not apply and the
GSI charts may be applicable, but should be used with Rocks of low strength
caution.
When rocks such as marls, claystones, siltstones and
Discontinuities with lling materials weak sandstones are developed in stable conditions or a
post tectonic environment, they present a simple struc-
The GSI charts can be used to estimate the character- ture with few discontinuities. Even when bedding planes
istics of rock-masses with discontinuities with lling exist they do not always appear as clearly dened dis-
materials using the descriptions in the columns of poor continuity surfaces.
or very poor condition of discontinuities. If the lling In such cases, the use of the GSI chart for the blocky
material is systematic and thick (e.g. more than few cm) or massive rock masses (Fig. 1) is applicable. The dis-
or shear zones are present with clayey material then the continuities, although they are limited in number, cannot
use of the GSI chart for heterogeneous rock masses be better than fair (usually fair or poor) and hence the GSI
(Fig. 2) is recommended. values tend to be in the range of 4060. In these cases, the
low strength of the rock mass results from low values of
The inuence of water the intact strength rci and the constant mi.
When these rocks form continuous masses with no
The shear strength of the rock mass is reduced by the discontinuities, the rock mass can be treated as intact
presence of water in the discontinuities or the lling with engineering parameters given directly by laboratory
materials when these are prone to deterioration as a testing. In such cases the GSI classication is not
result of changes in moisture content. This is particularly applicable.
valid in the fair to very poor categories of discontinuities
where a shift to the right may be made for wet condi- Precision of the GSI classication system
tions (Fig. 4).
Water pressure is dealt with by eective stress anal- The qualitative GSI system works well for engineering
ysis in design and it is independent of the GSI charac- geologists since it is consistent with their experience in
terization of the rock mass. describing rocks and rock masses during logging and
mapping. In some cases, engineers tend to be uncom-
Weathered rock masses fortable with the system because it does not contain
parameters that can be measured in order to improve the
The GSI values for weathered rock masses are shifted to precision of the estimated GSI value.
the right of those of the same rock masses when these are The authors, two of whom graduated as engineers, do
unweathered. If the weathering has penetrated into the not share this concern as they feel that it is not mean-
intact rock pieces that make up the mass (e.g. in weath- ingful to attempt to assign a precise number to the GSI
63

Fig. 4 In fair to very poor


categories of discontinuities, a
shift to the right is necessary for
wet conditions as the surfaces of
the discontinuities or the lling
materials are usually prone to
deterioration as a result of
change in the moisture content.
The shift to the right is more
substantial in the low quality
range of rock mass (last lines
and columns)

value for a typical rock mass. In all but the very simplest weak (e.g. GSI<35), very weak and heterogeneous rock
of cases, GSI is best described by assigning it a range of masses where these correlations are not recommended.
values. For analytical purposes this range may be dened
by a normal distribution with the mean and standard
deviation values assigned on the basis of common sense. Estimation of intact strength rci and the constant mi
In the earlier period of the GSI application it was
proposed that correlation of adjusted RMR and Q While this paper is concerned primarily with the GSI
values with GSI be used for providing the necessary classication, it would not be appropriate to leave the
input for the solution of the Hoek and Brown criterion. related topic of the HoekBrown failure criterion with-
Although this procedure may work with the better out briey mentioning the estimation of intact strength
quality rock masses, it is meaningless in the range of rci and the constant mi.
64

The inuence of the intact rock strength rci is at least forcement or support whereas GSI was developed solely
as important as the value of GSI in the overall estimate for the purpose of estimating rock-mass strength.
of rock mass properties by means of the HoekBrown Therefore, GSI is only one element in a tunnel design
criterion. Ideally, rci should be determined by direct process and cannot be used, on its own, to specify tun-
laboratory testing under carefully controlled conditions. nelling conditions.
However, in many cases, this is not possible because of The use of any classication system to specify antic-
time or budget constraints, or because it is not possible ipated tunnelling conditions is always a problem as these
to recover samples for laboratory testing (particularly in systems are open to a variety of interpretations,
the case of weak, thinly schistose or tectonically dis- depending upon the experience and level of conservatism
turbed rock masses where discontinuities are included in of the observer. This can result in signicant dierences
the laboratory samples). Under such circumstances, in RMR or Q values for a particular rock mass and, if
estimates of the value of rci have to be made on the these dierences fall on either side of a major change
basis of published information, simple index tests or by point in excavation or support type, this can have
descriptive grades such as those published by the important nancial consequences.
International Society for Rock Mechanics (Brown The geotechnical baseline report (Essex 1997)
1981). was introduced in an attempt to overcome some of
Experience has shown that there is a tendency to these diculties and has attracted an increasing
underestimate the value of the intact rock strength in amount of international attention in tunnelling1. This
many cases. This is particularly so in weak and tecton- report, produced by the Owner and included in
ically disturbed rock masses where the characteristics of the contract documents, attempts to describe the
the intact rock components tend to be masked by the rock mass and the anticipated tunnelling conditions
surrounding sheared or weathered material. These as accurately as possible and to provide a rational
underestimations can have serious implications for basis for contractual discussions and payment. The au-
engineering design and care has to be taken to ensure thors of this paper recommend that this concept should
that realistic estimates of intact strength are made as be used in place of the traditional tunnel classications
early as possible in the project. In tunnelling, such esti- for the purpose of specifying anticipated tunnel
mates can be rened on the basis of a detailed back- conditions.
analysis of the tunnel deformation and, while this may
require considerable eort and even the involvement of
specialists in numerical analysis, the attempt will gen- Conclusions
erally be repaid many times over in the cost savings
achieved by more realistic designs. Rock-mass characterization has an important role in the
The value of the constant mi, as for the case of the future of engineering geology in extending its usefulness,
intact strength rci, is best determined by direct labora- not only to dene a conceptual model of the site geol-
tory testing. However, when this is not possible, an ogy, but also for the quantication needed for analyses
estimate based upon published values (e.g. in the pro- to ensure that the idealization (for modelling) does not
gram RocLab) is generally acceptable as the overall misinterpret actuality (Knill 2003). If it is carried out in
inuence of the value of mi on the rock-mass strength is conjunction with numerical modelling, rock-mass char-
signicantly less than that of either GSI or rci. acterization presents the prospect of a far better under-
standing of the reasons for rock-mass behaviour
(Chandler et al. 2004). The GSI has considerable po-
GSI and contract documents tential for use in rock engineering because it permits the
manifold aspects of rock to be quantied thereby
One of the most important contractual problems in rock enhancing geological logic and reducing engineering
construction and particularly in tunnelling is the issue of uncertainty. Its use allows the inuence of variables,
changed ground conditions. There are invariably which make up a rock mass, to be assessed and hence the
arguments between the owner and the contractor on the behaviour of rock masses to be explained more clearly.
nature of the ground specied in the contract and that One of the advantages of the index is that the geological
actually encountered during construction. In order to reasoning it embodies allows adjustments of its ratings
overcome this problem there has been a tendency to to cover a wide range of rock masses and conditions
specify the anticipated conditions in terms of the RMR but it also allows us to understand the limits of its
or Q tunnelling classications. More recently some application.
contracts have used the GSI classication for this pur-
pose, and the authors are strongly opposed to this trend.
As discussed earlier in this paper, RMR and Q were 1
A simple search for geotechnical baseline report on the Internet
developed for the purposes of estimating tunnel rein- will reveal the extent of this interest.
65

References

Barton NR, Lien R, Lunde J (1974) Engi- Deere DU (1964) Technical description of Hoek E, Kaiser PK, Bawden WF (1995)
neering classication of rock masses for rock cores for engineering purposes. Support of underground excavations in
the design of tunnel support. Rock Rock Mech Eng Geol 1(1):1722 hard rock. AA Balkema, Rotterdam
Mech 6(4):189239 Diederichs MS, Kaiser PK, Eberhardt E Hoek E, Marinos P, Benissi M (1998)
Bieniawski ZT (1973) Engineering classi- (2004) Damage initiation and propaga- Applicability of the geological strength
cation of jointed rock masses. Trans S tion in hard rock during tunnelling and index (GSI) classication for weak and
Afr Inst Civ Eng 15:335344 the inuence of near-face stress rota- sheared rock massesthe case of the
Brown ET (ed) (1981) Rock characteriza- tion. Int J Rock Mech Min Sci Athens schist formation. Bull Eng Geol
tion, testing and monitoringISRM 41(5):785812 Env 57(2):151160
suggested methods. Pergamon, Oxford, Essex RJ (1997) Geotechnical baseline re- Hoek E, Caranza-Torres CT, Corcum B
pp 171183 ports for underground construction. (2002) HoekBrown failure criterion-
Cai M, Kaiser PK, Uno H, Tasaka Y, American Society of Civil Engineers, 2002 edition. In: Bawden HRW, Curran
Minami M (2004) Estimation of rock Reston J, Telsenicki M (eds) Proceedings of the
mass strength and deformation modu- Hoek E (1994) Strength of rock and rock North American Rock Mechanics
lus of jointed hard rock masses using masses. News J ISRM 2(2):416 Society (NARMS-TAC 2002). Mining
the GSI system. Int J Rock Mech Min Hoek E, Brown ET (1980) Underground Innovation and Technology, Toronto,
Sci 41(1):319 excavations in rock. Institution of pp 267273
Chandler RJ, de Freitas MH, Marinos P Mining and Metallurgy, London Knill J (2003) Core values (1st Hans-Closs
(2004) Geotechnical characterization of Hoek E, Brown ET (1997) Practical esti- lecture). Bull Eng Geol Env 62:134
soils and rocks: a geological perspective. mates of rock mass strength. Int J Rock Marinos P, Hoek E (2000) GSI: a geologi-
Advances in geotechnical engineering: Mech Min Sci Geomech Abstr 34:1165 cally friendly tool for rock mass
the Skempton conference, vol 1, Tho- 1186 strength estimation. In: Proceedings of
mas Telford, London, pp 67102 Hoek E, Karzulovic A (2000) Rock mass the GeoEng2000 at the international
Cheng Y, Liu SC (1990) Power caverns of properties for surface mines. In: Hu- conference on geotechnical and geolog-
the Mingtan Pumped Storage Project, stralid WA, McCarter MK, van Zyl ical engineering, Melbourne, Technom-
Taiwan. In: JA Hudson (ed) Compre- DJA (eds) Slope stability in surface ic publishers, Lancaster, pp 14221446
hensive Rock Engineering, vol 5, pp mining. Society for Mining, Metallur- Marinos P, Hoek E (2001) Estimating the
111132 gical and Exploration (SME), Littleton, geotechnical properties of heteroge-
Cundall P, Carranza-Torres C, Hart R pp 5970 neous rock masses such as ysch. Bull
(2003) A new constitutive model based Hoek E, Wood D, Shah S (1992) A modi- Eng Geol Env 60:8292
on the HoekBrown criterion. In: ed HoekBrown criterion for jointed Sonmez H, Ulusay R (1999) Modications
Brummer et al. (eds) Proceedings of the rock masses. In: Hudson JA (ed) Pro- to the geological strength index (GSI)
3rd international symposium on FLAC ceedings of the rock mechanic sympo- and their applicability to the stability of
and FLAC3D numerical modelling in sium. International Society of Rock slopes. Int J Rock Mech Min Sci
Geomechanics, Sudbury, October 21 Mechanics Eurock 92, British Geo- 36:743760
24, pp 1725 technical Society, London, pp 209214
Hoek E, Marinos P, Marinos V (2005)
Characterization and engineering prop-
erties of tectonically undisturbed but
lithologically varied sedimentary rock
masses under publication. Int J Rock
Mech Min Sci