Anda di halaman 1dari 236

HARGA SATUAN PEKERJAAN TA

2.3.1.1 Penggalian 1 m tanah biasa sedalam 1m

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH

B BAHAN

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN BE

4.1.1.4.a Membuat 1 m lantai kerja beton mutu f'c =7,4 Mpa ( K 100), slump (

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Semen Portlan Kg
2 Pasir Beton Kg
3 Kerikil (Maks 30mm) Kg
4 Air Liter

C PERALATAN
1 Sewa Molen Sewa-hari

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

CATATAN
bobot pasir =1.400 Kg/m, Bobot isi kerikil = 1.350 Kg/m, Buckling factor pasir =20%

4.1.1.5.a Membuat 1 m beton mutu f'c =14,5 Mpa ( K 175), slump (12 2) cm

No Uraian Kode Satuan


Analisa Harga Satuan 1
A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Semen Portlan Kg
2 Pasir Beton Kg
3 Kerikil (Maks 30mm) Kg
4 Air Liter

C PERALATAN
1 Sewa Molen Sewa-hari

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

CATATAN
bobot pasir =1.400 Kg/m, Bobot isi kerikil = 1.350 Kg/m, Buckling factor pasir =20%

4.1.1.17.a Pembesian 10 Kg dengan besi polos atau besi ulir U 24

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Besi Beton (polos/ulir) U 32 Kg
2 Kawat Beton Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan Per 1 Kg

4.1.1.19 Pemasangan 10 Kg jaring kawat baja (wiremesh) M5

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

Analisa Harga Satuan 2


B BAHAN
1 Jaring kawat baja dilas Kg
2 Kawat Beton Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan Per 1 Kg

4.1.1.20.a Pemasangan 1m bekisting untuk pondasi (papan mal)

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Papan Mal kelas III m
2 Paku 5 - 10 cm Kg
3 Cerucuk 6-8 cm - panj 4 m Btg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.1.1.21 Pemasangan 1m bekisting untuk sloof

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kayu kelas III m
2 Paku 5 - 10 cm Kg
3 Minyak Bekisting Liter

C PERALATAN

Analisa Harga Satuan 3


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

4.1.1.22.b.1 Pemasangan berulang 1m bekisting untuk kolom (papan mal)

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kayu kelas III m
2 Paku 5 - 12 cm Kg
3 Minyak Bekisting Liter
4 Balok kayu klas II m
5 Papan mal klas III m
6 Dolken kayu 8-10 cm - panj 4 m Batang

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 4


4.1.1.23.a Pemasangan 1m bekisting untuk balok (papan mal)

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kayu kelas III m
2 Paku 5 - 12 cm Kg
3 Minyak Bekisting Liter
4 Balok kayu kelas II m
5 Papan Mal kelas III m
Dolken kayu 8-10 cm - panj 4
6 Batang
m

C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

4.2.1.11.a Pemasangan 1 m' kusen pintu alluminium (Uk. 1 1/2" x 3")

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Khusus alumunium L.03 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Profill alumunium m'
2 Sekrup fixer Buah
3 sealant Tube

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PASANG

4.4.1.17.b Pemasangan 1 m dinding batako 20/40/7

No Uraian Kode Satuan


Analisa Harga Satuan 5
A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Batako Uk. 20/40/7 bh
2 Semen portland Kg
3 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.4.4.1.23 Pemasangan 1 m dinding terawang (roster) camp. 1SP : 4PP


Uraian Kode Satuan
No.
A TENAGA
1. Pekerja L.01 OH
2. Tukang Batu L.02 OH
3. Kepala Tukang L.03 OH
4. Mandor L.04 OH

B BAHAN
1. Bata rooster (12 x 11 x 24) cm m
2. Semen portland Kg
3. Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 6


4.4.1.9 Pemasangan 1 m dinding bata merah (5x11x22) cm tebal batu cam

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Bata Merah m
2 Semen Portlan Kg
3 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PLES

4.4.2.3 Pemasangan 1 m plesteran 1SP:3PP tebal 15mm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.03 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 PC Kg
2 PP m

C PERALATAN

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

4.4.2.4 Pemasangan 1 m plesteran 1SP:4PP tebal 15mm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.03 OH
3 Kepala Tukang L.03 OH
Analisa Harga Satuan 7
4 Mandor L.04 OH

B BAHAN
1 Semen PC Kg
2 Pasir m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.4.2.27 Pemasangan 1 m acian

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.03 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Semen PC Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 8


HARGA SATUAN PEKERJAAN PENUTUP LANTAI D

4.4.3.4 Pemasangan 1 m lantai ubin warna ukuran 40cm x 40cm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin warna Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.4.3.4.a Pemasangan 1 m lantai ubin warna ukuran 40cm x 40cm (Unpolish)

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin warna Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.4.3.4.a Pemasangan 1 m lantai ubin warna ukuran 40cm x 40cm Unpolished

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
Analisa Harga Satuan 9
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin warna Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.4.3.4.b Pemasangan 1 m lantai ubin warna ukuran 40cm x 40cm Polished (e

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin warna Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 10


4.4.3.5 Pemasangan 1 m lantai ubin warna ukuran 30cm x 30cm Unpolished (

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin warna Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.4.3.36 Pemasangan 1 m lantai keramik 20 cm x 20 cm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin keramik Bh
2 Semen Portlan Kg
3 Pasir pasang m
4 Semen warna Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.4.3.4.A Pemasangan 1 m lantai ubin warna ukuran 60cm x 60 cm (Polish)

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Analisa Harga Satuan 11
B BAHAN
1 Ubin warna 60 x 60 cm Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

4.4.3.4.B Pemasangan 1 m lantai ubin warna ukuran 60cm x 60 cm (Unpolish

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin warna 60 x 60 cm Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 12


4.4.3.4.C Pemasangan 1 m lantai ubin warna ukuran 30cm x 60 cm (stepnozin

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Ubin warna 60 x 60 cm Bh
2 Semen Portlan Kg
3 Semen warna Kg
4 Pasir pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN LANGI

4.5.1.7. Pemasangan 1 m langit-langit gypsum board ukuran (120x240x9) mm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Gypsum Board Lembar
2 Paku Sekrup Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.5.1.7.a Pemasangan 1 m2 langit-langit GRC (120x240x4) mm, tebal 4 mm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Analisa Harga Satuan 13
B BAHAN
1 GRC Board Lembar
2 Paku GRC Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PENU

4.5.2.32.a Pemasangan 1 m genteng metal stone type classic 0.35

No Uraian Kode Satuan


A TENAGA
Pekerja L.01 OH
Tukang Kayu L.03 OH
Kepala Tukang L.11 OH
Mandor L.15 OH

B BAHAN
Genteng metal Bh
Paku Biasa 1/2"-1" Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 14


4.5.2.36.a Pemasangan 1 m nok genteng metal stone 1/2 lingkaran 0.35 (pjg-

No Uraian Kode Satuan


A TENAGA
Pekerja L.01 OH
Tukang Kayu L.03 OH
Kepala Tukang L.11 OH
Mandor L.15 OH

B BAHAN
Nok Genteng Metal Stone Bh
Paku Biasa 1/2"-1" Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN SANITASI D

5.1.1.1. Pemasangan 1 buah closet duduk / monoblock

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Closet Duduk Unit
2 Perlengkapan Ls

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

5.1.1.2. Pemasangan 1 buah closet jongkok porselen

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
Analisa Harga Satuan 15
4 Mandor L.04 OH

B BAHAN
1 Closet Jongkok Unit
2 Semen Portland Kg
3 Pasir Pasang m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

5.1.1.2.a Pemasangan 1 buah urinoir

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Urinoir Unit

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 16


5.1.1.12. Pemasangan 1 buah bak cuci piring stainles steel

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 buah bak cuci piring Unit
2 Water drain Bh

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

5.1.1.12.a Pemasangan 1 buah wastafel

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Wastafel Unit
2 Semen Portland Bh
3 Pasir Pasang Bh
4 Perlengkapan Ls

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Analisa Harga Satuan 17
B BAHAN
1 Kran Air Buah
2 Sealtape Buah

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

5.1.1.25. Pemasangan 1 m pipa PVC tipe AW diameter 1/2"

No Uraian Kode Satuan


A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02
Kepala Tukang L.03
Mandor L.04 OH

B BAHAN
Pipa PVC 1/2" m
Perlengkapan %

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 18


5.1.1.27. Pemasangan 1 m pipa PVC tipe AW diameter 1"

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Pipa PVC 1" m
2 Perlengkapan %

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

5.1.1.29. Pemasangan 1 m pipa PVC tipe AW diameter 2"

No Uraian Kode Satuan


A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02
Kepala Tukang L.03
Mandor L.04 OH

B BAHAN
Pipa PVC 2" m
Perlengkapan %

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

5.1.1.31. Pemasangan 1 m pipa PVC tipe AW diameter 3"

No Uraian Kode Satuan


A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02
Kepala Tukang L.03
Mandor L.04 OH
Analisa Harga Satuan 19
B BAHAN
Pipa PVC 3" m
Perlengkapan %

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

5.1.1.32. Pemasangan 1 m pipa PVC tipe AW diameter 4"

No Uraian Kode Satuan


A TENAGA
Pekerja L.01 OH
Tukang Kayu L.02
Kepala Tukang L.03
Mandor L.04 OH

B BAHAN
Pipa PVC 4" m
Perlengkapan %

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit (Contoh 15%)
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 20


HARGA SATUAN PEKERJAAN KUNCI

4.6.2.1. Pemasangan 1 buah kunci tanam antik

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kunci Tanam Antik Bh

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.2. Pemasangan 1 buah kunci tanam biasa

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kunci Tanam Biasa Bh

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.5. Pemasangan 1 buah engsel pintu

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN

Analisa Harga Satuan 21


1 Engsel Pintu Bh

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.5.a Pemasangan 1 buah Handle pintu

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Handle Pintu Bh

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 22


4.6.2.6 Pemasangan 1 buah Engsel Jendela

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Engsel Jendela Bh

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.9 Pemasangan 1 buah Kait Angin

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kait Angin Bh

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.11. Pemasangan 1 buah kunci slot

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kunci Slot Set

C PERALATAN
Analisa Harga Satuan 23
D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.13. Pemasangan 1 buah Door Stoper

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Door Stoper Set

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 24


4.6.2.17. Pemasangan 1 m kaca tebal 5 mm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kaca Tebal 5 mm m
2 Sealant Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.18. Pemasangan 1 m kaca tebal 8 mm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Kaca Tebal 8 mm m
2 Sealant Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.6.2.17.a Pemasangan 1 m kaca buram tebal 5 mm

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

Analisa Harga Satuan 25


B BAHAN
1 Kaca Buram Tebal 5 mm m
2 Sealant Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PENG

4.7.1.4. 1 m Pengecatan bidang kayu baru ( 1 lapis plamuur, 1 lapis cat dasar,

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Cat L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Cat menie Kg
2 Plamuur Kg
3 Cat Dasar Kg
4 Cat penutup Kg
5 Kuas Bh
6 Pengencer Ltr
7 Amplas Lbr

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 26


4.7.1.9 1 m Pelaburan 1 m bidang kayu dengan vernis

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Cat L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Vernis L
2 Dempul Kg
3 Amplas Lbr

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.7.1.10.a Pengecatan 1 m2 tembok baru interior mutu baik ( 1lapis plamur, 1

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Cat L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

B BAHAN
1 Plamuur Kg
2 Cat Dasar Kg
3 Cat Penutup Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.7.1.10.b Pengecatan 1 m2 tembok baru Eksterior mutu baik ( 1lapis plamur,

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
2 Tukang Cat L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH

Analisa Harga Satuan 27


B BAHAN
1 Plamuur Kg
2 Cat Dasar Kg
3 Cat Penutup (Weather Shield) Kg

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

4.7.1.10.c Pengecatan 1 m2 Coating

No Uraian Kode Satuan


A TENAGA
1 Pekerja L.01 OH
1 Tukang Cat L.02 OH
2 Kepala Tukang L.03 OH
3 Mandor L.04 OH

B BAHAN
1 Cat Coatingn(glossy) Ltr

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 28


HARGA SATUAN OVERHEAD DAN

8.1.1.1. Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. 20 x 20, K 300

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Tiang Pancang (Mini Pile / Ready Mix) uk. Btg
20 x 20, K 300 - 6m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.1.a Pemancangan Tiang Pancang (Mini Pile / Ready Mix) uk. 20 x 20, K

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Pemancangan Tiang Pancang (Mini Pile / Btg
Ready Mix) uk. 20 x 20, K 300 - 6m

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.1.b Pemasangan Plastik Cor

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Plastik Cor M2

C PERALATAN

Analisa Harga Satuan 29


D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.2. 1 M Pemasangan Rangka Plafond Metal Furring

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Rangka Plafond Metal Furring M

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.3. 1 M Pemasangan Kuda-kuda Atap Baja Ringan

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Rangka Baja Ringan Zincalume (truss/polos) M

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 30


8.1.1.4. 1 M' Pemasangan Wood Plank

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Wood Plank M'

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.5. 1 M Pekerjaan Water Proofing

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Water Proofing M

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.6. 1 M Pekerjaan Folding Gate

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Folding Gate M

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 31


8.1.1.7. 1 Unit Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.8. 1 M Aluminium Composit Panel

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Aluminium Composit Panel M

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 32


8.1.1.9. 1 Unit Kloset Jongkok

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Kloset Jongkok Unit

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.10. 1 Unit Shower Spray setara Toto

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Shower Spray setara Toto Unit

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.11. 1 Unit Roof Drain Metal

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Roof Drain Metal Unit

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)
Analisa Harga Satuan 33
8.1.1.12. 1 Unit Floor Drain Setara Toto

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Floordrain setara Toto Unit

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 34


8.1.1.13. 1 M2 Kaca Cermin

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 Kaca Cermin M

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

8.1.1.14. 1 buag kunci pintu bulat

No Uraian Kode Satuan


A TENAGA

B BAHAN
1 kunci bulat M

C PERALATAN

D Jumlah (A+B+C)
E Ovrhead & Profit
F Harga Satuan Pekerjaan (D+E)

Analisa Harga Satuan 35


GA SATUAN PEKERJAAN TANAH (2.3.1.)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.750 85,000.00 63,750.00


0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 67,000.00

JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT -

67,000.00
15% x D 10,050.00
77,050.00

A SATUAN PEKERJAAN BETON (4.1.1.)

c =7,4 Mpa ( K 100), slump (3-6) cm ,w/c =0,87 (Menggunakan Molen)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.960 85,000.00 81,600.00


0.130 100,000.00 13,000.00
0.013 120,000.00 1,560.00
0.048 130,000.00 6,240.00
JUMLAH TENAGA KERJA 102,400.00

230.00 1,504.00 345,920.00


893.00 70.71 63,147.86
1027.00 335.93 344,995.93
0.00 - -
JUMLAH HARGA BAHAN 754,063.78

0.250 165,000.00 41,250.00


JUMLAH HARGA ALAT 41,250.00

897,713.78
15% x D 134,657.07
1,032,370.85

ckling factor pasir =20%

a ( K 175), slump (12 2) cm ,w/c = 0,66 (Menggunakan Molen)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)


Analisa Harga Satuan 36
1.323 85,000.00 112,455.00
0.189 100,000.00 18,900.00
0.019 120,000.00 2,280.00
0.066 130,000.00 8,580.00
JUMLAH TENAGA KERJA 142,215.00

326.00 1,504.00 490,304.00


760.00 70.71 53,742.86
1,029.00 335.93 345,667.78
0.00 - -
JUMLAH HARGA BAHAN 889,714.63

0.250 165,000.00 41,250.00


JUMLAH HARGA ALAT 41,250.00

1,073,179.63
15% x D 160,976.95
1,234,156.58

ckling factor pasir =20%

au besi ulir U 24

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.070 85,000.00 5,950.00


0.070 100,000.00 7,000.00
0.007 120,000.00 840.00
0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 14,310.00

10.500 10,500.00 110,250.00


0.150 19,800.00 2,970.00
JUMLAH HARGA BAHAN 113,220.00

JUMLAH HARGA ALAT -

127,530.00
15% x D 19,129.50
146,659.50
14,665.95

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.025 85,000.00 2,125.00


0.025 100,000.00 2,500.00
0.025 120,000.00 3,000.00
0.001 130,000.00 130.00

Analisa Harga Satuan 37


JUMLAH TENAGA KERJA 7,755.00

10.200 9,300.00 94,860.00


0.050 19,800.00 990.00
JUMLAH HARGA BAHAN 95,850.00

JUMLAH HARGA ALAT -

103,605.00
15% x D 15,540.75
119,145.75
11,914.58

asi (papan mal)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.520 85,000.00 44,200.00


0.260 100,000.00 26,000.00
0.026 120,000.00 3,120.00
0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 76,700.00

0.031 2,100,000.00 65,100.00


0.300 20,300.00 6,090.00
0.125 8,200.00 1,025.00
JUMLAH HARGA BAHAN 72,215.00

JUMLAH HARGA ALAT -

148,915.00
15% x D 22,337.25
171,252.25

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.520 85,000.00 44,200.00


0.260 100,000.00 26,000.00
0.026 120,000.00 3,120.00
0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 76,700.00

0.045 1,950,000.00 87,750.00


0.300 20,300.00 6,090.00
0.100 -
JUMLAH HARGA BAHAN 93,840.00

Analisa Harga Satuan 38


JUMLAH HARGA ALAT

170,540.00
15% x D 25,581.00
196,121.00

untuk kolom (papan mal)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.660 85,000.00 56,100.00


0.330 100,000.00 33,000.00
0.033 120,000.00 3,960.00
0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 97,350.00

0.040 1,950,000.00 78,000.00


0.400 20,300.00 8,120.00
- - -
0.015 3,984,000.00 59,760.00
0.022 2,100,000.00 46,200.00
2.000 9,400.00 18,800.00
JUMLAH HARGA BAHAN 210,880.00
JUMLAH HARGA BAHAN x 55 % 115,984.00

JUMLAH HARGA ALAT -

213,334.00
15% x D 32,000.10
245,334.10

Analisa Harga Satuan 39


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.660 85,000.00 56,100.00


0.330 100,000.00 33,000.00
0.033 120,000.00 3,960.00
0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 97,350.00

0.040 1,950,000.00 78,000.00


0.400 20,300.00 8,120.00
- 20,300.00 -
0.018 3,984,000.00 71,712.00
0.022 2,100,000.00 46,200.00
2.000 9,400.00 18,800.00
JUMLAH HARGA BAHAN 222,832.00

JUMLAH HARGA ALAT

320,182.00
15% x D 48,027.30
368,209.30

um (Uk. 1 1/2" x 3")

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.043 85,000.00 3,655.00


0.043 100,000.00 4,300.00
0.0043 120,000.00 516.00
0.0021 130,000.00 273.00
JUMLAH TENAGA KERJA 8,744.00

1.100 84,150.00 92,565.00


2.000 2,400.00 4,800.00
0.060 100,000.00 6,000.00
JUMLAH HARGA BAHAN 103,365.00

JUMLAH HARGA ALAT -

112,109.00
15% x D 16,816.35
128,925.35

UAN PEKERJAAN PASANGAN DINDING (4.4.1.)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)


Analisa Harga Satuan 40
0.350 85,000.00 29,750.00
0.150 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 48,890.00

12.500 2,080.00 26,000.00


7.500 1,504.00 11,280.00
0.027 99,000.00 2,673.00
JUMLAH HARGA BAHAN 39,953.00

JUMLAH HARGA ALAT -

88,843.00
15% x D 13,326.45
102,169.45

g (roster) camp. 1SP : 4PP


Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)

0.300 85,000.00 25,500.00


0.100 100,000.00 10,000.00
0.010 120,000.00 1,200.00
0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 38,650.00

30.000 17,300.00 519,000.00


11.000 1,504.00 16,544.00
0.035 99,000.00 3,465.00
JUMLAH HARGA BAHAN 539,009.00

-
JUMLAH HARGA ALAT -

577,659.00
15% x D 86,648.85
664,307.85

Analisa Harga Satuan 41


x11x22) cm tebal batu campuran 1SP:4PP

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.300 85,000.00 25,500.000


0.100 100,000.00 10,000.000
0.010 120,000.00 1,200.000
0.015 130,000.00 1,950.000
JUMLAH TENAGA KERJA 38,650.000

70.000 1,485.00 103,950.000


11.500 1,504.00 17,296.000
0.043 99,000.00 4,257.000
JUMLAH HARGA BAHAN 125,503.000

JUMLAH HARGA ALAT

164,153.00
15% x D 24,622.95
188,775.95

SATUAN PEKERJAAN PLESTERAN (4.4.2.)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.300 85,000.00 25,500.00


0.150 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 44,250.00

7.776 1,504.00 11,695.10


0.023 99,000.00 2,277.00
JUMLAH HARGA BAHAN 13,972.10

JUMLAH HARGA ALAT


58,222.10
15% x D 8,733.32
66,955.42

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.300 85,000.00 25,500.00


0.150 100,000.00 15,000.00
0.015 120,000.00 1,800.00
Analisa Harga Satuan 42
0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 44,250.00

6.240 1,504.00 9,384.96


0.024 99,000.00 2,376.00
JUMLAH HARGA BAHAN 11,760.96

JUMLAH HARGA ALAT -

56,010.96
15% x D 8,401.64
64,412.60

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.200 85,000.00 17,000.00


0.100 100,000.00 10,000.00
0.010 120,000.00 1,200.00
0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 29,500.00

3.250 1,504.00 4,888.00


JUMLAH HARGA BAHAN 4,888.00

JUMLAH HARGA ALAT -

34,388.00
15% x D 5,158.20
39,546.20

Analisa Harga Satuan 43


RJAAN PENUTUP LANTAI DAN PENUTUP DINDING (4.4.3.)

an 40cm x 40cm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.00


0.125 100,000.00 12,500.00
0.013 120,000.00 1,560.00
0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 37,000.00

6.63 16,500.00 109,395.00


9.80 1,504.00 14,739.20
1.30 12,000.00 15,600.00
0.045 99,000.00 4,455.00
JUMLAH HARGA BAHAN 144,189.20

JUMLAH HARGA ALAT -

181,189.20
15% x D 27,178.38
208,367.58

ran 40cm x 40cm (Unpolish)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.00


0.125 100,000.00 12,500.00
0.013 120,000.00 1,560.00
0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 37,000.00

6.63 18,300.00 121,329.00


9.80 1,504.00 14,739.20
1.30 12,000.00 15,600.00
0.045 99,000.00 4,455.00
JUMLAH HARGA BAHAN 156,123.20

JUMLAH HARGA ALAT -

193,123.20
15% x D 28,968.48
222,091.68

ran 40cm x 40cm Unpolished (ex. Decogress)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.00


Analisa Harga Satuan 44
0.125 100,000.00 12,500.00
0.013 120,000.00 1,560.00
0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 37,000.00

6.63 #VALUE! #VALUE!


9.80 1,504.00 14,739.20
1.30 12,000.00 15,600.00
0.045 99,000.00 4,455.00
JUMLAH HARGA BAHAN #VALUE!

JUMLAH HARGA ALAT -

#VALUE!
15% x D #VALUE!
#VALUE!

ran 40cm x 40cm Polished (ex. Decogress)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.00


0.125 100,000.00 12,500.00
0.013 120,000.00 1,560.00
0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 37,000.00

6.63 #REF! #REF!


9.80 1,504.00 14,739.20
1.30 12,000.00 15,600.00
0.045 99,000.00 4,455.00
JUMLAH HARGA BAHAN #REF!

JUMLAH HARGA ALAT -

#REF!
15% x D #REF!
#REF!

Analisa Harga Satuan 45


an 30cm x 30cm Unpolished (ex. Decogress)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.26 85,000.00 22,100.00


0.13 100,000.00 13,000.00
0.013 120,000.00 1,560.00
0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 38,350.00

11.87 7,700.00 91,399.00


10 1,504.00 15,040.00
1.5 12,000.00 18,000.00
0.045 99,000.00 4,455.00
JUMLAH HARGA BAHAN 128,894.00

JUMLAH HARGA ALAT -

167,244.00
15% x D 25,086.60
192,330.60

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.70 85,000.00 59,500.00


0.35 100,000.00 35,000.00
0.035 120,000.00 4,200.00
0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 103,250.00

26.50 2,820.00 74,730.00


10.40 1,504.00 15,641.60
0.045 99,000.00 4,455.00
0.16 12,000.00 1,944.00
JUMLAH HARGA BAHAN 96,770.60

JUMLAH HARGA ALAT -

200,020.60
15% x D 30,003.09
230,023.69

ran 60cm x 60 cm (Polish)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.000


0.125 100,000.00 12,500.000
0.013 120,000.00 1,560.000
0.013 130,000.00 1,690.000
Analisa Harga Satuan 46
JUMLAH TENAGA KERJA 37,000.000

2.78 79,200.00 220,176.000


9.80 1,504.00 14,739.20
1.30 12,000.00 15,600.00
0.045 99,000.00 4,455.000
JUMLAH HARGA BAHAN 254,970.200

JUMLAH HARGA ALAT

291,970.20
15% x D 43,795.53
335,765.73

ran 60cm x 60 cm (Unpolish)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.000


0.125 100,000.00 12,500.000
0.013 120,000.00 1,560.000
0.013 130,000.00 1,690.000
JUMLAH TENAGA KERJA 37,000.000

2.78 79,700.00 221,566.000


9.80 1,504.00 14,739.20
1.30 12,000.00 15,600.00
0.045 99,000.00 4,455.000
JUMLAH HARGA BAHAN 256,360.200

JUMLAH HARGA ALAT

293,360.20
15% x D 44,004.03
337,364.23

Analisa Harga Satuan 47


ran 30cm x 60 cm (stepnozing)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.000


0.125 100,000.00 12,500.000
0.013 120,000.00 1,560.000
0.013 130,000.00 1,690.000
JUMLAH TENAGA KERJA 37,000.000

5.56 60,200.00 334,712.000


9.80 1,504.00 14,739.20
1.30 12,000.00 15,600.00
0.045 99,000.00 4,455.000
JUMLAH HARGA BAHAN 369,506.200

JUMLAH HARGA ALAT

406,506.20
15% x D 60,975.93
467,482.13

ATUAN PEKERJAAN LANGIT-LANGIT (4.5.1.)

oard ukuran (120x240x9) mm, tebal 9mm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.100 85,000.00 8,500.00


0.050 100,000.00 5,000.00
0.005 120,000.00 600.00
0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 14,750.00

0.364 73,800.00 26,863.20


0.110 47,500.00 5,225.00
JUMLAH HARGA BAHAN 32,088.20

JUMLAH HARGA ALAT -

46,838.20
15% x D 7,025.73
53,863.93

0x240x4) mm, tebal 4 mm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.100 85,000.00 8,500.00


0.050 100,000.00 5,000.00
0.005 120,000.00 600.00
0.005 130,000.00 650.00
Analisa Harga Satuan 48
JUMLAH TENAGA KERJA 14,750.00

0.364 78,000.00 28,392.00


0.110 21,000.00 2,310.00
JUMLAH HARGA BAHAN 30,702.00

JUMLAH HARGA ALAT -

45,452.00
15% x D 6,817.80
52,269.80

ATUAN PEKERJAAN PENUTUP ATAP (4.5.2.)

type classic 0.35

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.200 85,000.00 17,000.00


0.100 100,000.00 10,000.00
0.010 120,000.00 1,200.00
0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 28,330.00

1.620 80,000.00 129,600.00


0.200 20,300.00 4,060.00
JUMLAH HARGA BAHAN 133,660.00

JUMLAH HARGA ALAT

134,860.00
15% x D 20,229.00
155,089.00

Analisa Harga Satuan 49


tone 1/2 lingkaran 0.35 (pjg- 40 cm)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.250 85,000.00 21,250.00


0.150 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 39,740.00

1.100 70,000.00 77,000.00


0.050 20,300.00 1,015.00
JUMLAH HARGA BAHAN 78,015.00

JUMLAH HARGA ALAT

79,815.00
15% x D 11,972.25
91,787.25

N PEKERJAAN SANITASI DALAM GEDUNG (5.1.1.)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

3.30 85,000.00 280,500.00


1.10 100,000.00 110,000.00
0.01 120,000.00 1,200.00
0.16 130,000.00 20,800.00
JUMLAH TENAGA KERJA 412,500.00

1.00 2,930,000.00 2,930,000.00


6% x closet 175,800.00 175,800.00
JUMLAH HARGA BAHAN 3,105,800.00

JUMLAH HARGA ALAT -

3,518,300.00
15% x D 527,745.00
4,046,045.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1.00 85,000.00 85,000.00


1.50 100,000.00 150,000.00
0.15 120,000.00 18,000.00
Analisa Harga Satuan 50
0.16 130,000.00 20,800.00
JUMLAH TENAGA KERJA 273,800.00

1.00 189,000.00 189,000.00


6.00 1,504.00 9,024.00
0.01 99,000.00 990.00
JUMLAH HARGA BAHAN 199,014.00

JUMLAH HARGA ALAT -

472,814.00
15% x D 70,922.10
543,736.10

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1.00 85,000.00 85,000.00


1.50 100,000.00 150,000.00
0.15 120,000.00 18,000.00
0.16 130,000.00 20,800.00
JUMLAH TENAGA KERJA 273,800.00

1.00 1,860,000.00 1,860,000.00


JUMLAH HARGA BAHAN 1,860,000.00

JUMLAH HARGA ALAT -

2,133,800.00
15% x D 320,070.00
2,453,870.00

Analisa Harga Satuan 51


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.03 85,000.00 2,550.00


0.3 100,000.00 30,000.00
0.03 120,000.00 3,600.00
0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 38,100.00

1.00 645,000.00 645,000.00


1.00 50,000.00 50,000.00
JUMLAH HARGA BAHAN 695,000.00

JUMLAH HARGA ALAT -

733,100.00
15% x D 109,965.00
843,065.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.03 85,000.00 2,550.00


0.3 100,000.00 30,000.00
0.03 120,000.00 3,600.00
0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 38,100.00

1.20 956,000.00 1,147,200.00


6.00 1,504.00 9,024.00
0.01 99,000.00 990.00
12.00 114,720.00 114,720.00
JUMLAH HARGA BAHAN 1,271,934.00

JUMLAH HARGA ALAT -

1,310,034.00
15% x D 196,505.10
1,506,539.10

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.01 85,000.00 850.00


0.40 100,000.00 40,000.00
0.04 120,000.00 4,800.00
0.005 130,000.00 650.00
Analisa Harga Satuan 52
JUMLAH TENAGA KERJA 46,300.00

1.00 32,000.00 32,000.00


0.025 9,500.00 237.50
JUMLAH HARGA BAHAN 32,237.50

JUMLAH HARGA ALAT -

78,537.50
15% x D 11,780.63
90,318.13

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.036 85,000.00 3,060.00


0.06 100,000.00 6,000.00
0.006 120,000.00 720.00
0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 10,040.00

1.20 21,100.00 25,320.00


35.00 7,385.00 7,385.00
JUMLAH HARGA BAHAN 32,705.00

JUMLAH HARGA ALAT

32,965.00
15% x D 4,944.75
37,909.75

Analisa Harga Satuan 53


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.036 85,000.00 3,060.00


0.060 100,000.00 6,000.00
0.006 120,000.00 720.00
0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 10,040.00

1.20 40,100.00 48,120.00


35.00 14,035.00 14,035.00
JUMLAH HARGA BAHAN 62,155.00

JUMLAH HARGA ALAT

72,195.00
15% x D 10,829.25
83,024.25

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.054 85,000.00 4,590.00


0.09 100,000.00 9,000.00
0.009 120,000.00 1,080.00
0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 15,060.00

1.20 78,800.00 94,560.00


35.00 27,580.00 27,580.00
JUMLAH HARGA BAHAN 122,140.00

JUMLAH HARGA ALAT

137,200.00
15% x D 20,580.00
157,780.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.081 85,000.00 6,885.000


0.135 100,000.00 13,500.000
0.0135 120,000.00 1,620.000
0.004 130,000.00 520.000
Analisa Harga Satuan 54
JUMLAH TENAGA KERJA 22,525.000

1.20 155,000.00 186,000.000


35.00 54,250.00 54,250.000
JUMLAH HARGA BAHAN 240,250.000

JUMLAH HARGA ALAT

262,775.00
15% x D 39,416.25
302,191.25

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.081 85,000.00 6,885.000


0.135 100,000.00 13,500.000
0.0135 120,000.00 1,620.000
0.004 130,000.00 520.000
JUMLAH TENAGA KERJA 22,525.000

1.20 250,000.00 300,000.000


35.00 87,500.00 87,500.000
JUMLAH HARGA BAHAN 387,500.000

JUMLAH HARGA ALAT

410,025.00
15% x D 61,503.75
471,528.75

Analisa Harga Satuan 55


TUAN PEKERJAAN KUNCI DAN KACA (4.6.2.)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.06 85,000.00 5,100.00


0.60 100,000.00 60,000.00
0.06 120,000.00 7,200.00
0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 72,690.00

1.00 47,000.00 47,000.00


JUMLAH HARGA BAHAN 47,000.00

JUMLAH HARGA ALAT -

119,690.00
15% x D 17,953.50
137,643.50

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.01 85,000.00 850.00


0.50 100,000.00 50,000.00
0.05 120,000.00 6,000.00
0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 57,500.00

1.00 54,000.00 54,000.00


JUMLAH HARGA BAHAN 54,000.00

JUMLAH HARGA ALAT -

111,500.00
15% x D 16,725.00
128,225.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.015 85,000.00 1,275.00


0.15 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 18,179.00

Analisa Harga Satuan 56


1.00 27,000.00 27,000.00
JUMLAH HARGA BAHAN 27,000.00

JUMLAH HARGA ALAT -

45,179.00
15% x D 6,776.85
51,955.85

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.015 85,000.00 1,275.00


0.15 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 18,179.00

1.00 134,000.00 134,000.00


JUMLAH HARGA BAHAN 134,000.00

JUMLAH HARGA ALAT -

152,179.00
15% x D 22,826.85
175,005.85

Analisa Harga Satuan 57


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.01 85,000.00 850.00


0.10 100,000.00 10,000.00
0.01 120,000.00 1,200.00
0.0005 130,000.00 65.00
JUMLAH TENAGA KERJA 12,115.00

1.00 #VALUE!
JUMLAH HARGA BAHAN #VALUE!

JUMLAH HARGA ALAT -

#VALUE!
15% x D #VALUE!
#VALUE!

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.015 85,000.00 1,275.00


0.15 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 19,115.00

1.00 #REF! #REF!


JUMLAH HARGA BAHAN #REF!

JUMLAH HARGA ALAT -

#REF!
15% x D #REF!
#REF!

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.02 85,000.00 1,700.00


0.2 100,000.00 20,000.00
0.02 120,000.00 2,400.00
0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 24,230.00

1.00 16,800.00 16,800.00


JUMLAH HARGA BAHAN 16,800.00

Analisa Harga Satuan 58


JUMLAH HARGA ALAT -

41,030.00
15% x D 6,154.50
47,184.50

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.01 85,000.00 850.00


0.10 100,000.00 10,000.00
0.01 120,000.00 1,200.00
0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 12,700.00

1.00 #REF! #REF!


JUMLAH HARGA BAHAN #REF!

JUMLAH HARGA ALAT -

#REF!
15% x D #REF!
#REF!

Analisa Harga Satuan 59


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.015 85,000.00 1,275.00


0.150 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 18,179.00

1.10 135,000.00 148,500.00


0.05 100,000.00 5,000.00
JUMLAH HARGA BAHAN 153,500.00

JUMLAH HARGA ALAT -

171,679.00
15% x D 25,751.85
197,430.85

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.015 85,000.00 1,275.00


0.150 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 18,179.00

1.10 300,000.00 330,000.00


0.05 100,000.00 5,000.00
JUMLAH HARGA BAHAN 335,000.00

JUMLAH HARGA ALAT -

353,179.00
15% x D 52,976.85
406,155.85

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.015 85,000.00 1,275.00


0.150 100,000.00 15,000.00
0.015 120,000.00 1,800.00
0.0008 130,000.00 104.00
JUMLAH TENAGA KERJA 18,179.00
Analisa Harga Satuan 60
1.10 130,000.00 143,000.00
0.05 100,000.00 5,000.00
JUMLAH HARGA BAHAN 148,000.00

JUMLAH HARGA ALAT -

166,179.00
15% x D 24,926.85
191,105.85

ATUAN PEKERJAAN PENGECATAN (4.7.1.)

is plamuur, 1 lapis cat dasar, 2 lapis cat penutup )

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.07 85,000.00 5,950.00


0.009 100,000.00 900.00
0.006 120,000.00 720.00
0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 7,960.00

0.20 47,500.00 9,500.00


0.15 31,200.00 4,680.00
0.17 31,000.00 5,270.00
0.26 53,500.00 13,910.00
0.01 22,000.00 220.00
0.03 21,900.00 657.00
0.2 2,970.00 594.00
JUMLAH HARGA BAHAN 34,831.00

JUMLAH HARGA ALAT -

42,791.00
15% x D 6,418.65
49,209.65

Analisa Harga Satuan 61


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.16 85,000.00 13,600.00


0.16 100,000.00 16,000.00
0.016 120,000.00 1,920.00
0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 31,910.00

0.15 31,700.00 4,755.00


0.05 21,000.00 1,050.00
0.10 2,970.00 297.00
JUMLAH HARGA BAHAN 6,102.00

JUMLAH HARGA ALAT -

38,012.00
15% x D 5,701.80
43,713.80

mutu baik ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.02 85,000.00 1,700.00


0.063 100,000.00 6,300.00
0.0063 120,000.00 756.00
0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 9,146.00

0.10 31,200.00 3,120.00


0.10 51,500.00 5,150.00
0.26 69,700.00 18,122.00
JUMLAH HARGA BAHAN 26,392.00

JUMLAH HARGA ALAT -

35,538.00
15% x D 5,330.70
40,868.70

r mutu baik ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.02 85,000.00 1,700.00


0.063 100,000.00 6,300.00
0.0063 120,000.00 756.00
0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 9,146.00
Analisa Harga Satuan 62
0.10 31,200.00 3,120.00
0.10 51,500.00 5,150.00
0.26 85,150.00 22,139.00
JUMLAH HARGA BAHAN 30,409.00

JUMLAH HARGA ALAT -

39,555.00
15% x D 5,933.25
45,488.25

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

0.02
0.063 100,000.00 6,300.00
0.0063 120,000.00 756.00
0.003 -
JUMLAH TENAGA KERJA 7,056.00

0.399 70,800.00 28,249.20


-
JUMLAH HARGA BAHAN 28,249.20

JUMLAH HARGA ALAT -

35,305.20
15% x D 5,295.78
40,600.98

Analisa Harga Satuan 63


SATUAN OVERHEAD DAN PROFIT (8.1.1.)

dy Mix) uk. 20 x 20, K 300 - 6m

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 960,000.00 960,000.00

JUMLAH HARGA BAHAN 960,000.00

JUMLAH HARGA ALAT -

960,000.00
15% x D 144,000.00
1,104,000.00

Ready Mix) uk. 20 x 20, K 300 - 6m

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 145,500.00 145,500.00

JUMLAH HARGA BAHAN 145,500.00

JUMLAH HARGA ALAT -

145,500.00
15% x D 21,825.00
167,325.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 #REF! #REF!

JUMLAH HARGA BAHAN #REF!

JUMLAH HARGA ALAT -

Analisa Harga Satuan 64


#REF!
15% x D #REF!
#REF!

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 120,000.00 120,000.00


JUMLAH HARGA BAHAN 120,000.00

JUMLAH HARGA ALAT -

120,000.00
15% x D 18,000.00
138,000.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 192,000.00 192,000.00


JUMLAH HARGA BAHAN 192,000.00

JUMLAH HARGA ALAT -

192,000.00
15% x D 28,800.00
220,800.00

Analisa Harga Satuan 65


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 61,000.00 61,000.00


JUMLAH HARGA BAHAN 61,000.00

JUMLAH HARGA ALAT -

61,000.00
15% x D 9,150.00
70,150.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 77,700.00 77,700.00


JUMLAH HARGA BAHAN 77,700.00

JUMLAH HARGA ALAT -

77,700.00
15% x D 11,655.00
89,355.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 615,000.00 615,000.00


JUMLAH HARGA BAHAN 615,000.00

JUMLAH HARGA ALAT -

615,000.00
15% x D 92,250.00
707,250.00

Analisa Harga Satuan 66


87 x 213,5 cm

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 4,170,000.00 4,170,000.00


JUMLAH HARGA BAHAN 4,170,000.00

JUMLAH HARGA ALAT -

4,170,000.00
15% x D 625,500.00
4,795,500.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 900,000.00 900,000.00


JUMLAH HARGA BAHAN 900,000.00

JUMLAH HARGA ALAT -

900,000.00
15% x D 135,000.00
1,035,000.00

Analisa Harga Satuan 67


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 189,000.00 189,000.00


JUMLAH HARGA BAHAN 189,000.00

JUMLAH HARGA ALAT -

189,000.00
15% x D 28,350.00
217,350.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 228,000.00 228,000.00


JUMLAH HARGA BAHAN 228,000.00

JUMLAH HARGA ALAT -

228,000.00
15% x D 34,200.00
262,200.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 74,300.00 74,300.00


JUMLAH HARGA BAHAN 74,300.00

JUMLAH HARGA ALAT -

74,300.00
15% x D 11,145.00
85,445.00
Analisa Harga Satuan 68
Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 316,000.00 316,000.00


JUMLAH HARGA BAHAN 316,000.00

JUMLAH HARGA ALAT -

316,000.00
15% x D 47,400.00
363,400.00

Analisa Harga Satuan 69


Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 290,000.00 290,000.00


JUMLAH HARGA BAHAN 290,000.00

JUMLAH HARGA ALAT -

290,000.00
15% x D 43,500.00
333,500.00

Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

JUMLAH TENAGA KERJA -

1.00 60,000.00 60,000.00


JUMLAH HARGA BAHAN 60,000.00

JUMLAH HARGA ALAT -

60,000.00
15% x D 9,000.00
69,000.00

Analisa Harga Satuan 70


ENGINEERS ESTIMA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FAK.TEKNIK UNTAN (TAHAP I)
LOKASI : KOTA PONTIANAK
TAHUN ANGGARAN : 2015

VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
I. PEKERJAAN PENDAHULUAN
1 Bowplank 1.000 1.000
2 Papan Nama Proyek 1.000 1.000
3 Pembersihan Lokasi 1.000 1.000
4 Listrik dan Air Kerja 1.000 1.000
5 Direksikeet 1.000 1.000

II. PEKERJAAN PONDASI


1 Cerucuk dia. 15 - 1200 cm+pemancangan #REF! #REF!
2 Cerucuk dia. 8/10 - 400 cm+pemancangan
3 Galian Tanah
4 Urugan Tanah Kembali #VALUE! #VALUE!
5 Urugan Pasir tebal 15 cm #REF! #REF!
6 Lantai kerja tebal 5 cm
7 Pondasi Type P1 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Bekisting Pondasi
8 Pondasi Type P2 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Bekisting Pondasi
9 Pondasi Type P3 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Bekisting Pondasi
10 Pondasi Type P4 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Bekisting Pondasi
VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
11 Pondasi Type P5 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Bekisting Pondasi
12 Kolom Pondasi Uk. 35/35 cm (P1, P2, P3 & P4) -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Kolom
13 Kolom Pondasi Uk. 25/25 cm (P5) -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Kolom

III. PEKERJAAN STRUKTUR BETON BERTULANG


LANTAI I
1 Balok Sloof Uk. 20/50 cm elv.00
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Sloof
2 Balok Sloof Uk. 20/40 cm elv. 00 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Sloof
4 Balok Sloof Uk. 15/30 cm elv. 00 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Sloof
VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
5 Jenggotan Uk. 10/50 cm (sloof 20/50.A) -
- Beton K-225 (Ready Mix) #REF! #REF!
- Wiremesh M6
- Bekisting Sloof
6 Balok Sloof Uk. 25/50 cm elv. -1.00 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Sloof
7 Balok Sloof Uk. 20/50 cm elv. -1.00 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Sloof
8 Balok Sloof Uk. 20/30 cm elv. -1.00 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Sloof
9 Balok Sloof Uk. 15/30 cm elv. -1.00 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Sloof
8 Kolom Lt.1 Ukuran 35/35 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Kolom
9 Kolom lt. 1 Praktis Ukuran 7/7 cm ( 40%)
- Beton K-100 #REF! #REF!
- Tulangan
- Bekisting
10 Kolom Lt.1 Praktis Ukuran 7/7 cm ( 40%)
- Beton K-100 #REF! #REF!
- Tulangan
VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
- Bekisting
11 Tangga Beton -
a. Balok Uk. 15/30 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
b. Plat Tangga -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Bekisting Lantai
c. Anak Tangga -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U24
- Bekisting Sloof
-
LANTAI II -
1 Kolom Lt. II Ukuran 35/35 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Kolom Pemakaian Berulang
3 Balok Lt. II Ukuran 20/50 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
4 Balok Lt. II Ukuran 20/40 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
5 Balok Lt. II Ukuran 20/45 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
6 Balok Lt. II Ukuran 15/45 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
7 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Bag.Roster) -
- Beton K-225 (Ready Mix) #REF! #REF!
- Wiremesh M6
- Bekisting Balok
8 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Dudukan Bat -
- Beton K-225 (Ready Mix) #REF! #REF!
- Wiremesh M6
- Tulangan U24
- Bekisting Balok
11 Balok Dack Ukuran 20/50 cm elv. 6.25 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
12 Balok Dack Ukuran 20/45 cm elv. 6.25 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
13 Balok Dack Ukuran 20/40 cm elv. 6.25 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
14 Balok Dack Ukuran 15/45 cm elv. 6.25 -
- Beton K-225 (Ready Mix) #REF! #REF!
VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
- Tulangan U32
- Tulangan U24
- Bekisting Balok
15 Plat Dack Beton elv. 6.25 -
- Beton K-225 t = 10 cm (Ready Mix) #REF! #REF!
- Wiremesh 2xM6
- Bekisting Lantai
16 Balok Dack Ukuran 20/50 cm elv. 6.60 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
17 Balok Dack Ukuran 20/45 cm elv. 6.60 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
18 Balok Dack Ukuran 20/40 cm elv. 6.60 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
19 Balok Dack Ukuran 15/45 cm elv. 6.60 -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok
20 Plat Dack Beton elv. 6.60 -
- Beton K-225 t = 10 cm (Ready Mix) #REF! #REF!
- Wiremesh 2xM6
- Bekisting Lantai
VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
21 Ring Balok Ukuran. 20/40 cm -
- Beton K-225 (Ready Mix) #REF! #REF!
- Tulangan U32
- Tulangan U24
- Bekisting Balok

IV. PEKERJAAN LANTAI


LANTAI I
1 Plat Lantai I
- Beton K-225 (Ready Mix) #REF! #REF!
- Wiremesh M6 (1,5 lapis)
- Wiremesh M6 (2 lapis utk daerah Toilet, Janitor & Selasar W
- Bekisting Lantai
-
LANTAI II -
1 Plat Lantai Dua -
- Beton K-225 (Ready Mix) #REF! #REF!
- Wiremesh M6 (1,5 lapis)
- Bekisting Lantai

V. PEKERJAAN DINDING
LANTAI I
1 Dinding Batako ( 64% ) #VALUE!

VI. PEKERJAAN ATAP


1 Rangka Atap Zincallum (Truss/Polos) dengan jurai dalam #REF! #REF!
2 Atap Genteng Metal Stone Classic t= 0.35 #REF! #REF!
3 Prabung Genteng Metal Stone 1/2 Lingkaran
4 List Plank Woodplank

VII. PEKERJAAN INSTALASI AIR BERSIH & KOTOR


1 Instalasi Air Kotor
- Pipa PVC AW 4' ( 50%) #REF! #REF!
- Pipa PVC AW 3' ( 50%)
2 Instalasi Air Bersih
- Pipa PVC AW 1' ( 50%) #REF! #REF!
VOLUME VOLUME
NO URAIAN PEKERJAAN
TAHAP I TOTAL

1 2 3 3
- Pipa PVC AW 2' ( 50%) #VALUE!

VIII. PEKERJAAN LAIN-LAIN


1 Tangga di teras
- Beton K-225 (Ready Mix) #REF! #REF!
- Wiremesh 2 lps M6
- Bekisting
2 Konsul Atas Ventilasi (V4)
- Betok K225 #REF! #REF!
- Wiremesh M6
- Bekisting
ENGINEERS ESTIMATE ( EE )
UNAN GEDUNG KULIAH FAK.TEKNIK UNTAN (TAHAP I)
NTIANAK

VOLUME VOLUME KODE HARGA SATUAN SUB TO


PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
N
1.000 1.000 Lsm - 2,500,000.00
1.000 1.000 Lsm - 450,000.00
1.000 1.000 Lsm - 2,000,000.00
1.000 1.000 Lsm - 2,000,000.00
1.000 1.000 Lsm - 24,000,000.00

pemancangan #REF! #REF! Btg - #REF!


+pemancangan Btg - 19,400.00
M 2.3.1.1 77,050.00
#VALUE! #VALUE! M 2.3.1.9.a Err:509
#REF! #REF! M 2.3.1.11 Err:509
M 4.1.1.4.a 1,032,370.85
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
M 4.1.1.20.a 171,252.25
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
M 4.1.1.20.a 171,252.25
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
M 4.1.1.20.a 171,252.25
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
M 4.1.1.20.a 171,252.25
VOLUME VOLUME KODE HARGA SATUAN SUB TO
PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
M 4.1.1.20.a 171,252.25
m (P1, P2, P3 & P4) -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.22.a #REF!
m (P5) -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.22.a #REF!

TON BERTULANG

v.00
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
v. 00 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
v. 00 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
VOLUME VOLUME KODE HARGA SATUAN SUB TO
PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
oof 20/50.A) -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF!
M 4.1.1.21 196,121.00
v. -1.00 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
v. -1.00 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
v. -1.00 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
v. -1.00 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
m -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.22.a.1 #REF!
7/7 cm ( 40%)
#REF! #REF! M 4.1.1.4.a 1,032,370.85
Kg 4.1.1.17.a 14,665.95
M 4.1.1.20.a 171,252.25
/7 cm ( 40%)
#REF! #REF! M 4.1.1.4.a 1,032,370.85
Kg 4.1.1.17.a 14,665.95
VOLUME VOLUME KODE HARGA SATUAN SUB TO
PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
M 4.1.1.20.a 171,252.25
-
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
M 4.1.1.24.a.1 #REF!
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17.a 14,665.95
M 4.1.1.21 196,121.00
-
-
m -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
n Berulang M 4.1.1.22.b.1 245,334.10
m -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
VOLUME VOLUME KODE HARGA SATUAN SUB TO
PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
m -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
k Ukuran 15/45 cm (Bag.Roster) -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF!
M 4.1.1.23.a 368,209.30
k Ukuran 15/45 cm (Dudukan Bat -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m elv. 6.25 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m elv. 6.25 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m elv. 6.25 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m elv. 6.25 -
#REF! #REF! M B. 13.f.2 #REF!
VOLUME VOLUME KODE HARGA SATUAN SUB TO
PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
-
ady Mix) #REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF!
M 4.1.1.24.a.1 #REF!
m elv. 6.60 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m elv. 6.60 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m elv. 6.60 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
m elv. 6.60 -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30
-
ady Mix) #REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF!
M 4.1.1.24.a.1 #REF!
VOLUME VOLUME KODE HARGA SATUAN SUB TO
PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
m -
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17
Kg 4.1.1.17.a 14,665.95
M 4.1.1.23.a 368,209.30

#REF! #REF! M B. 13.f.2 #REF!


Kg 4.1.1.19.a #REF!
daerah Toilet, Janitor & Selasar W Kg 4.1.1.19.a #REF!
M 4.1.1.24.a.1 #REF!
-
-
-
#REF! #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a
M 4.1.1.24.a.1 #REF!

#VALUE! M 4.4.1.17.b 102,169.45

uss/Polos) dengan jurai dalam #REF! #REF! M 8.1.1.3 220,800.00


Classic t= 0.35 #REF! #REF! M 4.5.2.32.a 155,089.00
ne 1/2 Lingkaran M' 4.5.2.36.a 91,787.25
M' 8.1.1.4. 70,150.00

BERSIH & KOTOR

#REF! #REF! M' 5.1.1.32. 471,528.75


M' 5.1.1.31. 302,191.25

#REF! #REF! M' 5.1.1.27 83,024.25


VOLUME VOLUME KODE HARGA SATUAN SUB TO
PEKERJAAN SAT
TAHAP I TOTAL ANALISA (Rp.)

2 3 3 4 5 6
#VALUE! M' 5.1.1.29 157,780.00

#REF! #REF! M B. 13.f.2 #REF!


Kg 4.1.1.19.a #REF!
M 4.1.1.21 196,121.00

#REF! #REF! M 4.1.1.7.a #REF!


Kg 4.1.1.19.a #REF!
M 4.1.1.21 196,121.00

JUMLA
A. ANALISA TEKNIS SATUAN PEKERJAAN
URAIAN PEKERJAAN/PEKERJA/
NO. BAHAN

(1) (2)

I. PEKERJAAN FINISHING STRUKTUR BETON BERTULANG


LANTAI I
1 Jenggotan Uk. 10/50 cm (sloof 20/50.A)
- Plesteran Jenggotan Uk. 10/50 cm
Pekerja
Tukang batu
Kepala Tukang
Mandor

Semen PC
Pasir

2 Kolom Lt.1 Ukuran 35/35 cm


- Plesteran Kolom 35/35 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir
- Acian Kolom Teras
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
3 Kolom lt. 1 Praktis Ukuran 7/7 cm ( 40%)
- Beton K-100
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir
Kerikil
Air

- Tulangan
Pekerja
Tukang
Kepala Tukang
Mandor

Besi Beton (polos/ulir) U32


Kawat Beton

- Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

Papan Mal kelas III


Paku 5 - 10 cm
Cerucuk 6-8 cm - panjang 4 m

4 Kolom Lt.1 Praktis Ukuran 7/7 cm ( 40%)


- Beton K-100
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir
Kerikil
Air

- Tulangan
Pekerja
Tukang
Kepala Tukang
Mandor

Besi Beton (polos/ulir) U32


Kawat Beton

- Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

Papan Mal kelas III


Paku 5 - 10 cm
Cerucuk 6-8 cm - panjang 4 m

5 Tangga Beton
a. Keramik 30 x 60 cm Polish
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Ubin warna 60 x 60 cm
Semen Portlan
Semen warna
Pasir pasang
LANTAI II
1 Kolom Lt. II Ukuran 35/35 cm
- Plesteran Kolom 35/35 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

2 Balok Lt. II Ukuran 15/45 cm


- Plesteran Balok Ukuran 15/45 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Plesteran Ukuran 15/45 cm


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

3 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Bag.Roster)


- Plesteran Jenggotan Bawah Balok Ukuran 15/45 cm (Roster)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Jenggotan Bawah Balok Ukuran 15/45 cm


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

4 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Dudukan Bata Merah)


- Plesteran Jenggotan (Dudukan Bata Merah)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Jenggotan Bawah Balok Ukuran 15/45 cm


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

5 Kolom Praktis Lt.II Ukuran 7/7 cm


- Beton K-100
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir
Kerikil
Air

- Tulangan U24
Pekerja
Tukang
Kepala Tukang
Mandor

Besi Beton (polos/ulir) U32


Kawat Beton

- Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

Papan Mal kelas III


Paku 5 - 10 cm
Cerucuk 6-8 cm - panjang 4 m

6 Balok Praktis Lt.II Ukuran 7/7 cm


- Beton K-100
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir
Kerikil
Air
- Tulangan U24
Pekerja
Tukang
Kepala Tukang
Mandor

Besi Beton (polos/ulir) U32


Kawat Beton

- Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

Papan Mal kelas III


Paku 5 - 10 cm
Cerucuk 6-8 cm - panjang 4 m

7 Balok Dack Ukuran 20/50 cm elv. 7.25


- Plesteran Balok Dack 20/50 cm (teras)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 20/50 cm (teras)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

8 Balok Dack Ukuran 20/45 cm elv. 7.25


- Plesteran Balok Dack 20/45 cm (teras)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 20/45 cm (teras)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

9 Balok Dack Ukuran 20/40 cm elv. 7.25


- Plesteran Balok Dack 20/40 cm (teras)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 20/40 cm (teras)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

10 Balok Dack Ukuran 15/45 cm elv. 7.25


- Plesteran Balok Dack 15/45 cm (teras)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 15/45 cm (teras)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

11 Plat Dack Beton elv. 7.25 (Teras)


- Waterproofing Plat Dack
- Plesteran Plat Dack (bag. Atas)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir
- Acian Plat Dack (bag.atas)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

- Plesteran Plat Dack (bag. bawah expose plafond)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Plat Dack (bag.bawah expose plafond)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

12 Balok Dack Ukuran 20/50 cm elv. 7.25


- Plesteran Balok Dack 20/50 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 20/50 cm


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

13 Balok Dack Ukuran 20/45 cm elv. 7.25


- Plesteran Balok Dack 20/45 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 20/45 cm


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

14 Balok Dack Ukuran 20/40 cm elv. 7.25


- Plesteran Balok Dack 20/40 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 20/40 cm


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

15 Balok Dack Ukuran 15/45 cm elv. 7.25


- Plesteran Balok Dack 15/45 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Balok Dack 15/45 cm


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
16 Plat Dack Beton elv. 7.25
- Waterproofing Plat Dack

- Plesteran Plat Dack (bag. Atas)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Plat Dack (bag.atas)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

- Plesteran Plat Dack (bag. bawah expose plafond)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

- Acian Plat Dack (bag.bawah expose plafond)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

II. PEKERJAAN KERAMIK LANTAI, DINDING DAN PLAFOND


LANTAI I
1 Keramik Lantai Uk. 60x60 UnPolysh (Teras)
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Ubin warna 60 x 60 cm
Semen PC
Semen Warna
Pasir Pasang

2 Keramik Lantai Uk. 60x60 Polish


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Ubin warna 60 x 60 cm
Semen PC
Semen Warna
Pasir Pasang

3 Keramik Lantai WC/KM & janitor Uk. 40x40 cm Unpolish


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Ubin warna 60 x 60 cm
Semen PC
Semen Warna
Pasir Pasang

4 Keramik Dinding WC/KM Uk. 40x40 cm Polish


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Ubin warna 60 x 60 cm
Semen PC
Semen Warna
Pasir Pasang

5 Dinding Batako ( 36% )


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Batako uk 20/40/7
Semen PC
Pasir pasang

6 Plesteran Dinding
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

7 Acian Batako Dinding Luar & Kolom Bag. Luar


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

8 Rangka Plafond Metal Furing

9 Plafond Gypsum
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Gypsum Board
Paku sekrup

10 Plesteran Bawah Plat Lantai (Teras Samping&Bawah Lantai)


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

LANTAI II
1 Keramik Lantai Uk. 60x60 Polish
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Ubin warna 60 x 60 cm
Semen PC
Semen Warna
Pasir Pasang

2 Dinding Batako
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Batako uk 20/40/7
Semen PC
Pasir pasang

3 Plesteran Dinding
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC
Pasir

4 Acian Batako Dinding Luar & Kolom Bag.Luar


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Semen PC

5 Dinding Bata Merah


Pekerja
Tukang Batu
Kepala Tukang
Mandor

Batako uk 20/40/7
Semen PC
Pasir pasang

6 Rangka Plafond Metal Furing


7 Plafond Gypsum
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Gypsum Board
Paku sekrup

8 Plafond GRC
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Gypsum Board
Paku sekrup
III. PEKERJAAN PINTU, JENDELA & VENTILASI
LANTAI I
1 Pintu Type P1
- Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm 2 daun

- Aluminum Composit Panel

2 Pintu Type PJ1


- Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm 2 daun

- Kaca t = 8 mm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kaca Tebal 8 mm
Sealant

- Aluminum Composit Panel

3 Pintu Type P2
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant

- Pintu Double Multipleks 4 mm fin. HPL 2 Daun

4 Pintu Type P3
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant
- Pintu Double Multipleks 4 mm fin. HPL 1 Daun

5 Pintu Type P4
- Kusen Belian

- Pintu Belian 1 Daun

6 Pintu Type PV1


- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant

- Pintu Double Multipleks 4 mm fin. HPL 2 Daun


- Ventilasi Jalusi Aluminium
7 Jendela Type JV1
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant

- Jendela kaca Hidup Kunci Swing (70x98 cm)


- Ventilasi Jalusi Aluminium
8 Jendela Type J1.a
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant
- Jendela kaca Hidup Kunci Swing (102x74 cm)
- Kaca t = 5 mm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kaca Tebal 5 mm
Sealant
9 Jendela Type J2.a
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant

- Jendela kaca Hidup Kunci Swing (102x70 cm)


- Jendela kaca Hidup Kunci Swing (54x70 cm)
- Kaca t = 5 mm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kaca Tebal 5 mm
Sealant
10 Ventilasi Type V1
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant

- Kaca t = 5 mm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kaca Tebal 5 mm
Sealant
11 Ventilasi Type V2
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant
- Kaca t = 5 mm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kaca Tebal 5 mm
Sealant
12 Ventilasi Type V3
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant
- Ventilasi Kaca Hidup Engsel Dorong
13 Ventilasi Type V6
- Kusen Aluminium
Pekerja
Tukang Khusus Aluminium
Kepala Tukang
Mandor

Propil Aluminium
Sekrup fixer
Sealant
- Ventilasi Jalusi Aluminium

LANTAI II
1 Pintu Type PV1
- Kusen Aluminium
- Pintu Double Multipleks 4 mm fin. HPL 2 Daun
- Ventilasi Jalusi Aluminium
2 Jendela Type J1.b
- Kusen Aluminium
- Jendela kaca Hidup Kunci Swing (102x74 cm)
- Kaca t = 5 mm
3 Jendela Type J2.b
- Kusen Aluminium
- Jendela kaca Hidup Kunci Swing (102x70 cm)
- Jendela kaca Hidup Kunci Swing (54x70 cm)
- Kaca t = 5 mm
4 Jendela Type JV2
- Kusen Aluminium
- Jendela kaca Hidup Kunci Swing (70x98 cm)
- Ventilasi Jalusi Aluminium
5 Ventilasi Type V1
- Kusen Aluminium
- Kaca t = 5 mm
6 Ventilasi Type V2
- Kusen Aluminium
- Kaca t = 5 mm
7 Ventilasi Type V4
- Kusen Aluminium
- Ventilasi Jalusi Aluminium
8 Ventilasi Type V5
- Kusen Aluminium
- Ventilasi Jalusi Aluminium

IV. PEKERJAAN PENGUNCI & PENGGANTUNG


LANTAI I
1 Kunci Pintu 2 Slag
2 Kunci Pintu Bulat (P4)
3 Engsel Pintu
4 Slot Tanam Pintu (P2 & PV1)

LANTAI II
1 Kunci Pintu 2 Slag
2 Engsel Pintu
3 Slot Tanam Pintu (PV1)

V. PEKERJAAN TOILET
1 Kloset Jongkok
2 Kloset Duduk Setara Toto
3 Urinoir Setara Toto
4 Dinding Pemisah Urinoir Setara Toto
5 Bak Air Lapis Keramik
6 Shower Spray setara Toto
7 Stop kran Shower Spray
8 Wastafel Lengkap Setara Toto
9 Kaca Cermin
10 Kran Air
11 Floor Drain Stainless Setara Toto
12 Beerfut (gorong dia.80 cm) Type 1
- Galian tanah
- Gorong dia. 80 cm
- Pipa pvc. Dia. 2 '(pipa distribusi)
- Pipa pvc. Dia. 1/2 (pipa hawa)
- Penutup Atas:
a. Cor Beton K175 t = 8 cm
13 Beerfut (gorong dia.80 cm) Type 2
- Galian tanah
- Gorong dia. 80 cm
- Pipa pvc. Dia. 2 '(pipa distribusi)
- Pipa pvc. Dia. 1/2 (pipa hawa)
- Penutup Atas:
a. Cor Beton K175 t = 8 cm

VI. PEKERJAAN INSTALASI AIR BERSIH, KOTOR & HUJAN


1 Instalasi Air Kotor
- Pipa PVC AW 4'
- Pipa PVC AW 3'
2 Instalasi Air Bersih
- Pipa PVC AW 1'
- Pipa PVC AW 2'
3 Instalasi Air Hujan
- Roof Drain Metal
- Pipa PVC AW 3'

VII. PEKERJAAN ELEKTRIKAL


LANTAI I
1 SL 23 watt setara philips + Pemasangan
2 SL 11 watt setara philips + Pemasangan
3 SL 9 watt setara philips + Pemasangan
4 Baret Persegi SL 23 watt + Pemasangan
5 Stop kontak
6 Instalasi Listrik+Kabel Suprime+Konduit
7 Instalasi Stop Kontak+Kabel Suprime+Konduit
8 Instalasi listrik AC
9 Instalasi Proyektor
10 Saklar Tunggal setara panasonic
11 Saklar Double setara panasonic
12 Panel Utama
13 Panel LT 1
14 Grounding

LANTAI II
1 SL 23 watt setara philips + Pemasangan
2 SL 18 watt setara philips + Pemasangan
3 SL 11 watt setara philips + Pemasangan
4 Baret Persegi SL 23 watt + Pemasangan
5 Stop kontak
6 Instalasi Listrik+Kabel Suprime+Konduit
7 Instalasi Stop Kontak+Kabel Suprime+Konduit
8 Instalasi Proyektor
9 Saklar Triple setara panasonic
10 Saklar Double setara panasonic
11 Panel LT 2
12 Grounding
13 Penangkal Petir
VIII. PEKERJAAN PENGECATAN
LANTAI I
1 Cat Tembok Interior
2 Cat Tembok Exterior
3 Cat Kilat

LANTAI II
1 Cat Tembok Interior
2 Cat Tembok Exterior
3 Cat Finishing Bata Merah

IX. PEKERJAAN LAIN-LAIN


1 Tangga di teras
- Keramik 30 x 60 cm Polish
2 Konsul Atas Ventilasi (V4)
- Plesteran Konsul Atas Ventilasi
- Acian Konsul Atas Ventilasi
Finishing Arsitektural
3 Dinding Roster (press)
4 Ornamen Sirip Beton di Sun Shading Woodplank
- Beton K-175
- Tulangan (12)
5 Ornamen Sirip Beton di Sun Shading Woodplank
- Bekisting Balok
- Plesteran Ornamen Sirip Beton
- Acian Ornamen Sirip Beton
- Sun Shading Woodplank + Rangka Besi Type 1 (Bag Teras)
- Sun Shading Woodplank + Rangka Besi Type 2
KOEFISIEN KEBUTUHAN DIALOKASIKAN ALOKASI WAKTU PENYELESA
VOL SATUAN DARI HARG PEKERJAAN PEKERJA, Dlm Hari
SATUAN BAHAN, & ALAT BAHAN, & ALAT Hari
(3) (4) (5) (6) (7) (8)

85.500 m2
0.300 25.650 OH 5 Orang 5.130
0.150 12.825 OH 3 Orang 4.275
0.015 1.283 OH 1 Orang 1.283
0.015 1.283 OH 1 Orang 1.283

7.776 664.848 kg 13.30 Zak


0.023 1.967 m3 1.97 m3

132.720 m2
0.300 39.816 OH 6 Orang 6.636
0.150 19.908 OH 3 Orang 6.636
0.015 1.991 OH 1 Orang 1.991
0.015 1.991 OH 1 Orang 1.991

7.776 1032.031 kg 20.64 Zak


0.023 3.053 m3 3.05 m3
26.250 m2
0.200 5.250 OH 1 Orang 5.250
0.100 2.625 OH 1 Orang 2.625
0.010 0.263 OH 1 Orang 0.263
0.010 0.263 OH 1 Orang 0.263

3.250 85.313 kg 1.71 m3

0.505 M
0.960 0.485 OH 1 Orang 0.485
0.130 0.066 OH 1 Orang 0.066
0.013 0.007 OH 1 Orang 0.007
0.048 0.024 OH 1 Orang 0.024

230.00 116.150 kg 2.32 Zak


893.00 450.965 kg 0.32 M3
1,027.00 518.635 kg 0.29 M3
- 0.000 liter liter

172.054 Kg
0.070 12.044 OH 5 Orang 2.409
0.070 12.044 OH 5 Orang 2.409
0.007 1.204 OH 1 Orang 1.204
0.004 0.688 OH 1 Orang 0.688

10.500 1806.567 Kg
0.150 25.808 Kg

9.979 M2
0.520 5.189 OH 2 Orang 2.595
0.260 2.595 OH 1 Orang 2.595
0.026 0.259 OH 1 Orang 0.259
0.026 0.259 OH 1 Orang 0.259

0.031 0.309 m3
0.300 2.994 Kg
0.125 1.247 Btg

0.666 M
0.960 0.485 OH 1 Orang 0.485
0.130 0.066 OH 1 Orang 0.066
0.013 0.007 OH 1 Orang 0.007
0.048 0.024 OH 1 Orang 0.024

230.00 116.150 kg 2.32 Zak


893.00 450.965 kg 0.32 M3
1,027.00 518.635 kg 0.29 M3
- 0.000 liter liter

226.781 Kg
0.070 15.875 OH 5 Orang 3.175
0.070 15.875 OH 5 Orang 3.175
0.007 1.587 OH 1 Orang 1.587
0.004 0.907 OH 1 Orang 0.907

10.500 2381.201 Kg
0.150 34.017 Kg

14.250 M
0.520 7.410 OH 2 Orang 3.705
0.260 3.705 OH 1 Orang 3.705
0.026 0.371 OH 1 Orang 0.371
0.026 0.371 OH 1 Orang 0.371

0.031 0.442 m3
0.300 4.275 Kg
0.125 1.781 Btg

24.003 M
0.250 6.001 OH 2 Orang 3.000
0.125 3.000 OH 1 Orang 3.000
0.013 0.312 OH 1 Orang 0.312
0.013 0.312 OH 1 Orang 0.312

5.560 133.457 Bh 64 Bh
9.800 235.229 kg 4.70 Zak
1.300 31.204 kg 31.204 Kg
0.045 1.080 m3 1.080 m3
43.050 M
0.300 39.816 OH 6 Orang 6.636
0.150 19.908 OH 3 Orang 6.636
0.015 1.991 OH 1 Orang 1.991
0.015 1.991 OH 1 Orang 1.991

7.776 1032.031 kg 20.64 Zak


0.023 3.053 m3 3.05 m3

20.835 M
0.300 39.816 OH 6 Orang 6.636
0.150 19.908 OH 3 Orang 6.636
0.015 1.991 OH 1 Orang 1.991
0.015 1.991 OH 1 Orang 1.991

7.776 1032.031 kg 20.64 Zak


0.023 3.053 m3 3.05 m3

20.835 M
0.200 5.250 OH 1 Orang 5.250
0.100 2.625 OH 1 Orang 2.625
0.010 0.263 OH 1 Orang 0.263
0.010 0.263 OH 1 Orang 0.263

3.250 85.313 kg 1.71 m3

120.000 M
0.300 39.816 OH 6 Orang 6.636
0.150 19.908 OH 3 Orang 6.636
0.015 1.991 OH 1 Orang 1.991
0.015 1.991 OH 1 Orang 1.991

7.776 1032.031 kg 20.64 Zak


0.023 3.053 m3 3.05 m3

120.000 M
0.200 5.250 OH 1 Orang 5.250
0.100 2.625 OH 1 Orang 2.625
0.010 0.263 OH 1 Orang 0.263
0.010 0.263 OH 1 Orang 0.263

3.250 85.313 kg 1.71 m3

ukan Bata Merah)


48.480 M
0.300 39.816 OH 6 Orang 6.636
0.150 19.908 OH 3 Orang 6.636
0.015 1.991 OH 1 Orang 1.991
0.015 1.991 OH 1 Orang 1.991

7.776 1032.031 kg 20.64 Zak


0.023 3.053 m3 3.05 m3

48.480 M
0.200 5.250 OH 1 Orang 5.250
0.100 2.625 OH 1 Orang 2.625
0.010 0.263 OH 1 Orang 0.263
0.010 0.263 OH 1 Orang 0.263

3.250 85.313 kg 1.71 m3

0.157 M
0.960 0.151 OH 1 Orang 0.151
0.130 0.020 OH 1 Orang 0.020
0.013 0.002 OH 1 Orang 0.002
0.048 0.008 OH 1 Orang 0.008

230.00 36.110 kg 0.72 Zak


893.00 140.201 kg 0.10 M3
1,027.00 161.239 kg 0.09 M3
- 0.000 liter liter

53.473 Err:509
0.070 3.743 OH 5 Orang 0.749
0.070 3.743 OH 5 Orang 0.749
0.007 0.374 OH 1 Orang 0.374
0.004 0.214 OH 1 Orang 0.214

10.500 561.467 Kg
0.150 8.021 Kg

3.108 Err:509
0.520 1.616 OH 2 Orang 0.808
0.260 0.808 OH 1 Orang 0.808
0.026 0.081 OH 1 Orang 0.081
0.026 0.081 OH 1 Orang 0.081

0.031 0.096 m3
0.300 0.932 Kg
0.125 0.389 Btg

1.337 M
0.960 1.284 OH 1 Orang 1.284
0.130 0.174 OH 1 Orang 0.174
0.013 0.017 OH 1 Orang 0.017
0.048 0.064 OH 1 Orang 0.064

230.00 307.510 kg 6.15 Zak


893.00 1193.941 kg 0.85 M3
1,027.00 1373.099 kg 0.76 M3
- 0.000 liter liter
455.498 Kg
0.070 31.885 OH 5 Orang 6.377
0.070 31.885 OH 5 Orang 6.377
0.007 3.188 OH 1 Orang 3.188
0.004 1.822 OH 1 Orang 1.822

10.500 4782.729 Kg
0.150 68.325 Kg

19.085 M
0.520 9.924 OH 2 Orang 4.962
0.260 4.962 OH 1 Orang 4.962
0.026 0.496 OH 1 Orang 0.496
0.026 0.496 OH 1 Orang 0.496

0.031 0.592 m3
0.300 5.726 Kg
0.125 2.386 Btg

17.328 M
0.300 5.198 OH 6 Orang 0.866
0.150 2.599 OH 3 Orang 0.866
0.015 0.260 OH 1 Orang 0.260
0.015 0.260 OH 1 Orang 0.260

7.776 134.743 kg 2.69 Zak


0.023 0.399 m3 0.40 m3

17.328 M
0.200 3.466 OH 1 Orang 3.466
0.100 1.733 OH 1 Orang 1.733
0.010 0.173 OH 1 Orang 0.173
0.010 0.173 OH 1 Orang 0.173

3.250 56.316 kg 1.13 m3

21.713 M2
0.300 6.514 OH 6 Orang 1.086
0.150 3.257 OH 3 Orang 1.086
0.015 0.326 OH 1 Orang 0.326
0.015 0.326 OH 1 Orang 0.326

7.776 168.840 kg 3.38 Zak


0.023 0.499 m3 0.50 m3

21.713 M2
0.200 4.343 OH 1 Orang 4.343
0.100 2.171 OH 1 Orang 2.171
0.010 0.217 OH 1 Orang 0.217
0.010 0.217 OH 1 Orang 0.217

3.250 70.567 kg 1.41 m3

8.560 M2
0.300 2.568 OH 6 Orang 0.428
0.150 1.284 OH 3 Orang 0.428
0.015 0.128 OH 1 Orang 0.128
0.015 0.128 OH 1 Orang 0.128

7.776 66.563 kg 1.33 Zak


0.023 0.197 m3 0.20 m3

8.560 M2
0.200 1.712 OH 1 Orang 1.712
0.100 0.856 OH 1 Orang 0.856
0.010 0.086 OH 1 Orang 0.086
0.010 0.086 OH 1 Orang 0.086

3.250 27.820 kg 0.56 m3

14.259 M2
0.300 4.278 OH 6 Orang 0.713
0.150 2.139 OH 3 Orang 0.713
0.015 0.214 OH 1 Orang 0.214
0.015 0.214 OH 1 Orang 0.214

7.776 110.878 kg 2.22 Zak


0.023 0.328 m3 0.33 m3

14.259 M2
0.200 2.852 OH 1 Orang 2.852
0.100 1.426 OH 1 Orang 1.426
0.010 0.143 OH 1 Orang 0.143
0.010 0.143 OH 1 Orang 0.143

3.250 46.342 kg 0.93 m3

69.752 M2 1.000
69.752 M2
0.300 20.926 OH 6 Orang 3.488
0.150 10.463 OH 3 Orang 3.488
0.015 1.046 OH 1 Orang 1.046
0.015 1.046 OH 1 Orang 1.046

7.776 542.392 kg 10.85 Zak


0.023 1.604 m3 1.60 m3
69.752 M2
0.200 13.950 OH 1 Orang 13.950
0.100 6.975 OH 1 Orang 6.975
0.010 0.698 OH 1 Orang 0.698
0.010 0.698 OH 1 Orang 0.698

3.250 226.694 kg 4.53 m3

85.282 M2
0.300 25.585 OH 6 Orang 4.264
0.150 12.792 OH 3 Orang 4.264
0.015 1.279 OH 1 Orang 1.279
0.015 1.279 OH 1 Orang 1.279

7.776 663.153 kg 13.26 Zak


0.023 1.961 m3 1.96 m3

85.282 M2
0.200 17.056 OH 1 Orang 17.056
0.100 8.528 OH 1 Orang 8.528
0.010 0.853 OH 1 Orang 0.853
0.010 0.853 OH 1 Orang 0.853

3.250 277.167 kg 5.54 m3

15.600 M2
0.300 4.680 OH 6 Orang 0.780
0.150 2.340 OH 3 Orang 0.780
0.015 0.234 OH 1 Orang 0.234
0.015 0.234 OH 1 Orang 0.234

7.776 121.306 kg 2.43 Zak


0.023 0.359 m3 0.36 m3

15.600 M2
0.200 3.120 OH 1 Orang 3.120
0.100 1.560 OH 1 Orang 1.560
0.010 0.156 OH 1 Orang 0.156
0.010 0.156 OH 1 Orang 0.156

3.250 50.700 kg 1.01 m3

63.608 M2
0.300 19.082 OH 6 Orang 3.180
0.150 9.541 OH 3 Orang 3.180
0.015 0.954 OH 1 Orang 0.954
0.015 0.954 OH 1 Orang 0.954

7.776 494.616 kg 9.89 Zak


0.023 1.463 m3 1.46 m3

63.608 M2
0.200 12.722 OH 1 Orang 12.722
0.100 6.361 OH 1 Orang 6.361
0.010 0.636 OH 1 Orang 0.636
0.010 0.636 OH 1 Orang 0.636

3.250 206.726 kg 4.13 m3

18.460 M2
0.300 5.538 OH 6 Orang 0.923
0.150 2.769 OH 3 Orang 0.923
0.015 0.277 OH 1 Orang 0.277
0.015 0.277 OH 1 Orang 0.277

7.776 143.545 kg 2.87 Zak


0.023 0.425 m3 0.42 m3

18.460 M2
0.200 3.692 OH 1 Orang 3.692
0.100 1.846 OH 1 Orang 1.846
0.010 0.185 OH 1 Orang 0.185
0.010 0.185 OH 1 Orang 0.185

3.250 59.995 kg 1.20 m3

15.555 M2
0.300 4.667 OH 6 Orang 0.778
0.150 2.333 OH 3 Orang 0.778
0.015 0.233 OH 1 Orang 0.233
0.015 0.233 OH 1 Orang 0.233

7.776 120.956 kg 2.42 Zak


0.023 0.358 m3 0.36 m3

15.555 M2
0.200 3.111 OH 1 Orang 3.111
0.100 1.556 OH 1 Orang 1.556
0.010 0.156 OH 1 Orang 0.156
0.010 0.156 OH 1 Orang 0.156

3.250 50.554 kg 1.01 m3


138.150 M2 1.000

138.150 M2
0.300 41.445 OH 6 Orang 6.908
0.150 20.723 OH 3 Orang 6.908
0.015 2.072 OH 1 Orang 2.072
0.015 2.072 OH 1 Orang 2.072

7.776 1074.254 kg 21.49 Zak


0.023 3.177 m3 3.18 m3

138.150 M2
0.200 27.630 OH 4 Orang 6.908
0.100 13.815 OH 2 Orang 6.908
0.010 1.382 OH 1 Orang 1.382
0.010 1.382 OH 1 Orang 1.382

3.250 448.988 kg 8.98 m3

138.150 M2 1.000
0.300 41.445 OH 6 Orang 6.908
0.150 20.723 OH 3 Orang 6.908
0.015 2.072 OH 1 Orang 2.072
0.015 2.072 OH 1 Orang 2.072

7.776 1074.254 kg 21.49 Zak


0.023 3.177 m3 3.18 m3

138.150 M2
0.200 27.630 OH 4 Orang 6.908
0.100 13.815 OH 2 Orang 6.908
0.010 1.382 OH 1 Orang 1.382
0.010 1.382 OH 1 Orang 1.382

3.250 448.988 kg 8.98 m3

42.390 M
0.250 10.598 OH 2 Orang 5.299
0.125 5.299 OH 1 Orang 5.299
0.013 0.551 OH 1 Orang 0.551
0.013 0.551 OH 1 Orang 0.551

2.780 117.844 Bh 117.84 Bh


9.800 415.422 Kg 8.31 Zak
1.300 55.107 Kg 55.107 Kg
0.045 1.908 M3 1.908 M3

322.460 M
0.250 80.615 OH 5 Orang 16.123
0.125 40.308 OH 2 Orang 20.154
0.013 4.192 OH 1 Orang 4.192
0.013 4.192 OH 1 Orang 4.192

2.780 896.439 Bh 896.44 Bh


9.800 3160.108 Kg 63.20 Zak
1.300 419.198 Kg 419.198 Kg
0.045 14.511 M3 14.511 M3

36.220 M
0.250 9.055 OH 2 Orang 4.528
0.125 4.528 OH 1 Orang 4.528
0.013 0.471 OH 1 Orang 0.471
0.013 0.471 OH 1 Orang 0.471

6.630 240.139 Bh 240.14 Bh


9.800 354.956 Kg 7.10 Zak
1.300 47.086 Kg 47.086 Kg
0.045 1.630 M3 1.630 M3

123.320 M
0.250 30.830 OH 4 Orang 7.708
0.125 15.415 OH 2 Orang 7.708
0.013 1.603 OH 1 Orang 1.603
0.013 1.603 OH 1 Orang 1.603

6.630 817.612 Bh 817.61 Bh


9.800 1208.536 Kg 24.17 Zak
1.300 160.316 Kg 160.316 Kg
0.045 5.549 M3 5.549 M3

175.841 M
0.350 61.544 OH 8 Orang 7.693
0.150 26.376 OH 4 Orang 6.594
0.015 2.638 OH 1 Orang 2.638
0.018 3.165 OH 1 Orang 3.165

12.500 2198.013 Bh 2,198.01 Bh


7.500 1318.808 Kg 26.38 Zak
0.027 4.748 Kg 4.748 Kg

853.577 M
0.300 256.073 OH 12 Orang 21.339
0.150 128.037 OH 6 Orang 21.339
0.015 12.804 OH 1 Orang 12.804
0.015 12.804 OH 1 Orang 12.804

7.776 6637.415 kg 132.75 Zak


0.023 19.632 m3 19.63 m3

291.138 M
0.200 58.228 OH 8 Orang 7.278
0.100 29.114 OH 4 Orang 7.278
0.010 2.911 OH 1 Orang 2.911
0.010 2.911 OH 1 Orang 2.911

3.250 946.199 kg 18.92 m3

361.475 M

361.475 M
0.100 36.148 OH 8 Orang 4.518
0.050 18.074 OH 4 Orang 4.518
0.005 1.807 OH 1 Orang 1.807
0.005 1.807 OH 1 Orang 1.807

0.364 131.577 lbr 131.58 lbr


0.110 39.762 kg 39.76 kg

226.130 M
0.300 67.839 OH 12 Orang 5.653
0.150 33.920 OH 6 Orang 5.653
0.015 3.392 OH 1 Orang 3.392
0.015 3.392 OH 1 Orang 3.392

7.776 1758.387 kg 35.17 Zak


0.023 5.201 m3 5.20 m3

451.790 M
0.250 112.948 OH 5 Orang 22.590
0.125 56.474 OH 2 Orang 28.237
0.013 5.873 OH 1 Orang 5.873
0.013 5.873 OH 1 Orang 5.873
2.780 1255.976 Bh 1,255.98 Bh
9.800 4427.542 Kg 88.55 Zak
1.300 587.327 Kg 587.327 Kg
0.045 20.331 M3 20.331 M3

398.637 M
0.350 139.523 OH 12 Orang 11.627
0.150 59.796 OH 4 Orang 14.949
0.015 5.980 OH 1 Orang 5.980
0.018 7.175 OH 1 Orang 7.175

12.500 4982.963 Bh 4,982.96 Bh


7.500 2989.778 Kg 59.80 Zak
0.027 10.763 Kg 10.763 Kg

683.199 M
0.300 204.960 OH 12 Orang 17.080
0.150 102.480 OH 6 Orang 17.080
0.015 10.248 OH 1 Orang 10.248
0.015 10.248 OH 1 Orang 10.248

7.776 5312.555 kg 106.25 Zak


0.023 15.714 m3 15.71 m3

160.732 M
0.200 32.146 OH 8 Orang 4.018
0.100 16.073 OH 4 Orang 4.018
0.010 1.607 OH 1 Orang 1.607
0.010 1.607 OH 1 Orang 1.607

3.250 522.379 kg 10.45 m3

114.075 M
0.300 34.223 OH 12 Orang 2.852
0.100 11.408 OH 4 Orang 2.852
0.010 1.141 OH 1 Orang 1.141
0.015 1.711 OH 1 Orang 1.711

70.000 7985.250 Bh 7,985.25 Bh


11.500 1311.863 Kg 26.24 Zak
0.043 4.905 Kg 4.905 Kg

649.205 M
377.205 M
0.100 37.721 OH 6 Orang 6.287
0.050 18.860 OH 3 Orang 6.287
0.005 1.886 OH 1 Orang 1.886
0.005 1.886 OH 1 Orang 1.886

0.364 137.303 lbr 137.30 lbr


0.110 41.493 kg 41.49 kg

272.000 M
0.100 27.200 OH 4 Orang 6.800
0.050 13.600 OH 2 Orang 6.800
0.005 1.360 OH 1 Orang 1.360
0.005 1.360 OH 1 Orang 1.360

0.364 99.008 lbr 99.01 lbr


0.110 29.920 kg 29.92 kg
1.000 Unit

3.150 M

1.000 Unit

2.247 M
0.015 0.034 OH 1 Orang 0.034
0.150 0.337 OH 1 Orang 0.337
0.015 0.034 OH 1 Orang 0.034
0.0008 0.002 OH 1 Orang 0.002

1.100 2.472 M2 2.47 M3


0.050 0.112 kg 0.11 kg

8.944 M

10.974 M'
0.043 0.472 OH 1 Orang 0.472
0.043 0.472 OH 1 Orang 0.472
0.0043 0.047 OH 1 Orang 0.047
0.0021 0.023 OH 1 Orang 0.023

1.100 12.071 m' 12.07 m'


2.000 21.948 bh 0.44 bh
0.060 0.658 tube 0.658 tube

2.000 Unit

10.050 M'
0.043 0.432 OH 1 Orang 0.432
0.043 0.432 OH 1 Orang 0.432
0.0043 0.043 OH 1 Orang 0.043
0.0021 0.021 OH 1 Orang 0.021

1.100 11.055 m' 11.06 m'


2.000 20.100 bh 0.40 bh
0.060 0.603 tube 0.603 tube
2.000 Unit

0.197 M

8.000 Unit

74.800 M'
0.043 3.216 OH 1 Orang 3.216
0.043 3.216 OH 1 Orang 3.216
0.0043 0.322 OH 1 Orang 0.322
0.0021 0.157 OH 1 Orang 0.157

1.100 82.280 m' 82.28 m'


2.000 149.600 bh 2.99 bh
0.060 4.488 tube 4.488 tube

4.000 Unit
15.951 M

112.700 M'
0.043 4.846 OH 1 Orang 4.846
0.043 4.846 OH 1 Orang 4.846
0.0043 0.485 OH 1 Orang 0.485
0.0021 0.237 OH 1 Orang 0.237

1.100 123.970 m' 123.97 m'


2.000 225.400 bh 4.51 bh
0.060 6.762 tube 6.762 tube

30.000 Unit
20.160 M

98.560 M'
0.043 4.238 OH 1 Orang 4.238
0.043 4.238 OH 1 Orang 4.238
0.0043 0.424 OH 1 Orang 0.424
0.0021 0.207 OH 1 Orang 0.207

1.100 108.416 m' 108.42 m'


2.000 197.120 bh 3.94 bh
0.060 5.914 tube 5.914 tube
12.000 Unit
23.688 M
0.015 0.355 OH 1 Orang 0.355
0.150 3.553 OH 1 Orang 3.553
0.015 0.355 OH 1 Orang 0.355
0.0008 0.019 OH 1 Orang 0.019

1.100 26.057 M2 26.06 M3


0.050 1.184 kg 1.18 kg
25.860 M'
0.043 1.112 OH 1 Orang 1.112
0.043 1.112 OH 1 Orang 1.112
0.0043 0.111 OH 1 Orang 0.111
0.0021 0.054 OH 1 Orang 0.054

1.100 28.446 m' 28.45 m'


2.000 51.720 bh 1.03 bh
0.060 1.552 tube 1.552 tube

2.000 Unit
1.000 Unit
5.471 M
0.015 0.082 OH 1 Orang 0.082
0.150 0.821 OH 1 Orang 0.821
0.015 0.082 OH 1 Orang 0.082
0.0008 0.004 OH 1 Orang 0.004

1.100 6.018 M2 6.02 M3


0.050 0.274 kg 0.27 kg

106.040 M'
0.043 4.560 OH 1 Orang 4.560
0.043 4.560 OH 1 Orang 4.560
0.0043 0.456 OH 1 Orang 0.456
0.0021 0.223 OH 1 Orang 0.223

1.100 116.644 m' 116.64 m'


2.000 212.080 bh 4.24 bh
0.060 6.362 tube 6.362 tube

13.860 M
0.015 0.208 OH 1 Orang 0.208
0.150 2.079 OH 1 Orang 2.079
0.015 0.208 OH 1 Orang 0.208
0.0008 0.011 OH 1 Orang 0.011

1.100 15.246 M2 15.25 M3


0.050 0.693 kg 0.69 kg

31.200 M'
0.043 1.342 OH 1 Orang 1.342
0.043 1.342 OH 1 Orang 1.342
0.0043 0.134 OH 1 Orang 0.134
0.0021 0.066 OH 1 Orang 0.066

1.100 34.320 m' 34.32 m'


2.000 62.400 bh 1.25 bh
0.060 1.872 tube 1.872 tube
4.032 M
0.015 0.060 OH 1 Orang 0.060
0.150 0.605 OH 1 Orang 0.605
0.015 0.060 OH 1 Orang 0.060
0.0008 0.003 OH 1 Orang 0.003

1.100 4.435 M2 4.44 M3


0.050 0.202 kg 0.20 kg

13.920 M'
0.043 0.599 OH 1 Orang 0.599
0.043 0.599 OH 1 Orang 0.599
0.0043 0.060 OH 1 Orang 0.060
0.0021 0.029 OH 1 Orang 0.029

1.100 15.312 m' 15.31 m'


2.000 27.840 bh 0.56 bh
0.060 0.835 tube 0.835 tube
1.555 M

15.680 M'
0.043 0.674 OH 1 Orang 0.674
0.043 0.674 OH 1 Orang 0.674
0.0043 0.067 OH 1 Orang 0.067
0.0021 0.033 OH 1 Orang 0.033

1.100 17.248 m' 17.25 m'


2.000 31.360 bh 0.63 bh
0.060 0.941 tube 0.941 tube
4.032 M

74.800 M'
4.000 Unit
15.951 M

22.820 M'
6.000 Unit
4.032 M
12.120 M'
2.000 Unit
1.000 Unit
1.862 M

232.640 M'
48.000 Unit
32.256 M
106.040 M'
13.860 M

23.400 M'
3.024 M

22.400 M'
2.688 M

26.640 M'
3.528 M

8.000 Bh
8.000 Bh
88.000 Bh
4.000 Bh

4.000 Bh
32.000 Bh
8.000 Bh

5.000 Unit
1.000 Unit
2.000 Unit
3.000 Unit
6.000 Unit
1.000 Unit
1.000 Unit
3.000 Unit
1.500 M
6.000 Bh
7.000 Bh

5.000 M
9.000 Bh
8.000 M'
2.000 M'

0.424 M
1.667 M
3.000 Bh
4.000 M'
2.000 M'

0.184 M

10.075 M'
8.905 M'

39.033 M'
9.625 M'

8.000 Bh
72.160 M'

30.000 set
8.000 set
14.000 set
7.000 set
29.000 pcs
59.000 ttk
29.000 ttk
5.000 ttk
5.000 ttk
12.000 pcs
8.000 pcs
1.000 set
1.000 set
1.000 set

42.000 set
12.000 set
8.000 set
1.000 set
29.000 pcs
63.000 ttk
29.000 ttk
4.000 ttk
2.000 pcs
7.000 pcs
1.000 set
1.000 set
1.000 set
1301.934 M
410.728 M
29.841 M

1214.722 M
1166.253 M
114.075 M

26.270 M

7.840 M
7.840 M

35.212 M

7.118 M
155.844 Kg

39.000 M
46.300 M
46.300 M
62.600 M
71.421 M
ALOKASI WAKTU PENYELESAIAN
Dalam Minggu
Minggu Pembulatan
(1) (1)

4.000

0.733
0.611
0.183
0.183

0.948
0.948
0.284
0.284

0.750
0.375
0.038
0.038

0.069
0.009
0.001
0.003

0.344
0.344
0.172
0.098

0.371
0.371
0.037
0.037

0.069
0.009
0.001
0.003

0.454
0.454
0.227
0.130

0.529
0.529
0.053
0.053

0.429
0.429
0.045
0.045
4.000

0.948
0.948
0.284
0.284

0.948
0.948
0.284
0.284

0.750
0.375
0.038
0.038

0.948
0.948
0.284
0.284

0.750
0.375
0.038
0.038

0.948
0.948
0.284
0.284

0.750
0.375
0.038
0.038

0.022
0.003
0.000
0.001

0.107
0.107
0.053
0.031

0.115
0.115
0.012
0.012

0.183
0.025
0.002
0.009
0.911
0.911
0.455
0.260

0.709
0.709
0.071
0.071

0.124
0.124
0.037
0.037

0.495
0.248
0.025
0.025

0.155
0.155
0.047
0.047

0.620
0.310
0.031
0.031

0.061
0.061
0.018
0.018

0.245
0.122
0.012
0.012

0.102
0.102
0.031
0.031

0.407
0.204
0.020
0.020
0.498
0.498
0.149
0.149
1.993
0.996
0.100
0.100

0.609
0.609
0.183
0.183

2.437
1.218
0.122
0.122

0.111
0.111
0.033
0.033

0.446
0.223
0.022
0.022
0.454
0.454
0.136
0.136

1.817
0.909
0.091
0.091

0.132
0.132
0.040
0.040

0.527
0.264
0.026
0.026

0.111
0.111
0.033
0.033
0.444
0.222
0.022
0.022
0.987
0.987
0.296
0.296

0.987
0.987
0.197
0.197

0.987
0.987
0.296
0.296

0.987
0.987
0.197
0.197

4.000

0.757
0.757
0.079
0.079
2.303
2.879
0.599
0.599

0.647
0.647
0.067
0.067

1.101
1.101
0.229
0.229

1.099
0.942
0.377
0.452
3.048
3.048
1.829
1.829

1.040
1.040
0.416
0.416

0.645
0.645
0.258
0.258

0.808
0.808
0.485
0.485

4.000

3.227
4.034
0.839
0.839
1.661
2.136
0.854
1.025

2.440
2.440
1.464
1.464

0.574
0.574
0.230
0.230

0.407
0.407
0.163
0.244
0.898
0.898
0.269
0.269

0.971
0.971
0.194
0.194
4.000

0.005
0.048
0.005
0.000

0.067
0.067
0.007
0.003

0.062
0.062
0.006
0.003
0.459
0.459
0.046
0.022

0.692
0.692
0.069
0.034

0.605
0.605
0.061
0.030
0.051
0.508
0.051
0.003
0.159
0.159
0.016
0.008

0.012
0.117
0.012
0.001

0.651
0.651
0.065
0.032

0.030
0.297
0.030
0.002

0.192
0.192
0.019
0.009

0.009
0.086
0.009
0.000

0.086
0.086
0.009
0.004

0.096
0.096
0.010
0.005

4.000
2.000

2.000

4.000
4.000

3.000

3.000
8.000

8.000
TIME SCHEDULE

PEKERJAAN : PEMBANGUNAN LANJUTAN GEDUNG KULIAH FAKULTAS TEKNIK UNIVERSITAS TANJUNGPURA

LOKASI : KOTA PONTIANAK

MINGGU KE
URAIAN
No (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Ket.
1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
I PEKERJAAN FINISHING STRUKTUR BETON BERTULANG 9.63 Lantai 1 Lantai 1 Lantai 1 Lantai 1 Lantai 1 Lantai 1 Lantai 2 Lantai 2
4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81
II PEKERJAAN KERAMIK LANTAI, DINDING DAN PLAFOND 38.51 Lantai 1 Lantai 1 Lantai 1 Lantai 1 Lantai 2 Lantai 2 Lantai 2 Lantai 2
2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25
III PEKERJAAN PINTU, JENDELA & VENTILASI 18.01 Lantai 1 Lantai 1 Lantai 1 Lantai 1 Lantai 2 Lantai 2 Lantai 2 Lantai 2
0.12 0.12 0.12 0.12
IV PEKERJAAN PENGUNCI & PENGGANTUNG 0.48 Lantai 1 Lantai 2
0.51 0.51 0.51 0.51
V PEKERJAAN TOILET 2.03
0.4683 0.4683 0.4683 0.4683
VI PEKERJAAN INSTALASI AIR BERSIH, KOTOR & HUJAN 1.87
1.2535 1.2535 1.2535 1.2535 1.2535 1.2535
VII PEKERJAAN ELEKTRIKAL 7.52
1.2196 1.2196 1.2196 1.2196 1.2196 1.2196 1.2196 1.2196
VIII PEKERJAAN PENGECATAN 9.76
1.5233 1.5233 1.5233 1.5233 1.5233 1.5233 1.5233 1.5233
IX PEKERJAAN LAIN-LAIN 12.19

Jumlah Nilai Pekerjaan 100.00


Kemajuan Pekerjaan Mingguan 1.67 6.49 6.49 7.74 9.52 9.52 9.52 10.74 11.06 4.99 4.99 5.62 3.37 3.37 3.37 1.52
Kemajuan Pekerjaan Komulatif Mingguan 1.67 8.16 14.64 22.38 31.91 41.43 50.95 61.69 72.75 77.75 82.74 88.37 91.74 95.11 98.48 100.00
Pontianak, 09 Ag
Nomor : 29/PEN-VES/VIII/2016
Lampiran : 1 (satu) File

Kepada Yth.
Pokja konstruksi I
Gedung BAK/BPKHM Lantai III Universitas Tanjungpura
di -
Pontianak

Perihal : Penawaran Pekerjaan Pembangunan Gedung Kuliah


Teknik Universitas Tanjungpura

Sehubungan dengan Pengumuman Pelelangan Pemilihan Langsung


Pascakualifikasi dan Dokumen Pengadaan Nomor : 9085/UN22.13/PL/2016
Agustus 2016 dan setelah kami mempelajari dengan seksama Dokumen Peng
Berita Acara Pemberian Penjelasan serta Adendum Dokumen Pengadaan, deng
mengajukan penawaran untuk Pekerjaan : Pembangunan Lanjutan Gedu
Fakultas Teknik Universitas Tanjungpura
Sebesar Rp ### Terbilang (Dua Milyar Tiga Puluh Tujuh Juta

Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercan


Dokumen Pengadaan untuk melaksanakan pekerjaan tersebut diatas

Penawaran ini berlaku sejak batas akhir pemasukan Dokumen Penawaran Sam
tanggal 11 Oktober 2016

Sesuai dengan persyaratan, bersama surat penawaran ini kami lampirkan :

1. File/scan Daftar Kuantitas dan Harga


2. File/Scan Dokumen Penawaran Teknis, terdiri dari
- Metoda Pelaksanaan
- Jadwal Waktu Pelaksanaan
- Daftar Harga Satuan Dasar Upah, Bahan dan Peralatan
- Dukungan Beton Ready Mix dari produsen Beton Ready Mix
- Dukungan Besi Tulangan Beton dari supplier/Distributor besi tulangan beton
- Daftar Personil inti
- Jenis, kapasitas, komposisi dan jumlah peralatan utama minimal yang dibutuh
dengan isian kualifikasi)
- Rencana Keselamatan dan Kesehatan Kerja Kontrak (RK3K)
- Spesifikasi Teknis
3. Analisa Teknis Satuan Pekerjaan
4. Analisa Harga Satuan Pekerjaan
5. Formulir rekapitulasi perhitungan Tingkt Komponen Dalam Negeri (TKDN), ap
memenuhi syarat untuk diberi preferensi harga; dan
6. Dokumen Kualifikasi

Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup


tunduk pada semua ketentuan yang tercantum dalam Dokumen Pengadaan

Penawar,
PT. VISTA EMAS SE

ENDANG MASRONI, S
Direktur Utama
anak, 09 Agustus 2016

ng Kuliah Fakultas

Langsung dengan
3/PL/2016 tanggal 2
umen Pengadaan dan
daan, dengan ini kami
tan Gedung Kuliah

Tujuh Juta Rupiah)

ang tercantum dalam

waran Sampai dengan

irkan :

an beton

ng dibutuhkan (sesuai

TKDN), apabila
n sanggup dan akan
gadaan

nawar,
EMAS SEJATI

ASRONI, SH, MH
tur Utama
REKAPITULASI BIAYA PEKERJAAN

PEKERJAAN : PEMBANGUNAN LANJUTAN GEDUNG KULIAH


UNIVERSITAS TANJUNGPURA
LOKASI : KOTA PONTIANAK
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN

1 2

I PEKERJAAN FINISHING STRUKTUR BETON BERTULANG


II PEKERJAAN KERAMIK LANTAI, DINDING DAN PLAFOND
III PEKERJAAN PINTU, JENDELA & VENTILASI
IV PEKERJAAN PENGUNCI & PENGGANTUNG
V PEKERJAAN TOILET
VI PEKERJAAN INSTALASI AIR BERSIH, KOTOR & HUJAN
VII PEKERJAAN ELEKTRIKAL
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN LAIN-LAIN

JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN
ASI BIAYA PEKERJAAN

GUNAN LANJUTAN GEDUNG KULIAH FAKULTAS TEKNIK


TAS TANJUNGPURA

TOTAL JUMLAH
HARGA
(Rp.)
3

178,390,779.88
713,138,788.39
333,609,790.00
8,865,402.00
37,612,369.63
34,690,663.89
139,282,000.00
180,686,587.00
225,679,405.10

1,851,955,785.88
185,195,578.59
2,037,151,364.47
2,037,000,000.00

Pontianak, 09 Agustus 2016


Penawar,
PT. VISTA EMAS SEJATI

ENDANG MASRONI, SH, MH


Direktur Utama
BILL OF QUANTITY (B
PEKERJAAN : PEMBANGUNAN LANJUTAN GEDUNG KULIAH FAKULTAS TEKNIK UNIVERSITAS TANJUNG
LOKASI : KOTA PONTIANAK
TAHUN ANGGARAN : 2016

VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
I. PEKERJAAN FINISHING STRUKTUR BETON BERTULANG
LANTAI I
` Jenggotan Uk. 10/50 cm (sloof 20/50.A)
- Plesteran Jenggotan Uk. 10/50 cm 85.500 M
2 Kolom Lt.1 Ukuran 35/35 cm
- Plesteran Kolom 35/35 cm 132.720 M
- Acian Kolom Teras 26.250 M
3 Kolom lt. 1 Praktis Ukuran 7/7 cm ( 40%)
- Beton K-100 0.505 M
- Tulangan 172.054 Kg
- Bekisting 9.979 M
4 Kolom Lt.1 Praktis Ukuran 7/7 cm ( 40%)
- Beton K-100 0.666 M
- Tulangan 226.781 Kg
- Bekisting 14.250 M
5 Tangga Beton
a. Keramik 30 x 60 cm Polish 24.003 M
b. Plesteran Bawah Tangga 19.169 M
C. Railing Tangga, Void Tangga & Void Lt.2 (Finishing) 22.240 M'

LANTAI II
1 Kolom Lt. II Ukuran 35/35 cm
- Plesteran Kolom 35/35 cm 43.050 M
2 Balok Lt. II Ukuran 15/45 cm
- Plesteran Balok Ukuran 15/45 cm 20.835 M
- Acian Plesteran Ukuran 15/45 cm 20.835 M
3 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Bag.Roster)
- Plesteran Jenggotan Bawah Balok Ukuran 15/45 cm (Roster) 120.000 M
- Acian Jenggotan Bawah Balok Ukuran 15/45 cm 120.000 M
4 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Dudukan Bata Merah)
- Plesteran Jenggotan (Dudukan Bata Merah) 48.480 M
- Acian Jenggotan Bawah Balok Ukuran 15/45 cm 48.480 M
5 Kolom Praktis Lt.II Ukuran 7/7 cm
VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
- Beton K-100 0.157 M
- Tulangan U24 53.473 Kg
- Bekisting 3.108 M
6 Balok Praktis Lt.II Ukuran 7/7 cm
- Beton K-100 1.337 M
- Tulangan U24 455.498 Kg
- Bekisting 19.085 M
7 Balok Dack Ukuran 20/50 cm elv. 7.25
- Plesteran Balok Dack 20/50 cm (teras) 17.328 M
- Acian Balok Dack 20/50 cm (teras) 17.328 M
8 Balok Dack Ukuran 20/45 cm elv. 7.25
- Plesteran Balok Dack 20/45 cm (teras) 21.713 M
- Acian Balok Dack 20/45 cm (teras) 21.713 M
9 Balok Dack Ukuran 20/40 cm elv. 7.25
- Plesteran Balok Dack 20/40 cm (teras) 8.560 M
- Acian Balok Dack 20/40 cm (teras) 8.560 M
10 Balok Dack Ukuran 15/45 cm elv. 7.25
- Plesteran Balok Dack 15/45 cm (teras) 14.259 M
- Acian Balok Dack 15/45 cm (teras) 14.259 M
11 Plat Dack Beton elv. 7.25 (Teras)
- Waterproofing Plat Dack 69.752 M
- Plesteran Plat Dack (bag. Atas) 69.752 M
- Acian Plat Dack (bag.atas) 69.752 M
- Plesteran Plat Dack (bag. bawah expose plafond) 85.282 M
- Acian Plat Dack (bag.bawah expose plafond) 85.282 M
12 Balok Dack Ukuran 20/50 cm elv. 7.25
- Plesteran Balok Dack 20/50 cm 15.600 M
- Acian Balok Dack 20/50 cm 15.600 M
VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
13 Balok Dack Ukuran 20/45 cm elv. 7.25
- Plesteran Balok Dack 20/45 cm 63.608 M
- Acian Balok Dack 20/45 cm 63.608 M
14 Balok Dack Ukuran 20/40 cm elv. 7.25
- Plesteran Balok Dack 20/40 cm 18.460 M
- Acian Balok Dack 20/40 cm 18.460 M
15 Balok Dack Ukuran 15/45 cm elv. 7.25
- Plesteran Balok Dack 15/45 cm 15.555 M
- Acian Balok Dack 15/45 cm 15.555 M
16 Plat Dack Beton elv. 7.25
- Waterproofing Plat Dack 138.150 M
- Plesteran Plat Dack (bag. Atas) 138.150 M
- Acian Plat Dack (bag.atas) 138.150 M
- Plesteran Plat Dack (bag. bawah expose plafond) 138.150 M
- Acian Plat Dack (bag.bawah expose plafond) 138.150 M

II. PEKERJAAN KERAMIK LANTAI, DINDING DAN PLAFOND


LANTAI I
1 Keramik Lantai Uk. 60x60 UnPolysh (Teras) 42.390 M
2 Keramik Lantai Uk. 60x60 Polish 322.460 M
3 Keramik Lantai WC/KM & janitor Uk. 40x40 cm Unpolish 36.220 M
4 Keramik Dinding WC/KM Uk. 40x40 cm Polish 123.320 M
5 Dinding Batako ( 36% ) 175.841 M
6 Plesteran Dinding 853.577 M
7 Acian Batako Dinding Luar & Kolom Bag. Luar 291.138 M
8 Rangka Plafond Metal Furing 361.475 M
9 Plafond Gypsum 361.475 M
10 Plesteran Bawah Plat Lantai (Teras Samping&Bawah Lantai) 226.130 M

LANTAI II
1 Keramik Lantai Uk. 60x60 Polish 451.790 M
2 Dinding Batako 398.637 M
3 Plesteran Dinding 683.199 M
4 Acian Batako Dinding Luar & Kolom Bag.Luar 160.732 M
5 Dinding Bata Merah 114.075 M
6 Rangka Plafond Metal Furing 649.205 M
7 Plafond Gypsum 377.205 M
8 Plafond GRC 272.000 M

III. PEKERJAAN PINTU, JENDELA & VENTILASI


VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
LANTAI I
1 Pintu Type P1
- Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm 2 daun 1.000 Unit
- Aluminum Composit Panel 3.150 M
2 Pintu Type PJ1
- Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm 2 daun 1.000 Unit
- Kaca t = 8 mm 2.247 M
- Aluminum Composit Panel 8.944 M
3 Pintu Type P2
- Kusen Aluminium 3" Silver 10.974 M'
- Pintu Double Multipleks 4 mm fin. HPL 2 Daun 2.000 Unit
4 Pintu Type P3
- Kusen Aluminium 3" Silver 10.050 M'
- Pintu Double Multipleks 4 mm fin. HPL 1 Daun 2.000 Unit
5 Pintu Type P4
- Kusen Belian 0.197 M
- Pintu Belian 1 Daun 8.000 Unit
6 Pintu Type PV1
- Kusen Aluminium 3" Silver 74.800 M'
- Pintu Double Multipleks 4 mm fin. HPL 2 Daun 4.000 Unit
- Ventilasi Jalusi Aluminium 15.951 M
7 Jendela Type JV1
- Kusen Aluminium 3" Silver 112.700 M'
- Jendela kaca Hidup Kunci Swing (70x98 cm) 30.000 Unit
- Ventilasi Jalusi Aluminium 20.160 M
8 Jendela Type J1.a
- Kusen Aluminium 3" Silver 98.560 M'
- Jendela kaca Hidup Kunci Swing (102x74 cm) 12.000 Unit
- Kaca t = 5 mm 23.688 M
VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
9 Jendela Type J2.a
- Kusen Aluminium 3" Silver 25.860 M'
- Jendela kaca Hidup Kunci Swing (102x70 cm) 2.000 Unit
- Jendela kaca Hidup Kunci Swing (54x70 cm) 1.000 Unit
- Kaca t = 5 mm 5.471 M
10 Ventilasi Type V1
- Kusen Aluminium 3" Silver 106.040 M'
- Kaca t = 5 mm 13.860 M
11 Ventilasi Type V2
- Kusen Aluminium 3" Silver 31.200 M'
- Kaca t = 5 mm 4.032 M
12 Ventilasi Type V3
- Kusen Aluminium 3" Silver 13.920 M'
- Ventilasi Kaca Hidup Engsel Dorong 1.555 M
13 Ventilasi Type V6
- Kusen Aluminium 3" Silver 15.680 M'
- Ventilasi Jalusi Aluminium 4.032 M

LANTAI II
1 Pintu Type PV1
- Kusen Aluminium 3" Silver 74.800 M'
- Pintu Double Multipleks 4 mm fin. HPL 2 Daun 4.000 Unit
- Ventilasi Jalusi Aluminium 15.951 M
2 Jendela Type J1.b
- Kusen Aluminium 3" Silver 22.820 M'
- Jendela kaca Hidup Kunci Swing (102x74 cm) 6.000 Unit
- Kaca t = 5 mm 4.032 M
3 Jendela Type J2.b
- Kusen Aluminium 3" Silver 12.120 M'
- Jendela kaca Hidup Kunci Swing (102x70 cm) 2.000 Unit
- Jendela kaca Hidup Kunci Swing (54x70 cm) 1.000 Unit
- Kaca t = 5 mm 1.862 M
4 Jendela Type JV2
- Kusen Aluminium 3" Silver 232.640 M'
- Jendela kaca Hidup Kunci Swing (70x98 cm) 48.000 Unit
- Ventilasi Jalusi Aluminium 32.256 M
5 Ventilasi Type V1
- Kusen Aluminium 3" Silver 106.040 M'
- Kaca t = 5 mm 13.860 M
6 Ventilasi Type V2
VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
- Kusen Aluminium 3" Silver 23.400 M'
- Kaca t = 5 mm 3.024 M
7 Ventilasi Type V4
- Kusen Aluminium 3" Silver 22.400 M'
- Ventilasi Jalusi Aluminium 2.688 M
8 Ventilasi Type V5
- Kusen Aluminium 3" Silver 26.640 M'
- Ventilasi Jalusi Aluminium 3.528 M

IV. PEKERJAAN PENGUNCI & PENGGANTUNG


LANTAI I
1 Kunci Pintu 2 Slag 8.000 Bh
2 Kunci Pintu Bulat (P4) 8.000 Bh
3 Engsel Pintu 88.000 Bh
4 Slot Tanam Pintu (P2 & PV1) 4.000 Bh

LANTAI II
1 Kunci Pintu 2 Slag 4.000 Bh
2 Engsel Pintu 32.000 Bh
3 Slot Tanam Pintu (PV1) 8.000 Bh

V. PEKERJAAN TOILET
1 Kloset Jongkok 5.000 Unit
2 Kloset Duduk Setara Toto 1.000 Unit
3 Urinoir Setara Toto 2.000 Unit
4 Dinding Pemisah Urinoir Setara Toto 3.000 Unit
5 Bak Air Lapis Keramik 6.000 Unit
VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
6 Shower Spray setara Toto 1.000 Unit
7 Stop kran Shower Spray 1.000 Unit
8 Wastafel Lengkap Setara Toto 3.000 Unit
9 Kaca Cermin 1.500 M
10 Kran Air 6.000 Bh
11 Floor Drain Stainless Setara Toto 7.000 Bh
12 Beerfut (gorong dia.80 cm) Type 1
- Galian tanah 5.000 M
- Gorong dia. 80 cm 9.000 Bh
- Pipa pvc. Dia. 2 '(pipa distribusi) 8.000 M'
- Pipa pvc. Dia. 1/2 (pipa hawa) 2.000 M'
- Penutup Atas:
a. Cor Beton K175 t = 8 cm 0.424 M
13 Beerfut (gorong dia.80 cm) Type 2
- Galian tanah 1.667 M
- Gorong dia. 80 cm 3.000 Bh
- Pipa pvc. Dia. 2 '(pipa distribusi) 4.000 M'
- Pipa pvc. Dia. 1/2 (pipa hawa) 2.000 M'
- Penutup Atas:
a. Cor Beton K175 t = 8 cm 0.184 M

VI. PEKERJAAN INSTALASI AIR BERSIH, KOTOR & HUJAN


1 Instalasi Air Kotor
- Pipa PVC AW 4' 10.075 M'
- Pipa PVC AW 3' 8.905 M'
2 Instalasi Air Bersih
- Pipa PVC AW 1' 39.033 M'
- Pipa PVC AW 2' 9.625 M'
3 Instalasi Air Hujan
- Roof Drain Metal 8.000 Bh
- Pipa PVC AW 3' 72.160 M'

VII. PEKERJAAN ELEKTRIKAL


LANTAI I
1 SL 23 watt setara philips + Pemasangan 30.000 set
2 SL 11 watt setara philips + Pemasangan 8.000 set
3 SL 9 watt setara philips + Pemasangan 14.000 set
4 Baret Persegi SL 23 watt + Pemasangan 7.000 set
5 Stop kontak 29.000 pcs
6 Instalasi Listrik+Kabel Suprime+Konduit 59.000 ttk
VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4
7 Instalasi Stop Kontak+Kabel Suprime+Konduit 29.000 ttk
8 Instalasi listrik AC 5.000 ttk
9 Instalasi Proyektor 5.000 ttk
10 Saklar Tunggal setara panasonic 12.000 pcs
11 Saklar Double setara panasonic 8.000 pcs
12 Panel Utama 1.000 set
13 Panel LT 1 1.000 set
14 Grounding 1.000 set

LANTAI II
1 SL 23 watt setara philips + Pemasangan 42.000 set
2 SL 18 watt setara philips + Pemasangan 12.000 set
3 SL 11 watt setara philips + Pemasangan 8.000 set
4 Baret Persegi SL 23 watt + Pemasangan 1.000 set
5 Stop kontak 29.000 pcs
6 Instalasi Listrik+Kabel Suprime+Konduit 63.000 ttk
7 Instalasi Stop Kontak+Kabel Suprime+Konduit 29.000 ttk
8 Instalasi Proyektor 4.000 ttk
9 Saklar Triple setara panasonic 2.000 pcs
10 Saklar Double setara panasonic 7.000 pcs
11 Panel LT 2 1.000 set
12 Grounding 1.000 set
13 Penangkal Petir 1.000 set

VIII. PEKERJAAN PENGECATAN


LANTAI I
1 Cat Tembok Interior 1,301.934 M
2 Cat Tembok Exterior 410.728 M
3 Cat Kilat 29.841 M
VOLUME
NO URAIAN PEKERJAAN SAT
TAHAP II

1 2 4

LANTAI II
1 Cat Tembok Interior 1,214.722 M
2 Cat Tembok Exterior 1,166.253 M
3 Cat Finishing Bata Merah 114.075 M

IX. PEKERJAAN LAIN-LAIN


1 Tangga di teras
- Keramik 30 x 60 cm Polish 26.270 M
2 Konsul Atas Ventilasi (V4)
- Plesteran Konsul Atas Ventilasi 7.840 M
- Acian Konsul Atas Ventilasi 7.840 M
Finishing Arsitektural
3 Dinding Roster (press) 35.212 M
4 Ornamen Sirip Beton di Sun Shading Woodplank
- Beton K-175 7.118 M
- Tulangan (12) 155.844 Kg
5 Ornamen Sirip Beton di Sun Shading Woodplank
- Bekisting Balok 39.000 M
- Plesteran Ornamen Sirip Beton 46.300 M
- Acian Ornamen Sirip Beton 46.300 M
- Sun Shading Woodplank + Rangka Besi Type 1 (Bag Teras) 62.600 M
- Sun Shading Woodplank + Rangka Besi Type 2 71.421 M
BILL OF QUANTITY (BQ)
ANGUNAN LANJUTAN GEDUNG KULIAH FAKULTAS TEKNIK UNIVERSITAS TANJUNGPURA
PONTIANAK

VOLUME KODE HARGA SATUAN SUB TOTA


URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7
RUKTUR BETON BERTULANG

of 20/50.A)
/50 cm 85.500 M 4.4.2.3 66,955.42 5

132.720 M 4.4.2.3 66,955.42 8


26.250 M 4.4.2.27 39,546.20 1
7 cm ( 40%)
0.505 M 4.1.1.4.a 1,032,370.85
172.054 Kg 4.1.1.17.a 14,665.95 2
9.979 M 4.1.1.20.a 171,252.25 1
7 cm ( 40%)
0.666 M 4.1.1.4.a 1,032,370.85
226.781 Kg 4.1.1.17.a 14,665.95 3
14.250 M 4.1.1.20.a 171,252.25 2

h 24.003 M 4.4.3.4.C 467,482.13 11


19.169 M 4.4.2.3 66,955.42 1
ga & Void Lt.2 (Finishing) 22.240 M' 900,000.00 20

43.050 M 4.4.2.3 66,955.42 2

45 cm 20.835 M 4.4.2.3 66,955.42 1


45 cm 20.835 M 4.4.2.27 39,546.20
Ukuran 15/45 cm (Bag.Roster)
h Balok Ukuran 15/45 cm (Roster) 120.000 M 4.4.2.3 66,955.42 8
ok Ukuran 15/45 cm 120.000 M 4.4.2.27 39,546.20 4
Ukuran 15/45 cm (Dudukan Bata Merah)
kan Bata Merah) 48.480 M 4.4.2.3 66,955.42 3
ok Ukuran 15/45 cm 48.480 M 4.4.2.27 39,546.20 1
7 cm
VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7
0.157 M 4.1.1.4.a 1,032,370.85
53.473 Kg 4.1.1.17.a 14,665.95
3.108 M 4.1.1.20.a 171,252.25
7 cm
1.337 M 4.1.1.4.a 1,032,370.85 1
455.498 Kg 4.1.1.17.a 14,665.95 6
19.085 M 4.1.1.20.a 171,252.25 3
elv. 7.25
cm (teras) 17.328 M 4.4.2.3 66,955.42 1
(teras) 17.328 M 4.4.2.27 39,546.20
elv. 7.25
cm (teras) 21.713 M 4.4.2.3 66,955.42 1
(teras) 21.713 M 4.4.2.27 39,546.20
elv. 7.25
cm (teras) 8.560 M 4.4.2.3 66,955.42
(teras) 8.560 M 4.4.2.27 39,546.20
elv. 7.25
cm (teras) 14.259 M 4.4.2.3 66,955.42
(teras) 14.259 M 4.4.2.27 39,546.20
ras)
69.752 M 8.1.1.5. 89,355.00 6
tas) 69.752 M 4.4.2.3 66,955.42 4
69.752 M 4.4.2.27 39,546.20 2
awah expose plafond) 85.282 M 4.4.2.3 66,955.42 5
h expose plafond) 85.282 M 4.4.2.27 39,546.20 3
elv. 7.25
cm 15.600 M 4.4.2.3 66,955.42 1
15.600 M 4.4.2.27 39,546.20
VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7
elv. 7.25
cm 63.608 M 4.4.2.3 66,955.42 4
63.608 M 4.4.2.27 39,546.20 2
elv. 7.25
cm 18.460 M 4.4.2.3 66,955.42 1
18.460 M 4.4.2.27 39,546.20
elv. 7.25
cm 15.555 M 4.4.2.3 66,955.42 1
15.555 M 4.4.2.27 39,546.20

138.150 M 8.1.1.5. 89,355.00 12


tas) 138.150 M 4.4.2.3 66,955.42 9
138.150 M 4.4.2.27 39,546.20 5
awah expose plafond) 138.150 M 4.4.2.3 66,955.42 9
h expose plafond) 138.150 M 4.4.2.27 39,546.20 5

NTAI, DINDING DAN PLAFOND

Polysh (Teras) 42.390 M 4.4.3.4.B 337,364.23 14


lish 322.460 M 4.4.3.4.A 335,765.73 108
nitor Uk. 40x40 cm Unpolish 36.220 M 4.4.3.4.a 222,091.68 8
40x40 cm Polish 123.320 M 4.4.3.4 208,367.58 25
175.841 M 4.4.1.17.b 102,169.45 17
853.577 M 4.4.2.3 64,412.60 54
Kolom Bag. Luar 291.138 M 4.4.2.27 39,546.20 11
361.475 M 8.1.1.2. 138,000.00 49
361.475 M 4.5.1.7. 53,863.93 19
(Teras Samping&Bawah Lantai) 226.130 M 4.4.2.3 64,412.60 14

lish 451.790 M 4.4.3.4.A 335,765.73 151


398.637 M 4.4.1.17.b 102,169.45 40
683.199 M 4.4.2.3 64,412.60 44
Kolom Bag.Luar 160.732 M 4.4.2.27 39,546.20 6
114.075 M 4.4.1.9 188,775.95 21
649.205 M 8.1.1.2. 138,000.00 89
377.205 M 4.5.1.7. 53,863.93 20
272.000 M 4.5.1.7.1 52,269.80 14

ELA & VENTILASI


VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7

m - uk. 87 x 213,5 cm 2 daun 1.000 Unit 8.1.1.7 9,591,000.00 9


3.150 M 8.1.1.8 1,035,000.00 3

m - uk. 87 x 213,5 cm 2 daun 1.000 Unit 8.1.1.7 9,591,000.00 9


2.247 M 4.6.2.18. 406,155.85
8.944 M 8.1.1.8 1,035,000.00 9

10.974 M' 4.2.1.11.a 128,925.35 1


m fin. HPL 2 Daun 2.000 Unit 2,950,000.00 5

10.050 M' 4.2.1.11.a 128,925.35 1


m fin. HPL 1 Daun 2.000 Unit 1,450,000.00 2

0.197 M 4.6.1.28.a 16,043,650.00 3


8.000 Unit 1,450,000.00 11

74.800 M' 4.2.1.11.a 128,925.35 9


m fin. HPL 2 Daun 4.000 Unit 2,925,000.00 11
15.951 M 490,000.00 7

112.700 M' 4.2.1.11.a 128,925.35 14


Swing (70x98 cm) 30.000 Unit 605,000.00 18
20.160 M 485,000.00 9

98.560 M' 4.2.1.11.a 128,925.35 12


Swing (102x74 cm) 12.000 Unit 635,000.00 7
23.688 M 4.6.2.17. 197,430.85 4
VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7

25.860 M' 4.2.1.11.a 128,925.35 3


Swing (102x70 cm) 2.000 Unit 635,000.00 1
Swing (54x70 cm) 1.000 Unit 485,000.00
5.471 M 4.6.2.17. 197,430.85 1

106.040 M' 4.2.1.11.a 128,925.35 13


13.860 M 4.6.2.17. 197,430.85 2

31.200 M' 4.2.1.11.a 128,925.35 4


4.032 M 4.6.2.17. 197,430.85

13.920 M' 4.2.1.11.a 128,925.35 1


l Dorong 1.555 M 295,000.00

15.680 M' 4.2.1.11.a 128,925.35 2


4.032 M 490,000.00 1

74.800 M' 4.2.1.11.a 128,925.35 9


m fin. HPL 2 Daun 4.000 Unit 2,925,000.00 11
15.951 M 490,000.00 7

22.820 M' 4.2.1.11.a 128,925.35 2


Swing (102x74 cm) 6.000 Unit 635,000.00 3
4.032 M 4.6.2.17. 197,430.85

12.120 M' 4.2.1.11.a 128,925.35 1


Swing (102x70 cm) 2.000 Unit 635,000.00 1
Swing (54x70 cm) 1.000 Unit 485,000.00
1.862 M 4.6.2.17. 197,430.85

232.640 M' 4.2.1.11.a 128,925.35 29


Swing (70x98 cm) 48.000 Unit 605,000.00 29
32.256 M 485,000.00 15

106.040 M' 4.2.1.11.a 128,925.35 13


13.860 M 4.6.2.17. 197,430.85 2
VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7
23.400 M' 4.2.1.11.a 128,925.35 3
3.024 M 4.6.2.17. 197,430.85

22.400 M' 4.2.1.11.a 128,925.35 2


2.688 M 490,000.00 1

26.640 M' 4.2.1.11.a 128,925.35 3


3.528 M 490,000.00 1

PENGGANTUNG

8.000 Bh 4.6.2.2 128,225.00 1


8.000 Bh 8.1.1.14. 69,000.00
88.000 Bh 4.6.2.5 51,955.85 4
4.000 Bh 45,000.00

4.000 Bh 4.6.2.2 128,225.00


32.000 Bh 4.6.2.5 51,955.85 1
8.000 Bh 45,000.00

5.000 Unit 8.1.1.9 217,350.00 1


1.000 Unit 5.1.1.1. 4,046,045.00 4
2.000 Unit 5.1.1.2.a 2,453,870.00 4
ara Toto 3.000 Unit 1,490,000.00 4
6.000 Unit 790,000.00 4
VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7
1.000 Unit 8.1.1.10 262,200.00
1.000 Unit 145,000.00
o 3.000 Unit 5.1.1.12.a 1,506,539.10 4
1.500 M 8.1.1.12. 333,500.00
6.000 Bh 5.1.1.19 90,318.13
Toto 7.000 Bh 8.1.1.12 363,400.00 2
ype 1
5.000 M 2.3.1.1 77,050.00
9.000 Bh 545,000.00 4
busi) 8.000 M' 5.1.1.29 157,780.00 1
a) 2.000 M' 5.1.1.25 37,909.75

0.424 M 4.1.1.5 1,234,156.58


ype 2
1.667 M 2.3.1.1 77,050.00
3.000 Bh 545,000.00 1
busi) 4.000 M' 5.1.1.29 157,780.00
a) 2.000 M' 5.1.1.25 37,909.75

0.184 M 4.1.1.5 1,234,156.58

R BERSIH, KOTOR & HUJAN

10.075 M' 5.1.1.32. 471,528.75 4


8.905 M' 5.1.1.31. 302,191.25 2

39.033 M' 5.1.1.27 83,024.25 3


9.625 M' 5.1.1.29 157,780.00 1

8.000 Bh 8.1.1.11 85,445.00


72.160 M' 5.1.1.31. 302,191.25 21

asangan 30.000 set 195,000.00 5


sangan 8.000 set 159,000.00 1
angan 14.000 set 98,000.00 1
asangan 7.000 set 745,000.00 5
29.000 pcs 24,500.00
Konduit 59.000 ttk 295,000.00 17
VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7
rime+Konduit 29.000 ttk 295,000.00 8
5.000 ttk 345,000.00 1
5.000 ttk 490,000.00 2
12.000 pcs 45,000.00
8.000 pcs 64,000.00
1.000 set 9,850,000.00 9
1.000 set 9,850,000.00 9
1.000 set 985,000.00

asangan 42.000 set 195,000.00 8


asangan 12.000 set 175,000.00 2
sangan 8.000 set 159,000.00 1
asangan 1.000 set 745,000.00
29.000 pcs 24,500.00
Konduit 63.000 ttk 295,000.00 18
rime+Konduit 29.000 ttk 295,000.00 8
4.000 ttk 490,000.00 1
2.000 pcs 45,000.00
7.000 pcs 64,000.00
1.000 set 9,850,000.00 9
1.000 set 985,000.00
1.000 set 19,500,000.00 19

1,301.934 M 4.7.1.10.a 40,868.70 53


410.728 M 4.7.1.10.b 45,488.25 18
29.841 M 4.7.1.4. 1 49,209.65 1
VOLUME KODE HARGA SATUAN SUB TOTA
URAIAN PEKERJAAN SAT
TAHAP II ANALISA (Rp.) (Rp

2 4 5 6 7

1,214.722 M 4.7.1.10.a 40,868.70 49


1,166.253 M 4.7.1.10.b 45,488.25 53
114.075 M 4.7.1.10.c 40,600.98 4

26.270 M 4.4.3.4.C 467,482.13 12

lasi 7.840 M 4.4.2.3 64,412.60


7.840 M 4.4.2.27 39,546.20

35.212 M 4.4.1.23 664,307.85 23


Shading Woodplank
7.118 M 4.1.1.5.a 1,234,156.58 8
155.844 Kg 4.1.1.17.a 14,665.95 2
Shading Woodplank
39.000 M 4.1.1.23.a 368,209.30 14
ton 46.300 M 4.4.2.3 66,955.42 3
46.300 M 4.4.2.27 39,546.20 1
Rangka Besi Type 1 (Bag Teras) 62.600 M 1,750,000.00 109
Rangka Besi Type 2 71.421 M 690,000.00 49

JUM

JUMLAH T
ENGINEERS ESTIMATE
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH FAK.TEKNIK UNTAN (TOTAL)
LOKASI : KOTA PONTIANAK
TAHUN ANGGARAN : 2015

VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
I. PEKERJAAN PENDAHULUAN
1 Bowplank 1.000 Lsm
2 Papan Nama Proyek 1.000 Lsm
3 Pembersihan Lokasi 1.000 Lsm
4 Listrik dan Air Kerja 1.000 Lsm
5 Direksikeet 1.000 Lsm

II. PEKERJAAN PONDASI


1 Cerucuk dia. 15 - 1200 cm+pemancangan #REF! Btg
2 Cerucuk dia. 8/10 - 400 cm+pemancangan Btg
3 Galian Tanah M
4 Urugan Tanah Kembali #VALUE! M
5 Urugan Pasir tebal 15 cm #REF! M
6 Lantai kerja tebal 5 cm M
7 Pondasi Type P1
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Bekisting Pondasi M
8 Pondasi Type P2
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Bekisting Pondasi M
9 Pondasi Type P3
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Bekisting Pondasi M
10 Pondasi Type P4
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Bekisting Pondasi M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
11 Pondasi Type P5
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Bekisting Pondasi M
12 Kolom Pondasi Uk. 35/35 cm (P1, P2, P3 & P4)
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Kolom M
13 Kolom Pondasi Uk. 25/25 cm (P5)
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Kolom M

III. PEKERJAAN STRUKTUR BETON BERTULANG


LANTAI I
1 Balok Sloof Uk. 20/50 cm elv.00
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Sloof M
2 Balok Sloof Uk. 20/40 cm elv. 00
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Sloof M
4 Balok Sloof Uk. 15/30 cm elv. 00
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Sloof M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
5 Jenggotan Uk. 10/50 cm (sloof 20/50.A)
- Beton K-225 (Ready Mix) #REF! M
- Wiremesh M6 Kg
- Bekisting Sloof M
- Plesteran Jenggotan Uk. 10/50 cm M
6 Balok Sloof Uk. 25/50 cm elv. -1.00
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Sloof M
7 Balok Sloof Uk. 20/50 cm elv. -1.00
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Sloof M
8 Balok Sloof Uk. 20/30 cm elv. -1.00
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Sloof M
9 Balok Sloof Uk. 15/30 cm elv. -1.00
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Sloof M
8 Kolom Lt.1 Ukuran 35/35 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Kolom M
- Plesteran Kolom 35/35 cm M
- Acian Kolom Teras M
9 Kolom lt. 1 Praktis Ukuran 7/7 cm
- Beton K-100 #REF! M
- Tulangan Kg
- Bekisting M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
10 Kolom Lt.1 Praktis Ukuran 7/7 cm
- Beton K-100 #REF! M
- Tulangan Kg
- Bekisting M
11 Tangga Beton
a. Balok Uk. 15/30 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
b. Plat Tangga
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Bekisting Lantai M
c. Anak Tangga
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U24 Kg
- Bekisting Sloof M
d. Keramik 30 x 60 cm Polish M
e. Plesteran Bawah Tangga M
f. Railing Tangga, Void Tangga & Void Lt.2 (Finishing) M'

LANTAI II
1 Kolom Lt. II Ukuran 35/35 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Kolom Pemakaian Berulang M
- Plesteran Kolom 35/35 cm M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
3 Balok Lt. II Ukuran 20/50 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
4 Balok Lt. II Ukuran 20/40 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
5 Balok Lt. II Ukuran 20/45 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
6 Balok Lt. II Ukuran 15/45 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Balok Ukuran 15/45 cm M
- Acian Plesteran Ukuran 15/45 cm M
7 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Bag.Roster)
- Beton K-225 (Ready Mix) #REF! M
- Wiremesh M6 Kg
- Bekisting Balok M
- Plesteran Jenggotan Bawah Balok Ukuran 15/45 cm (Roster) M
- Acian Jenggotan Bawah Balok Ukuran 15/45 cm M
8 Jenggotan Lt. II Bawah Balok Ukuran 15/45 cm (Dudukan Bata Merah)
- Beton K-225 (Ready Mix) #REF! M
- Wiremesh M6 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Jenggotan (Dudukan Bata Merah) M
- Acian Jenggotan Bawah Balok Ukuran 15/45 cm M
9 Kolom Praktis Lt.II Ukuran 7/7 cm
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
- Beton K-100 #REF! M
- Tulangan U24 Kg
- Bekisting M
10 Balok Praktis Lt.II Ukuran 7/7 cm
- Beton K-100 #REF! M
- Tulangan U24 Kg
- Bekisting M
11 Balok Dack Ukuran 20/50 cm elv. 6.25
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Balok Dack 20/50 cm (teras) #REF! M
- Acian Balok Dack 20/50 cm (teras) #REF! M
12 Balok Dack Ukuran 20/45 cm elv. 6.25
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Balok Dack 20/45 cm (teras) M
- Acian Balok Dack 20/45 cm (teras) M
13 Balok Dack Ukuran 20/40 cm elv. 6.25
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Balok Dack 20/40 cm (teras) M
- Acian Balok Dack 20/40 cm (teras) M
14 Balok Dack Ukuran 15/45 cm elv. 6.25
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
- Plesteran Balok Dack 15/45 cm (teras) M
- Acian Balok Dack 15/45 cm (teras) M
15 Plat Dack Beton elv. 6.25
- Beton K-225 t = 10 cm (Ready Mix) #REF! M
- Wiremesh 2xM6 Kg
- Bekisting Lantai M
- Waterproofing Plat Dack M
- Plesteran Plat Dack (bag. Atas) #REF! M
- Acian Plat Dack (bag.atas) #REF! M
- Plesteran Plat Dack (bag. bawah expose plafond) #REF! M
- Acian Plat Dack (bag.bawah expose plafond) #REF! M
16 Balok Dack Ukuran 20/50 cm elv. 6.60
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Balok Dack 20/50 cm (teras) M
- Acian Balok Dack 20/50 cm (teras) M
17 Balok Dack Ukuran 20/45 cm elv. 6.60
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Balok Dack 20/45 cm (teras) M
- Acian Balok Dack 20/45 cm (teras) M
18 Balok Dack Ukuran 20/40 cm elv. 6.60
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M
- Plesteran Balok Dack 20/40 cm (teras) M
- Acian Balok Dack 20/40 cm (teras) M
19 Balok Dack Ukuran 15/45 cm elv. 6.60
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
- Bekisting Balok M
- Plesteran Balok Dack 15/45 cm (teras) M
- Acian Balok Dack 15/45 cm (teras) M
20 Plat Dack Beton elv. 6.60
- Beton K-225 t = 10 cm (Ready Mix) #REF! M
- Wiremesh 2xM6 Kg
- Bekisting Lantai M
- Waterproofing Plat Dack M
- Plesteran Plat Dack (bag. Atas) M
- Acian Plat Dack (bag.atas) M
- Plesteran Plat Dack (bag. bawah expose plafond) M
- Acian Plat Dack (bag.bawah expose plafond) M
21 Ring Balok Ukuran. 20/40 cm
- Beton K-225 (Ready Mix) #REF! M
- Tulangan U32 Kg
- Tulangan U24 Kg
- Bekisting Balok M

IV. PEKERJAAN LANTAI


LANTAI I
1 Plat Lantai I
- Beton K-225 (Ready Mix) #REF! M
- Wiremesh M6 (1,5 lapis) Kg
- Wiremesh M6 (2 lapis utk daerah Toilet, Janitor & Selasar W Kg
- Bekisting Lantai M

LANTAI II
1 Plat Lantai Dua
- Beton K-225 (Ready Mix) #REF! M
- Wiremesh M6 (1,5 lapis) Kg
- Bekisting Lantai M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
V. PEKERJAAN KERAMIK LANTAI, DINDING DAN PLAFOND
LANTAI I
1 Keramik Lantai Uk. 60x60 UnPolysh (Teras) #REF! M
2 Keramik Lantai Uk. 60x60 Polish M
3 Keramik Lantai WC/KM & janitor Uk. 40x40 cm M
4 Keramik Dinding WC/KM Uk. 40x40 cm M
5 Dinding Batako M
6 Plesteran Dinding #VALUE! M
7 Acian Batako Dinding Luar & Kolom Bag. Luar #REF! M
8 Rangka Plafond Metal Furing #REF! M
9 Plafond Gypsum #REF! M
10 Plesteran Bawah Plat Lantai (Teras Samping&Bawah Lantai) M

LANTAI II
1 Keramik Lantai Uk. 60x60 Polish #REF! M
2 Dinding Batako M
3 Plesteran Dinding #VALUE! M
4 Acian Batako Dinding Luar & Kolom Bag.Luar #REF! M
5 Dinding Bata Merah M
6 Rangka Plafond Metal Furing #REF! M
7 Plafond Gypsum #REF! M
8 Plafond GRC M

VI. PEKERJAAN ATAP


1 Rangka Atap Zincallum (Truss/Polos) dengan jurai dalam #REF! M
2 Atap Genteng Metal Stone Classic t= 0.35 #REF! M
3 Prabung Genteng Metal Stone 1/2 Lingkaran M'
4 List Plank Woodplank M'

VII. PEKERJAAN PINTU, JENDELA & VENTILASI


LANTAI I
1 Pintu Type P1
- Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm 2 daun #REF! Unit
- Aluminum Composit Panel M
2 Pintu Type PJ1
- Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm 2 daun #REF! Unit
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
- Kaca t = 8 mm M
- Aluminum Composit Panel M
3 Pintu Type P2
- Kusen Aluminium #REF! M'
- Pintu Double Multipleks 4 mm fin. HPL 2 Daun Unit
4 Pintu Type P3
- Kusen Aluminium #REF! M'
- Pintu Double Multipleks 4 mm fin. HPL 1 Daun Unit
5 Pintu Type P4
- Kusen Belian #REF! M
- Pintu Belian 1 Daun Unit
6 Pintu Type PV1
- Kusen Aluminium #REF! M'
- Pintu Double Multipleks 4 mm fin. HPL 2 Daun Unit
- Ventilasi Jalusi Aluminium M
6 Jendela Type JV1
- Kusen Aluminium #REF! M'
- Jendela kaca Hidup Kunci Swing (70x98 cm) Unit
- Ventilasi Jalusi Aluminium M
7 Jendela Type J3.a
- Kusen Aluminium #REF! M'
- Jendela kaca Hidup Kunci Dorong (102x70 cm) Unit
- Kaca t = 5 mm M
8 Jendela Type J4.a
- Kusen Aluminium #REF! M'
- Jendela kaca Hidup Kunci Dorong (102x70 cm) Unit
- Jendela kaca Hidup Kunci Dorong (102x54 cm) Unit
- Kaca t = 5 mm M
9 Ventilasi Type V1
- Kusen Aluminium #REF! M'
- Ventilasi Jalusi Aluminium M
11 Ventilasi Type V2
- Kusen Aluminium #REF! M'
- Ventilasi Jalusi Aluminium M
12 Ventilasi Type V3
- Kusen Aluminium #REF! M'
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
- Ventilasi Jalusi Aluminium M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
13 Ventilasi Type V4
- Kusen Aluminium #REF! M'
- Ventilasi Hidup Kaca Buram t = 5 mm M

LANTAI II
1 Pintu Type P2
- Kusen Aluminium #REF! M'
- Pintu Double Multipleks 4 mm fin. HPL 2 Daun Unit
2 Jendela Type J1
- Kusen Aluminium #REF! M'
- Jendela kaca Hidup Kunci Swing (70x98 cm) Unit
3 Jendela Type J2
- Kusen Aluminium #REF! M'
- Jendela kaca Hidup Kunci Swing (70x98 cm) Unit
4 Jendela Type J3.b
- Kusen Aluminium #REF! M'
- Jendela kaca Hidup Kunci Dorong (102x70 cm) Unit
- Kaca t = 5 mm M
5 Jendela Type J4.b
- Kusen Aluminium #REF! M'
- Jendela kaca Hidup Kunci Dorong (102x70 cm) Unit
- Jendela kaca Hidup Kunci Dorong (102x54 cm) Unit
- Kaca t = 5 mm M
6 Ventilasi Type V1
- Kusen Aluminium #REF! M'
- Ventilasi Jalusi Aluminium M
7 Ventilasi Type V2
- Kusen Aluminium #REF! M'
- Ventilasi Jalusi Aluminium M
8 Ventilasi Type V3
- Kusen Aluminium #REF! M'
- Ventilasi Jalusi Aluminium M
9 Ventilasi Type V5
- Kusen Aluminium #REF! M'
- Ventilasi Jalusi Aluminium M
- Kaca t = 5 mm M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
10 Ventilasi Type V6
- Kusen Aluminium #REF! M'
- Ventilasi Jalusi Aluminium M
- Kaca t = 5 mm M

VIII. PEKERJAAN PENGUNCI & PENGGANTUNG


LANTAI I
1 Kunci Pintu 2 Slag #REF! Bh
2 Kunci Pintu Bulat (P4) Bh
3 Engsel Pintu Bh
4 Slot Tanam Pintu (P2) Bh

LANTAI II
1 Kunci Pintu 2 Slag #REF! Bh
2 Engsel Pintu Bh
3 Slot Tanam Pintu (P2) Bh

IX. PEKERJAAN TOILET


1 Kloset Jongkok 5.000 Unit
2 Kloset Duduk Setara Toto 1.000 Unit
3 Urinoir Setara Toto 2.000 Unit
4 Dinding Pemisah Urinoir 3.000 Unit
5 Bak Air Lapis Keramik 6.000 Unit
6 Kran Semprot 1.000 Unit
7 Wastafel Lengkap Setara Toto 3.000 Unit
8 Kaca Cermin 1.800 M
9 Kran Air 6.000 Bh
10 Floor Drain Stainless Setara Toto 7.000 Bh
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
11 Beerfut (gorong dia.80 cm) Type 1
- Galian tanah #REF! M
- Gorong dia. 80 cm 9.000 Bh
- Pipa pvc. Dia. 2 '(pipa distribusi) 8.000 M'
- Pipa pvc. Dia. 1/2 (pipa hawa) 2.000 M'
- Penutup Atas:
a. Cor Beton K175 t = 8 cm #REF! M
12 Beerfut (gorong dia.80 cm) Type 2
- Galian tanah #REF! M
- Gorong dia. 80 cm 3.000 Bh
- Pipa pvc. Dia. 2 '(pipa distribusi) 4.000 M'
- Pipa pvc. Dia. 1/2 (pipa hawa) 2.000 M'
- Penutup Atas:
a. Cor Beton K175 t = 8 cm #REF! M

X. PEKERJAAN INSTALASI AIR BERSIH, KOTOR & HUJAN


1 Instalasi Air Kotor
- Pipa PVC AW 4' #REF! M'
- Pipa PVC AW 3' M'
2 Instalasi Air Bersih
- Pipa PVC AW 1' #REF! M'
- Pipa PVC AW 2' M'
3 Instalasi Air Hujan
- Roof Drain Metal 8.000 Bh
- Pipa PVC AW 3' #REF! M'

XI. PEKERJAAN ELEKTRIKAL


LANTAI I
1 SL 23 watt setara philips + Pemasangan 30.00 set
2 SL 11 watt setara philips + Pemasangan 8.00 set
3 SL 9 watt setara philips + Pemasangan 14.00 set
4 Baret Persegi SL 23 watt + Pemasangan 7.00 set
5 Stop kontak 29.00 pcs
6 Instalasi Lampu 59.00 ttk
7 Instalasi listrik Stop Kontak 29.00 ttk
8 Instalasi listrik AC 5.00 ttk
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
9 Instalasi Proyektor 5.00 ttk
10 Saklar Tunggal setara panasonic 12.00 pcs
11 Saklar Double setara panasonic 8.00 pcs
12 Panel Utama 1.00 set
13 Panel LT 1 1.00 set
14 Grounding 1.00 set

LANTAI II
1 SL 23 watt setara philips + Pemasangan 42.00 set
2 SL 18 watt setara philips + Pemasangan 12.00 set
3 SL 11 watt setara philips + Pemasangan 8.00 set
4 Baret Persegi SL 23 watt + Pemasangan 1.00 set
5 Stop kontak 29.00 pcs
6 Instalasi Lampu 63.00 ttk
7 Instalasi listrik Stop Kontak 29.00 ttk
8 Instalasi Proyektor 4.00 ttk
9 Saklar Triple setara panasonic 2.00 pcs
10 Saklar Double setara panasonic 7.00 pcs
11 Panel LT 2 1.00 set
12 Grounding 1.00 set
13 Penangkal Petir 1.00 set

XII. PEKERJAAN PENGECATAN


LANTAI I
1 Cat Tembok Interior #REF! M
2 Cat Tembok Exterior M
3 Cat Kilat M

LANTAI II
1 Cat Tembok Interior #REF! M
2 Cat Tembok Exterior M
3 Cat Finishing Bata Merah M
VOLUME
NO URAIAN PEKERJAAN SAT
TOTAL

1 2 3 4
XIII. PEKERJAAN LAIN-LAIN
1 Tangga di teras
- Beton K-225 (Ready Mix) #REF! M
- Wiremesh 2 lps M6 Kg
- Bekisting M
- Keramik 30 x 60 cm Polish M
2 Rabat Beton Teras
- Cerucuk Bawah Rabat Beton dia.6-8 pjg.2m #REF! Btg
- Urugan Pasir Bawah Rabat M
- Beton K-225 (Ready Mix) M
- Wiremesh M6 Kg
- Plesteran Kasar M
3 Konsul Atas Ventilasi (V4)
- Betok K225 #REF! M
- Wiremesh M6 Kg
- Bekisting M
- Plesteran Konsul Atas Ventilasi M
- Acian Konsul Atas Ventilasi M
Finishing Arsitektural
4 a. Dinding Roster (press) #REF! M
b. Balok Tutup Roster uk. 8/10 cm
- Beton K-100 #REF! M
- Tulangan Kg
- Bekisting M
c. Ornamen Sirip Beton di Roster
- Beton K-175 #REF! M
- Tulangan ( 12) Kg
- Wiremesh M6 Kg
- Bekisting Balok M
- Plesteran Ornamen Sirip Beton M
- Acian Ornamen Sirip Beton M
5 - Sun Shading Woodplank + Rangka #REF! M
ENGINEERS ESTIMATE ( EE )
MBANGUNAN GEDUNG KULIAH FAK.TEKNIK UNTAN (TOTAL)
OTA PONTIANAK
15

VOLUME KODE HARGA SATUAN SUB TOTAL


RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
HULUAN
1.000 Lsm - 2,500,000.00 2,500,
1.000 Lsm - 450,000.00 450,
1.000 Lsm - 2,000,000.00 2,000,
1.000 Lsm - 2,000,000.00 2,000,
1.000 Lsm - 24,000,000.00 24,000,

SI
00 cm+pemancangan #REF! Btg - #REF!
400 cm+pemancangan Btg - 19,400.00 #
M 2.3.1.1 77,050.00 #
ali #VALUE! M 2.3.1.9.a Err:509 #
5 cm #REF! M 2.3.1.11 Err:509
cm M 4.1.1.4.a 1,032,370.85 #

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.17 #
M 4.1.1.20.a 171,252.25 #

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.17 #
M 4.1.1.20.a 171,252.25 #

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.17 #
M 4.1.1.20.a 171,252.25 #

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.17 #
M 4.1.1.20.a 171,252.25 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.17 #
M 4.1.1.20.a 171,252.25 #
5/35 cm (P1, P2, P3 & P4)
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.22.a #REF! #
5/25 cm (P5)
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.22.a #REF! #

TUR BETON BERTULANG

0 cm elv.00
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
0 cm elv. 00
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
0 cm elv. 00
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
0 cm (sloof 20/50.A)
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF! #
M 4.1.1.21 196,121.00 #
n Uk. 10/50 cm M 4.4.2.3 66,955.42 #
0 cm elv. -1.00
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
0 cm elv. -1.00
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
0 cm elv. -1.00
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
0 cm elv. -1.00
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
5/35 cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.22.a.1 #REF! #
/35 cm M 4.4.2.3 66,955.42 #
M 4.4.2.27 39,546.20 #
kuran 7/7 cm
#REF! M 4.1.1.4.a 1,032,370.85
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.20.a 171,252.25 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
kuran 7/7 cm
#REF! M 4.1.1.4.a 1,032,370.85
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.20.a 171,252.25 #

cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.17 #
M 4.1.1.24.a.1 #REF! #

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.21 196,121.00 #
cm Polish M 4.4.3.4.C 467,482.13 #
Tangga M 4.4.2.3 66,955.42 #
oid Tangga & Void Lt.2 (Finishing) M' 950,000.00 #

35/35 cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
makaian Berulang M 4.1.1.22.b.1 245,334.10 #
/35 cm M 4.4.2.3 66,955.42 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
0/50 cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
0/40 cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
20/45 cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
15/45 cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
kuran 15/45 cm M 4.4.2.3 66,955.42 #
uran 15/45 cm M 4.4.2.27 39,546.20 #
ah Balok Ukuran 15/45 cm (Bag.Roster)
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF! #
M 4.1.1.23.a 368,209.30 #
n Bawah Balok Ukuran 15/45 cm (Roster) M 4.4.2.3 66,955.42 #
awah Balok Ukuran 15/45 cm M 4.4.2.27 39,546.20 #
ah Balok Ukuran 15/45 cm (Dudukan Bata Merah)
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
n (Dudukan Bata Merah) M 4.4.2.3 66,955.42 #
awah Balok Ukuran 15/45 cm M 4.4.2.27 39,546.20 #
kuran 7/7 cm
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
#REF! M 4.1.1.4.a 1,032,370.85
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.20.a 171,252.25 #
kuran 7/7 cm
#REF! M 4.1.1.4.a 1,032,370.85
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.20.a 171,252.25 #
0/50 cm elv. 6.25
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
ck 20/50 cm (teras) #REF! M 4.4.2.3 66,955.42
0/50 cm (teras) #REF! M 4.4.2.27 39,546.20
0/45 cm elv. 6.25
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
ck 20/45 cm (teras) M 4.4.2.3 66,955.42 #
0/45 cm (teras) M 4.4.2.27 39,546.20 #
0/40 cm elv. 6.25
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
ck 20/40 cm (teras) M 4.4.2.3 66,955.42 #
0/40 cm (teras) M 4.4.2.27 39,546.20 #
5/45 cm elv. 6.25
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
ck 15/45 cm (teras) M 4.4.2.3 66,955.42 #
5/45 cm (teras) M 4.4.2.27 39,546.20 #
6.25
cm (Ready Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF! #
M 4.1.1.24.a.1 #REF! #
Dack M 8.1.1.5. 89,355.00 #
k (bag. Atas) #REF! M 4.4.2.3 66,955.42
ag.atas) #REF! M 4.4.2.27 39,546.20
k (bag. bawah expose plafond) #REF! M 4.4.2.3 66,955.42
ag.bawah expose plafond) #REF! M 4.4.2.27 39,546.20
0/50 cm elv. 6.60
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
ck 20/50 cm (teras) M 4.4.2.3 66,955.42 #
0/50 cm (teras) M 4.4.2.27 39,546.20 #
0/45 cm elv. 6.60
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
ck 20/45 cm (teras) M 4.4.2.3 66,955.42 #
0/45 cm (teras) M 4.4.2.27 39,546.20 #
0/40 cm elv. 6.60
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #
ck 20/40 cm (teras) M 4.4.2.3 66,955.42 #
0/40 cm (teras) M 4.4.2.27 39,546.20 #
5/45 cm elv. 6.60
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
M 4.1.1.23.a 368,209.30 #
ck 15/45 cm (teras) M 4.4.2.3 66,955.42 #
5/45 cm (teras) M 4.4.2.27 39,546.20 #
6.60
cm (Ready Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.19.a #REF! #
M 4.1.1.24.a.1 #REF! #
Dack M 8.1.1.5. 89,355.00 #
k (bag. Atas) M 4.4.2.3 66,955.42 #
ag.atas) M 4.4.2.27 39,546.20 #
k (bag. bawah expose plafond) M 4.4.2.3 66,955.42 #
ag.bawah expose plafond) M 4.4.2.27 39,546.20 #
20/40 cm
y Mix) #REF! M B. 13.f.2 #REF!
Kg 4.1.1.17 #
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.23.a 368,209.30 #

y Mix) #REF! M B. 13.f.2 #REF!


apis) Kg 4.1.1.19.a #REF! #
pis utk daerah Toilet, Janitor & Selasar W Kg 4.1.1.19.a #REF! #
M 4.1.1.24.a.1 #REF! #

y Mix) #REF! M B. 13.f.2 #REF!


apis) Kg 4.1.1.19.a #
M 4.1.1.24.a.1 #REF! #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
K LANTAI, DINDING DAN PLAFOND

60x60 UnPolysh (Teras) #REF! M 4.4.3.4.B 337,364.23


60x60 Polish M 4.4.3.4.A 335,765.73 #
KM & janitor Uk. 40x40 cm M 4.4.3.4 208,367.58 #
/KM Uk. 40x40 cm M 4.4.3.4 208,367.58 #
M 4.4.1.17.b 102,169.45 #
#VALUE! M 4.4.2.3 64,412.60 #
g Luar & Kolom Bag. Luar #REF! M 4.4.2.27 39,546.20
al Furing #REF! M 8.1.1.2. 138,000.00
#REF! M 4.5.1.7. 53,863.93
t Lantai (Teras Samping&Bawah Lantai) M 4.4.2.3 64,412.60 #

60x60 Polish #REF! M 4.4.3.4.A 335,765.73


M 4.4.1.17.b 102,169.45 #
#VALUE! M 4.4.2.3 64,412.60 #
g Luar & Kolom Bag.Luar #REF! M 4.4.2.27 39,546.20
M 4.4.1.9 188,775.95 #
al Furing #REF! M 8.1.1.2. 138,000.00
#REF! M 4.5.1.7. 53,863.93
M 4.5.1.7.1 52,269.80 #

um (Truss/Polos) dengan jurai dalam #REF! M 8.1.1.3 220,800.00


Stone Classic t= 0.35 #REF! M 4.5.2.32.a 155,089.00
etal Stone 1/2 Lingkaran M' 4.5.2.36.a 91,787.25
k M' 8.1.1.4. 70,150.00

JENDELA & VENTILASI

os 12 mm - uk. 87 x 213,5 cm 2 daun #REF! Unit 8.1.1.7 9,591,000.00


t Panel M 8.1.1.8 1,035,000.00 #

os 12 mm - uk. 87 x 213,5 cm 2 daun #REF! Unit 8.1.1.7 9,591,000.00


VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
M 4.6.2.18. 406,155.85 #
t Panel M 8.1.1.8 1,035,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


pleks 4 mm fin. HPL 2 Daun Unit 3,000,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


pleks 4 mm fin. HPL 1 Daun Unit 1,500,000.00 #

#REF! M 4.6.1.28.a 16,043,650.00


n Unit 1,500,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


pleks 4 mm fin. HPL 2 Daun Unit 3,000,000.00 #
minium M

#REF! M' 4.2.1.11.a 128,925.35


p Kunci Swing (70x98 cm) Unit 800,000.00 #
minium M -

#REF! M' 4.2.1.11.a 128,925.35


p Kunci Dorong (102x70 cm) Unit 700,000.00 #
M 4.6.2.17. 197,430.85 #

#REF! M' 4.2.1.11.a 128,925.35


p Kunci Dorong (102x70 cm) Unit 700,000.00 #
p Kunci Dorong (102x54 cm) Unit 600,000.00 #
M 4.6.2.17. 197,430.85 #

#REF! M' 4.2.1.11.a 128,925.35


minium M 700,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


minium M 700,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
minium M 700,000.00 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7

#REF! M' 4.2.1.11.a 128,925.35


a Buram t = 5 mm M 750,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


pleks 4 mm fin. HPL 2 Daun Unit 3,000,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


p Kunci Swing (70x98 cm) Unit 800,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


p Kunci Swing (70x98 cm) Unit 800,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


p Kunci Dorong (102x70 cm) Unit 700,000.00 #
M 4.6.2.17. 197,430.85 #

#REF! M' 4.2.1.11.a 128,925.35


p Kunci Dorong (102x70 cm) Unit 700,000.00 #
p Kunci Dorong (102x54 cm) Unit 600,000.00 #
M 4.6.2.17. 197,430.85 #

#REF! M' 4.2.1.11.a 128,925.35


minium M 700,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


minium M 700,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


minium M 700,000.00 #

#REF! M' 4.2.1.11.a 128,925.35


minium M 700,000.00 #
M 4.6.2.17. 197,430.85 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7

#REF! M' 4.2.1.11.a 128,925.35


minium M 700,000.00 #
M 4.6.2.17. 197,430.85 #

NCI & PENGGANTUNG

#REF! Bh 4.6.2.2 128,225.00


4) Bh 8.1.1.14. 69,000.00 #
Bh 4.6.2.5 51,955.85 #
) Bh 50,000.00 #

#REF! Bh 4.6.2.2 128,225.00


Bh 4.6.2.5 51,955.85 #
) Bh 50,000.00 #

5.000 Unit 8.1.1.9 217,350.00 1,086,


Toto 1.000 Unit 5.1.1.1. 4,046,045.00 4,046,
2.000 Unit 5.1.1.2.a 2,453,870.00 4,907,
noir 3.000 Unit 650,000.00 1,950,
k 6.000 Unit 800,000.00 4,800,
1.000 Unit 8.1.1.10 262,200.00 262,
tara Toto 3.000 Unit 5.1.1.12.a 1,506,539.10 4,519,
1.800 M 8.1.1.12. 333,500.00 600,
6.000 Bh 5.1.1.19 90,318.13 541,
Setara Toto 7.000 Bh 8.1.1.12 363,400.00 2,543,
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
80 cm) Type 1
#REF! M 2.3.1.1 77,050.00
9.000 Bh 550,000.00 4,950,
ipa distribusi) 8.000 M' 5.1.1.29 157,780.00 1,262,
(pipa hawa) 2.000 M' 5.1.1.25 37,909.75 75,

= 8 cm #REF! M 4.1.1.5 1,234,156.58


80 cm) Type 2
#REF! M 2.3.1.1 77,050.00
3.000 Bh 550,000.00 1,650,
ipa distribusi) 4.000 M' 5.1.1.29 157,780.00 631,
(pipa hawa) 2.000 M' 5.1.1.25 37,909.75 75,

= 8 cm #REF! M 4.1.1.5 1,234,156.58

ASI AIR BERSIH, KOTOR & HUJAN

#REF! M' 5.1.1.32. 471,528.75


M' 5.1.1.31. 302,191.25 #

#REF! M' 5.1.1.27 83,024.25


M' 5.1.1.29 157,780.00 #

8.000 Bh 8.1.1.11 85,445.00 683,


#REF! M' 5.1.1.31. 302,191.25

IKAL

ps + Pemasangan 30.00 set 200,000.00 6,000,


ps + Pemasangan 8.00 set 160,000.00 1,280,
+ Pemasangan 14.00 set 100,000.00 1,400,
t + Pemasangan 7.00 set 750,000.00 5,250,
29.00 pcs 25,000.00 725,
59.00 ttk 250,000.00 14,750,
ntak 29.00 ttk 250,000.00 7,250,
5.00 ttk 350,000.00 1,750,
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
5.00 ttk 500,000.00 2,500,
anasonic 12.00 pcs 50,000.00 600,
anasonic 8.00 pcs 65,000.00 520,
1.00 set 10,000,000.00 10,000,
1.00 set 10,000,000.00 10,000,
1.00 set 2,000,000.00 2,000,

ps + Pemasangan 42.00 set 200,000.00 8,400,


ps + Pemasangan 12.00 set 180,000.00 2,160,
ps + Pemasangan 8.00 set 160,000.00 1,280,
t + Pemasangan 1.00 set 750,000.00 750,
29.00 pcs 25,000.00 725,
63.00 ttk 250,000.00 15,750,
ntak 29.00 ttk 250,000.00 7,250,
4.00 ttk 500,000.00 2,000,
nasonic 2.00 pcs 50,000.00 100,
anasonic 7.00 pcs 65,000.00 455,
1.00 set 10,000,000.00 10,000,
1.00 set 2,000,000.00 2,000,
1.00 set 20,000,000.00 20,000,

CATAN

#REF! M 4.7.1.10.a 40,868.70


M 4.7.1.10.b 45,488.25 #
M 4.7.1.4. 1 49,209.65 #

#REF! M 4.7.1.10.a 40,868.70


M 4.7.1.10.b 45,488.25 #
erah M 4.7.1.10.c 40,600.98 #
VOLUME KODE HARGA SATUAN SUB TOTAL
RAIAN PEKERJAAN SAT
TOTAL ANALISA (Rp.) (Rp.)

2 3 4 5 6 7
AIN

y Mix) #REF! M B. 13.f.2 #REF!


Kg 4.1.1.19.a #REF! #
M 4.1.1.21 196,121.00 #
m Polish M 4.4.3.4.C 467,482.13 #

bat Beton dia.6-8 pjg.2m #REF! Btg #REF!


h Rabat M 2.3.1.11 Err:509 #
y Mix) M B. 13.f.2 #REF! #
Kg 4.1.1.19.a #
M 4.4.2.3 66,955.42 #
(V4)
#REF! M 4.1.1.7.a #REF!
Kg 4.1.1.19.a #REF! #
M 4.1.1.21 196,121.00 #
as Ventilasi M 4.4.2.3 66,955.42 #
entilasi M 4.4.2.27 39,546.20 #
al
ess) #REF! M 4.4.1.23 664,307.85
r uk. 8/10 cm
#REF! M 4.1.1.4.a 1,032,370.85
Kg 4.1.1.17.a 14,665.95 #
M 4.1.1.20.a 171,252.25 #
ton di Roster
#REF! M 4.1.1.5.a 1,234,156.58
Kg 4.1.1.17.a 14,665.95 #
Kg 4.1.1.19.a #REF! #
M 4.1.1.23.a 368,209.30 #
Sirip Beton M 4.4.2.3 66,955.42 #
p Beton M 4.4.2.27 39,546.20 #
lank + Rangka #REF! M 700,000.00

JUMLAH
PPN
JUMLAH TOTA
HARGA SATUAN
UPAH DAN BAHAN BANGUNAN

NO TENAGA KERJA KODE

A. UPAH
1 Pekerja L. 01
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listrik / Pan L. 02
3 Kepala Tukang L. 03
4 Mandor L. 04

STANDAR HARGA SATUAN DASAR BAHAN

NO MATERIAL SATUAN

B. BAHAN PENGISI
2 Batu pecah 1-2 cm M
3 Pasir Kasar M
4 Pasir Halus M
5 Semen PC Zak
6 Semen PC Kg
8 Kerawang ( roster ) 18 x 18 cm Bh
9 Batu Bata 5 x 11 x 22 cm Bh
9 Bataco 20 x 40 x 7 cm ( press ) Bh
10 Keramik 40 x 40 cm ex Roman (Polish) Kotak
11 Keramik 40 x 40 cm ex Roman (Unpolish) Kotak
11 Keramik 30 x 60 stepnozing (setaraf Indogress) Kotak
12 Keramik 60 x 60 Polish (setaraf Indogress) Kotak
13 Keramik 60 x 60 Unpolish (setaraf Indogress) Kotak

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 8/8 - 4 M M
2 Ky. Belian ketam Uk. 4/8 - 4 M M
1 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M
2 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M
3 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M
NO MATERIAL SATUAN

4 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M


5 Papan kayu klas I ketam M
6 Papan kayu klas II (mabang) tdk ketam M
7 Papan mal klas III M
8 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M M
9 Kayu cerucuk /dolken 8 - 10 - Pj. 4 M Btg
11 Wood Plank M'
NO MATERIAL SATUAN

D. BAHAN CAT
1 Amplas Lbr
2 Thiner Ltr
3 Cat dasar kilat Kg
4 Cat kilat Kg
5 Plamur Kg
6 Cat Dasar Emulsion setara Mowilex Kg
7 Cat Akhir Emulsion setara Mowilex Kg
8 Cat Weather Shield setara Mowilex Kg
10 Cat Glossy Coat Kg
9 Dempul Kg
10 Vernis Ltr
11 Meni Kg
12 Oker Kg
13 Lem Kayu Kg
14 Kuas 4" Bh
15 Water Proofing M

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton U 32 Kg
2 Besi Tulangan Beton U 24 Kg
3 Besi wire mesh 5 Kg
4 Besi wire mesh 6 Kg
5 Kawat baja/bendrat Kg
6 Besi Profil Kg
7 Folding gate M
8 Rangka Aluminium 1 1/2" x 3" Meter
9 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d M
10 Alumunium Komposit + Rangka Besi M
11 Rangka Plafond Plafond Metal Furing + Pasang M

F. BAHAN PENGGANTUNG
1 Handle Pintu Bh
3 Engsel pintu Bh
4 Slot pintu Bh
5 Kunci tanam antik Bh
6 Kunci tanam biasa Bh
7 Kunci silindir Bh
8 Paku campuran 1" - 5 " Kg
9 Paku GRC Kg
10 Paku beton Kg
10 Sekrup Gibsum Kg
11 Sekrup Fixer Bh
NO MATERIAL SATUAN

12 Sekrup Zincalume Bh
14 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit
NO MATERIAL SATUAN

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M
2 Kaca Polos, t = 8 mm M
3 Kaca Es, t = 5 mm M
4 Sealent Kg

I. BAHAN TRIPLEK
1 Panel GRC 120 x 240 x 40 Lbr
2 GypsumBoard t = 9mm Lbr

J. BAHAN SANITASI
1 Kloset duduk (monoblok) Bh
2 Kloset jongkok Bh
3 Wastafel setara Toto Bh
4 Urinoir type U 57 M ex Toto Unit
5 Shower Spray setara Toto Unit
6 Floordrain setara Toto Bh
7 Kaca Cermin M
8 Kitchenzink stainless steel 1 lubang Unit
9 Kran air uk 1/2" Bh
10 Sealtape Bh
11 Pipa PVC dia 1/2" AW ex Wavin Btg
12 Pipa PVC dia 1" AW ex Wavin Btg
13 Pipa PVC dia 2" AW ex Wavin Btg
14 Pipa PVC dia 3" AW ex Wavin Btg
15 Pipa PVC dia 4" AW ex Wavin Btg
16 Roof Drain Metal Bh
ARGA SATUAN
AN BAHAN BANGUNAN

HARGA SATUAN DASAR


(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

85,000.00
100,000.00
120,000.00
130,000.00

HARGA SATUAN DASAR


(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

453,500.00
99,000.00
99,000.00
75,200.00
1,504.00
17,300.00
1,485.00
2,080.00
99,000.00
110,000.00
241,000.00
317,000.00
319,000.00

7,850,000.00
10,180,000.00
14,850,000.00
3,984,000.00
4,100,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

1,950,000.00
13,120,000.00
6,200,000.00
2,100,000.00
8,200.00
9,400.00
61,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

2,970.00
21,900.00
31,000.00
53,500.00
31,200.00
51,500.00
69,700.00
85,150.00
70,800.00
21,000.00
31,700.00
47,500.00
12,000.00
16,900.00
22,000.00
77,700.00

12,500.00
10,500.00
9,300.00
9,200.00
19,800.00
13,350.00
615,000.00
84,150.00
192,000.00
900,000.00
120,000.00

134,000.00
27,000.00
16,800.00
47,000.00
54,000.00
60,000.00
20,300.00
21,000.00
31,000.00
47,500.00
2,400.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

490.00
4,170,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
PROFIT & OVERHEAD)
(Rp)

135,000.00
300,000.00
130,000.00
100,000.00

78,000.00
73,800.00

2,930,000.00
189,000.00
956,000.00
1,860,000.00
228,000.00
316,000.00
290,000.00
645,000.00
32,000.00
9,500.00
21,100.00
40,100.00
78,800.00
155,000.00
250,000.00
74,300.00