Page
OWNER PMC
without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.
MAIN CONTRACTOR
MATERIAL REQUISITION
FOR
HYDRASTEP
(CONDUCTIVITY LEVEL INDICATOR)
Date ____________________
01 08.06.2010 ISSUED FOR ORDER MEGHA VIJAYWARGIYA MAMTA GUPTA R.SINGHAL NRA
00 03.04.2010 ISSUED FOR ENQUIRY R.PARAMESH MAMAT GUPTA R.SINGHAL NRA
WRITTEN BY CHECKED BY APPROVED BY PM
REV. DATE STATUS
(Name) (Name) (Name)
DOCUMENT REVISIONS
Sections changed in last revision are identified by a line in the right margin
Project No. Unit Doc. Code Serial No. Rev. Page
1. SCOPE OF SUPPLY
1.1 Hydrastep as per MR with Documentation 00770-05D-SR-1552-025 01 08.06.2010
2. APPLICABLE DOCUMENTS
2.2 Data sheet for Hydrastep (Conductivity level Indicator) 00770-05D-SP-1552-025 01 08.06.2010
3. QUALITY REQUIREMENTS
4. GENERAL
Notes:
1) Date of attachment corresponds with the issue date of the MR at which the attachment has been included in the MR. This
is not related to the issue date indicated on the attachment itself.