QCS 2010
QCS 2010 Section 1 Part 22 New Technologies and Innovations Page 2
1 Qatar is committed to researching and using new technology and innovations within
construction industry. Because of this commitment it is open to proposals from outside
2 This Part specifies the requirements associated with the proposal and approval of new
technologies and innovations for use in construction in Qatar.
1 New technologies / innovations are allowed for use in any project on experimental or
research basis after getting an approval from National Committee For Construction and
Building materials Specifications (NCCBS) of the Ministry of Environment and any other
concerned parties.
2 The period allowed for such an experiment or research shall be limited to a trial period of a
maximum of two years after which it will be evaluated prior to approval or otherwise by the
concerned parties.
3 The supplier will be required to submit a guarantee certificate for an agreed period of time.
4 The supplier shall submit a written warranty to bear all fiscal and legal responsibilities as a
result of using the experiment if not meeting the suppliers claims/specifications. He shall
remove any material or debris left from the experiment.
2 Notwithstanding the above Qatar wishes suppliers to propose technology and innovations
that it believes can benefit Qatar and the environment.
22.3 DOCUMENTATION
1 The technology provider shall be requested to submit with his proposals the following
documents:
a) Drawings
b) Specifications
c) Technology Reference and Manual
d) Specifications and Source
QCS 2010
QCS 2010 Section 1 Part 22 New Technologies and Innovations Page 3
END OF PART