FLOW CHART PEKERJAAN BORE PILE

START

SURVEYING

KOORDINASI DENGAN
REINFORCING
INSTANSI TERKAIT
BAR

CHECK SITUASI INSTALL


LOKASI TREMIE PIPE
PEKERJAAN

POURING Pengeboran dgDrillingBucket


CONCRETE Preboring dgauger
PREBORING

INSTALL UNINSTALL
CASING CASING

GALIAN
DRILLING
STRUKTUR

PEMOTONGAN InstallRebar Pengecoran dgpipa tremi


CLEANING
KEPALA TIANG

FINISH

1
DOKUMENTASI PEKERJAAN BORE PILE
1. Setting Out

2. Pemasangan Temporary Casing Dengan Vibro


Hammer

4. Mengukur Bored Length dgn 3. Prose Borring


Measuring Tape

5. Proses memasukkan Steel


cage ke Bored Hole

6. Pengecoran (Casting) 7. Uninstall Casing