N SATUA
O BAHAN N HARGA
1 Air LT 600
2 2 Btg Kayu Begesting 6x10 cm ,p = 4m M3 2200000
3 BALOK KAYU M3 2200000
4 Besi beton (polos/ ulir) KG 8800
5 KAWAT BETON KG 15000
6 Kayu terentang/Begesting M3 2200000
7 KORAL BETON KG 225000
8 MINYAK BEKISTING LT 30000
9 Paku biasa 5 cm - 10 cm KG 14500
10 PASIR BETON KG 165000
11 PLYWOOD 9 MM LBR 120650
12 SEMEN PORTLAND KG 1350
HARGA UPAH
N SATUA
O PEKERJAAN N HARGA
1 Kepala Tukang Hr 85000
2 Mandor Hr 90000
3 Pekerja Hr 65000
4 Tukang Batu Hr 80000
5 Tukang besi Hr 80000
6 Tukang Kayu Hr 80000
DAFTAR ANALISA PEKERJAAN BETON