Tagum City
Low to no Some areas in The Water Facilities Service Pipeline No. of The TWD 23,093,022 Construction
access on Tagum City, barangays to Management Expansion Barangays Construction .20 Division
water in are still be covered and Covered Division shall
some areas unreached by can now constructio conduct pipeline
in Tagum the water enjoy the n of expansions on
City where supply of benefits of Elevated the identified
the Tagum Water having water Steel areas of Tagum
population District at a more Tanks on City
of children convenient Mankilam
and women manner and La
are Filipina
materially areas
high
TOTAL P 25, 321, 922.20
Prepared by: Approved by: Date: