Anda di halaman 1dari 1
TAMPED MOUNDS OF FINE SAND OR DIRT ACROSS LocaTor WIRE TRENCH 2 ABOVE PIPE PER B45 INVERT OF PIPE. oD. Lala 7 EDGE OF TRENCH PLAN VIEW TYPK PIPE INST, ‘TION. vs € FINISHED GRADE © ¢ OF WATERUNE lun, Me 1 $$$ ———— PIN. (CLEAR TYP) Be REGS 7 *45 @ 8 OLM/STD.IT HOOK (TYPH(SEE NOTE 3) oun, 7 — VARIES: 1” PREFORMED EXPANSION PAPER (4-1/4” PIECES) CONCRETE CAP DETAIL SELECT BACKFILL MATERIAL COMPACTED OR CONSOUDATED IN ACCORDANCE WITH STD. B-2868 AND SPECS. CLEAN FINE SAND TAMPED UNDER PIPE TO SPRING UNE OF PIPE EXPOSED (OR SAND SLURRY POURED TO SPRING LINE, TAKING CARE NOT TO FLOAT PIPE): THEN ADDITIONAL SAND TO COVER PIPE, TAMPED MOUND BOTTOM OF TRENCH 2 MIN.CLEARANCE UNDER BELL OR COUPUNG TYPICAL TRENCH SECTION NOTES: PIPE ZONE BACKFILL Ay 1 THE BACKFILL MATERIAL INTHE PIPE ZONE WAY CONSIST. OF MATERIAL FROM THE EXCAVATION WHERE THAT MATERIAL IS A UNIFORMLY GRADED SUITABLE SOIL FREE FROM STONES OR LUMPS EXCEEDINGKINCHES IN GREATEST DIMENSION, VEGETABLE MATTER. OR OTHER UNSATISFACTORY MATERIAL AS APPROVED BY THE ENGINEER, HAVING A SAND EQUVALENT VALUE OF 20 OR BETTER AND COMPACTED TO A RELATE COMPACTION AS RECOMMENDED BY THE MANUFACTURER OF THE PIPE. CONCRETE CAP _(FOR SHALLOW WATERLINE WHEN APPROVED BY ENGINEER) 2 CAP SHALL BE OF CLASS ‘K CONCRETE 3. REBAR SHALL HAVE A YIELD STRENGTH «60 KS! 4. PREFORMED EXPANSION PAPER PER ASTM I75!

Anda mungkin juga menyukai