Dateofbirth:16thOctober1986
PERSONALPROFILE
MailAddress:1206/BMumtazabadColonyMultan Nationality:Pakistani
Mobileno.:(+92)3033779737
Email:engr.adam@gmail.com EducationLevel:BScComputerSystemEngineer(20022007)
OBJECTIVE/PROFESSIONALPROFILE
AproficientlearnerwiththevisionofhardworkingandfirmbeliefinContinuousImprovement,capableofworkingunderthe
supervisionasateamandalsoabletoworkonowninitiative.
RFprofessionalwithmorealmost9yearsexperienceofGSM,GPRS,EDGE,WCDMAnetworksbasedonZTE,Nokia(BSSS12/S13/S14,
FlexiBTS,RG10,RG20,RG30,RG40RU40,50GPRS,EDGEandAMREnabledDualBandNetwork900/1800,NETACT4.2/5.2,6.0)and
ZTE (OMCZXG10, V3 ,V4 BSCs and latest NetNuemen EMS clients ). Extensive Experience in Vendor SWAPs Motorola,
Ericsson,NSN,ZTE,Huawei.ExcellentworkingknowledgeofMicrosoftExcel.
PROFESSIONALEXPERIENCE: (8Years6months)
Organization Designation Responsibilities YearofService
ZTE 2G&3GRF 3G RF Planning and Optimization Engineer JAN 2015- TILL
(PAKISTAN) Optimization for Telenor first 3G Rollout project in NOW
TeamLeader Pakistan. CSSR ,DCR,IRAT KPIs optimization
and acceptance from customer on cluster
level and site level. Now moved at
Vimplecom Mobilink Pakistan as 2G/3G RF
Optimization Consultant for Ericsson to ZTE
swap.
NOKIA 2G/3GRF RF Optimization on RG40 RU40 for 2G swap JUNE 2014
(MOBILY SAUDI Planning& and 3G Rollout for Daily KPIs monitoring DEC2014
ARABIA) Optimization (CSSR,DCR ,HOSR RRC Success Rate, RAB
Consultant Success Rate , HSDPA establishment
Success Rate,IRAT,SHO,Throughput per user)
and troubleshooting of the worst cells.
NOKIA TO ZTE 2G&3GRF CSSR ,DCR,HOSR, PS KPIs optimization and APRIL 2013- JUNE
SWAP Optimization acceptance from customer on cluster level 2014
(PAKISTA Engineer. and site level. Features implementation to
N) improve KPIs.
NOKIA 2GRF RF Optimization Consultant in Nokia for 3 NOV 2011-
(SOUTHAFRICA, Optimization swap projects in South MARCH2013
SAUDIAARABIA, Consultant Africa(Vodacom),Saudi Arabia(Mobily),
IRAQ) Iraq(Zain).These swap projects were
successfully completed and acceptance was
obtained from customer. Cell level KPIs
acceptance criteria in Mobily and cluster
level in Others was successfully
achieved.Strong use of MML commands
TELENOR(NOKIA) 2GRF Worked as RF Executive as internal MARCH 2010 AUG
(PAKISTAN) Planningand Employee of Telenor Pakistan. Main 2011
Optimization responsibilities were to plan new sites on
Engineer Asset,TRX addition working for high blocking
area,BSC dimensioning to improve KPIs.
Member of Customer Liasion Team to resolve
the customer complaints.BSC level KPIs
analysis and Optimization .
ZONG(HUAWEI/ 2GRF Paktel was acquired by china mobile and JUNE 08 TILL
ZTE) Planningand started its first GSM rollout. Worked as RF MARCH 2010
(PAKISTAN) Optimization Engineer as a internal Employee of China
Engineer Mobile Pakistan for BSC level KPIs
monitoring and optimization, Sales Joint Visit
complaint resolutions, New sites planning
and optimization.
SHANGHAI RFEngineer Technical Site Surveys, DT of new sites, JUNE 07 TILL JUNE
TELECOM Cluster DTs, Area Profiling, TSSRs, Project 2008
(PAKISTAN) Coordination
Activitiesas2GRFOptimizationEngineer
Activitiesas3GRFOptimizationEngineer
To meet the agreed KPIs on the cluster level .To support the customer in daily tasks of optimization.
Daily KPIs monitoring (RRC Success Rate, RAB Success Rate , HSDPA establishment Success
Rate,IRAT,SHO,Throughput per user) and troubleshooting of the worst cells.
3g Rollout sites pre-launch optimization.
Reduce the Code congestion, CE blocking by shifting the traffic by Min RSCP and Ec/No level.
IRAT HO improvement by modification of 2D/2F/3A profiles.
HSDPA throughput improvement by codes and CQI reporting interval.
Cell coverage reduction by QRxlevelmin and QQualmin value.
Worst cell optimization on the basis of high access failure rate (including RRC&RAB failures) , high
drop rate ,intra frequency and IRAT failures etc
Analyzing log file(RxLev, RxQual,CPICH RSCP, CPICH EcNo, Pilot Pollution) with Subcon coordinator to
locate the bad patches and low throughput areas.
Addition or deletion of neighbor cells in order to improve the clusters. (3G-3G/3G-2G)
Recommending the Physical changes (mainly up/down tilts, azimuth) to optimize the network.
Swapped feeders Checking and pushing the integration teams to resolve this.
Planning Part:
Special Projects:
Retuned parameters to push traffic from outer GSM to inner DCS zone in order to Optimize DCS
utilization.
Worked on AMR implementation.
Worked on reduction of SD blocking for the whole C-III region.
Worked on reduction of HO per call.
Worked on reduction of Location Updates through sites re-parenting and LAC modifications.
IRAT HOSR improvement on network level .
RTWP working on network level and proposed filters for external interference and Master Slave
antenna issue resolution.
TECHNICALTRAININGS:
TOOLSEXPERTISE:
15.M2000