Anda di halaman 1dari 5

MuhammadAdamImam

Dateofbirth:16thOctober1986

PERSONALPROFILE
MailAddress:1206/BMumtazabadColonyMultan Nationality:Pakistani
Mobileno.:(+92)3033779737
Email:engr.adam@gmail.com EducationLevel:BScComputerSystemEngineer(20022007)

OBJECTIVE/PROFESSIONALPROFILE

AproficientlearnerwiththevisionofhardworkingandfirmbeliefinContinuousImprovement,capableofworkingunderthe
supervisionasateamandalsoabletoworkonowninitiative.

RFprofessionalwithmorealmost9yearsexperienceofGSM,GPRS,EDGE,WCDMAnetworksbasedonZTE,Nokia(BSSS12/S13/S14,
FlexiBTS,RG10,RG20,RG30,RG40RU40,50GPRS,EDGEandAMREnabledDualBandNetwork900/1800,NETACT4.2/5.2,6.0)and
ZTE (OMCZXG10, V3 ,V4 BSCs and latest NetNuemen EMS clients ). Extensive Experience in Vendor SWAPs Motorola,
Ericsson,NSN,ZTE,Huawei.ExcellentworkingknowledgeofMicrosoftExcel.

PROFESSIONALEXPERIENCE: (8Years6months)
Organization Designation Responsibilities YearofService
ZTE 2G&3GRF 3G RF Planning and Optimization Engineer JAN 2015- TILL
(PAKISTAN) Optimization for Telenor first 3G Rollout project in NOW
TeamLeader Pakistan. CSSR ,DCR,IRAT KPIs optimization
and acceptance from customer on cluster
level and site level. Now moved at
Vimplecom Mobilink Pakistan as 2G/3G RF
Optimization Consultant for Ericsson to ZTE
swap.
NOKIA 2G/3GRF RF Optimization on RG40 RU40 for 2G swap JUNE 2014
(MOBILY SAUDI Planning& and 3G Rollout for Daily KPIs monitoring DEC2014
ARABIA) Optimization (CSSR,DCR ,HOSR RRC Success Rate, RAB
Consultant Success Rate , HSDPA establishment
Success Rate,IRAT,SHO,Throughput per user)
and troubleshooting of the worst cells.

NOKIA TO ZTE 2G&3GRF CSSR ,DCR,HOSR, PS KPIs optimization and APRIL 2013- JUNE
SWAP Optimization acceptance from customer on cluster level 2014
(PAKISTA Engineer. and site level. Features implementation to
N) improve KPIs.
NOKIA 2GRF RF Optimization Consultant in Nokia for 3 NOV 2011-
(SOUTHAFRICA, Optimization swap projects in South MARCH2013
SAUDIAARABIA, Consultant Africa(Vodacom),Saudi Arabia(Mobily),
IRAQ) Iraq(Zain).These swap projects were
successfully completed and acceptance was
obtained from customer. Cell level KPIs
acceptance criteria in Mobily and cluster
level in Others was successfully
achieved.Strong use of MML commands
TELENOR(NOKIA) 2GRF Worked as RF Executive as internal MARCH 2010 AUG
(PAKISTAN) Planningand Employee of Telenor Pakistan. Main 2011
Optimization responsibilities were to plan new sites on
Engineer Asset,TRX addition working for high blocking
area,BSC dimensioning to improve KPIs.
Member of Customer Liasion Team to resolve
the customer complaints.BSC level KPIs
analysis and Optimization .
ZONG(HUAWEI/ 2GRF Paktel was acquired by china mobile and JUNE 08 TILL
ZTE) Planningand started its first GSM rollout. Worked as RF MARCH 2010
(PAKISTAN) Optimization Engineer as a internal Employee of China
Engineer Mobile Pakistan for BSC level KPIs
monitoring and optimization, Sales Joint Visit
complaint resolutions, New sites planning
and optimization.
SHANGHAI RFEngineer Technical Site Surveys, DT of new sites, JUNE 07 TILL JUNE
TELECOM Cluster DTs, Area Profiling, TSSRs, Project 2008
(PAKISTAN) Coordination

Activitiesas2GRFOptimizationEngineer

Daily KPIs(CSSR,DCR,Blocking,HOSR,TBF Success Rate) analysis and optimization of assigned


BSC,Clusters.
Sector swap detection by analysis of pre and post swap traffic .
Escalation of zero PS data cells to operations and care team to rectify by GENA toggle.
Neighbour Audit for swapped sites and proposed addition and deletion of neighbours where required.
IASR improvement by RACH uplink access level and SLO,MAXRetrans Parameters
TCH Blocking improvement by FRL/FRU,BTSLoadSeg Accesslevel min, CRO, PT, PBGTHO and
VAMOS parameters.
DCR Improvement by Accessmin, TRP shifting, HO Optimization and Frequency cleaning.
SDR improvement by SDCCH Shifting, BSTXPWRMAX, RxAccessmin, T200F&S and Frequency
Tuning.
Improving TBF Success Rate by parameters BFG and TRP and CDED and CDEF parametres..
POC trials adjustment to improve the KPIs like DCR,HOSR by reducing interference.
HOC parameters modifications MinInterval, Emergency HO levels to improve HOSR.
Routine neighbor audit of BSCs, analysis of per neighbor stats in cells having poor handover
performance and to change handover margins.
Adjustments of idle mode boundaries by tweaking ACCMIN, C1, C2,CRH.
FRL/FRU/NBLO Parameters setting for reduced TCH Blocking improving CSSR
Recommendations for newly on-aired sites based on DT performed at the time of commissioning
and analysis of Statistical data.
Inter MSC HO analysis and correction of wrong LACs contributing to HO failures.
Making XML from plan edit for implementation in BSC.
Frequency change where required to improve the KPIs.
Making of BSC report for final acceptance after complete swap.

Activitiesas3GRFOptimizationEngineer

To meet the agreed KPIs on the cluster level .To support the customer in daily tasks of optimization.
Daily KPIs monitoring (RRC Success Rate, RAB Success Rate , HSDPA establishment Success
Rate,IRAT,SHO,Throughput per user) and troubleshooting of the worst cells.
3g Rollout sites pre-launch optimization.
Reduce the Code congestion, CE blocking by shifting the traffic by Min RSCP and Ec/No level.
IRAT HO improvement by modification of 2D/2F/3A profiles.
HSDPA throughput improvement by codes and CQI reporting interval.
Cell coverage reduction by QRxlevelmin and QQualmin value.
Worst cell optimization on the basis of high access failure rate (including RRC&RAB failures) , high
drop rate ,intra frequency and IRAT failures etc
Analyzing log file(RxLev, RxQual,CPICH RSCP, CPICH EcNo, Pilot Pollution) with Subcon coordinator to
locate the bad patches and low throughput areas.
Addition or deletion of neighbor cells in order to improve the clusters. (3G-3G/3G-2G)
Recommending the Physical changes (mainly up/down tilts, azimuth) to optimize the network.
Swapped feeders Checking and pushing the integration teams to resolve this.

Nokia SWAP MDT Activities


Parameters mapping verification from Nokia and ZTE dump during after MDT so that sites are on
aired with pre swap parameters.
Lead the swap of Nokia and Ericsson to ZTE as swap lead.
Swap detection by CI plot during swap from DT MAPINFO CI export.
To check the Alarms during the swap of on aired sites .
TCH Assignment Success rate verification during swap MDT to ensure on air site KPIs are fine.
BCCH and sub-cell level difference check to ensure during swap MDT that site is on aired properly.
Cell re-selection , HO attempts and success verification after swap MDT to ensure that old
neighbors are deleted and new neighbors are added properly so that HOSR KPI is fine and traffic
distribution is fine .
Parameters modifications after swap to reduce SDCCCH and TCH blocking due to fluctuations on
neighbouring sites.
Data and TCH Traffic verification of after swap by summing up the traffic on pre criteria.

Planning Part:

Planning of new Sites coverage, quality and capacity .


Generation of Coverage models in asset tool.
Mapping of Parameters from Motorla and Ericsson dump for creation of swapped sites.
Pre and Post audit of Dump to verify the mapped parameters.
Problem resolution during MDT of swapped sites.
Frequency Plan and Neighbour planning of new sites.
MAIO Plan of new and swapped sites.
MAL List creation of swapped sites and new sites.
PSC planning of new sites.

DATA KPIs Optimization:


Improving throughput by modifying CDED and CDEF values, Dynamic Timeslots, reducing
interference by shifting traffic on other band, PS allocation method, Using more Static PDTCH, HR
Allocation algorithm.
Improving TBF drop rate by modifying coding schemes ,Frequency cleaning, BEP value
reduction.
Improving TBF Success rate by BFG and CDED CDED and setting initial coding schemes of GPRS
and EDGE,shifting traffic to low TCH traffic band.
Improving UL and DL blocking KPIs by increasing dedicated data timeslots and enabling more trx
with data capability and assigning them to EDAP pool.
Analysis of Data KPIs and finding the reason of degradation on counter level and improvement
of KPIs by improving that counter degradation such as TBF allocation improvement by reducing
TBF blocking and reducing interference on specific band to improve allocation.

Special Projects:
Retuned parameters to push traffic from outer GSM to inner DCS zone in order to Optimize DCS
utilization.
Worked on AMR implementation.
Worked on reduction of SD blocking for the whole C-III region.
Worked on reduction of HO per call.
Worked on reduction of Location Updates through sites re-parenting and LAC modifications.
IRAT HOSR improvement on network level .
RTWP working on network level and proposed filters for external interference and Master Slave
antenna issue resolution.

Technical Reports & Audits:


Preparing Bi Weekly Global Drive Test reports for Major cities after log file analysis using TEMS and
giving recommendations to improve QOS.
Weekly Technical report containing Red. Green and Yellow Flags for assigned clusters and sending
this report to regional Team Leader.
Submitting Bench marking reports to customer after successful trials showing improvements in KPIs.
Making reports for TCH blocking, SDCCH blocking and Neighbor audits at network level.
New Sites Health Report & initial QoS Monitoring for new sites.
Periodic network level audit of cell parameters to remove discrepancies accumulating over a period
of time.

TECHNICALTRAININGS:

Nokia Siemens Networks BSC Dimensioning

TOOLSEXPERTISE:

1.TEMS Investigation 8.1.1 2.Asset 6.1

3.Optima 4.Net Act (Nokia)

5.MAP INFO 8.0 6.GOOGLE EARTH

7.Auto Cad 8. Ericsson MCOM

9. Plan Editor(Nokia) 10. SONAR

11. Actix 12. Tang(Nokia)

13. Minos(ZTE) 14. IBSC

15.M2000

Anda mungkin juga menyukai