This document is to provide report for XL Axiata on Site Quality & Performance Acceptance, as part 2 of Single Site Acceptance on
Staging Report is applicable for newly deployed eNB that on air at the same time with other eNB within a cluster basis. The
ALIEF RISBAYA
Approved Checked Date Rev Reference
Content
1 Introduction.................................................................................................................. 3
1.1 General Site Information................................................................................................3
1.2 Summary of Important Key Performance Indicator on Drive Test...................................3
2 Performance Result.....................................................................................................4
2.1 Statistical (NMS) Measurement......................................................................................4
2.2 Drive Test Event............................................................................................................. 5
2.3 Drive Test Plot................................................................................................................ 6
2.3.1 RSRP (Reference Signal Received Power.....................................................................6
2.3.2 SINR (Signal to Noise & Interference Ratio)..................................................................7
2.3.3 PCI Plot.......................................................................................................................... 7
2.4 Stationary Test............................................................................................................... 8
2.4.1 Downlink (FTP) Throughput...........................................................................................8
2.4.2 Uplink (FTP) Throughput................................................................................................8
2.4.3 Speed Test (Using OOKLA & OpenSignal).....................................................................9
2.4.4 Functional Test............................................................................................................... 9
2.5 Site Audit........................................................................................................................ 9
2.6 Alarms............................................................................................................................ 9
2.7 Transmission check......................................................................................................10
2.8 Google Earth Snapshot................................................................................................10
3 Surrounding Sites Assessment................................................................................11
3.1 Geographical Location..................................................................................................11
3.2 New Site & Neighbors First Tier....................................................................................11
3.3 New Cell & Neighbors First Tier...................................................................................12
3.4 Summary of Tuning Activities.......................................................................................12
3.5 Conclusion................................................................................................................... 12
4 KPI Justification......................................................................................................... 13
4.1 DL Single User Throughput (Max)...............................................................................13
4.2 RTT Latency Justification..15
5 (14)
SITE QUALITY AND PERFORMANCE ACCEPTANCE REPORT
ared No.
ALIEF RISBAYA
Approved Checked Date Rev Reference
1 Introduction
Basic KPI report is provided to XL Axiata as part of LTE Project deliverables on cell level.
ALIEF RISBAYA
Approved Checked Date Rev Reference
Return Time to LTE Success Rate 100% 100% 100% > 97% Pass
Session Setup Success Rate 100% 100% 100% > 99% Pass
2 Performance Result
Accessibility
Sector Sector Sector
No Name Ref Measured On Status
1 2 3
1 Session Setup Success Rate > 99% Cell Busy Hour 100% 100% 100% Pass
2 CSFB Call Setup Success Rate (CSFB SR) > 95% Cell Busy Hour 100% 100% 100% Pass
Voice - Incoming Call Setup Success Rate
3 > 97% Cell Busy Hour 100% 100% 100% Pass
(Merge with Outgoing and Incoming)
Retainability
No Name Ref Measured On Sector 1 Sector 2 Sector 3 Status
Session Abnormal Release Rate Cell Busy
1 < 1.4 % 0.00% 0.88% 0.17% Pass
(SARR) Hour
Integrity
Measured
No Name Reference Sector 1 Sector 2 Sector 3 Status
On
UL Packet Loss Cell Busy
1 <1e-3% 0 3.896E-05 1.566E-05 Pass
(PDCP) Hour
DL Packet Loss Cell Busy
2 <1e-3% 0 1.561E-06 1.861E-06 Pass
(PDCP) Hour
3 Downlink Peak > 21.2 Mbps (3 MHz) Cell Daily 30.348 24.311 43.500 Info
PDCP User > 70.3 Mbps (10 MHz) only*
5 (14)
SITE QUALITY AND PERFORMANCE ACCEPTANCE REPORT
ared No.
ALIEF RISBAYA
Approved Checked Date Rev Reference
Mobility
Secto Secto Secto
No Name Ref Measured On Status
r1 r2 r3
HO Success Rate - Intra Frequency
1 > 98% Cell Busy Hour 100% 100% 100% Pass
(IN & OUT)
HO Success Rate - Inter Frequency
2 > 98% Cell Busy Hour N/A N/A N/A Pass
(IN & OUT)
PS Inter-RAT HO Success Rate (IN &
3 > 90% Cell Busy Hour 100% 100% 100% Pass
OUT) for WRAN (PSHO IRAT)
ALIEF RISBAYA
Approved Checked Date Rev Reference
ALIEF RISBAYA
Approved Checked Date Rev Reference
ALIEF RISBAYA
Approved Checked Date Rev Reference
3 PCI Plot
ALIEF RISBAYA
Approved Checked Date Rev Reference
6 Stationary Test
ALIEF RISBAYA
Approved Checked Date Rev Reference
ALIEF RISBAYA
Approved Checked Date Rev Reference
4 Functional Test
7 Site Audit
PLAN/BEFORE AFTER
Site Audit
Sec 1 Sec 2 Sec 3 Sec 1 Sec 2 Sec 3
Azimuth 30 180 285
Tilt (E/M) 4/2 0/2 2/0
Antenna Height 40 40 40
Location 113.2385556; -7.118722222
8 Alarms
9 Transmission check
Installed S1-U Bandwidth
Capacity Existing After
eNodeB Name TRM Capacity Upgrade
Required Available Capacity
5 (14)
SITE QUALITY AND PERFORMANCE ACCEPTANCE REPORT
ared No.
ALIEF RISBAYA
Approved Checked Date Rev Reference
454C816E_LTE_PANGELEN
VLAN Configuration
VLAN Gateway Subnet VLAN IP Gateway Subnet
eNodeB Name IP S1
S1 S1 S1 OAM OAM OAM OAM
454C816E_LTE_P 10.207. 10.207.17 255.255. 10.207. 10.207.17 255.255.2
1119 3719
ANGELEN 171.39 1.33 255.240 170.39 0.33 55.240
Transmission Node Visibility
eNodeB Name Capacity TRM Required
454C816E_LTE_PANGELEN Monitored
ALIEF RISBAYA
Approved Checked Date Rev Reference
11 Geographical Location
ALIEF RISBAYA
Approved Checked Date Rev Reference
15 Conclusion
After new site LTE_PANGELEN SAMPANG is integrated, the performance of new site is
normal
4 KPI Justification