Anda di halaman 1dari 10

SUMITOMO CORPORATION

Pakage 2 : 2 x 25 MW Dual Fuel Generators


Project
Thilawa, Thanlyin, Myanmar
Minutes of the Meeting
Ref. No. GTG-2016-SC-Drivers-001 Drivers Safety Committee Meeti
Date: April, 04th,2016 Time Start:AM 09:00
Location: SC- Office Time End: PM 09:30
SC- Aung Hsan Htoo
ATTENDEES:
Drivers-Aung Kyaw Soe,Nay Lin Kyaw,Pyo Wai Aung,Thein Naing, Ye Man,Kyaw Ky

EACH MEMBER OF THE SAFETY TEAM MUST HAVE A SUBSTITUTE JUST IN CASE THEY
CANNOT ATTEND.
Item Minute/Action Responsible Target Date
Safety Activities

Safety Issues

* Never drive a car on only a few hours of Always


sleep.
* Always report unsafe driving practice by Always
any car driver.
* Always check crossing any train rail ways Always
before pass.
1 * Should be up to date your driving license. Always
* Should not be drive after drunk. Always
* Should be wear belts in driving time. Always
* Do not smoke in driving time. Always
* Don't take out anger on your passengers. Always
* All drivers are capable of performing Always
their work activities safety and
responsibly.
*Regularly in time of duty. Always

Prepaired by: Signature and date:


Aung Hsan Htoo
Safety Officer
Approved by: Signature and date:
Motohiro Eitoku
Contruction Manager

Page 1 of 10
SUMITOMO CORPORATION
Pakage 2 : 2 x 25 MW Dual Fuel Generators
Project
Thilawa, Thanlyin, Myanmar

Committee Meeting

in Naing, Ye Man,Kyaw Kyaw

E JUST IN CASE THEY

Comments

Page 2 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

Minutes of the Meeting


Ref. No. B-11-2016-001 Site Safety Committee Meeti
Date: April,2,2017 Time Start:
Location: Hazama Office Time End:
Hazama Staff, Investcorp Staff,
ATTENDEES:
HTG Staff, ATAD Staff

Each subcontractor shall attand monthly safety

Item Minute/Action Responsible Description


Safety Activities

TNSM Overall Total of Safe Man-Hours:

February, 2017, to March, 2017 Hazama,


1 Hazama- 2,160 IVC,HTG, INFO
Investcorp- 25,680 ATAD
HTG - 832
ATAD - 0
28,672 as of March.31, 2017
o Monthly Hazard Identification Chart For: Fire - 2 - (1)
electrical burning
February, 2017 to March.31, 2017 small fire. (2) Gas
cutting small fire.
Fire _ 2
Physical -1-
Environmental _ 0 hit by hammer small
Physical _ 1 injury
Mechanical _ 0 hazard(medication)
2 Electrical _ 1 Hazama, Electrical -1-
Fall _ 0 IVC,HTG, overload current and
Others _ 0 ATAD blow-out the wire.

o Monthly Tracking Chart For:

February, 2017 to March.31, 2017


Near Miss _ 0
Accident/Incident _ 4

MONTHLY NEXT SAFETY MEETING

Hazama,
Date: April.30, 2017
3 IVC,HTG, INFO
Time: 00:00
ATAD
Location: Hazama Office

Page 3 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

Item Minute/Action Responsible Description


Safety Issues
Finding on the monthly safety
work through.

Page 4 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

Page 5 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

Item

Prepaired by: Signature and date:


Toe Wai Aung
Safety Officer
Approved by: Signature and date:
Mr.Masuhisa
Site Manager

Page 6 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

ty Committee Meeting

safety

Description Comments

INFO

re - 2 - (1)
lectrical burning
mall fire. (2) Gas
utting small fire.
Physical -1-
it by hammer small
njury
azard(medication)
Electrical -1-
verload current and
low-out the wire.

INFO

Page 7 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

Description Comments

Page 8 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

Page 9 of 10
HAZAMA ANDO CORPORATION
(TNSM PROJECT)
Monthly Safety Meeting

Comments