Anda di halaman 1dari 31

fofHkUurk izi=

QeZ@Bsdsnkj dk uke%&
dk uke esllZ lqizhe Jh eks0 jlhn
ekcZy b.MLV+ht [k.M dk uke% fu0[ka0&1] y[ku
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % uohiukg va/ks dh pkSdh ls eksgEenuxj
dSFku[ksMk lsrkyq
dY;kuiqj lEidZ ekxZ dk fuekZ.k
vuqcU/k la0@fnukad@ykxr % 11@bZ0bZ0@,0bZ0 prqFkZ@13&14 fnukad 18-05-13 fofHkUurk rd@ls vf/kd
e en dk uke tSlk vuqcU/k esa vafdr gS qfuV
;
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Construction of granular sub-base by providing well graded
material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with smooth wheel roller
to achieve the desired density, complete as per Technical
Specificaation Clause 401. Cum 74.25 3083.50 228949.88 574.860 2922.00 9009987.00 -8781037.12 -3835.35% 0.00%
2 Providing, Laying spreading and compacting stone
aggregates (G-2) of 63-45 mm size to water bound
macadam specification including spreading in uniform
thickness, hand packing, rolling with Smooth wheel roller 80-
100 Kn in stages to proper grade and camber, applying and Sqm 990.00 1.40 1386.00 1387.400 3545.00 4963.00 -3577.00 -258.08% 0.00%
brooming, Stone screening binding materials to fill up the
3 Providing,
interstices ofLaying spreading watering
coarse aggregate, and compacting
and compactingstone
to
aggregates (G-3) ofcost
the required denstiy 53-22.4 mm size
of all material to hire
water water
andbound
P.O.L
macadam
charges of specification including
road roller all T&P etcspreading
required in
for uniform
proper
tsthickness, hand packing, rolling
completion of work as directed by E/I with Smooth wheel roller
80-100 Kn in stages to proper grade and camber, applying
and brooming stone screening to fill up the nterstices of
ofcoarse aggregate wateringand compacting to the required
denstiy including cost of all material water hire & P.O.L
charges of road roller, all T&P etc required for proper
completion of work as directed by E/I

Sqm 990.00 61.70 61083.00 342.910 3593.00 221688.10 -160605.10 -262.93% 0.00%
4 Brick edging on both sides of the road with first class bricks
8 cm wide& 12 cm deep laid with mudmortar including
labour & supply ofbricks finished to required template and in
proper alingment and also including dressing & ramming the
excavated earth as directed by the Engineer-in-Charge
Sqm 900.00 16.18 14562.00 1.200 69500.00 1124510.00 -1109948.00 -7622.22% 0.00%
5 Providing and applying primer coat with bitumen emulsion
(SS) on prepared surface of granular base including
cleaning of road surface and spraying primer at the rate of
0.75 Kg/SQM usingmannual menas (Excluding cost of
Bitumen). Sqm 750.00 1403.98 1052985.00 4610.520 1.70 2386.77 162145.65 0.00% 15.40%
6 Providing and applying tack coat with VG_10 using bitumen
distributor at the rate of 0.35 kg per Sqm on the prepared
surface cleaned with hydraulic broom ( Excluding cost of
Bitumen). Rm 500.00 351.00 175500.00 ### 1.10 386.10 175113.90 99.78% 0.00%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsvariation kaithankheda
e en dk uke tSlk vuqcU/k esa vafdr gS ;
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z izfr'kr vuqcU/k ij fVIi.kh
la0 qfuV foLrkj esa
vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14
7 Constuction of embankemnt with approved material
obtained from land as permitted and approved by Engineer-
in-Charge and as per Technical Specification Clause
301.3.4.1 and compacting to meet requirement of Tables
300.1 and 300.2 as per Technical Specificaiton clause 301.5
Cum 600.00 73.72 44232.00 ### 69.50 5123.54 39108.46 88.42% 0.00%
8 Providing and laying & rolling seal coat "Type-C" sealing
the voids in a bituminous surface laid including mixing in a
suitable plant,laying and rolling with three wheel roller 80-
100 KN static roller capacity finished to required level and
grade including Cost of stone material, labour at Plant and
Laying Site as required and T&P etc.but excuding cost of
Bitumen, Hire Charges of Plant loading of aggregate FE Cum 38.61 2577.86 99531.17 ### 17.50 45112.55 54418.62 54.67% 0.00%
loader, heating mix in HMP and transporting the mix material
9 Earthwork in excavation for structures as per drawing
with tipper and laying with paver finsher to the required line,
& technical
grade specifications
and rolling with power clause 305.
roller 8-10 including
T required forsetting
proper
out. Construction of shoring & bracing
completion of work as per direction of E/I . removal of
stumps & other deleterious matter dressing of sides &
bottom backfilling the excavated earthwork.
30.900 121.00 0.00
Plain cement concrement 1:3:6 nominal mix in foundation
with crushed aggregate 40 mm nominal size mechanically
mised placed in foundation and compected by vibration
including curing for 14 days as per Technical Specification
Clauses 802.1202.1203.

2.300 5850.00 0.00


Providing and Laying reinforced concrete pipe NP3 for
culverte on first class bedding of granular material in single
row including fixing collar with cement mortar 1:2 ( 1 cement
: 2 coarse sand ) As per MORD Specification No 9.3-
1100(B) for 600 mm dia NP3.

0.000 2250.00 0.00


Brick masonary work in 1:3 cement mortar in foundation
complete excluding pointing and plastering as per drawing
and technical specifications clauses 600.3, 1202 & 1203

12.320 6090.00 0.00


Pointing with cement mortar (1:3) on brickwork in sub
structure & super structure as per drawing and technical
specification clauses 613.3, 1204 and 1208.4.

0.000 54.40 0.00

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsvariation kaithankheda
e en dk uke tSlk vuqcU/k esa vafdr gS ;
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z izfr'kr vuqcU/k ij fVIi.kh
la0 qfuV foLrkj esa
vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Plastering with cement mortar (1:4) 15 mm thick on
brickwork in substructure/superstructure as per technical
specification clauses 613.4 & 1204.

0.000 115.00 0.00


Total 1678229.05 1404170.06 -1005489.12 162145.65
Below 2.36% 39606.21 33138.41 -23729.54 3826.64
G. Total 1638622.84 1371031.64 -981759.58 158319.01

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsvariation kaithankheda
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsvariation kaithankheda
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsvariation kaithankheda
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsvariation kaithankheda
fofHkUurk izi=
QeZ@Bsdsnkj dk uke%& esllZ egk'kfDr VsMlZ
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % Construction work of Kahatanapur Link Road. [k.M dk uke% fu0[ka0&1] y[ku
vuqcU/k la0@fnukad@ykxr % 112@bZ0bZ0@,0bz0 f}rh;@2013&14 fnukad 19-12-2013
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk 20% ls vf/kd
la0 qfuV izkfo/kku
fofHkUurk izfr'kr vuqcU/k ij
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr vkx.ku ij vuqcU/k ij
1 2 3 cpr
vf/kdr
cpr vf/kdrk
cpr vf/kdrk
4 5 6 7 8 9 10 11 12 k
1 Earthwork in excavation for widening /camber as per drawing
and techical specifications clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious materials and disposa/upto a lead of 50 m.
dressing of sides and botom using manulas
Cum 23.98 78.88 1891.54 18.48 69.85 1290.83 17.657 69.85 1233.34 658.20 57.49 4.45% 0.00%
2 Construction of granular sub-base by providing well graded
Material spreadign in uniform layers with moto grader on
prepared surfae mixing by mix in place method with totavaror
at OMC and compacting with smooth wheel roler to achieve
the desire density, complete as per technical Specification
clause 401 including Cost of all material, water hire & P.O.L
Cum 23.98 2739.18 65685.54 18.48 2595.00 47955.60 17.66 2595.00 45819.92 19865.62 2135.68 4.45% 0.00%
3 Providing,
charges of laying spreading
road roler all T&P and compacting
etc required stone completion
for proper aggregate
(G-2)
of workofas
63-63 m size
directed to water bound macadam specification
by E/I.
including spreading in uniform thickness, hand packing rooling
with smooth wheel roler 80-100 KN in stages to proper grading
and camber, applying and brooming stone screeing binding
matrials to fill up the interstices of coarse aggregate, watering
and compacting to the required density including cst of all
material, water hire & P.O.L charges of road roler all T&P etc
required for proper completion of work as directed by E/I.

Cum 59.40 3481.12 206778.53 54.00 3198.00 172692.00 55.52 3198.00 177552.96 29225.57 4860.96 0.00% 2.81%
4 Providing, laying spreading and compacting stone aggregate
(G-3) of 53-22.4 m size to water bound macadam specification
including spreading in uniform thickness, hand packing rooling
with smooth wheel roler 80-100 KN in stages to proper grading
and camber, applying and brooming stone screeing binding
matrials to fill up the interstices of coarse aggregate, watering
and compacting to the required density including cst of all
material, water hire & P.O.L charges of road roler all T&P etc
required for proper completion of work as directed by E/I.

Cum 45.00 3356.08 151023.60 45.00 3192.00 143640.00 46.275 3192.00 147709.80 3313.80 4069.80 0.00% 2.83%
5 Providing and laying brick edging with first class bricks 7-8 cm.
Wide, 12 cm. Deep laid on either side of the metalled surface
as per directions of Engineer-in-charge including cost of all
materials, labour, T&P etc. required for proper completion of
the work.
Km. 0.16 62000.00 9920.00 0.16 55000.00 8800.00 0.16 55000.00 8800.00 1120.00 0.00 0.00% 0.00%
6 Providing and applying primer coat with bitumen emulsion (SS)
on prepared surface of granular base including cleaning of
road surface and spraying primer at the rate of 0.75kg/sqm
using mannual means excluding cost of materials.
Sqm 600.00 33.32 19992.00 600.00 1.40 840.00 617.00 1.40 863.80 19128.20 23.80 0.00% 2.83%
7 P/L. Tack Coat with VG_10 garde bitumen usign bitumen
Distributor at rate of 0.35 kg. per sqm on the prepared primed
surface excuding cost of materials and machinery
Sqm 600.00 21.27 12762.00 600.00 1.00 600.00 617.00 1.00 617.00 12145.00 17.00 0.00% 2.83%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid (2)
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk 20% ls vf/kd
la0 qfuV izkfo/kku
fofHkUurk izfr'kr vuqcU/k ij
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr vkx.ku ij vuqcU/k ij
1 2 3 cpr
vf/kdr
cpr vf/kdrk
cpr vf/kdrk
4 5 6 7 8 9 10 11 12 k
8 Providing and laying & rolling of open graded premix carpet of
20 mm thickness composed of 13.2 mm to 5.6 mm
agggregates using VG-10 grade of bitumen to required
line,grade and level to serve as wearing course on a previously
prepared base including mixing in a suitable plant,laying and
rolling with three wheel roller 80-100 KN static roller capacity
finished to required level and grade to be followed by seal coat
including Cost of stone material, labour at Plant and Laying
Site as required and T&P etc. but excuding cost of Bitumen,
Hire Charges of Plant loading of aggregate FE loader, heating
mix in HMP and transporting the mix material with tipper and
laying with paver finsher to the required line, grade and rolling
with power roller 8-10 T required for proper completion of work
as per direction of E/I

Sqm 600.00 177.74 106644.00 600.00 63.20 37920.00 617.00 63.20 38994.40 67649.60 1074.00 0.00% 2.83%
9 Providing and laying & rolling Seal coat "Type C" over PC
surface with HMP of appropriate capacity not less than 75
tonnes/ hours using crushed stone chipping 6.7 mm nominal
size @ 0.90 Cum per 100 Sqm and penetration bitumen @ 98
Kg. per 100 Sqm required proper comp of work as per direction
of E/I including cost of Bitumen and Plant hire Charges of
HMP and cartage of mix
Sqm 600.00 66.31 39786.00 600.00 15.90 9540.00 617.00 15.90 9810.30 29975.70 270.30 2.83%
Total 614483.21 423278.43 431401.52 183081.69 2193.17 10315.86
Below 0.95% 4021.15 4098.31 1739.28 20.84 98.00
G. Total 419257.28 427303.21 181342.41 2172.33 10217.86

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj.k fy[kk tk;sA
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA

voj vfHk;Urk lgk;d vfHk;Urk vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk


fuekZ.k [k.M&1] yks0fu0fo0] y[kufuekZ.k [k.M&1] yks0fu0fo0] y[ku fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
y[ku y[ku

Bsdsnkj

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid (2)
fVIi.kh
foLrkj esa
fMVsy vkQ
estjesUV ds
vk/kkj ij

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid (2)
fVIi.kh
foLrkj esa
fMVsy vkQ
estjesUV ds
vk/kkj ij

vfHk;Urk
yks0fu0fo0]

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid (2)
fofHkUurk izi=
QeZ@Bsdsnkj dk uke%& esllZ Jh lkbZjke bUVizkbtst
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % Protection work of betan Nala at Rusaina to Jhaubaia Link Road. [k.M dk uke% fu0[ka0&1] y[ku
vuqcU/k la0@fnukad@ykxr % 144@bZ0bZ0@,0bz0 f}rh;@2013&14 fnukad 21-12-2013
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk 20% ls vf/kd
la0 qfuV izkfo/kku
fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr vkx.ku ij vuqcU/k ij foLrkj esa
fMVsy vkQ
1 2 3 vf/kdr cpr vf/kdrk estjesUV ds
cpr cpr vf/kdrk
4 5 6 7 8 9 10 11 12 k vk/kkj ij

1 Earthwork in excavation for structures as per drawing


and technical specifications clause 305.1 including
setting out, construction of shoring and bracing, removal
of stumps and other deleterious materials and disposal
upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material.
Cum 0.00 0.00 0.00 81.60 78.88 6436.61 81.20 78.88 6405.06 31.55 0.49% 0.00%
2 Plain cement concrement 1:3:6 nominal mix in
foundation with crushed aggregate 40 mm nominal size
mechanically mixed,placed in foundation and compected
by vibration including curing for 14 days.
Cum 0.00 0.00 0.00 14.40 5400.00 77760.00 15.26 5400.00 82404.00 4644.00 0.00% 5.97%
3 Brick masonry work in 1:3 cement mortar in foundation
complete excluding pointing and plastering as per
drawing and technical speficiations clauses 600, 1202 &
1203 Cum 0.00 0.00 0.00 108.00 5430.00 586440.00 92.89 5430.00 504392.70 82047.30 13.99% 0.00%
4 plain/reinforce cement concrete in substructure
complete as per drqwing and technical specification
clauses 802,804,804,806,807,1202,&1204 Cum 0.00 0.00 0.00 1.20 6150.00 7380.00 1.10 6150.00 6765.00 615.00 8.33% 0.00%
5 Pointing with cement mortar (1:4) on brickwork in sub
structure & super structure as per drawing and technical
specification clauses 613.3 , 1204 and 1208.4
Sqm 0.00 0.00 0.00 100.50 50.30 5055.15 96.90 50.30 4874.07 181.08 3.58% 0.00%
6 Construction of granular sub-base by providing well
graded material, spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with
smooth wheel roller to achieve the desired density,
complete as per Technical Specification Clause 401.
Cum 0.00 0.00 0.00 19.00 2650.00 50350.00 33.38 2650.00 88457.00 38107.00 0.00% 75.68%
7 Construction of un-reinforced, dowel jointed at expansion and
construction joint only, plain cement concrete pavement, thickness
as per design, over a prepared sub base, with 43 grade cement or any
other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine
aggregates conforming to IS: 383, maximum size of coarse aggregate
not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2
cum capacity and appropriate weigh batcher using approved mix
design, laid in approved fixed side formwork (steel channel, laying and
fixing of 125 micron thick polythene film, wedges, steel plates including
levelling the formwork as per drawing), spreading the concrete with
shovels, rakes, compacted using needle, screed and plate vibrators
and finished in continuous operation including provision of contraction
and expansion, construction joints, applying debonding strips, primer,
sealant, dowel bars, near approaches to bridge/culvert and
construction joints, admixtures as approved, curing of concrete slabs
for 14-days, curing compound (where specified) and water finishing to
lines and grade as per drawing and Technical Specification Clause
1501.

Cum 0.00 0.00 0.00 20.00 7000.00 140000.00 30.04 7000.00 210280.00 70280.00 0.00% 50.20%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk 20% ls vf/kd
la0 qfuV izkfo/kku
fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr vkx.ku ij vuqcU/k ij foLrkj esa
fMVsy vkQ
1 2 3 cpr
vf/kdr
cpr vf/kdrk
cpr vf/kdrk estjesUV ds
4 5 6 7 8 9 10 11 12 k vk/kkj ij

8 Constuction of embankemnt with approved material


obtained from borrow pits (carted earth) with a lift upto
1.5m & lead up to 1000 m transportion to site,
spreading, grading to required slope and compacting to
meet requirement of Tables 300.1 and 300.2 as per
Technical Specification clause 301.5
Cum 0.00 0.00 0.00 237.50 128.00 30400.00 232.12 128.00 29711.36 688.64 2.27% 0.00%
Total 0.00 903821.76 933289.19 83563.57 113031.00
Below 1.22% 11026.63 11386.13 1019.48 1378.98
G. Total 892795.13 921903.06 82544.09 111652.02

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj.k fy[kk tk;sA
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA

voj vfHk;Urk lgk;d vfHk;Urk vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk


fuekZ.k [k.M&1] yks0fu0fo0] y[kufuekZ.k [k.M&1] yks0fu0fo0] y[ku fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
y[ku y[ku

Bsdsnkj

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsSahid
fofHkUurk izi=
QeZ@Bsdsnkj dk uke%& esllZ ,e0vkbZ0ih0 dkULVD'kuA [k.M dk uke% fu0[ka0&1] y[ku
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % uUniqj ls jkekfMxzh dkyst gksrs gq, uUn fcgkj dkyksuh lEidZ ekxZ ds fuekZ.k dk dk;ZA
vuqcU/k la0@fnukad@ykxr % fofHkUurk rd@ls vf/kd
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa izfr'kr vuqcU/k ij fVIi.kh
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk
la0 qfuV izkfo/kku foLrkj esa
vkx.ku ij vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Construction of granular sub-base by providing well graded
material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with smooth wheel roller
to achieve the desired density, complete as per Technical
Specification Clause 401. Cum 476.00 2513.00 1196188.00 476.00 2513.00 1196188.00 426.32 2513.00 1071342.16 124845.84 124845.84 10.44% 0.00%
2 Providing ,Laying ,spreading and compacting stone
aggregates of 63-45 mm size to water bound macadam
specification including spreading in uniform thickness , hand
packing ,rolling with Smooth wheel roller 80-100 KN in
stages to proper grade and camber ,applying and
brooming ,Stone screening,binding materials to fill up
theinterstices of coarse aggregate ,watering and compacting
to the required density
Cum 345.00 3047.00 1051215.00 345.00 3047.00 1051215.00 364.93 3047.00 1111941.71 60726.71 60726.71 0.00% 5.78%
3 Providing ,Laying ,spreading and compacting stone
aggregates of 53-22.4 mm size to water bound macadam
specification including spreading in uniform thickness , hand
packing ,rolling with Smooth wheel roller 80-100 KN in
stages to proper grade and camber ,applying and
brooming ,Stone screening to fill up the nterstices of coarse
aggregate ,watering and compacting to the required density
Cum 300.94 3045.00 916362.30 300.94 3045.00 916362.30 322.02 3045.00 980550.90 64188.60 64188.60 0.00% 7.00%
4 Brick edging on both sides of the road with first class bricks
8 cm wide & 12 cm deep laid with mudmortar including
labour & supply of bricks finished to required template and Km 1.15 55000.00 63250.00 1.15 55000.00 63250.00 1.15 55000.00 63250.00 0.00% 0.00%
in proper alingment and also including dressing & ramming
5 Providing and applying
the excavated earth asprimer coat by
directed withthe
bitumen emulsion
Engineer - in
(SS) on prepared surface of granular base including
-charge.
cleaning of road surface and spraying primer at the rate of
0.75kg/sqm usingmannual means. excluding cost of
Bitumen Sqm 4012.50 1.40 5617.50 4012.50 1.40 5617.50 4389.82 1.40 6145.75 528.25 528.25 0.00% 9.40%
6 Providing and applying tack coat with VG_10 using bitumen
distributor at the rate of 0.35 kg per sqm on the prepared
surface cleaned with hydraulic broom .excluding cost of
bitumen Sqm 4012.50 0.80 3210.00 4012.50 0.80 3210.00 4685.69 0.80 3748.55 538.55 2938.55 0.00% 91.54%
7 Providing laying & rolling of open graded premix carpet of
20 mm thickness composed of 13.2mm to 5.6 mm
aggregates either using penetration grade bitumen or
emulsion to required line ,grade and level to serve as
wearing course on a previously prepared base including
mixing in a suitable plant ,laying and rolling with a three
wheel 80-100 KN static roller capacity finished to required
level and grades to be followed by seal coat . excluding cost
of bitumen
Sqm 4012.50 61.60 247170.00 4012.50 61.60 247170.00 4391.14 61.60 270494.22 23324.22 23324.22 0.00% 9.44%
8 Providing and laying seal coat 'C' Type sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall . excluding cost of bitumen Sqm 4012.50 15.40 61792.50 4012.50 15.40 61792.50 4389.82 15.40 67603.23 5810.73 5810.73 0.00% 9.40%
9 300 mm Hume pipe Culvert

9a Earthwork in excavation for structures as per drawing and


technical specifications clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious materials and disposal upto a lead of 50
m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material. Cum 38.00 69.85 2654.30 38.00 69.85 2654.30 36.13 69.85 2523.68 130.62 130.62 4.92% 0.00%
9b Laying reinforced cement concrement pipe for culverts on
first class bedding of granular material in single row
including fixing collar with cement motar 1:2 but excluding
excavation,protection works,back filling,concrete and
masonary works in head walls and parapets
Rm 15.00 915.77 13736.55 15.00 915.77 13736.55 15.00 915.77 13736.55 0.00 0.00% 0.00%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsV
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa izfr'kr vuqcU/k ij fVIi.kh
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk
la0 qfuV izkfo/kku foLrkj esa
vkx.ku ij vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
9c Construction of embankment with approved material
obtained from borrow pits(carted earth) with a lift upto 1.5m
& lead up to 1000 m, transporting to site, spreading, grading
to required slope and compacting to meet requirement of
Tables 300.1 and 300.2 . as per Technical Specification
clause 301.5 Cum 585.00 111.60 65286.00 585.00 111.60 65286.00 592.65 111.60 66139.74 853.74 853.74 0.00% 1.31%
Total 3626482.15 3626482.15 3657476.49 124976.46 124976.46
Below 3.75% 135993.08 137155.37 4686.62 4686.62
G. Total 3490489.07 3520321.12 120289.84 120289.84

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj.k voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsV
fofHkUurk izi=
QeZ@Bsdsnkj dk uke%& esllZ flag dkULVD'kuA [k.M dk uke% fu0[ka0&1] y[ku
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % dsljhiqj lEidZ ekxZA
vuqcU/k la0@fnukad@ykxr % 92@bZ0bZ0@,0bZ0 f}rh;@10&11 fnukad 04-11-10 fofHkUurk rd@ls vf/kd
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa izfr'kr vuqcU/k ij fVIi.kh
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk
la0 qfuV izkfo/kku foLrkj esa
vkx.ku ij vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Construction of granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at OMC, carriage
of mixed Material to work site, spreading in uniform layers
with motor grader on prepared surface and compacting with
vibratory power roller to achieve the desired density,
complete as per clause 401
Cum 98.00 2075.00 203350.00 98.00 2075.00 203350.00 83.52 2037.00 170130.24 33219.76 33219.76 16.34% 0.00%
2 P/L, spreading and compacting 75 mm compacted inter coat
(G2 )with specific sizes of 45-63 mm gauge stone ballast of
approved quarry @ 0.99Cum per 10 Sqm,Sreening material
6.7 mm grit of approved quarry to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with 3 wheeled steel/ vibratory roller 8-10
tonnes in stages to proper grade and camber, applying and
brooming requisite type of screening/ binding Materials to fill
up the interstices of coarse aggregate, watering and
compacting to the required density including Cost of all
material , water,hire & P.O.L. of road roller, all T & P etc.
required for proper completion of work as directed by E/I

Cum 68.00 2517.30 171176.40 68.00 2517.30 171176.40 62.64 2517.30 157683.67 13492.73 13492.73 7.88% 0.00%
3 P/L, spreading and compacting 75 mm compacted inter coat
(G3 )with specific sizes of 22.4-53 mm gauge stone ballast
of approved quarry @ 0.99 Cum per 10 Sqm, Sreening
material 6.7 mm grit of approved quarry to water bound
macadam specification including spreading in uniform
thickness, hand packing, rolling with 3 wheeled steel/
vibratory roller 8-10 tonnes in stages to proper grade and
camber, applying and brooming requisite type of screening/
binding Materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density
including Cost of all material , water, hire & P.O.L. of road
roller, all T & P etc. required for proper completion of work
as directed by E/I

Cum 68.00 2524.00 171632.00 68.00 2524.00 171632.00 62.640 2524.00 158103.36 13528.64 13528.64 7.88% 0.00%
4 Providing and laying brick edging with first class bricks 8 cm.
Wide, 12 cm. Deep laid on either side of the metalled
surface as per directions of Engineer-in-charge including
cost of all materials, labour, T&P etc. required for proper
completion of the work (as per SI No. 765 of schedule of
rates of UPPWD). Km. 0.30 44750.00 13425.00 0.30 44750.00 13425.00 0.262 44750.00 11724.50 1700.50 1700.50 12.67% 0.00%
5 Earthwork in patries in ordinary soil excavation to be done in
the form of regular pits not exceeding 0.50 M. in depth and
E/W in embankment to be in 20 cm. layers including lift upto
1.50M. and lead upto 30M. ramming and dressing the
surface as per direction of E/I. excluding abadi portion in Km
including Royality Cum 150.00 59.00 8850.00 150.00 59.00 8850.00 175.72 59.00 10367.48 1517.48 1517.48 0.00% 17.15%
6 All as item No. 1but Carted Earthwork by 1.00 km including
royality and compensation of Earth Cum 50.00 102.00 5100.00 50.00 102.00 5100.00 112.97 102.00 11522.94 6422.94 6422.94 0.00% 125.94%
7 Earthwork in excavation in trenches for foundations pipe
cable etc. in ordinary soil (loam clay or sand) including lift
upto 1.5 meter led upto 50 meter and dressing of sites and
ramming of bottem and disposal of surplus excavated earth
as per direction of E/I/. Cum 20.00 60.00 1200.00 20.00 60.00 1200.00 36.64 60.00 2198.40 998.00 998.40 0.00% 83.20%
8 Providing and laying in Cement concrete 1:4:8 (1cement:4
fine sand:8 graded brick ballast 40 mm nominal size) and
curing complete, including supply of all materials,labour and
T&P etc.required for proper completion of the work in
foundations and floors as per S.I.No.275.
Cum 6.00 2550.00 15300.00 6.00 2550.00 15300.00 4.280 2550.00 10914.00 4386.00 4386.00 28.67% 0.00%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsKesari Pur
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa izfr'kr vuqcU/k ij fVIi.kh
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk
la0 qfuV izkfo/kku foLrkj esa
vkx.ku ij vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
9 Providing, laying and fixing of 600 mm dia NP-3 Hume Pipe
including its collars with 1:2 cement mortor in proper position
complete as per direction of Engineer-in-charge.
Rm 7.50 1494.00 11205.00 7.50 1494.00 11205.00 0.00 1494.00 0.00 11205.00 11205.00 100.00% 0.00%
10 Class-150 brick work in 1:3 cement and coarse sand mortar
in foundation and plinth including supply of all
materials,labour and T&P etc.required for proper completion
of the work Cum 6.50 3300.00 21450.00 6.50 3300.00 21450.00 8.34 3300.00 27522.00 6072.00 6072.00 0.00% 28.31%
11 pointing on brick work in 1:2 cement mortar ( 1 cement & 2
fine sand) including supply of all materials,labour and T&P
etc.required for proper completion of the work Sqm 20.00 100.00 2000.00 20.00 100.00 2000.00 15.850 100.00 1585.00 415.00 415.00 20.75% 0.00%
12 12 cm. cement plaster in singal coat on rough side of brick
wall in 1:4 cement mortar incl. cost of material as per PWD
detailed specification Sqm 2.00 90.00 180.00 2.00 90.00 180.00 1.98 90.00 178.20 1.80 1.80 1.00% 0.00%
13 P/L Prime coat over WBM Surface @ 0.75 Kg/Sqm bitumen
emulsion including cost of labour, emulsion, T&P etc
complete as required for Proper completion of work as per
PWD/MORT&H specification (as per MORTH clause No.
502). But excluding cost of Bitumen Emulsion SS Sqm 1800.00 1.30 2340.00 1800.00 1.30 2340.00 835.22 1.30 1085.79 1254.21 1254.21 53.60% 0.00%
14 P/L 20 mm thick Premix Carpet composed of 13.2 mm grit
@ 1.80 Cum per 100 Sqm, 11.2 mm grit @ 0.90 Cum per
100 Sqm using penetration grade bitumen 80/100 @ 146
Kg. per 100 Sqm including Cost of material, labour at Plant
and Laying Site as required and T&P etc. But excuding cost
of Bitumen, Hire Charges of Plant loading of aggregate FE
loader, heating mix in HMP not less then 75 T transporting
the mix material with tipper and laying with paver finsher to
the required line, grade and rolling with power roller 8-10 T
required for proper completion of work as per direction of E/I

Sqm 1800.00 54.60 98280.00 1800.00 54.60 98280.00 853.20 54.60 46584.72 51695.28 51695.28 52.60% 0.00%
15 P/L Seal coat Type A over PC surface with HMP of
appropriate capacity not less than 75 tonnes/ hours using
crushed stone chipping 6.7 mm nominal size @ 0.90 Cum
per 100 Sqm and penetration grade bitumen @ 98 Kg. per
100 Sqm including Cost of material, labour at Plant and
Laying Site as required and T&P etc. But excuding cost of
Bitumen, Hire Charges of Plant loading of aggregate FE
loader, heating mix in HMP not less then 75 T transporting
the mix material with tipper and laying with paver finsher to
the required line, grade and rolling with power roller 8-10 T
required for proper completion of work as per direction of E/I

Sqm 1800.00 13.30 23940.00 1800.00 13.30 23940.00 835.22 13.30 11108.43 12831.57 12831.57 53.60% 0.00%
Total 749428.40 749428.40 620708.73 143730.49 15010.42 143730.49 15010.82
Below 0.25% 1873.57 1551.77 359.33 37.53 359.33 37.53
G. Total 747554.83 619156.96 143371.16 14972.89 143371.16 14973.29

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj.k voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsKesari Pur
fofHkUurk izi=
QeZ@Bsdsnkj dk uke%&
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % [k.M dk uke% fu0[ka0&1] y[ku
vuqcU/k la0@fnukad@ykxr %
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk 20% ls vf/kd
la0 qfuV izkfo/kku
izfr'kr vuqcU/k
fofHkUurk fVIi.kh
ij foLrkj esa
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr vkx.ku ij vuqcU/k ij
fMVsy vkQ
1 2 3 cpr
vf/kdr
cpr vf/kdrk
cpr vf/kdrk estjesUV ds
4 5 6 7 8 9 10 11 12 k vk/kkj ij

1 Earthwork in excavation for widening/camber as per ekxZ


drawing and technical specifications clause 305.1 LFky ij
including setting out construction of shoring and bracing,
removal of stumps and other deleterious materials and vko';drk
disposal upto a lead of 50 m d dressing of sides and uqlkj
bottom using manulas mens.
Cum 69.30 78.88 5466.38 150.30 69.85 10498.46 41.00 69.85 2863.85 2602.53 7634.61 73% 0.00% pkSM+k
bZ
2 Construction of granular sub-base by providing well
graded material, spreading in uniform layers with motor miyC/k u
grader on prepared surface, mixing by mix in place gks ikus
method with rotavator at OMC, and compacting with ds dkj.k
smooth wheel roller to achieve the desired density,
complete as per Technical Specification Clause 401.
ekxZ
including Cost of all material, water, hire & P.O.L charges 175 eh0
of raod roller, all T&P etc. required for proper completion de
of work as directed by E/I yEckbZ
170.55 2652.92 452455.51 170.55 2590.00 441724.50 106.32 2590.00 275368.80 177086.71 166355.70 38% 0.00%
esa
3 Providing ,Laying ,spreading and compacting stone cuk;h
aggregates (G-2) of 63-45 mm size to water bound
macadam specification including spreading in uniform x;hA
thickness , hand packing ,rolling with Smooth wheel
roller 80-100 KN in stages to proper grade and
camber ,applying and brooming ,Stone
screening,binding materials to fill up theinterstices of
coarse aggregate ,watering and compacting to the
required density including Cost of all material, water,
hire & P.O.L charges of raod roller, all T&P etc. required
for proper completion of work as directed by E/I
272.25 3321.98 904409.06 258.75 3192.00 825930.00 206.47 3192.00 659052.24 245356.82 166877.76 20% 0.00%
4 Providing ,Laying ,spreading and compacting stone
aggregates (G-3) of 53-22.4 mm size to water bound
macadam specification including spreading in uniform
thickness , hand packing ,rolling with Smooth wheel
roller 80-100 KN in stages to proper grade and
camber ,applying and brooming ,Stone screening to fill
up the nterstices of coarse aggregate ,watering and
compacting to the required density for proper completion
of work as directed including Cost of all material, water,
hire & P.O.L charges of raod roller, all T&P etc. required
for proper completion of work as directed by E/I
225.00 3258.37 733133.25 225.00 3190.00 717750.00 177.94 3190.00 567628.60 165504.65 150121.40 21% 0.00%
5 Brick edging on both sides of the road with first class
bricks 7-8 cm wide & 12 cm deep laid with mudmortar
including labour & supply of bricks finished to required
template and in proper alingment and also including
dressing & ramming the excavated earth as directed by
the Engineer - in -charge.
0.80 62000.00 49600.00 0.80 55000.00 44000.00 0.63 55000.00 34375.00 15225.00 9625.00 22% 0.00%
6 Providing and applying primer coat with bitumen
emulsion (SS) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.75kg/sqm usingmannual means .
excluding cost of material
3000.00 1.31 3930.00 3000.00 1.40 4200.00 2372.55 1.40 3321.57 608.43 878.43 21% 0.00%
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsas (4)
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk 20% ls vf/kd
la0 qfuV izkfo/kku
izfr'kr vuqcU/k
fofHkUurk fVIi.kh
ij foLrkj esa
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr vkx.ku ij vuqcU/k ij
fMVsy vkQ
1 2 3 cpr
vf/kdr
cpr vf/kdrk
cpr vf/kdrk estjesUV ds
4 5 6 7 8 9 10 11 12 k vk/kkj ij

7 Providing and applying tack coat with VG_10 using


bitumen distributor at the rate of 0.35 kg per sqm on the
prepared primed surface excluding cost of materials
and machinery. 3000.00 1.31 3930.00 3000.00 1.00 3000.00 2390.55 1.00 2390.55 1539.45 609.45 20% 0.00%
8 Providing laying & rolling of open graded premix carpet
of 20 mm thickness composed of 13.2mm to 5.6 mm
aggregates using VG-10 grade of bitumen to required
line grade level to serve as wearing course on a
previously prepared base including mixing in a suitable
plant, laying and rolling with three wheel roller 80-100
KN static rooler capacity finished to required level and
grade to be followed by seal coat including Cost of stone
material, labour at plant and Laying site as required and
T&P etc. but excuding cost Bitumen, Hire charges of
plant loading of aggregate FE loader, heating mix in
HMP and transporting the mix material with tipper and
laying with paver finisher to the required line, grade and
rolling with power roller 8-10 T required for proper
completion of work as per direction of E/I.
3000.00 75.96 227880.00 3000.00 63.20 189600.00 2390.55 63.20 151082.76 76797.24 38517.24 20% 0.00%
9 Providing and laying rolling seal coat "Type-C" sealing
the voids in a bituminous suface laid including mixing in
a suitable plant, laying and rolling with three wheel roller
80-100 KN static rooler capacity finished to required
level and grade to be followed by seal coat including
Cost of stone material, labour at plant and Laying site as
required and T&P etc. but excuding cost Bitumen, Hire
charges of plant loading of aggregate FE loader, heating
mix in HMP and transporting the mix material with tipper
and laying with paver finisher to the required line, grade
and rolling with power roller 8-10 T required for proper
completion of work as per direction of E/I.
3000.00 22.48 67440.00 3000.00 15.90 47700.00 2390.55 15.90 38009.75 29430.25 9690.25 20% 0.00%
Total 2448244.20 2284402.96 1734093.12 714151.08
Below 1.10% 25128.43 19075.02 7855.66
G. Total 2259274.53 1715018.10 706295.42

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj.k fy[kk tk;sA
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA

voj vfHk;Urk lgk;d vfHk;Urk vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk


fuekZ.k [k.M&1] yks0fu0fo0] y[kufuekZ.k [k.M&1] yks0fu0fo0] y[ku fuekZ.k [k.M&1] yks0fu0fo0y[ku o`Rr] yks0fu0fo0]
y[ku y[ku

Bsdsnkj

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsas (4)
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsas (4)
file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsas (4)
fofHkUurk izi=
Bsdsnkj dk uke % f=nso dkULVD'ku dEiuhA
dk;ZZ dk uke % jue lEidZ ekxZA [k.M dk uke% fu0[ka0&1] y[ku
vuqcU/k la0@fnukad@ykxr % 101@bZ0bZ0@,0bZ0 r`rh;@10&11 fnukad 10-11-10
rduhdh Lohd`fr vkx.ku esa fofHkUurk 20% ls vf/kd
e en dk uke tSlk vuqcU/k esa ;qfuV izkfo/kku vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
vafdr gSek=k vkx.ku ij vuqcU/k ij
ek=k nj ykxr nj ykxr ek=k nj ykxr cpr vf/kdrk fMVsy vkQ
cpr vf/kdrk cpr vf/kdrk estjesUV ds
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 vk/kkj ij
19
1 Providing and laying in Cement concrete 1:4:8
(1cement:4 fine sand:8 graded brick ballast 40
mm nominal size) and curing complete,
including supply of all materials,labour and T&P
etc.required for proper completion of the work in
foundations and floors as per S.I.No.275.
Cum 12.00 2550.00 30600.00 12.00 2550.00 30600.00 2.78 2550.00 7089.00 23511.00 23511.00 76.83% 0.00%
2 Providing, laying and fixing NP-3 Hume Pipe
including its collars with 1:2 cement mortor in
proper position complete as per direction of
Engineer-in-charge.
300mm M 7.50 458.60 3439.50 7.50 458.60 3439.50 15.00 458.60 6879.00 3439.50 3439.50 0.00% 100.00%
600MM M 7.50 1494.00 11205.00 7.50 1494.00 11205.00 0.00 1494.00 0.00 11205.00 11205.00 100.00% 0.00%
900mm M 7.50 3141.00 23557.50 7.50 3141.00 23557.50 0.00 3141.00 0.00 23557.50 23557.50 100.00% 0.00%
3 Class-150 brick work in 1:3 cement and coarse
sand mortar in foundation and plinth including
supply of all materials,labour and T&P
etc.required for proper completion of the work
Cum 25.00 3300.00 82500.00 25.00 3300.00 82500.00 5.61 3300.00 18513.00 63987.00 63987.00 77.56% 0.00%
4 struck pointing on brick work in 1:2 cement
mortar ( 1 cement & 2 fine sand) including
supply of all materials,labour and T&P
etc.required for proper completion of the work Sqm 25.00 100.00 2500.00 25.00 100.00 2500.00 16.27 100.00 1627.00 873.00 873.00 34.92% 0.00%
Total . 153802.00 153802.00 34108.00 123133.50 3439.50 123133.50 3439.50
Below 21.84% 33590.36 7449.19 26892.36 751.19 26892.36 751.19
G. Total 120211.64 26658.81 96241.14 2688.31 96241.14 2688.31

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsRanmau (30%)
fofHkUurk izi=
Bsdsnkj dk uke % f=nso dkULVD'ku dEiuhA
dk;ZZ dk uke % jue lEidZ ekxZA [k.M dk uke% fu0[ka0&1] y[ku
vuqcU/k la0@fnukad@ykxr % 101@bZ0bZ0@,0bZ0 r`rh;@10&11 fnukad 10-11-10
rduhdh Lohd`fr vkx.ku esa fofHkUurk 20% ls de
e en dk uke tSlk vuqcU/k esa vafdr ;qfuV izkfo/kku vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
gS ek=k vkx.ku ij vuqcU/k ij
ek=k nj ykxr nj ykxr ek=k nj ykxr cpr vf/kdrk fMVsy vkQ
cpr vf/kdrk cpr vf/kdrk estjesUV ds
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 vk/kkj ij
19
6 P/L Prime coat over WBM Surface @ 0.75 Kg/Sqm
bitumen emulsion including cost of labour,
emulsion, T&P etc complete as required for Proper
completion of work as per PWD/MORT&H
specification (as per MORTH clause No. 502).
Sqm 3000.00 22.10 66300.00 3000.00 1.30 3900.00 3300.00 1.30 4290.00 62010.00 390.00 0.00% 10.00%
7 PC 20mm thickness composed of 13.2 mm grit @
1.80 Cum per 100 Sqm, 11.2 mm grit @ 0.90 Cum
per 100 Sqm using penetration grade bitumen
80/100 @ 146 Kg. per 100 Sqm including Cost of
material, Bitumen, heating binder and aggregate to
the required temperature , rolling with
roller/handrammer, and including labour and all T&P
required for proper completion of work as per
direction of E/I (Excluding cost of Bitumen)

Sqm 3000.00 131.40 394200.00 3000.00 54.60 163800.00 3300.00 54.60 180180.00 214020.00 16380.00 0.00% 10.00%
8 Seal coat (Type A) composed with 6.7 mm grit @
0.9 Cum per 100 Sqm, using penetration grade
bitumen 80/100 @ 146 Kg. per 100 Sqm including
Cost of material, Bitumen, heating binder and
aggregate to the required temperature , rolling with
roller/handrammer, and including labour and all
T&P required for proper completion of work with
power roller 8-10 T required proper comp of work as
per direction of E/I (Excluding cost of Bitumen)

Sqm 3000.00 60.50 181500.00 3000.00 13.30 39900.00 3300.00 13.30 43890.00 137610.00 3990.00 0.00% 10.00%
9 Earthwork in excavation in trenches for foundation
in ordinary soil including lift upto 1.5 m,lead upto 50
m and dressing of sides and ramming of bottom
and disposal of surplus excavated earth as directed
by the Engineer-in-Charge within a distance of 50
m. Cum 50.00 59.00 2950.00 50.00 60.00 3000.00 50.09 60.00 3005.40 55.40 5.40 0.00% 0.18%
10 12 cm. cement plaster in singal coat on rough side
of brick wall in 1:4 cement mortar incl. cost of
material as per PWD detailed specification Sqm 2.00 80.00 160.00 2.00 80.00 160.00 1.96 80.00 156.80 3.20 3.20 2.00% 0.00%
11 Earthwork in Patries in ordinary soil excavation to
be done in the form of regular pits not exceeding
0.50 M. in depth and E/W in embankment to be in
20 cm. layers including lift upto 1.50M and lead
upto 30m ramming and dressing the surface as per
direction of E/I. excludign abadi portion in km.
including Royality
Cum 200.00 59.00 11800.00 200.00 59.00 11800.00 207.90 59.00 12266.10 466.10 466.10 0.00% 3.95%
Total . 656910.00 222560.00 243788.30 413643.20 521.50 3.20 21231.50
Below 21.84% 48607.10 53243.36 90339.67 113.90 0.70 4636.96
G. Total 173952.90 190544.94 323303.53 407.60 2.50 16594.54
izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhd voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsRanmau (20%)
fofHkUurk izi=
Bsdsnkj dk uke % f=nso dkULVD'ku dEiuhA
dk;ZZ dk uke % jue lEidZ ekxZA [k.M dk uke% fu0[ka0&1] y[ku
vuqcU/k la0@fnukad@ykxr % 101@bZ0bZ0@,0bZ0 r`rh;@10&11 fnukad 10-11-10
rduhdh Lohd`fr vkx.ku esa fofHkUurk rd@ls vf/kd
e en dk uke tSlk vuqcU/k esa ;qfuV izkfo/kku vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
vafdr gSek=k vkx.ku ij vuqcU/k ij
ek=k nj ykxr nj ykxr ek=k nj ykxr cpr vf/kdrk fMVsy vkQ
cpr vf/kdrk cpr vf/kdrk estjesUV ds
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 vk/kkj ij
19
1 Earthwork in Cutting or in embackment in
ordinary soil excavation to be done in the form
of regular pits not exceeding 1/2 M. in depth and
E/W in embankment to be in 20 cm. layers
including ramming and dressing the surface to
required level and slope and also including 1.5M
lift and 2 km. the earth form cutting shall be
used in making embankment or to be disposal
of a spoil bank within 30 m distance as per
directed by E/I.
Cum 1400.00 59.00 82600.00 0.00 59.00 0.00 0.00 59.00 0.00 82600.00 0.00 0.00% 0.00%
2 Brick on edge soling with new bricks laid on
edge & dry including preparation of subgrade to
required camber, filling joints with local earth,
spreading, blinding coat one cm. Thick with local
earth over the entire surface and including
supply of all materials, labour, T&P etc. required
for proper completion of work.
Sqm 577.00 265.40 153135.80 400.00 265.40 106160.00 400.00 265.40 106160.00 46975.80 0.00 0.00% 0.00%
3 Providing, laying, spreading and compacting 75
mm compacted coat (G2 ) with specific sizes of
45-63 mm gauge stone ballast shankergarh and
Screening material Type -B of approved quarry
as per PWD specifiction including spreading in
uniform thickness, hand packing, rolling with 3
wheeled steel/ vibratory roller 8-10 tonnes in
stages to proper grade and camber, applying
and brooming requisite type of screening/
binding Materials to fill up the interstices of
coarse aggregate, watering and compacting to
the required density including Cost of all
material , water, hire & P.O.L. of road roller, all T
& P etc.required for proper completion of work
as directed by E/I

Cum 247.50 2311.70 572145.75 225.00 2321.70 522382.50 247.50 2321.70 574620.75 2475.00 52238.25 0.00% 10.00%
4 Providing, laying, spreading and compacting 75
mm compacted coat (G3 ) with specific sizes of
22.4-53 mm gauge stone ballast shankergarh
and Screening material Type -B of approved
quarry as per PWD specifiction including
spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel/ vibratory roller 8-10
tonnes in stages to proper grade and camber,
applying and brooming requisite type of
screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and
compacting to the required density including
Cost of all material , water, hire & P.O.L. of road
roller, all T & P etc.required for proper
completion of work as directed by E/I

Cum 225.00 2319.70 521932.50 225.00 2329.30 524092.50 247.50 2329.30 576501.75 54569.25 52409.25 0.00% 10.00%
5 Providing and laying brick edging with first class
bricks 8 cm. Wide, 12 cm. Deep laid on either
side of the metalled surface as per directions of
Engineer-in-charge including cost of all
materials, labour, T&P etc. required for proper
completion of the work (as per SI No. 765 of
schedule of rates of UPPWD).
Km. 1.00 44750.00 44750.00 1.00 44750.00 44750.00 1.10 44750.00 49225.00 4475.00 4475.00 0.00% 10.00%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsRanmau
rduhdh Lohd`fr vkx.ku esa
e en dk uke tSlk vuqcU/k esa ;qfuV izkfo/kku vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
ek=k nj
vafdr gSek=k
ykxr nj ykxr ek=k nj ykxr
vkx.ku ij vuqcU/k ij fMVsy vkQ
cpr vf/kdrk
cpr vf/kdrk cpr vf/kdrk estjesUV ds
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 vk/kkj ij
19
6 P/L Prime coat over WBM Surface @ 0.75
Kg/Sqm bitumen emulsion including cost of
labour, emulsion, T&P etc complete as required
for Proper completion of work as per
PWD/MORT&H specification (as per MORTH
clause No. 502). Sqm 3000.00 22.10 66300.00 3000.00 1.30 3900.00 3300.00 1.30 4290.00 62010.00 390.00 0.00% 10.00%
7 P/L Tack coat over primed surface @ 0.25
Kg/Sqm bitumen emulsion including cost of
labour, T&P etc complete as required for Proper
completion of work as per PWD/MORT&H
specification (as per MORTH clause No. 503)
But including cost of Bitumen 80/100
Sqm 3000.00 7.10 21300.00 3000.00 0.00 0.00 0.00 0.00 0.00 21300.00 0.00 0.00% 0.00%
8 PC 20mm thickness composed of 13.2 mm grit
@ 1.80 Cum per 100 Sqm, 11.2 mm grit @ 0.90
Cum per 100 Sqm using penetration grade
bitumen 80/100 @ 146 Kg. per 100 Sqm
including Cost of material, Bitumen, heating
binder and aggregate to the required
temperature , rolling with roller/handrammer,
and including labour and all T&P required for
proper completion of work as per direction of
E/I (Excluding cost of Bitumen)
Sqm 3000.00 131.40 394200.00 3000.00 54.60 163800.00 3300.00 54.60 180180.00 214020.00 16380.00 0.00% 10.00%
9 Seal coat (Type A) composed with 6.7 mm grit
@ 0.9 Cum per 100 Sqm, using penetration
grade bitumen 80/100 @ 146 Kg. per 100 Sqm
including Cost of material, Bitumen, heating
binder and aggregate to the required
temperature , rolling with roller/handrammer,
and including labour and all T&P required for
proper completion of work with power roller 8-
10 T required proper comp of work as per
direction of E/I (Excluding cost of Bitumen)

Sqm 3000.00 60.50 181500.00 3000.00 13.30 39900.00 3300.00 13.30 43890.00 137610.00 3990.00 0.00% 10.00%
10 Earthwork in excavation in trenches for
foundation in ordinary soil including lift upto 1.5
m,lead upto 50 m and dressing of sides and
ramming of bottom and disposal of surplus
excavated earth as directed by the Engineer-in-
Charge within a distance of 50 m. Cum 50.00 59.00 2950.00 50.00 60.00 3000.00 50.09 60.00 3005.40 55.40 5.40 0.00% 0.18%
11 Providing and laying in Cement concrete 1:4:8
(1cement:4 fine sand:8 graded brick ballast 40
mm nominal size) and curing complete,
including supply of all materials,labour and T&P
etc.required for proper completion of the work in
foundations and floors as per S.I.No.275.
Cum 12.00 2550.00 30600.00 12.00 2550.00 30600.00 2.78 2550.00 7089.00 23511.00 23511.00 76.83% 0.00%
12 Providing, laying and fixing NP-3 Hume Pipe
including its collars with 1:2 cement mortor in
proper position complete as per direction of
Engineer-in-charge.
300mm M 7.50 458.60 3439.50 7.50 458.60 3439.50 15.00 458.60 6879.00 3439.50 3439.50 0.00% 100.00%
600MM M 7.50 1494.00 11205.00 7.50 1494.00 11205.00 0.00 1494.00 0.00 11205.00 11205.00 100.00% 0.00%
900mm M 7.50 3141.00 23557.50 7.50 3141.00 23557.50 0.00 3141.00 0.00 23557.50 23557.50 100.00% 0.00%
13 Class-150 brick work in 1:3 cement and coarse
sand mortar in foundation and plinth including
supply of all materials,labour and T&P
etc.required for proper completion of the work
Cum 25.00 3300.00 82500.00 25.00 3300.00 82500.00 5.61 3300.00 18513.00 63987.00 63987.00 77.56% 0.00%
14 struck pointing on brick work in 1:2 cement
mortar ( 1 cement & 2 fine sand) including
supply of all materials,labour and T&P
etc.required for proper completion of the work Sqm 25.00 100.00 2500.00 25.00 100.00 2500.00 16.27 100.00 1627.00 873.00 873.00 34.92% 0.00%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsRanmau
rduhdh Lohd`fr vkx.ku esa
e en dk uke tSlk vuqcU/k esa ;qfuV izkfo/kku vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
ek=k nj
vafdr gSek=k
ykxr nj ykxr ek=k nj ykxr
vkx.ku ij vuqcU/k ij fMVsy vkQ
cpr vf/kdrk
cpr vf/kdrk cpr vf/kdrk estjesUV ds
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 vk/kkj ij
19
15 12 cm. cement plaster in singal coat on rough
side of brick wall in 1:4 cement mortar incl. cost
of material as per PWD detailed specification
Sqm 2.00 80.00 160.00 2.00 80.00 160.00 1.96 80.00 156.80 3.20 3.20 2.00% 0.00%
16 Earthwork in Patries in ordinary soil excavation
to be done in the form of regular pits not
exceeding 0.50 M. in depth and E/W in
embankment to be in 20 cm. layers including lift
upto 1.50M and lead upto 30m ramming and
dressing the surface as per direction of E/I.
excludign abadi portion in km. including Royality
Cum 200.00 59.00 11800.00 200.00 59.00 11800.00 207.90 59.00 12266.10 466.10 466.10 0.00% 3.95%
Total . 2206576.05 1573747.00 1584403.80 687652.50 65480.25 123136.70 133793.50
Below 21.84% 343706.34 346033.79 150183.31 14300.89 26893.06 29220.50
G. Total 1230040.66 1238370.01 537469.19 51179.36 96243.64 104573.00

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsRanmau
fofHkUurk izi=
Bsdsnkj dk uke % f=nso dkULVD'ku dEiuhA
dk;ZZ dk uke % xkSfj;k dyk ekxZ ds fdeh0 6 esa fLFkr x?kkV lsrq ,oa igaqp ekxZ dh ejEer dk dk;ZA [k.M dk uke% fu0[ka0&1] y[ku
vuqcU/k la0@fnukad@ykxr % 61@bZ0bZ0@,0bZ0 f}rh;@11&12 fnukad 07-09-10
rduhdh Lohd`fr vkx.ku esa fofHkUurk rd@ls vf/kd
e en dk uke tSlk vuqcU/k esa ;qfuV izkfo/kku vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
ek=k nj
vafdr gSek=k
ykxr nj ykxr ek=k nj ykxr
vkx.ku ij vuqcU/k ij fMVsy vkQ
cpr vf/kdrk
cpr vf/kdrk cpr vf/kdrk estjesUV
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ds vk/kkj ij
19
1 Earthwork in excavation in trenches for
foundation pipe cable etc in ordinary soil
including lift upto 1.5 m,lead upto 50 m and
dressing of sides and ramming of bottom and
disposal of surplus excavated earth as directed
by the Engineer-in-Charge within a distance of
50 m. and dressing of sites and ramming of
bottem and disposal of surplus excavated earth
as per direction E/I.
Cum 1848.00 60.00 110880.00 0.00 60.00 0.00 0.00 60.00 0.00 110880.00 0.00 0.00% 0.00%
2 Earthwork in Cutting or in embackment in
ordinary soil excavation to be done in the form
of regular pits not exceeding 1/2 M. in depth and
E/W in embankment to be in 20 cm. layers
including ramming and dressing the surface to
required level and slope and also including 1.5M
lift and 2 km. the earth form cutting shall be
used in making embankment or to be disposal
of a spoil bank within 30 m distance as per
directed by E/I.
Cum 0.00 115.00 0.00 7900.00 115.00 908500.00 7884.63 115.00 906732.45 906732.45 1767.55 0.19% 0.00%
3 Brick on edge soling with new bricks laid on
edge & dry including preparation of subgrade to
required camber, filling joints with local earth,
spreading, blinding coat one cm. Thick with local
earth over the entire surface and including
supply of all materials, labour, T&P etc. required
for proper completion of work.
Sqm 1443.75 270.40 390390.00 800.00 265.40 212320.00 801.00 265.40 212585.40 177804.60 265.40 0.00% 0.13%
4 Providing, laying, spreading and compacting 75
mm compacted coat (G3 ) with specific sizes of
22.4-53 mm gauge stone ballast shankergarh
and Screening material Type -B of approved
quarry as per PWD specifiction including
spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel/ vibratory roller 8-10
tonnes in stages to proper grade and camber,
applying and brooming requisite type of
screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and
compacting to the required density including
Cost of all material , water, hire & P.O.L. of road
roller, all T & P etc.required for proper
completion of work as directed by E/I

Cum 48.56 2274.70 110465.12 75.40 2312.00 174324.80 75.30 2312.00 174093.60 63859.68 231.20 0.13% 0.00%
5 P/L 20 mm thick Premix Carpet composed of
13.2 mm grit @ 1.80 Cum per 100 Sqm, 11.2
mm grit @ 0.90 Cum per 100 Sqm using
penetration grade bitumen 80/100 @ 146 Kg.
per 100 Sqm including Cost of material, labour
at Plant and Laying Site as required and T&P
etc. excluding cost of Bitumen, Hire Charges of
Plant loading of aggregate FE loader, heating
mix in HMP not less then 75 T transporting the
mix material with tipper and laying with paver
finsher to the required line, grade and rolling
with power roller 8-10 T etc. required for proper
completion of work as per direction of E/I .

7000.00 128.90 902300.00 1400.00 54.60 76440.00 1400.00 54.60 76440.00 825860.00 0.00 0.00% 0.00%

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsGaurya
rduhdh Lohd`fr vkx.ku esa
e en dk uke tSlk vuqcU/k esa ;qfuV izkfo/kku vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk izfr'kr vuqcU/k ij fVIi.kh
la0 foLrkj esa
ek=k nj
vafdr gSek=k
ykxr nj ykxr ek=k nj ykxr
vkx.ku ij vuqcU/k ij fMVsy vkQ
cpr vf/kdrk
cpr vf/kdrk cpr vf/kdrk estjesUV
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ds vk/kkj ij
19
6 P/L Seal coat Type A over PC surface with HMP
of appropriate capacity not less than 75 tonnes/
hours using crushed stone chipping 6.7 mm
nominal size @ 0.90 Cum per 100 Sqm and
penetration grade bitumen 80/100 @ 98 Kg. per
100 Sqm including Cost of material, labour at
Plant and Laying Site as required and T&P etc.
excluding cost of Bitumen, Hire Charges of
Plant loading of aggregate FE loader, heating
mix in HMP not less then 75 T transporting the
mix material with tipper and laying with paver
finsher to the required line, grade and rolling
with power roller 8-10 T etc. required for proper
completion of work as per direction of E/I

Sqm 7000.00 58.40 408800.00 1400.00 13.30 18620.00 1400.00 13.30 18620.00 390180.00 0.00 0.00% 0.00%
7 Construction of K.C drain 0.00 781.60 0.00 500.00 781.60 390800.00 500.00 781.60 390800.00 390800.00 0.00 0.00% 0.00%
8 Construction of Chute drain Rm 0.00 1702.50 0.00 180.00 1702.50 306450.00 181.90 1702.50 309684.75 309684.75 3234.75 0.00% 1.06%
9 Supply and laying 25-50 kgs. Stone boulder in
aprn and loe wall and 30 cm. thick pitching on
slop. Cum 0.00 1735.00 0.00 590.25 1735.00 1024083.75 589.38 1735.00 1022574.30 1022574.30 1509.45 0.15% 0.00%
10 Painting 2 Coat with plastic emulsion paint. Sqm 0.00 42.00 0.00 1440.00 42.00 60480.00 1428.00 42.00 59976.00 59976.00 504.00 0.83% 0.00%
11 Painting 2 Coat over pariming coat on steel
work. Sqm 0.00 53.00 0.00 720.00 53.00 38160.00 720.00 53.00 38160.00 38160.00 0.00% 0.00%
Total . 1922835.12 3210178.55 3209666.50 1504724.60 2791787.18 4012.20 3500.15
Below 7.10% 227922.68 227886.32 106835.45 198216.89 284.87 248.51
G. Total 2982255.87 2981780.18 1397889.15 2593570.29 3727.33 3251.64

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsGaurya
fofHkUurk izi=
QeZ@Bsdsnkj dk uke%& esslZlZ pkS/kjh b.Vj izkbtst [k.M dk uke% fu0[ka0&1] y[ku
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % cnS;k ekxZ ls 'kadjiqj lEidZ ekxZA
vuqcU/k la0@fnukad@ykxr % 20@bZ0bZ0@,0bZ0 r``rh;@11&12 fnukad 09-12-11 fofHkUurk rd@ls vf/kd
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa izfr'kr vuqcU/k ij fVIi.kh
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk
la0 qfuV izkfo/kku foLrkj esa
vkx.ku ij vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Construction of granular sub-base by providing close graded
material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with vibratory roller to
achieve the desired density, complete as per Clause 401
Cum 24.00 2531.00 60744.00 22.00 2533.00 55726.00 12.33 2533.00 31231.89 29512.11 24494.11 43.95%
2 Providinng and Laying of 125 micron Polythene including
supply of all materials,labour and T&P etc.required for
proper completion of the work
Sqm 240.00 30.00 7200.00 240.00 30.00 7200.00 124.50 30.00 3735.00 3465.00 3465.00 48.13%
3 P/L Cement Concrete pavement 1:1.5:3 (1 Cement: 1.5
Coarse sand: 3 Stone
grit 20 mm nominai size) Of M-20 Grade with OPC and
curing complete .including cost of form work in C.C Road Cum 36.00 6400.00 230400.00 36.00 6400.00 230400.00 18.675 6400.00 119520.00 110880.00 110880.00 48.13%
4 Providing and laying sealing of CC pavement joints with
coarse sand and bitumen including primer, supply of all
materials,labour and T&P etc.required for proper completion
of the work as per direction of E/I. Sqm 1.43 295.00 421.85 1.50 79.00 118.50 0.525 79.00 41.48 380.37 77.02 65.00%
5 Earthwork in excavation in trenches for foundation in
ordinary soil including lift upto 1.5 m,lead upto 50 m and
dressing of sides and ramming of bottom and disposal of
surplus excavated earth as directed by the Engineer-in-
Charge within a distance of 50 m.
Cum 46.21 60.00 2772.60 46.00 60.00 2760.00 9.74 60.00 584.40 2188.20 2175.60 78.83%
6 Providing and laying in Cement concrete 1:4:8 (1cement:4
fine sand:8 graded brick ballast 40 mm nominal size) and
curing complete, including supply of all materials,labour and
T&P etc.required for proper completion of the work as per
direction of E/I
Cum 9.12 2750.00 25080.00 10.00 3875.00 38750.00 3.14 3875.00 12167.50 12912.50 26582.50 68.60%
7 Class-150 brick work in 1:4 cement and coarse sand mortar
in foundation and plinth including supply of all
materials,labour ,curing and T&P etc.required for proper
completion of the work
Cum 18.40 3300.00 60720.00 18.00 3300.00 59400.00 7.29 3300.00 24057.00 36663.00 35343.00 59.50%
8 Providing and laying Cement concrete with 1:2:4 (1cement:2
coarse sand:4 graded stone grit 20 mm ) by laid over base
concrete including supply of all materials,curing, labour and
T&P etc.required for proper completion of the work

Cum 1.20 5050.00 6060.00 1.20 5050.00 6060.00 0.319 5050.00 1610.95 4449.05 4449.05 73.42%
9 Plaster on brick work in 1:3 cement mortar ( 1 cement & 3
Coarse sand) including supply of all materials,labour and
T&P etc.required for proper completion of the work
Sqm 201.60 146.00 29433.60 201.00 105.00 21105.00 53.86 105.00 5655.30 23778.30 15449.70 73.20%
Total 422832.05 421519.50 198603.52 224228.53 222915.98
Below 14.59% 61499.70 28976.25 32714.94 32523.44
G. Total 360019.80 169627.27 191513.59 190392.54

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj.k voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsShri lal (3)


fofHkUurk izi=
QeZ@Bsdsnkj dk uke%& esllZ Mh0ds0 dkULVD'ku dEiuh [k.M dk uke% fu0[ka0&1] y[ku
ys[kk'kh"kZd@;kstuk@dk;Z dk uke % supply and fixign and median markers, Delinators, Bolard etc deva Chinhat road Km. 46
vuqcU/k la0@fnukad@ykxr % 74@bZ0bZ0@,0bZ0 @12&13 fnukad 28-10-2013 fofHkUurk rd@ls vf/kd
e en dk uke tSlk vuqcU/k esa vafdr gS ; rduhdh Lohd`fr vkx.ku esa izfr'kr vuqcU/k ij fVIi.kh
vuqcU/k esa izkfo/kku LFky ij lEikfnr dk;Z fofHkUurk
la0 qfuV izkfo/kku foLrkj esa
vkx.ku ij vuqcU/k ij cpr vf/kdrk fMVsy vkQ
ek=k nj ykxr ek=k nj ykxr ek=k nj ykxr cpr vf/kdrk cpr vf/kdrk estjesUV ds
vk/kkj ij
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Providing and laying of hot applied thermoplastic compound
2.5 mm thick including reflectorising glass beads @ 250
gms per sqm area, thickness of 2.5 mm is exclusive of
surface applied glass beads as per IRC:35. The finished
surface to be level, uniform and free from streaks and holes. Sqm 2750.00 445.00 1223750.00 3055.83 445.00 1359844.35 136094.35 11.12%
2 Supplying and instalation of delinators (road way indicators,
hazard markers, object marker) 80-100 cm. high above
ground level, painted black and white in 15 cm. wide strips,
fitted with 80x100 mm rectangular or 75 mm dia circular
reflectorised panel at the top buried or pressed into the
ground and conforming to IRC:79 and the drawing. No 80.00 1375.00 110000.00 120.00 1375.00 165000.00 55000.00 50.00%
3 Supply & fixing of Bollard made(Single Side) out of
aluminium sheet welded poly shaped to make it monolithic
pillar size 1200 mm high Bollard is having a frame 900x600
mm and 600 mm dia for fixation made out of 35 x 35 x 5 mm
angle iron and from side is fully cover. No. 2.00 5554.00 11108.00 6.00 5554.00 33324.00 22216.00 200.00%
4 Supply and fixing of Median Marker (MM)asj per approved
quality and make. No. 800.00 600.00 480000.00 1059.00 600.00 635400.00 161400.00 33.63%
Total 1824858.00 2193568.35 374710.35
Below 1.49% 27190.38 32684.17 5583.18
G. Total 1797667.62 2160884.18 369127.17

izek.k i=%
1 vf/kdrk dk ogu dgka-------------------------------------------- ls fd;k tk;sxk] dk fooj.k fy[kk tk;sA
2 fofHkUurk ds ckn Hkh izFke U;wure] Bsdsnkj U;wure gh jgsxkA
3 bl ?kVc<+ lfgr leLr O;; Lohd`r ykxr ls vf/kd ugha gksxkA
4 ;fn enksa dk izkfo/kku Lohd`r vkx.ku esa ugha gS] rks en dks djkus dk vksfpR; foLrkj esa fy[kk tk;sA
5 ;fn dk;Z cxSj iwoZ Lohd`fr ds djk fy;k x;k gS rks iwoZ esa Lohd`r u djkus dk Li"Vhdj.k voj vfHk;Urk
6 mu enksa esa fofHkUurk ugha djk;k x;k ftu enksa esa Bsdsnkj dh njsa] foHkkxh; njksa ls vf/kd gSA vf/k'kklh vfHk;Urk v/kh{k.k vfHk;Urk
lgk;d vfHk;Urk fuekZ.k [k.M&1] yks0fu0fo0 y[ku o`Rr] yks0fu0fo0]
fuekZ.k [k.M&1] yks0fu0fo0] y[ku y[ku y[ku

file:///var/www/apps/conversion/tmp/scratch_6/350954953.xlsShri lal (2)

Anda mungkin juga menyukai