REKAPITULASI
J JUMLAH I + II 54,545,600.00
K PPN (10% X C) 5,454,560.00
L TOTAL (C + D) 60,000,160.00
M JUMLAH DIBULATKAN 60,000,000.00
Larantuka, .
CV/PT..
NAMA JELAS
Jabatan
REKAPITULASI
17,058,125.00
B. TENAGA PENUNJANG
3 Pengawas Lapangan 1.00 7.00 1,155,775.00 8,090,425.00
JUMLAH 15,260,000.00
B SEWA KENDARAAN DAN OPERASIONAL
1 Sewa Kendaraan Roda 2 1.00 Unit 400,000.00 400,000.00
JUMLAH 400,000.00
C BIAYA SEWA KANTOR PROYEK
1 Sewa Kantor Proyek 7.00 Bulan 150,000.00 1,050,000.00
JUMLAH 1,050,000.00
D PERALATAN
1 Komputer Desk Top 1.00 Unit 500,000.00 500,000.00
2 Laptop 1.00 Unit 600,000.00 600,000.00
3 Printer A4 1.00 Unit 350,000.00 350,000.00
4 Digital Camera 1.00 Unit 200,000.00 200,000.00
5 Meter Roll 1.00 Unit 50,000.00 50,000.00
6 Pengukur Suhu Aspalt 1.00 Unit 200,000.00 200,000.00
JUMLAH 1,900,000.00
E BIAYA ATK
1 Kertas HVS A4 7.00 Rim 55,000.00 385,000.00
2 Bahan Computer dan Printer 1.00 Ls 350,000.00 350,000.00
3 Penggandaan/Foto Copy 1.00 Ls 1,000,000.00 1,000,000.00
4 Alat Tulis 1.00 Ls 100,000.00 100,000.00
JUMLAH 1,835,000.00
E BIAYA FASILITAS KANTOR
1 Meja dan Kursi Kerja 1.00 Set 350,000.00 350,000.00
2 White Board 1.00 Bh 150,000.00 150,000.00
JUMLAH 500,000.00
H BIAYA KOMUNIKASI
1 Biaya Telepon 1.00 Ls 224,000.00 224,000.00
JUMLAH 224,000.00
C. BIAYA PELAPORAN
1 Laporan Mingguan, Bulanan 5.00 Buku 55,000.00 275,000.00
2 Buku Laporan Akhir 5.00 Buku 70,000.00 350,000.00
JUMLAH 625,000.00
BILL OF QUANTITY (BOQ)
Gaji Dasar Per Beban Biaya Beban Biaya Tunjangan Total Biaya langsung
Pengalam Sub Jumlah Rp Imbalan jasa
Bulan (GD) Umum Sosial Proyek Per Bulan Personil Rp.
No Nama Posisi an Thn
Min
(GD) (0.5 - 1.3) GD (0.3 - 0.4) GD (0.1 - 0.3) GD (1.2 - 3.1)GD
1 0.5 0.3 (1+2+3) 0.1 x [4] 0,1
1 2 3 4 5 6 7 = 4+5+6
A Tenaga Ahli
1 S1 Teknik Sipil Site Engineer 5 450,000.00 450,000.00 157,500.00 1,057,500.00 105,750.00 90,000.00 1,253,250.00
2 S1 Teknik Sipil Quality Control 5 425,000.00 425,000.00 148,750.00 998,750.00 99,875.00 85,000.00 1,183,625.00
B Tenaga Penunjang
1 D3 Sipil/SMK (Bangunan) Pengawas lapangan 4 415,000.00 415,000.00 145,250.00 975,250.00 97,525.00 83,000.00 1,155,775.00
C Tenaga Pendukung