Anda di halaman 1dari 3

[CHANTHOEUN CHIV] | [CURRICULUM

VITAE]
[GolfView Apartment Building B5 Room 5808, 9/16 Moo 17, Phahonyothin Road, Klong Nung, Klong Luang,
Pathum Thani, 12120, Thailand] | [Mobile: +66-95-0942362] | [Email: Chanthoeun.chiv@yahoo.com]

OBJECTIVE
[To replace tip text with your own, just select a line of text and start typing. For best results when selecting
text to copy or replace, dont include space to the right of the characters in your selection.]

SKILLS & ABILITIES


[On the Design tab of the ribbon, check out the Themes, Colors, and Fonts galleries to get a custom look with
just a click.]

EXPERIENCE
[Mar 2017] [Present]
STRUCTURAL ENGINEER AIT SOLUTIONS (THAILAND)

Key responsibilities:
Perform seismic fragility analysis and progressive collapse analysis
Perform modeling and design of buildings using common software such
as ETABS, SAP2000, SAFE, PERFORM 3D,etc. for performance-based
evaluation
Prepare the necessary design calculation sheets, drawings using
AutoCAD and the reports of the building project
Demonstrate leadership while managing interns who are working on
the same projects and while working together with colleagues and
seniors.
On-going assignment:
Lungsuan Parkview Residential Building Project (17-storey)

[Jun 2015] [Feb 2017]


STRUCTURAL ENGINEER TEAM CONSULTING ENGINEERING AND
MANAGEMENT CO.LTD (THAILAND)

Key responsibilities:
Prepare detailed design of various structures within the projects
Prepare, modify, and review of structural drawings
Identify options and recommend solutions to solve technical issues
according to civil design and design interface
Coordinate effectively with all concern parties
Accomplished Structures:
Downstream Powerhouse Gantry Crane Runway Girder
RC girder carrying 35 T draft tube gantry crane
Powerhouse to 115 kV Switchyard Interconnection Structures
Design relevant interconnection structures such as steel
bridge for cables, bridge bearing base plate and its
anchorage, steel connections, RC structures (abutment, road
crossing, cable trenches, staircases), and drainage system
Warehouses
Design four 46x26 m warehouses with overhead cranes (5 T
and 20 T capacity)
RC beams and columns supported by mat foundation
Covers steel roof struss (11.5x11 m)
Right-Side Junction Pool
Prepare, modify, and review of structural drawings of this fish
passage facility
EDL Powerhouse Unit
Partially prepare structural anlaysis report of the EDL
powerhouse unit

RESEARCH WORKER RAMBLL SVERIGE AB (SWEDEN)


[Jan 2014] [Jun 2014]
Key responsibilities:
Accomplish master thesis project within 6 months
Accomplishment:
Preliminary Design of a Fiber-Reinforced Polymer Pedestrian Bridge
The aim of this master thesis is to create a preliminary design
of the bridge Kaponjrbron with a fiber reinforced polymer
(FRP) composite cross-section. A literature study is carried out
to learn about FRP materials and how they interact with each
other. Subsequently, a calculation module is developed to
determine equivalent material properties that were later used
to create several cross-section combinations in a finite
element model (FEM) program. The FE model is then used to
develop a preliminary design of the FRP composite cross-
section to fulfill the design requirements for pedestrian
bridges

INTERNSHIP KAMPOT CEMENT CO.LTD (CAMBODIA)


[Apr 2011] [May 2011]
Training subjects:
Safety work, drawing understanding, excavation, grading,
compaction, base course preparation, scaffolding, concreting

EDUCATION
[2012] [2015]
CHALMERS UNIVERSITY OF TECHNOLOGY MASTER OF SCIENCE (SWEDEN)

Structural Engineering and Building Technology

THAMMASAT UNIVERSITY BACHELOR OF ENGINEERING (THAILAND)


Civil Engineering (First-Class-Honors)

COMMUNICATION
[You delivered that big presentation to rave reviews. Dont be shy about it now! This is the place to show how
well you work and play with others.]

LEADERSHIP

Page 2
[Are you president of your fraternity, head of the condo board, or a team lead for your favorite charity? Youre
a natural leadertell it like it is!]

Page 3

Anda mungkin juga menyukai