uk Flash Report

Project: Hinkley Jetty Design


Customer: EM
Finalisation
Sub-Vendor: Zhejiang Chankong Steel
Vendor: ESC Group
Pipe CO.,LTD

Vendor Address: Putuo,Shanghai,China Sub-Vendor Address: Tianning,Jiashan,Zhejiang

Vendor Reference: Sub-Vendor Reference:

GQIS Assignment No: Customer Reference:

Report No: Inspection Report-GQIS-


Purchase Order No: 3568
002
8PM 25th,August-8AM
Date of Visit: 26th,August,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial
No., Cast, Heat No.
1 1 Raw coil material inspection Detail as following table

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


www.GQIS.com
Inspection Report

Customer: EM Purchase Order 3568


No.:

1. SMMARY / AREAS OF CONCERN:

1.1 Raw coil material inspection.


GQIS inspector performed inspection for coil material according to ITP and drawing, the detail inspection content
as following table, all the data in line with ITP & drawing & specification, the result satisfactory.
Coil No. Material Grade Size Heat No. Delivering Specification
Condition
167111902 S420M 1501X24.67 16303198 Hot Rolled EN 10025-4 2004:S420M

1.2 Review all instruments and measurement tools calibration certificates.


GQIS inspector review all instruments and measurement tools calibration certificates, confirm the calibration
process and result satisfactory the standard and code, all certificates are valuable and not found any instrument
or tool expire of valuable time.

1.3 Visual and dimension inspection


GQIS inspector performed visual and dimension inspection for pile No. 3568-C04-065 according to ITP(No.14)
and drawing, the inspection
result as: outside diameter:
913mm~914mm,
roundness:1mm, welding
reinforce: 2mm,
straightness:29mm(the
drawing require
straightness less than
40mm, the factory initiative
rectified by fire), after
rectified checked the
straightness about 6mm, at
the same time asked the
factory examination the
baked area by MT and not
found any indication.
Confirmed all data
satisfactory applicable document 3568-MPS-01 CK/QP5.7.4 and drawing, the result acceptable.

Picture

Inspection raw coil material.

Inspection raw coil material.

Review all instruments and


measurement tools
calibration certificates.

Visual inspection

Visual and dimension


inspection for pile of 3568-
C04-065, and performed MT
after rectified straightness
by fire.

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016


www.GQIS.com
Inspection Report

Customer: EM Purchase Order 3568


No.:

Accepted Yes Non-Compliant Yes / No

Technical Specialist: Su Jinlong Operations Coordinator:


Date:
Date: 8PM 25th,August-8AM 26th,August,2016

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016