Anda di halaman 1dari 6

CP5070 Prepared on

CHEMICAL PRODUCT DESIGN & DEVELOPMENT 11 April 2017

Part II: Bill of Materials (BOM)


After discussing with group members, the materials that are needed to construct a prototype for
SMART MASK are identified. The following is the BOM constructed for the prototype.

Table 1 BOM of SMART MASK

Project Title: SMART MASK


Leader: Yong Siew Kuan
Victor Tan Chun How
Cindy Hoe Xin Yee
Group members:
Hirotaka Darmono
Cheong Si Yuan Keane
BILL OF MATERIALS (BOM)
Unit Total
Item Description of
Quantity Supplier Cost Cost Drawing/Sketch Ref:
no. Material
(SGD) (SGD)

1. Metal Press 1 packet Daiso 2.00 2.00 -


Stud

2. Elastic waist 1m Daiso 2.00 2.00 -


band

3. Gauze Mask (3 1 packet Daiso 2.00 2.00 -


in 1 packet)

4. Cloth 1 piece Daiso 2.00 2.00 -

5. Glasses stopper 1 pair Daiso 2.00 2.00 -

6. Rubber Tubing 2 pieces Daiso 1.00 2.00 -

7. Cotton wool 1 bunch Lab - - -

8. Superglue 1 piece Lab - - -

9. Zip-lock 2 pieces Lab - - -

10. PNIPAAm 1g Weibo Chem 54.00 54.00 Product Code:


Corporation 717481

Grand total 66.00

SchoolofChemicalandLifeScience PAGE1OF
DiplomainChemicalEngineering(DCHE)
CP5070 Prepared on
CHEMICAL PRODUCT DESIGN & DEVELOPMENT 11 April 2017

Part III: Project Management


(a) Activity Logic Table

Activity Activit Description Duration Preceding Precedence


y Code (days) Activity

Design A - Define specification 7 N.A B, D

- Create 3D sketch

- Make dimensions for sketch

Purchase and B - Send MCR to specific suppliers 14 A C


order parts
-Wait for quotations

- If agreed, send agreement

- Purchase ready-made product

Deliver parts C - Parts to be delivered on site 14 B E

- Ensure that the delivery order


has been collected

Prepare D Compose procedures to make 4 C E


manuals prototype

Make parts E Construct parts as required 7 C, D F

Assemble F Assemble each part to make the 7 E G


prototype

Test G Carry various test to ensure the 3 F H


workability of prototype

Modification12 H Modify faulty, not functional parts 3 G N.A

1 If test fail, this task will be carried out.

2 After modification another test is carried out. The cycle will stop when the mask is fully function.

SchoolofChemicalandLifeScience PAGE2OF
DiplomainChemicalEngineering(DCHE)
CP5070 Prepared on
CHEMICAL PRODUCT DESIGN & DEVELOPMENT 11 April 2017
(b) Network Diagram
(c) 111

SchoolofChemicalandLifeScience PAGE3OF6
DiplomainChemicalEngineering(DCHE)
CP5070 Prepared on
CHEMICAL PRODUCT DESIGN & DEVELOPMENT 11 April 2017
(d)

SchoolofChemicalandLifeScience PAGE4OF6
DiplomainChemicalEngineering(DCHE)
CP5070 Prepared on
CHEMICAL PRODUCT DESIGN & DEVELOPMENT 11 April 2017
(e) Gantt Chart for SMART MASK

(f)

SchoolofChemicalandLifeScience PAGE5OF6
DiplomainChemicalEngineering(DCHE)
CP5070 Prepared on
CHEMICAL PRODUCT DESIGN & DEVELOPMENT 11 April 2017
(g)

SchoolofChemicalandLifeScience PAGE6OF
DiplomainChemicalEngineering(DCHE)

Anda mungkin juga menyukai