Anda di halaman 1dari 6

Analisa software Geo5 (Gravity wall) Model 1

Verification of complete wall

Slope stability verification (Bishop)


Sum of active Fa = 832.67 kN/m
forces :
Sum of passive Fp = 1731.08 kN/m
forces :
Sliding moment : Ma 10766.4 kNm/
= 7 m
Resisting moment : Mp 22382.8 kNm/
= 0 m
Factor of safety = 2.08 > 1.50
Slope stability ACCEPTABLE

Check for overturning stability


Resisting moment Mres = 2852.9 kNm/
3 m
Overturning Mov = 960.40 kNm/
moment r m

Safety factor = 2.97 > 1.50


Wall for overturning is SATISFACTORY

Check for slip


Resisting horizontal Hre = 451.2 kN/
force s 4 m
Active horizontal force Hac = 44.77 kN/
t m

Safety factor = 10.08 > 1.50


Wall for slip is SATISFACTORY

Overall check - WALL is SATISFACTORY

Design load acting at the center of footing bottom


Moment Norm. force Shear Force Eccentricity Stress
No.
[kNm/m] [kN/m] [kN/m] [] [kPa]
1 566.56 893.96 44.77 0.115 211.14
Service load acting at the center of footing bottom
Moment Norm. force Shear Force
No.
[kNm/m] [kN/m] [kN/m]
1 566.56 893.96 44.77
Verification of foundation soil

Eccentricity verification
Max. eccentricity of normal e = 0.11
force 5
Maximum allowable ealw = 0.33
eccentricity 3
Eccentricity of the normal force is SATISFACTORY

Verification of bearing capacity


Max. stress at footing bottom = 211.1 kP
4 a
Bearing capacity of foundation R = 676.7 kP
soil d 3 a
Safety factor = 3.21 > 1.50
Bearing capacity of foundation soil is SATISFACTORY

Overall verification - bearing capacity of found. soil is SATISFACTORY

Table 1. Rekapitulasi hasil perhitungan


Syar
Kontrol SF Ket.
at
Sliding 2.08 1.50 OK
Stabilitas 2.97 1.50
OK
Guling
Stabilitas 10.0 1.50 OK
Geser 8
Eksentrisitas 0.11 0.333 OK
5
Daya dukung 3.21 1.50 OK
Analisa software Geo5 (Gravity wall) Model 2

Verification of complete wall

Slope stability verification (Bishop)


Sum of active Fa = 1717.25 kN/m
forces :
Sum of passive Fp = 1967.53 kN/m
forces :
Sliding moment : Ma 42381.6 kNm/
= 8 m
Resisting moment : Mp 48558.5 kNm/
= 2 m
Factor of safety = 1.15 < 1.50
Slope stability NOT ACCEPTABLE

Check for overturning stability


Resisting moment Mres = 3024.7 kNm/m
9
Overturning Mov = 983.53 kNm/m
moment r

Safety factor = 3.08 > 1.50


Wall for overturning is SATISFACTORY

Check for slip


Resisting horizontal Hre = 159.8 kN/m
force s 7
Active horizontal force Hac = 318.7 kN/m
t 2

Safety factor = 0.50 < 1.50


Wall for slip is NOT SATISFACTORY

Overall check - WALL is NOT SATISFACTORY

Design load acting at the center of footing bottom


Moment Norm. force Shear Force Eccentricity Stress
No.
[kNm/m] [kN/m] [kN/m] [] [kPa]
1 487.53 919.30 318.72 0.096 207.01
Service load acting at the center of footing bottom
Moment Norm. force Shear Force
No.
[kNm/m] [kN/m] [kN/m]
1 487.53 919.30 318.72
Verification of foundation soil

Eccentricity verification
Max. eccentricity of normal e = 0.09
force 6
Maximum allowable ealw = 0.33
eccentricity 3
Eccentricity of the normal force is SATISFACTORY

Verification of bearing capacity


Max. stress at footing bottom = 207.0 kP
1 a
Bearing capacity of foundation R = 94.70 kP
soil d a
Safety factor = 0.46 < 1.50
Bearing capacity of foundation soil is NOT SATISFACTORY

Overall verification - bearing capacity of found. soil is NOT SATISFACTORY

Table 2. Rekapitulasi hasil perhitungan


Syar
Kontrol SF Ket.
at
Sliding 1.15 1.50 Not
OK
Stabilitas 3.08 1.50
OK
Guling
Stabilitas 0.50 1.50 Not
Geser OK
Eksentrisitas 0.09 0.333 OK
6
Daya dukung .46 1.50 Not
OK

Anda mungkin juga menyukai