MUNICIPALIDAD DISTRITAL DE LLUSCO A0: 2016

JEFE, DIRECCION DE INFRAESTRUCTURA DE OBRAS. MES DE JUNIO


DISTRITO DE LLUSCO

FICHA TECNICA DE PROYECTO


DATOS GENERALES
UBICACIN NOMBRE DEL PROYECTO: UNIDAD EJECUTORA
DPTO CUSCO
MUNICIPALIDAD DISTRITAL DE LLUSCO
PROV CHUMBIVILCAS
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL
DIST LLUSCO DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO MODALIDAD ADMINISTRACION DIRECTA
LOC. COM. ANTUYO LLAULLIMARCA.

PERFIL EXPEDIENTE TECNICO


RES. VARIACION VIABILIDAD PLAZO EJECUCION
CODIGO SNIP _ RES. ALC. N 094-2016 A/MDLL. RES. APROB./MODIFIC. _
APROB.
MONTO _ MONTO 1,345,976.03 MONTO _ _ 6 MESES.

- - FECHA 31/05/2016. FECHA _

CADENA FUNCIONAL

SEC. FUNC. FUNCION PROGRAMA SUB PROYECTO ACT. PROYECTO COMPONENTE META FINALIDAD

013

INFORMACION DE AGENTES

N CARGO ESPECIALIDAD COLEGIATURA RESOLUCION

1 ING. YURI J. PACOMPIA SULLCA Proyectista/Consultor ING CIVIL 60132 _

2 ING. GRIMALDO DIAZ VENERO Inspector/Supervisor ING CIVIL 115910 _

3 ARQTO. FREDY ALFARO HERRERA. RESIDENTE DE OBRA. ARQUITECTO O8407 _

FECHA DE INICIO: 6/7/2016 FECHA DE REINICIO: ************* FECHA DE CONCLUSION: 30/11/2016. TIEMPO DE EJECUCION 6 MESES FECHA DE TERMINO REAL:

METAS ESTRUCTURA DE PRESUPUESTO EXP. TEC.


METAS A CUMPLIR EN EL SIGUIENTE TRABAJO: CONSTRUCCION DE MONTO DEL PROYECT. S/. 1,345,976.03
MURO DE CONTENCION; CONSTRUCCION DE CERCO PERIMETRICO; INFRAESTRUCTURA DEPORTIVA CON GRASS ARTIFICIAL.
Costo Directo 1,074,658.70

Gastos Generales 159,665.00

Gastos de Supervision 60,877.50

Gastos de Expediente Tecnico 28,464.83

Gastos de Liquidacion 22,310.00

TOTAL S/. 1,345,976.03


RESUMEN INFORME MENSUAL

AVANCE F ISICO AVANCE FINANCIERO

MAYORES PROGRAM. EJECUTADO


PROGRAMADO PARTIDAS NUEVAS DEDUCTIVOS EJECUTADO AVANCE FINANCIERO EJECUTADO
MES METRADOS ACUM. ACUMUL.

VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % % % MONTO % % ACUMULADO

0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00 0.00 - -
JUNIO 195,772.76 18.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 12,700.44 1.18 18.22 1.18 275.00 0.00 0.00
JULIO 269,292.06 25.06 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00

AGOSTO 221,796.87 20.64 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00

SETIEMBRE 166,032.66 15.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00 0.00

OCTUBRE 177,576.78 16.52 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00

NOVIEMBRE 44,187.58 4.11 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00

TOTAL ### 100.00 - 0.00 - 0.00 - 0.00 12,700.44 1.18% 1.18% TOTAL 275.00 0.02%

CURVA AVANCE FISICO EJECUTADO VS PROGRAMADO CURVA DE AVANCE FISICO VS AVANCE FINANCIERO

100.00 100.00

90.00 90.00

80.00 80.00

70.00 70.00

60.00
60.00 AVANC E F ISIC O

50.00
50.00 AVANCE FIS ICO
AVANC E F INANC IER O

40.00
40.00
AVANCE PROGRAMADO

30.00
30.00

20.00
20.00

10.00
10.00

0.00
0.00
JUNIO
OCURRENCIAS ACCIONES
DEMOLICION DE MURO EXISTENTE DE PIEDRA EN CERCO PERIMETRICO. ESTAMOS EJECUTANDO LA EXCAVACION DE ZANJAS Y ZAPATAS EN CERCO PERIMETRICO.
MUNICIPALIDAD DISTRITAL DE LLUSCO
JEFE DIRECCION DE INFRAESTRUCTURA DE OBRAS.

INFORME MENSUAL DE OBRA N 001


MES DE JUNIO

OBRA : MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C.


ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

Residente de Obra. ARQTO: FREDY ALFARO HERRERA.


Supervisor de Obra. ING. GRIMALDO DIAZ VENERO.

2016
CONTENIDO
INFORME MENSUAL DE OBRA N 001
MES DE JUNIO

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C.


OBRA : ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

RESIDENTE DE OBRA: ARQTO: FREDY ALFARO HERRERA.


Ubicacin COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA. Ao 2016

No DESCRIPCION CONTROL
1.0. Informe Mensual
1.1 Contenido P
1.2 Resumen Fisico Financiero P
1.3 Descripcion General P
1.4 Partidas ejecutadas Valorizadas Mensual P
1.5 Aspectos Tecnicos - 1 P
1.6 Aspectos Tecnicos - 2 P
1.7 Aspectos Financieros P
1.8 Valorizacines
1.8.1 Resumen de las Valorizaciones P
1.8.2 Valorizacin de Avance de Obra P
1.8.3 Valorizacin de Mayores Metrados X
1.8.4 Valorizacin de Partidas Nuevas X
1.8.5 Valorizacin de Deductivos X
1.9 Metrados
1.9.1 Metrados Diarios Ejecutados de Avance de Obra P
1.9.2 Metrados Diarios Ejecutados Mayores Metrados X
1.9.3 Metrados Diarios Ejecutados Partidas Nuevas X
1.10 Sustento de Metrados
1.10.1 Sustento de Metrados Ejecutados de Avance de Obra P
1.10.2 Sustento de Metrados Ejecutados Mayores Metrados X
1.10.3 Sustento de Metrados Ejecutados Partidas Nuevas X
1.11 Movimiento de Almacn
1.11.1 Resumen de los Movimiento de Almacn Mensual X
1.11.2 Movimiento de Almacn Mensual Valorizado X
1.11.3 Movimiento de Almacn Mensual diario X
1.11.4 Movimiento de Almacn de Materiales Transferidos X
1.11.5 Movimiento de Almacn de Materiales Prestados/Recibidos X
1.11.6 Movimiento de Almacn de Materiales de Convenio X
1.11.7 Movimiento de Amacn de Materiales de Beneficiarios X
1.12 Movimiento de Maquinaria Valorizada
1.12.1 Resumen de Movimiento de Maquinaria X
1.12.2 Control Diario de Maquinaria X
1.13 Cronogramas
1.13.1 Cronograma Programado por entregable P/X
1.13.2 Cronograma Real Ejecutado Por Entregable P
1.14 Anexos
1.14.1 Resumen Gastos Personal,BB.SS X
1.14.2 Auxiliar Estandar X
1.14.3 Hojas de Tareo de Personal Obrero X
1.14.4 Registro Fotogrfico P
1.14.5 Control de Calidad X
1.14.6 Modificaciones del Proyecto X
1.14.7 Cuaderno de Obra (Copias) P
1.14.8 Registro Digitalizado (USB/CD) P
P:Presentado N : No presentado X: No corresponde
RESUMEN AVANCE FISICO Y FINANCIERO

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA


DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

CORRESPONDIENTE : AL MES DE JUNIO 2016.

PRESUPUESTO DE OBRA S/. 1,345,976.03 REGION CUSCO

PRESUPUESTO BASE S/. 1,074,658.70 DEPARTAMENTO CUSCO

FECHA DE INICIO DE OBRA 6/6/2016 PROVINCIA CHUMBIVILCAS


PLAZO DE EJECUCIN 6 MESES DISTRITO LLUSCO.
FECHA DE TERMINO 11/30/2016 COMUNIDAD COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA.

JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE ACUMULADO


AVANCE FINANCIERO 275.00 275.00
0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02%

JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE ACUMULADO


AVANCE FISICO 12,700.44 12,700.44
1.18% 0.00% 0.00% 0.00% 0.00% 0.00% 1.18%
INFORME MENSUAL DE OBRA N 001
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE
OBRA :
LLUSCO CHUMBIVILCAS CUSCO

A GENERALIDADES

A.1 RESIDENTE DE OBRA ARQTO: FREDY ALFARO HERRERA.


Especialidad : ARQUITECTO.
Colegiatura : 08407

A.2 FECHA REPORTADA : DEL 01 DE JUNIO AL 30 DE JUNIO DEL 2016

A.3 DATOS DEL PROYECTO

Unidad Ejecutora : MUNICIPALIDAD DISTRITAL DE LLUSCO.


Sec. Fun. -
Funcin -
Programa -
Sub Programa -
Componente -
Meta : CODIGO DE META 013

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C.


ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO
Finalidad
Obra
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C.
ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

Fuente de Financiamiento CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES.


Modalidad de Ejecucin : ADMINISTRACION DIRECTA
Convenio :-

A.4 FINANCIERO
Presupuesto Base : S/. 1,074,658.70
Presupuesto Total : S/. 1,345,976.03
Prespuesto Asignado ao 2016 : S/. 200,000.00
Prespuesto Ejecutado Ao 2016 : S/. 275.00 0.02%
Prespuesto Ejecutado Anterior : S/. - 0.00%
Prespuesto Ejecutado Actual : S/. 275.00 0.02%
Presupuesto Ejecutado Acumulado : S/. 275.00 0.02%
Presupuesto Saldo : S/. 1,345,701.03 99.98%

A.5 VALORIZACIONES
Presupuesto Base : S/. 1,074,658.70
Valorizacin Anterior : S/. - 0.00%
Valorizacin Actual : S/. 12,700.44 1.18%
Valorizacin Acumulada. : S/. 12,700.44 1.18%
Valorizacin Mayores Metrados Anterior : S/. - -
Valorizacin Mayores Metrados Actual : S/. - -
Valorizacin Mayores Metrados Acumulada : S/. - -
Valorizacin Partidas Nuevas Anterior : S/. - -
Valorizacin Partidas Nuevas Actual : S/. - -
Valorizacin Partidas Nuevas Acumulada : S/. - -
Valorizacin Deductivos : S/. - -
Valorizacin Total Acumulada : S/. 12,700.44 1.18%
Valorizacin Saldos : S/. 1,061,958.26 98.82%

A.6 CRONOGRAMA DE OBRA :


Inicio de Obra : 6/6/2016
Paralizacion : -
Reinicio : -
Fin de Obra : 11/30/2016
Programado : 6.00 meses
Ejecutado : 1.00 MES.

A.7 UBICACIN
Lugar :COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA.
Distrito : LLUSCO
Provincia : CHUMBIVILCAS
Departamento : CUSCO
B ASPECTOS TECNICOS
B.1 BREVE DESCRIPCION DE LA META
METAS A CUMPLIR EN EL SIGUIENTE TRABAJO:
CONSTRUCCION DE MURO DE CONTENCION; CONSTRUCCION DE CERCO
PERIMETRICO; INFRAESTRUCTURA DEPORTIVA CON GRASS ARTIFICIAL.

B.2 DOCUMENTOS TECNICOS

DOCUMENTO NUMERO FECHA OBSERVACIONES


Resolucin de Aprobacion Expediente RES. ALC. N 094-2016 A/MDLL. 31/05/2016.
Acta de Apertura de Cuaderno Obra 0 - 100 6-Jun-16
Acta de Entrega de Terreno 6-Jun-16
Acta de Inicio de Obra 6-Jun-16
Acta de Terminacion Obra -
Acta de Paralizacin/Corte -
Acta de Reinicio de Obra -
Fecha de Paralizacion -

B.3 RECURSOS UTILIZADOS


B.3.1 RECURSOS HUMANOS

CATEGORIA MUNICIPALIDAD CONVENIO BENEFICIARIOS


Residente de Obra 1
Inspector de Obra 0
Asistente Tcnico 1
Asistente Administrativo 0
Maestro de Obra 1
Promotor 0
Almacenero 0
Chofer Maquinaria Liviana 0
Operario 1
Oficial 3
Pen 13
Total 20

B.3.2 PLANILLA DE TAREOS

DESCRIPCION PROGRAMADO ANTERIOR ACTUAL ACUMULADO SALDO


MUNICIPALIDAD 196,210.58 0.00 17,270.00 17,270.00 178,940.58
TOTAL 196,210.58 0.00 17,270.00 17,270.00 178,940.58
* En el tem de programado se consigna lo formulado en el expediente tcnico Inicial
B.3.2 RECURSOS DE MAQUINARIA Y EQUIPO

TOTAL (HRS) EN EL
MAQUINARIA APOYO MAQ. PROPIA MAQ. ALQUILD. TOTAL (S/.)
MES
Camion Canter de 2 m3 X 0 0.00
Moto Lineal 0
Moto Sierra 0.70 0
Camioneta 4x4 del Alquilado 0

TOTAL Costo Directo S/. 0.00

B.3.3 VALORIZACION DE MAQUINARIA Y EQUIPO

DESCRIPCION APROBADO ANTERIOR ACTUAL ACUMULADO SALDO


Costo Directo Camion Canter 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00

COMENTARIO
Se hizo el requerimiento de implementos de seguridad para el personal obrero, como tambien fierros, ladrillos y cemento para el buen
desempeo de la obra.

AVANCE FISICO
BREVE APRECIACION SOBRE LA VALORIZACION MENSUAL
A la fecha se cuenta con un avance fisico de S/. 12,700.44 el cual representa el 1.18% del presupuesto total.
Las actividades realizadas fueron: almacen y guardiania, trazo y replanteo inicial en (cerco perimetrico - muro de contencion ) ,
excavacion de zanja para cimiento ,eliminacion de material excedente y demolicion de muro existente en cerco perimetrico. En la fecha
seguimos en excavacion de zanjas para cimiento, zapatas y demolicion de muro existente.

VALORIZACION DE OBRA

DESCRIPCION APROBADO ANTERIOR ACTUAL ACUMULADO SALDO


Programado S/. 1,074,658.70 S/. 0.00 S/. 12,700.44 S/. 12,700.44 S/. 1,061,958.25
Partidas Nueva S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Mayor Metrado S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Deductivos S/. 0.00
TOTAL S/. 1,074,658.70 S/. 0.00 S/. 12,700.44 S/. 12,700.44 S/. 1,061,958.25
C. ASPECTO FINANCIERO
C.1.1 ASIGNACION PRESUPUESTAL POR AO

DESCRIPCION PERIODOS DE GESTION TOTAL SALDO


2016 2017 2018
Programado 200,000.00 0.00 0.00 200,000.00 1,074,658.70 874,658.70
TOTAL 200,000.00 0.00 0.00 200,000.00 1,074,658.70 874,658.70

C.1.2 EJECUCION DE METAS FINANCIERAS 2016


ANTERIOR ACTUAL
DESCRIPCION PROGRAMADO ACUMULADO SALDO
2016 2016
Programado 1,074,658.70 0.00 275.00 275.00 1,074,383.70

TOTAL 1,074,658.70 0.00 275.00 275.00 1,074,383.70

NOTA: El reporte se realizo considerando los materiales totales ingresados a obra, y el monto gastado en planillas.

D. ASPECTO ADMINISTRATIVO
(Indicar la problemtica, soluciones y metas cumplidas)

Se realizo requerimientos de insumos de materiales para el buen desempeo de la obra.


y se esta trabajando de acuerdo a cronograma de expediente tecnico.
Se hizo los requerimientos adecuados de acuerdo a los insumos que contempla el expediente tecnico y estan en su proceso administrativo.
el trabajo.

E. ASPECTO SOCIAL
(Indicar la problemtica, soluciones y metas cumplidas)
Se reune constantemente con la parte benificiaria de la obra e informandoles sobre algunas problematicas que se sucitan en la obra.

Por parte de la residencia se esta coordinando con la sub gerencia de obras y los beneficiarios para el cambio de personal, para cada mes.

F. OBSERVACIONES Y RECOMENDACIONES
(Indicar la problemtica, soluciones y metas cumplidas)
Esta valorizacion esta sujeto al expediente tecnico del consultor .
La residencia realiza el rediseo sobre el proyecto, para el buen desempeo de la obra.
Se vio la necesidad de hacer residencia en la obra, ya que muchas veces es necesario para la parte tecnica y
para una mejor coordinacion en el proceso constructivo de la obra.
RESUMEN DE VALORIZACIONES DE AVANCE DE OBRA N 001

OBRA :
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

MONTO DE OBRA S/. 1,074,658.70 REGION : CUSCO


MONTO ASIGNADO 2016 S/. 200,000.00 DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA 6/6/2016 PROVINCIA : CHUMBIVILCAS
PLAZO DE EJECUCIN 6.00 DISTRITO : LLUSCO
FECHA DE TERMINO 11/30/2016 LOCALIDAD : COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA.
VALORIZACION DE AVANCE FISICO

AVANCES
PRESUPUESTO SALDO
ITEM VALORIZACION ANTERIOR ACTUAL ACUMULADO
Valorizado Valorizado Valorizado Valorizado
S/. % % % %
S/. S/. S/. S/.
1 PROGRAMADO S/. 1,074,658.70 S/. 0.00 0.00% S/. 12,700.44 1.18% S/. 12,700.44 1.18% S/. 1,061,958.26 98.82%

2 NUEVAS PARTIDAS

3 MAYORES METRADOS

4 DEDUCTIVOS

5 TOTAL 1,074,658.70 0.00 0.00% 12,700.44 1.18% 12,700.44 1.18% 1,061,958.26 98.82%
FORMATO No 033

VALORIZACIN POR METRADOS BASE


CORRESPONDIENTE AL MES : JUNIO -- 2016.
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS
PROYECTO :
CUSCO

MONTO DE OBRA : S/. 1,074,658.70 REGION : CUSCO


MONTO ASIGNADO : S/. 200,000.00 DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA : 6/6/2016 PROVINCIA : CHUMBIVILCAS
PLAZO DE EJECUCIN : 6 MESES DISTRITO : LLUSCO
FECHA DE TERMINO : 11/30/2016 LOCALIDAD : COMUNIDAD CAMPESINA DE ANTUYO - LLAYLLIMARCA.

FECHA DE PRESENTACIN: 28/06/2016


AVANCE FISICO DE OBRA VALORIZADO
METRADOS BASE SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
S/. S/. S/. S/. S/. S/.

01 CONSTRUCCION DE MURO DE CONTENCION 214,158.71 0.00 0.00% 6,889.18 3.22% 6,889.18 3.22% 207,269.53
1.01 OBRAS PROVISIONALES 2,408.84 0.00 0.00% 1,441.68 59.85% 1,441.68 59.85% 967.16
01.01.01 CARTEL DE OBRA und 1.00 967.16 967.16 - 0.00% - 0.00% - - 0.00% 1.00 967.16 100.00%
01.01.02 ALAMACEN Y GUARDIANIA m2 12.00 120.14 1,441.68 - 0.00% 12.00 1,441.68 100.00% 12.00 1,441.68 100.00% - - 0.00%
1.02 OBRAS PRELIMINARES 941.27 0.00 0.00% 517.10 54.94% 517.10 54.94% 424.17
01.02.01 TRAZO Y REPLANTEO INICIAL m2 233.95 1.75 409.41 - 0.00% 136.80 239.40 58.47% 136.80 239.40 58.47% 97.15 170.01 41.53%
01.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 262.00 2.03 531.86 - 0.00% 136.80 277.70 52.21% 136.80 277.70 52.21% 125.20 254.16 47.79%
1.03 MOVIMIENTO DE TIERRAS 28,427.77 0.00 0.00% 4,930.39 17.34% 4,930.39 17.34% 23,497.37
01.03.01 EXCAVACION MANUAL DE ZANJA EN TERRENO SEMI DURO m3 285.93 20.83 5,955.92 - 0.00% 225.72 4,701.71 78.94% 225.72 4,701.71 78.94% 60.21 1,254.21 21.06%
01.03.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 76.14 25.52 1,943.09 - 0.00% - 0.00% - - 0.00% 76.14 1,943.09 100.00%
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE m3 151.52 10.03 1,519.75 - 0.00% 22.80 228.68 15.05% 22.80 228.68 15.05% 128.72 1,291.06 84.95%
01.03.04 ACOPIO DE P.G DE 15" m3 204.31 46.02 9,402.35 - 0.00% - 0.00% - - 0.00% 204.31 9,402.35 100.00%
01.03.05 TRANSLADO DE P.G A OBRA m3 204.31 47.02 9,606.66 - 0.00% - 0.00% - - 0.00% 204.31 9,606.66 100.00%
1.04 CONCRETO SIMPLE 165,074.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 165,074.00
01.04.01 CONCRETO f'c=140 kg/cm2 m3 332.01 406.11 134,832.58 - 0.00% - 0.00% - - 0.00% 332.01 134,832.58 100.00%
01.04.02 ENCOFRADO Y DESENCOFRADO m2 779.82 38.78 30,241.42 - 0.00% - 0.00% - - 0.00% 779.82 30,241.42 100.00%
1.05 VARIOS 6,478.91 0.00 0.00% 0.00 0.00% 0.00 0.00% 6,478.91
01.05.01 TUBERIA DE DRENAJE PVC SAP C7.5 =4" m 153.00 19.47 2,978.91 - 0.00% - 0.00% - - 0.00% 153.00 2,978.91 100.00%
01.05.02 ROTURA DE BRIQUETAS und 1.00 3,500.00 3,500.00 - 0.00% - 0.00% - - 0.00% 1.00 3,500.00 100.00%
1.06 FLETE TERRESTRE 10,827.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 10,827.92
01.06.01 FLETE TERRESTRE kg 83,291.71 0.13 10,827.92 - 0.00% - 0.00% - - 0.00% 83,291.71 10,827.92 100.00%
2 CONSTRUCCION DE CERCO PERIMETRICO 471,511.27 0.00 0.00% 5,811.27 1.23% 5,811.27 1.23% 465,700.01
2.01 OBRAS PRELIMINARES 3,729.25 0.00 0.00% 445.97 11.96% 445.97 11.96% 3,283.28
02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,143.94 1.51 1,727.35 - 0.00% 136.80 206.57 11.96% 136.80 206.57 11.96% 1,007.14 1,520.78 88.04%
02.01.02 TRAZO Y REPLANTEO INICIAL m2 1,143.94 1.75 2,001.90 - 0.00% 136.80 239.40 11.96% 136.80 239.40 11.96% 1,007.14 1,762.50 88.04%
2.02 MOVIMIENTO DE TIERRAS 15,010.08 0.00 0.00% 5,365.30 35.74% 5,365.30 35.74% 9,644.78
02.02.01 DEMOLICION MANUAL DE MURO DE ADOBE EXISTENTE m3 274.54 20.83 5,718.67 - 0.00% 200.64 4,179.33 73.08% 200.64 4,179.33 73.08% 73.90 1,539.34 26.92%
02.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 128.00 23.79 3,045.12 - 0.00% 22.27 529.85 17.40% 22.27 529.85 17.40% 105.73 2,515.27 82.60%
02.02.03 EXCAVACION DE ZANJA PARA CIMIENTOS m3 169.26 20.83 3,525.69 - 0.00% 20.52 427.43 12.12% 20.52 427.43 12.12% 148.74 3,098.25 87.88%
02.02.04 EXCAVACION DE ZANJA EN GRADERIOS DE ACCESO DE EMERGENCIA m3 2.40 17.33 41.59 - 0.00% - 0.00% - - 0.00% 2.40 41.59 100.00%
02.02.05 RELLENO Y COMPACTACION CON MATERIAl PROPIO m3 35.97 27.60 992.77 - 0.00% - 0.00% - - 0.00% 35.97 992.77 100.00%
02.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 168.12 10.03 1,686.24 - 0.00% 22.80 228.68 13.56% 22.80 228.68 13.56% 145.32 1,457.56 86.44%
2.03 CONCRETO SIMPLE 64,356.01 0.00 0.00% 0.00 0.00% 0.00 0.00% 64,356.01
02.03.01 SOLADO DE CONCRETO SIMPLE FC=140 kg/ cm2 m3 16.00 136.74 2,187.84 - 0.00% - 0.00% - - 0.00% 16.00 2,187.84 100.00%
02.03.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 102.92 220.79 22,723.71 - 0.00% - 0.00% - - 0.00% 102.92 22,723.71 100.00%
02.03.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. m3 100.44 211.34 21,226.99 - 0.00% - 0.00% - - 0.00% 100.44 21,226.99 100.00%
02.03.04 ENCOFRADO Y DESENCOFRADO m2 411.68 38.78 15,964.95 - 0.00% - 0.00% - - 0.00% 411.68 15,964.95 100.00%
02.03.05 CONCRETO f'c=140 kg/cm2 EN GRADERIOS DE INGRESO m3 6.00 375.42 2,252.52 - 0.00% - 0.00% - - 0.00% 6.00 2,252.52 100.00%
2.04 CONCRETO ARMADO 175,983.72 0.00 0.00% 0.00 0.00% 0.00 0.00% 175,983.72
02.04.01 ZAPATAS 50,523.76 0.00 0.00% 0.00 0.00% 0.00 0.00% 50,523.76
02.04.01.0 CONCRETO f'c=175 kg/cm2 EN ZAPATAS m3 112.00 405.88 45,458.56 - 0.00% - 0.00% - - 0.00% 112.00 45,458.56 100.00%
02.04.01.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 840.00 6.03 5,065.20 - 0.00% - 0.00% - - 0.00% 840.00 5,065.20 100.00%
02.04.02 COLUMNAS 102,162.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 102,162.25
02.04.02.0 CONCRETO f'c=210 kg/cm2 m3 47.50 453.00 21,517.50 - 0.00% - 0.00% - - 0.00% 47.50 21,517.50 100.00%
02.04.02.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 7,654.28 6.03 46,155.31 - 0.00% - 0.00% - - 0.00% 7,654.28 46,155.31 100.00%
02.04.02.0 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 1,002.60 34.40 34,489.44 - 0.00% - 0.00% - - 0.00% 1,002.60 34,489.44 100.00%
02.04.03 VIGAS DE CORONACION 23,297.71 0.00 0.00% 0.00 0.00% 0.00 0.00% 23,297.72
02.04.03.0 CONCRETO f'c=175 kg/cm2 m3 21.73 405.88 8,819.77 - 0.00% - 0.00% - - 0.00% 21.73 8,819.77 100.00%
02.04.03.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,297.46 6.03 7,823.68 - 0.00% - 0.00% - - 0.00% 1,297.46 7,823.68 100.00%
02.04.03.0 ENCOFRADO Y DESENCOFRADO m2 171.59 38.78 6,654.26 - 0.00% - 0.00% - - 0.00% 171.59 6,654.26 100.00%
2.05 ALBAILERIA 0.00%
128,627.48 0.00 0.00% 0.00 0.00% 0.00 128,627.48
02.05.01 MURO CARAVISTA DE LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24), JUNTA 1.5 cm. MORTERO 1:1:5 m2 1,294.56 99.36 - - - - 1,294.56 128,627.48 100.00%
128,627.48 0.00% 0.00% 0.00%
2.06 REVOQUES, ENLUCIDOS Y MOLDURAS 34,340.37 0.00 0.00% 0.00 0.00% 0.00 0.00% 34,340.37
02.06.01 TARRAJEO DE SOBRECIMIENTOS MEZCLA C:A 1:5 m2 696.85 18.92 13,184.40 - 0.00% - 0.00% - - 0.00% 696.85 13,184.40 100.00%
02.06.02 TARRAJEO DE COLUMNAS MEZCLA C:A 1:5 m2 612.50 22.82 13,977.25 - 0.00% - 0.00% - - 0.00% 612.50 13,977.25 100.00%
02.06.03 TARRAJEO DE VIGA DE CORONACION MEZCLA C:A 1:5 m2 314.58 22.82 7,178.72 - 0.00% - 0.00% - - 0.00% 314.58 7,178.72 100.00%
2.07 PINTURA 24,876.89 0.00 0.00% 0.00 0.00% 0.00 0.00% 24,876.89
AVANCE FISICO DE OBRA VALORIZADO
METRADOS BASE SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
S/. S/. S/. S/. S/. S/.

02.07.01 PINTURA SATINADA EN COLUMNAS Y VIGAS DE CORONACION m2 927.08 16.77 15,547.13 - 0.00% - 0.00% - - 0.00% 927.08 15,547.13 100.00%
02.07.02 SOLAQUEADO DE MUROS CARAVISTA m2 1,227.60 7.60 9,329.76 - 0.00% - 0.00% - - 0.00% 1,227.60 9,329.76 100.00%
2.08 CARPINTERIA METALICA 4,800.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4,800.00
02.08.01 BARANDAS METALICAS PARA GRADAS DE INGRESO SEGUN DISEO m 45.00 80.00 3,600.00 - 0.00% - 0.00% - - 0.00% 45.00 3,600.00 100.00%
02.08.02 PUERTA METALICA und 1.00 1,200.00 1,200.00 - 0.00% - 0.00% - - 0.00% 1.00 1,200.00 100.00%
2.09 VARIOS 3,500.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,500.00
02.09.01 ROTURA DE BRIQUETAS und 1.00 3,500.00 3,500.00 - 0.00% - 0.00% - - 0.00% 1.00 3,500.00 100.00%
2.1 FLETE TERRESTRE 16,287.47 0.00 0.00% 0.00 0.00% 0.00 0.00% 16,287.47
02.10.01 FLETE TERRESTRE kg 125,288.26 0.13 16,287.47 - 0.00% - 0.00% - - 0.00% 125,288.26 16,287.47 100.00%
3 INFRAESTRUCTURA DEPORTIVA CON GRASS ARTIFICIAL 388,988.72 0.00 0.00% 0.00 0.00% 0.00 0.00% 388,988.71
3.01 OBRAS PROVISIONALES 1,441.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,441.68
03.01.01 ALAMACEN Y GUARDIANIA m2 12.00 120.14 1,441.68 - 0.00% - 0.00% - - 0.00% 12.00 1,441.68 100.00%
3.02 OBRAS PRELIMINARES 3,518.73 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,518.73
03.02.01 TRAZO Y REPLANTEO INICAL m2 930.88 1.75 1,629.04 - 0.00% - 0.00% - - 0.00% 930.88 1,629.04 100.00%
03.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 930.88 2.03 1,889.69 - 0.00% - 0.00% - - 0.00% 930.88 1,889.69 100.00%
3.03 MOVIMIENTO DE TIERRAS 35,512.01 0.00 0.00% 0.00 0.00% 0.00 0.00% 35,512.00
03.03.01 EXCAVACION CON MAQUINARIA EN TERRENO SUELTO m3 334.96 8.54 2,860.56 - 0.00% - 0.00% - - 0.00% 334.96 2,860.56 100.00%
03.03.02 RELLENO Y COMPACTADO CON MATERIAL PRESTAMO m3 231.00 3.31 764.61 - 0.00% - 0.00% - - 0.00% 231.00 764.61 100.00%
03.03.03 REFINE Y NIVELACION EN TERRENO NORMAL Y COMPACTADO m2 770.00 3.48 2,679.60 - 0.00% - 0.00% - - 0.00% 770.00 2,679.60 100.00%
03.03.04 RELLENO CON MATERIAL DRENANTE COMPACTADO m3 72.96 67.78 4,945.23 - 0.00% - 0.00% - - 0.00% 72.96 4,945.23 100.00%
03.03.05 RELLENO CON MATERIAL ARENA GRUESA m3 72.96 103.79 7,572.52 - 0.00% - 0.00% - - 0.00% 72.96 7,572.52 100.00%
03.03.06 RELLENO CON MATERIAL HORMIGON SELECCIONADO m3 72.96 78.29 5,712.04 - 0.00% - 0.00% - - 0.00% 72.96 5,712.04 100.00%
03.03.07 RELLENO CON MATERIAL GRAVA SELECCIONADA m3 72.96 48.29 3,523.24 - 0.00% - 0.00% - - 0.00% 72.96 3,523.24 100.00%
03.03.08 NIVELACION INTERIOR Y COMPACTADO FINAL DE TERRENO m2 983.55 3.31 3,255.55 - 0.00% - 0.00% - - 0.00% 983.55 3,255.55 100.00%
03.03.09 EXCAVACION PARA CIMIENTOS m3 9.12 20.83 189.97 - 0.00% - 0.00% - - 0.00% 9.12 189.97 100.00%
03.03.10 ELIMINACION DE MATERIAL EXCEDENTE m3 399.67 10.03 4,008.69 - 0.00% - 0.00% - - 0.00% 399.67 4,008.69 100.00%
3.04 OBRAS DE CONCRETO SIMPLE 45,308.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 45,308.58
03.04.01 VEREDAS DE CONCRETO f'c=175 kg/cm2 EN PERIMETRO DE GRASS SINTETICO m3 25.58 430.52 11,012.70 - 0.00% - 0.00% - - 0.00% 25.58 11,012.70 100.00%
03.04.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 34.20 38.78 1,326.28 - 0.00% - 0.00% - - 0.00% 34.20 1,326.28 100.00%
03.04.03 JUNTAS DE DILATACION EN VEREDAS m 29.00 4.38 127.02 - 0.00% - 0.00% - - 0.00% 29.00 127.02 100.00%
03.04.04 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. PARA GRADERIO m3 96.20 245.35 23,602.67 - 0.00% - 0.00% - - 0.00% 96.20 23,602.67 100.00%
03.04.05 CONCRETO CICLOPEO PARA CIMIENTACION 1:10 + 30% P.G m3 20.38 271.85 5,540.30 - 0.00% - 0.00% - - 0.00% 20.38 5,540.30 100.00%
03.04.06 ENCOFRADO Y DESENCOFRADO EN GRADERIO m2 95.40 38.78 3,699.61 - 0.00% - 0.00% - - 0.00% 95.40 3,699.61 100.00%
3.05 REVOQUES, ENLUCIDOS Y MOLDURAS 1,173.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,173.70
03.05.01 TARRAJEO EN ZARDINEL CON CEMENTO Y ARENA m2 11.32 21.41 242.36 - 0.00% - 0.00% - - 0.00% 11.32 242.36 100.00%
03.05.02 TARRAJEO EN GRADERIOS EN PASO Y CONTRAPASO m2 43.50 21.41 931.34 - 0.00% - 0.00% - - 0.00% 43.50 931.34 100.00%
3.06 PINTURAS 946.15 0.00 0.00% 0.00 0.00% 0.00 0.00% 946.15
03.06.01 PINTURA LATEX EN GRADERIOS m2 87.00 9.11 792.57 - 0.00% - 0.00% - - 0.00% 87.00 792.57 100.00%
03.06.02 PINTURA ESMALTE EN CANCHA SINTETICA m2 15.80 9.72 153.58 - 0.00% - 0.00% - - 0.00% 15.80 153.58 100.00%
3.07 GRASS SINTETICO 85,655.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 85,655.04
03.07.01 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 608.00 140.88 85,655.04 - 0.00% - 0.00% - - 0.00% 608.00 85,655.04 100.00%
3.08 SISTEMA DE DRENAJE 5,554.55 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,554.55
03.08.01 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 127.50 2.03 258.83 - 0.00% - 0.00% - - 0.00% 127.50 258.84 100.00%
03.08.02 EXCAVACION MANUAL EN TERRENO SUELTO PARA TUBERIAS m3 17.70 14.88 263.38 - 0.00% - 0.00% - - 0.00% 17.70 263.38 100.00%
03.08.03 REFINE Y NIVELACION DE ZANJAS m2 51.00 1.70 86.70 - 0.00% - 0.00% - - 0.00% 51.00 86.70 100.00%
03.08.04 CAMA DE APOYO PARA TUBERIA CON MATERIAL DE PRESTAMO m 125.40 4.75 595.65 - 0.00% - 0.00% - - 0.00% 125.40 595.65 100.00%
03.08.05 TUBERIA CRIBADA PARA DRENAJE PVC D= 6" m 67.50 21.56 1,455.30 - 0.00% - 0.00% - - 0.00% 67.50 1,455.30 100.00%
03.08.06 TUBERIA PVC SAL =4" m 65.00 18.94 1,231.10 - 0.00% - 0.00% - - 0.00% 65.00 1,231.10 100.00%
03.08.07 RELLENO CON MATERIAL PROPIO m3 17.70 25.52 451.70 - 0.00% - 0.00% - - 0.00% 17.70 451.70 100.00%
03.08.08 ELIMINACION DE MATERIAL EXCEDENTE m3 2.21 10.03 22.17 - 0.00% - 0.00% - - 0.00% 2.21 22.17 99.98%
03.08.09 CAJA DE REGISTRO DE DESAGUE 0.80 X 0.80 ALT. VARIABLE und 7.00 169.96 1,189.72 - 0.00% - 0.00% - - 0.00% 7.00 1,189.72 100.00%
3.09 ILUMINACION DE CAMPO DEPORTIVO 9,172.55 0.00 0.00% 0.00 0.00% 0.00 0.00% 9,172.55
03.09.01 SUMINISTRO Y MONTAJE DE REFLECTORES 400W und 10.00 620.56 6,205.60 - 0.00% - 0.00% - - 0.00% 10.00 6,205.60 100.00%
03.09.02 CABLE NYY 2-1x6 mm2 m 323.55 9.17 2,966.95 - 0.00% - 0.00% - - 0.00% 323.55 2,966.95 100.00%
3.10 COBERTURA CON PLANCHAS DE CALAMINA CURVOS 179,269.32 0.00 0.00% 0.00 0.00% 0.00 0.00% 179,269.32
03.10.01 TRAZO Y REPLANTEO INICAL m2 558.00 1.75 976.50 - 0.00% - 0.00% - - 0.00% 558.00 976.50 100.00%
03.10.02 EXCAVACION DE CIMIENTOS PARA POSTES METALICOS m3 21.87 20.83 455.55 - 0.00% - 0.00% - - 0.00% 21.87 455.55 100.00%
03.10.03 CONCRETO f'c=140 kg/cm2 PARA SOLADOS m3 1.46 385.86 563.36 - 0.00% - 0.00% - - 0.00% 1.46 563.36 100.00%
03.10.04 CONCRETO f'c=175 kg/cm2 m3 21.14 405.88 8,580.30 - 0.00% - 0.00% - - 0.00% 21.14 8,580.30 100.00%
03.10.05 COLUMNAS METALICAS DE 150 MM X 150 MM X 12MM und 18.00 1,250.00 22,500.00 - 0.00% - 0.00% - - 0.00% 18.00 22,500.00 100.00%
03.10.06 VIGA DE ACERO ESTRUCTURAL DE 150MM X 150 MM X 12 MM und 16.00 1,250.00 20,000.00 - 0.00% - 0.00% - - 0.00% 16.00 20,000.00 100.00%
03.10.07 CERCHAS METALICAS SEGUN DISEO und 11.00 3,850.00 42,350.00 - 0.00% - 0.00% - - 0.00% 11.00 42,350.00 100.00%
03.10.08 CORREAS DE METALICAS DE 2" X 2" X 2.5MM m 713.00 36.75 26,202.75 - 0.00% - 0.00% - - 0.00% 713.00 26,202.75 100.00%
03.10.09 COBERTURA CON CALAMINA CURVO 0.95 M X 2 M X 4MM m2 576.00 45.25 26,064.00 - 0.00% - 0.00% - - 0.00% 576.00 26,064.00 100.00%
03.10.10 PINTURA ANTICORROSIVA ESTRUCTURA METALICA m2 165.00 15.02 2,478.30 - 0.00% - 0.00% - - 0.00% 165.00 2,478.30 100.00%
03.10.11 SOLDADURA SUPERCITO m 750.00 6.27 4,702.50 - 0.00% - 0.00% - - 0.00% 750.00 4,702.50 100.00%
03.10.12 INSTALACION ESTRUCTURA METALICA und 11.00 1,232.34 13,555.74 - 0.00% - 0.00% - - 0.00% 11.00 13,555.74 100.00%
03.10.13 INSTALACION DE COBERTURA m2 576.00 18.82 10,840.32 - 0.00% - 0.00% - - 0.00% 576.00 10,840.32 100.00%
3.11 VARIOS 5,200.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,200.00
03.11.01 SUMINISTRO E INSTALACION DE ARCO PARA CANCHA SINTETICA und 2.00 850.00 1,700.00 - 0.00% - 0.00% - - 0.00% 2.00 1,700.00 100.00%
03.11.02 ROTURA DE BRIQUETAS und 1.00 3,500.00 3,500.00 - 0.00% - 0.00% - - 0.00% 1.00 3,500.00 100.00%
3.12 FLETE TERRESTRE 16,236.41 0.00 0.00% 0.00 0.00% 0.00 0.00% 16,236.41
03.12.01 FLETE TERRESTRE kg 124,895.45 0.13 16,236.41 - 0.00% - 0.00% - - 0.00% 124,895.45 16,236.41 100.00%
COSTO DIRECTO S/. 1,074,658.70 S/. 0.00 0.00% S/. 12,700.44 1.18% S/. 12,700.44 1.18% S/. 1,061,958.25 98.82%
GASTOS GENERALES (14.86%) 14.86% S/. 159,665.00 S/. 0.00 0.00% S/. 1,886.94 1.18% S/. 1,886.94 1.18% S/. 157,778.06 98.82%
GASTOS DE SUPERVISION (5.66% ) 5.66% S/. 60,877.50 S/. 0.00 0.00% S/. 719.46 1.18% S/. 719.46 1.18% S/. 60,158.04 98.82%
GASTOS DE EXPEDIENTE TECNICO (2.65%) 2.65% S/. 28,464.83 S/. 0.00 0.00% S/. 336.40 1.18% S/. 336.40 1.18% S/. 28,128.43 98.82%
GASTOS DE LIQUIDACION (2.08% ) 2.08% S/. 22,310.00 S/. 0.00 0.00% S/. 263.66 1.18% S/. 263.66 1.18% S/. 22,046.34 98.82%
AVANCE FISICO DE OBRA VALORIZADO
METRADOS BASE SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
S/. S/. S/. S/. S/. S/.

PRESUPUESTO TOTAL S/. 1,345,976.03 S/. 0.00 0.00% S/. 15,906.90 1.18% S/. 15,906.90 1.18% S/. 1,330,069.11 98.82%
*Se debe considerar las normas establecidad de la RESOLUCIN DE CONTRALORIA No 072-88 y 036-2001 para su trmite.
*Se debe consoderar los gastos generales.
FORMATO No 033

VALORIZACIN POR METRADOS BASE


CORRESPONDIENTE AL MES : JUNIO

PROYECTO : MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS NIVEL PRIMARIO DE ANTUYO EN LA COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA DEL DISTRITO DE LLUSCO
CHUMBIVILCAS CUSCO

MONTO DE OBRA : S/. 1,074,658.70 REGION : CUSCO


MONTO ASIGNADO : S/. 200,000.00 DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA : 6/6/2016 PROVINCIA : CHUMBIVILCAS
PLAZO DE EJECUCIN : 4.5 MESES DISTRITO : LLUSCO
FECHA DE TERMINO : 11/1/2016 LOCALIDAD : COMUNIDAD CAMPESINA DE ANTUYO - LLAYLLIMARCA.

FECHA DE PRESENTACIN: 26/06/2016


AVANCE FISICO DE OBRA VALORIZADO
METRADOS BASE SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
S/. S/. S/. S/. S/. S/.

01 CONSTRUCCION DE CERCO PERIMETRICO 359,284.03 0.00 0.00% 0.00 0.00% 0.00 0.00% 359,284.03 100.00%
1.01 OBRAS PRELIMINARES 3,221.63 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,221.63 100.00%
01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 868.76 1.51 1,311.83 - 0.00% - 0.00% - - 0.00% 868.76 1,311.83 100.00%
01.01.02 TRAZO Y REPLANTEO INICAL m2 1,115.00 1.64 1,828.60 - 0.00% - 0.00% - - 0.00% 1115.00 1,828.60 100.00%
01.01.03 TRAZO, NIVEL Y REPLANTEO EN RAMPA DE INGRESO m2 40.00 2.03 81.20 - 0.00% - 0.00% - - 0.00% 40.00 81.20 100.00%
1.02 MOVIMIENTO DE TIERRAS 11,434.96 0.00 0.00% 0.00 0.00% 0.00 0.00% 11,434.96 100.00%
01.02.01 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 69.12 23.79 1,644.36 - 0.00% - 0.00% - - 0.00% 69.12 1,644.36 100.00%
0 01.02.02 EXCAVACION DE ZANJA PARA CIMIENTOS m3 110.74 20.83 2,306.71 - 0.00% - 0.00% - - 0.00% 110.74 2,306.71 100.00%
01.02.03 EXCAVACION DE ZANJA EN GRADERIOS DE INGRESOCON EQUIPO (TERRENO SEMI DURO) m3 12.80 17.33 221.82 - 0.00% - 0.00% - - 0.00% 12.80 221.82 100.00%
01.02.04 RELLENO CON MATERIAL DE PRESTAMO (GRADERIOS DE INGRESO) m3 64.00 71.61 4,583.04 - 0.00% - 0.00% - - 0.00% 64.00 4,583.04 100.00%
01.02.05 RELLENO Y COMPACTACION CON MATERIAl PROPIO m3 35.97 27.60 992.77 - 0.00% - 0.00% - - 0.00% 35.97 992.77 100.00%
01.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 168.12 10.03 1,686.24 - 0.00% 0.00% - - 0.00% 168.12 1,686.24 100.00%
1.03 CONCRETO SIMPLE 83,267.29 0.00 0.00 0.00 83,267.29 100.00%
01.03.01 SOLADO DE CONCRETO SIMPLE FC=140 kg/ cm2 m3 8.64 136.74 1,181.43 - 0.00% - 0.00% - - 0.00% 8.64 1,181.43 100.00%
01.03.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 87.11 220.79 19,233.02 - 0.00% - 0.00% - - 0.00% 87.11 19,233.02 100.00%
01.03.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. m3 99.55 211.34 21,038.90 - 0.00% - 0.00% - - 0.00% 99.55 21,038.90 100.00%
01.03.04 ENCOFRADO Y DESENCOFRADO m2 348.43 38.78 13,512.12 - 0.00% - 0.00% - - 0.00% 348.43 13,512.12 100.00%
01.03.05 CONCRETO f'c=175 kg/cm2 EN ZAPATAS m3 60.48 405.88 24,547.62 - 0.00% - 0.00% - - 0.00% 60.48 24,547.62 100.00%
01.03.06 CONCRETO f'c=140 kg/cm2 EN GRADERIOS DE INGRESO m3 10.00 375.42 3,754.20 - 0.00% - 0.00% - - 0.00% 10.00 3,754.20 100.00%
1.04 CONCRETO ARMADO 107,306.17 0.00 0.00 0.00 107,306.17 100.00%
01.04.01 COLUMNAS 80,616.07 0.00 0.00 0.00 80,616.07 100.00%
01.04.01.01 CONCRETO f'c=210 kg/cm2 m3 34.80 453.00 15,764.40 - 0.00% - 0.00% - - 0.00% 34.80 15,764.40 100.00%
01.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 7,241.39 5.98 43,303.51 - 0.00% - 0.00% - - 0.00% 7241.39 43,303.51 100.00%
01.04.01.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 626.40 34.40 21,548.16 - 0.00% - 0.00% - - 0.00% 626.40 21,548.16 100.00%
01.04.02 VIGAS DE CORONACION 26,690.10 0.00 0.00% 0.00 0.00 26,690.10 100.00%
01.04.02.01 CONCRETO f'c=175 kg/cm2 m3 24.54 405.88 9,960.30 - 0.00% - 0.00% - - 0.00% 24.54 9,960.30 100.00%
01.04.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,712.50 5.98 10,240.75 - 0.00% - 0.00% - - 0.00% 1712.50 10,240.75 100.00%
01.04.02.03 ENCOFRADO Y DESENCOFRADO m2 167.33 38.78 6,489.06 - 0.00% - 0.00% - - 0.00% 167.33 6,489.06 100.00%
1.05 ALBAILERIA 71,667.82 0.00 0.00 0.00 71,667.82 100.00%
01.05.01
MURO CARAVISTA DE LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24), JUNTA 1.5 cm. MORTERO 1:1:5
m2 936.10 76.56 71,667.82 - 0.00% - 0.00% - - 0.00% 936.10 71,667.82 100.00%

1.06 REVOQUES, ENLUCIDOS Y MOLDURAS 22,593.09 0.00 0.00 0.00 22,593.09 100.00%
01.06.01 TARRAJEO DE SOBRECIMIENTOS MEZCLA C:A 1:5 m2 398.20 18.92 7,533.94 - 0.00% - 0.00% - - 0.00% 398.20 7,533.94 100.00%
01.06.02 TARRAJEO DE COLUMNAS MEZCLA C:A 1:5 m2 436.80 22.82 9,967.78 - 0.00% - 0.00% - - 0.00% 436.80 9,967.78 100.00%
01.06.03 TARRAJEO DE VIGA DE CORONACION MEZCLA C:A 1:5 m2 223.11 22.82 5,091.37 - 0.00% - 0.00% - - 0.00% 223.11 5,091.37 100.00%
1.07 PINTURA 20,639.20 0.00 0.00 0.00 20,639.20 100.00%
01.07.01 PINTURA SATINADA EN COLUMNAS Y VIGAS DE CORONACION m2 659.91 16.77 11,066.69 - 0.00% - 0.00% - - 0.00% 659.91 11,066.69 100.00%
01.07.02 SOLAQUEADO DE MUROS CARAVISTA m2 1,095.05 7.60 8,322.38 - 0.00% - 0.00% - - 0.00% 1095.05 8,322.38 100.00%
01.07.03 PINTURA ESMALTE EN PANEL METALICO m2 150.80 8.29 1,250.13 - 0.00% - 0.00% - - 0.00% 150.80 1,250.13 100.00%
1.08 CARPINTERIA METALICA 19,366.40 0.00 0.00 0.00 19,366.40 100.00%
01.08.01 BARANDAS METALICAS PARA GRADAS DE INGRESO SEGUN DISEO m 45.00 80.00 3,600.00 - 0.00% - 0.00% - - 0.00% 45.00 3,600.00 100.00%
01.08.02 PUERTA METALICA und 1.00 1,200.00 1,200.00 - 0.00% - 0.00% - - 0.00% 1.00 1,200.00 100.00%
01.08.03 PANEL METALICO CON MALLA OLIMPICA und 40.00 364.16 14,566.40 - 0.00% - 0.00% - - 0.00% 40.00 14,566.40 100.00%
1.09 VARIOS 3,500.00 0.00 0.00 0.00 3,500.00 100.00%
01.09.01 ROTURA DE BRIQUETAS und 1.00 3,500.00 3,500.00 - 0.00% - 0.00% - - 0.00% 1.00 3,500.00 100.00%
1.10 FLETE TERRESTRE 16,287.47 0.00 0.00 0.00 16,287.47 100.00%
01.10.01 FLETE TERRESTRE kg 125,288.26 0.13 16,287.47 - 0.00% - 0.00% - - 0.00% 125288.26 16,287.47 100.00%
COSTO DIRECTO S/. 359,284.03 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 359,284.03 100.00%
GASTOS GENERALES (13.36%) 13.36% S/. 48,000.35 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 48,000.35 100.00%
GASTOS DE SUPERVISION (5.5% ) 5.50% S/. 19,760.62 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 19,760.62 100.00%
GASTOS DE EXPEDIENTE TECNICO (3.17%) 3.17% S/. 11,389.30 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 11,389.30 100.00%
GASTOS DE LIQUIDACION (2.49% ) 2.49% S/. 8,946.17 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 8,946.17 100.00%
PRESUPUESTO TOTAL S/. 447,380.47 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 447,380.47 100.00%
*Se debe considerar las normas establecidad de la RESOLUCIN DE CONTRALORIA No 072-88 y 036-2001 para su trmite.
*Se debe cosiNerar los gastos generales.
AVANCE FISICO DE OBRA VALORIZADO
METRADOS BASE SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
S/. S/. S/. S/. S/. S/.
FORMATO No 033

VALORIZACIN DE ADICIONALES DE OBRA POR PARTIDAS NUEVAS


CORRESPONDIENTE AL MES : JUNIO - 2016.

PROYECTO : MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS NIVEL PRIMARIO DE ANTUYO EN LA COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA DEL DISTRITO DE
LLUSCO CHUMBIVILCAS CUSCO

MONTO DE OBRA : S/. 1,074,658.70 REGION : CUSCO


MONTO ASIGNADO : S/. 200,000.00 DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA : 6/6/2016 PROVINCIA : CHUMBIVILCAS
PLAZO DE EJECUCIN : 4.5 MESES DISTRITO : LLUSCO.
FECHA DE TERMINO : 10/31/2016 LOCALIDAD : COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMAR

FECHA DE PRESENTACIN: ......./......./.......

AVANCES ADICIONALES
PROGRAMADO ADICIONAL SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN
Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado
S/. S/. S/. S/. S/. S/.
1.00 CONSTRUCCION DE CERCO PERIMETRICO 1,929.86 0.00 0.00% 1,929.86 100.00% 1,929.86 100.00%
1.02 MOVIMIENTO DE TIERRAS 1,929.86 0.00 0.00% 1,929.86 100.00% 1,929.86 100.00%
01.02.07 DEMOLICION DE MURO DE PIEDRA EXISTENTE. M3 91.68 21.05 1,929.86 0.00 - 0.00% 91.68 1,929.86 100.00% 91.68 1,929.86 100.00%
COSTO DIRECTO S/. 1,929.86 S/. 0.00 S/. 1,929.86 100.00% S/. 1,929.86 100.00% S/. 0.00
*Se debe considerar las normas establecidad de la RESOLUCIN DE CONTRALORIA No 072-88 y 036-2001 para su trmite.
*Se debe cosiderar los gastos generales.
MPESINA DE ANTUYO LLAYLLIMAR

FECHA DE PRESENTACIN: ......./......./.......

SALDO

0.00%
MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS NIVEL PRIMARIO DE ANTUYO EN LA
PROYECTO: COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

Resumen:
01.01.02 ALAMACEN Y GUARDIANIA 12.00
01.02.01 TRAZO Y REPLANTEO INICIAL 136.80
01.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO 136.80
01.03.01 EXCAVACION MANUAL DE ZANJA EN TERRENO SEMI DURO 225.72
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE 22.80
02.01.01 LIMPIEZA DEL TERRENO MANUAL 136.80
02.01.02 TRAZO Y REPLANTEO INICIAL 136.80
02.02.01 DEMOLICION MANUAL DE MURO DE ADOBE EXISTENTE 200.64
02.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS 22.27
02.02.03 EXCAVACION DE ZANJA PARA CIMIENTOS 20.52
02.02.06 ELIMINACION DE MATERIAL EXCEDENTE 22.80

01.01.02 ALAMACEN Y GUARDIANIA


LARGO PROFUND.
FECHA DESCRIPCION N VECES ANCHO (m) METRADO SUBTOTAL TOTAL
(m) (m)
06/06/16 4.00 3.00 12.00
TOTAL METRADO (M2) : 12.00

01.02.01 TRAZO Y REPLANTEO INICIAL


LARGO PROFUND.
FECHA DESCRIPCION N VECES ANCHO (m) METRADO SUBTOTAL TOTAL
(m) (m)
06/06/16
07/06/16
08/06/16
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16 5.40 1.80 9.72
14/06/16 4.20 1.80 7.56
15/06/16 5.20 1.80 9.36
16/06/16 4.60 1.80 8.28
17/06/16 4.30 1.80 7.74
18/06/16 5.20 1.80 9.36
19/06/16
20/06/16 4.30 1.80 7.74
21/06/16 4.70 1.80 8.46
22/06/16 4.80 1.80 8.64
23/06/16 4.80 1.80 8.64
24/06/16 4.40 1.80 7.92
25/06/16 4.90 1.80 8.82
26/06/16
27/06/16 4.50 1.80 8.10
28/06/16 4.60 1.80 8.28
29/06/16 5.60 1.80 10.08
30/06/16 4.50 1.80 8.10
TOTAL METRADO (M2) : 136.80

01.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO


LARGO PROFUND.
FECHA DESCRIPCION N VECES ANCHO (m) METRADO SUBTOTAL TOTAL
(m) (m)
06/06/16
07/06/16
08/06/16
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16 5.40 1.80 9.72
14/06/16 4.20 1.80 7.56
15/06/16 5.20 1.80 9.36
16/06/16 4.60 1.80 8.28
17/06/16 4.30 1.80 7.74
18/06/16 5.20 1.80 9.36
19/06/16
20/06/16 4.30 1.80 7.74
21/06/16 4.70 1.80 8.46
22/06/16 4.80 1.80 8.64
23/06/16 4.80 1.80 8.64
24/06/16 4.40 1.80 7.92
25/06/16 4.90 1.80 8.82
26/06/16
27/06/16 4.50 1.80 8.10
28/06/16 4.60 1.80 8.28
29/06/16 5.60 1.80 10.08
30/06/16 4.50 1.80 8.10
TOTAL METRADO (M3) : 136.80
01.03.01 EXCAVACION MANUAL DE ZANJA EN TERRENO SEMI DURO
LARGO PROFUND.
FECHA DESCRIPCION N VECES ANCHO (m) METRADO SUBTOTAL TOTAL
(m) (m)
06/06/16
07/06/16
08/06/16
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16 5.40 1.80 2.20 21.38
14/06/16 4.20 1.80 2.00 15.12
15/06/16 5.20 1.80 1.90 17.78
16/06/16 4.60 1.80 1.70 14.08
17/06/16 4.30 1.80 1.60 12.38
18/06/16 5.20 1.80 1.50 14.04
19/06/16
20/06/16 4.30 1.80 1.80 13.93
21/06/16 4.70 1.80 1.50 12.69
22/06/16 4.80 1.80 1.60 13.82
23/06/16 4.80 1.80 1.70 14.69
24/06/16 4.40 1.80 1.70 13.46
25/06/16 4.90 1.80 1.50 13.23
26/06/16
27/06/16 4.50 1.80 1.45 11.75
28/06/16 4.60 1.80 1.55 12.83
29/06/16 5.60 1.80 1.34 13.51
30/06/16 4.50 1.80 1.36 11.02
TOTAL METRADO (M3) : 225.72

01.03.03 ELIMINACION DE MATERIAL EXCEDENTE


LARGO PROFUND.
FECHA DESCRIPCION N VECES ANCHO (m) METRADO SUBTOTAL TOTAL
(m) (m)
06/06/16
07/06/16
08/06/16
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16 4.20 AREA= 0.30 1.26
14/06/16 3.50 AREA= 0.30 1.05
15/06/16 5.10 AREA= 0.30 1.53
16/06/16 3.80 AREA= 0.30 1.14
17/06/16 6.10 AREA= 0.30 1.83
18/06/16 5.30 AREA= 0.30 1.59
19/06/16
20/06/16 5.70 AREA= 0.30 1.71
21/06/16 4.60 AREA= 0.30 1.38
22/06/16 3.50 AREA= 0.30 1.05
23/06/16 5.20 AREA= 0.30 1.56
24/06/16 3.40 AREA= 0.30 1.02
25/06/16 3.50 AREA= 0.30 1.05
26/06/16
27/06/16 5.30 AREA= 0.30 1.59
28/06/16 5.00 AREA= 0.30 1.50
29/06/16 5.90 AREA= 0.30 1.77
30/06/16 5.90 AREA= 0.30 1.77
TOTAL METRADO (M3) : 22.80

02.01.01 LIMPIEZA DEL TERRENO MANUAL


LARGO PROFUND.
FECHA DESCRIPCION N VECES ANCHO (m) METRADO SUBTOTAL TOTAL
(m) (m)
06/06/16
07/06/16
08/06/16
09/06/16 16.00 1.80 28.80
10/06/16 20.00 1.80 36.00
11/06/16 20.00 1.80 36.00
12/06/16
13/06/16 20.00 1.80 36.00
14/06/16
15/06/16
16/06/16
17/06/16
18/06/16
19/06/16
20/06/16
21/06/16
22/06/16
23/06/16
24/06/16
25/06/16
26/06/16
27/06/16
28/06/16
29/06/16
30/06/16
TOTAL METRADO (M2) : 136.80
02.01.02 TRAZO Y REPLANTEO INICIAL
ANCHO ALTURA.
FECHA DESCRIPCION N VECES REPETIC. LARGO (m) METRADO SUBTOTAL
(m) (m)
06/06/16
07/06/16
08/06/16 76.00 1.80 136.80
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16
14/06/16
15/06/16
16/06/16
17/06/16
18/06/16
19/06/16
20/06/16
21/06/16
22/06/16
23/06/16
24/06/16
25/06/16
26/06/16
27/06/16
28/06/16
29/06/16
30/06/16
TOTAL METRADO (M2) 136.80

02.02.01 DEMOLICION MANUAL DE MURO DE ADOBE EXISTENTE


ANCHO ALTURA.
FECHA DESCRIPCION N VECES REPETIC. LARGO (m) METRADO SUBTOTAL
(m) (m)
06/06/16
07/06/16 4.00 0.80 2.20 7.04
08/06/16 5.00 0.80 2.20 8.80
09/06/16 5.00 0.80 2.20 8.80
10/06/16 4.00 0.80 2.20 7.04
11/06/16 5.00 0.80 2.20 8.80
12/06/16
13/06/16 6.00 0.80 2.20 10.56
14/06/16 5.00 0.80 2.20 8.80
15/06/16 6.00 0.80 2.20 10.56
16/06/16 5.00 0.80 2.20 8.80
17/06/16 4.00 0.80 2.20 7.04
18/06/16 6.00 0.80 2.20 10.56 114.00
19/06/16 114
20/06/16 5.00 0.80 2.20 8.80
21/06/16 6.00 0.80 2.20 10.56
22/06/16 8.00 0.80 2.20 14.08
23/06/16 8.00 0.80 2.20 14.08
24/06/16 4.00 0.80 2.20 7.04
25/06/16 5.00 0.80 2.20 8.80
26/06/16
27/06/16 5.00 0.80 2.20 8.80
28/06/16 6.00 0.80 2.20 10.56
29/06/16 7.00 0.80 2.20 12.32
30/06/16 5.00 0.80 2.20 8.80
TOTAL METRADO (M3) 200.64

02.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS


ANCHO AREA
FECHA DESCRIPCION N VECES REPETIC. LARGO (m) ALTO (m) METRADO
(m) (CAD)
06/06/16
07/06/16
08/06/16
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16
14/06/16
15/06/16
16/06/16
17/06/16
18/06/16
19/06/16
20/06/16 EJE (01-02-03) 3 0.80 0.80 1.20 2.30
21/06/16 EJE (04-05-06) 3 0.80 0.80 1.20 2.30
22/06/16 EJE (07-08-09) 3 0.80 0.80 1.20 2.30
23/06/16 EJE (10-11-12) 3 0.80 0.80 1.20 2.30
24/06/16 EJE (13-14-15) 3 0.80 0.80 1.20 2.30
25/06/16 EJE (16-17) 2 0.80 0.80 1.20 1.54
26/06/16
27/06/16 EJE (18-19-20) 3 0.80 0.80 1.20 2.30
28/06/16 EJE (21-22-23) 3 0.80 0.80 1.20 2.30
29/06/16 EJE (24-25-26) 3 0.80 0.80 1.20 2.30
30/06/16 EJE (27-28-29) 3 0.80 0.80 1.20 2.30
22.27
02.02.03 EXCAVACION DE ZANJA PARA CIMIENTOS
ANCHO PROFUND
FECHA DESCRIPCION N VECES REPETIC. LARGO (m) ALTO (m) METRADO
(m) (m)
06/06/16
07/06/16
08/06/16
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16
14/06/16
15/06/16
16/06/16
17/06/16
18/06/16
19/06/16
20/06/16 8.80 0.60 0.45 2.38
21/06/16 9.00 0.60 0.45 2.43
22/06/16 7.60 0.60 0.45 2.05
23/06/16 7.60 0.60 0.45 2.05
24/06/16 6.80 0.60 0.45 1.84
25/06/16 6.40 0.60 0.45 1.73
26/06/16
27/06/16 5.20 0.60 0.45 1.40
28/06/16 7.40 0.60 0.45 2.00
29/06/16 8.20 0.60 0.45 2.21
30/06/16 9.00 0.60 0.45 2.43
20.52

02.02.06 ELIMINACION DE MATERIAL EXCEDENTE


ANCHO PROFUND
FECHA DESCRIPCION N VECES REPETIC. LARGO (m) ALTO (m) METRADO
(m) (m)
06/06/16
07/06/16
08/06/16
09/06/16
10/06/16
11/06/16
12/06/16
13/06/16 4.20 AREA= 0.30 1.26
14/06/16 3.50 AREA= 0.30 1.05
15/06/16 5.10 AREA= 0.30 1.53
16/06/16 3.80 AREA= 0.30 1.14
17/06/16 6.10 AREA= 0.30 1.83
18/06/16 5.30 AREA= 0.30 1.59
19/06/16
20/06/16 5.70 AREA= 0.30 1.71
21/06/16 4.60 AREA= 0.30 1.38
22/06/16 3.50 AREA= 0.30 1.05
23/06/16 5.20 AREA= 0.30 1.56
24/06/16 3.40 AREA= 0.30 1.02
25/06/16 3.50 AREA= 0.30 1.05
26/06/16
27/06/16 5.30 AREA= 0.30 1.59
28/06/16 5.00 AREA= 0.30 1.50
29/06/16 5.90 AREA= 0.30 1.77
30/06/16 5.90 AREA= 0.30 1.77
22.80
PARTIDAS EJECUTADAS VALORIZADA MENSUAL

ACTUAL

PARTIDA DESCRIPCION UND METRADO PRECIO %


UNITARIO PARCIAL METRADO VALORIZACION
01 CONSTRUCCION DE MURO DE CONTENCION 9,165.39 6,889.18 75.17%
1.01 OBRAS PROVISIONALES 1,441.68 1,441.68 100.00%
01.01.02 ALAMACEN Y GUARDIANIA m2 12.00 120.14 1,441.68 12.00 1,441.68 100.00%
1.02 OBRAS PRELIMINARES 852.54 517.10 60.65%
01.02.01 TRAZO Y REPLANTEO INICIAL m2 225.54 1.75 394.70 136.80 239.40 60.65%
01.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 225.54 2.03 457.85 136.80 277.70 60.65%
1.03 MOVIMIENTO DE TIERRAS 6,871.17 4,930.39 71.75%
01.03.01 EXCAVACION DE ZANJA CON EQUIPO (TERRENO SEMI DURO) m3 223.03 20.83 4,645.71 225.72 4,701.71 101.21%
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE m3 221.88 10.03 2,225.46 22.80 228.68 10.28%
1.00 CONSTRUCCION DE CERCO PERIMETRICO 14,619.07 5,811.27 39.75%
1.01 OBRAS PRELIMINARES 3,263.08 445.97 13.67%
01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 868.76 1.51 1,311.83 136.80 206.57 15.75%
01.01.02 TRAZO Y REPLANTEO INICIAL m2 1,115.00 1.75 1,951.25 136.80 239.40 12.27%
1.02 MOVIMIENTO DE TIERRAS 11,355.99 5,365.30 47.25%
02.02.01 DEMOLICION MANUAL DE MURO DE ADOBE EXISTENTE m3 274.54 20.83 5,718.67 200.64 4,179.33 73.08%
02.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 69.12 23.79 1,644.36 22.27 529.85 32.22%
02.02.03 EXCAVACION DE ZANJA PARA CIMIENTOS m3 110.74 20.83 2,306.71 20.52 427.43 18.53%
01.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 168.12 10.03 1,686.24 22.80 228.68 13.56%
S/. 12,700.44 1.18%
PARTIDAS EJECUTADAS VALORIZADA MENSUAL

ACTUAL

PARTIDA DESCRIPCION UND METRADO PRECIO %


UNITARIO PARCIAL METRADO VALORIZACION
30,060.84 19,027.17 63.30%
210.00 3.21 675.09 210.00 675.09 100.00%

791.42 27.50 21,767.22 494.26 13,594.13 62.45%


791.42 9.63 7,618.53 494.26 4,757.94 62.45%
66,602.80 14,423.62 21.66%
3602.00 2.65 9,538.85 910.00 2,409.87 25.26%
2074.75 27.50 57,063.94 436.80 12,013.75 21.05%
S/. 33,450.79 4.00%
FORMATO No 033

VALORIZACIN DE ADICIONALES POR MAYORES METRADOS


CORRESPONDIENTE AL MES : AGOSTO MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO
PROYECTO :

MONTO DE OBRA : S/. 1,154,456.16 REGION : CUSCO


MONTO ASIGNADO : S/. 300,000.00 DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA : 6/6/2016 PROVINCIA CHUMBIVILCAS
PLAZO DE EJECUCIN : 6 MESES DISTRITO SANTO TOMAS
FECHA DE TERMINO : LOCALIDAD : COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMAR

FECHA DE PRESENTACIN: ......./......./.......

AVANCES ADICIONALES
PROGRAMADO ADICIONAL SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN
Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
S/. S/. S/. S/. S/. S/.
36929 CINTAS CORREAS MADERA 3"X3", L=3M und 24 20.0118 480.2832 0 0 0.00 0 0 0 0 0
36930 COBERTURA CON CALAMINA METLICA 0.80MX3.0M m2 75.6 36.00 2721.24 0.00 0.00% 0.00 0.00% 0 0.00% 0 0.00%
36931 TABLAS MADERA CORRIENTE 1"" X 8" X 10' und 18 55.24 994.24 0.00 0.00% 0.00 0.00% 0 0.00% 0 0.00%
36932 ACCESORIOS CAMPAMENTO (INSTALACIONES ESPECIALES) glb 1 25.00 25.00 0.00 0.00% 0.00 0.00% 0 0.00% 0 0.00%
1.03 ACCESOS PEATONALES AL LUGAR DE LAS OBRAS EN EL CAMPO 3713.04 0.00 0.00% 0.00 0.00% 0 0.00% 0 0.00%
36951 EXCAVACIN MANUAL EN TERRENO NATURAL COMPACTO m3 100 27.50 2750.40 0.00 0.00% 0.00 0.00% 0 0.00% 0 0.00%
36952 TERRAPLANEO, RETIRO, ACOMODO MATERIAL EXCAVADO m3 100 9.63 962.64 0.00 0.00% 0.00 0.00% 0 0.00% 0 0.00%
COSTO DIRECTO S/. 11,166.56 0.00 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00%
EXPEDIENTE TCNICO (4.2% C.T.)
GASTOS GENERALES (16.5% C.D.)
LIQUIDACIN DE OBRA (1.8% C.D.)
UTILES DE ESCRITORIO (0.2% C.D.) 12.00% S/. 1,339.99 0.00 S/. 0.00 S/. 0.00 S/. 0.00
CAPACITACIN SOSTENIMIENTO OBRA, MIT. AMB. (1.8% C.D.) 5.00% S/. 558.33 0.00 S/. 0.00 S/. 0.00 S/. 0.00
UTILIDAD (10.6% CT) 0.57% S/. 63.57 0.00 S/. 0.00 S/. 0.00 S/. 0.00
PRESUPUESTO TOTAL 2.07% S/. 231.45 0.00 S/. 0.00 S/. 0.00 S/. 0.00
*Se debe considerar las normas establecidad de la RESOLUCIN DE CONTRALORIA No 072-88 y 036-2001 para su trmite.
FORMATO No 034

VALORIZACIN DE OBRA POR DEDUCTIVOS N 01


CORRESPONDIENTE AL MES : AGOSTO
MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO
PROYECTO :

MONTO DE OBRA : S/. 1,074,658.70 REGION : CUSCO


MONTO ASIGNADO : S/. 200,000.00 DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA : 6/6/2016 PROVINCIA CHUMBIVILCAS
PLAZO DE EJECUCIN : 6 MESES DISTRITO SANTO TOMAS
FECHA DE TERMINO : Err:502 LOCALIDAD : COMUNIDAD CAMPESINA DE ANT

FECHA DE PRESENTACIN: ......./......./.......


DEDUCTIVOS
PROGRAMADO DEDUCTIVO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCIN
Unid. Metrado P. Unit. Presup. Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado
S/. S/. S/. S/. S/.
36923 TRAZO Y REPLANTEO m2 72 3.21 231.46 0 0.00% 0 0.00% 0 0.00%
36924 EXCAVACIN MANUAL EN TERRENO NATURAL COMPACTO m3 36 27.50 990.14 0 0.00% 0 0.00% 0 0.00%
36925 ELIMINACIN MATERIAL EXCEDENTE m3 36 9.63 346.55 0 0.00% 0 0.00% 0 0.00%
36926 PALOS ROLLIZOS EUCALIPTO 6" L=3.50M und 12 45.9 550.80 0 0.00% 0 0.00% 0 0.00%
36927 CINTAS CORREAS MADERA 3"X3", L=12M und 3 53.15 159.46 0 0.00% 0 0.00% 0 0.00%
36928 CINTAS CORREAS MADERA 3"X3", L=6M und 5 28.44 142.20 0 0.00% 0 0.00% 0 0.00%
COSTO DIRECTO
EXPEDIENTE TCNICO (4.2% C.T.)
GASTOS GENERALES (16.5% C.D.)
LIQUIDACIN DE OBRA (1.8% C.D.)
UTILES DE ESCRITORIO (0.2% C.D.)
CAPACITACIN SOSTENIMIENTO OBRA, MIT. AMB. (1.8% C.D.)
UTILIDAD (10.6% CT)
PRESUPUESTO TOTAL
*Se debe considerar las normas establecidad de la RESOLUCIN DE CONTRALORIA No 072-88 y 036-2001 para su trmite.
SCO

: COMUNIDAD CAMPESINA DE ANT

N: ......./......./.......

DEDUCTIVO

Valorizado %
S/.
0 0.00%
0 0.00%
0 0.00%
0 0.00%
0 0.00%
0 0.00%
PARTIDAS EJECUTADAS VALORIZADA MENSUAL - JUNIO 2016.

ACTUAL

PARTIDA DESCRIPCION UND METRADO PRECIO %


UNITARIO PARCIAL METRADO VALORIZACION
01 CONSTRUCCION DE MURO DE CONTENCION 9,858.62 6,889.18
1.01 OBRAS PROVISIONALES 1,441.68 1,441.68
01.01.02 ALAMACEN Y GUARDIANIA m2 12.00 120.14 1,441.68 12.00 1,441.68 100.00%
1.02 OBRAS PRELIMINARES 941.27 517.10
01.02.01 TRAZO Y REPLANTEO INICIAL m2 233.95 1.75 409.41 136.80 239.40 58.47%
01.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 262.00 2.03 531.86 136.80 277.70 52.21%
1.03 MOVIMIENTO DE TIERRAS 7,475.67 4,930.39
01.03.01 EXCAVACION MANUAL DE ZANJA EN TERRENO SEMI DURO m3 285.93 20.83 5,955.92 225.72 4,701.71 78.94%
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE m3 151.52 10.03 1,519.75 22.80 228.68 15.05%
2 CONSTRUCCION DE CERCO PERIMETRICO 17,704.96 5,811.27
2.01 OBRAS PRELIMINARES 3,729.24 445.97
02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,143.94 1.51 1,727.35 136.80 206.57 11.96%
02.01.02 TRAZO Y REPLANTEO INICIAL m2 1,143.94 1.75 2,001.90 136.80 239.40 11.96%
2.02 MOVIMIENTO DE TIERRAS 13,975.72 5,365.30
02.02.01 DEMOLICION MANUAL DE MURO DE ADOBE EXISTENTE m3 274.54 20.83 5,718.67 200.64 4,179.33 73.08%
02.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 128.00 23.79 3,045.12 22.27 529.85 17.40%
02.02.03 EXCAVACION DE ZANJA PARA CIMIENTOS m3 169.26 20.83 3,525.69 20.52 427.43 12.12%
02.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 168.12 10.03 1,686.24 22.80 228.68 13.56%
S/. 27,563.58 S/. 12,700.44 1.18%
FORMATO No 04
CONTROL DE METRADOS MENSUAL DE OBRA No 001

OBRA : MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

PROGRAM METRADOS DIARIOS MES DE JUNIO 2016. TOTAL. ANTERIOR. ACUM. SALDO.
CODIGO PARTIDA Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue
UNID CANT MES. Cant Cant Cant
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
01 CONSTRUCCION DE MURO DE CONTENCION
1.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA und 1.00 0.00 0.00 0.00 1.0
01.01.02 ALAMACEN Y GUARDIANIA m2 12.00 12.00 12.00 0.00 12.00 0.0
1.02 OBRAS PRELIMINARES
01.02.01 TRAZO Y REPLANTEO INICIAL m2 233.95 9.72 7.56 9.36 8.28 7.74 9.36 7.74 8.46 8.64 8.64 7.92 8.82 8.10 8.28 10.08 8.10 136.80 0.00 136.80 97.2
01.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 262.00 9.72 7.56 9.36 8.28 7.74 9.36 7.74 8.46 8.64 8.64 7.92 8.82 8.10 8.28 10.08 8.10 136.80 0.00 136.80 125.2
1.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION MANUAL DE ZANJA EN TERRENO SEMI DURO m3 285.93 21.38 15.12 17.78 14.08 12.38 14.04 13.93 12.69 13.82 14.69 13.46 13.23 11.75 12.83 13.51 11.02 225.71 0.00 225.71 60.2
01.03.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 76.14 0.00 0.00 0.00 76.1
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE m3 151.52 1.26 1.05 1.53 1.14 1.83 1.59 1.71 1.38 1.05 1.56 1.02 1.05 1.59 1.50 1.77 1.77 22.80 0.00 22.80 128.7
01.03.04 ACOPIO DE P.G DE 15" m3 204.31 0.00 0.00 0.00 204.3
01.03.05 TRANSLADO DE P.G A OBRA m3 204.31 0.00 0.00 0.00 204.3
1.04 CONCRETO SIMPLE
01.04.01 CONCRETO f'c=140 kg/cm2 m3 332.01 0.00 0.00 0.00 332.0
01.04.02 ENCOFRADO Y DESENCOFRADO m2 779.82 0.00 0.00 0.00 779.8
1.05 VARIOS
01.05.01 TUBERIA DE DRENAJE PVC SAP C7.5 =4" m 153.00 0.00 0.00 0.00 153.0
01.05.02 ROTURA DE BRIQUETAS und 1.00 0.00 0.00 0.00 1.0
1.06 FLETE TERRESTRE
01.06.01 FLETE TERRESTRE kg 83,291.71 0.00 0.00 0.00 83291.7
2 CONSTRUCCION DE CERCO PERIMETRICO
2.01 OBRAS PRELIMINARES
02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,143.94 28.80 36.00 36.00 36.00 136.80 0.00 136.80 1007.1
02.01.02 TRAZO Y REPLANTEO INICIAL m2 1,143.94 136.80 136.80 0.00 136.80 1007.1
2.02 MOVIMIENTO DE TIERRAS
02.02.01 DEMOLICION MANUAL DE MURO DE ADOBE EXISTENTE m3 274.54 7.04 8.80 8.80 7.04 8.80 10.56 8.80 10.56 8.80 7.04 10.56 8.80 10.56 14.08 14.08 7.04 8.80 8.80 10.56 12.32 8.80 200.64 0.00 200.64 73.9
02.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 128.00 2.30 2.30 2.30 2.30 2.30 1.54 2.30 2.30 2.30 2.30 22.27 0.00 22.27 105.7
02.02.03 EXCAVACION DE ZANJA PARA CIMIENTOS m3 169.26 2.38 2.43 2.05 2.05 1.84 1.73 1.40 2.00 2.21 2.43 20.52 0.00 20.52 148.7
02.02.04 EXCAVACION DE ZANJA EN GRADERIOS DE ACCESO DE EMERGENCIA m3 2.40 0.00 0.00 0.00 2.4
02.02.05 RELLENO Y COMPACTACION CON MATERIAl PROPIO m3 35.97 0.00 0.00 0.00 36.0
02.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 168.12 1.26 1.05 1.53 1.14 1.83 1.59 1.71 1.38 1.05 1.56 1.02 1.05 1.59 1.50 1.77 1.77 22.80 0.00 22.80 145.3
2.03 CONCRETO SIMPLE
02.03.01 SOLADO DE CONCRETO SIMPLE FC=140 kg/ cm2 m3 16.00 0.00 0.00 0.00 16.0
02.03.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 102.92 0.00 0.00 0.00 102.9
02.03.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. m3 100.44 0.00 0.00 0.00 100.4
02.03.04 ENCOFRADO Y DESENCOFRADO m2 411.68 0.00 0.00 0.00 411.7
02.03.05 CONCRETO f'c=140 kg/cm2 EN GRADERIOS DE INGRESO m3 6.00 0.00 0.00 0.00 6.0
2.04 CONCRETO ARMADO
02.04.01 ZAPATAS
02.04.01.01 CONCRETO f'c=175 kg/cm2 EN ZAPATAS m3 112.00 0.00 0.00 0.00 112.0
02.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 840.00 0.00 0.00 0.00 840.0
02.04.02 COLUMNAS
02.04.02.01 CONCRETO f'c=210 kg/cm2 m3 47.50 0.00 0.00 0.00 47.5
02.04.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 7,654.28 0.00 0.00 0.00 7654.3
02.04.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 1,002.60 0.00 0.00 0.00 1002.6
02.04.03 VIGAS DE CORONACION
02.04.03.01 CONCRETO f'c=175 kg/cm2 m3 21.73 0.00 0.00 0.00 21.7
02.04.03.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,297.46 0.00 0.00 0.00 1297.5
02.04.03.03 ENCOFRADO Y DESENCOFRADO m2 171.59 0.00 0.00 0.00 171.6
2.05 ALBAILERIA
02.05.01 MURO CARAVISTA DE LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24), JUNTA 1.5 cm. MORTERO m2 1,294.56 0.00 0.00 0.00 1294.6
2.06 1:1:5
REVOQUES, ENLUCIDOS Y MOLDURAS
02.06.01 TARRAJEO DE SOBRECIMIENTOS MEZCLA C:A 1:5 m2 696.85 0.00 0.00 0.00 696.9
02.06.02 TARRAJEO DE COLUMNAS MEZCLA C:A 1:5 m2 612.50 0.00 0.00 0.00 612.5
02.06.03 TARRAJEO DE VIGA DE CORONACION MEZCLA C:A 1:5 m2 314.58 0.00 0.00 0.00 314.6
2.07 PINTURA
02.07.01 PINTURA SATINADA EN COLUMNAS Y VIGAS DE CORONACION m2 927.08 0.00 0.00 0.00 927.1
02.07.02 SOLAQUEADO DE MUROS CARAVISTA m2 1,227.60 0.00 0.00 0.00 1227.6
2.08 CARPINTERIA METALICA
02.08.01 BARANDAS METALICAS PARA GRADAS DE INGRESO SEGUN DISEO m 45.00 0.00 0.00 0.00 45.0
02.08.02 PUERTA METALICA und 1.00 0.00 0.00 0.00 1.0
2.09 VARIOS
02.09.01 ROTURA DE BRIQUETAS und 1.00 0.00 0.00 0.00 1.0
2.1 FLETE TERRESTRE 0.00 0.00 0.00 0.0
02.10.01 FLETE TERRESTRE kg 125,288.26 0.00 0.00 0.00 125288.3
3 INFRAESTRUCTURA DEPORTIVA CON GRASS ARTIFICIAL
3.01 OBRAS PROVISIONALES
03.01.01 ALAMACEN Y GUARDIANIA m2 12.00 0.00 0.00 0.00 12.0
3.02 OBRAS PRELIMINARES
03.02.01 TRAZO Y REPLANTEO INICAL m2 930.88 0.00 0.00 0.00 930.9
03.02.02 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 930.88 0.00 0.00 0.00 930.9
3.03 MOVIMIENTO DE TIERRAS
03.03.01 EXCAVACION CON MAQUINARIA EN TERRENO SUELTO m3 334.96 0.00 0.00 0.00 335.0
03.03.02 RELLENO Y COMPACTADO CON MATERIAL PRESTAMO m3 231.00 0.00 0.00 0.00 231.0
03.03.03 REFINE Y NIVELACION EN TERRENO NORMAL Y COMPACTADO m2 770.00 0.00 0.00 0.00 770.0
03.03.04 RELLENO CON MATERIAL DRENANTE COMPACTADO m3 72.96 0.00 0.00 0.00 73.0
03.03.05 RELLENO CON MATERIAL ARENA GRUESA m3 72.96 0.00 0.00 0.00 73.0
03.03.06 RELLENO CON MATERIAL HORMIGON SELECCIONADO m3 72.96 0.00 0.00 0.00 73.0
03.03.07 RELLENO CON MATERIAL GRAVA SELECCIONADA m3 72.96 0.00 0.00 0.00 73.0
03.03.08 NIVELACION INTERIOR Y COMPACTADO FINAL DE TERRENO m2 983.55 0.00 0.00 0.00 983.6
03.03.09 EXCAVACION PARA CIMIENTOS m3 9.12 0.00 0.00 0.00 9.1
03.03.10 ELIMINACION DE MATERIAL EXCEDENTE m3 399.67 0.00 0.00 0.00 399.7
3.04 OBRAS DE CONCRETO SIMPLE
03.04.01 VEREDAS DE CONCRETO f'c=175 kg/cm2 EN PERIMETRO DE GRASS SINTETICO m3 25.58 0.00 0.00 0.00 25.6
03.04.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 34.20 0.00 0.00 0.00 34.2
03.04.03 JUNTAS DE DILATACION EN VEREDAS m 29.00 0.00 0.00 0.00 29.0
03.04.04 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.G. PARA GRADERIO m3 96.20 0.00 0.00 0.00 96.2
03.04.05 CONCRETO CICLOPEO PARA CIMIENTACION 1:10 + 30% P.G m3 20.38 0.00 0.00 0.00 20.4
03.04.06 ENCOFRADO Y DESENCOFRADO EN GRADERIO m2 95.40 0.00 0.00 0.00 95.4
FORMATO No 04
CONTROL DE METRADOS MENSUAL DE OBRA No 001

OBRA : MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

PROGRAM METRADOS DIARIOS MES DE JUNIO 2016. TOTAL. ANTERIOR. ACUM. SALDO.
CODIGO PARTIDA Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue
UNID CANT MES. Cant Cant Cant
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
3.05 REVOQUES, ENLUCIDOS Y MOLDURAS
03.05.01 TARRAJEO EN ZARDINEL CON CEMENTO Y ARENA m2 11.32 0.00 0.00 0.00 11.3
FORMATO No 04
CONTROL DE METRADOS MENSUAL DE OBRA No 001

OBRA : MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

PROGRAM METRADOS DIARIOS MES DE JUNIO 2016. TOTAL. ANTERIOR. ACUM. SALDO.
CODIGO PARTIDA Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue
UNID CANT MES. Cant Cant Cant
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
03.05.02 TARRAJEO EN GRADERIOS EN PASO Y CONTRAPASO m2 43.50 0.00 0.00 0.00 43.5
3.06 PINTURAS
03.06.01 PINTURA LATEX EN GRADERIOS m2 87.00 0.00 0.00 0.00 87.0
03.06.02 PINTURA ESMALTE EN CANCHA SINTETICA m2 15.80 0.00 0.00 0.00 15.8
3.07 GRASS SINTETICO
03.07.01 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 608.00 0.00 0.00 0.00 608.0
3.08 SISTEMA DE DRENAJE
03.08.01 TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 127.50 0.00 0.00 0.00 127.5
03.08.02 EXCAVACION MANUAL EN TERRENO SUELTO PARA TUBERIAS m3 17.70 0.00 0.00 0.00 17.7
03.08.03 REFINE Y NIVELACION DE ZANJAS m2 51.00 0.00 0.00 0.00 51.0
03.08.04 CAMA DE APOYO PARA TUBERIA CON MATERIAL DE PRESTAMO m 125.40 0.00 0.00 0.00 125.4
03.08.05 TUBERIA CRIBADA PARA DRENAJE PVC D= 6" m 67.50 0.00 0.00 0.00 67.5
03.08.06 TUBERIA PVC SAL =4" m 65.00 0.00 0.00 0.00 65.0
03.08.07 RELLENO CON MATERIAL PROPIO m3 17.70 0.00 0.00 0.00 17.7
03.08.08 ELIMINACION DE MATERIAL EXCEDENTE m3 2.21 0.00 0.00 0.00 2.2
03.08.09 CAJA DE REGISTRO DE DESAGUE 0.80 X 0.80 ALT. VARIABLE und 7.00 0.00 0.00 0.00 7.0
3.09 ILUMINACION DE CAMPO DEPORTIVO
03.09.01 SUMINISTRO Y MONTAJE DE REFLECTORES 400W und 10.00 0.00 0.00 0.00 10.0
03.09.02 CABLE NYY 2-1x6 mm2 m 323.55 0.00 0.00 0.00 323.6
3.1 COBERTURA CON PLANCHAS DE CALAMINA CURVOS
03.10.01 TRAZO Y REPLANTEO INICAL m2 558.00 0.00 0.00 0.00 558.0
03.10.02 EXCAVACION DE CIMIENTOS PARA POSTES METALICOS m3 21.87 0.00 0.00 0.00 21.9
03.10.03 CONCRETO f'c=140 kg/cm2 PARA SOLADOS m3 1.46 0.00 0.00 0.00 1.5
03.10.04 CONCRETO f'c=175 kg/cm2 m3 21.14 0.00 0.00 0.00 21.1
03.10.05 COLUMNAS METALICAS DE 150 MM X 150 MM X 12MM und 18.00 0.00 0.00 0.00 18.0
03.10.06 VIGA DE ACERO ESTRUCTURAL DE 150MM X 150 MM X 12 MM und 16.00 0.00 0.00 0.00 16.0
03.10.07 CERCHAS METALICAS SEGUN DISEO und 11.00 0.00 0.00 0.00 11.0
03.10.08 CORREAS DE METALICAS DE 2" X 2" X 2.5MM m 713.00 0.00 0.00 0.00 713.0
03.10.09 COBERTURA CON CALAMINA CURVO 0.95 M X 2 M X 4MM m2 576.00 0.00 0.00 0.00 576.0
03.10.10 PINTURA ANTICORROSIVA ESTRUCTURA METALICA m2 165.00 0.00 0.00 0.00 165.0
03.10.11 SOLDADURA SUPERCITO m 750.00 0.00 0.00 0.00 750.0
03.10.12 INSTALACION ESTRUCTURA METALICA und 11.00 0.00 0.00 0.00 11.0
03.10.13 INSTALACION DE COBERTURA m2 576.00 0.00 0.00 0.00 576.0
3.11 VARIOS
03.11.01 SUMINISTRO E INSTALACION DE ARCO PARA CANCHA SINTETICA und 2.00 0.00 0.00 0.00 2.0
03.11.02 ROTURA DE BRIQUETAS und 1.00 0.00 0.00 0.00 1.0
3.12 FLETE TERRESTRE
03.12.01 FLETE TERRESTRE kg 124,895.45 0.00 0.00 0.00 124895.5
FORMATO No 04
CONTROL DE METRADOS PARTIDAS NUEVAS MENSUAL DE OBRA No 001

OBRA : MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS NIVEL PRIMARIO DE ANTUYO EN LA COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO
PROGRAM MES DE JUNIO 2016. TOTAL ANTERIOR ACUM SALDO
CODIGO PARTIDA Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue Vie Sb D Lun Mar Mi Jue
UNID CANT MES Cant Cant Cant
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
01.02.07 DEMOLICION DE MURO DE PIEDRA EXISTENTE. M3 0.00 0.00 0.00 0.0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
06.00.00 PONTONES
METRADOS

PROYECTO: CONSTRUCCION DE LA CARRETERA BOCA MANTALO - ALTO MANTALO (24.81 Km)

PONTON TIPO I - L = 10 m
N Ubicacin Longitud Ancho Observ.
05 20+900 10.00 3.60 Qda. Kitasiari
07 24+880 10.00 3.60 Qda. Lucumayo

PONTON TIPO II - L = 8 m
N Ubicacin Longitud Ancho Observ.
02 12+185 8.00 3.60 Qda. Sanboato
03 13+450 8.00 3.60 Qda. Sivichari
04 18+930 8.00 3.60 Qda. Charahuato

PONTON TIPO III - L = 6m


N Ubicacin Longitud Ancho Observ.
01 6+400 6.00 3.60 FALTA VARANDAS
06 24+410 6.00 3.60 Qda. Tituruchayoc

Resumen:
06.01.00 TRAZO Y REPLANTEO PARA ESTRUCTURAS 40.00
06.02.00 PUENTE PEATONAL PROVISIONAL 0.00
06.03.00 EXCAVACION NO CLASIFICADA BAJO AGUA PARA ESTRUCTURAS 42.67
06.04.00 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO 0.00
06.05.00 EXCAVACION PARA ESTRUCTURAS EN ROCA FIJA 0.00
06.06.00 PERFILADO Y COMPACTACION MANUAL DE TERRENO 35.72
06.07.00 ENCOFRADO Y DESENCOFRADO 76.60
06.08.00 CC F'c = 140 Kg/Cm2 + 50% P.G. 60.08
06.09.00 CC F'c = 175 Kg/Cm2 + 30% P.G. 44.84
06.10.00 C F'c = 210 Kg/Cm2 0.00
06.11.00 C F'c = 280 Kg/Cm2 0.00
06.12.00 ACERO DE REFUERZO F'y = 4200 Kg/Cm2 43.20
06.13.00 RELLENO CON MATERIAL SELECCIONADO 0.00
06.14.00 BARANDA METALICA 0.00
06.15.00 TUBERIA PVC SAL 2" 10.08
06.16.00 JUNTA ASFALTICA 0.00

06.01.00 TRAZO Y REPLANTEO PARA ESTRUCTURAS


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO PROG. 12+120
6/4/2012 REPLANTEO Y MONUMENT 1 10.00 4.00 40.00

PONTONES TIPO III


TOTAL METRADO (M2) : 40.00

06.02.00 PUENTE PEATONAL PROVISIONAL


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II

PONTONES TIPO III

TOTAL METRADO (M2) : 0.00

06.03.00 EXCAVACION NO CLASIFICADA BAJO AGUA PARA ESTRUCTURAS


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO PROG. 12+120
6/4/2012 EXCAVACION PARA LA SU 1 4.00 3.70 0.30 4.44
6/5/2012 EXCAVACION PARA EL CU 1 7.30 3.70 0.30 8.10
6/6/2012 EXCAVACION PARA EL CU 1 7.50 4.00 0.30 9.00
6/7/2012 EXCAVACION PARA EL CU 1 7.30 3.70 0.30 8.10
6/8/2012 EXCAVACION DE LOS ALE 2 3.60 1.75 0.30 3.78
6/9/2012 EXCAVACION PARA LOS A 2 3.50 0.90 0.30 1.89
6/11/2012 EXCAVACION PARA EL CU 1 4.00 1.50 0.25 1.50
6/12/2012 EXCAVACION PARA LOS A 2 3.75 2.60 0.30 5.85

PONTONES TIPO III

TOTAL METRADO (M3) : 42.67

06.04.00 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTONES TIPO II
PONTON SAMBOATO PROG. 12+120

PONTONES TIPO III

TOTAL METRADO (M3) : 0.00

06.05.00 EXCAVACION PARA ESTRUCTURAS EN ROCA FIJA


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I
PONTONES TIPO II

PONTONES TIPO III

TOTAL METRADO (M3) : 0.00

06.06.00 PERFILADO Y COMPACTACION MANUAL DE TERRENO


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO
6/14/2012 PERFILADO Y COMPACTA 1 29.28 1.22 35.72

PONTONES TIPO III

TOTAL METRADO (M2) : 35.72

06.07.00 ENCOFRADO Y DESENCOFRADO


LARGO ANCHO ALTURA.
FECHA DESCRIPCION N VECES REPETIC. METRADO SUBTOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO
6/14/2012 ENCOFRADO DE ZAPATA DE 1 10.38 1.22 12.66
6/15/2012 ENCOFRADO DE ZAPATA DE 1 11.00 1.22 13.42
6/16/2012 ENCOFRADO DE ZAPATA DE 1 10.00 1.22 12.20
6/19/2012 ENCOFRADO DE LA ESTR 1 6.00 2.40 14.40
6/21/2012 ENCOFRADO DE ALEROS 1 6.30 2.44 15.37
6/22/2012 DESENCOFRADO DEL ESTRIBO VACIADO
6/28/2012 ARMADO DEL CASTILLO PARA EL ENCOFRADO DEL ESTRIBO
6/29/2012 ENCOFRADO DEL LADO PO 1 3.00 1.22 3.66
6/30/2012 ENCOFRADO DEL CUERPO 1 4.00 1.22 4.88
PONTONES TIPO III

TOTAL METRADO (M2)

06.08.00 CC F'c = 140 Kg/Cm2 + 50% P.G.


LARGO ANCHO AREA
FECHA DESCRIPCION N VECES REPETIC. ALTO (m) METRADO
(m) (m) (CAD)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO
6/13/2012 VACIADO DE SUB ZAPATA 1 0.65 37.44 24.34
6/18/2012 VACIADO DE LA ZAPATA D 1 7.25 3.65 0.75 19.85
ALEROS 2 4.00 2.65 0.75 15.90

PONTONES TIPO III

TOTAL METRADO (M3)


06.09.00 CC F'c = 175 Kg/Cm2 + 30% P.G.
LARGO ANCHO PROFUND
FECHA DESCRIPCION N VECES REPETIC. ALTO (m) METRADO
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO
6/22/2012 VACIADO DEL CUERPO DE 1 7.23 1.90 1.85 25.41
ALEROS 2 3.50 1.85 1.50 19.43

PONTONES TIPO III

TOTAL METRADO (M3)

06.10.00 C F'c = 210 Kg/Cm2


LARGO ANCHO PROFUND
FECHA DESCRIPCION N VECES REPETIC. ALTO (m) METRADO
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II

PONTONES TIPO III

TOTAL METRADO (M3)


06.11.00 C F'c = 280 Kg/Cm2
LARGO ANCHO PROFUND
FECHA DESCRIPCION N VECES REPETIC. ALTO (m) METRADO
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II

PONTONES TIPO III

TOTAL METRADO (M3)

06.12.00 ACERO DE REFUERZO F'y = 4200 Kg/Cm2

FECHA DESCRIPCION N VECES REPETIC.


LONGITUD 1/2" 5/8" 3/4" 1"
(m) (ml) (ml) (ml) (ml)
1.02 1.60 2.26 4.04
PONTONES TIPO I

PONTONES TIPO II
6/13/2012 ACERO PARA EL ANCLAJE 27 1.00
PONTONES TIPO III

06.13.00 RELLENO CON MATERIAL SELECCIONADO


LARGO ANCHO BASE PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL
(m) (m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II

PONTONES TIPO III

0.00

TOTAL METRADO (M3)

06.14.00 BARANDA METALICA


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II

PONTONES TIPO III

TOTAL METRADO (ML) : 0.00

06.15.00 TUBERIA PVC SAL 2"


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO
6/22/2012 TUBERIA PVC SAL 2" EN E 6 1.68 10.08

PONTONES TIPO III

TOTAL METRADO (ML) : 10.08

06.16.00 JUNTA ASFALTICA


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES METRADO SUBTOTAL TOTAL
(m) (m) (m)
PONTONES TIPO I
En Losa Principal

En Losa de Aproximac.

En Estribos
PONTONES TIPO II
En Losa Principal

En Losa de Aproximac.

En Estribos
PONTONES TIPO III
En Losa Principal

En Losa de Aproximac.

En Estribos

TOTAL METRADO (ML) : 0.00

METRADO DE PARTIDAS NUEVAS

CAMPAMENTO DE OBRA
FECHA DESCRIPCION N VECES REPET. LARGO (m) ALTURA (m) ANCHO (m) METRADO SUBTOTAL
PONTON SAMBOATO PROG. 12+180
6/1/2012 HABILITACION DE AMBIENTE P 1 6.00 4.00 24.00
6/2/2012 TECHADO DEL CAMPAMENTO 1 6.00 4.00 24.00
TOTAL METRADO (M2) :

DESMONTAJE DE FALSO PUENTE


FECHA DESCRIPCION N VECES REPET. LARGO (m) ALTURA (m) ANCHO (m) METRADO SUBTOTAL
PONTON PROG. 6+220 1 7.00 5.70 39.90

TOTAL METRADO (M2) :

ELIMINACION MANUAL DE MATERIAL EXCEDENTE


LARGO ANCHO PROFUND.
FECHA DESCRIPCION N VECES FACTOR METRADO TOTAL
(m) (m) (m)
PONTONES TIPO I

PONTONES TIPO II
PONTON SAMBOATO PROG. 12+120
6/4/2012 ELIMINACCION MANUAL D 1 4.00 3.70 0.30 1.20 5.33
6/5/2012 ELIMINACCION MANUAL D 1 7.30 3.70 0.30 1.20 9.72
6/6/2012 ELIMINACION DE MATERI 1 7.50 4.00 0.30 1.20 10.80
6/7/2012 ELIMINACION DE MATERI 1 7.30 3.70 0.30 1.20 9.72
6/8/2012 ELIMINACION DE MATERI 2 3.60 1.75 0.30 1.20 4.54
6/9/2012 ELIMINACION DE MATERI 2 3.50 0.90 0.30 1.20 2.27
6/11/2012 ELIMINACION DE MATERI 1 4.00 1.50 0.25 1.20 1.80
6/12/2012 ELIMINACION DE MATERI 2 3.75 2.60 0.30 1.20 7.02

PONTONES TIPO III


TOTAL METRADO (M3) : 51.20
TOTAL
76.60

SUBTOTAL

TOTAL METRADO (M3)


SUBTOTAL

0.00

0.00

TOTAL METRADO (M3)

SUBTOTAL

TOTAL METRADO (M3)


SUBTOTAL

TOTAL METRADO (M3)

METRADO
(Kg.)
TOTAL METRADO (KG)

TOTAL

0.00
TOTAL

48.00

TOTAL

39.90
RESUMEN DE GASTOS REALIZADOS EN PERSONAL

Afectaciones
Gastos. Gastos. Gastos. Exp. Afecto de Personal de
Descripcion Costo Directo Total Presupuestales de
Generales supervision Tecnico Municipio
Ejecucion por mes
Planilla AGOSTO S/. 26,354.57
Planilla de SETIEMBRE
Planilla de OCTUBRE
Planilla NOVIEMBRE
Planilla DICIEMBRE

Total

Gastos. Gastos. Gastos. Cap.


Montos de Planillas Costo Directo Total Saldo
Generales supervision Social

Presupuesto de Expediente Tecnico en


S/. 132,600.00 S/. 48,300.00 S/. 444,326.21 S/. 0.00 S/. 625,226.21 S/. 598,871.64
el Rubro de Personal

RESUMEN DE GASTOS REALIZADOS EN BIENES

Afectaciones
Gastos. Gastos. Gastos. Exp.
Descripcion Costo Directo Total Presupuestales de
Generales supervision Tecnico
Ejecucion por mes
B. AGOSTO S/. 0.00
B. SETIEMBRE
B. OCTUBRE
B. NOVIEMBRE
B. DICIEMBRE
B. Mayo
Total

Gastos. Gastos. Gastos. Cap.


Montos de Bienes Costo Directo Total Saldo
Generales supervision Social

Presupuesto de Expediente Tecnico en


S/. 1,500.00 S/. 350,245.20 S/. 351,745.20 S/. 351,745.20
el Rubro de Bienes

RESUMEN DE GASTOS REALIZADOS EN SERVICIOS

Afectaciones
Gastos. Gastos. Gastos. Cap.
Descripcion Costo Directo Total Presupuestales de
Generales supervision Social
Ejecucion por mes
S. Diciembre S/. 48,300.05
S. Enero
S. Febrero
S. Marzo
S. Abril
S. Mayo
Total

Gastos. Gastos. Gastos. Cap.


Montos de Bienes Costo Directo Total Saldo
Generales supervision Social
Presupuesto de Expediente Tecnico en
S/. 159,665.00 S/. 14,000.00 S/. 42,189.26 S/. 215,854.26 S/. 215,854.26
el Rubro de Servicios
FORMATO No 061

RESUMEN DEL MOVIMIENTO MENSUAL DE ALMACEN

CORRESPONDIENTE AL MES JUNIO - 2016.

MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS NIVEL PRIMARIO DE ANTUYO EN LA COMUNIDAD CAMPESINA DE ANTUYO
PROYECTO LLAYLLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

MONTO DE OBRA S/. 897,081.92 REGION : CUSCO


MONTO ASIGNADO S/. 200,000.00 DEPARTAMENTO : CUSCO
FECHA DE INICIO DE OBRA 6/6/2016 PROVINCIA :CHUMBIVILCAS
PLAZO DE EJECUCIN 4.5 MESES DISTRITO :LLUSCO
FECHA DE TERMINO 10/31/2016 LOCALIDAD : COMUNIDAD CAMPESINA DE ANTUYO - LLAYLLIMARCA.

AVANCES
PROGRAMADO SALDO
ANTERIOR ACTUAL AGOSTO ACUMULADO
ITEM MOVIMIENTO DE ALMACENES
S/. Valorizado % Valorizado % Valorizado % Valorizado %
S/. S/. S/. S/.
1 PROGRAMADO S/. 669,630.13 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 669,630.13 100.00%

TOTAL S/. 669,630.13 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 669,630.13 100.00%
* El costo de lo programado se refiere a lo formulado en el expediente tcnico.
MOVIMIENTO DIA A DIA - JUNIO DE 2016.
OBRA :
MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS NIVEL PRIMARIO DE ANTUYO EN LA COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

RESIDENTE: ARQTO: FREDY ALFARO HERRERA.


ALMACENERO:

INGRESO ACTUAL MES DE AGOSTO 2016


N DESCRIPCION UND. INGRESO DE MOVIMIENTO
MONTO EN
P.U. Saldo monto 18 19 20 21 22 23 24 25 26 27 28 29 30 TOTAL SALDO MATERIALES SALDO MONTO
MATERIALES SOLES.

Entrada 3.00 3 6.00


1 BARRETA EXAGONAL. UND 3.00 S/. 2.00 6.00 Salida 0 - 0.00 -
Saldo 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Entrada 10.00 10 135.00
2 CARRETILLA BUGUIS. UND 10.00 S/. 13.50 135.00 Salida 2.00 2 27.00 0.00 -
Saldo 10.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Entrada 10.00 10 2,480.00
3 CINCEL DE 1" * 30 CON PUNTA PLANA. UND 10.00 S/. 248.00 2,480.00 Salida 0 - 10.00 2,480.00
Saldo 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Entrada 2.00 2 12.00
4 COMBO DE 25 LIBRAS. UND 2.00 6.00 12.00 Salida 0 - 0.00 -
Saldo 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Entrada 2.00 2 516.00
5 COMBO DE 4 LIBRAS. UND 2.00 S/. 258.00 516.00 Salida 0 - 0.00 -
Saldo 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Entrada 200.00 200 59,520.00
6 CORDEL DE NYLON. MTS 200.00 S/. 297.60 59,520.00 Salida 100.00 100 29,760.00 0.00 -
Saldo 200.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Entrada 500.00 500 6,000.00
7 MANGUERA DE 3/4 REFORZADA. MTS 500.00 S/. 12.00 6,000.00 Salida 200 200 2,400.00 0.00 -
Saldo 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00
Entrada 100.00 100 450.00
8 MANGUERA DE NIVELACION. MTS 100.00 S/. 4.50 450.00 Salida 14 14 63.00 86.00 387.00
Saldo 86.00 86.00 86.00 86.00 86.00 86.00 86.00 86.00 86.00 86.00 86.00 86.00 86.00
Entrada 20.00 20 40.00
9 PALA CUCHARA - LAMPA. UND 20.00 S/. 2.00 40.00 Salida 8.00 8 16.00 12.00 24.00
Saldo 20.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
Entrada 20.00 20 120.00
10 PICO. UND 20.00 S/. 6.00 120.00 Salida 12.00 12 72.00 0.00 -
Saldo 20.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Entrada 5.00 5 105.00
11 WINCHA DE 5 METROS. UND 5.00 S/. 21.00 105.00 Salida 1.00 1 21.00 0.00 -
Saldo 5.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
Entrada 2.00 2 0.80
12 WINCHA DE 50 METROS. UND 2.00 S/. 0.40 0.80 Salida 1.00 1 0.40 0.00 -
Saldo 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Entrada 8.00 8 64.00
13 ARCHIVADOR LOMO ANCHO. UND 8.00 S/. 8.00 64.00 Salida 8.00 8 64.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 8.00 8 64.00
14 ARCHIVADOR LOMO DELGADO. UND 8.00 S/. 8.00 64.00 Salida 8.00 8 64.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 10.00 f 10 1.50
15 PAPEL BOND A4. MLL 10.00 S/. 0.15 1.50 Salida 0.00 5 5 0 10 1.50 0.00 -
Saldo 10.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 100.00 100 850.00
16 BINCAB CARD. UND 100.00 S/. 8.50 850.00 Salida 100 100 850.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 4.00 4 48.00
17 CUADERNO DE OBRA X 100 FOLIOS AUTOCOPIATIVO. UND 4.00 S/. 12.00 48.00 Salida 4.00 4 48.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 6.00 6 198.00
18 CUADERNO LORO A - 4 X 100 HOJAS. UND 6.00 33.00 198.00 Salida 6.00 6 198.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 1.00 1 15.00
19 ENGRAMPADOR GRANDE. UND 1.00 S/. 15.00 15.00 Salida 1.00 1 15.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 2.00 2 260.00
20 FILE MANILLA A4 COLOR AMARILLO. CTO 2.00 S/. 130.00 260.00 Salida 2.00 - 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 2.00 2 30.00
21 GRAPA ARTESCO 26/6X500. CJA 2.00 S/. 15.00 30.00 Salida 2.00 2 30.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 5.00 5 150.00
22 LAPICERO TINTA LIQUIDA COLOR NEGRO. UND 5.00 S/. 30.00 150.00 Salida 5.00 5 150.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 5.00 5 240.00
23 LAPICERO TINTA LIQUIDA COLOR AZUL. UND 5.00 S/. 48.00 240.00 Salida 5.00 5 240.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 3.00 3 58.50
24 LAPICERO TINTA LIQUIDA COLOR ROJO. UND 3.00 S/. 19.50 58.50 Salida 3.00 3 58.50 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 20.00 20 290.00
25 NOTAS DE SALIDA FOJA 50X4 AUTOCOPIADOS. UND 20.00 S/. 14.50 290.00 Salida 20.00 20 290.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 10.00 10 500.00
26 NOTAS DE ENTRADA FOJA 50X4 AUTOCOPIATIVO. UND 10.00 S/. 50.00 500.00 Salida 10.00 10 500.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 1.00 1 2.00
27 PERFORADOR GRANDE. UND 1.00 S/. 2.00 2.00 Salida 1.00 1 2.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 1.00 1 6.00
28 SACAGRAPAS ARTESCO. UND 1.00 S/. 6.00 6.00 Salida 1.00 1 6.00 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 30.00 30 1,395.00
29 BOTAS DE JEBE TALLA 39,40,41. PAR 30.00 S/. 46.50 1,395.00 Salida 12.00 - 0.00 -
Saldo 30.00 30.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
Entrada 2.00 2 93.00
30 CASCO COLOR BLANCO. UND 2.00 S/. 46.50 93.00 Salida 1.00 1 46.50 0.00 -
Saldo 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Entrada 15.00 15 540.00
31 CASCO DE SEGURIDAD DE COLOR AZUL. UND 15.00 S/. 36.00 540.00 Salida 0 - 30.00 1,080.00
Saldo 15.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Entrada 15.00 15 82.50
32 CASCO DE SEGURIDAD DE COLOR NARANJA. UND 0.00 S/. 5.50 - Salida 12.00 - 0.00 -
Saldo 0.00 15.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Entrada 8.00 8 196.00
33 CASCO DE SEGURIDAD DE COLOR VERDE. UND 0.00 S/. 24.50 - Salida 0 - 8.00 196.00
Saldo 0.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Entrada 30.00 30 165.00
34 CHALECOS DE SEGURIDAD DE COLOR ANARANJADO. UND 0.00 S/. 5.50 - Salida 12.00 12 66.00 18.00 99.00
Saldo 0.00 30.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
Entrada 50.00 50 275.00
35 GUANTES DE CUERO. PAR 0.00 S/. 5.50 - Salida 12.00 12 66.00 38.00 209.00
Saldo 0.00 50.00 38.00 38.00 38.00 38.00 38.00 38.00 38.00 38.00 38.00 38.00 38.00
Entrada 50.00 50 275.00
36 GUANTES DE JEBE DE ALBANIL TALLA N 9. PAR 0.00 S/. 5.50 - Salida 0 - 50.00 275.00
Saldo 0.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Entrada 20.00 20 50.00
37 LENTES DE SEGURIDAD. UND 0.00 S/. 2.50 - 8.00 20.00
37 LENTES DE SEGURIDAD. UND 0.00 S/. 2.50 - Salida 12.00 12 30.00 8.00 20.00
Saldo 0.00 20.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Entrada 3.00 3 15.00
38 ARNES. UND 0.00 S/. 5.00 - Salida 0 - 3.00 15.00
Saldo 0.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Entrada 0 -
39 - Salida 0 - 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 0 -
40 - Salida 0 - 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Entrada 0 -
41 - Salida 0 - 0.00 -
Saldo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SALDO TOTAL VALORIZADO S/. S/. 4,785.00
MUNICIPALIDAD DISTRITAL DE LLUSCO.
OBRA: INSTALACION DE SISTEMA DE RIEGO DE ASPERSION EN LA COMUNIDAD DE ORCCOMA ANEXO LARA.
RESIDENTE DE OBRA ARQTO: FREDY ALFARO HERRERA.
ALMACENERO:
SALDO VALORIZADO DE OBRA - JUNIO DE 2016.
SALDO ANTERIOR MOVIMIENTO DEL MES SALDO
CANTIDAD COSTO INGRESO EGRESO CANTIDAD COSTO
N DESCRIPCION UND. PRECIO
SALDO ANTERIOR COSTO CANT COSTO CANT COSTO SALDO SALDO
UNIT

1 BARRETA EXAGONAL. UND 0 0.00 3480.00 0.00 3556.00 0.00 1320.00 S/. 0.00

2 CARRETILLA BUGUIS. UND 0 0.00 6.00 0.00 102.00 0.00 0.00 S/. 0.00

3 CINCEL DE 1" * 30 CON PUNTA PLANA. UND 0 0.00 0.00 0.00 0.00 0.00 10.00 S/. 2,480.00

4 COMBO DE 25 LIBRAS. UND 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 0.00

5 COMBO DE 4 LIBRAS. UND 0 0.00 0.00 0.00 0.00 0.00 11.00 S/. 0.00

6 CORDEL DE NYLON. MTS 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 0.00

7 MANGUERA DE 3/4 REFORZADA. MTS 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 0.00

8 MANGUERA DE NIVELACION. MTS 0 0.00 0.00 0.00 2.00 0.00 100.00 S/. 387.00

9 PALA CUCHARA - LAMPA. UND 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 24.00

10 PICO. UND 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 0.00

11 WINCHA DE 5 METROS. UND 0 0.00 0.00 0.00 0.00 0.00 4.00 S/. 0.00

12 WINCHA DE 50 METROS. UND 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 0.00

13 ARCHIVADOR LOMO ANCHO. UND 0 0.00 0.00 0.00 3.00 0.00 13.00 S/. 0.00

14 ARCHIVADOR LOMO DELGADO. UND 0 0.00 0.00 0.00 0.00 0.00 2.00 S/. 0.00

15 PAPEL BOND A4. MLL 0 0.00 0.00 0.00 0.00 0.00 3.00 S/. 0.00

16 BINCAB CARD. UND 0 0.00 0.00 0.00 0.00 0.00 1.00 S/. 0.00

17 CUADERNO DE OBRA X 100 FOLIOS AUTOC UND 0 0.00 0.00 0.00 0.00 0.00 1.00 S/. 0.00

18 CUADERNO LORO A - 4 X 100 HOJAS. UND 0 0.00 0.00 0.00 0.00 0.00 2.00 S/. 0.00

19 ENGRAMPADOR GRANDE. UND 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 0.00

20 FILE MANILLA A4 COLOR AMARILLO. CTO 0 0.00 79.00 0.00 27.00 0.00 59.00 S/. 0.00

21 GRAPA ARTESCO 26/6X500. CJA 0 0.00 0.00 0.00 0.00 0.00 0.00 S/. 0.00

22 LAPICERO TINTA LIQUIDA COLOR NEGRO. UND 0 0.00 0.00 0.00 0.00 0.00 18.00 S/. 0.00

23 LAPICERO TINTA LIQUIDA COLOR AZUL. UND 0 0.00 0.00 0.00 16.00 0.00 0.00 S/. 0.00
0 0.00 80.00 0.00 28.00 0.00
24 LAPICERO TINTA LIQUIDA COLOR ROJO. UND 52.00 S/. 0.00
0 0.00 20.00 0.00 20.00 0.00
25 NOTAS DE SALIDA FOJA 50X4 AUTOCOPIA UND 0.00 S/. 0.00
0 0.00
26 NOTAS DE ENTRADA FOJA 50X4 AUTOCOPI UND 10.00 0.00 10.00 0.00 0.00 S/. 0.00
0 0.00
27 PERFORADOR GRANDE. UND 1.00 0.00 1.00 0.00 0.00 S/. 0.00
0 0.00
28 SACAGRAPAS ARTESCO. UND 1.00 0.00 1.00 0.00 0.00 S/. 0.00
0 0.00
29 BOTAS DE JEBE TALLA 39,40,41. PAR 30.00 0.00 30.00 0.00 0.00 S/. 0.00
0 0.00
30 CASCO COLOR BLANCO. UND 2.00 0.00 2.00 0.00 0.00 S/. 0.00
0 0.00
31 CASCO DE SEGURIDAD DE COLOR AZUL. UND 15.00 0.00 0.00 0.00 15.00 S/. 1,080.00
0 0.00
32 CASCO DE SEGURIDAD DE COLOR NARAN UND 15.00 0.00 0.00 0.00 0.00 S/. 0.00
0 0.00
33 CASCO DE SEGURIDAD DE COLOR VERDE UND 8.00 0.00 0.00 0.00 8.00 S/. 196.00
0 0.00
34 CHALECOS DE SEGURIDAD DE COLOR AN UND 30.00 0.00 12.00 0.00 18.00 S/. 99.00
0 0.00
35 GUANTES DE CUERO. PAR 50.00 0.00 0.00 0.00 50.00 S/. 209.00
0 0.00
36 GUANTES DE JEBE DE ALBANIL TALLA N 9 PAR 50.00 0.00 12.00 0.00 18.00 S/. 275.00
0 0.00
37 LENTES DE SEGURIDAD. UND 20.00 0.00 20.00 0.00 0.00 S/. 0.00
0 0.00
38 ARNES. UND 3.00 0.00 0.00 0.00 3.00 S/. 15.00
38 ARNES. UND 3.00 0.00 0.00 0.00 3.00 S/. 15.00

TOTAL S/. 4,765.00


RESUMEN DEL MOVIMIENTO MAQUINARIA DE OBRA N 01

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DEL NIVEL PRIMARIO C.C. ANTUYO LLAULLIMARCA DEL DISTRITO DE LLUSCO
Obra : CHUMBIVILCAS CUSCO

PRESUPUESTO DE OBRA S/. 1,345,976.03 REGION CUSCO


PRESUPUESTO BASE S/. 1,074,658.70 DEPARTAMENTO CUSCO
FECHA DE INICIO DE OBRA 6/6/2016 PROVINCIA CHUMBIVILCAS
PLAZO DE EJECUCIN 4.5 MESES DISTRITO LLUSCO
FECHA DE TERMINO 1/30/2015 LOCALIDAD COMUNIDAD CAMPESINA DE ANTUYO - LLAYLLIMARCA.

AVANCES
PROGRAMADO SALDO
ANTERIOR ACTUAL ACUMULADO
ITEM MAQUINARIA
S/. Valorizado % Valorizado % Valorizado % Valorizado %
S/. S/. S/. S/.

PROGRAMADO COSTO DIRECTO

1 VOLQUETE CANTER 5,200.00 0.00 0.00% 1,300.00 25.00% 1,300.00 25.00% 3,900.00 75.00%
2 CAMIONETA 19,500.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 19,500.00 100.00%

TOTAL 24,700.00 0.00 0.00% 1,300.00 5.26% 1,300.00 5.26% 23,400.00 94.74%
* El costo de lo programado se refiere al costo de la maquinaria requerida.
FORMATO No 01

CONTROL DE MOVIMIENTO DIARIO MENSUAL DE MAQUINARIA DE OBRA

OBRA :

FECHA DE PRESENTACIN: MES DE JUNIO


MAQUINARIA DE APOYO MAQUINA SECA

Dom Lun Mar Mie Jue Vie Sab Dom Lun Mar Mi Jue Vie Sb Dom Lun Mar Mi Jue Vie Sb Dom Lun Mar Mi Jue Vie Sb Dom Lun Mar TOTAL
ITEM MAQUINARIA DIAS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Comb. Hm DIAS
VOLQUETE CANTER Combustible 4 5 5 5 5 24
1
HM
MOTO LINEAL DE 150CC Combustible 1.5 1.5 1.5 1.5 6
3
HM
TOTAL 30

CUADRO RESUMEN DE COMBUSTIBLE

SALDO SALIDA SALIDA SALDO


DESCRIPCION UND
ACUM ACT ACUM ACT
PETROLEO D-2 GLN 245 19 19 226
GASOLINA GLN 44 6 6 38
CRONOGRAMA REAL DE OBRA POR ENTREGABLES

MEJORAMIENTO DE LA OFERTA DE LOS SERVICIOS EDUCATIVOS NIVEL PRIMARIO DE ANTUYO EN LA COMUNIDAD CAMPESINA DE ANTUYO LLAYLLIMARCA DEL DISTRITO DE LLUSCO CHUMBIVILCAS CUSCO

N DESCRIPCION COSTO 1 MES JUNIO 2 MES JULIO 3ER MES SETIEMBRE 4TO MES OCTUBRE 5TO MES ENERO 6TO MES NOVIEMBRE VALORIZACION
I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI XVII XVIII XIX XX XXI XXII XXIII XVI TOTAL

1 CONSTRUCCION DE MURO DE CONTENCION 214,158.71 0.00

2 OBRAS PROVISIONALES 2,408.84 1441.68 1441.68


59.85%

3 OBRAS PRELIMINARES 941.27 0.00

4 MOVIMIENTO DE TIERRAS 28,427.77 0.00

5 CONCRETO SIMPLE 165,074.00 0.00

6 VARIOS 6,478.91 0.00

7 FLETE TERRESTRE 10,827.92 0.00

8 CONSTRUCCION DE CERCO PERIMETRICO 471,511.27 0.00

9 OBRAS PRELIMINARES 3,729.25 0.00

10 MOVIMIENTO DE TIERRAS 15,010.08 0.00

11 CONCRETO SIMPLE 64,356.01 0.00

12 CONCRETO ARMADO 175,983.72 0.00

13 ZAPATAS 50,523.76 0.00

14 COLUMNAS 102,162.25 0.00

15 VIGAS DE CORONACION 23,297.71 0.00

16 ALBAILERIA 128,627.48 0.00

17 REVOQUES, ENLUCIDOS Y MOLDURAS 34,340.37 0.00

18 PINTURA 24,876.89 0.00

19 CARPINTERIA METALICA 4,800.00 0.00

20 VARIOS 3,500.00 0.00

21 FLETE TERRESTRE 16,287.47 0.00

22 INFRAESTRUCTURA DEPORTIVA CON GRASS ARTIFICIAL 0.00


388,988.72

23 OBRAS PROVISIONALES 1,441.68 0.00

24 OBRAS PRELIMINARES 3,518.73 0.00

25 MOVIMIENTO DE TIERRAS 35,512.01 0.00

0.00
26 OBRAS DE CONCRETO SIMPLE 45,308.58 0.00

27 REVOQUES, ENLUCIDOS Y MOLDURAS 1,173.70 0.00

28 PINTURAS 946.15 0.00

29 GRASS SINTETICO 85,655.04 0.00

30 SISTEMA DE DRENAJE 5,554.55 0.00

31 ILUMINACION DE CAMPO DEPORTIVO 9,172.55 0.00

32 COBERTURA CON PLANCHAS DE CALAMINA CURVOS 179,269.32 0.00

33 VARIOS 5,200.00 0.00

34 FLETE TERRESTRE 16,236.41 0.00

1441.68
COSTO DIRECTO 1,074,658.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PORCENTAJE DE AVANCE SEMANAL 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
836760.80503
COSTO DIRECTO 1,074,658.70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
GASTOS GENERALES (14.86%) 14.86% 159,665.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GASTOS DE SUPERVISION (5.66% ) 5.66% 60,877.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GASTOS DE EXPEDIENTE TECNICO (2.65%) 2.65% 28,464.83 0.00 0.00
GASTOS DE LIQUIDACION (2.08% ) 2.08% 22,310.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRESUPUESTO TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
GASTO 1er MES GASTO 2do MES GASTO 3er MES GASTO 4to MES GASTO 5to MES GASTO 6to MES
COSTO TOTAL 1,345,976.03 0.00 0 0 0 0.00 0
AVANCE MENSUAL 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
VALORIZACION
%

0.00%

59.85%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%
0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00
FORMATO No 08

AUXILIAR ESTANDAR

CORRESPONDIENTE AL MES AGOSTO


________________________________________ DISTRITO DE SANTO TOMAS - CHUMBIVILCAS - CUSCO"

MONTO DE OBRA S/. 1,345,976.03 DEPARTAMENTO : CUSCO


MONTO ASIGNADO : S/. 300,000.00 PROVINCIA : CHUMBIVILCAS
FECHA DE INICIO DE OBRA 8/5/2013 DISTRITO : SANTO TOMAS
PLAZO DE EJECUCIN 6 LOCALIDAD :
FECHA DE TERMINO

RESUMEN DE GASTOS FINANCIERO

DESCRIPCION AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE TOTAL


COSTO CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL S/. 26,354.57 0.00 0.00 0.00 S/. 26,354.57
COSTO CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES S/. 0.00 0.00 0.00 0.00 S/. -
COSTO CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS S/. 48,300.05 0.00 0.00 0.00 S/. 48,300.05
COSTO CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS S/. -
74654.62
S/. 74,654.62

MANIFIESTO DE GASTOS

SERVICIOS PRESTADOS DETALLE MONTO PERSONA NATURAL Y/O JURIDICA FECHA


GASTOS DE
PLANILLA DE PERSONAL MES DE AGOSTO
1 SUPERVISION S/. 26,354.57 M.P.CH 8/31/2014
S/. 26,354.57

SERVICIOS PRESTADOS DETALLE MONTO PERSONA NATURAL Y/O JURIDICA FECHA O/C N
GASTOS DE
ELABORACION DE EXPEDIENTE TECNICO EXPEDIENTE
1 TECNICO S/. 23,000.00 PEDRO HUARCAYA
S/. 23,000.00
Folio 24 de 25

F-13
CUADERNO DE OBRA
GENERALIDADES
a.- La recomendacin se base en las Resoluciones de contralora No 195-88-CG y 072-98-CG y la Directiva de Supervisin de Obras 010-02-MPC
b.- El Cuaderno debe estar legalizado antes del inicio de obra y foliado en todas sus hojas, debiendo ser correlativo los cuadernos siguientes
c.- Se debe aperturar el Cuaderno por el Residente en el primer Asiento de obra, esto por cada cuaderno utilizado.
e.- Se debe transcribir en el cuaderno, el Acta de Entrega de Terreno de Obra y El Acta de Inicio de Obra
f.- Se debe evitar enmendadura y borrones en los registros, dejar espacios en blanco excepto para la firma del Residente de Obra a la finalizacin
de cada asiento del da. CD
g.- El registro del cuaderno de obra es de forma diaria y durante el proceso de inicio y finalizacin del proyecto.
A la finalizacin de cada mes se debe transcribir los metrados ejecutados de cada mes, diferenciando por partidas programadas,
h.-
mayores metrados, partidas nuevas adicionales de ser el caso, para que la inspeccin de el visto bueno.
i.- Se debe formular en forma oportuna los adicionales de obra de acuerdo a las normas establecidas en el cuaderno de obra.
j.- A la conclusin de obra se debe registrar la valorizacin final del proyecto.
k.- Se debe transcribir el Acta de Terminacin de Obra.
I.- La Inspeccin de Obra registrara de forma correlativa los asientos; solamente efectuar un Asiento Provisional de Cuaderno de Obra por parte de la
Inspeccin solo en caso de fuerza mayor debiendo dejar el Residente de Obra el espacio donde corresponda en el cuaderno.
J.- Se adjunta el formato de registro del Cuaderno de Obra:
FORMATO DE REGISTRO DE CUADERNO DE OBRA
"NOMBRE DEL PROYECTO"
Asiento No..... DEL RESIDENTE DE OBRA Fecha: Da, mes y ao
1 PERSONAL DE OBRA
-Se debe registrar de forma detallada el personal con su categora y cantidad, debiendo desagregar en tem aparte cuando
a un convenio y aporte de beneficiarios esto de forma diaria, el mismo que debe coincidir con su planilla de reporte mensual
2 ALMACEN DE OBRA
-Se debe registrar de forma detallada el material, con su unidad y cantidad, adjunto con el nmero de nota de salida /entrada donde se registro el
movimiento.
-Se debe indicar la procedencia del material si es de transferencia, prstamo recibido y/o recibidos de otras obras, aporte beneficiarios
2.1 INGRESOS 2.1 SALIDA
100 Bls de cemento YURTA (prstamo Obra ......) N/I 3978 50 Blas de cemento YURTA (prstamo Obra ......) N/S 4978
023 m3 de Hormign de ro (Aporte Beneficiario) N/I 3980 13 m3 de Hormign de ro (Aporte Beneficiario) N/S 4980
-El movimiento registrado en el cuaderno de obra debe concordar con lo registrado en los formatos F-67
3 MOVIMIENTO DE MAQUINARIA
-Se debe registrar de forma detallada la maquinaria que se utilizada en obra de forma diaria de acuerdo al modelo siguiente:
Cantidad Equipo HM Combustible Actividad realizada
1 Motoniveladora Cat 120 4.5 10 gl petrleo Perfilado y compactado de base 00+10
-El movimiento registrado en el cuaderno de obra debe concordar con lo registrado en los formatos F-72 y los partes Diarios
-En caso de maquinaria alquilada se debe especificar su procedencia.
4.- MODIFICACIONES DEL PROYECTO
-Se debe indicar claramente las causales de forma detallada por partidas y su incidencia presupuestal debiendo ser de forma independiente
la formulacin de los Adicionales de Obra por mayores metrados, partidas nuevas y deductivos.
-Toda ejecucin de partidas adicionales debe contar con la opinin del proyectista, solicitudes por parte del Residente de Obra, autorizacin y
conocimiento de la Inspeccin de Obra y/o entidad debidamente registrado en el cuaderno de obra de estos actos.
-Se debe formular el Expediente Tcnico de acuerdo a las Resoluciones de contralora No 195-88-CG y 072-98-CG, para su trmite de aprobacin
por la Entidad, considerando que se debe adjuntar las copias de cuaderno de obra donde se tenga las solicitud del Residente de Obra y las
autorizaciones de la Inspeccin de Obra, de acuerdo al siguiente orden:
-Se tiene el siguiente orden del Expediente Tcnico de Modificaciones:
1.- Memoria Descriptiva 5.-Hoja de Metrados 10.-Presupuesto Analtico.
2.-Justificacin Tcnica con copias de 6.-Presupuesto de Obra 11.-Cronograma de Obra
cuaderno de obra 7.-Precios Unitarios 12.-Cronograma de Recursos
3.-Especificaciones Tcnicas 8.-Relacin de Insumos 13.-Planos.
4.-Memorias de Clculo 9-Frmula Polinmica
5.- CONTROL DE CALIDAD
-Se debe registrar las pruebas efectuadas en campo detalladamente con los antecedentes correspondientes indicando la ubicacin, estructura evaluada
compararlo con las normas establecidas, y los resultados obtenidos de acuerdo al forma F-10 del Informe Mensual de Obra.
6.- AVANCE DE OBRA
-Se debe registrar de forma detallada el avance indicando el nombre de actividad (Partida) con la descripcin de sus progresivas,ejes, segn sea
el tipo de obra considerando que equipo se utiliza, como el ejemplo siguiente:
Perfilado y compactado de la sub rasante con rodillo neumtico y motoniveladora en la progresiva 00+10 al 00+50 en una longitud de 400 ml y ancho de 20 ml
Vaceado de concreto fc 210 kg/cm2 de muro de sostenimiento de la cimentacin con mezcladora y vibradora de la progresiva 00+20 en una longitud
de 5m, ancho de 1.20 m y espesor de 0.50 m.
7.- METRADOS
-Se debe indicar el tipo de metrado a registrar: Programado, Mayor Metrado y Partidas Nuevas
-Se registrara el cdigo, nombre de la partida, unidad formulada del expediente tcnico y el metrado ejecutado del da, como ejemplo,
7.1 PROGRAMADO
04.02.03 Concreto fc 210 kg/cm2 losa 23 m2
7.1 MAYOR METRADO
04.02.03 Perfilado y compactado de sub rasante 450 m2
-Esta informacin debe ser compatible con lo formulado en el formato F-4 del Informe Mensual y la valorizacin correspondiente.
8.- OBSERVACIONES Y RECOMENDACIONES
-Se indica los problemas del proceso constructivo, logros, solicitudes, y otros que el Residente de Obra viera por conveniente.