DESIGN CODE GOOD ENGINEERING PRACTICE EQUIP NO E - 111 OPERATING CONDITIONS DESIGN CONDITIONS
FLUID CIRCULATED SHELL TUBE SHELL TUBE
VAP/CON/COOL/HEAT Steam Benzene TOTAL FLUID ENTERING kg/hr 20 495 PRESSURE (kg/cm2) 3.5 3.5 TOTAL FLUID VAPOUR kg/hr TEMPERATURE (C) 150 100 TOTAL FLUID LIQUID kg/hr 495 HYDRO TEST (kg/cm2) TOTAL FLUID STEAM kg/hr 20 AIR-TEST (kg/cm2) NON CONDENSATE kg/hr VACUUM TEST (mm Hg) FLUID CONDENSATE kg/hr HEAT TREATMENT STEAM CONDENSATE kg/hr RADIOGRAPHY LIQUID SP. GRAVITY 0.88 INSULATION Hot VISCOSITY C.P. 0.4 CORROSION ALLOWANCE (mm) SP. HEAT Kcal/Kg C 0.46 TUBE OD mm 20, sch 40 TH. COND. Kcal/mC hr 0.13 PITCH mm N.C SP. GRAVITY 0.0017 SHELL ID mm 40 NB, sch 40 GAS VISCOSITY C.P. 0.013 BAFFLE PITCH mm OR SP. HEAT Kcal/Kg C 0.48 CLEAN OVER COEFF (Kcal/hr m2C) VAP TH. COND. Kcal/m hrC 0.020 NO OF TUBES 2 turns HEAT LOAD Kcal / hr 10319 LENGTH TUBES (mm) 5000 OP. TEMP (INLET) C 134 30 NO OF PASSES Four Four OP. TEMP (OUTLET) C 134 80 BAFFLE TYPE OP. PRESSURE Kg / cm2 2.1 2 VERTICAL/HORIZON NO. OF PASSES Four Four 25%, 50% CUT VELOCITY m/s 0.45 PRESSURE DROP kg/cm2 Negligible Negligible ALLOWED/ACTUAL MATERIAL OF CONSTRUCTION FOULING FACTOR hrCm2/Kcal 4.010E-3 LMTD / C LMTD C 77 SHELL SA 106 GR B FILM COEFFICIENT Kcal/hrm2C SHELL COVER EXCHANGER AREA m2 0.84 CHANNEL CHANNEL COVER BELLOWS TUBE SHEET NOZZLE SCHEDULE NOZZLES SA 106 GR B NOZZLE FLANGES SA 105 NOZZLE SERVICE PIPE FLANGE BOLTS AND NUTS SA 193 GR B7 / SA 194 GR 2H NO QTY Nm Size THK LENG RTG TYPE GASKETS CAF N1 1 Benzene Out 20 Sch 40 200 ASA 150 RF TUBE SA 106 GR B N2 1 Benzene In 20 Sch 40 200 ASA 150 RF REINFORCEMENT N3 1 Cond Out 25 Sch 40 200 ASA 150 RF SUPPORTS N4 1 Steam In 25 Sch 40 200 ASA 150 RF SPACER &TIE RODS BAFFLES PARTITION IMPINGEMENT BAFF COUPLING & PLUG